Attachment 10 - 35_ Drawings - 612-165_12182019_Part1.pdf
PDF 15 MB Posted
- Solicitation number
- 36C77623R0068
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
x x x x x x x x x x x x x
North co nc
MARTINEZ, CA
MUIR ROAD
AR
AN
A
DR
IV
E
V E
TE
R
A N
S D
R
IV
E
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
U.S. Department of Veterans Affairs
PROJECT LOCATION:
PROJECT TITLE:
BUILDING NUMBER:
ARCHITECT/ENGINEER OF RECORD:
BANCROFT ARCHITECTS + ENGINEERS
CONTRACT NUMBER:
STATION PROJECT NUMBER:
BAE PROJECT NUMBER:
CONSULTANTS:
REVIEW ONLY - NOT FOR CONSTRUCTION
12/18/2019
FINAL DESIGN BUILD PROPOSAL PACKAGE
12/18/2019
COVER SHEET A/E DESIGN TO DEVELOP RFP FOR
PARKING STRUCTURE
VA NORTHERN CALIFORNIA HEALTHCARE SYSTEM
MA CR
612-165
G001
A/E DESIGN TO DEVELOP RFP FOR PARKING
STRUCTURE
612-165 36C26119C0018
17-115
150 MUIR ROAD
MARTINEZ, CA 94553
FINAL DESIGN BUILD
PROPOSAL PACKAGE
VA NORTHERN CALIFORNIA HEALTHCARE SYSTEM
700 NICHOLAS BLVD. SUITE
ELK GROVE VILLAGE,
ILLINOIS 60007
847.952.9362 www.bancroft-ae.com
STRUCTURAL/PARKING CONSULTANT:
WALKER CONSULTANTS
601 CALIFORNIA ST, SUITE 820
SAN FRANCISCO, CA 94108
P: 415-644-0630 www.walkerconsultants.com
CIVIL:
CHAUDHARY & ASSOCIATES, INC.
211 GATEWAY ROAD WEST, SUITE 204
NAPA, CA 94558-6279
P: 707-255-2729
NOT TO SCALE
N
1 STATE MAP
NOT TO SCALE
N
2 VICINITY MAP
NOT TO SCALE
N
3 CAMPUS MAP
MUIR ROAD
Revisions: Date:
35% SCHEMATIC DESIGN (SD1) 08/15/2019
DESIGN BUILD PROPOSAL PACKAGE 10/11/2019
FINAL DESIGN BUILD PROPOSAL PACKAGE 12/18/2019
I A I D I 1 I 0 0 I - I 1 I
AREA MODULE
FLOOR LEVEL DESIGNATOR
DRAWING TYPE DESIGNATOR
DISCIPLINE DESIGNATOR (LEVEL 2)
DISCIPLINE DESIGNATOR (LEVEL 1)
DISCIPLINE DESIGNATOR (LEVEL 1)
G - GENERAL
H - HAZARDOUS MATERIALS
S - STRUCTURAL
A - ARCHITECTURAL
I - INTERIORS
F - FIRE PROTECTION
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
SHEET IDENTIFICATOR
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
12/18/2019
GENERAL - DRAWING INDEX A/E DESIGN TO DEVELOP RFP FOR
PARKING STRUCTURE
VA NORTHERN CALIFORNIA HEALTHCARE SYSTEM
MA CR
612-165
G002
FINAL DESIGN BUILD
PROPOSAL PACKAGE
DRAWING INDEX
PDF NUMBER Sheet Number DRAWING TITLE 35%
DESIGN BUILD PROPOSAL
PACKAGE
50 E003 ELECTRICAL COORDINATION BETWEEN 612-165 & 612-162 X
51 ED101 ELECTRICAL OVERALL DEMOLITION SITE PLAN X X
52 E101 ELECTRICAL OVERALL SITE PLAN X X
53 EL101 ELECTRICAL - LIGHTING PLAN - BASEMENT X X
54 EL102 ELECTRICAL - LIGHTING PLAN-GROUND FLOOR X X
55 EL103 ELECTRICAL - LIGHTING PLAN - SECOND FLOOR X X
56 EP101 ELECTRICAL - POWER PLAN - BASEMENT X X
57 EP102 ELECTRICAL - POWER PLAN - GROUND FLOOR X X
58 EP103 ELECTRICAL - POWER PLAN - SECOND FLOOR X X
59 ET 101 ELECTRICAL SECURITY, CODE CALL AND FIRE ALARM PLAN BASEMENT X X
60 ET 102 ELECTRICAL SECURITY, CODE CALL AND FIRE ALARM PLAN GROUND
FLOOR
X X
61 ET 103 ELECTRICAL SECURITY, CODE CALL AND FIRE ALARM PLAN SECOND
FLOOR
X X
62 EL 402 ELECTRICAL - LIGHITNG - ENLARGED STAIR PLANS X X
63 EP 401 ELECTRICAL - POWER ELEVATOR LOBBY & FIRE ALARM X X
64 EP 402 ELECTRICAL - POWER ELEVATOR & FIRE ALARM PLANS X X
65 EP 403 ELECTRICAL - POWER ENLARGED STAIR PLANS X X
66 E601 ELECTRICAL LOAD CALCULATION X X
10 - FIRE PROTECTION
67 FX001 GENERAL NOTES • X
68 FX101 FIRE PROTECTION - BASEMENT PLAN X X
69 FX102 FIRE PROTECTION - GROUND TIER PLAN X X
70 FX103 FIRE PROTECTION - SECOND TIER PLAN X X
71 FX500 FIRE PROTECTION DETAILS • X
72 FX800 FIRE PROTECTION - RISER DIAGRAM X
11-PLUMBING
73 P001 PLUMBING - GENERAL NOTES X X
74 P100 PLUMBING - UNDERGROUND PLAN X
75 P101 PLUMBING - BASEMENT PLAN X X
76 P102 PLUMBING - GROUND TIER PLAN X X
77 P103 PLUMBING - SECOND TIER PLAN X X
78 P501 PLUMBING - DETAILS X
79 P601 PLUMBING - RISER DIAGRAM X
80 P701 PLUMBING - SCHEDULE X
13-MECHANICAL
81 M001 MECHANICAL - GENERAL NOTES X
82 M101 MECHANICAL - GROUND TIER PLAN X X
83 M400 MECHANICAL SCHEDULE AND DETAILS X
DRAWING INDEX
PDF NUMBER Sheet Number DRAWING TITLE 35%
DESIGN BUILD PROPOSAL
PACKAGE
00-GENERAL
1 G001 COVER SHEET X X
2 G002 GENERAL - DRAWING INDEX X X
3 G1001 GENERAL - CONTRACTOR & BOD PROTOCOL NOTES X X
4 GI002 GENERAL - ABBREVIATIONS, SYMBOLS & MOUNT.HEIGHTS X X
5 GI101 GENERAL - CODE & BUILDING INFORMATION X X
6 GI200 GENERAL - LIFE SAFETY ORIENTATION PLAN X X
7 GI301 GENERAL - RENDERED VIZUALIZATION X X
01-CIVIL
8 CD101 CIVIL - DEMOLITION PLAN X X
9 CG101 CIVIL - PRELIMINARY GRADING PLAN X X
10 CS101 CIVIL - OVERALL SITE PLAN X X
11 CS102 CIVIL - SITE SURVEY X X
12 CU101 CIVIL - PRELIMINARY UTILITY PLAN X X
13 CE101 CIVIL- EROSION CONTROL PLAN X X
02-STRUCTURAL
14 SE001 STRUCTURAL - GENERAL NOTES X X
15 SE101 STRUCTURAL - BASEMENT TIER PLAN X X
16 SE102 STRUCTURAL - GROUND TIER PLAN X X
17 SE103 STRUCTURAL - SECOND TIER PLAN X X
18 SE301 STRUCTURAL - TYPICAL SLAB AND WALL DETAILS X X
20 SE302 STRUCTURAL - FOUNDATION DETAILS X X
19 SE303 STRUCTURAL - FOUNDATION SCHEDULES AND DETAILS X X
21 SE 410 STRUCTURAL - STAIR TOWER NO. 1 ENLARGED PLANS X X
22 SE 420 STRUCTURAL - STAIR TOWER NO. 2 ENLARGED PLANS X X
23 SE 501 STRUCTURAL - TYPICAL SLAB DETAILS X X
24 SE 502 STRUCTURAL - TYPICAL SLAB DETAILS X X
25 SE 520 STRUCTURAL - DETAILS X X
26 SE 610 STRUCTURAL - COLUMN SCHEDULE AND DETAILS X X
27 SE 620 STRUCTURAL - BEAM SCHEDULE AND DETAILS X X
28 SE 630 STRUCTURAL - BRIDGE PLAN AND SECTIONS X X
29 SE 705 STRUCTURAL - MOMENT FRAME ELEVATIONS X X
29 SE 706 STRUCTURAL - SHEAR WALL ELEVATIONS X X
02.1-PARKING
31 AG101 BASEMENT TIER STRIPING PLAN X X
32 AG102 GROUND TIER STRIPING PLAN X X
33 AG103 SECOND TIER STRIPING PLAN X X
34 AG500 STRIPPING & SIGNAGE DETAILS X X
35 AG501 SIGNAGE DETAILS X X
36 AG502 SIGN MOUNTING DETAILS X
03-ARCHITECTURAL
37 A101 ARCHITECTURAL - BASEMENT FLOOR PLAN X X
38 A102 ARCHITECTURAL - GROUND TIER PLAN X X
39 A103 ARCHITECTURAL - SECOND TIER PLAN X X
40 A201 ARCHITECTURAL - EXTERIOR ELEVATIONS X X
41 A202 ARCHITECTURAL - ENLARGED EXTER. BUILDING ELEVATIONS X X
42 A301 ARCHITECTURAL - BUILDING SECTION X X
43 A302 ARCHITECTURAL - STAIR SECTIONS X X
44 A401 ARCHITECTURAL - ENLARGED FLOOR PLANS X X
45 A402 ARCHITECTURAL - ENLARGED STAIR PLANS X X
46 VT101 ARCHITECTURAL - ELEVATOR INFORMATION X X
47 VT102 ARCHITECTURAL - ELEVATOR PLANS X X
08 - ELECTRICAL
48 E001 ELECTRICAL GENERAL NOTES X X
49 E002 ELECTRICAL SYMBOLS AND ABBREVIATIONS X X
Revisions: Date:
35% SCHEMATIC DESIGN (SD1) 08/15/2019
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
12/18/2019
GENERAL - CONTRACTOR &
BOD PROTOCOL NOTES
A/E DESIGN TO DEVELOP RFP FOR
PARKING STRUCTURE
VA NORTHERN CALIFORNIA HEALTHCARE SYSTEM
MA CR
612-165
G1001
FINAL DESIGN BUILD
PROPOSAL PACKAGE
1. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL PUBLISHED
APPLICABLE LOCAL / STATE / FEDERAL / NATIONAL CODES, ORDINANCES AND
REGULATIONS ALONG WITH ALL RELATED VA DIRECTIVES, DESIGN GUIDES
AND MANUALS, SPECIFICATIONS AND STANDARDS PLUS ALL VA
REQUIREMENTS (FEDERAL AND LOCAL) THAT ARE PROJECT SPECIFIC TO THE
DOCUMENTED SCOPE OF WORK ON THIS SITE.
