SHEET INDEX:

VT101: INDEX, SUMMARY, GENERAL NOTES, RAIL FORCES, MEP REQUIREMENTS, WORK

BY OTHERS, NOTES

VT102: HOISTWAY PLANS AND MACHINE ROOM PLANS, HOISTWAY SECTION

ELEVATOR SUMMARY:

GARAGE ELEVATOR 1: 4000 POUNDS @ 150 FPM

GARAGE ELEVATOR 2: 4000 POUNDS @ 150 FPM

GENERAL NOTES:

1. THESE DRAWINGS ARE FOR GENERAL INFORMATION AND REFERENCE ONLY. THE

REQUIREMENTS OF INDIVIDUAL EQUIPMENT WILL VARY.

2. THESE DRAWINGS ARE INTENDED FOR DISTRIBUTION TO THE APPROPRIATE

CONSULTANTS AND ENGINEERS INCLUDING: ARCHITECT; STRUCTURAL, ELECTRICAL AND

MECHANICAL ENGINEERS.

3. FIELD VERIFY ALL DIMENSIONS.

4. ROUGH OPENING DIMENSIONS FOR ELEVATOR ENTRANCES APPLY ONLY IN CASES OF

MASONRY OR CONCRETE CONSTRUCTION.

POWER FEEDER REQUIREMENTS MAIN POWER SUPPLY: XXXX

ELEVATOR NUMBER CAPACITY

POUNDS

SPEED

FPM

SCR

HP

RATING

MG/PUMP UNIT

MOTOR

HP

STARTING

AMPS

FULL LOAD CURRENT

RUNNING

AMPS

ACCELER.

AMPS

MACH.RM BTUH

PER CAR

ELEVATOR 1

ELEVATOR 2

NOTES:

1. ELECTRIC POWER AND CURRENT ARE BASED ON THREE (3) PHASE A.C. POWER SUPPLY.

2. MAIN POWER TO BE PROVIDED AT EACH CONTROLLER THRU FUSED DISCONNECTING MEANS OR CIRCUIT

BREAKERS.

3. MAIN POWER SUPPLY DISCONNECTING MEANS TO BE SIZED TO LIMIT VOLTAGE DROP TO LESS THAN 5%.

4. USE COPPER CONDUCTORS ONLY.

5. DIVERSITY FACTORS (NATIONAL ELECTRIC CODE SECTION 430-26, SECTION 620-15) =

(2) CARS = 95% (3) CARS = 90% (4) CARS = 85% (5) CARS = 82% (6) CARS = 79% (7) CARS = 77%

(8) CARS = 75% (9) CARS = 73% (10) CARS = 72%

6. MACHINE ROOM TEMPERATURE TO BE MIN. 65 DEGREES F., MAX.85 DEGREES F.

7. RELATIVE HUMIDITY MAX. 85% NON CONDENSING.

8. THE SELECTION OF MAIN POWER SUPPLY DISCONNECTING MEANS TO BE SIZED IN ACCORDANCE WITH THE

NATIONAL ELECTRIC CODE, SECTION 620-51, ARTICLE 430-52 (EXCEPTIONS A, B, C).

9. PROVIDE LOCAL TELEPHONE SERVICE LINE TO EACH CAR CONTROLLER (IF APPLICABLE).

10. PROVIDE GFCI-PROTECTED PIT AND MACHINE ROOM OUTLETS.

ADDITIONAL POWER AND DISCONNECT REQUIREMENTS IN MACHINE ROOM

PEND

PEND

PEND

PEND

PEND

PEND

PEND

PEND

PEND

PEND

PEND

PEND

CAR LIGHT AND FAN WITH

LOCKABLE DISCONNECT

AUXILIARY SYSTEM

INTERCOM SYSTEM

(IF APPLICABLE)

SUPPLY TERMINAL SUPPLY VOLTAGE CIRCUIT CAPACITY

EACH CONTROLLER

AT AMPLIFIER

120-1-60

120-1-60

(20 AMP PER CAR)

1800 WATTS

(15 AMP MIN)

PERFORMED BY OTHER TRADES, "NOT IN ELEVATOR CONTRACT" (NIEC)

CODE ITEMS ARE BASED ON THE ASME A17.1 SEFETY CODE FOR ELEVATOR AND ESCALATORS. LOCAL JURISDICTIONS MAY VARY.

LEGAL HOISTWAY AND PIT:

PROVIDE CLEAR AND PLUMB ELEVATOR HOISTWAY WITH VARIATION NOT TO EXCEED 1" WITHIN 100 VERTICAL FEET AT ANY POINT. (GLASS)- GLASS HOISTWAY ENCLOSURE OF OBSERVATION TYPE ELEVATORS SHALL BE CONSTRUCTED OF LAMINATED GLASS CONFORMING TO THE REQUIREMENTS OF ANSI Z97.1. RECOMMEND SUBSTANTIALLY FLUSH HOISTWAY CONSTRUCTION. AVOID PROJECTIONS OR SETBACKS.

ENCLOSE WEB OF HOISTWAY FRAMING STEEL. LEDGES OR BEAMS ALONG THE REAR OR SIDE WALLS OF THE HOISTWAY, GREATER THAN 2" WIDE SHALL BE PROVIDED WITH BEVELED CANTS 75 DEGREES FROM THE HORIZONTAL. HOISTWAY DIVIDER BEAMS ARE EXEMPT. PROVIDE ADEQUATE STRUCTURAL SUPPORT FOR ATTACHMENT OF ELEVATOR CAR AND/OR COUNTERWEIGHT GUIDE RAILS. PROVIDE FOR VERTICAL ATTACHMENT SPACING AS NOTED ON ELEVATOR DRAWINGS. BUILDING SUPPORTS ARE NOT TO DEFLECT IN EXCESS OF 1/8" UNDER NORMAL CONDITIONS. PROVIDE DIVIDER BEAMS BETWEEN ADJACENT ELEVATORS. PROVIDE FOR VERTICAL ATTACHMENT SPACING AS NOTED ON

ELEVATOR DRAWINGS. DIVIDER BEAMS NEED NOT BE FIREPROOFED.

BUILDING SUPPORTS ARE NOT TO DEFLECT IN EXCESS OF 1/4" DURING SEISMIC CONDITIONS WITH 0.5G HORIZONTAL ACCELERATION.

INSTALL GUIDE RAIL BRACKET SUPPORTS IN CONCRETE AS REQUIRED. CONCRETE INSERTS OR IMBEDS, IF USED, WILL BE PROVIDED BY THE ELEVATOR CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR. VERIFY LOCATIONS ON ELEVATOR SHOP DRAWINGS. CUT AND PATCH WALLS, BEAMS AND FLOORS. PROVIDE WALL BLOCKOUTS FOR PUSH BUTTON STATIONS, HALL LANTERNS AND POSITION INDICATORS OR OTHER SIGNAL FIXTURES. VERIFY LOCATION AND SIZES OF BLOCKOUTS ON ELEVATOR SHOP DRAWINGS. GROUT AND PATCH AS REQUIRED. PROVIDE WALL POCKETS AND/OR STRUCTURAL BEAMS FOR ADEQUATE SUPPORT OF THE HOIST MACHINE, OVERHEAD SHEAVES AND DEAD END HITCH BEAMS. DEFLECTION OF BUILDING SUPPORT BEAMS SHALL NOT EXCEED 1/1666 OF SPAN UNDER STATIC LOADING.

(SHAFTWALL)- FOR SHAFTWALL CONSTRUCTION, ERECT THE FRONT HOISTWAY WALL AFTER ELEVATOR ENTRANCE FRAMES HAVE BEEN INSTALLED. (CONCRETE)- IF FRONT HOISTWAY WALLS ARE CONCRETE OR CONCRETE BLOCK, FORM OPENINGS 24" GREATER IN WIDTH AND 12" GREATER IN HEIGHT THAN THE CLEAR OPENING. GROUT ROUGH OPENING AFTER ELEVATOR ENTRANCE FRAMES HAVE BEEN INSTALLED.

PROVIDE SOUND ATTENUATING ASSEMBLIES FOR WALLS OF MACHINE ROOM AND/OR HOISTWAYS WHERE SOUND SENSITIVE AREAS ARE ADJACENT. PROVIDE A PIT ACCESS LADDER FOR EACH ELEVATOR THAT DOES NOT HAVE A WALK IN PIT. DRAINS CONNECTED DIRECTLY TO SEWERS SHALL NOT BE INSTALLED IN ELEVATOR PITS. SUMPS MAY BE INSTALLED. WHERE DRAINS ARE NOT PROVIDED TO PREVENT THE ACCUMULATION OF WATER, SUMP PUMPS SHALL BE PROVIDED. SUMPS IN PITS SHALL BE COVERED WITH COVERING LEVEL WITH PIT FLOOR.

WHERE THE DIFFERENCE IN LEVEL BETWEEN THE FLOORS OF ADJACENT PITS EXCEEDS 2'-0", PROVIDE A 6'-0" HIGH PIT DIVIDER SCREEN.

SCREENS SHALL EXTEND FROM THE PIT FLOOR TO 6'-0" ABOVE THE TOP RUNG OF ANY PIT ACCESS LADDER MOUNTED TO A HOISTWAY DIVIDER BEAM AND SHALL EXTEND 2'-0: HORIZONTALLY BEYOND THE LADDER. FOR WALK IN PITS, THE PIT DIVIDER SCREEN SHALL EXTEND FROM THE HIGHER PIT FLOOR TO 6'-0" ABOVE THE PIT FLOOR. PIT SCREEN SHALL REJECT A 2" BALL. PROVIDE AN ENCLOSURE NOT LESS THAN 6'-0" HIGH BETWEEN ADJACENT HOISTWAY PITS. ENCLOSURE SHALL REJECT A 2" BALL. WHERE A LADDER IS PROVIDED ON THE ENCLOSURE, THE ENCLOSURE SHALL EXTEND NOT LESS THAN 6 FT ABOVE THE TOP RUNG AND NOT LESS THAN 12 INCHES EACH SIDE OF THE SIDE RAILS.

PROTECT OPEN HOISTWAYS AND ELEVATOR ENTRANCES DURING CONSTRUCTION PER OSHA REGULATIONS. PROTECT CAR ENCLOSURE, ELEVATOR ENTRANCES AND SPECIAL FINISHES FROM DAMAGE AFTER INSTALLATION. IF ELEVATOR HOISTWAY EXTENDS THROUGH MORE THAN 2 FLOORS PROVIDE MIN. 3 SF OF SMOKE VENTING PER ELEVATOR, OR 3.5% OF THE TOTAL HOISTWAY AREA, WHICHEVER IS GREATER.

