Attachment 09 Repair Upgrade Fire Suppression System Bldg 579 SOW.pdf
PDF 25 MB Posted
- Solicitation number
- FA910123RB007
About this file
This document provides the statement of work for the repair and upgrade of the fire suppression system in Building 579 at Arnold Air Force Base as part of the Civil Engineering Building and Utilities Mechanical Program III solicitation. The solicitation seeks proposals to repair and upgrade the fire suppression system, which includes replacing the existing wet pipe sprinkler system with a dry pipe sprinkler system, installing a fire pump, replacing valves, piping, and sprinkler heads, and performing associated testing and inspections. Proposals are due by the date specified in the solicitation documents for the Civil Engineering Building and Utilities Mechanical Program III opportunity issued by the Department of the Air Force Materiel Command Test Center.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
13776-21-016
ANZY209019
SOW NO. 13776-21-016
29 July 2021
STATEMENT OF WORK
TO
DESIGN/BUILD
REPAIR/UPGRADE APTU CO2 FIRE SUPPRESSION SYSTEM, BLDG. 579
ARNOLD ENGINEERING DEVELOPMENT COMPLEX
ARNOLD AIR FORCE BASE, TENNESSEE 37389-9998
NOT SENSITIVE
IRA-5792
NOT SENSITIVE – IRA-5792
ANZY209019 Table of Contents -1
TABLE OF CONTENTS
1 SCOPE
1.1 General
2 APPLICABLE DOCUMENTS
2.1 Government Documents
2.2 Non-Government Documents
2.3 Drawings
2.4 Specifications
3 REQUIREMENTS
3.1 General
3.2 Service Requirements
3.3 Qualifications
3.4 Design/Technical Requirements
3.5 Installation
3.6 Verification and Testing
3.7 Training
3.8 Quality Assurance
3.9 Submittals
Appendix A – Reference Drawings
Appendix B – CSI Specification Sections
ANZY209019 Page -1
1.
1.1
1.2
1.3
1.4
SCOPE
General: Contractor shall provide all services, engineering, plans, labor, equipment, supplies, and materials to design, repair, and upgrade the CO2 fire suppression system for buildings 579. Work shall be performed at Arnold Air Force Base, Tennessee. Installation, repair, upgrades, testing, and acceptance shall be performed within a an eight(8) week outage period.
Design and installation of the fire systems shall be performed and stamped by a Qualified Fire Protection Engineer (QFPE) in the State of Tennessee. The fire protection system installation shall be performed by a certified Fire Protection Contractor licensed in the State of Tennessee.
Lead and asbestos materials are not anticipated during execution of this project.
However, if the Contractor encounters lead or asbestos materials, the Contractor shall cease work and immediately notify the Government for further instruction.
The work includes site investigations, verification of existing as-built conditions, analysis, space utilization, occupant activity, energy source, equipment selection, and detailed drawings that clearly show new equipment locations, interfaces, and interferences. The Contractor is strongly encouraged to visit the site to verify existing conditions prior to submitting proposals or beginning design work. All proprietary equipment or software necessary shall be provided as part of this contract.
2. APPLICABLE DOCUMENTS: All fire systems shall be designed and installed in accordance with the latest edition of the following standards and primary industry codes. However, Contractor shall determine and comply with all industry standard required codes.
2.1 Government Documents:
2.1.1 AEDC Safety, Health, and Environmental (SHE) Standards latest version, available upon request from the Government. The Contractor shall determine applicable SHE Standards and include in their specification.
A. A6 with Supplement User and Subcontractor Safety (Mandatory Documents/Submittals).
B. A10 Job Safety Analysis.
2.1.2 AEDC Engineering Standards:
A. T3 Engineering Design and Drafting Practices, 2013.
2.1.3 United Facility Criteria:
A. UFC 3-600-01 Fire Protection Engineering for Facilities.
ANZY209019 Page -2
2.2 Non-Government Documents:
2.2.1 Contractor shall consider all relevant industry code standards in performing this scope of work. The following is a list of the primary code requirements.
2.2.2 National Fire Protection Association:
A. NFPA 12-18 Carbon Dioxide Extinguishing Systems.
B. NFPA 70-20 National Electrical Code (NEC).
C. NFPA 72-19 National Fire Alarm and Signaling Code.
D. NFPA 101-18 Life Safety Code.
E. NFPA 423-16 Construction and Protection of Aircraft Engine Test Facilities.
2.3 Drawings
2.3.1 Reference Drawings
A. The reference drawings in Appendix A of existing infrastructure, systems, structures and conditions are provided “for information only”. The information on these drawings may or may not reflect exact conditions at the current site. It is at the Contractor’s expense and it is the Contractor’s responsibility to verify applicable conditions and dimensions before proceeding with any work.
2.3.2 Specifications: The following CSI Specification sections (relevant to AEDC) are provided in Appendix B. The Contractor shall include requirements in these specification sections in their design. Applicable codes and standards within these specification sections apply to this scope of work.
A. B.1 - 01 10 00 - Job Conditions at AEDC.
B. B.2 - 01 33 00 - Submittal Procedure.
C. B.3 - 01 74 19 - Construction Waste Management and Disposal.
3. REQUIREMENTS
3.1 General:
3.1.1 Authority Having Jurisdiction: The designated Authority Having Jurisdiction (AHJ) will be the determining official to resolve any differences in requirements among the codes cited. The AHJ will also make the final determination of the application of code requirements to AEDC. The Contractor shall obtain through the Contracting Officer the AHJ’s approval in writing in resolving such conflicts. In
ANZY209019 Page -3
NFPA publications referred to herein, consider advisory provisions to be mandatory, as though the word "shall" had been substituted for "should" wherever it appears; interpret reference to "authority having jurisdiction" to mean the Contracting Officer’s designated representative.
3.1.2 Personnel: Provide a list of personnel assigned to this project with telephone numbers and email addresses. Identify the team design lead and respective design discipline of each member of the team. The Contractor shall be available for contact during the construction.
3.1.3 Work Schedule: Work schedules shall be coordinated in advance with Government Representative. Government escorts will be provided for all work in secure areas. Installation, repair, upgrades, testing, and acceptance shall be performed within a an eight(8) week outage period.
3.1.4 Schedule: Within 10 days following notice to proceed, prepare and submit an overall schedule showing each major design, procurement, and installation milestones and their proposed duration and completion dates. The schedule submitted shall conform to the contract performance period. The Government will furnish the schedule for areas affected by this work upon request of the Contractor. Contractor shall complete on-site construction work within 8 weeks.