2. EACH CONTRACTOR SHALL HAVE PUBLIC LIABILITY, PROPERTY DAMAGE AND
WORKMAN'S COMPENSATION INSURANCE
3. CONTRACTOR SHALL REFERENCE ALL DRAWINGS IN ALL SECTIONS OF WORK
FOR FULLY DEFINING THEIR SCOPE OF WORK RESPONSIBILITIES AND
COORDINATE SAME WITH THE GENERAL/PRIME CONTRACTOR.
SUBCONTRACTORS AND SUPPLIERS FOR EACH TRADE ARE ADVISED THAT
INFORMATION PERTINENT TO THEIR SCOPE OF WORK ALSO OCCURS IN
OTHER SECTIONS OF THE DRAWINGS AND THE COMPLETE SET OF CONTRACT
DOCUMENTS.
4. ALL ENGINEERING SYSTEMS WORK INCLUDED IN THE CONTRACT DRAWINGS
SHALL BE TAKEN IN A SENSE AS A DIAGRAMMATIC REPRESENTATION OF ITS
INTENDED PLACEMENT AND DISTRIBUTION WITHIN THE GENERAL PROXIMITY
WHERE SHOWN. THE SIZE AND THE MEANS OF RUNNING DISTRIBUTION
SYSTEMS ARE SHOWN BUT IT IS NOT INTENDED TO SHOW EVERY
CONNECTION, FITTING, OFFSET, SUPPORT ELEMENT, OR EVERY STRUCTURAL
DIFFICULTY THAT CAN BE ENCOUNTERED DURING THE INSTALLATION OF THE
WORK.
5. PROJECT LIMIT LINES ARE SHOWN ON THE DRAWINGS FOR ORIENTATION
PURPOSES ONLY AND SHOULD NOT BE CONSTRUED TO INDICATE THE FULL
EXTENT OR LIMITS OF THE AREA(S) OF WORK.
6. ALL EXISTING BUILDING UTILITIES AND INFRASTRUCTURE SERVICES SYSTEMS
THAT FEED OTHER SPACES OUTSIDE THE DEMISED PROJECT AREA AND THAT
ARE LOCATED WITHIN THE AREA OF WORK, THEREBY INTERFERING WITH THE
NEW CONSTRUCTION, SHALL BE REROUTED AND RELOCATED AS REQUIRED
TO MAINTAIN FULL SERVICE TO THE AFFECTED AREAS.
7. ALL FINISHED AREAS ADJACENT TO OR INCLUDED WITHIN THE AREA(S) OF
CONSTRUCTION ALONG WITH ALL PUBLIC PROJECT ACCESS ROUTES SHALL
BE PROTECTED FROM DUST AND DIRT THROUGH THE USE OF VA/COR
APPROVED DUSTPROOF PROTECTION. SEE THE OCCUPIED AREA
PROTECTION PROTOCOLS PROVIDED IN THE "GENERAL" DRAWINGS SECTION
AND COORDINATE ALL SITE SPECIFIC CONDITIONS IMPACTS ENCOUNTERED
WITH THE VA/COR.
8. DO NOT SCALE THE DRAWINGS. USE THE GIVEN DIMENSIONS.
9. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING ALL SHOP DRAWING REQUIREMENTS WITH ALL OF THE
AFFECTED TRADES, THE VA/COR AND WITH THE AE.
10. OBTAIN ALL REQUIRED VA/COR AUTHORIZATIONS BEFORE BEGINNING ANY
DEMOLITION WORK OR NEW CONSTRUCTION, INCLUDING TEMPORARY
BARRICADES AND PROTECTION WORK.
11. EACH CONTRACTOR SHALL MAINTAIN A COMPETENT OSHA-30 FOREMAN OR
EQUALLY QUALIFIED DIRECT REPRESENTATIVE ON THE JOB SITE AT ALL
TIMES.
12. EACH CONTRACTOR SHALL COOPERATE AND COORDINATE WITH THE
GENERAL/PRIME CONTRACTOR’S SUPERINTENDENT AND WITH THE FOREMAN
OF ALL OTHER TRADES IN ORDER THAT THERE BE NO DELAYS IN THE
EXECUTION AND COMPLETION OF THE WORK.
13. DURING CONSTRUCTION EACH CONTRACTOR SHALL KEEP ON SITE ACCURATE
FIELD RECORDS OF ALL CONCEALED AND VISUALLY ACCESSIBLE WORK THAT
DIFFERS FROM THE CONTRACT DRAWINGS/DOCUMENTS. THESE AS-BUILT
MARKED-UP RECORD DRAWINGS/DOCUMENTS WILL BE KEPT UP TO DATE BY
THE GENERAL/PRIME CONTRACTOR AND PROVIDED TO THE VA/COR FOR
DISTRIBUTION AT THE COMPLETION OF THE PROJECT.
14. IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO ADEQUATELY
PROTECT EXISTING CONSTRUCTION AND FINISHES TO REMAIN IN PLACE
DURING BOTH THE DEMOLITION AND CONSTRUCTION SEQUENCES OF WORK.
ANY DAMAGE TO SUCH AREAS SHALL BE RESTORED AND REFINISHED TO A
"LIKE-NEW" CONDITION PRIOR TO THE VA/COR'S ACCEPTANCE OF THAT WORK.
15. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE FOR THE PATCH,
REPAIR, REFINISHING AND/OR REPLACEMENT OF ALL CONSTRUCTION,
MATERIALS, ASSEMBLIES, EQUIPMENT, SIGNAGE AND FINISHES DAMAGED BY
THE PROJECT DEMOLITION, TEMPORARY CONSTRUCTION, NEW
CONSTRUCTION OR THE MOVEMENT OF PERSONNEL, TOOLS, EQUIPMENT,
MATERIALS, ETC. BOTH INSIDE AND OUTSIDE OF THE DESIGNATED AREAS OF
WORK.
16. PROVIDE THE CUTTING AND PATCHING FOR ALL DEMOLITION WORK AND ALL
NEW CONSTRUCTION WORK BEING PERFORMED OUTSIDE OF THE PROJECT
LIMIT LINES AS REQUIRED TO PROPERLY COMPLETE THE PROJECT SCOPE OF
WORK.
17. ALL CUTTING, CORING AND DRILLING OF EXISTING CONCRETE AND MASONRY
CONSTRUCTION SHALL NOT DAMAGE EXISTING REINFORCING STEEL, PIPING,
CONDUITS OR OTHER CONCEALED CONSTRUCTION WITHIN. PRIOR TO
CORING, DRILLING, CUTTING OR PERFORMING ANY BREAKING EFFORTS,
PROVIDE PENETRATING FIELD X-RAYING OF THE INTENDED AREAS AND
DOCUMENT THE EXACT SIZE AND LOCATIONS OF ALL SUCH INTERFERENCES.
COORDINATE WITH AND OBTAIN VA/COR APPROVAL BEFORE PROCEED WITH
ANY SUCH REQUIRED PENETRATIONS WORK.
18. RELOCATIONS OF ANY INFRASTRUCTURE DISTRIBUTION SYSTEMS OR
EQUIPMENT, WHICH MAY ALTER THE ARCHITECTURAL OR STRUCTURAL
CONSTRUCTION, MUST BE APPROVED FIRST BY THE VA/COR PRIOR TO
STARTING ITS RELOCATION.
19. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE TO PROVIDE THE
REMOVAL OF ALL CONSTRUCTION DEMOLITION DEBRIS, SPOIL AND
MATERIALS FROM THE PROJECT SITE ON A DAILY BASIS UNLESS
SPECIFICALLY REFERENCED OTHERWISE IN THE PROJECT SPECIFIC
LOGISTICAL SEQUENCING REQUIREMENTS.
20. CONTRACTORS TO ENSURE ALL FIRE RESISTIVE RATINGS ARE MAINTAINED
PER LOCATIONS SHOWN ON THE DRAWINGS AND AS DISCOVERED IN THE
FIELD. ALL PENETRATIONS ARE TO BE SEALED BY AN APPROVED UL
FIRESTOPPING SYSTEM. SEAL ALL EXISTING PENETRATIONS EXPOSED
DURING CONSTRUCTION AS PER THE APPROVED UL FIRESTOPPING SYSTEM
INSTALLATION REQUIREMENTS. FOLLOW THE MANUFACTURE'S DESIGN
RECOMMENDATIONS FOR THE PROPER FIRE STOPPING MATERIAL TO BE USED
IN EACH SPECIFIC APPLICATION.
21. ALL FIRESTOPS SHALL MATCH THE FIRE RATING OF THE CONSTRUCTION
BEING PENETRATED, SUCH AS WALLS, FLOORS, CEILINGS, PARTITIONS ETC.
AND SHALL COMPLY WITH ALL CODE REQUIREMENTS. USE ONLY A SINGLE
(FMRC) APPROVED MANUFACTURERS LINE OF PRODUCTS FOR ALL PROJECT
FIRESTOPPING.
22. THE BASIS OF DESIGN FOR ALL FIRE STOPPING WILL BE PRODUCTS AS
MANUFACTURED BY THE 3M COMPANY.