RECOMMEND APPLICATION OF NORMALLY CLOSED VENT WITH MANUALLY ACTIVATED MOTORIZED DAMPER. PROVIDE ACCESS TO DAMPER MOTOR FROM OUTSIDE THE BOUNDS OF THE HOISTWAY AND ELEVATOR MACHINE ROOM. PROVIDE FLOORING FOR ELEVATOR CARS AS

SPECIFIED.

STANDBY POWER PROVISIONS:

(TRACTION)- PROVIDE STANDBY POWER OF THE SAME VOLTAGE CHARACTERISTICS OF NORMAL POWER VIA THE NORMAL FEEDERS TO RUN ONE ELEVATOR IN EACH GROUP AND/OR SINGLE ELEVATOR UNIT AT FULL RATED SPEED. PROVIDE A TRANSFER SWITCH WITH 2 DRY CONTACTS AND CONDUCTORS TO A SINGLE ELEVATOR CONTROL PANEL IN EACH GROUP AND /OR SINGLE ELEVATOR AS DESIGNATED BY ELEVATOR CONTRACTOR. ONE CONTACT SHALL INDICATE THE PRESENCE OF STANDBY POWER. THE TRANSFER SWITCH SHALL PROVIDE AN ADJUSTABLE TIME DELAY OF APPROXIMATELY 20 - 45 SECONDS FOR A PRE-TRANSFER SIGNAL IN EITHER DIRECTION. PROVIDE SINGLE PHASE POWER TO EACH CAR CONTROLLER FOR LIGHTING, CAR EXHAUST BLOWER, CAR EMERGENCY CALL BELL AND CAR INTERCOM AMPLIFIERS.

ELEVATORS REQUIRED FOR USE DURING CONSTRUCTION MUST COMPLY WITH ALL ELEVATOR AND FIRE/LIFE SAFETY CODES.

LEGAL MACHINE ROOM:

PROVIDE REINFORCED MACHINE ROOM FLOOR CAPABLE OF SUPPORTING STATIC LOADS IMPOSED BY THE ELEVATOR EQUIPMENT, WITH THE EXCEPTION OF TRACTION ELEVATOR HOIST MACHINES. FLOORS SHALL SUSTAIN A CONCENTRATED LOAD OF 300 POUNDS ON ANY 4 SQUARE INCH AREA. ERECT WALL ENCLOSURES AT MACHINE ROOM LEVEL AFTER MACHINE OR PUMP UNIT IS SET IN PLACE. PROVIDE SOUND ATTENUATION MATERIALS IN WALLS ADJACENT TO TENNANT SPACES. PROVIDE BLOCKOUTS THROUGH MACHINE ROOM FLOOR, SECONDARY FLOOR AND/OR WALLS FOR HOIST ROPES, HYDRAULIC OIL LINES AND ELECTRICAL WIRING DUCTS. VERIFY LOCATIONS ON ELEVATOR SHOP DRAWINGS. PROVIDE SELF CLOSING, SELF LOCKING MACHINE ROOM AND MACHINERY SPACE ACCESS DOOR OR GATE. KEYING MUST BE INDEPENDENT OF ANY OTHER BUILDING LOCKS. DOOR OR GATE SHALL BE OPERABLE FROM INSIDE WITHOUT A KEY. PROVIDE SOUNDPROOF DOORS WHERE ACCESS IS PROVIDED FROM ADJACENT TENANT SPACE. PROVIDE MINIMUM 3'-0" X 7'-0" DOOR. - PROVIDE MACHINE ROOM VENTILATION AND HEATING. MAINTAIN MINIMUM TEMPERATURE OF 65° F. AND MAXIMUM 85° F. MAINTAIN MAXIMUM 85% RELATIVE HUMIDITY, NON-CONDENSING. OUTSIDE OF LOS ANGELES, CA., HVAC UNIT MAY BE LOCATED WITHIN THE BOUNDS OF THE MACHINE ROOM, IF SOLELY FOR THE HEATING AND COOLING OF THAT MACHINE ROOM. REFER TO THE ELEVATOR DRAWINGS FOR MINIMUM CLEAR HEADROOM UNDER MACHINE ROOM CEILING AND/OR ANY ENCROACHING BEAM. (INCLUDING FIREPROOFING). CODE MINIMUM HEADROOM IS - PROVIDE A SELF CLOSING, AND SELF LOCKING 30" X 30" MAXIMUM GOVERNOR ACCESS DOOR. PROVIDE STEEL VERTICAL ACCESS LADDER AND PLATFORM AS REQUIRED. PLATFORM SHALL SUPPORT A CONCENTRATED LOAD OF 300 POUNDS ON ANY 4 SQ. IN. AREA, AND A LIVE LOAD OF NOT LESS THAN 125 POUNDS/SQ. FT. ACCESS PLATFORM GRATING SHALL REJECT A 3/4" DIAMETER BALL. PROVIDE A 42" HIGH GUARDRAIL AND 4" TOE BOARDS PER CODE. HIGH GUARDRAIL AND 4" TOE BOARDS PER CODE. MACHINE ROOM ENCLOSURES AND ACCESS DOORS SHALL HAVE A FIRE ENDURANCE OF AT LEAST EQUAL TO THAT REQUIRED FOR THE HOISTWAY ENCLOSURE AND THE HOISTWAY DOORS, ONLY EQUIPMENT USED IN CONJUNCTION WITH THE FUNCTION OF THE ELEVATOR SHALL BE PERMITTED IN THE ELEVATOR MACHINE ROOM. ACCESS THROUGH THE ELEVATOR MACHINE ROOM SPACES TO ADJACENT ROOMS OR AREAS SHALL NOT BE PERMITTED. A PERMANENT, SAFE AND CONVENIENT

ACCESS TO MACHINE SPACES SHALL BE PROVIDED FOR AUTHORIZED PERSONNEL.

ELECTRICAL SERVICES:

PROVIDE PIT AND MACHINE ROOM LIGHTING AND GFCI PROTECTED ELECTRICAL OUTLET. PROVIDE ADEQUATE LIGHTING TO MAINTAIN MINIMUM 10 FOOT CANDLES ILLUMINATION ON THE PIT FLOOR AND 20 FOOT CANDLES ILLUMINATION AT THE MACHINE ROOM FLOOR, CONTROL ROOM FLOOR AND SECONDARY MACHINERY SPACES. - PROVIDE 3-PHASE MAINLINE FUSED DISCONNECT SWITCH (OR CIRCUIT BREAKER) FOR EACH ELEVATOR. SWITCH SHALL BE LOCKABLE IN "OPEN" POSITION. PROVIDE POWER FEEDERS FROM DISCONNECT TO EACH ELEVATOR CONTROLLER. PROVIDE AUXILIARY DISCONNECTS AND FEEDERS IN MULTIPLE MACHINE ROOM LEVELS. VERIFY CONTROLLER LOCATIONS ON ELEVATOR SHOP DRAWINGS. PROVIDE LEGAL CLEARANCE AROUND DISCONNECTS. PROVIDE SINGLE PHASE POWER FEEDERS TO EACH CAR CONTROLLER FOR LIGHTING AND EXHAUST BLOWER INCLUDING ADEQUATE CIRCUIT BREAKER FOR 2400 WATTS PER ELEVATOR. VERIFY CONTROLLER LOCATION ON ELEVATOR SHOP DRAWINGS. PROVIDE SINGLE PHASE POWER FEEDER AND CIRCUIT BREAKER FOR 3600 WATTS TO EACH GROUP ELEVATOR CONTROL PANEL IN EACH MACHINE ROOM AS DESIGNATED BY ELEVATOR CONTRACTOR. PROVIDE EMERGENCY CAR TELEPHONE CONNECTION TO EACH INDIVIDUAL ELEVATOR CONTROLLER IN MACHINE ROOMS.

FOR HYDRAULIC ELEVATORS, PROVIDE TWO "NORMALLY OPEN" AUXILIARY CONTACTS INSTALLED IN EACH MAIN LINE DISCONNECT SWITCH IN THE ELEVATOR MACHINE ROOM. PROVIDE SMOKE DETECTORS (NFPA NO. 72) IN EACH ELEVATOR LOBBY. PROVIDE IN TOP OF HOISTWAY AND MACHINE ROOM TO INITIATE FIREFIGHTERS RETURN FEATURE. MAIN LOBBY FLOOR DETECTOR TO BE INDIVIDUALLY ZONED. SUPPLY 2 DRY CONTACTS AND DETECTOR WIRES TO EACH ELEVATOR GROUP CONTROLLER IN EACH ELEVATOR MACHINE ROOM. PROVIDE TEMPORARY POWER DURING CONSTRUCTION OF THE SAME CHARACTERISTICS AS PERMANENT POWER TO INSTALL, TEST AND ADJUST ELEVATOR

EQUIPMENT.

RAIL FORCES MAXIMUM ON EACH GUIDE RAIL (FORCES ARE IN KIPS)

ELEVATOR NUMBER

NOTES:

BUILDING SUPPORTS TO RESIST HORIZONTAL FORCES WITH A TOTAL DEFLECTION AT POINT OF SUPPORT NOT IN

EXCESS OF 1/8" DURING NORMAL CONDITIONS.

* THESE REACTIONS DO NOT OCCUR SIMULTANEOUSLY WITH PIT BUFFER REACTIONS.

** BUILDING SUPPORTS FOR GUIDE RAIL ATTACHMENT SHALL RESIST HORIZONTAL FORCES WITH A TOTAL DEFLECTION NOT IN EXCESS OF 1/4" BASED UPON 0.5G ACCELERATION DURING SEISMIC CONDITIONS.

