Attachment 10 Price Proposal.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- FA910123RB007
About this file
This pricing sheet requests pricing for two contract line item numbers (CLINs) under a request for proposal for the Civil Engineering Building and Utilities Mechanical III program at Arnold Air Force Base. CLIN 0001 is for a mandatory post-award conference at a firm-fixed price of $4,500, while CLIN 0002 is a seed project to repair and upgrade the fire suppression system in Building 579 with an estimated price between $250,000 to $500,000. Offerors are instructed to enter their total evaluated price for CLIN 0002 in the provided cell, which will automatically calculate the total price across both CLINs. The solicitation seeks design, repair, upgrade, testing and commissioning services for the fire suppression system within an eight-week outage period.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Attachment 10 Pricing Sheet
| On the tab titled "Total Evaluated Price (TEP)", please enter the total price of the fire suppression system seed project (CLIN 0002) in cell C3. Please round up to the nearest dollar. Do not change the fortmating. The TEP will claculate automatically. CLIN 0001 Post-Award Conference is a firm-fixed-price of $4,500.00, do not change this amount. |
| Please return this pricing sheet with your proposal. |
Total Evaluated Price (TEP)
| CLIN | Description | Totals |
| 0001 | Post-Award Conference: The contractor shall attend the post-award conference at Arnold AFB, TN. Post Award Conference Extended Description: This ONE-TIME USE CLIN is established to meet the minimum order requirements of $1K as stated in the RFP. The mandatory one-time post-award conference is required prior to work starting on the basic CE BUMP III Multiple Award Construction Contract Indefinite Delivery Indefinite Quantity (MACC IDIQ). See the Statement of Work (SOW) at Attachment 1 to the basic CE BUMP III MACC IDIQ. This CLIN is a firm-fixed-price of $4,500.00. | $4,500.00 |
| 0002 | Task Order 01 (Seed Project): Repair Upgrade Fire Suppression System Bldg 579 at Arnold AFB Order of Magnitude: Between $250K - $500K. Seed project extended description: The Contractor shall provide all services, engineering, plans, labor, equipment, supplies, and materials to design, repair, and upgrade the CO2 fire suppression system for buildings 579. Work shall be performed at Arnold AFB, Tennessee. Installation, repair, upgrades, testing, and acceptance shall be performed within a an eight(8) week outage period. | |
| Total Evaluated Price | $4,500.00 |
PLEASE ROUND UP TO THE NEAREST DOLLAR
File details come from the government source that posted it. Updated .