3.1.5 Meetings: All meetings shall be conducted at AEDC unless otherwise specified by the Government.
3.1.6 Ownership: Final design documentation shall become the sole property of the Government.
3.1.7 The Contractor shall generate specifications and drawings to be used during the construction (or installation) of the project. The Contractor shall determine applicable sections to be included in the construction documents. Specifications shall not be marked “proprietary” or “company confidential.” All Contractor-generated specifications will become the property of the Government.
3.1.8 Contractor shall provide all design/build services for the scope of work defined herein.
3.1.9 Contractor shall provide and submit all design calculations, drawings and specifications (CSI format) in accordance with industry code standards and Government standards herein.
3.2 Service Requirements:
3.2.1 Investigation and surveys:
A. Onsite as-built conditions. Contractor shall verify drawings and existing conditions. Submit findings to the Government before beginning work.
ANZY209019 Page -4
3.2.2 Design Reviews: The Contractor shall conduct meetings at Arnold AFB with the Government and AEDC stakeholders and shall provide meeting minutes and comment resolution for the following:
A. 30% Design Review.
B. 60% Design Review.
C. 90% Design Review.
D. 100% Final Review.
3.2.3 Allow a minimum of 14 calendar days once submission is received for the Government to review submissions made by the Contractor.
3.2.4 After each Government review of the design package submittals, the Contractor shall make changes and corrections as necessary. The Contractor shall furnish the Government written disposition of the review comments within 14 calendar days of receipt of the comments. The disposition of comments may be presented at the design review meeting.
3.2.5 The Contractor shall prepare and submit meeting minutes for each meeting with the Government or the Government Representative. Meeting minutes shall be submitted within one week after the meeting. Meeting minutes shall be considered final after approval by the Government.
3.2.6 Final fire related drawings and calculations shall be stamped by a Qualified Fire Protection Engineers licensed in the State of Tennessee. Final drawings and calculations not related to fire shall be stamped by a Professional Engineer that is qualified for each respective discipline.
3.2.7 Required design submittals: Proceed with project design upon receiving and incorporating Government comments from each phase according to Appendix B.2.
3.2.8 All submittals shall be in accordance with Appendix B.2 Submittal Procedure. In addition to design review meetings, the Government may request status updates or technical discussion by phone.
3.2.9 Design Reviews: Proceed with project design upon receiving and incorporating Government comments from each phase according to the following:
A. Design Concepts/Investigation Study Phase (30% Design Review):
Perform an on-site pre-design review and inspections to verify existing conditions. At the outset of the conceptual design, the work shall commence with a meeting with the Government, Contractor, and users to fully understand and confirm requirements and design alternatives.
Provide conceptual designs, hazard analyses, code analyses, ANZY209019 Page -5 construction schedule, and budgetary cost estimates. This design document package shall be submitted to the Contracting Officer within 40 days after Notice to Proceed (or date as agreed to by the Government).
B. (60% Design Review): Provide all catalog cut sheets detailing technical information for the components of each system. Provide working plans, current as built drawing detailing the system affected by the scope of work, and preliminary calculations. Provide specification for all materials being used on the design. This design document package shall be submitted to the Contracting Officer within 40 days after receipt of 30% design review comments (or date as agreed to by the Government).
C. (90% Design Review): Provide final drawings, estimates, specifications, calculations, and analysis. This design document package shall be submitted to the Contracting Officer within 40 days after receipt of 60% design review comments (or date as agreed to by the Government).
Drawings shall show floor plan of all construction, fire alarm equipment, and fire alarm devices.
D. Final Design (100%): Prior to beginning construction, furnish final design documentation including drawings, specifications, estimates, calculations, and other required deliverables. Drawings shall be stamped by a Qualified Fire Protection Engineer, licensed in the State of Tennessee. This design package shall be submitted to the Contracting Officer within 14 calendar days after receipt of 90% design review comments. The final design shall be submitted as one package including drawings, specifications and calculations. The Contractor shall include a Drawing Index to the Title Sheet and include it in the design package. For drawing format, reference AEDC Engineering Standard T3, Engineering Design and Drafting Practices. All drawing submittals shall be in accordance with Appendix B.2 Submittal Procedure in English units of measure. Final design documentation shall become the sole property of the Government and shall be used by the Government without encumbrance or restrictions.
E. Final calculations and meeting minutes shall be in accordance with Appendix B.2 - Submittal Procedure. Meeting minutes will be considered final after approval by the Government.
F. Design review documentation, including hazard analysis, engineering drawings, equipment, materials, and calculations shall be sent to the Contracting Officer electronically followed by five hard copies received 14 calendar days prior to the design review date for approval. Calls between the Contractor and the Government Representative shall be placed at least weekly for technical discussion and updates.
ANZY209019 Page -6
3.3 Qualifications:
3.3.1 Design Services: Design drawings shall be prepared by or under the supervision of a registered Fire Protection Engineer licensed in the State of Tennessee.
Submit copy of the professional engineering license.
3.3.2 Shop Drawing Services: Shop drawings and calculations for Special Hazards fire systems shall be prepared by an individual with a National Institute for Certification in Engineering Technologies, Special Hazards Systems, NICET Level III certification. Submit a copy of the NICET Level III certifications of the individual(s) preparing the shop drawings.
3.3.3 Installer: The installation of the fire protection system shall be performed by a Fire Protection Contractor with the licenses required by the State of Tennessee.
A NICET Level III fire alarm technician shall supervise the installation of the fire alarm system. A NICET Level II or higher fire alarm technician shall install and terminate fire alarm devices. A NICET Level II or higher Special Hazards Systems technician shall install and terminate Special Hazards Systems. Submit a copy of the NICET certifications for the installation supervisor and installer individuals.
3.3.4 Testing: A NICET Level III fire alarm technician shall be utilized to test and certify the fire alarm devices, cabinets, and panels. A NICET Level III Special Hazards Systems shall test CO2 system. Submit copy of the NICET certifications for the testing individuals.
3.4 Design/Technical Requirements:
3.4.1 CO2 System
G. The system design shall comply with the requirements of all applicable code/standards and shall include but are not limited to NFPA 12, NFPA 70, NFPA 72, NFPA 101, NFPA 423, UFC 3-600-01, and all other applicable NFPA standards required by UFC 3-600-01.
H. The system design shall include but not be limited to wiring, raceways, fire suppression valves, controls, control consoles, control panels, battery backup, and all associated initiation and notification devices and miscellaneous items required for a complete operating system as determined by QFPE. Final quantity, system layout, and coordination are the responsibility of the Contractor.
I. The Contractor shall verify all technical requirements necessary for the design of the modifications to the existing CO2 suppression system for applicable areas of Building 579. Materials and technical requirements provided herein are not necessarily exhaustive in nature.