23. PROVIDE AN HOURLY RATED FIRESTOP AT ALL PENETRATIONS OF RATED
CONSTRUCTION AND/OR ASSEMBLIES, WHETHER NEW OR EXISTING, AND AS A
DIRECT RESULT OF THE PROJECT DEMOLITION WORK OR NEW
CONSTRUCTION. WHERE COMBUSTIBLE PENETRANTS OCCUR USE A FIRE
RATED INTUMESCENT MATERIAL AND WHERE NONCOMBUSTIBLE
PENETRANTS OCCUR USE A FIRE RATED ENDOTHERMIC MATERIAL. ALL
FIRESTOPPING WORK MUST BE APPROVED BY THE VA/COR BEFORE
CONCEALED BY CONSTRUCTION.
1. ALL CONTRACTORS, SUBCONTRACTORS AND THEIR REPRESENTATIVES
WORKING ON THIS PROJECT SHALL AT ALL TIMES PRIOR TO AND DURING THE
COURSE OF THEIR ACTIVITY BE RESPONSIBLE FOR THE SAFETY OF THEIR
EMPLOYEES, ALL OTHERS AND ARE TO BE IN CARE OF THE PROPERTY.
2. EACH CONTRACTOR OR SUBCONTRACTOR, AS REPRESENTATIVES OF THEIR
EMPLOYEES, SHALL ASCERTAIN THAT THE CONDITIONS UNDER WHICH THEY
WILL BE REQUIRED TO ACCOMPLISH THEIR WORK ARE SAFE AND MEET ALL
APPLICABLE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HAZARD
ACT, ALONG WITH ALL OTHER APPLICABLE GOVERNING REGULATIONS AND VA
REQUIREMENTS.
3. THE BEGINNING OF WORK ON SITE BY A CONTRACTOR OR SUBCONTRACTOR
SHALL INDICATE HIS/HER SATISFACTION AND FULL ACCEPTANCE OF THE
CURRENT SITE CONDITIONS REGARDING SAFETY AND THE NECESSARY
COMPLIANCE WITH ALL CONTRACT REQUIREMENTS REGARDING SAME. THE
CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR ANY ACCIDENTS,
INJURIES, AND/OR DAMAGES INCURRED AS A RESULT OF ANY VISIBLE OR
KNOWN UNSAFE CONDITIONS THAT EXIST.
4. IF UNSATISFIED WITH THE CURRENT SITE SAFETY CONDITIONS AND/OR THE
NECESSARY COMPLIANCE, THE CONTRACTOR OR SUBCONTRACTOR SHALL
INDICATE THE ACTIONS AND/OR DEVICES NECESSARY TO RENDER THE JOB-
SITE SAFE. IF THE WORK OF OTHER PARTIES, UPON INSPECTION, IS FOUND AT
ANY TIME TO BE UNSAFE THE CONTRACTOR OR SUBCONTRACTOR SHALL
IMMEDIATELY STOP ALL WORK AND NOTIFY THE GENERAL/PRIME
CONTRACTOR AND THE VA/COR. THE SUBMISSION OF A BID FOR ANY PORTION
OF WORK INCLUDED IN THIS CONTRACT SHALL ALSO INDICATE
ACKNOWLEDGMENT AND ACCEPTANCE OF THESE REQUIREMENTS.
5. PROJECT TO COMPLY WITH CALIFORNIA BAY ENVIRONMENTAL
REQUIREMENTS
SUMMARY DESCRIPTION:
1. THE BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS ARE TO BE FOLLOWED FOR ALL
CONTRACTOR PROPOSED EQUIVALENT SUBSTITUTIONS OR DEVIATIONS FROM THE BASE
BID/CONSTRUCTION DOCUMENTS.
2. AN EQUIVALENT SUBSTITUTION REPRESENTS ANY DEVIATION FROM THE CONTRACT DOCUMENTS ORIGINAL DESIGN INTENT, SCOPE OF WORK REQUIREMENTS, THE DETAILING OR SPECIFICATIONS.
3. NO SUCH EQUIVALENT SUBSTITUTION OR DEVIATION WILL BE ALLOWED WITHOUT FIRST GOING
THROUGH THE BOD COMPLIANCE PROTOCOLS PROCESS AND OBTAINING VA APPROVAL.
4. ONCE VA APPROVAL OF THE EQUIVALENT SUBSTITUTION OR DEVIATION REQUEST HAS BEEN
OBTAINED, THE FORMAL SHOP DRAWING PREPARATION AND SUBMITTAL PROCESS MAY BEGIN FOR
THAT WORK.
5. THE FOLLOWING BOD COMPLIANCE PROTOCOLS DEFINE IN DETAIL THE RESPONSIBILITIES AND THE
EVALUATION PROCESS ALONG WITH THE REQUIREMENTS AND PROCEDURES TO BE FOLLOWED
WHEN REQUESTING VA CONSIDERATION OF ANY PROPOSED EQUIVALENT SUBSTITUTION OR
DEVIATION.
BOD COMPLIANCE PROTOCOLS:
1. THE BOD COMPLIANCE PROTOCOLS APPLY TO ALL MATERIALS, EQUIPMENT, HARDWARE, FINISHES, CONTROLS, ENGINEERING SYSTEMS AND THEIR INCLUSIVE PARTS, DETAILED ASSEMBLIES, IMPACTED ELEMENTS OF WORK PLUS ALL RELATED DESIGN CRITERIA ELEMENTS AND SPECIFIED PARAMETERS THAT ARE CONTAINED WITHIN THE BID/ISSUED FOR CONSTRUCTION DRAWINGS AND SPECIFICATIONS
DOCUMENTATION, OR AS SPECIFICALLY REFERENCED BY SAME.
2. SPECIFIC DESIGN INTENT AND PERFORMANCE CHARACTERISTICS REQUIRING BOD COMPLIANCE ANALYSIS WILL VARY WITH EACH SPECIFIC ITEM BEING PROPOSED AS AN EQUIVALENT SUBSTITUTION
AND WILL NEED TO BE FULLY COMPARED AND ANALYZED TO ESTABLISH BOD EQUIVALENCY
COMPLIANCE.
3. CRITICAL DESIGN CHARACTERISTICS AND ELEMENTS ARE SPECIFIC TO EACH ITEM NEEDING CONSIDERATION AND COULD CONSIST OF, BUT NOT LIMITED TO, CRITERIA SUCH AS DIMENSIONAL
LOGISTICS, PERFORMANCE CHARACTERISTICS, CAPACITY, DUTY REQUIREMENTS, OPERATIONAL
EFFICIENCIES, ACOUSTICAL REQUIREMENTS, UTILITIES IMPACTS, CONNECTION ADJUSTMENTS, DETAILING DEPARTURES, FRAMING ALTERATIONS, ROUGH IN REQUIREMENTS, WEIGHT INCREASES AND/OR DISTRIBUTIONS, STRUCTURAL IMPACTS, ATTACHMENTS, SUPPORTS, FINISHES, AVAILABILITY, COMPATIBILITY, CONSTRUCTABILITY, WARRANTIES, SERVICE LIFE, MAINTENANCE REQUIREMENTS, ENVIRONMENTAL CONSIDERATIONS, LEED RELATED DESIGN CONSIDERATIONS, ETC.
4. A VERY CRITICALLY IMPORTANT DESIGN CHARACTERISTIC OF ALL BOD ITEMS NEEDING TO BE FULLY
EVALUATED AND PROPERLY COORDINATED WOULD BE THE DESIGN AND LAYOUT OF DIMENSIONAL
LOGISTICS REQUIREMENTS. THOSE CRITICAL PARAMETERS COULD CONSIST OF, BUT NOT LIMITED
TO, ALL DIMENSIONAL ELEMENTS THAT AFFECT SIZE, HEIGHT, WIDTH, DEPTH, THICKNESS,
PLACEMENT, SPACING, CLEARANCES, ACCESS, MOUNTING, CONNECTIONS AND LOCATION
REQUIREMENTS, INSTALLATION TOLERANCES, OPERABLE ELEMENT CLEARANCES, ETC., ALL OF
WHICH COULD IMPACT OTHER AREAS OF CONSTRUCTION OR COMPONENTS OF WORK REQUIRING
ADJUSTMENTS IN ORDER TO COMPLY WITH THE DESIGN INTENT.
5. CONTRACTORS WILL BE RESPONSIBLE TO FULLY IDENTIFY ALL PROPOSED EQUIVALENT
SUBSTITUTIONS, DEPARTURES, IMPACTS, ALTERATIONS AND ADJUSTMENTS FROM THE "BASIS OF DESIGN" INTENT TO THE GENERAL/PRIME CONTRACTOR DURING THE BIDDING PROCESS AND OBTAIN
THEIR APPROVAL BEFORE COMPLETING THEIR PRICING AND SUBMITTING A BID TO SAME.
6. IF A PROPOSED EQUIVALENT SUBSTITUTION ITEM WILL REQUIRE THAT ALTERATIONS AND/OR ADJUSTMENTS NEED TO BE MADE, TO THE WORK OF THE PROVIDING CONTRACTOR, THE WORK OF OTHER CONTRACTORS OR THE WORK OF THE VA, THE SUBMITTING CONTRACTOR SHALL BE FULLY RESPONSIBLE TO INFORM AND ADVISE THE GENERAL/PRIME CONTRACTOR OF ANY AND ALL SUCH NECESSARY IMPACTS REQUIRED AS A PART OF THEIR BIDDING AND FUTURE CONTRACTUAL SCOPE
OF WORK RESPONSIBILITIES.
7. THE CONTRACTOR PROPOSING THE EQUIVALENT SUBSTITUTION SHALL BE RESPONSIBLE FOR ALL RELATED WORK AND SHALL IDENTIFY, VERIFY, COORDINATE AND PROVIDE ENGINEERED SOLUTIONS FOR ALL IMPACT ISSUES AFFECTING INFRASTRUCTURE SYSTEMS, UTILITIES SERVICES, BUILDING
STRUCTURE, SURROUNDING ELEMENTS, AND SYSTEMS AFFECTED FROM WEIGHT DIFFERENTIALS,
REVISED LOADING CHARACTERISTICS, CONNECTION AND MOUNTING VARIANCES, INSTALLATION
CONFLICTS AND DETAILING ALTERATIONS OR ADJUSTMENTS, ETC. CAUSED BY THE EQUIVALENT
SUBSTITUTION REQUIREMENTS.