ELEVATOR 1 ELEVATOR 2 OCCURING ON

NO

RM

AL

F

OR

CE

S

SE

IS

MI

C

FO

RC

ES

CAR NORMAL FACE OF

MAIN RAIL

CAR NORMAL SIDE OF MAIN RAIL -

LOADING OR RUNNING

FORCE TRANSMITTED TO PIT STRUCTURE AT

CAR SAFETY APPLICATION*

CAR SEISMIC** FACE OF MAIN RAIL

CAR SEISMIC** SIDE OF MAIN RAIL

- LOADING OR RUNNING

CWT SEISMIC** FACE OF CWT RAIL

R1 .K .K

R2 .K .K

CAR R3 N/A N/A

.K .KR1

.K .K

R1 N/A N/A

FORCE TRANSMITTED TO PIT STRUCTURE AT

CWT SAFETY APPLICATIONCWT R3 N/A N/A

R2

R2

CW

T

CA

R

N/A N/A CWT SEISMIC** SIDE OF CWT RAIL

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

12/18/2019

ARCHITECTURAL - ELEVATOR

INFORMATION

A/E DESIGN TO DEVELOP RFP FOR

PARKING STRUCTURE

VA NORTHERN CALIFORNIA HEALTHCARE SYSTEM

Checker Author

612-165

VT101

FINAL DESIGN BUILD

PROPOSAL PACKAGE

Revisions: Date:

35% SCHEMATIC DESIGN (SD1) 08/15/2019

DESIGN BUILD PROPOSAL PACKAGE 10/11/2019

FINAL DESIGN BUILD PROPOSAL PACKAGE 12/18/2019

ADJACENT TO HOISTWAY

PA

P1

PA.1

PA.5

P0

19'

- 4

9' - 4"

9' - 4"

8" 8' -

0" 8"

8" 8' -

0" 8"

2' - 8"

4' - 0"

2' - 8"

2' - 8"

4' - 0"

2' - 8"

4' - 8"

4' - 8"

4' - 8"

4' - 8"

6' - 11"

1 3/4" 6' - 3" 6 1/4"

HYDRAULIC

CYLINDER

SU

BM

ER

SI

BL

E

PO

W

ER

U

NI

T

SU

BM

ER

SI

BL

E

PO

W

ER

U

NI

T

CL

EA

R

HO

IS

TW

AYCL

EA

R

CL

EA

R

PL

AT

FO

RM

PL

AT

FO

RM

CL

EA

R

CL

EA

R

OP

EN

IN

G

OP

EN

IN

G

VT102

ELEVATOR

LOBBY

ELEVATOR

EQUIPMENT

ROOM

42" MIN CLEARANCE REQ.

38" W X 84" H, MIN. ACCESS DOOR

LIGHT SW.

42" MIN CLEARANCE REQ.

1' - 6"

A T

P

IP

E O

U

TL

E T

CIRCULATION

1' - 6"

A T

P

IP

E O

U

TL

E T

CIRCUIT

BREAKER

MICROPROGRESSOR CONTROL

38"W. X 32 3/8" H

MICROPROGRESSOR CONTROL

38"W. X 32 3/8" H

42" MIN CLEARANCE REQ.

PER N.E.C.

2" MI. AIR

CIRCULATION

6'-6" MIN.

EL

BASEMENT

0"

EL

GROUND TIER

11' - 4"

EL

FOUNDATION

-1' - 0"

EL

SECOND TIER

22' - 8"

EL

STAIR ROOF

32' - 8"

EL

ELEVATOR MACHINE

ROOM

37' - 8"

4' - 0"

7'-0

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

12/18/2019

ARCHITECTURAL - ELEVATOR

PLANS

A/E DESIGN TO DEVELOP RFP FOR

PARKING STRUCTURE

VA NORTHERN CALIFORNIA HEALTHCARE SYSTEM

MA CR

612-165

VT102

FINAL DESIGN BUILD

PROPOSAL PACKAGE

TRUE

NORTH

PLAN

NORTH

1/4" = 1'-0"

1 HOISTWAY AND MACHINE ROOM PLAN

1. PROVIDE 8"X8" BLOCKOUT FOR HYDRAULIC OIL LINE AND

6"X6" BLOCKOUT FOR ELECTRICAL CONDUIT FOR EACH

ELEVATOR. VERIFY LOCATIONS WITH ELEVATOR

CONTRACTOR.

2. VERIFY PATH OF OIL LINE WITH ELEVATOR CONTRACTOR.

3. PROVIDE SELF-CLOSING, SELF LOCKING MACHING ROOM

ACCESS DOOR.

4. PROVIDE LIGHTING TO MAINTAIN MINIMUM 10 FOOTCANDLES

ILLUMINATION AT MACHINE ROOM FLOOR.

5. PROVIDE LIGHTS, LIGHT SWITCHES AND GFCI PROTECTED

UTILITY OUTLETS, COORDINATE LOCATIONS WITH ELEVATOR

CONTRACTOR.

6. MCAHING ROOM HEAT EMMISSIONS: - BTUH TOTAL FOR

ELEVATORS.

7. LAYOUT OF EQUIPMENT IS REPRESENTATIONAL ONLY.

ACTUAL EQUIPMENT LAYOUT AND LOCATIONS OF LOADS WILL

VARY FROM THAT SHOWN BASED ON ACTUAL VENDOR

LAYOUT.

Revisions: Date:

35% SCHEMATIC DESIGN (SD1) 08/15/2019

DESIGN BUILD PROPOSAL PACKAGE 10/11/2019

FINAL DESIGN BUILD PROPOSAL PACKAGE 12/18/2019

1/4" = 1'-0"

2 ELEVATOR SECTION

PROVIDE STRUCTURAL SUPPORT INCLUDING

DIVIDER BEAMS FOR CAR RAIL FASTENING AT -'-"

MAX. VERTICAL SPACING THRU TOP OF HOISTWAY.

IF SPACING BETWEEN SUPPORTS CANNOT BE

MAINTAINED AS NOTED, PROVIDE INTERMEDIATE

SUPPORT BEAMS OR CONTINUOUS VERTICAL

STRUCTURE BETWEEN FLOOR BEAMS.

ELEVATOR CONTRACTOR TO PROVIDE

GUARDRAIL ON TOP OF ELEVATOR PER

ELEVATOR CODE

DEDUCT ALTERNATE 1

DELETE ONE (1) ELEVATOR

REFER TO COMMENTS ON SHEET SE410

ELECTRICAL GENERAL NOTES GENERAL NOTES - DEMOLITION

SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING

THE LIFE SAFETY AND INFECTION CONTROL REQUIREMENTS LOCATED WITHIN

THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS

THEY ARE A DIRECT PART OF THIS SECTION AND AS IF THEY WERE DIRECTLY

INCLUDED AND PROVIDED BELOW.

EQUIVALENCY SUBSTITUTIONS:THE “BASIS OF DESIGN (BOD) PROTOCOLS” IS

TO BE FOLLOWED FOR ALL EQUIPMENT, MATERIALS AND ASSEMBLIES

SPECIFIED AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION

SECTIONS, WHETHER THE BOD DESIGNATE IS SPECIFICALLY REFERENCED

THEREIN OR NOT. SEE THE GENERAL DRAWINGS SECTION FOR THE FULL

BOD EQUIVALENCY SUBSTITUTION REQUIREMENTS AND PROTOCOLS TO BE

FOLLOWED.

1. CODES: THE WORK SHALL COMPLY WITH ALL APPLICABLE LOCAL,

MUNICIPAL, STATE, NATIONAL CODES, AND ALL VA APPLICABLE DESIGN

MANUALS STANDARDS REQUIREMENTS. WHERE THE CONSTRUCTION

DOCUMENTS INDICATE MORE RESTRICTIVE REQUIREMENTS THE

CONSTRUCTION DOCUMENTS SHALL GOVERN. HOWEVER, THE

CONSTRUCTION DOCUMENTS SHALL NOT BE INTERPRETED AS AUTHORITY

TO VIOLATE ANY CODE OR REGULATION. ALL WORK, MATERIAL, AND

EQUIPMENT SHALL COMPLY WITH ALL REQUIREMENTS OF THE LATEST

EDITIONS AND INTERIM AMENDMENTS OF THE NATIONAL ELECTRICAL CODE

(N.E.C.), NATIONAL ELECTRICAL SAFETY CODE, OSHA, AND ALL

APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES ALONG

WITH ALL DESIGN CRITERIA STANDARDS AND REQUIREMENTS. ALL

ELECTRICAL EQUIPMENT PROVIDED UNDER THIS CONTRACT SHALL BE

NEW (EXCEPT WHERE OTHERWISE NOTED) AND SHALL BEAR THE MARK

OF NATIONALLY RECOGNIZED TESTING LABORATORY, WHEN APPLICABLE.

ALL EQUIPMENT OF THE SAME TYPE AND CAPACITY SHALL BE BY THE

SAME MANUFACTURER.

2. DRAWINGS AND SPECIFICATIONS: THE CONTRACTOR SHALL BE

RESPONSIBLE FOR READING AND COMPLYING WITH BOTH THE DRAWINGS

AND SPECIFICATIONS. IN THE EVENT OF A CONFLICT OR INCONSISTENCY

BETWEEN THE DRAWINGS, NOTES, SPECIFICATIONS, OR CODES, THE

REFERENCE WHICH PROVIDES THE MORE COMPLETE OR HIGHER

STANDARD SHALL PREVAIL UNLESS OTHERWISE CLARIFIED BY THE VA/CO

AND/OR THE VA/COR. CONTRACTOR SHALL REVIEW ENTIRE SET OF

CONTRACT DOCUMENTS: INCLUDING BUT NOT NECESSARILY LIMITED TO

ALL ARCHITECTURAL, ALL STRUCTURAL, ALL MECHANICAL, ALL ELECTRICAL,

ALL PLUMBING, AND ENTIRE SPECIFICATIONS. CONTRACTOR SHALL

ACKNOWLEDGE AND INCLUDE IN THE SCOPE OF WORK (CONTRACT) ALL

CONDITIONS PERTINENT TO THE COMPLETION OF THE ELECTRICAL WORK.

CONTRACTOR SHALL FULLY COORDINATE ELECTRICAL WORK WITH THE

INSTALLATION OF WORK BY ALL OTHER TRADES AND MAKE NECESSARY

FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE ELECTRICAL

INSTALLATION. ALL OF THE ABOVE SHALL BE INCLUDED IN THE BASE

SCOPE OF WORK AT NO ADDITIONAL COST TO THE VA.

