Attachment 10 Price Proposal.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Civil Engineering Building and Utilities Mechanical III (CE BUMP III) at Arnold AFB
Solicitation number
FA910123RB007
Issued by

About this file

This pricing sheet requests pricing for two contract line item numbers (CLINs) under a request for proposal for the Civil Engineering Building and Utilities Mechanical III program at Arnold Air Force Base. CLIN 0001 is for a mandatory post-award conference at a firm-fixed price of $4,500, while CLIN 0002 is a seed project to repair and upgrade the fire suppression system in Building 579 with an estimated price between $250,000 to $500,000. Offerors are instructed to enter their total evaluated price for CLIN 0002 in the provided cell, which will automatically calculate the total price across both CLINs. The solicitation seeks design, repair, upgrade, testing and commissioning services for the fire suppression system within an eight-week outage period.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Attachment 10 Pricing Sheet

On the tab titled "Total Evaluated Price (TEP)", please enter the total price of the fire suppression system seed project (CLIN 0002) in cell C3. Please round up to the nearest dollar. Do not change the fortmating. The TEP will claculate automatically. CLIN 0001 Post-Award Conference is a firm-fixed-price of $4,500.00, do not change this amount.
Please return this pricing sheet with your proposal.

Total Evaluated Price (TEP)

CLINDescriptionTotals
0001Post-Award Conference: The contractor shall attend the post-award conference at Arnold AFB, TN. Post Award Conference Extended Description: This ONE-TIME USE CLIN is established to meet the minimum order requirements of $1K as stated in the RFP. The mandatory one-time post-award conference is required prior to work starting on the basic CE BUMP III Multiple Award Construction Contract Indefinite Delivery Indefinite Quantity (MACC IDIQ). See the Statement of Work (SOW) at Attachment 1 to the basic CE BUMP III MACC IDIQ. This CLIN is a firm-fixed-price of $4,500.00.$4,500.00
0002Task Order 01 (Seed Project): Repair Upgrade Fire Suppression System Bldg 579 at Arnold AFB Order of Magnitude: Between $250K - $500K. Seed project extended description: The Contractor shall provide all services, engineering, plans, labor, equipment, supplies, and materials to design, repair, and upgrade the CO2 fire suppression system for buildings 579. Work shall be performed at Arnold AFB, Tennessee. Installation, repair, upgrades, testing, and acceptance shall be performed within a an eight(8) week outage period.
Total Evaluated Price$4,500.00

PLEASE ROUND UP TO THE NEAREST DOLLAR