ANZY209019 Page -7
J. The Contractor shall perform and submit a code analysis to determine all relevant and applicable code requirements. The code analysis shall be performed by a QFPE in accordance with UFC 3-600-01 and. Submit the code analysis to the Government for approval.
K. Based on investigations and as-builts recertification, Contractor shall integrate the suppression system with the existing interfaces to minimize interferences.
L. The Contractor shall perform and submit a hazard analysis to identify hazards in the facility. The hazard analysis shall be performed by a QFPE in accordance with UFC 3-600-01. Submit the hazard analysis to the Government for approval.
M. The Contractor shall be responsible for all required programming of the existing Fire Alarm Control Panel (Notifier 640).
N. Kirk Key System: Add a Kirk Key System to the CO2 System. Provide One Key Control.
O. The Contractor shall program the CO2 releasing panel to indicate the “Normal” or “Supervisory” condition for the CO2 valve tamper switches based on the mechanical state of the kirk key system as follows:
1. “Normal” – Kirk key system is set in “Closed valve” configuration and CO2 valves are closed.
2. “Normal” – Kirk key system is set in “Open valve” configuration and
CO2 valves are open.
3. “Supervisory” – Kirk key system is set in “Closed valve” configuration and CO2 valves are open.
4. “Supervisory” – Kirk key system is set in “Open valve” configuration and CO2 valves are closed.
P. Control Room Console:
1. Provide Momentary Push Button for CO2 Spurts.
2. Provide Press and Hold (3-5 second delay) Button for Flood Activations.
Q. Visual Notification: Provide Visual Notification only for CO2 Activations in the Control Room.
R. Manual Activation: Provide Manual activation only for CO2 System.
S. Output Signal: Provide the following output signals (24VDC) from the CO2 Releasing Panel:
1. Kirk Key Configuration.
ANZY209019 Page -8
2. CO2 System Armed/Disarmed.
3. Spurt Activation.
4. Cell Flood Activation.
5. Pit Flood Activation.
T. Double Block and Bleed: At CO2 Tank add a second main manual control valve to provide Double Block and Bleed isolation at the tank for maintenance purposes.
U. Provide Remote Pneumatic Station outside the control room to activate CO2 Spurts and Floods in the event electronics fail to activate the CO2 System.
V. Paint and label all CO2 Piping.
W. Label exhaust duct entry point.
3.5 Installation:
3.5.1 General
A. All work shall be performed in accordance with Appendix B.1, Job Conditions for requirements for performing work at AEDC.
B. After the approval of the 100% design, the Contractor shall attend a preconstruction conference at Arnold Air Force Base. At such conference the Contractor shall meet with the Contracting Officer and other selected personnel and be briefed on such things as safety issues, obtaining electrical hold orders, obtaining digging and burn permits, equipment and material lay-down area; pass, registration, and security issues, waste disposal, and test and inspection procedures.
C. During the project construction phase (8 week build performance period), the Contractor shall meet weekly with the Government Representative, or as requested, to provide an update on the status and coordinate activities.
D. Provide equipment, materials, installation, workmanship, inspection, and testing in strict accordance with the required and advisory provisions of NFPA 12, NFPA 70, NFPA 72, NFPA 101, NFPA 423, UFC 3-600-01, and except as modified herein. Provide system complete and ready for operation.
E. Remove ceiling tile and work around existing grid as required to perform work. Replace all damaged ceiling tiles or grid with same like and kind of integrated acoustical ceiling system to match existing.
ANZY209019 Page -9
F. All new wall, ceiling, or floor penetrations shall be sealed. Specific guidance will be given by the Government Representative at the on-site pre-design review and inspections.
G. After the final inspection and successful testing, the Contractor shall convene a construction completion conference. At this conference, all unresolved issues (punch list) shall be addressed and upon their resolution, the system shall be accepted by the Government.
3.5.2 Site Conditions
A. The system shall operate in an industrial setting. The Contractor shall become familiar with the existing site conditions, including site location, site configuration, topography, climate, site accessibility and adjacent land use.
3.5.3 Safety
A. The Contractor shall maintain a safe and healthy work environment for their employees in accordance with and documented in accordance with OSHA requirements and AEDC SHE Standards as identified during design. Prior to construction, the Contractor shall review the AEDC SHE Standards and submit a Safely Plan in accordance with AEDC SHE Standards A6 with Supplement.
3.5.4 Demolition
A. Submit a demolition plan prior to beginning construction. All construction waste shall be disposed of in accordance with Appendix B.3 Construction Waste Management and Disposal.
3.5.5 Installation Support:
A. Onsite supervision of construction.
B. Prepare Job Safety Analysis per AEDC Standard A10.
C. Conduct a pre-final walk through inspection with AEDC stakeholders.
D. Conduct a suppression/detection operational test.
3.5.6 Outages:
A. The Contractor shall coordinate outages (including utilities) with the Government Representative. The Contractor shall submit utility outage requests for Government approval at least two weeks prior to each requested outage date. Utility tie in’s such as electrical and any other
ANZY209019 Page -10 outages shall be identified during design, and coordinated as required. All material shall be on base prior to outage approval.
B. Outage approvals will be based on Air Force test Schedule.
C. During outage periods, the Contractor shall meet with the Government Representative daily, or as requested, to provide an update on the status and coordinate activities.
3.6 Verification and Testing:
3.6.1 Battery Testing – The Contractor shall verify that battery capacity complies with UFC 3-600-01 requirements.
3.6.2 Preliminary Acceptance Testing – The Contractor shall ensure that the systems are ready and shall perform preliminary tests before Final Acceptance Testing.
3.6.3 Final Acceptance Testing - The Contractor shall perform final acceptance testing in accordance with UFC 3-600-01. Coordinate testing with the Government.
3.6.4 The Government will accept the installation of the systems upon demonstration of successful acceptance testing and receipt of all submittals.
3.7 Training: The Contractor shall coordinate and provide 8 hours system training to the appropriate shops to include electricians, pipefitters, and fire department.
3.8 Quality Assurance:
3.8.1 Equipment and devices shall be compatible and operable with all other system components.
3.8.2 The recommended practices stated in the manufacturer's literature or documentation shall be considered as mandatory requirements.
3.8.3 Materials and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of similar products.
3.9 Submittals:
3.9.1 Provide all submittals in accordance with Appendix B.2 and as follows.
3.9.2 Do not purchase materials for this project until design is complete, approved, and material submittals have been approved by the Government in writing. Any work performed by the Contractor, without authorization of the Government, which does not conform to the Design Requirements of this Statement of Work shall be corrected by the Contractor at no additional cost to the Government.