3. INTERPRETATION OF THE DOCUMENTS: CAREFULLY COMPARE THE

DRAWINGS AND SPECIFICATIONS, CHECKING MEASUREMENTS AND

CONDITIONS UNDER WHICH THIS INSTALLATION IS TO BE MADE. FOR

CLARIFICATION BETWEEN VARIOUS DRAWINGS, BETWEEN DRAWINGS OR

SPECIFICATION, OR BETWEEN SECTIONS OF THE SPECIFICATION, THE

MATTER SHALL BE REFERRED TO THE VA/COR FOR CLARIFICATION AND

APPROVAL BEFORE ANY WORK IS EXECUTED. THE CONTRACTOR SHALL

STATE IN THEIR PROPOSAL ANY EXCEPTIONS NECESSARY TO MAKE THIS

A COMPLETE, READY TO USE INSTALLATION. IF NOT STATED IN THEIR

BID, IT WILL NOT BE CONSIDERED EXTRA. ALL WORK SHALL BE DONE

IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, IN A NEAT AND

WORKABLE MANNER CONSISTENT WITH INDUSTRY RECOGNIZED GOOD

PRACTICE, AND SHALL BE SUBJECT TO THE APPROVAL OF THE VA/COR.

ANY CHANGES TO THE CONTRACT REQUIREMENTS MUST BE APPROVED

PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL KEEP UP-TO-DATE

AS-BUILT DRAWINGS, ON-SITE, AVAILABLE, INCLUDING ALLOWABLE

DEVIATIONS FROM THE CONTRACT DRAWINGS.

4. ELECTRICAL DRAWINGS: THE ELECTRICAL DRAWINGS ARE DIAGRAMMATIC

AND SHALL NOT BE SCALED. THE CONTRACTOR SHALL DETERMINE THE

EXACT LOCATION OF ALL DOORS, WALLS, FURNITURE, EQUIPMENT, ETC..

THE LOCATION OF RACEWAY SYSTEM COMPONENTS IS SCHEMATIC. THE

EXACT LOCATION OF RACEWAY SYSTEM COMPONENTS SHALL BE

DETERMINED BY THE CONTRACTOR IN THE FIELD. THE CONTRACTOR

SHALL CONFIRM THE DIMENSIONS OF THE ACTUAL EQUIPMENT TO BE

SUPPLIED FOR THIS PROJECT, VERIFY CLEARANCES AND ROUGH-INS,

AND OBTAIN ALL APPROVALS PRIOR TO STARTING WORK.

5. SITE EXAMINATION: BEFORE SUBMITTING A BID, THE CONTRACTOR

SHALL VISIT THE SITE, EXAMINE THE PREMISES, AND MAKE A THOROUGH

SURVEY OF THE EXISTING CONDITIONS. THIS VISIT SHALL ONLY BE

ALLOWED AS PER THE VA SCHEDULED WALK THROUGH. THE SUBMISSION

OF A BID WILL BE CONSTRUED AS EVIDENCE THAT SUCH A VISIT HAS

BEEN MADE. NO CONSIDERATION OR ALLOWANCE WILL BE GRANTED FOR

FAILURE TO VISIT THE SITE OR FOR LATER CLAIMS FOR LABOR,

EQUIPMENT, MATERIALS REQUIRED, OR FOR DIFFICULTIES ENCOUNTERED

WHICH COULD HAVE BEEN FORESEEN HAD SUCH VISIT BEEN MADE.

CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND

SPECIFICATIONS, VISIT THE SITE OF THE WORK, AND FULLY INFORM

THEM SELF AS TO ALL CONDITIONS AND MATTERS THAT CAN, IN ANY

WAY, AFFECT THE WORK OR THE COST THEREOF. SHOULD THIS

CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM, THE

DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS OR BE IN DOUBT AS

TO THEIR MEANING, NOTIFY THE VA/COR AT ONCE, IN WRITING, OF ANY

DISCREPANCIES BETWEEN EXISTING CONDITIONS AND NEW WORK, OR

BETWEEN ELECTRICAL WORK AND THE WORK OF OTHER TRADES. OBTAIN

CLARIFICATION(S) PRIOR TO SUBMITTING ANY BID. LACK OF SUCH

NOTIFICATION SHALL BE CONSTRUED TO INDICATE NO DISCREPANCIES OR

CONFLICTS EXIST. ADDITIONAL COMPENSATION WILL NOT BE GRANTED

AFTER AWARD OF CONTRACT FOR ANY WORK REQUIRED TO COMPLY WITH

THESE REQUIREMENTS.

6. COORDINATION WITH OTHER TRADES: THE ELECTRICAL CONTRACTOR

SHALL OBTAIN A COMPLETE SET OF GENERAL, ARCHITECTURAL AND

ENGINEERING DOCUMENTS AND COORDINATE WITH MECHANICAL,

PLUMBING, ARCHITECTURAL, AND OTHER TRADES FOR EXACT DIMENSIONS,

CLEARANCES, ROUGH-IN LOCATIONS, AND OTHER ADDITIONAL SCOPES OF

WORK THAT MAY NOT BE SHOWN ON THE ELECTRICAL PLANS. THE

ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL 120 VOLT

(AND HIGHER) AC POWER TO OTHER TRADES EQUIPMENT AND

HARDWARE. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, CONTROLS,

FIRE AND SECURITY SYSTEMS, MOTORIZED DOORS, DAMPERS, LIFTS, AND

OTHER SYSTEMS. UNLESS SPECIFICALLY NOTED OTHERWISE ON THE

ELECTRICAL PLANS, THE ELECTRICAL CONTRACTOR SHALL FURNISH ALL

SAFETY DISCONNECT SWITCHES TO MECHANICAL EQUIPMENT. THE

CONTRACTOR SHALL CHECK ALL ARCHITECTURAL, STRUCTURAL, AND

MECHANICAL TRADES WORK FOR POSSIBLE INTERFERENCE CAUSED BY

CONDITIONS IN THE FIELD, BEFORE THE BID IS MADE. NO ALLOWANCE

SHALL SUBSEQUENTLY BE MADE TO THE CONTRACTOR BY REASON OF

HIS FAILURE TO HAVE MADE SUCH EXAMINATIONS OR OF ANY ERROR OF

THEIR PART.

7. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR SCHEDULING

DELIVERY, RECEIVING, UNLOADING, UNCRATING, STORING SETTING IN

PLACE, AND PROTECTING FROM DAMAGE, VANDALISM, THEFT OR WEATHER

DURING CONSTRUCTION FOR ALL NEW EQUIPMENT FURNISHED BY THE

ELECTRICAL CONTRACTOR. CONTRACTOR SHALL PAY ALL PERMIT FEES,

PLAN REVIEW FEES, LICENSE FEES, INSPECTIONS AND TAXES APPLICABLE

TO THIS DIVISION IF NECESSARY. (FEDERAL GOVERNMENT IS NOT

SUBJECT TO LOCAL PERMITS OR FEE FOR THE PROJECT).

8. FIRE STOPPING: ALL PENETRATIONS IN WALL, FLOOR OR CEILINGS SHALL

BE SUITABLY CLOSED UP AND SEALED WITH AN INTUMESCENT FIRE

STOPPING COMPOUND LISTED IN THE MOST RECENT FACTORY MUTUAL

RESEARCH CORPORATION (FMRC) APPROVAL GUIDE. WHEN NEW

CABLES/CONDUITS PENETRATE EXISTING FIRE RATED WALL, PENETRATIONS

SHALL BE SEALED TO MATCH EXISTING RATING TO ENSURE IT RETAIN

EXISTING CONDITIONS. THE BOD FOR FIRE STOPPING PRODUCTS SHALL

BE AS MANUFACTURED BY THE 3M CO.

9. PAINTING: ALL NEWLY INSTALLED EXPOSED PIPING SHALL BE PAINTED

TO MATCH THE ADJACENT WALL OR CEILING SURFACE UNLESS THE

REQUIRED COLOR CODING IS SPECIFIED.

10. VA FURNISHED EQUIPMENT: EQUIPMENT THAT WILL BE FURNISHED BY

THE VA WILL BE INDICATED ON A SCHEDULE OR BE INCLUDED IN

SPECIFIC NOTES OR SPECIFICATIONS. THE CONTRACTOR SHALL

COORDINATE WITH THE VA/COR FOR DELIVERY SCHEDULES. THE

CONTRACTOR IS TO ASSUME THAT ON SITE STORAGE MAY NOT BE

AVAILABLE WHEN COORDINATING DELIVERY OF EQUIPMENT. THE

CONTRACTOR, IN COORDINATION WITH THE VA/COR, WILL INSPECT THE

DELIVERY FOR ACCURACY AND SHIPMENT DAMAGE AND ACCEPTING THE

EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE TO STORE,

PROTECT, AND ULTIMATELY INSTALL THE EQUIPMENT.

11. ELECTRICAL SERVICE DISRUPTIONS: ANY WORK INVOLVING A TASK

WHICH EXPOSES ACTIVE BUS SHALL BE PERFORMED AFTER HOURS

(11:00PM TO 5:00AM). THIS RESTRICTION INCLUDES REMOVING THE

COVER FROM ANY PANEL BOARD, SWITCHBOARD, M.C.C. ETC.. ALL WORK

WHICH EXPOSES ACTIVE BUS REQUIRES A WRITTEN NOTIFICATION TO THE

VA/COR WHICH WILL OUTLINE THE METHOD OF PROCEDURE FOR THE

WORK. THE CONTRACTOR SHALL PROVIDE A MINIMUM OF 2 WEEKS

NOTICE TO THE VA/COR BEFORE WORKING ON ANY ENERGIZED

ELECTRICAL SYSTEM. ALL POWER DISRUPTION SHALL OCCUR AT TIMES

AND OF DURATIONS ACCEPTABLE TO THE VA/COR.

12. EQUIPMENT: ALL MATERIALS AND EQUIPMENT USED IN THIS

INSTALLATION SHALL BE NEW, AND HAVE THE APPROPRIATE UL LISTING

AND LABEL. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL,

TOOLS, EQUIPMENT SERVICES, AND ACCESSORIES FOR COMPLETE

INSTALLATION OF ALL ELECTRICAL WORK AS NOTED. ITEMS OMITTED FROM

EITHER THE SPECIFICATIONS OR THE DRAWINGS, BUT SHOWN OR

DESCRIBED IN ONE OR THE OTHER, AND ITEMS NECESSARY TO MAKE

THE ELECTRICAL SYSTEM COMPLETE AND WORKABLE SHALL FORM A

PART OF THE WORK

13. MISCELLANEOUS SUPPORTING MEMBERS: ALL ANGLES CHANNELS,

AND OTHER MISCELLANEOUS STEEL, BOLTS, RODS, ETC.. REQUIRED TO

SUPPORT LIGHT FIXTURE, CONDUIT, RACEWAY, LADDER TRAY, OR OTHER

ELECTRICAL EQUIPMENT OR DEVICES SHALL BE FURNISHED AND

INSTALLED BY THE CONTRACTOR. ANY MENTION OF A SPECIFIC VOLTAGE

ON THE ELECTRICAL DRAWINGS SHALL NOT RELIEVE THE ELECTRICAL

CONTRACTOR OF THE RESPONSIBILITY TO VERIFY THE VOLTAGE PRIOR TO

PURCHASING OR ROUGH-IN WORK.

