This document is a comprehensive MRI Inspection Tests checklist dated 10/28/2024, detailing 22 specific verification and validation procedures for medical imaging equipment installation and functionality. The checklist covers critical aspects of MRI system acceptance, including software license verification, emergency circuit testing, patient positioning accuracy, image quality assessment, and equipment performance validation against manufacturer specifications and federal regulations.
Key inspection points include verifying delivery order line items, software and hardware installations, safety systems (emergency circuits, door interlocks), patient support systems, image quality metrics, workstation functionality, and coil performance. The document is specifically associated with VA Delivery Order requirements and appears to be part of the VA National Acquisition Center's High Tech Medical Equipment (HTME) Inspection Services procurement, which is a small business set-aside solicitation for medical equipment testing services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36H79725R0001 A0001.docx | DOCX document | |
| 36H79725R0001 A0001.docx | DOCX document | |
| Attachment 3 - VA General X-Ray Inspection Tests 10-28-2024_01.pdf | ||
| 36H79725R0001_1.docx | DOCX document | |
| Attachment 4 - Past Performance Questionnaire_Final.docx | DOCX document | |
| Attachment 2 - VA CT Inspection Tests 10-28-2024_01.pdf | ||
| 36H79725R0001 3rd Party Follow-On_FINAL.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10/28/2024 MRI Inspection Tests
1. Verify that all line items listed in the VA Delivery Order are present.
2. Verify that all purchased System Applications Software License Keys are permanently installed.
3. Verify that all Service, Maintenance, and Operator Manuals are present for the system and all applicable purchased items.
4. Verify that all System Back-up Software is present and the same revision as the software installed.
5. Verify operation of Audible and Visual Indicators.
6. Verify proper operation of all System Emergency Activation Circuits (System Emergency Power OFF (EPO), Console, Gantry, and ERDU (Quenching)).
7. Where applicable, verify proper operation of System and/or Control Console UPS unit(s).
8. Verify that MRI Warning Signs are properly installed and Door Interlock Switches (where applicable) are properly installed and operational.
9. Verify proper operation of all Gantry functions (safety limits, safety switches,
10. Verify proper alignment and accuracy of all Patient Positioning Lasers (axial, sagittal, and coronal).
11. Verify proper operation of Patient Support (horizontal, vertical, and lateral (where applicable) movement accuracy, safety limits, safety switches, maximum stroke and scannable range, maximum patient localizer scan range, position repeatability and indexing accuracy, table releases, correct weight limit capacity, etc.).
12. Verify proper operation of Patient Intercom, Speakers, and TV Systems.
13. Verify that the maximum Images Per Second (ips) Reconstruction Time meets the Manufacturer’s Specifications.
14. Verify that the system’s Image Quality (standard deviation, ct mean, low contrast, signal to noise ratio, spatial resolution (lone pair gauge and MTF), MRI numbers, slice width accuracy, spatial linearity accuracy (head and numbers, slice width accuracy, spatial linearity accuracy (head and body), image uniformity, visual image evaluation, etc.) meets or exceeds Federal Regulations, and Manufacturer’s Published and Purchase Specifications using the Manufacturer’s and MRI system phantoms
15. Where applicable, verify proper installation and operation of Independent Workstation(s) and server(s).
16. Verify that all Coils are present and functioning to Manufacturer’s Specifications.
17. Verify that Image Homogeneity Levels meet Manufacturer’s Published and Purchase Specifications.
18. Verify Shim Data.
19. Verify Gradient Strength and Amplifiers.
20. Verify RF Generator Power.
10/28/2024 MRI Inspection Tests
21. Where applicable, verify that safe operation of the Contrast Injector (after installation) has been confirmed by the unit’s OEM.
22. Where applicable, verify that all work identified in the Performance Work Statement (PWS) for Extended Installation listed in the VA Delivery Order has been completed .