8. SPECIAL ATTENTION NEEDS TO BE PAID TO ANY SYSTEMS EQUIPMENT AND MATERIAL PERFORMANCE CHARACTERISTICS INCLUDING ALL ASPECTS OF THEIR DIMENSIONAL LOGISTICS FEATURES AND
REQUIREMENTS ALONG WITH ANY STRUCTURAL AND UTILITIES IMPACTS.
9. EACH EQUIVALENT SUBSTITUTION REQUEST ALONG WITH ANY AND ALL IMPACTS, VARIANCES, ALTERATIONS OR ADJUSTMENTS REQUIRED TO OTHER ELEMENTS OF WORK WILL ALSO REQUIRE
VA/CO APPROVAL(S) BEFORE ANY SUCH REQUEST IS DEEMED APPROPRIATE BY THE GOVERNMENT
AND ALLOWED TO PROCEED INTO THE NORMAL SHOP DRAWING PREPARATION, SUBMITTAL AND
REVIEW PROCESS.
10. NO REQUEST FOR AN EQUIVALENT SUBSTITUTION REVIEW IS ALLOWED TO BE MADE VIA A SHOP DRAWING SUBMISSION. ANY SUCH SUBMISSION WILL NOT BE REVIEWED AND WILL BE REJECTED AS
NON-CONFORMING WITH THE DESIGN INTENT AND NOTED THAT THE CONTRACTOR IS TO FOLLOW
THE STANDARD BOD COMPLIANCE PROTOCOLS.
11. ANY UNDOCUMENTED OR UNFORESEEN IMPACTS, VARIANCES, ALTERATIONS OR ADJUSTMENTS
REQUIRED TO ELEMENTS OF WORK AS A RESULT OF AN EQUIVALENCY SUBSTITUTION THAT
SURFACE DURING THE CONSTRUCTION PHASE SHALL IMMEDIATELY BE MADE KNOWN TO THE
GENERAL/PRIME CONTRACTOR WHO WILL IN TURN NOTIFY THE VA/COR. ALL SUCH UNDOCUMENTED OR UNFORESEEN CONDITIONS WILL BE FULLY IDENTIFIED, DOCUMENTED AND SUBMITTED TO THE
VA/COR FOR REVIEW, EVALUATION AND DIRECTION(S) ON HOW TO PROCEED.
12. ANY NON-COMPLIANT EQUIVALENT SUBSTITUTIONS WORK FOUND TO BE IN PLACE DURING THE
CONSTRUCTION PHASE THAT HAD NOT GONE THROUGH THE BOD COMPLIANCE PROTOCOLS
APPROVAL PROCESS AND THAT DOESN’T HAVE THE VA/CO’S APPROVAL WILL BE SUBJECT TO
POSSIBLE REJECTION AND REMOVAL AS DETERMINED BY THE GOVERNMENT.
13. THE FINAL INSTALLATION OF ANY EQUIVALENT SUBSTITUTION AND ITS IMPACTS SHALL NOT COMPROMISE ANY OF THE BOD PERFORMANCE CHARACTERISTICS NOR SHALL IT ENCUMBER ANY OF
THE ASSOCIATED DESIGN INTENT LAYOUT AND DIMENSIONAL LOGISTICS REQUIREMENTS.
14. ALL EQUIVALENT SUBSTITUTION INSTALLATIONS AND THEIR IMPACTS TO OTHER SOW ELEMENTS SHALL COMPLY WITH ALL APPLICABLE BUILDING CODES, REGULATIONS AND VA REQUIREMENTS, PLUS ALLOW ANY SYSTEMS, EQUIPMENT AND/OR MATERIALS TO FUNCTION PROPERLY AND SAFELY.
15. COMPLY WITH ALL SWPP TREATMENT REQUIREMENTS.
GENERAL NOTES SPECIAL SAFETY NOTES BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS
A. ONCE APPROVED BY THE VA/COR THE CONTRACTORS SHALL PERFORM THEIR
FINAL COORDINATION EFFORTS AND BEGIN THE NORMAL SHOP DRAWING
PREPARATION AND SUBMITTAL PROCESS INCLUDING PROVIDING ANY
ADDITIONAL ENGINEERING WORK NECESSITATED BY THE EQUIVALENT
SUBSTITUTION.
B. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
ALL WORK ASSOCIATED WITH AND IMPACTED BY ANY EQUIVALENT
SUBSTITUTION ALONG WITH THE COMPLETE COORDINATION AND
MANAGEMENT OF THE WORK.
2. GENERAL/PRIME CONTRACTOR RESPONSIBLE FOR COORDINATION
A. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE TO FULLY
IDENTIFY, DOCUMENT, MAKE SUBMISSIONS, TRACK, COORDINATE,
OBTAIN APPROVALS AND INCLUDE THE COST OF ALL SUCH EQUIVALENT
SUBSTITUTIONS, VARIANCE MODIFICATIONS AND ALL IMPACT SCOPE OF WORK
IN THEIR BASE BID COST OF CONSTRUCTION AS WELL AS ALLOWED FOR
WITHIN THEIR PROJECT SCHEDULE.
B. THE GENERAL/PRIME CONTRACTOR SHORTLY AFTER CONTRACT
AWARD/EXECUTION SHALL NOTIFY AND COORDINATE WITH THE VA/COR, ALL
SUCH KNOWN EQUIVALENT SUBSTITUTION DEVIATION REQUESTS AND
POSSIBLE IMPACTS FROM THE SPECIFIC BOD REQUIREMENTS PROVIDED IN
THE DRAWINGS AND SPECIFICATIONS.
C. ALL SUCH DEVIATIONS, VARIANCES AND IMPACTS WILL BE FULLY IDENTIFIED,
DOCUMENTED AND SUBMITTED TO THE VA/COR FOR REVIEW, EVALUATION
AND DIRECTION(S) ON HOW TO PROCEED.
D. DOCUMENTATION BEFORE STARTING THE WORK. THEY WILL ALSO BE
RESPONSIBLE TO FULLY IDENTIFY AND COORDINATE SAME WITH ALL
AFFECTED SUBCONTRACTORS TO BE SURE THAT ALL SUCH WORK IS
INCLUDED IN THEIR BASE BID SCOPE OF WORK.
3. CONTRACTORS IDENTIFY PROPOSED EQUIVALENT SUBSTITUTION(S)
A. ALL CONTRACTORS, BEFORE SUBMITTING THEIR REQUEST FOR EQUIVALENT
SUBSTITUTION SHALL BE RESPONSIBLE TO HAVE FULLY VERIFIED AND
CERTIFIED IN WRITING THAT THE DESIGN CHARACTERISTICS OF THE ITEMS
THEY WILL BE SUBMITTING FOR BOD COMPLIANCE REVIEW MEETS OR
EXCEEDS THE DESIGN INTENT AND PERFORMANCE REQUIREMENTS AS
DESIGNED, DETAILED AND SPECIFIED.
4. CONTRACTORS PREPARE DETAILED COMPARISONS
A. THE REQUESTING CONTRACTOR SHALL PREPARE AND PROVIDE TO THE
GENERAL/PRIME CONTRACTOR A FULL LINE ITEM, SIDE-BY-SIDE COMPARISON
LISTING OF ALL BOD DESIGN AND MANUFACTURED CHARACTERISTICS
VERSUS THE SAME FOR THE EQUIVALENT SUBSTITUTION BEING PROPOSED.
B. ALL EQUIPMENT, MATERIALS OR ASSEMBLY EQUIVALENT SUBSTITUTIONS
SHALL BE PROVIDED ON A CONTRACTOR PREPARED ITEMIZED LISTING PER
EACH REQUESTED SUBSTITUTION WITH A FULL AND DETAILED COMPARATIVE
DESCRIPTION OF ALL SPECIFICATIONS, PERFORMANCE CHARACTERISTICS,
CAPACITIES, WEIGHT, DIMENSIONAL LOGISTICS AND KNOWN DEVIATIONS
FROM THE ORIGINAL BOD.
5. CONTRACTORS IDENTIFY RELATED IMPACTS AND DEVIATIONS
A. THE REQUESTING CONTRACTOR SHALL BE RESPONSIBLE TO FULLY IDENTIFY
AND DOCUMENT ALL PROPOSED EQUIVALENT SUBSTITUTION CAUSED
IMPACTS, DEVIATIONS AND MODIFICATIONS FROM THE ORIGINAL BOD
REQUIREMENTS WITH THE GENERAL/PRIME CONTRACTOR AS WELL AS ALL
AFFECTED CONTRACTORS.
B. SEE THE DETAILED PROTOCOL REQUIREMENTS FOR THE EXTENT OF
RESPONSIBILITIES AND DOCUMENTATION REQUIRED FOR THIS CRITICAL ITEM.
6. CONTRACTOR'S DOCUMENTATION TO GENERAL/PRIME CONTRACTOR
A. CONTRACTORS SHALL COORDINATE WITH THE GENERAL/PRIME CONTRACTOR
AS TO THE SPECIFIC DATE THAT EACH IS REQUIRED FOR THE COMPLETION OF
THEIR EQUIVALENT SUBSTITUTION UBMISSION REQUEST DOCUMENTATION
AND DELIVERY OF THE COMPLETED PACKAGE(S) TO THEM.
B. THE GENERAL/PRIME CONTRACTOR HAVING BEEN MADE FULLY AWARE OF
THESE POTENTIAL EQUIVALENCY SUBSTITUTIONS AND IMPACTS DURING THE
BIDDING PROCESS SHALL INCLUDE AND DOCUMENT THIS BOD PROCESS IN
THEIR DETAILED PROJECT SCHEDULE ALLOWING A SEPARATE TASK ITEM
TIMELINE WITH CRITICAL DATES AND PERFORMANCE TARGETS IDENTIFIED
AND TRACKED.
7. TRACKING LIST OF PROPOSED EQUIVALENT SUBSTITUTIONS AND IMPACTS
A. THE SUCCESSFUL GENERAL/PRIME CONTRACTOR SHALL PREPARE A
COMPLETE MASTER LISTING, BY SPECIFICATION AND/OR DRAWING SECTIONS,
OF ALL PROPOSED EQUIVALENT SUBSTITUTION REQUESTS.
