This document is a project tracking list for facility improvements at Arvin Gym, comprising eleven tasks with estimated costs totaling approximately $5.86 million. The projects are organized by tracking number and include detailed project descriptions and scope of work specifications.
The projects encompass facility repairs and upgrades including: (1) Crandel Pool stainless-steel repair with FRP replacement ($750K); (2) 4th Floor Classroom construction featuring glass walls, LED lighting, HVAC, and furnishings ($250K); (3) Scuba Room AC installation with LED lighting upgrades ($400K); (4) Male and Female Boxing Changing Rooms renovation ($400K); (5) Additional cooling systems for Arvin Gym with large-format fans and exhaust systems ($650K); (6) Kinetics Lab expansion ($250K); (7) HVAC installation in Buckner Weight Room with ten-ton Mitsubishi system ($250K); (8) 2nd Floor Basketball Court flooring replacement ($950K); and (9) 4th Floor Basketball Court flooring replacement ($950K). Design projects include (10) a 10-Meter Dive Tower and Dive Platforms with engineer-stamped drawings ($450K) and (11) a 40' x 40' Weight Bearing Mezzanine design for the 3rd floor boxing room ($350K). Each task includes specific scope details such as materials, dimensions, quantities, and system specifications required for completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tasks TRACKING # BUILDING # ROOM # SHORT DESCRIPTION DETAILED DESCRIPTION
Crandel Pool Stainless-Steel Repair Est cost $750K
Project Description: Repair Arvin Gym Crandel Pool deteriorated metal and all stainless-steel. Replace window and door frames, and all doors with FRP.
Scope: Arvin Gym Crandel Pool repair: Replace all stainless-steel to include but not limited to window and door frames, doors, railings, and trim with FRP; paint and/or powder coat all heater, and ventilation covers within the pool area. All rusted and deteriorated metal will either be replaced with a new appropriately sized FRP product, painted, or powder coated with a chemical/chlorine resistant paint.
4th Floor Classroom Repair Est $250K
Project Description: Construct new 900sf 4th floor classroom to include new walls ceiling, lights, electrical, carpeting, paint, and furnishings.
Scope: Convert 900sf 4th observatory into a fully functioning classroom with new 8 foot glass wall, 50% screen and 100% blackout curtains, new 12' ceiling-grid-tiles, install twenty new 8" round LED lights, modify the fire suppression system, install ten duplex outlets, provide 3-ton ceiling hung mini-split AC/Heat system with wall mounted controls, new carpet, repaint all the walls, provide and install conference table and chairs, training tables and chairs, 3- and 2-person couches and matching lounge chairs, and coffee and end tables.
Install Scuba Room AC Est $400K
Project Description: Provide cooling to the scuba team compressor room and upgrade facility lighting.
Scope : Provide evaluation for a cooling system to counter heat generated from the Scuba Compressor room. Provide minimum new 2-ton mini split, increase the exhaust vent size from 6x12 to 8x24, install power ventilation. Replace approximately 750 florescent lights to LED's (150ea High-hats, 300ea 2x2, 300ea 2x4). The contractor shall provide rezoning and new controls/switches as required per the SOW.
Repair Male & Female Boxing Changing Rooms Est $400K
Project Description: Convert two rooms into Male and Female changing rooms for cadet boxing.
Scope: Move existing entry door forward to include changing rooms within the boxing program footprint. Install two new doorless entry ways (1-male, 1-female), Remove existing glass and mirrors, install new 10ft drop ceiling, provide new flooring, new LED Lights, new wall coverings and equipment hooks, and provide 20 free-standing benches.
Provide Additional Cooling in Arvin Gym Est $650K
Project Description: Provide new large format fans, exhaust fans, and louvers in stairwells, over climbing walls, and weight rooms
Scope: Provide and install new large format (8 and 10ft) high-efficient fans in stairwells and above climbing walls, remove perimeter windows and install 2,500 CFM quiet exhaust fans and electric mechanical louvers at each end of the building to create cross ventilation and expel heat trapped at the top of closed corridors, and install fans in select weight rooms.
Expand Kinetics Lab Est $250K
Project Description: Remove walls, repair floor, ceiling and plaster
SOW : Full room restoration and expand (will provide more details as we build these)
Install HVAC in Buckner Weight Room Est $250K
Project Description: Install 120K 10ton HVAC system with six-ceiling cassettes in the Arvin Gym Buckner Weight Room
SOW : Furnish and install a complete Mitsubishi 10-ton (120,000 BTU) HVAC system, including six (6) ceiling cassette units, to provide adequate cooling and heating to designated areas within the facility. This system will augment the existing system.
Replace Flooring on 2nd Floor Basketball Court Est $950K
Project Description: Remove existing hard wood court flooring and cove base, repair sub-flooring and install new resilient rubber floor material.
Replace Flooring on 4th Floor Basketball Court Est $950K
Project Description: Remove existing hard wood court flooring and cove base, repair sub-flooring and install new resilient rubber floor material.
Design 10-Meter Dive Tower and Dive Platforms Est $450K
Project Description: Provide engineer stamped drawings and design to replace the currently outdated building 727 Crandal Pool dive tower and multiple dive platforms.
New design shall be in accordance with h
SOW : Provide a full design for a new three level collegiate dive platform with adjoining diving board on either side.
Design 40' x 40' Weight Bearing Mezzanine Est $350K
Project Description: Provide engineer stamped drawings and design for a new 40' x 40' weight bearing mezzanine constructed in the 3rd floor boxing room.
SOW : Provide a full design for either a free standing mezzanine, or one connected to the building steel structure to support loads from the top and a hanging load from the bottom.