14. SAFETY: CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO

ENSURE THE SAFETY OF THE VA'S EMPLOYEES, BUILDING EMPLOYEES

AND GUESTS, AS WELL AS THEIR OWN FORCES, BY ADEQUATELY

PROTECTING ANY EXPOSED LIVE CONDUCTORS, OR DEVICES THROUGHOUT

THE COURSE OF THIS WORK.

15. EQUIPMENT CONNECTIONS: PROVIDE FINAL CONNECTIONS FOR ALL

EQUIPMENT FURNISHED UNDER OTHER DIVISIONS AND FOR ALL VA

FURNISHED EQUIPMENT. PROVIDE A FLEXIBLE LIQUID TIGHT CONNECTION

TO ALL VIBRATION PRODUCING EQUIPMENT.

16. TEMPORARY LIGHTING, POWER, FIRE, AND SAFETY:PROVIDE TEMPORARY

LIGHTING AND POWER AS REQUIRED IN AREAS UNDERGOING WORK

DURING CONSTRUCTION. FURNISH AND INSTALL ONE OSHA APPROVED

PIGTAIL SOCKET WITH 150-WATT LAMP FOR EVERY 500 SQUARE FEET

OF FLOOR SPACE AND A MINIMUM 1 PER ROOM. THE TEMPORARY

LIGHTING SHALL BE LEFT IN PLACE UNTIL PERMANENT LIGHTING IS

COMPLETELY OPERATIONAL. FURNISH AND INSTALL POWER OUTLETS TO A

TOTAL OF ONE FOR EVERY 2000 SQUARE FEET OR PART THEREOF OF

FLOOR AREA. THESE SHALL BE 15 AMP, SINGLE PHASE RECEPTACLES

FOR EITHER 110 OR 220 VOLTS AS DIRECTED BY THE GENERAL/PRIME

CONTRACTOR. COORDINATE FOR ADDITIONAL TEMPORARY POWER

REQUIREMENTS WITH OTHER TRADES AND PROVIDE AN ADEQUATE

INSTALLATION. COMPLY WITH NFPA 241 FOR SAFEGUARDING DURING

CONSTRUCTION AND ALTERATION OPERATIONS. IN ADDITION, ANY

OPENINGS IN FIRE RATED SEPARATIONS BETWEEN OCCUPIED AND

UNOCCUPIED (OR OPERATIONAL AND NON-OPERATIONAL) AREAS SHALL

BE SEALED AT THE END OF EACH WORK DAY WITH AN APPROPRIATE

FIRE RATED ENCLOSURE OR SEALANT. DO NOT COMPROMISE EXISTING

SECURITY OR FIRE ALARM SYSTEMS SERVING THE OCCUPIED OR

OPERATIONAL AREAS. DURING CONSTRUCTION THE CONTRACTOR SHALL AT

ALL TIMES MAINTAIN ELECTRICAL UTILITIES OF THE BUILDING WITHOUT

INTERRUPTION. SHOULD IT BE NECESSARY TO INTERRUPT ANY

ELECTRICAL SERVICE OR UTILITY, THE CONTRACTOR SHALL SECURE

PERMISSION IN WRITING FROM THE VA/COR FOR SUCH INTERRUPTION AT

LEAST 2 WEEKS IN ADVANCE. ANY INTERRUPTION SHALL BE MADE WITH

THE MINIMUM AMOUNT OF INCONVENIENCE TO THE VA AND ANY

SHUT-DOWN TIME SHALL HAVE TO BE ON A PREMIUM TIME/AFTER

HOURS BASIS AND SUCH TIME TO BE INCLUDED IN THE CONTRACTOR'S

BID. CONTRACTOR SHALL PROVIDE ALL NECESSARY TEMPORARY LIGHTING

AND POWER FOR ALL TRADES DURING CONSTRUCTION AND REMOVE IT

AT COMPLETION OF WORK. CONTRACTOR SHALL ESTABLISH SAFE

WORKING PROCEDURES FOR THE PROTECTION OF THE WORKMEN IN ALL

PHASES OF WORK, COMPLYING WITH THE APPLICABLE PROVISIONS OF

ALL CITY, STATE, AND FEDERAL SAFETY LAWS (OSHA), AND AS

RECOMMENDED IN THE "MANUAL OF ACCIDENT PREVENTION IN

CONSTRUCTION" AS ISSUED BY THE ASSOCIATION OF GENERAL

CONTRACTORS OF AMERICA, INC., 20TH AND E. STREETS, N.W.

WASHINGTON, D.C.

17. POWER COORDINATION: THE CONTRACTOR SHALL PERFORM ALL

COORDINATION AND SCHEDULING OF LOCAL POWER OUTAGES REQUIRED

WITH THE VA/COR. ALL NEEDED POWER OUTAGES TO BE SCHEDULED

WITH THE VA/COR TWO WEEKS IN ADVANCE.

18. CABLING: BRANCH CIRCUITS TO RECEPTACLES, LIGHTING AND MISC.

SMALL LOADS (15 OR 20 AMP CIRCUITS), UNLESS SPECIFICALLY NOTED

OTHERWISE, SHALL BE 2 - #12, 1 - #12 GRD., 3/4" C. A SEPARATE

NEUTRAL SHALL BE RUN FOR EACH CIRCUIT. SEE WIRE SIZING TABLE.

ALL WIRE SIZE #12 AWG AND LARGER SHALL BE STRANDED AND SOLID

FOR #14 AND SMALLER. EACH BRANCH CIRCUIT HOMERUN SHALL

HAVE NO MORE THAN THREE CIRCUITS. EACH BRANCH CIRCUIT HOMERUN

SHALL HAVE A SEPARATE GREEN INSULATED EQUIPMENT GROUNDING

CONDUCTOR. ALL CONDUCTORS SHALL BE COPPER TYPE THWN / XHHW.

19. CABLING SIZES: BRANCH CIRCUIT CABLE SIZING SHALL BE ADJUSTED

BASED ON THE VALUES INDICATED IN THE WIRE SIZING TABLE.

20. SPECIAL LUG REQUIREMENTS: ANY CABLE WHICH TERMINATES

DIRECTLY ON TO A BUS BAR SHALL BE 2 BOLT LONG BARREL TYPE

WITH INSPECTION HOLES PRODUCED WITH NON FLASHING TYPE DYES

WITH THE BOD AS MANUFACTURED BY THOMAS AND BETTS, OR

EQUIVALENT MINIMUM 10 TONS OF COMPRESSION, HEX CRIMP. THE USE

OF HEAT SHRINK TUBING IS EXPLICITLY FORBIDDEN. THERE SHALL BE

NO "SHINERS" AT THE LUGS.

21. RACEWAYS: ALL WIRE SHALL BE INSTALLED IN THIN WALL (E.M.T.)

CONDUIT UNLESS OTHERWISE NOTED. MINIMUM SIZE SHALL BE 3/4"

EXCEPT FOR DROPS FOR DEVICES, SWITCH LEGS, TEMPERATURE

CONTROL CONDUITS, AND WHERE INDICATED OR AS CALLED FOR ON THE

DRAWINGS. ALL THINWALL FITTINGS SHALL BE OF THE STEEL

COMPRESSION GLAND TYPE. ALL UNDERFLOOR, UNDERGROUND OR

EXPOSED-TO-WEATHER CONDUIT SHALL BE HEAVYWALL GALVANIZED RIGID

STEEL. (G.R.S.), MINIMUM 3/4". ALLCONDUIT FASTENERS, STRAPS,

SUPPORTS ETC. MUST BE "BOLT-ON" GALVANIZED STEEL ON EXPOSED

CONSTRUCTION AND IN WET AREAS. SNAP-ON BLACK METAL "CADDY"

CLIPS IN METAL PARTITION WALLS AND ABOVE SUSPENDED CEILINGS

WILL BE PERMITTED. ALL FASTENERS, STRAPS, CLIPS, ETC. SHALL BE

UL LISTED FOR THEIR USE. SUPPORT CONDUIT WITH THE BOD OF

UNISTRUT P1000 AND 3/8" THREADED ROD 8'-0" O.C. MAX. PROVIDE

MYERS HUBS OR EQUAL FOR ALL CONDUIT TO ENCLOSURE

CONNECTIONS. ALL CONDUIT RACEWAYS SHALL BE CONCEALED IN OR

WITHIN: WALLS, CEILING CAVITY, ROOF CONSTRUCTION (WHERE

APPROVED), SLAB, GRADE, ETC. UNLESS OTHERWISE NOTED. ANY

RACEWAY THAT IS TO BE ROUTED EXPOSED SHALL BE APPROVED BY

THE VA/COR AND SUCCESSFULLY REVIEWED BY THE ARCHITECT/ENGR.

PRIOR TO INSTALLATION. ALL CONDUIT SHALL BE ROUTED PARALLEL OR

PERPENDICULAR TO WALLS AND STRUCTURAL MEMBERS WITH 90° BENDS

WHERE REQUIRED AND SHALL BE RACKED. PULL AND JUNCTION BOXES

SHALL BE HELD TO A MINIMUM. CONTRACTOR SHALL INSTALL ALL WORK

IN NEAT & INDUSTRY RECOGNIZED MANNER OF BEST PRACTICES.