B. THIS MASTER LISTING WILL CONSIST OF A SUMMARY DESCRIPTION OF EACH
REQUEST ALONG WITH A BULLET POINT LISTING OF THE MAJOR IMPACTS AND
DEVIATIONS RESULTING FROM IT.
C. THIS DOCUMENT WILL BE PREPARED AS A SPREAD SHEET AND UTILIZED AS A
TRACKING TOOL FOR DOCUMENTING ALL SIGNIFICANT ASSOCIATED DATES,
ACTION ITEMS, CURRENT STATUS, REJECTIONS/APPROVALS AND ADDITIONAL
PERTINENT ISSUES AND ITEMS TO BE RECORDED AND TRACKED AS REQUIRED
BY THE VA/COR.
8. EQUIVALENCY REQUEST(S) SUBMITTED TO VA
A. THE SUCCESSFUL GENERAL/PRIME CONTRACTOR SHALL SUBMIT TO THE
VA/COR FOR PRELIMINARY REVIEW A MASTER SUMMARY LISTING OF ALL
EQUIVALENT SUBSTITUTION REQUESTS WITH ANY/ALL IMPACTS IDENTIFIED.
B. A SEPARATE FULLY DETAILED SUBMISSION DOCUMENTATION PACKAGE SHALL
BE PREPARED FOR EACH SUBSTITUTION REQUEST AND WILL CONSIST OF
SEQUENCE ITEMS NUMBER 3, 4, 5 & 6 ALONG WITH ANY ADDITIONAL
PERTINENT INFORMATION DEEMED NECESSARY SUCH AS SKETCHES,
DETAILED DRAWINGS, ENGINEERING DESIGN AND CALCULATIONS, MORE
DETAILED DESCRIPTIONS, ETC.
9. VA REVIEW AND ACTION NOTIFICATION
A. THE VA/COR SHALL REVIEW EACH SUBSTITUTION REQUEST PACKAGE AND
TAKE SUCH ACTION AS DEEMED NECESSARY ON EACH. SUCH ACTION COULD
CONSIST OF REJECTION, APPROVAL OR DIRECTION ON PROVIDING MORE
DETAILED INFORMATION AND/OR CLARIFICATION(S) ON EACH SUBMISSION
AND/OR EACH IMPACT.
B. AS PART OF THE VA'S REVIEW PROCESS THE AE WILL ALSO BE INCLUDED IN A
SIMILAR FASHION TO THE SHOP DRAWING REVIEW PROCESS AND SHALL
CONSULT WITH THE VA/COR AND PROVIDE A RECOMMENDATION FOR THE
VA'S CONSIDERATION.
C. THE AE WILL REJECT IMMEDIATELY WITHOUT REVIEWING ANY SUBMITTAL
THAT IS DEEMED INCOMPLETE AND NOT IN COMPLIANCE WITH THE BOD
PROTOCOLS COMPLIANCE REQUIREMENTS.
D. IT SHOULD BE NOTED THAT IT IS NOT THE AE'S RESPONSIBILITY TO
RESEARCH, DOCUMENT AND PROVE EQUIVALENCE, THAT IS THE
REQUESTING/SUBMITTING CONTRACTOR'S RESPONSIBILITY AS PER THESE
PROTOCOLS. THE AE'S RESPONSIBILITY IS TO REVIEW AND ANALYZE THE
DETAILED COMPARATIVE DOCUMENTATION PROVIDED AND ADVISE THE
VA/COR ON WHAT WAS SUBMITTED.
10. VA APPROVAL ALLOWS SHOP DRAWING PROCESS TO BEGIN
A. PRIOR TO THE CONTRACTOR(S) BEING ALLOWED TO PROCEED WITH SHOP
DRAWING PREPARATION AND THE OFFICIAL SHOP DRAWING SUBMISSION(S)
PROCESS, THEY WILL FIRST NEED TO OBTAIN THE VA/COR APPROVAL(S) ON
EACH EQUIVALENT SUBSTITUTION REQUEST THAT WILL AFFECT THE SHOP
DRAWING PROCESS FOR THAT.
11. IMPLEMENTATION OF SUBSTITUTION(S) AND IMPACT(S)
GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED HEREIN.
PROTECTION PROTOCOLS: VERIFY AND COORDINATE ALL PROTECTION REQUIREMENTS TO BE PROVIDED FOR EACH SPECIFIC AREA OR LOCATION OF SCHEDULED WORK WITH THE VA/COR, BEFORE BEGINNING ANY WORK. WHEN PERFORMING DEMOLITION WORK IN ANY OCCUPIED SPACES FOLLOW THE “OCCUPIED AREAS PROTECTION PROTOCOLS” UNLESS MODIFIED IN WRITING BY
THE VA/COR ON A CASE BY CASE BASIS.
1. BEFORE BEGINNING ANY DEMOLITION WORK EACH CONTRACTOR AND DISCIPLINE SHALL PERFORM A FULL EXAMINATION OF ALL AREAS OF WORK AND FULLY VERIFY ALL EXISTING CONDITIONS ALONG WITH ALL OF THE AREAS OF WORK FOR ANY UNFORESEEN CONDITIONS OR DISCREPANCIES FROM THE DOCUMENTATION THAT WOULD AFFECT THEIR WORK AND/OR THE WORK OF OTHERS. ANY UNFORESEEN CONDITIONS OR DISCREPANCIES DISCOVERED ARE TO BE IMMEDIATELY IDENTIFIED AND COORDINATED WITH THE GENERAL/PRIME CONTRACTOR WHO SHALL IN TURN DOCUMENT AND PROMPTLY REPORT ANY SUCH CONDITIONS DIRECTLY TO THE VA/COR FOR DIRECTION ON HOW TO PROCEED BEFORE ALLOWING ANY WORK TO BEGIN.
2. ALL REQUIRED DEMOLITION WORK IS NOT NECESSARY LIMITED TO WHAT IS ONLY SPECIFICALLY SHOWN OR DIRECTLY CALLED OUT ON THE DEMOLITION PLANS OR THAT IS ONLY SPECIFICALLY IDENTIFIED WITHIN THE DEMOLITION NOTES DESCRIPTIONS. THE INTENT OF THE DOCUMENTATION IS TO GENERALLY IDENTIFY THE MORE SPECIFIC MAJOR ELEMENTS OF WORK IN PLACE THAT SHALL REQUIRE REMOVAL AND/OR REWORK IN ORDER TO ACCOMPLISH THE DESIGN INTENT OF THE DOCUMENTS. THE FULL EXTENT OF DEMOLITION WORK COULD INCLUDE BUT NOT NECESSARILY BE LIMITED TO ALL AFFECTED LESSER ELEMENTS OF ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, MEDICAL GASES, FIRE PROTECTION SPRINKLER SYSTEMS AND ALL ELECTRICAL SYSTEMS WORK INCLUDING HIGH AND LOW VOLTAGE POWER, COMMUNICATION SYSTEMS SUCH AS CCTV, SECURITY, IT DATA, LIFE SAFETY, FIRE PROTECTION, NURSE CALL, PA, BAS CONTROLS SYSTEMS, TEMPERATURE AND OTHERWISE, ETC.
3. ALL REQUIRED DEMOLITION WORK IS NECESSARY TO FACILITATE THE EXTENT OF BOTH THE NEW CONSTRUCTION WORK AS WELL AS TO FACILITATE THE REPLACEMENT, RELOCATION AND/OR THE REWORKING OF THE EXISTING SYSTEMS. ANY REWORKING OF THE CURRENT ELEMENTS AND COMPONENTS CURRENTLY NEEDING TO BE MODIFIED IN ORDER TO PROPERLY SUPPORT THE COMPLETED PROJECT SHALL BE PROVIDED AS INTENDED TO CONFORM WITH THE ORIGINAL DESIGN INTENT WHETHER SPECIFICALLY CALLED FOR IN GREAT DETAIL WITH EVERY ANCILLARY ELEMENT FULLY NAMED AND IDENTIFIED OR AS CALLED OUT AS A GENERAL COMPONENT PORTION OF WORK THAT NEEDS TO BE PROPERLY REMOVED IN ORDER TO COMPLETE THE SCOPE OF WORK AS INTENDED TO COMPLY WITH ALL BASES OF DESIGN REQUIREMENTS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE DEMOLITION AND REMOVAL OF ALL EXISTING WALLS, CEILINGS, SUSPENSION SYSTEMS, FLOORING, ELECTRICAL, TELEPHONE AND PLUMBING CONSTRUCTION AS WELL AS ALL MATERIALS, FINISHES AND EQUIPMENT THAT IS NOT SPECIFICALLY SHOWN OR CALLED FOR AS REQUIRED TO FACILITATE THE NEW CONSTRUCTION WORK INSIDE THE CONTRACT AREA, THE ADJACENT SPACES AND THE SPACES ABOVE AND BELOW. SOME ADDITIONAL ITEMS THAT MAY NOT BE SPECIFICALLY SHOWN IN GREAT DETAIL ON THE DEMOLITION PLAN THAT ARE A PART OF THE DEMOLITION WORK, BUT NOT LIMITED TO, ARE CASEWORK, SHELVING, BRACKETS, STANDARDS, DOOR HARDWARE, MISCELLANEOUS OTHER HARDWARE, SIGNAGE, FLOORING MATERIALS, WALL BASE, WOOD GROUNDS, WALL COVERING MATERIALS, BACKING LINERS OR BOARDS, ANY REMAINING MASTIC, GROUT, CAULKING AND SEALANTS, EXPOSED ANCHORS AND FASTENERS, FRAMING MATERIALS, BACKER BOARDS OR METAL PLATES, CHAIR RAILS, BRACKETS, HOOKS, SURFACE MOUNTED
OR RECESSED ACCESSORIES, PRIVACY CURTAINS AND TRACKS, ETC.
5. ALL DEMOLITION WORK SHALL BE PERFORMED IN A SYSTEMATICALLY SAFE FULLY SUPERVISED COORDINATED AND PROPERLY MANAGED SEQUENCE OF WORK UNDER THE DIRECT SUPERVISION OF THE GENERAL/PRIME CONTRACTOR’S SUPERINTENDENT AND/OR THEIR MANAGEMENT PERSONNEL INCLUDING THE PERFORMANCE OF ANY ANCILLARY ELEMENTS OF
SELECTIVE DEMOLITION.