3.9.3 This Statement of Work includes a list of submittals in 3.9.4 that are required during design or prior to installation. Specific information regarding design review
ANZY209019 Page -11 submittals are provided in Appendix B.2. Additional submittals are provided within this SOW and listed as follows:
A. The Contractor shall provide a proposed installation plan that minimizes the overall impact to the test facility. The installation plan shall indicate work breakouts that can be performed within an eight(8) week duration, including verification and acceptance testing.
B. The Contractor shall provide a maintenance plan for the proposed design solution. Include a list of proposed spare parts and consumables anticipated as part of a maintenance plan. Coordinate with the Government for approval.
C. Design drawings shall include, but not be limited to, QFPE code analysis, site plans, building plans, fixture locations, sections, elevations, details, and fixture schedules. Electronic documentation submitted in accordance with the Submittal Section in Appendix B.2.
D. The following submittals shall be provided before, during and after installation/construction and listed in the submittal register prepared by the Contractor.
1. The Contractor shall document and maintain a list of all modifications and substitutions made during the project and submit to the Government at conclusion of the project as part of as-built package.
2. Hazard Analysis.
3. Codes Analysis.
4. Schematic diagrams.
5. Operating and maintenance instructions.
6. Manufacturer’s cut sheets, and descriptive data for each piece of equipment.
7. Parts list and recommended spare parts. The list shall give the manufacturer’s name, part number, and vendor for each item.
8. Warranty: The Contractor shall provide a standard one year standard manufacturer warranty for all equipment, or manufacturer’s standard warranty, whichever is longer. The warranty period shall begin after acceptance at AEDC.
9. As-Built drawings: The Contractor shall provide final Record (As- Built) drawings showing final configuration of work accomplished.
10. Furnish all final shop drawings for review prior to fabrication.
11. Provide a copy of the Fire Panel Program in electronic format on
CD-ROM.
3.9.4 The submittals listed in Table 1 below shall be provided during or after design, before construction.
Table I.
ANZY209019 Page -12
No. Paragraph Reference Submittal Description Due
1 Para 3.1.2 List of personnel At kickoff meeting
2 Para 3.1.4 Design Schedule Within 10 days after award
3 Para 3.1.9 Design Calculations After receipt of 30%, 60%, 90%, 100% design review comments
4 Para 3.2.1.A Field Survey/Existing Conditions Before Beginning Work
5 Para 3.2.5 Meeting Minutes Within 1 week after meeting
6 Para 3.2.9.A 30% Design Review 40 days after notice of award
7 Para 3.3.9.B 60% Design Review 40 days after receipt of 30% design review comments
8 Para 3.2.9.C 90% Design Review 40 days after receipt of 60% design review comments
9 Para 3.2.9.D 100% Final Design 14 days after receipt of 90% design review comments
10 Para 3.3.1 Fire Protection Engineer License Within 10 days after task order award
11 Para 3.3.2 Certification of Individual doing shop drawings
Within 10 days after task order award
12 Para 3.3.3 Certification of installation contractor Within 10 days after task order award
13 Para 3.3.4 Certification of testing individual Within 10 days after task order award
14 Para 3.4.1.D Code Analysis At each design review submittal
ANZY209019 Page -13
No. Paragraph Reference Submittal Description Due
15 Para 3.4.1.E Hazard Analysis At the 30% design review submittal
16 Para 3.5.3 Safety and Health Plan Before beginning on site work
17 Para 3.5.4.A Demolition Plan Prior to beginning construction
18 Para 3.5.6.A Outage Requests 2 weeks prior to outage
ANZY209019 Appendix B.1-1
APPENDIX A
REFERNCE DRAWINGS
DRAWING REFERENCE
G E N E R A L N O T E S
DWG NO.
R E V I S I O N S
DATE:BY:REV.
DESCRIPTION
DESCRIPTION:
DRAWN BY:
DATE:
REV:
SCALE:
APP'D BY:
ELECTRICAL WIRING DIAGRAM
APTU BUILDING
ARNOLD AIR FORCE BASE
LOW PRESSURE CO2 FIRE EXTINGUISHING SYSTEM
D. BURKE
8/29/07
A
NTS
13776-21-016
ANZY209019 NOT SENSITIVE - IRA-5792 Appendix A - 1
AutoCAD SHX Text
ELECTRICAL WIRING DIAGRAM FACP #2 - BUILDING FIRE ALARM
AutoCAD SHX Text GROUND SHIELDS AT THIS END ONLY . USE TWISTED, SHIELDED . USE TWISTED, SHIELDED PAIR CHARACTERISTIC IMPEDANCE 120 OHMS (+,- 20%) DO NOT ALLOW SHIELD DRAIN WIRE NOT ALLOW SHIELD DRAIN WIRE ALLOW SHIELD DRAIN WIRE TO ENTER ENCLOSURE. GROUND EXTERNALLY. .
AutoCAD SHX Text
24VDC, POWER LIMITED USER POWER. 1.25A (MAX.) PER CIRCUIT.