GROUND ALL CONDUITS, MOTORS, AND EXPOSED NON-CURRENT

CARRYING METAL PARTS OF ELECTRICAL EQUIPMENT IN ACCORDANCE

WITH ALL PROVISIONS WITH THE LATEST EDITION OF THE NATIONAL

ELECTRICAL CODE. VA SPECIFICATION SECTION 26 05 26 "GROUNDING

AND BONDING ELECTRICAL SYSTEM". CONTRACTOR SHALL PROVIDE

BOXES, JUNCTION BOXES, SPLICE BOXES AND FITTINGS WHERE

NECESSARY OR REQUIRED BY THE NEC. ALL ELECTRICAL CONDUITS TO A

MINIMUM OF 3/4". MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES

AND TYPES OF EMERGENCY AND NORMAL BRANCH WIRING DEVICES

SHALL HAVE DIVIDERS BETWEEN DEVICES. PROVIDE COLOR RED CONDUIT

FOR FIRE ALARM. WHERE CORE DRILLING AND CUTTING OF FLOORS OR

WALLS IS REQUIRED, X-RAY THE AREAS PRIOR TO DRILLING. AVOID

INTERFERENCE WITH EXISTING CONCEALED ELECTRICAL, PLUMBING

INSTALLATIONS REINFORCING STEEL. REFINISH DAMAGED AND CUT

SURFACES TO MATCH ADJACENT FINISHES. CONTRACTOR SHALL

FIREPROOF ALL CONDUIT OPENINGS BETWEEN FLOORS AND ANY

INTERSPACE FIRE SEPARATION BLOCK WALLS WITH A VA/COR APPROVED

U.L. LISTED FIRE RETARDANT MATERIAL, AS SUCCESSFULLY REVIEWED BY

THE ARCHITECT/ENGINEER.

22. LIGHTING: ALL FINAL LOCATIONS AND ARRANGEMENTS OF LIGHTING

FIXTURES SHALL BE OBTAINED FROM THE ARCHITECTURAL DRAWINGS AND

REFLECTED CEILING PLAN.

23. RECEPTACLES: CONTRACTOR SHALL VERIFY ALL OUTLET MOUNTING

ARRANGEMENTS, HEIGHTS AND LOCATIONS WITH THE ARCHITECTURAL

DRAWINGS PRIOR TO ROUGH-IN. ANY MENTION OF A SPECIFIC

MOUNTING ARRANGEMENT, HEIGHT OR LOCATION SHALL NOT RELIEVE THE

CONTRACTOR OF THE RESPONSIBILITY TO VERIFY THE SPECIFIC

REQUIREMENT WITH THE EQUIPMENT FURNISHED OR THE OTHER TRADES

WORKING IN THE SAME AREA. NO ADDITIONS TO THE CONTRACT SUM

WILL BE PERMITTED FOR OUTLETS IN WRONG LOCATIONS, IN CONFLICT

WITH OTHER WORK ETC. THE VA RESERVES THE RIGHT TO RELOCATE

ANY DEVICE 10'-0" PRIOR TO ROUGH-IN WITHOUT ANY ADDITIONAL

CHARGES BY THE CONTRACTOR.

OUTLET BOXES MOUNTED BACK-TO-BACK IN THE SAME WALL ARE

PROHIBITED. A MINIMUM 24" CENTER-TO-CENTER LATERAL SPACING

SHALL BE MAINTAINED BETWEEN BOXES.

ALL THE EMERGENCY POWER OUTLETS SHALL BE RED IN COLOR.

24. GUARANTEE: ALL EQUIPMENT FURNISHED AND WORK PERFORMED UNDER

THE CONTRACT DOCUMENTS SHALL BE GUARANTEED AGAINST DEFECTS IN

MATERIALS OR WORKMANSHIP FOR A PERIOD AS PER VA SPECIFICATION,

UNLESS OTHERWISE NOTED. ANY FAILURE OF EQUIPMENT OR WORK DUE

TO DEFECTS IN MATERIALS OR WORKMANSHIP SHALL BE CORRECTED BY

THE CONTRACTOR AT NO COST TO THE VA.

25. FINAL INSPECTION: ALL THE ITEMS AND WORK SHALL BE TESTED FOR

SAFE AND PROPER OPERATIONS.

26. UPON COMPLETION OF THE WORK, THE ELECTRICAL CONTRACTOR SHALL

REVIEW AND CHECK THE ENTIRE PORTION OF WORK, CLEAN EQUIPMENT

AND DEVICES, REMOVE SURPLUS MATERIALS AND RUBBISH FROM THE

VA'S PROPERTY, LEAVING THE WORK IN NEAT AND CLEAN ORDER AND IN

COMPLETE WORKING CONDITION. THE ELECTRICAL CONTRACTOR SHALL BE

RESPONSIBLE FOR REMOVAL OF ANY CARTON, DEBRIS, ETC. FOR

EQUIPMENT INSTALLED BY THIS CONTRACTOR INCLUDING EQUIPMENT

FURNISHED BY THE VA. THE ABOVE SHALL ALSO APPLY TO ALL

EQUIPMENT FURNISHED BY OTHERS AND UNPACKED OR REMOVED FROM

CARTON, BY THE CONTRACTOR.

NOTES:

1. ALL DIMENSIONS ARE CONSIDERED FROM FINISHED FLOOR AND, UNLESS NOTED OTHERWISE, SHALL

NOT VARY. RAISED FLOORS SHALL BE CONSIDERED FINISHED FLOOR.

2. ALL DIMENSIONS SHALL BE COORDINATED WITH ARCHITECTURAL DETAILS AND MAY BE ADJUSTED TO

CONFORM WITH ARCHITECTURAL REQUIREMENTS AS LONG AS NO CODE RESTRICTION IS VIOLATED.

3. OUTLETS INSTALLED LOWER THAN 15" AFF (FORWARD REACH) AND 9" AFF (SIDE REACH) ARE IN

VIOLATION OF ADA.

SPECIAL NOTES:

1. EXIT SIGNS SHALL NOT BE INSTALLED IN A MANNER THAT THE SIGN WILL BLOCK FIRE ALARM VISUAL

AS NOTED ON DRAWINGS.

EXCEPTION: 44" MAXIMUM TO TOP ABOVE COUNTERS

DEVICES.

16" TO BOTTOM OF BOX OR AS NOTED ON

ABOVE COUNTERS WHICH ARE 20"-25"D.

48" TO HIGHEST OPERABLE PART (SIDE OR FORWARD

ACCESS).

2. FOR LIGHTING FIXTURES MOUNTING HEIGHTS SEE SCHEDULE AND DRAWINGS.

16" TO BOTTOM OF BOX.

COUNTERS WHICH ARE 20"-25"D.

EXCEPTION: 44" MAXIMUM TO TOP ABOVE

90" TO CENTERLINE OF SIGN OR CENTERED IN WALL

48" TO CENTERLINE OF BOX MINIMUM (TOILETS).

66" TO CENTERLINE OF BOX MAXIMUM (SHOWERS -

LOCATED OUT OF SPRAY AREA).

AREA BETWEEN TOP OF DOOR AND CEILING.

80" TO CENTERLINE OF DEVICE OR 6" BELOW

CEILING, WHICHEVER IS LOWER.

48" TO CENTERLINE OF BOX.

EXCEPTION: 44" MAXIMUM TO TOP ABOVE COUNTERS

WHICH ARE 20"-25"D.

80" TO BOTTOM OF DEVICE OR NOT MORE THAN

96" TO TOP.

FIRE ALARM VISUAL ONLY DEVICE OR A

COMBINATION AUDIBLE AND VISUAL DEVICE

NOT LESS THAN 90" TO TOP OR 6"

BELOW CEILING, WHICH EVER IS

HIGHER.

48" TO CENTERLINE OF BOX - NOT MORE

THAN 5'-0" FROM EXIT.

54" TO DIAL CENTER (NON-ACCESSIBLE).

48" TO HIGHEST OPERABLE PART (ACCESSIBLE).

12" CEILING TO CENTERLINE OR 7'-0" TO

CENTERLINE IF CEILING IS OVER 8'-0".

DISCONNECT SWITCHES, MOTOR STARTERS,

MOTOR PUSH BUTTON STATIONS

MOUNTING HEIGHTSDEVICE

"A" FT.

NOTES:

1. TABLES ARE BASED ON EVENLY DISTRIBUTED LOAD ALLOWING A 3% VOLTAGE DROP AT LAST OUTLET.

2. 480V MOTOR BRANCH CIRCUIT CONDUCTORS SHALL BE #12 AWG IN 3/4" C UNLESS OTHERWISE NOTED.

3. SIZE OF CONDUCTORS ARE BASED UPON EACH MOTOR BEING FED WITH SEPARATE CONDUIT. IF CONDUCTORS

FOR TWO MOTORS (MAX.) ARE TO BE COMBINED IN ONE CONDUIT, INCREASE THE SIZE OF CONDUCTORS AND

CONDUITS PER NATIONAL ELECTRICAL CODE (NEC), TO COMPENSATE FOR CONDUCTOR DE-RATING.

4. PROVIDE DEDICATED NEUTRAL FOR EACH CIRCUIT.

LIGHT SWITCHES, WALL MOUNTED

OCCUPANCY

SENSORS

WALL MOUNTED EXIT SIGNS

CEILING MOUNTED EXIT SIGNS

RECEPTACLES

SPECIAL OUTLETS OR

RECEPTACLES

PLUGMOLD OR WIREMOLD

CLOCK OUTLETS

DATA/COMMUNICATION OR TELEPHONE OUTLETS

TELEPHONE OUTLETS - WALL TYPE

FIRE ALARM MANUAL PULL STATIONS

FIRE ALARM AUDIBLE ONLY DEVICE

WALL MOUNTED REMOTE INDICATOR LIGHT

AREA OF REFUGE TELEPHONE

CALL FOR AID SWITCH WITH PULL CHAIN TO FLOOR

CARD READER

INTERCOM STATION

SOUND SYSTEM VOLUME CONTROL

MICROPHONE OUTLETS

THERMOSTATS

TEMPERATURE/HUMIDITY SENSORS

60" TO CENTER LINE OF BOX.

54" TO HIGHEST OPERABLE PART (SIDE ACCESS).

48" HIGHEST OPERABLE PART (FORWARD ACCESS).

16" TO BOTTOM OF BOX.

54" TO HIGHEST OPERABLE PART (SIDE ACCESS).

48" HIGHEST OPERABLE PART (FORWARD ACCESS).

54" TO HIGHEST OPERABLE PART (SIDE ACCESS).

48" HIGHEST OPERABLE PART (FORWARD ACCESS).

SAME AS TELEPHONE - ACCESSIBLE.

16" TO BOTTOM OF BOX.

80" TO BOTTOM FIXTURE.

60" TO CENTERLINE.

IF DISTANCE (A+B) IN

FEET IS: (SEE DIAGRAM

AT RIGHT)

FOR 120V-20A BRANCH CIRCUITS ONLY (UNLESS NOTED OTHERWISE)

USE COPPER WIRE IN METALLIC

DRAWINGS. EXCEPTION: 44" MAXIMUM TO TOP

CONDUIT, AWG SIZE AS FOLLOWS

ON ENTIRE CIRCUIT AND SIZE

CONDUIT ACCORDINGLY.