6. ALL DEMOLITION, THE HANDLING OF MATERIALS AND EQUIPMENT ALONG WITH THE MOVEMENT OF THESE ELEMENTS THROUGHOUT THE FACILITY SHALL BE PERFORMED SO AS TO PREVENT DAMAGE TO ADJACENT IMPROVEMENTS AND FACILITIES TO REMAIN AS WELL AS TO PROVIDE SAFETY FOR ALL TRADESPEOPLE, STAFF, RESIDENTS/PATIENTS, VISITORS AND SERVICE
PROVIDERS.
7. PROVIDE ALL PHYSICAL AND ENVIRONMENTAL PROTECTIVE MEASURES AS REQUIRED BY THE PROJECT DOCUMENTS, VA FEDERAL AND LOCAL REQUIREMENTS, APPLICABLE OSHA REGULATIONS, THE STATION AND ALL LOCAL INFECTION CONTROL AUTHORITIES, NFPA REQUIREMENTS, THE VA/COR AND ALL OTHER REGULATORY AGENCIES AND VA AUTHORITIES HAVING
JURISDICTION OVER THIS PROJECT.
8. PROVIDE ALL TEMPORARY PARTITIONS, PROTECTION, DOOR ACCESS UNITS, ENCLOSURES, WALKWAYS, FENCING, RAILINGS, CANOPIES, AIR FILTRATION DEVICES, VESTIBULES, AIRLOCKS, ETC., WHERE REQUIRED BY THE CONTRACT DOCUMENTS, THE VA/COR AND ALL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT AND SHALL BE SURE TO MAINTAIN ADEQUATE AND SAFE EMERGENCY MEANS OF EGRESS FROM ALL AREAS. ALL SUCH WORK NEEDING TO BE PROVIDED WILL REQUIRE VA/COR REVIEW AND APPROVAL BEFORE BEGINNING ANY OF SUCH
WORK.
9. GREAT CARE SHALL BE TAKEN WHEN PERFORMING SELECTIVE DEMOLITION IN THE UTILIZATION OF MORE SENSITIVE AND LESS EVASIVE METHODS OF DEMOLITION/REMOVAL, AS WELL AS PROVIDING THE APPROPRIATE ENHANCED PROTECTIVE BARRIERS IN ORDER TO PROVIDE FOR THE LEAST AMOUNT OF DAMAGE TO THE WORK THAT IS TO REMAIN IN PLACE. EXISTING FINISHED SURFACES, MATERIALS AND EXPOSED EQUIPMENT THAT WOULD RECEIVE SIGNIFICANT AMOUNTS OF SURFACE DAMAGE AND WOULD REQUIRE SIGNIFICANT AMOUNTS OF PATCHING, REPAIRS AND REFINISHING WORK SHALL BE DEEMED AS DAMAGED AND UNUSABLE AND WILL NEED TO BE REPLACED IN WHOLE BY THE RESPONSIBLE CONTRACTOR AND ITS
REPLACEMENT ONCE COMPLETED WILL NEED TO RECEIVE VA/COR APPROVAL.
10. WHERE EXISTING FLOOR FINISHES ARE TO BE FULLY REMOVED TO ALLOW FOR THE INSTALLATION OF NEW, PROVIDE FOR THE COMPLETE REMOVAL OF THE EXISTING FLOOR FINISHES ALONG WITH ALL ASSOCIATED ATTACHMENT SYSTEMS SUCH AS MASTICS, ADHESIVES, TACKLES STRIPS, STAPLES, SETTING BEDS OF GROUT, MORTAR OR CONCRETE, CARPET PADDING, ATTACHED SUBFLOORING MATERIALS, ETC. AS REQUIRED TO GET DOWN TO THE EXISTING STRUCTURAL FLOOR SUBSTRATE THAT CAN BE PROPERLY PATCHED, REPAIRED, LEVELED AND
MADE READY TO RECEIVE THE NEW FLOOR FINISHES.
11. ITEMS INDICATED TO BE REMOVED AND SALVAGED FOR THE VA SHALL REMAIN THE VA’S PROPERTY AND SHALL BE CAREFULLY REMOVED, CLEANED AND PROTECTED FROM DAMAGE BY THE CONTRACTOR RESPONSIBLE AT ALL TIMES. ALL SUCH ITEMS INDICATED TO BE SALVAGED WILL BE PACKAGED AND/OR CRATED AS REQUIRED BY THE VA/COR TO PROPERLY PROTECT THEM FROM DAMAGE CAUSED BY THE HANDLING, MOVING AND/OR THE STORAGE OF THESE ITEMS. ALL PACKAGES AND/OR CRATES OF ITEMS SHALL HAVE THEIR CONTENTS CLEARLY MARKED AND FULLY IDENTIFIED ON BOTH THE TOP AND ONE SIDE OF EACH CONTAINER TO BE COORDINATED WITH AND APPROVED BY THE VA/COR. DELIVER ALL SALVAGED MATERIALS TO THE LOCATIONS INDICATED IN THE PROJECT DOCUMENTATION OR TO THE GOVERNMENTS DESIGNATED STORAGE FACILITY ON THE STATIONS CAMPUS AS DIRECTED BY THE VA/COR.
12. UNLESS OTHERWISE INDICATED OR STATED TO BE SAVED, SALVAGED OR IDENTIFIED AS NEEDING TO REMAIN OR BE RELOCATED AND/OR REUSED, ALL ITEMS IDENTIFIED TO BE REMOVED, DEMOLISHED, SCRAPED, ETC. BECOMES THE PROPERTY AND RESPONSIBILITY OF THE CONTRACTOR AND AS SUCH IT IS THEIR RESPONSIBILITY TO REMOVE ALL SUCH ITEMS FROM THE SIT
ON A DAILY BASIS UNLESS OTHERWISE APPROVED BY THE VA/COR.
13. DEMOLITION ITEMS OF VALUE TO THE CONTRACTOR(S) ARE NOT TO BE STORED ON SITE AND NEED TO BE REMOVED ON A DAILY BASIS UNLESS OTHERWISE APPROVED BY THE VA/COR.
14. ALL ITEMS OF WORK THAT ARE IDENTIFIED AS EXISTING TO BE REMOVED AND REUSED/REINSTALLED SHALL BE CAREFULLY DISCONNECTED, DETACHED, REMOVED AND DISASSEMBLED AS
REQUIRED FOR CONVENIENCE AND EASE OF HANDLING, MOVING, STORAGE AND FOR THEIR PROTECTION FROM DAMAGE. ALL SUCH ITEMS ARE TO BE INDIVIDUALLY WRAPPED, BOXED OR PLACED IN CARTONS FOR THE EASE OF HANDLING THE MATERIALS AND THEIR PLACEMENT IN A VA/COR IDENTIFIED PROTECTED STORAGE AREA (TBD) LOCATED ON THE STATION BUT NOT NECESSARILY CONVENIENT TO THE SITE OF THE WORK. EACH ITEM SHALL BE FULLY CLEANED, FREE FROM DAMAGE, PREPARED FOR SERVICE AND FULLY TESTED TO VERIFY ITS ABILITY FOR PROPER FUNCTIONAL REUSE PRIOR TO BEING PLACED IN STORAGE. THE CONTRACTOR TAKES RESPONSIBILITY FOR AND CERTIFIES ITS PERFORMANCE CAPABILITIES AND THE FACT THAT IT IS NOT DAMAGED AND FULLY CAPABLE FOR REUSE WHEN READY FOR ITS REINSTALLATION. IN THE EVENTUALITY THAT AN ITEM IS ULTIMATELY FOUND TO BE DAMAGED OR INOPERABLE AT THE POINT OF REINSTALLATION THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A NEW ITEM/DEVICE ALONG WITH ALL ANCILLARY SUPPORT WORK AND
EQUIPMENT NECESSARY TO FULLY REPLACE THE EXISTING.
15. WHERE EXISTING MATERIALS, ITEMS OR EQUIPMENT ARE TO BE REMOVED FOR THEIR REPLACEMENT IN THE SAME LOCATION BY THE SAME OR SIMILAR NEW MATERIALS, ITEMS OR EQUIPMENT, CAREFULLY DISCONNECT, DETACH, DISASSEMBLE IF REQUIRED, REMOVE AND DISPOSE OF THE ITEMS INDICATED ALONG WITH ANY AND ALL ANCILLARY SYSTEM
COMPONENTRY OR SUPPORT ITEMS ADDITIONALLY IDENTIFIED OR REQUIRED TO BE REPLACED.
16. WHERE STRUCTURAL SUPPORT OF EXISTING CONSTRUCTION ELEMENTS OR PORTIONS OF STRUCTURAL ELEMENTS TO REMAIN IS REQUIRED THE RESPONSIBLE CONTRACTOR PERFORMING THE WORK SHALL PROVIDE AND MAINTAINING ALL NECESSARY STRUCTURAL SUPPORTS, SHORING, STIFFENERS, BRACING, BEAMS, COLUMNS, FOOTINGS AND SUPPORTS AS NECESSARY TO ENSURE THE STABILITY OF THE ELEMENTS BEING SUPPORTED AND TO ADEQUATELY DISTRIBUTE ANY TEMPORARY LOADING SO AS NOT TO OVER LOAD ANY OF THE EXISTING STRUCTURE AND THE CONSTRUCTION BELOW. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL STRUCTURAL ENGINEERING ANALYSIS, CALCULATIONS AND SOLUTIONS FOR PROVIDING ANY SUCH WORK AND WILL NEED TO PROVIDE ALL SUCH PROPER DOCUMENTATION PREPARED BY A LICENSED STRUCTURAL ENGINEER TO THE VA/COR AS A SHOP DRAWING SUBMITTAL
FOR PROPER REVIEW AND APPROVAL BEFORE BEING ALLOWED TO BEGIN ANY SUCH WORK
17. ALL EXISTING CONSTRUCTION OR ITEMS INDICATED TO REMAIN IN PLACE AND OPERATION SHALL BE PROTECTED FROM DAMAGE BOTH DURING THE DEMOLITION OPERATIONS AS WELL AS THE NEW CONSTRUCTION EFFORTS. WHERE PRACTICABLE, AND WITH THE VA/COR'S APPROVAL, THE CONTRACTOR MAY ELECT TO REMOVE SUCH ITEMS TO A SUITABLE STORAGE LOCATION DURING THE DEMOLITION PHASE AND THEN PROPERLY CLEAN AND REINSTALL THE ITEMS WHEN APPLICABLE. IN NO CASE SHALL ANY LIFE SAFETY DEVICES, SYSTEMS OR MEASURES BE COMPROMISED BY THE TEMPORARY REMOVAL OF ANY NECESSARY ELEMENTS OF WORK, FOR THE CONVENIENCE OF THE CONTRACTOR, THAT WERE NOT PROPERLY
REPLACED IN KIND WITH A SIMILAR PROPERLY OPERATING TEMPORARY DEVICE.