AutoCAD SHX Text
TB11
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
NC
AutoCAD SHX Text
TB9
AutoCAD SHX Text
TROUBLE
AutoCAD SHX Text
NC
AutoCAD SHX Text C
AutoCAD SHX Text
NO
AutoCAD SHX Text
ALARM
AutoCAD SHX Text
NC
AutoCAD SHX Text
NO
AutoCAD SHX Text C
AutoCAD SHX Text
TB8
AutoCAD SHX Text C
AutoCAD SHX Text B-
AutoCAD SHX Text A+
AutoCAD SHX Text B+
AutoCAD SHX Text B-
AutoCAD SHX Text
TB6
AutoCAD SHX Text A-
AutoCAD SHX Text B+
AutoCAD SHX Text B+
AutoCAD SHX Text A+
AutoCAD SHX Text A-
AutoCAD SHX Text
TB5
AutoCAD SHX Text A+
AutoCAD SHX Text B-
AutoCAD SHX Text
TB4
AutoCAD SHX Text A-
AutoCAD SHX Text
REL 2
AutoCAD SHX Text
NAC/
AutoCAD SHX Text
REL 1
AutoCAD SHX Text
REL 3
AutoCAD SHX Text
NAC/
AutoCAD SHX Text
NAC/
AutoCAD SHX Text
TB3
AutoCAD SHX Text B-
AutoCAD SHX Text B+
AutoCAD SHX Text A+
AutoCAD SHX Text A-
AutoCAD SHX Text
NAC/
AutoCAD SHX Text J11
AutoCAD SHX Text
REL 4
AutoCAD SHX Text
AutoCAD SHX Text
TB14
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
TB10
AutoCAD SHX Text
NC
AutoCAD SHX Text
SUPERVISORY
AutoCAD SHX Text C
AutoCAD SHX Text
NO
AutoCAD SHX Text
NO
AutoCAD SHX Text
TX
AutoCAD SHX Text
PC/CRT
AutoCAD SHX Text
RX
AutoCAD SHX Text
REF
AutoCAD SHX Text
TX
AutoCAD SHX Text
TB15
AutoCAD SHX Text
REF
AutoCAD SHX Text
RX
AutoCAD SHX Text
EIA-485
AutoCAD SHX Text
TB12
AutoCAD SHX Text
REC
AutoCAD SHX Text
AutoCAD SHX Text
XMIT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EIA-485 ACS
AutoCAD SHX Text
TB13
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NEUTRAL
AutoCAD SHX Text
TB2
AutoCAD SHX Text
HOT
AutoCAD SHX Text
EARTH
AutoCAD SHX Text
BATTERY 24VDC
AutoCAD SHX Text
AutoCAD SHX Text
TB1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TB7
AutoCAD SHX Text
RESETABLE
AutoCAD SHX Text
AutoCAD SHX Text
NON-
AutoCAD SHX Text A+
AutoCAD SHX Text
SLC1
AutoCAD SHX Text
TB16
AutoCAD SHX Text B-
AutoCAD SHX Text A-
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ABLE
AutoCAD SHX Text
RESET-
AutoCAD SHX Text B+
AutoCAD SHX Text M1
AutoCAD SHX Text
RATED 2A @24VDC (RESISTIVE) DO NOT APPLY NOT APPLY APPLY AC VOLTAGE
AutoCAD SHX Text J5
AutoCAD SHX Text J6
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 2.2K
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 2.2K
AutoCAD SHX Text
SPARE NAC/ RELEASING
AutoCAD SHX Text
BATTERY
AutoCAD SHX Text
BATTERY
AutoCAD SHX Text B+
AutoCAD SHX Text B-
AutoCAD SHX Text
12AH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
12AH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
120V/1 /60HZFROM CUSTOMER'S DEDICATED, PROTECTED SUPPLY (3A MAX.)
AutoCAD SHX Text
DENOTES WIRING EXTERNAL TO PANEL.
AutoCAD SHX Text
DENOTES WIRING INTERNAL TO PANEL.
AutoCAD SHX Text DENOTES TWISTED, UNSHIELDED PAIR WIRE. OBSERVE POLARITY AS MARKED ON MODULE TERMINALS.
AutoCAD SHX Text 2.2K
AutoCAD SHX Text
.328A (TYP.)
AutoCAD SHX Text
W/P HORN/STROBE WIRING DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FROM PREVIOUS DEVICE OR FACP
AutoCAD SHX Text
TO NEXT DEVICE OR ELR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STROBE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AUDIBLE
AutoCAD SHX Text
TONE
AutoCAD SHX Text
SW2
AutoCAD SHX Text
SW3
AutoCAD SHX Text
SW4
AutoCAD SHX Text
HORN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BELL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MARCH TIME HORN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CODE 3 HORN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CODE 3 TONE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLOW WHOOP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SIREN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HI/LOW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MULTI-TONE HORN SWITCH SETTINGS
AutoCAD SHX Text
SW1
AutoCAD SHX Text HI dBA
AutoCAD SHX Text
AutoCAD SHX Text LOW dBA
AutoCAD SHX Text
AutoCAD SHX Text
OUTPUT LEVEL
AutoCAD SHX Text
%%UMULTI-TONE HORN DETAILS
AutoCAD SHX Text
X = AS REQUIRED
AutoCAD SHX Text
OFFICE (BLDG. FIRE ALARM)
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 2.2K
AutoCAD SHX Text
TO MONACO TRANSCIEVER (SHT. E16)
AutoCAD SHX Text
ALARM
AutoCAD SHX Text
TROUBLE
AutoCAD SHX Text
15K ELR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L1
AutoCAD SHX Text N
AutoCAD SHX Text
GND
AutoCAD SHX Text
%%UBATTERY CALCULATION
AutoCAD SHX Text
15K ELR
AutoCAD SHX Text
SHLD
AutoCAD SHX Text
XMT+
AutoCAD SHX Text
XMT-
AutoCAD SHX Text
TO REMOTE I/O ENCLOSURE #4 (SHT. E19)
AutoCAD SHX Text
15K ELR RELOCATED FROM MONACO PANEL (TYP.)
AutoCAD SHX Text
SLC1 (+)
AutoCAD SHX Text
SLC1 (-)
AutoCAD SHX Text
SLC1 (+)
AutoCAD SHX Text
SLC1 (-)
AutoCAD SHX Text
SLC1 FROM XP6-R MODULE M7 (SHT. E16)
AutoCAD SHX Text
LOCATED AT WIRING EXIT POINT FROM BLDG.
AutoCAD SHX Text
RCV+
AutoCAD SHX Text
RCV-
AutoCAD SHX Text
RCV+
AutoCAD SHX Text
RCV-
AutoCAD SHX Text
SHLD
AutoCAD SHX Text
XMT+
AutoCAD SHX Text
XMT-
AutoCAD SHX Text A
AutoCAD SHX Text
BGF
AutoCAD SHX Text 03/14/08
AutoCAD SHX Text
AS-BUILTS.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
24VDC TO FDU-80 (SHT. E19)
AutoCAD SHX Text
24VDC TO P/B LAMPS XP6-R MODULE M6 (SHT. E17)
AutoCAD SHX Text
GND
AutoCAD SHX Text
AutoCAD SHX Text
FDU-80
AutoCAD SHX Text
-24V OUT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GND
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text P2
AutoCAD SHX Text
(-) EIA-485 OUT
AutoCAD SHX Text
(-) EIA-485 IN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text P1
AutoCAD SHX Text
(+) EIA+485 OUT
AutoCAD SHX Text
(+) EIA+485 IN
AutoCAD SHX Text
+24V OUT
AutoCAD SHX Text
-24V IN
AutoCAD SHX Text
+24V IN
AutoCAD SHX Text N/C
AutoCAD SHX Text
TB1
AutoCAD SHX Text
TO REMOTE I/O ENCLOSURE #3 (SHT. E18)
AutoCAD SHX Text
POLARITY OF NAC/REL CIRCUITS SHOWN IN ALARM CONDITION
AutoCAD SHX Text
SLC (-)
AutoCAD SHX Text
AutoCAD SHX Text
SLC (+)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC (-)
AutoCAD SHX Text
AutoCAD SHX Text
SLC (+)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC (-)
AutoCAD SHX Text
AutoCAD SHX Text
SLC (+)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC (-)
AutoCAD SHX Text
AutoCAD SHX Text
SLC (+)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC (-)
AutoCAD SHX Text
AutoCAD SHX Text
SLC (+)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC (-)
AutoCAD SHX Text
AutoCAD SHX Text
SLC (+)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC (-)
AutoCAD SHX Text
AutoCAD SHX Text
SLC (+)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC (-)
AutoCAD SHX Text
AutoCAD SHX Text
SLC (+)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC (-)
AutoCAD SHX Text
AutoCAD SHX Text
SLC (+)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC (-)
AutoCAD SHX Text
AutoCAD SHX Text
SLC (+)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC (-)
AutoCAD SHX Text
AutoCAD SHX Text
SLC (+)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC (-)
AutoCAD SHX Text
AutoCAD SHX Text
SLC (+)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC (-)
AutoCAD SHX Text
AutoCAD SHX Text
SLC (+)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1DD002
AutoCAD SHX Text
1DD010
AutoCAD SHX Text
PHOTO
AutoCAD SHX Text
PHOTO
AutoCAD SHX Text
PHOTO
AutoCAD SHX Text
PHOTO
AutoCAD SHX Text
PHOTO
AutoCAD SHX Text
PHOTO
AutoCAD SHX Text
HEAT
AutoCAD SHX Text
HEAT
AutoCAD SHX Text
PHOTO
AutoCAD SHX Text
PHOTO
AutoCAD SHX Text
PHOTO
AutoCAD SHX Text
PHOTO
AutoCAD SHX Text
PHOTO
AutoCAD SHX Text
1DD009
AutoCAD SHX Text
1DD007
AutoCAD SHX Text
1DD011
AutoCAD SHX Text
1DD013
AutoCAD SHX Text
1DD001
AutoCAD SHX Text
SLC1 TO XP10-M MODULE M2 (SHT. E16)
AutoCAD SHX Text
MECHANICAL ROOM
AutoCAD SHX Text
ELECTRICAL ROOM CEILING
AutoCAD SHX Text
REST ROOM CEILING
AutoCAD SHX Text
GND
AutoCAD SHX Text
#12 AWG.
