This is a Work Order Form used by the U.S. Army Engineering & Support Center for authorizing and tracking contracted work. The form serves as the primary document for documenting labor, materials, subcontracts, and associated costs for work performed under an existing contract.

Part I captures administrative information including contractor name, facility details, work order request number, date, and contract/task order numbers. Part II provides detailed cost tracking with separate sections for prime contractor labor (broken down by classification such as Site Supervisor and SSHO/QC with regular and overtime rates), prime contractor parts/materials/supplies/equipment (with manufacturer part numbers, quantities, and unit pricing), and subcontracts including labor, travel, and materials with associated markups. The form requires identification of whether payment bonds are required for orders exceeding $35,000. Part III contains authorization signatures from the Designated Government Representative and Contracting Officer. Part IV includes certification of satisfactory service completion by the contractor and quality assurance evaluation. Part V provides final acceptance and receipt acknowledgment by the Contracting Officer. The form also mandates CEHNC Safety Compliance documentation, including either a USACE-accepted Activity Hazard Assessment (AHA) or an attached AHA for review, verification of a competent person with an appointment memo on file, and notation of any additional required safety plans or programs. A separate pricing template (9203-16 Rev A) is referenced for detailed cost breakdowns including labor, rental equipment, MSE handling fees, profit, subcontractor costs, travel, and materials with associated taxes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR:

FACILITY NAME:

FACILITY LOCATION:

WO REQUEST NO:

WORK ORDER DATE:

Check if applicable:

Labor Classification Reg Labor Hours

Regular Labor Rate OT Labor Hours OT Labor Rate Firm-Fixed Price Labor (Y or N) Total Regular Labor Total OT

Labor Site Supervisor

SSHO/QC

TOTAL FFP LABOR

Description Manf Part # Qty Unit Price Amount

TOTAL MATERIALS

Cost Total Subcontract Labor From Sheet 2 Subcontract Travel From Sheet 2 Subcontract Materials From Sheet 2

0.00% 0.00%

Total Subcontractor Price $0.00

TOTAL COST $0.00

Firm-Fixed Price (FFP) (This Work Order)

DESIGNATED GOVERNMENT REPRESENTATIVE: DATE:

CONTRACTING OFFICER

CLIN/SUB-CLIN:

Distribution:

CONTRACT NO.:

TASK ORDER NO.:

INITIATOR:

PAYMENT BOND REQUIRED? (OVER $35K)

PRIME CONTRACTOR LABOR

PART II - COST SUMMARY

Competent Person One of these boxes must be checked:

Subcontract Total

I concur this work is a validated requirement.

PART III - AUTHORIZATION

Subcontractor Markup

Unit

PRIME CONTRACTOR PARTS/MATERIALS/SUPPLIES/EQUIPMENT

SUBCONTRACTS

Shipping Material Handling

WORK ORDER FORM

PART I - WORK ORDER INFORMATION

Contractor Signature:

Contractor confirms the competant person has an appointment memo approved on file and will be documented on the AHA prior to start of work.

There is an appointment memo and proof of qualifications attached to this WO for review and approval.

CEHNC Safety Compliance

Safety AHA One of these boxes must be checked:

Contractor confirms there is a USACE accepted AHA associated with the work being performed in this WO included in the APP. AHA identification number:

Contractor acknowledges there is an activity associated with the WO that requires an additional plan or program. Plan is attached for review with the WO.

Work Order Work Plan:

Contractor acknowledges there is NOT an AHA associated with the work being performed in this WO included in the APP. AHA is attached for review with the WO.

1 copy: US Army Engineering & Support Center, Attn: ____________________

PART V - Final Acceptance

SIGNATURE: DATE:

PART IV - CERTIFICATION OF SERVICES

I certify that the services under the above Work Order have been satisfactorily completed.

Inbrief Conducted: Outbrief Conducted:

DATE/TIME WORK COMPLETED

FOR FINAL BILLING OVERTIME

LABOR TO BE CHARGED ( ) Yes ( ) No

DATE:SIGNATURE: QUALITY ASSURANCE EVALUATOR

Distribution:

CONTRACTOR

Work Order Authorized

Prime Contractor WO Fee

Totals Labor Total

Materials Cost

CONTRACTING OFFICER

1 copy: COR

RECEIPT AND ACCEPTANCE IS HEREBY ACKNOWLEDGED

SIGNATURE:

SIGNATURE:

DATE:

DATE:

Bond Fees Prime Total

Labor -$ Rental Equipment -$ MSE handling fee -$ Profit -$

Total -$

Subcontractor -$ Subcontractor Handling Fee -$ Total -$

SubContractor Total -$

Travel -$ G&A on Travel -$ Travel Total -$

Materials -$ MSE handling fee -$ profit -$ Tax -$ Materials Total -$