18. DURING THE COURSE OF SELECTIVE DEMOLITION OR REMOVAL OPERATIONS AND THE EXISTING SUBSTRATE MATERIALS/CONSTRUCTION IS DAMAGED BEYOND REASONABLE REPAIR, THE CONTRACTOR SHALL BE RESPONSIBLE TO FULLY REPLACE THE ENTIRE DAMAGED SECTION AND/OR SECTIONS. THIS DAMAGED AREA SHALL BE REMOVED AND REPLACED AS REQUIRED TO REPAIR THE SUBSTRATE TO A LIKE NEW CONDITION THAT CONTAINS NO IRREGULAR JOINT CONNECTIONS, CONDITIONS, DEFECTS, WEAKNESS OR WILL CAUSE ADVERSE EFFECTS THAT WILL RESULT IN ANY DIFFERENTIAL FINISHED SURFACE CONDITIONS OR AREAS OF JOINT WEAKNESS THAT WILL RESULT IN SURFACE CRACKING AND BE APPARENT THAT THE CONDITION IS IN
FACT A PATCH/REPAIR.
19. REFER TO ALL ENGINEERING DISCIPLINE DRAWINGS AND DOCUMENTATION FOR THE BASIC EXTENT BEING REQUIRED FOR ALL INFRASTRUCTURE AND SYSTEMS DEMOLITION AS WELL AS FOR IDENTIFYING ALL EXISTING EQUIPMENT, PIPING, CONDUITS, DUCTWORK, WIRING, CONTROLS, ETC. THAT ARE INTENDED TO REMAIN WITHIN ANY OF THE AREAS OF DEMOLITION, THE
AREAS OF REWORKING OF EXISTING SYSTEMS AND THE AREAS OF NEW WORK.
20. UNLESS OTHERWISE NOTED ALL EXISTING PARTITION CONSTRUCTION WITHIN THE PROJECT AREA OF WORK SCHEDULED TO RECEIVE NEW FINISHES SHALL HAVE ALL EXISTING FINISHES REMOVED INCLUDING BUT NOT LIMITED TO ALL CERAMIC TILE, VINYL WALL COVERING, WOOD PANELING, WAINSCOT MATERIALS, GROUT, MASTIC, WALL COVERING BACKING, WALL BASE, ADHESIVE, STAPLES, EXPOSED FASTENERS, ETC. SUCH THAT THE SUB-STRAIGHT WALL/PARTITION SURFACES REQUIRE NO FURTHER DEMOLITION AND ARE PREPARED TO RECEIVE ALL REQUIRED PATCHING, REPAIRS, RESURFACING AND REFINISHING AS REQUIRED TO RECEIVE THE NEW FINISHES.
21. ALL FINISHED AREAS ADJACENT TO OR INCLUDED WITHIN THE AREA(S) OF CONSTRUCTION ALONG WITH ALL PUBLIC PROJECT ACCESS ROUTES SHALL BE PROTECTED FROM DUST AND DIRT THROUGH THE USE OF VA/COR APPROVED DUSTPROOF PROTECTION. SEE THE OCCUPIED AREA PROTECTION PROTOCOLS PROVIDED IN THE "GENERAL" DRAWINGS SECTION AND
COORDINATE ALL SITE SPECIFIC CONDITIONS IMPACTS ENCOUNTERED WITH THE VA/COR.
22. ALL NEW WORK ALONG WITH ANY PORTIONS OF EXISTING EQUIPMENT, MATERIALS OR REWORKED ELEMENTS WHEN COMPLETED SHALL FULLY COMPLY WITH ALL BASES OF DESIGN
REQUIREMENTS.
23. IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO ADEQUATELY PROTECT EXISTING CONSTRUCTION AND FINISHES TO REMAIN IN PLACE DURING BOTH THE DEMOLITION AND CONSTRUCTION SEQUENCES OF WORK. ANY DAMAGE TO SUCH AREAS SHALL BE RESTORED AND REFINISHED TO A "LIKE-NEW" CONDITION PRIOR TO THE VA/COR'S ACCEPTANCE OF THAT
WORK.
24. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE FOR THE PATCH, REPAIR, REFINISHING AND/OR REPLACEMENT OF ALL CONSTRUCTION, MATERIALS, ASSEMBLIES, EQUIPMENT, SIGNAGE AND FINISHES DAMAGED BY THE PROJECT DEMOLITION, TEMPORARY CONSTRUCTION, NEW CONSTRUCTION OR THE MOVEMENT OF PERSONNEL, TOOLS, EQUIPMENT, MATERIALS, ETC.
BOTH INSIDE AND OUTSIDE OF THE DESIGNATED AREAS OF WORK.
25. PROVIDE THE CUTTING AND PATCHING FOR ALL DEMOLITION WORK AND ALL NEW CONSTRUCTION WORK BEING PERFORMED OUTSIDE OF THE PROJECT LIMIT LINES AS REQUIRED TO
PROPERLY COMPLETE THE PROJECT SCOPE OF WORK.
26. ALL CUTTING, CORING AND DRILLING OF EXISTING CONCRETE AND MASONRY CONSTRUCTION SHALL NOT DAMAGE EXISTING REINFORCING STEEL, PIPING, CONDUITS OR OTHER CONCEALED CONSTRUCTION WITHIN. PRIOR TO CORING, DRILLING, CUTTING OR PERFORMING ANY BREAKING EFFORTS, PROVIDE PENETRATING FIELD X-RAYING OF THE INTENDED AREAS AND DOCUMENT THE EXACT SIZE AND LOCATIONS OF ALL SUCH INTERFERENCES. COORDINATE WITH AND OBTAIN VA/COR APPROVAL BEFORE PROCEEDING WITH ANY SUCH REQUIRED
PENETRATIONS WORK.
27. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE TO PROVIDE THE REMOVAL OF ALL CONSTRUCTION DEMOLITION DEBRIS, SPOIL AND MATERIALS FROM THE PROJECT SITE ON A DAILY BASIS UNLESS SPECIFICALLY REFERENCED OTHERWISE IN THE PROJECT SPECIFIC LOGISTICAL SEQUENCING REQUIREMENTS OR AS APPROVED BY THE VA/COR.
GENERAL DEMOLITION NOTES
BOD EQUIVALENT SUBSTITUTIONS PROCESS SEQUENCE:
1. BIDDING PHASE
A. ALL BOD PROPOSED EQUIVALENT SUBSTITUTIONS, DEVIATIONS AND ASSOCIATED IMPACTS SHALL BE FULLY IDENTIFIED AND COORDINATED WITH THE GENERAL/PRIME CONTRACTOR(S) DURING THE BIDDING PROCESS SUCH THAT THE COST OF ALL ASSOCIATED BOD SUBSTITUTION MODIFICATIONS, REQUIRED DEVIATIONS AND SCOPE OF WORK IMPACTS DIRECTLY AFFECTING OTHER TRADES
SHALL BE INCLUDED IN THE BASE BIDS OF ALL AFFECTED CONTRACTORS.
Revisions: Date:
35% SCHEMATIC DESIGN (SD1) 08/15/2019
EARTH
GRAVEL
CONCRETE
CONCRETE MASONRY UNIT
STEEL/STAINLESS STEEL
ALUMINUM
RIGID INSULATION
MORTAR/SAND/STUCCO/GYPS
UM BOARD SURFACE
SECTION NUMBER
SHEET WHERE
DRAWN
DETAIL NUMBER
SHEET WHERE
DRAWN
NAME OF LEVEL
HEIGHT ABOVE
PROJECT DATUM
XXX
X
XXXX
BUILDING &
WALL SECTION
EXTERIOR ELEVATION
DETAIL BUBBLE
SECTION DETAIL
INTERIOR ELEVATION
(MULTIPLE)
INTERIOR ELEVATION
(SINGLE)
PARTITION TYPE
WINDOW NUMBER
DOOR NUMBER
ROOM TAG
ELEVATION TAG
DRAWING TITLE AND SCALE
EQUIPMENT NUMBER
NOTE:
SEE CORRESPONDING NUMBERED LIST ON
SHEET WHERE TAG OCCURS UNLESS NOTED
OTHERWISE.