AutoCAD SHX Text S1-5
AutoCAD SHX Text
GND
AutoCAD SHX Text
#12 AWG.
AutoCAD SHX Text S1-3
AutoCAD SHX Text
GND
AutoCAD SHX Text
#12 AWG.
AutoCAD SHX Text S1-2
AutoCAD SHX Text
GND
AutoCAD SHX Text
#12 AWG.
AutoCAD SHX Text S1-7
DWG NO.
R E V I S I O N S
DATE:BY:REV.
DESCRIPTION
DESCRIPTION:
DRAWN BY:
DATE:
REV:
SCALE:
APP'D BY:
PROJECT NUMBER:
OF
DWG. NUMBER:
ELECTRICAL WIRING DIAGRAM
APTU BUILDING
ARNOLD AIR FORCE BASE
LOW PRESSURE CO2 FIRE EXTINGUISHING SYSTEM
144344 E20 E35
JLT
8/30/07
A
NTS
13776-21-016
ANZY209019 NOT SENSITIVE - IRA-5792 Appendix A - 2
AutoCAD SHX Text
ELECTRICAL WIRING DIAGRAM REMOTE I/0 #4 - BUILDING FIRE ALARM
AutoCAD SHX Text
REMOVE JUMPER
AutoCAD SHX Text +0
AutoCAD SHX Text
1MM063
AutoCAD SHX Text
IDC
AutoCAD SHX Text
SLC1 IN
AutoCAD SHX Text
SLC1 OUT
AutoCAD SHX Text
SLC1 (-)
AutoCAD SHX Text
SLC1 (+)
AutoCAD SHX Text B-
AutoCAD SHX Text B+
AutoCAD SHX Text A+
AutoCAD SHX Text
AutoCAD SHX Text
AB SLCT
AutoCAD SHX Text
DISABLE 2
AutoCAD SHX Text
DISABLE 1
AutoCAD SHX Text
CONFIG JUMPERS
AutoCAD SHX Text
COMM LOSS
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text +1
AutoCAD SHX Text
1MM064
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text
1MM065
AutoCAD SHX Text +2
AutoCAD SHX Text
IDC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text +3
AutoCAD SHX Text
1MM066
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1MM069
AutoCAD SHX Text
SET BASE ADDRESS TO 1MM063
AutoCAD SHX Text
XP10-M ADDRESSABLE INPUT MODULE
AutoCAD SHX Text
1MM068
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text +4
AutoCAD SHX Text
1MM067
AutoCAD SHX Text
IDC
AutoCAD SHX Text +5
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text +6
AutoCAD SHX Text
IDC
AutoCAD SHX Text
AutoCAD SHX Text M3
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text +7
AutoCAD SHX Text
1MM070
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text
1MM072
AutoCAD SHX Text +8
AutoCAD SHX Text
IDC
AutoCAD SHX Text
1MM071
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text +9
AutoCAD SHX Text
AutoCAD SHX Text
PUMP ROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TB1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC1 (-)
AutoCAD SHX Text
SLC1 (+)
AutoCAD SHX Text
SOUTH MANUAL RELEASE PREACTION
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
WEST MANUAL RELEASE PREACTION
AutoCAD SHX Text
SLC1 (-)
AutoCAD SHX Text
SLC1 (+)
AutoCAD SHX Text A-
AutoCAD SHX Text
REMOVE JUMPER
AutoCAD SHX Text +0
AutoCAD SHX Text
1MM073
AutoCAD SHX Text
IDC
AutoCAD SHX Text
SLC1 IN
AutoCAD SHX Text
SLC1 OUT
AutoCAD SHX Text
SLC1 (-)
AutoCAD SHX Text
SLC1 (+)
AutoCAD SHX Text B-
AutoCAD SHX Text B+
AutoCAD SHX Text A+
AutoCAD SHX Text
AutoCAD SHX Text
AB SLCT
AutoCAD SHX Text
DISABLE 2
AutoCAD SHX Text
DISABLE 1
AutoCAD SHX Text
CONFIG JUMPERS
AutoCAD SHX Text
COMM LOSS
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text +1
AutoCAD SHX Text
1MM074
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text
1MM075
AutoCAD SHX Text +2
AutoCAD SHX Text
IDC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text +3
AutoCAD SHX Text
1MM076
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1MM079
AutoCAD SHX Text
SET BASE ADDRESS TO 1MM073
AutoCAD SHX Text
XP10-M ADDRESSABLE INPUT MODULE
AutoCAD SHX Text
1MM078
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text +4
AutoCAD SHX Text
1MM077
AutoCAD SHX Text
IDC
AutoCAD SHX Text +5
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text +6
AutoCAD SHX Text
IDC
AutoCAD SHX Text
AutoCAD SHX Text M4
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text +7
AutoCAD SHX Text
1MM080
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text
1MM082
AutoCAD SHX Text +8
AutoCAD SHX Text
IDC
AutoCAD SHX Text
1MM081
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text +9
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A-
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
NORTH MANUAL RELEASE PREACTION
AutoCAD SHX Text
LOW AIR P/S X/P
AutoCAD SHX Text
MANUAL RELEASE PREACTION X/P
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
MANUAL RELEASE PREACTION X/P
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
PUMP ROOM
AutoCAD SHX Text
CENTER HEAT DETECTOR 190°F
AutoCAD SHX Text
NORTH HEAT DETECTOR 190°F
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
WATER FLOW SWITCH
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
SOUTH HEAT DETECTOR 190°F
AutoCAD SHX Text
OS&Y VALVE TAMPER SWITCH
AutoCAD SHX Text
* NOT PROVIDED BY CHEMETRON NOT PROVIDED BY CHEMETRON
AutoCAD SHX Text
VALVE ROOM
AutoCAD SHX Text
HIGH BAY NORTH
AutoCAD SHX Text
HIGH BAY SOUTH
AutoCAD SHX Text
HEAT DETECTOR 190°F
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
HIGH BAY SOUTH
AutoCAD SHX Text
HEAT DETECTOR 190°F
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
MEN'S ROOM
AutoCAD SHX Text
HEAT DETECTOR 190°F
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
OFFICE ROOM
AutoCAD SHX Text
HEAT DETECTOR 190°F
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
ENTRY WAY
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
HIGH BAY ALARM
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
TROUBLE
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
VALVE ROOM ALARM
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
TROUBLE
AutoCAD SHX Text
FROM ALARMLINE CONTROLLERS (SHT. E23)
AutoCAD SHX Text
REMOVE JUMPER
AutoCAD SHX Text +0
AutoCAD SHX Text
1MM083
AutoCAD SHX Text
IDC
AutoCAD SHX Text
SLC1 IN
AutoCAD SHX Text
SLC1 OUT
AutoCAD SHX Text
SLC1 (-)
AutoCAD SHX Text
SLC1 (+)
AutoCAD SHX Text B-
AutoCAD SHX Text B+
AutoCAD SHX Text A+
AutoCAD SHX Text
AutoCAD SHX Text
AB SLCT
AutoCAD SHX Text
DISABLE 2
AutoCAD SHX Text
DISABLE 1
AutoCAD SHX Text
CONFIG JUMPERS
AutoCAD SHX Text
COMM LOSS
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text +1
AutoCAD SHX Text
1MM084
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text
1MM085
AutoCAD SHX Text +2
AutoCAD SHX Text
IDC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text +3
AutoCAD SHX Text
1MM086
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1MM089
AutoCAD SHX Text
SET BASE ADDRESS TO 1MM083
AutoCAD SHX Text
XP10-M ADDRESSABLE INPUT MODULE
AutoCAD SHX Text
1MM088
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text +4
AutoCAD SHX Text
1MM087
AutoCAD SHX Text
IDC
AutoCAD SHX Text +5
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text +6
AutoCAD SHX Text
IDC
AutoCAD SHX Text
AutoCAD SHX Text M5
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text +7
AutoCAD SHX Text
1MM090
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text
1MM092
AutoCAD SHX Text +8
AutoCAD SHX Text
IDC
AutoCAD SHX Text
1MM091
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text +9
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TB1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LOW AIR P/S X/P
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
MANUAL RELEASE PREACTION
AutoCAD SHX Text A-
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
WATER FLOW SWITCH
AutoCAD SHX Text
VERTICAL TANK WATER FLOW SWITCH
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
REMOVE JUMPER
AutoCAD SHX Text +0
AutoCAD SHX Text
1MM093
AutoCAD SHX Text
IDC
AutoCAD SHX Text
SLC1 IN
AutoCAD SHX Text
SLC1 OUT
AutoCAD SHX Text B-
AutoCAD SHX Text B+
AutoCAD SHX Text A+
AutoCAD SHX Text
AutoCAD SHX Text
AB SLCT
AutoCAD SHX Text
DISABLE 2
AutoCAD SHX Text
DISABLE 1
AutoCAD SHX Text
CONFIG JUMPERS
AutoCAD SHX Text
COMM LOSS
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text +1
AutoCAD SHX Text
1MM094
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text
1MM095
AutoCAD SHX Text +2
AutoCAD SHX Text
IDC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text +3
AutoCAD SHX Text
1MM096
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1MM099
AutoCAD SHX Text
SET BASE ADDRESS TO 1MM093
AutoCAD SHX Text
XP10-M ADDRESSABLE INPUT MODULE
AutoCAD SHX Text
1MM098
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text +4
AutoCAD SHX Text
1MM097
AutoCAD SHX Text
IDC
AutoCAD SHX Text +5
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text +6
AutoCAD SHX Text
IDC
AutoCAD SHX Text
AutoCAD SHX Text M6
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text +7
AutoCAD SHX Text
1MM100
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text
1MM102
AutoCAD SHX Text +8
AutoCAD SHX Text
IDC
AutoCAD SHX Text
1MM101
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text +9
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A-
AutoCAD SHX Text
BUTANE SPHERE WATER FLOW SWITCH
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
PROPANE TANK WATER FLOW SWITCH
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
ISO BUTANE TANK WATER FLOW SWITCH
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
SPARE INPUT
AutoCAD SHX Text
SPARE INPUT
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
SPARE INPUT
AutoCAD SHX Text
TII 326-2M SURGE SUPPRESSOR (TYP.)
AutoCAD SHX Text
GND
AutoCAD SHX Text ALL INPUTS ARE NORMALLY OPEN EXCEPT WHEN OTHERWISE DESIGNATED N.C.H.O. - NORMALLY CLOSED HELD OPEN
AutoCAD SHX Text
SLC1 (-)
AutoCAD SHX Text
SLC1 (+)
AutoCAD SHX Text
TO XP6-R MODULE M7 (SHT. E21)
AutoCAD SHX Text
POWER SUPPLY TROUBLE FROM CHG-120 MODULE M1 (SHT. E19)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLC1 (+)
AutoCAD SHX Text
SLC1 (-)
AutoCAD SHX Text
SLC1 FROM RIO #3 (VIA SUPPRESSOR S3-1) (SHT. E19)
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
EAST MANUAL RELEASE PREACTION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N.C.H.O.
AutoCAD SHX Text
OS&Y VALVE TAMPER SWITCH
AutoCAD SHX Text A
AutoCAD SHX Text
BGF
AutoCAD SHX Text 03/14/08
AutoCAD SHX Text
AS-BUILTS.
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
NORTH PIT SUMP PUMP WATER LEVEL SW
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
ELR
AutoCAD SHX Text
SOUTH PIT SUMP PUMP WATER LEVEL SW
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
SPARE INPUT
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
SPARE INPUT
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
SPARE INPUT
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
SPARE INPUT
AutoCAD SHX Text
GND
AutoCAD SHX Text
GND
AutoCAD SHX Text
GND
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
SPARE INPUT
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 47K
AutoCAD SHX Text
SPARE INPUT
AutoCAD SHX Text
GND
AutoCAD SHX Text
GND
AutoCAD SHX Text S3-8
AutoCAD SHX Text S3-12
AutoCAD SHX Text S3-14
AutoCAD SHX Text S3-16
AutoCAD SHX Text S3-18
S3-19
DWG NO.
R E V I S I O N S
DATE:BY:REV.
DESCRIPTION
DESCRIPTION:
DRAWN BY:
DATE:
REV:
SCALE:
APP'D BY:
PROJECT NUMBER:
OF
DWG. NUMBER:
ELECTRICAL WIRING DIAGRAM
APTU BUILDING
ARNOLD AIR FORCE BASE
LOW PRESSURE CO2 FIRE EXTINGUISHING SYSTEM
144344 E24 E35
D. BURKE
9/7/07
A
NTS
13776-21-016
ANZY209019 NOT SENSITIVE - IRA-5792 Appendix A - 3
AutoCAD SHX Text
CONTROL PANEL COMPARTMENT AREA OF REFRIGERATION HOUSING ENCLOSURE
AutoCAD SHX Text
OPENS 450 PSI
AutoCAD SHX Text
OPENS 8-18 PSI
AutoCAD SHX Text
CLOSES 310 PSI OPENS 290 PSI
AutoCAD SHX Text
CONDENSING UNIT COMPARTMENT AREA OF REFRIGERATION HOUSING ENCLOSURE
AutoCAD SHX Text
CONDENSING UNIT MOTOR WITH INTERNAL OVERLOAD PROTECTION
AutoCAD SHX Text FROM CUSTOMER'S DEDICATED, PROTECTED 460V/3 /60HZ SUPPLY.MIN. CKT AMPACITY = 5.9A MAX. FUSE SIZE = 15A
AutoCAD SHX Text
CHASSIS GND
AutoCAD SHX Text
460V 60HZ 3.4FLA
AutoCAD SHX Text
CO2 PRESSURE CONTROL SWITCH
AutoCAD SHX Text
REFRIGERANT SOLENOID
AutoCAD SHX Text
REFRIGERANT PRESSURE CONTROL
AutoCAD SHX Text
.160A @120VAC
AutoCAD SHX Text
%%UCONDENSING UNIT
AutoCAD SHX Text
LP
AutoCAD SHX Text
HP
AutoCAD SHX Text
CLASS "CC"
AutoCAD SHX Text
FUSE
AutoCAD SHX Text 3/10A
AutoCAD SHX Text 600V
AutoCAD SHX Text
FAN
AutoCAD SHX Text
MOTOR CONTACTOR
AutoCAD SHX Text M
AutoCAD SHX Text T3
AutoCAD SHX Text T2
AutoCAD SHX Text T1
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text X2
AutoCAD SHX Text X1
AutoCAD SHX Text H1
AutoCAD SHX Text H3
AutoCAD SHX Text H2
AutoCAD SHX Text H4
AutoCAD SHX Text 460/120V
AutoCAD SHX Text
50VA
AutoCAD SHX Text M
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UCRITICAL LEVEL CONTACT
AutoCAD SHX Text
%%ULOW LEVEL CONTACT
AutoCAD SHX Text 3A
AutoCAD SHX Text
RESISTIVE
AutoCAD SHX Text
INDUCTIVE
AutoCAD SHX Text 1A
AutoCAD SHX Text
LIQUID LEVEL GAUGE CONTACT RATINGS
AutoCAD SHX Text
250VAC
AutoCAD SHX Text
30VDC
AutoCAD SHX Text
VOLTAGE
AutoCAD SHX Text
125VAC
AutoCAD SHX Text 2.5A
AutoCAD SHX Text
CURRENT
AutoCAD SHX Text 5A
AutoCAD SHX Text
325 PSI
AutoCAD SHX Text
275 PSI
AutoCAD SHX Text
ALARM PRESSURE SWITCH #1
AutoCAD SHX Text
LP
AutoCAD SHX Text
HP
AutoCAD SHX Text
JUMPER
AutoCAD SHX Text
WHITE
AutoCAD SHX Text
BLACK
AutoCAD SHX Text
GREEN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RED
AutoCAD SHX Text
BLUE
AutoCAD SHX Text
YELLOW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ELR
AutoCAD SHX Text 1/2W
AutoCAD SHX Text 15K
AutoCAD SHX Text
ELECTRICAL WIRING DIAGRAM CO2 STORAGE UNIT
AutoCAD SHX Text
325 PSI
AutoCAD SHX Text
275 PSI
AutoCAD SHX Text
ALARM PRESSURE SWITCH #2
AutoCAD SHX Text
LP
AutoCAD SHX Text
HP
AutoCAD SHX Text
JUMPER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOT USED
AutoCAD SHX Text
TO MONACO TRANSCIEVER ZONE 15 INPUT (SHT. E16)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VAPOR SUPPLY VALVE TAMPER SWITCH
AutoCAD SHX Text
TANK SHUTOFF VALVE TAMPER SWITCH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MOUNTED ON CO2 STORAGE UNIT
AutoCAD SHX Text
1.5 HP
AutoCAD SHX Text
LIQUID LEVEL GAUGE CONTACTS (SHOWN IN PRESSURIZED STATE)
AutoCAD SHX Text A
AutoCAD SHX Text
BGF
AutoCAD SHX Text 03/14/08
AS-BUILTS.
DWG NO.
R E V I S I O N S
DATE:BY:REV.
DESCRIPTION
DESCRIPTION:
DRAWN BY:
DATE:
REV:
SCALE:
APP'D BY:
PROJECT NUMBER:
OF
DWG. NUMBER:
BACKPANEL LAYOUT
APTU BUILDING
ARNOLD AIR FORCE BASE
LOW PRESSURE CO2 FIRE EXTINGUISHING SYSTEM
144344 E33 E35
D. BURKE
9/11/07
A
3" = 1'
13776-21-016
ANZY209019 NOT SENSITIVE - IRA-5792 Appendix A - 4
AutoCAD SHX Text
TB3
AutoCAD SHX Text
TB-AC
AutoCAD SHX Text L1
AutoCAD SHX Text N
AutoCAD SHX Text
GND
AutoCAD SHX Text
%%UTERMINAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .