This document is a pricing schedule breakdown for two federal construction projects, 663A4-23-203 and 663A4-24-203, at the VAPSHCS American Lake Campus. The projects involve replacing HVAC units in Building 19. The pricing schedule provides detailed line items for various construction divisions such as HVAC, electrical, and general requirements. The document also includes instructions for the contractor regarding the pricing format, overhead and profit rates, and period of performance.
The related federal contract opportunity is a solicitation (36C26024R0082) for Construction Project 663A4-24-203 to Replace HVAC HP3 in Building 19. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation provides detailed requirements for the technical approach, key personnel qualifications, and past performance. Award will be made on a best value trade-off basis considering both technical and price factors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Contractor Questions and Answers.pdf | ||
| 36C26024R0082 0001.docx | DOCX document | |
| Attachment 9 - 663A4-23-203 - 663A4-24-203 - Contractor Rules of Behavior.pdf | ||
| Attachment 4 - 663A4-24-203 - Replace HVAC HP3 - Specifications .pdf | ||
| Attachment 3 - 663A4-24-203 -REPLACE HVAC HP3 - DRAWINGS.pdf | ||
| Attachment 8 - 663A4-23-203 - 663A4-24-203 - Past Performance Questionnaire.docx | DOCX document | |
| Attachment 2 - 663A4-23-203 - HP2A HP2B PHASE II - Specifications.pdf | ||
| Attachment 1 - 663A4-23-203 - HP2A HP2B PHASE II - IFC 231121 Drwgs.pdf | ||
| Attachment 7 - 663A4-23-203 - 663A4-24-203 WD-GD WA20240111 07.12.2024.pdf | ||
| Attachment 6 - 663A4-23-203 - 663A4-24-203 - Limitations on Subcontracting-Construction.pdf | ||
| Attachment 5- 663A4-23-203- 663A4-24-203 - SOW - 240807.pdf | ||
| 36C26024R0082.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Price Schedule 663A4-23-203
| PRICE SCHEDULE BREAKDOWN |
| Request For Proposal No.: 36C26024R0082 |
Project Number / Title: Construction Project 663A4-23-203 Replace HVAC HP2A, HP2B, Bldg.19 Project Location: VAPSHCS, American Lake Campus, VA
| Rates | Base Item | |
| Price | ||
| Division 1 General Requirements | N/A | $0.00 |
| Division 2 Existing Conditions | N/A | $0.00 |
| Division 3 Concrete | N/A | $0.00 |
| Division 4 Masonry | ||
| Division 5 Metals | N/A | $0.00 |
| Division 6 Woods, Plastic and Composites | N/A | $0.00 |
| Division 7 Thermal and Moisture Protection | N/A | $0.00 |
| Division 8 Openings | N/A | $0.00 |
| Division 9 Finishes | N/A | $0.00 |
| Division 10 Specialties | N/A | $0.00 |
| Division 11 Equipment | ||
| Division 12 Furnishings | ||
| Division 13 Special Construction | N/A | $0.00 |
| Division 14 Conveying Equipment | ||
| Division 21 Fire Suppression | N/A | $0.00 |
| Division 22 Plumbing | N/A | $0.00 |
| Division 23 HVAC | ||
| Division 25 Integrated Automation | ||
| Divison 26 Electrical | ||
| Division 27 Communications | ||
| Divison 28 Electronic Safety and Security | ||
| Division 31 Earthwork | N/A | $0.00 |
| Division 32 Exterior Improvements | N/A | $0.00 |
| Division Item 33 Utilities | N/A | $0.00 |
SubTotals N/A $0.00
Period of Performance (FAR 52.211-10) ________ days
| Mobilization / Demobilization | N/A | $0.00 |
| Insurance / Bonds | N/A | $0.00 |
| Taxes / Other Fees (provide itemized list) | N/A | $0.00 |
| O&M Manuals and Red Line Drawings | N/A | $0.00 |
| Overhead | Rate _______% | N/A |
| Overhead (daily rate) | Per Day $0.00 | N/A |
| SubContract Mark-Up | Rate _______% | N/A |
| Profit | Rate _______% | N/A |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
CONTRACT TOTALS $0.00
Price Schedule 663A4-24-203
| PRICE SCHEDULE BREAKDOWN |
| Request For Proposal No.: 36C26024R0082 |
Project Number / Title: Construction Project 663A4-24-203 Replace HVAC HP3, Bldg.19 Project Location: VAPSHCS, American Lake Campus, VA
| Rates | Base Item | |
| Price | ||
| Division 1 General Requirements | N/A | $0.00 |
| Division 2 Existing Conditions | N/A | $0.00 |
| Division 3 Concrete | N/A | $0.00 |
| Division 4 Masonry | ||
| Division 5 Metals | N/A | $0.00 |
| Division 6 Woods, Plastic and Composites | N/A | $0.00 |
| Division 7 Thermal and Moisture Protection | N/A | $0.00 |
| Division 8 Openings | N/A | $0.00 |
| Division 9 Finishes | N/A | $0.00 |
| Division 10 Specialties | N/A | $0.00 |
| Division 11 Equipment | ||
| Division 12 Furnishings | ||
| Division 13 Special Construction | N/A | $0.00 |
| Division 14 Conveying Equipment | ||
| Division 21 Fire Suppression | N/A | $0.00 |
| Division 22 Plumbing | N/A | $0.00 |
| Division 23 HVAC | ||
| Division 25 Integrated Automation | ||
| Divison 26 Electrical | ||
| Division 27 Communications | ||
| Divison 28 Electronic Safety and Security | ||
| Division 31 Earthwork | N/A | $0.00 |
| Division 32 Exterior Improvements | N/A | $0.00 |
| Division Item 33 Utilities | N/A | $0.00 |
SubTotals N/A $0.00
Period of Performance (FAR 52.211-10) ________ days
| Mobilization / Demobilization | N/A | $0.00 |
| Insurance / Bonds | N/A | $0.00 |
| Taxes / Other Fees (provide itemized list) | N/A | $0.00 |
| O&M Manuals and Red Line Drawings | N/A | $0.00 |
| Overhead | Rate _______% | N/A |
| Overhead (daily rate) | Per Day $0.00 | N/A |
| SubContract Mark-Up | Rate _______% | N/A |
| Profit | Rate _______% | N/A |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
CONTRACT TOTALS $0.00