Room name
XXX
ELEVATION
0'-0"
TRUE
NORTH
PROJECT
NORTH
1 View Name 1/8" = 1'-0"
NORTH ARROW
N
REVISION NUMBER
X
XXXX
X
XXXX
X
XXXX
X
X
X
X
ELEVATION NUMBER
AND SHEET WHERE
DRAWN
XXXX
X
XX
XX
XXX REVISION
NUMBER
ROOM
NAME
ROOM
NUMBER
ELEVATION
NUMBER
SHEET WHERE
DRAWN
ELEVATION
NUMBER AND
DIRECTION OF
VIEW
SHEET WHERE
DRAWN
DETAIL NUMBER
SHEET WHERE
DRAWN
/ XXXXX
KEYNOTE TAG
CLOCK OR
CLOCK
OUTLET
MANUAL FIRE
ALARM PULL
STATION
LIGHT
SWITCH &
DIMMER
DUPLEX
OUTLET
DUPLEX
OUTLET
TELECOMM
OUTLET
THERMOSTAT SPECIAL
PURPOSE
OUTLETS
SPECIAL
PURPOSE
OUTLETS
JUNCTION BOXRACEWAY
4'
0"
4' -0
" M
AX
H
IG
H R
EA
C
H
3' -0
" M
IN
F O
R C
O N
TR
O
LS
1' -3
" M
IN
L O
W R
EA
C
H
1'
6"
CARD READER,
LOCAL ALARM, OR
ARMING STATION
SWITCH AT
DOOR OR
CASED
OPENING
AUDIBLE
AND/OR
VISUAL FIRE
ALARM
SECURITY
STROBE
LIGHT
(BLUE
LIGHT)
FIREMAN'S
TELEPHONE
JACK
DISCONNECT
SWITCH &
MOTOR
STARTER
EMERGENCY
STROBE OR
LIGHT AND/OR
NURSE CALL
LIGHT
8" TYP
4'
0"
7'
2"
7'
2"
4'
0" 5'
6"
7'
2"
FEC OR
FHV
CABINET
ELECTRICAL
PANELBOARD
(FLUSH MTD)
ELECTRICAL
PANELBOARD
(SURFACE MTD)
3'
6"
6'
0"
2'
3" M
AX
6'
0"
3'
0" M
IN
F
O R
C O
N
TR
O
LS
4'
0" M
AX
H
IG
H
R
EA
C H
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
12/18/2019
GENERAL - ABBREVIATIONS,
SYMBOLS & MOUNT.HEIGHTS
A/E DESIGN TO DEVELOP RFP FOR
PARKING STRUCTURE
VA NORTHERN CALIFORNIA HEALTHCARE SYSTEM
MA CR
612-165
GI002
FINAL DESIGN BUILD
PROPOSAL PACKAGE
S
S SOUTH S
SAN SANITARY S
SCHED SCHEDULE S
SF SQUARE FOOT (FEET) S
SHT SHEET S
SIM SIMILAR S
SOW SCOPE OF WORK S
SPEC SPECIFICATION S
SPKLR SPRINKLER S
SPKR SPEAKER S
SQ SQUARE S
SS STAINLESS STEEL S
STD STANDARD S
STL STEEL S
STOR STORAGE S
SUSP SUSPEND S
SV SHEET VINYL S
T
T&G TOUNGE AND GROOVE T
TEMP TEMPERED T
TERR TERRAZZO T
THK THICK T
TO TOP OF T
TSTAT THERMOSTAT T
TYP TYPICAL T
U
UNO UNLESS NOTED OTHERWISE U
V
VAR VARIES V
VC VA SUPPLIED, CONTRACTOR INSTALLED V
VCT VINYL COMPOSITION TILE V
VENT VENTILATION V
VIF VERIFY IN FIELD V
VOL VOLUME V
VV VA SUPPLIED & INSTALLED V
VWC VINYL WALL COVERING V
W
W WEST W
W/ WITH W
W/O WITHOUT W
WC WALL COVERING W
WD WOOD W
WDW WINDOW W
WWM WELDED WIRE FABRIC W
M
MATL MATERIAL M
MAX MAXIMUM M
MECH MECHANICAL M
MFR MANUFACTURER M
MIN MINIMUM M
MISC MISCELLANEOUS M
MLWK MILLWORK M
MO MASONRY OPENING M
MR MOISTURE RESISTANT M
MTD MOUNTED M
MTG MOUNTING M
MTL METAL M
N
N NORTH N
N/A NOT APPLICABLE N
NAT NATURAL N
NIC NOT IN CONTRACT N
NO NUMBER N
NTS NOT TO SCALE N
O
OA OVERALL O
OC ON CENTER O
OFIC OWNER FURNISHED INSTALLED BY
CONTRACTOR
O
OH OPPOSITE HAND O
OPNG OPENING O
OPT OPTIONAL O
P
PAT PATTERN P
PL PLATE P
PLAM PLASTIC LAMINATE P
PLAS PLASTER OR PLASTIC P
PR PAIR P
PRE PREFINISHED P
PREP PREPARATION P
PROVIDE FURNISHE AND INSTALL P
PT PAINT P
PTME PAINT TO MATCH EXISTING P
PTN PARTITION P
PWR POWER P
Q
QT QUARRY TILE Q
QTR QUARTER Q
QTY QUANTITY Q
R
R RADIUS R
RB RESILIENT BASE R
RCP REFLECTED CEILING PLAN R
REC RECESSED R
RECPT RECEPTACLE R
REINF REINFORCED R
REQD REQUIRED R
RM ROOM R
RO ROUGH OPENING R
E
E EAST E
EA EACH E
EJ EXPANSION JOINT E
EL ELEVATION E
ELEC ELECTRICAL E
ELEV ELEVATOR E
ENCL ENCLOSURE E
EQ EQUAL E
EQUIP EQUIPMENT E
EWC ELECTRIC WATER COOLER E
EXH EXHAUST E
EXIST EXISTING E
EXP EXPOSED E
EXT EXTERIOR E
F
FA FIRE ALARM F
FD FLOOR DRAIN F
FDN FOUNDATION F
FE FIRE EXTINGUISHER F
FEC FIRE EXTINGUISHER CABINET F
FF&E FURNITURE, FIXTURE AND EQUIPMENT F
FHC FIRE HOSE CABINET F
FIG FIGURE F
FIN FINISH F
FIXT FIXTURE F
FL FLOOR F
FO FACE OF F
FP FIRE PROTECTION OR FIREPROOF F
FT FOOT F
FTG FOOTING F
G
GC GENERAL CONTRACTOR G
GL GLASS G
GYP BD GYPSUM BOARD G
H
HAZ MAT HAZARDOUS MATERIALS H
HDW HARWARE H
HM HOLLOW METAL H
HT HEIGHT H
I
INCL INCLUDED I
INSUL INSULATION I
INT INTERIOR I
J
J-BOX JUNCTION BOX J
JAN JANITOR J
JC JANITOR'S CLOSET J
JST JOIST J
JT JOINT J
L
LAM LAMINATE L
LAV LAVATORY L
LED LIGHT EMITTING DIODE L
LF LINEAR FEET (FOOT) L
LL LEAD LINED L
LT LT L
COR CONTRACTING OFFICER REPRESENTATIVE
A
ACT ACOUSTICAL CEILING TILE A
ADJ ADJACENT A
AFF ABOVE FINISH FLOOR A
AHU AIR HANDLING UNIT A
ALT ALTERNATE A
ALUM ALUMINUM A
APPROX APPROXIMATE A
AR AS REQUIRED A
AUTO AUTOMATIC A
AUX AUXILIARY A
AV AUDIO VISUAL A
AVG AVERAGE A
B
BAT BATTEN B
BD BOARD B
BLDG BUILDING B
BLK BLOCKING B
BM BEAM B
BO BY OWNER B
BOD BASIS OF DESIGN B
CORR CORRIDOR B
C
CC CONTRACTOR SUPPLIED & INSTALLED C
CEM CEMENT C
CJ CONTROL JOINT C
CL CENTER LINE C
CLG CEILING C
CLR CLEAR C
CMU CONCRETE MASONRY UNIT C
CO CONTRACTING OFFICER C
COL COLUMN C
CONC CONCRETE C
CONT CONTINUOUS C
COORD COORDINATE C
CPT CARPET C
CT CERAMIC TILE C
CTR CENTER C
CTRL CONTROL C
D
DAT DATUM D
DBL DOUBLE D
DEG DEGREE D
DEMO DEMOLITION D
DEPT DEPARTMENT D
DF DRINKING FOUNTAIN D
DIA DIAMETER D
DIFF DIFFUSER D
DIM DIMENSION D
DN DOWN D
DR DOOR D
DTL DETAIL D
DWG DRAWING D
ARCHITECTURAL ABBREVIATIONS
MATERIAL INDICATIONSGRAPHIC SYMBOLS STANDARD MOUNTING HEIGHTS
Revisions: Date:
35% SCHEMATIC DESIGN (SD1) 08/15/2019
PARKING DATA CAR COUNT - REFER TO AE101
OPENESS SCHEDULE
PARKING STRUCTURE
OPENESS
20% OF AREA + 40" OF
LINEAL DIMENSION TO
BE OPEN, ON MIN.2
SIDES
OPEN AREA 20% REQUIRED
SOUTH EAST NORTH WEST
TOTAL AREA
(SF)
TOTAL OPEN
AREA (SF)
PERCENTAGE
OPEN*
PERCENTAGE
OPEN*
PERCENTAGE
OPEN*
PERCENTAGE
OPEN*
OVERALL
LINEAL OPENING 40% REQUIRED
SOUTH EAST NORTH WEST
TOTAL
LENGTH (LF)
TOTAL OPEN
LENGTH (LF)
PERCENTAGE
OPEN*
TOTAL
LENGTH (LF)
TOTAL OPEN
LENGTH (LF)
PERCENTAGE
OPEN*
TOTAL
LENGTH (LF)
TOTAL OPEN
LENGTH (LF)
PERCENTAGE
OPEN*
TOTAL
LENGTH (LF)
TOTAL OPEN
LENGTH (LF)
PERCENTAGE
OPEN*
OVERALL
TOTAL AREA
(SF)
TOTAL OPEN
AREA (SF)
TOTAL AREA
(SF)
TOTAL OPEN
AREA (SF)
TOTAL AREA
(SF)
TOTAL OPEN
AREA (SF)
1083 231 21% 7173 2128 * 30% * 2861 1253 44% 10,666 3218 30% 36%
113'-5" 34'-8" 30.5% 426'-4" 352'-0" 82.5% 126'-0" 94'-0" 75% 426'-8" 359'-2" 84.2% 76.9%
GROSS BUILDING AREA
FLOOR SF
BASEMENT 31,105
GROUND TIER 54,109
SECOND TIER 38,807
TOTAL 124,021
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
12/18/2019
GENERAL - CODE & BUILDING
INFORMATION
A/E DESIGN TO DEVELOP RFP FOR
PARKING STRUCTURE
VA NORTHERN CALIFORNIA HEALTHCARE SYSTEM
MA CR
612-165
GI101
FINAL DESIGN BUILD
PROPOSAL PACKAGE
APPLICABLE CODES AND STANDARDS
PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS,
MASTER FORMAT 2004
PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES,
PG-18-4 STANDARD DETAILS AND CAD STANDARDS, 2014
PG-18-8 SEISMIC DESIGN HANDBOOK, 2016
PG-18-10 DESIGN MANUALS BY DISCIPLINE, VARIOUS
DATES
PG-18-12 DESIGN GUIDES – SUPPLY PROCESSING &
DISTRIBUTION, 2017
PG-18-13 BARRIER FREE DESIGN GUIDE, DECEMBER 2017
PG-18-14 ROOM FINISHES, DOOR, AND HARDWARE
SCHEDULES, 2017
PG-18…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .