36C77623R0068 0002.docx

DOCX document 28 KB Posted

Attached to
Y1LZ--Construct Parking Structure Replacing Expiring Lease Design-Build - Martinez - 612-165 (VA-22-00043313)
Solicitation number
36C77623R0068
Issued by

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 612-165 36C776 Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 00076 Department of Veterans Affairs Department of Veterans Affairs 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders

36C77623R0068

X X X

The purpose of this amendment is to provide answers to additional vendor questions. The due date is not extended.

Martinez Parking Structure – Solicitation 36C77623R0068 Technical Questions

1. The instructions for Phase I proposals do not address submitting the SF 1442 or the amendments.

0. Are these documents to be included in our Phase I submission?

0. If so, will they count against the 28-page limit?

Answer: The 1442 should be submitted without pricing. It will not count towards the page limit.

1. Regarding the conceptual drawings issued with the RFP, in their conversion to PDF it seems that a good amount of text and notes became illegible. Can these be converted again and reissued?

Answer: The conceptual drawings should not be used as an example. They are not to be used to design to. They are more to be used for ideas.

1. Reference INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS, Part 1.9 Selection Procedures of the solicitation. Can the evaluation method be changed to “Best Value” in lieu of LPTA?

Answer: No.

1. Reference the Statement of Work for Design Build Services, Part 1.1. Please confirm that the 350 spaces are gross spaces and not net spaces (450 minus the 100 projected to lose).

Answer: Confirming the scope is 350 stalls total.

1. Reference the Statement of Work for Design Build Services, Part 3.5 where it states “Provide an elevator….” which would seem to indicate one elevator. The conceptual drawings indicate two elevators and the VA Design Guide stipulate two. Please confirm that two elevators are required.

Answer: It is up for the Contactor to work with the A/E firm to meet ADA requirements, and other relevant codes, based on the size of the design.

1. Reference the Statement of Work for Design Build Services 3.14, 3.8.2 where it states that the A/E is responsible for making “weekly construction site visits”. Weekly site visits seem overly excessive. Are monthly site visits during construction acceptable?

Answer: Weekly site visits are not inherently required. We would expect the AE to be on the weekly calls. It is likely that earlier in the project, more frequent site visits might be necessary. The AE would also need to perform site visits as needed for design issues, omissions, site conflicts, errors, etc. It is not an expectation that the AE to oversee the construction team more than necessary, but to be available as needed.

End of Document