#12 AWG (MIN.)

WHICH ARE 20"-25"D.

#10 AWG

#8 AWG

#6 AWG (MAX.)

LAST

ON

CIRCUIT

FIRST ON

CIRCUIT.

PANELBOARD

1/2 WIRE LENGTH FROM FIRST

TO LAST RECEPTACLE OR

LIGHTING FIXTURE ON CIRCUIT.

FOR 277V-20A BRANCH CIRCUITS ONLY (UNLESS NOTED OTHERWISE)

PANELBOARD

LAST

ON

CIRCUI

T.

1/2 WIRE LENGTH FROM FIRST

TO LAST LIGHTING FIXTURE ON

CIRCUIT.

#12 AWG (MIN.)

#10 AWG

#8 AWG

#6 AWG (MAX.)

0' TO 100'

100' TO 175'

175' TO 300'

300' TO 450'

USE COPPER WIRE IN METALLIC

CONDUIT, AWG SIZE AS FOLLOWS

ON ENTIRE CIRCUIT AND SIZE

CONDUIT ACCORDINGLY.

FIRST

ON

CIRCUIT

"B" FT.

"B" FT.

"A"

FT.

IF DISTANCE (A+B) IN

FEET IS: (SEE DIAGRAM

AT RIGHT)

0' TO 250'

250' TO 400'

400' TO 700'

700' TO 1000'

MOUNTING HEIGHTS FOR ELECTRICAL DEVICES

WIRE SIZING TABLE

27. PROVIDE CONDUITS JUNCTION BOXES COLOR FOR VARIOUS SYSTEM

120/208V (NP) - SILVER. 120/208V (LS/CR) - ORANGE

277/480V - YELLOW, LIGHTING - WHITE. LIGHTING CONTROL -

PURPLE.

AS FOLLOW:

CARD READER / CAMERA - PINK. NURSE CALL - SIPHON GREEN.

1. EXAMINATION

A. THE CONTRACTOR SHALL VISIT THE SITE AND

EXAMINE AREAS UNDERWHICH THE WORK IS TO BE

PERFORMED AND NOTIFY THE OWNER IN WRITING OF

ANY CONDITIONS DETRIMENTAL TO THE PROPER AND

TIMELY COMPLETION OF THE WORK. CONTRACTOR

SHALL NOT PROCEED WITH WORK UNTIL

SATISFACTORY CONDITIONS HAVE BEEN

CORRECTED.

B. VERIFY FIELD MEASUREMENTS AND CIRCUITING

ARRANGEMENTS FOR DEVICES SHOWN ON

DRAWINGS.

C. DEMOLITION DRAWINGS ARE BASED ON FIELD

OBSERVATION AND EXISTING RECORD DRAWINGS.

REPORT DISCREPANCIES TO OWNER BEFORE

DISTURBING EXISTING INSTALLATION. CONTRACTOR

SHALL COORDINATE WITH OWNER FOR ANY

HIDDEN/UNFORESEEN WORK FOUND AFTER

COMMENCEMENT OF WORK THAT NEEDS TO BE

REWORKED/RELOCATED TO COMPLETE THE NEW

WORK.

D. COMMENCEMENT OF DEMOLITION MEANS

ACCEPTANCE OF EXISTING CONDITIONS.

E. REVIEW MECHANICAL AND ARCHITECTURAL

DEMOLITION DRAWINGS FOR ANY OTHER

ELECTRICAL REQUIREMENTS.

2. PREPARATION

A. DISCONNECT ELECTRICAL SYSTEMS AT PRIMARY AND

SECONDARY LOCATION OF SOURCE INCLUDING

COORDINATING AND DISCONNECTING UTILITY

CONNECTIONS.

3. DEMOLITION AND EXTENSION OF EXISTING

ELECTRICAL WORK.

A. REMOVE, RELOCATE, AND EXTEND EXISTING

ELECTRICAL WORK AS INDICATED ON THE

DRAWINGS AND AS NOTED HEREIN.

B. ABANDONED WIRING BACK TO SOURCE OF SUPPLY

AND REMOVE ABANDONED CONDUIT BACK TO

NEAREST ACCESSIBLE JUNCTION BOX FOR ALL

EQUIPMENT SHOWN TO BE REMOVED.

C. WHERE SOURCE OF SUPPLY IS A PANELBOARD, RE-

LABEL PROTECTIVE DEVICE AS "SPARE". AFTER

DEMOLITION IS COMPLETE, SUBMIT REVISED

PANELBOARD SCHEDULES INDICATING "SPARES" TO

OWNER AND ENGINEER.

D. DISCONNECT AND REMOVE ABANDONED

PANELBOARDS AND DISTRIBUTION EQUIPMENT.

E. DISCONNECT AND REMOVE ELECTRICAL DEVICES

AND EQUIPMENT THAT IS NO LONGER IN USE.

F. DISCONNECT AND REMOVE ABANDONED

LUMINARIES. REMOVE BRACKETS, STEMS,

HANGERS, AND OTHER ACCESSORIES.

G. REPAIR ADJACENT CONSTRUCTION AND

FINISHES DAMAGED DURING DEMOLITION AND

EXTENSION OF WORK.

H. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL

CONDUITS AND CONDUCTORS PASSING THROUGH

RENOVATED AREAS AND SERVICING UNDISTURBED

AREAS.

4. CLEANING, REPAIR, AND REPLACEMENT

A. GENERAL: CLEAN AND REPAIR EXISTING

MATERIALS AND EQUIPMENT THAT WILL REMAIN OR

ARE TO BE REUSED.

B. PANELBOARDS: CLEAN EXPOSED SURFACES AND

TIGHTEN ALL ELECTRICAL CONNECTIONS.

REPLACE DAMAGED CIRCUIT BREAKERS AND PROVIDE

CLOSURE PLATES FOR VACANT POSITIONS. PROVIDE

TYPED SCHEDULES SHOWING REVISED CIRCUITING

INFORMATION.

C. LUMINARIES: REMOVE EXISTING LUMINARIES AS

NOTED.

5. DISPOSAL

A. OWNER SHALL HAVE RIGHT TO RETAIN ANY

EQUIPMENT OR MATERIALS THAT HAVE BEEN

DEMOLISHED PRIOR TO DISPOSAL OR REMOVAL

FROM SITE.

B. ANY EQUIPMENT OR MATERIALS NOT WANTED BY

THE OWNER SHALL BECOME THE PROPERTY OF THE

CONTRACTOR AND REMOVED FROM SITE.

C. CONTRACTOR SHALL COMPLY WITH

ENVIRONMENTAL LAWS AND REGULATIONS FOR

DISPOSAL OF DEMOLISHED MATERIALS AND

EQUIPMENT.

28. CONTRACTOR TO COORDINATE WITH CONTRACTOR FOR

PROJECT 612-162 TO PROVIDE NORMAL AND

EMERGENCY POWER TO GARAGE.

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

ELECTRICAL GENERAL NOTES A/E DESIGN TO DEVELOP RFP FOR

PARKING STRUCTURE

VA NORTHERN CALIFORNIA HEALTHCARE SYSTEM

WG BX

612-165

E001

FINAL DESIGN BUILD

PROPOSAL PACKAGE

Revisions: Date:

35% SCHEMATIC DESIGN (SD1) 08/15/2019

DESIGN BUILD PROPOSAL PACKAGE 10/11/2019

FINAL DESIGN BUILD PROPOSAL PACKAGE 12/18/2019

crollins Typewritten text 12/18/2019

1. THIS IS A STANDARD SYMBOL/LEGEND DRAWING. SOME SYMBOLS OR ABBREVIATIONS

MAY APPEAR ON THIS DRAWING AND NOT ON THE PLANS.

GENERAL NOTES

S

S

S

S

PP

A/V

J

T

J

J

PB

PB

J

1PH SINGLE-PHASE

1P SINGLE POLE

2/C TWO-CONDUCTOR

3/C THREE-CONDUCTOR

3PH THREE-PHASE

4/C FOUR-CONDUCTOR

4W FOUR-WIRE

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAP ALARM ANNUNCIATOR PANEL

AC ALTERNATING CURRENT OR ARMORED CAB

ACC ACCESSIBLE

ADDL ADDITIONAL

ADJ ADJACENT, ADJOINING

ADO AUTOMATIC DOOR OPENER

AF AMPERE FRAME OR AMP FUSE

AFC ABOVE FINISHED COUNTER, AUTOMATIC

FREQUENCY CONTROL, OR AVAILABLE

FAULT CURRENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AH AMPERE HOUR

AHJ AUTHORITY HAVING JURISDICTION

AIC AMPERE INTERRUPTING CAPACITY

ALT ALTERNATE

AMB OR A AMBIENT

AMP AMPERE

ARCH ARCHITECT

ASC AMPS SHORT CIRCUIT

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AV AUDIO VISUAL

BAT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISH FLOOR

BIL BASIC INSULATION LEVEL

BLDG BUILDING

BPIP BOILER PLANT INSTRUMENTATION PANEL

BRKR BREAKER

BYP BY PASS

C CONDUIT

CAB CABINET

CALC CALCULATE

CAP CAPACITY

CAT CATALOG

CATV COMMUNITY ANTENNA TELEVISION

CCR CONTROL CONTRACTOR

CCTV CLOSED CIRCUIT TELEVISION

CB CODE BLUE

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CHW CHILLED WATER

CHWP CHILLED WATER PUMP

CKT CIRCUIT

CKT BRKR CIRCUIT BREAKER

CLF CURRENT LIMITING FUSE

CLG CEILING

CMU CONCRETE MASONRY UNIT

COAX COAX CABLE

COMM COMMUNICATION

COMPT COMPARTMENT

CONC CONCRETE

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CPT CONTROL POWER TRANSFORMER

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CU COPPER

CU FT CUBIC FEET

CUR CURRENT

DB DECIBEL OR DIRECT BURIAL

DC DIRECT CURRENT

DCP DIMMER CONTROL PANEL

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLITION

DIAG DIAGRAM

DISC DISCONNECT

DISTR DISTRIBUTION

DISTR PNL DISTRIBUTION PANEL

DMR SW DIMMER SWITCH

DN DOWN

DPDT DOUBLE POLE, DOUBLE THROW

DPST DOUBLE POLE, SINGLE THROW

DRSW DOOR SWITCH

DS DISCONNECT SWITCH

DWG DRAWING

ELECTRICAL ABBREVIATIONS

EC EMPTY CONDUIT

EG EQUIPMENT GROUND

EL ELEVATION

ELEC ELECTRIC OR ELECTRICAL

ELEV ELEVATOR

EMCP EMRGNCY MONITORING CONTROL PANEL

EMER EMERGENCY

EMI ELECTROMAGNETIC INTERFERENCE

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EPO EMERGENCY POWER OFF

EPRF EXPLOSION PROOF

ESMT EASEMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXIST EXISTING

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FABL FIRE ALARM BELL

FABX FIRE ALARM BOX

FACP FIRE ALARM CONTROL PANEL

NEUT OR N NEUTRAL

NFPA NATIONAL FIRE PROTECTION ASSO.

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NS NO SCALE

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OL OVERLOAD

P POLE

PA PUBLIC ADDRESS

PB PANELBOARD, PULL BOX, PUSHBUTTON

PBPU PREFABRICATED BEDSIDE PATIENT UNIT

PCB POLYCHLORINATED BIPHENYL

PEC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PNL PANEL

POD POWER OPERATED DAMPER

PT POTENTIAL TRANSFORMER

PTRV POWER TYPE ROOF VENTILATION

PVC POLYVINYL CHLORIDE (PLASTIC)

PWR POWER

RCP REFLECTED CEILING PLAN

REC RECESSED

RECPT RECEPTACLE

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

REQD REQUIRED

SCC SHORT CIRCUIT CAPACITY

SES SERVICE ENTRANCE SECTION

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SPEC SPECIFICATION

SPST SINGLE POLE, SINGLE THROW

SURF SURFACE

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TC TIME CLOCK

TEL TELEPHONE

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

UFD UNDERFLOOR DUCT

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

V VOLT

VA VOLT AMPERE

VAR VOLT AMPERE REACTIVE

VFD VARIABLE FREQUENCY DRIVE

VOLT VOLTAGE

W WATT

WH WATER HEATER

WP WEATHERPROOF

XFER TRANSFER

XFMR TRANSFORMER

ELECTRICAL SYMBOLS - DIAGRAM ELECTRICAL SYMBOLS - POWER PLAN ELECTRICAL SYMBOLS - LIGHTING PLAN FIRE ALARM SYMBOLS

PANELBOARD

EQUIPMENT TAG

SEE EQUIPMENT SCHEDULE

CABLE AND CONDUIT TAG

SEE SCHEDULE

FUSE WITH RATING

NORMALLY CLOSED RELAY CONTACT

NORMALLY OPEN RELAY CONTACT

MOLDED CASE CIRCUIT BREAKER

LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER

SWITCH AND FUSE UNIT

FUSED DRAWOUT POTENTIAL TRANSFORMER

MOTOR, SINGLE-PHASE

MOTOR, THREE-PHASE

DELTA CONNECTION

TRANSFORMER

WYE CONNECTION

EARTH GROUND

JUNCTION BOX

PULL BOX

TIME CLOCK

DISCONNECT SWITCH, FUSED

DISCONNECT SWITCH, UNFUSED

STARTER, COMBINATION WITH DISCONNECT SWITCH

STARTER OR MOTOR CONTROLLER

CONDUIT TERMINATED 6" AFF IN

STANDARD BOX FOR EXTENSION TO

EQUIPMENT AS DIRECTED.

CONDUIT TERMINATED W/COUPLING

(FLUSH W/FINISHED FLOOR) FOR

EXTENSION TO EQUIPMENT AS

DIRECTED.

POWER JUNCTION BOX

TRANSFORMER, PLAN

MOTOR, SINGLE-PHASE

MOTOR, THREE-PHASE

WYE CONNECTION

EARTH GROUND

LADDER CABLE TRAY

PULL BOX

WIREWAY

REGULAR POWER

PANELBOARD CABINET, FLUSH MOUNTED

PANELBOARD CABINET, SURFACE MOUNTED

RECEPTACLE, DUPLEX

RECEPTACLE, DUPLEX ON EMERGENCY POWER

RECEPTACLE, DUPLEX WITH GROUND

FAULT CIRCUIT INTERRUPTER

RECEPTACLE, QUADRAPLEX

LIFE SAFETY POWER

CRITICAL POWER

ELECTRICAL STRIP MOLD (OUTLETS ON

2'-0" CENTERS OR AS DESIGNATED ON

DRAWINGS), MTD 3'-6" AFF OR AS

INDICATED.

VARIABLE FREQUENCY DRIVE

DOUBLE GANG DEEP AUDIO/VISUAL JUNCTION BOX

SWITCH

BLANK = SINGLE POLE 2 = DOUBLE POLE

3 = THREE-WAY 4 = FOUR-WAY

D = DOOR SWITCH

DM= DIMMER K = KEY OPERATED

LV= LOW VOLTAGE L = LOCK

LM= LOW VOLTAGE MASTER P = WITH PILOT LIGHT

PB= PUSH BUTTON STATION RC= REMOTE CONTROL

T = TIMER OPERATED WP= WEATHER PROOF

X = EXPLOSION PROOF OS= OCCUPANCY SENSOR

LIGHT FIXTURE, RECESSED LED 1'x4'

LIGHT FIXTURE, SURFACE MOUNTED LED, 2'x4' LETTER

INDICATES TYPE.

LIGHT FIXTURE, SURFACE MOUNTED LED, 1'x4' LETTER

INDICATES TYPE.

LIGHT FIXTURE, LED EMERGENCY

LIGHT FIXTURE, RECESSED LED, 2'x2'

LIGHT FIXTURE, SURFACE MOUNTED LED

LIGHT TRACK WITH HEADS AS SHOWN

LIGHT FIXTURE, STRIP/INDUSTRIAL LED; LETTER INDICATES TYPE.

LIGHT FIXTURE, WALL MOUNTED

LIGHTING, UNDERCABINET LIGHT/COVE LIGHT

ALARM, FIRE, MANUAL PULL STATION

CEILING MOUNTED RECEPTACLE

HOMERUN TO PANELBOARDS. SLASHED

LINES

INDICATE NUMBER OF #12 AWG WIRES IN

3/4"C UNLESS OTHERWISE NOTED. LONG

SLASH INDICATES NEUTRAL, LONG SLASH

WITH DOT INDICATES EQUIPMENT GROUND.

SPECIAL PURPOSE RECEPTACLE

ON EMERGENCY POWER

JUNCTION BOX WITH DISCONNECT

SWITCH AND FLEXIBLE CONDUIT

CONNECTION

MOTION SENSOR (AUTO OPENING DOOR)

VFD

TC

XX

X

X Y

C C

W W

S

C

S

C

S

C

FLOOR RECEPTACLE, DUPLEX

PS-V POWER SUPPLY FOR DUAL DUCT

TERMINAL UNIT & PHOENIX VALVE

WALL MOUNTED STROBE

SPEAKER / STROBE

ALARM, LIGHT/STROBE, ONE ASSEMBLY

(WALL MOUNTED)

CEILING MOUNTED SECURITY CAMERA

WALL MOUNTED CARD READER

FIRE ALARM LINE = FA

ELECTROMAGNETIC TYPE DOOR HOLDER OUTLET

CEILING MOUNTED STROBE

SMOKE DETECTOR

HEAT DETECTOR

WALL MOUNTED STROBE

DUCT SMOKE DETECTOR

CEILING MOUNTED SPEAKER

CEILING MOUNTED SPEAKER/STROBE

DETECTOR, SMOKE, FOR DUCT

FC FOOTCANDLE

FI FILM ILLUMINATOR

FIXT FIXTURE

FLA FULL LOAD AMPS

FLEX FLEXIBLE METALLIC CONDUIT

FLT FLOODLIGHT

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FOUTT TELEPHONE FLOOR OUTLET

FP FIRE PROTECTION

FT FEET OR FOOT

FU SW FUSED SWITCH

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

HID HIGH INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HZ HERTZ

IESNA ILLUMINATION ENGINEERING SOCIETY OF

NORTH AMERICA

IMC INTERMEDIATE METAL CONDUIT

INCAND INCANDESCENT

IR INFRARED

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR kWHM KILOWATT HOUR METER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LM LUMEN

LP LIGHT POLE

LPS LOW PRESSURE SODIUM

LRA LOCKED ROTOR AMPS

LTCP LOCAL TEMPERATURE CONTROL PANEL

LT LIGHT

LTG LIGHTING

LTG PNL LIGHTING PANEL

LTNG LIGHTNING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MC METAL-CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MG MOTOR GENERATOR

MH MANHOLE

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT PROTECTION

MLO MAIN LUGS ONLY

MT MOUNT

MTD MOUNTED

MTG MOUNTING

MTS MANUAL TRANSFER SWITCH

MV MEDIUM VOLTAGE

MVA MEGAVOLT-AMPERE

MW MEGAWATT MICROWAVE

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

FARA

FIRE ALARM REMOTE ANNUCIATOR

P

S

CR

DH

S

S

H

D

D

PC

OS

SWITCH, LAMP HOLDER POLE

LIGHT FIXTURE RECESSED ROUND CEILING MOUNTED DOWNLIGHT

LIGHT FIXTURE RECESSED SQUARE CEILING MOUNTED DOWNLIGHT

SWITCH, EXTERIOR PHOTO CELL FOR CONTROL OF

EXTERIOR LIGHTING

SWITCH, OCCUPANCY SENSOR REFER TO FIXTURE

SCHEDULE FOR TYPE

L PS

LIGHT FIXTURE, RECESSED LED, 2'x4'

KEYPAD LOCK

KP

NURSE'S CALL MASTER STATION MTD ON

NURSE'S COUNTER TOP UNLESS

OTHERWISE NOTED.

NURSE CALL EMERGENCY PULL

SECURITY / DURESS-ALARM BUTTON

MOUNTED 3" ABOVE COUNTER TOP /

COUNTER TOP BACK SPLSH.

CODE BLUE PHONE LIGHT MOUNTED ABOVE

DUAL COIL SPEAKER FOR PA AND FIRE ALARM.

SS

N

S

P

A

B

TAMPER SWITCH

TS

FLOW SWITCH

FS

PRESSURE SWITCH

PS

AIPHONE

AIP

CAMERA CONTROL PANELCCP

ACCESS CONTROL PANEL

ACP

FIRE ALARM CONTROL PANEL

MONITOR MODULE

CONTROL MODULE

REMOTE TEST…