Attachment 1 TSP Replace Switchgear Drawings.pdf
PDF 5 MB Posted
- Attached to
- Stafford Building Major Electrical Upgrade - Construction Federal contract opportunity
- Solicitation number
- 6973GH-26-R-00009
About this file
These documents are electrical design drawings for a switchgear replacement project at the Mike Monroney Aeronautical Center for the Federal Aviation Administration (FAA). The project involves replacing the existing main switchgear and motor control centers (MCCs) in the Thomas P. Stafford Building, with work order number 25-003967. Key details include replacing two main switchboards (MSWB-A and MSWB-B), two motor control centers (MCC-A and MCC-B), and associated electrical equipment while maintaining continuous power through carefully planned temporary power substations. The project requires complex phasing with 19 distinct phases, including setting up temporary 2500 kVA unit substations, transitioning power feeds, replacing existing electrical components, and performing an arc flash study. Bid options are provided for replacing specific electrical circuits and conductors, with emphasis on minimal disruption to building operations and strict coordination with FAA operational requirements.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C .A
. E N
G
IN
E E
R
IN
G
E
X P
IR
E
S J
U N
E
0, C .A
. A R
C H
IT
E
C T
U R
E
E
X P
IR
E
S J
U N
E
0, C .H
. G U
E R
N S
E Y
C
O M
P A
N Y
N . G
R A
N D
B
LV
D
O K
LA
H
O M
A C
IT
Y
, O K
.4
.8
OF
TPS-027 REPLACE SWITCHGEAR MCC
100% SUBMISSION - AUGUST 28, 2025
MIKE MONRONEY AERONAUTICAL CENTER
Work Order No. 25-003967
/2
/2
:4
:4
A
M
G-001
027-TPS
THOMAS P. STAFFORD BUILDING
SHEET INDEX
SHEET NUMBER SHEET TITLE
15000 - ELECTRICAL
E-001 ELECTRICAL ABBREVIATIONS, LEGEND, AND NOTES
E-101 ELECTRICAL PLAN
E-600 ELECTRICAL CABLE CONDUIT AND WIRE SCHEDULE
E-601 ELECTRICAL PANEL SCHEDULES
E-602 ELECTRICAL EQUIPMENT ELEVATIONS
E-603 ELECTRICAL TEMPORARY ONE-LINE DIAGRAM
PUSH BUTTON
SWITCH, SAFETY, 30A , NON-FUSED, NEMA 3R (EXTERIOR) / NEMA 1 (INTERIOR), UON.
MOTOR STARTER OR LIGHTING CONTACTOR, SURFACE MOUNTED
PANELBOARD, SURFACE MOUNTED WITH COPPER BUS
PANELBOARD, RECESSED WITH COPPER BUS
CONDUIT STUB OFF BELOW GROUND, CAPPED, UON
MOTOR CONNECTIONM
POWER WIRING AND CONDUIT RUN, LONG HASH MARK INDICATES QUANTITY OF PHASE CONDUCTORS AND SWITCH LEG CONDUCTORS. SHORT HASH MARKS INDICATE NUMBER OF NEUTRAL CONDUCTORS. ALL CIRCUITS SHALL HAVE EQUIPMENT GROUND CONDUCTOR. NO HASH MARKS INDICATE TWO CONDUCTORS PLUS GROUND. CONDUCTOR SIZES GREATER THAN No. 12 AWG ARE NOTED AT POSITION "X"
X
TRANSFORMER, DRY-TYPE, DESIGNATOR SHOWN IN POSITION "X"
INDICATES EQUIPMENT IDENTIFIER
T"X
W-X,Y,Z
CIRCUIT HOMERUN TO PANEL OR CABINET NOTED; W=PANEL NAME;
X,Y,Z,=CIRCUIT NUMBERS; SYMBOL CAN BE USED WITH LONE
CONDUIT OR WIRING SYMBOLS
S
RECEPTACLE, DUPLEX, NEMA 5-20R, 18" AFF, UON
RECEPTACLE, QUADRUPLEX, NEMA 5-20R, 18" AFF, UON
RECEPTACLE, DUPLEX, MOUNTED IN FLOOR
RECEPTACLE, QUADRUPLEX, MOUNTED IN FLOOR
RECEPTACLE , SINGLE SPECIAL PURPOSE, MOUNTED 48" AFF, UON
NUMBER IN POSITION "X" INDICATES TYPE (SEE SCHEDULE)
RECEPTACLE , RECESSED, FLOOR MOUNTED QUADRUPLEX OUTLET,
NEMA 5-20R, AND VOICE/DATA OUTLET
X
WALL MOUNTED SWITCH
S SWITCH, MOTOR RATED, WITH THERMAL OVERLOADSM
S DIMMER SWITCHD
RECEPTACLE, DUPLEX, MOUNTED IN CEILING
RECEPTACLE, GFCI, NEMA 5-20R, 18" AFF, UON
TV
OCCUPANCY SENSOR, WALL MOUNTED
SOS
OCCUPANCY SENSOR, CEILING MOUNTEDOS
PHOTO-CONTROLLER, INTEGRAL PHOTOELECTRIC CELL AND RELAYPC
LIGHTING FIXTURE WITH EMERGENCY LIGHTING CAPABILITY
EXIT SIGN, LIGHTED, WALL MOUNTED; FACES ARE SOLID
CHEVRON'S INDICATED EGRESS PATH
EMERGENCY LIGHTING UNIT
2'X4' LIGHTING FIXTURE
1'X4' LIGHTING FIXTURE
ROUND, RECESSED, SURFACE, OR PENDANT LIGHT FIXTURE
EXIT SIGN, LIGHTED, CEILING MOUNTED; FACES ARE SOLID
CHEVRON'S INDICATED EGRESS PATH
ABV. DESCRIPTION
ABBREVIATIONS
DATA OUTLET, RECESSED, MOUNTED 18"AFF, UON,
"X" INDICATES NUMBER OF OUTLETS. A BLANK IN "X"
LOCATION INDICATES 2 PORT
(X)
SPEAKER, CEILING MOUNTEDSP
GROUND ROD LOCATION
LIGHTNING PROTECTION SYSTEM AIR TERMINAL
GROUND BAR WITH PHENOLIC STAND-OFFS; SIZE AS SPECIFIED
POWER TRANSFORMER, RATINGS ARE SHOWN IN TRANSFORMER SCHEDULE
POTENTIAL TRANSFORMER, PRIMARY TO SECONDARY RATIO SHOWN
NEXT TO SYMBOL
CURRENT TRANSFORMER, TURNS RATIO SHOWN NEXT TO SYMBOL
GROUNDING CONNECTION; WHEN USED WITH TRANSFORMER WINDING
SYMBOL IT INDICATES A NEUTRAL GROUNDING CONNECTION
(ON SECONDARY SIDE ONLY)
DELTA WINDING CONNECTION
SEPARABLE CONNECTOR OR CONNECTION FOR DRAWOUT ASSEMBLIES
CONDUCTOR CONNECTION
CIRCUIT BREAKER, MOLDED CASE, TRIP CURRENT [A] AND QUANTITY
OF POLES [P] SHOWN NEXT TO THE SYMBOL
SWITCH, DISCONNECT, NON-FUSED, LOAD BREAK; CONTINUOUS
CURRENT RATING [A] AND QUANTITY OF POLES [P] SHOWN NEXT
TO SYMBOL
SWITCH, DISCONNECT, FUSED, LOAD BREAK; FUSE AMPERE RATING [A]
AND FUSE TYPE SHOWN NEXT TO SYMBOL
FUSE, AMPERE RATING [A] AND FUSE TYPE SHOWN NEXT TO SYMBOL
MOTOR THERMAL OVERLOAD PROTECTOR
INTEGRAL PHOTOELECTRIC CELL AND RELAY (PHOTOCONTROL)
ENERGY METEREM
X
VSD
FEEDER NUMBER; SEE FEEDER SCHEDULE
VARIABLE SPEED DRIVE
H O
A
SWITCH, SELECTOR, HAND-OFF AUTOMATIC
CONTACTOR OR RELAY COIL, LETTER(S) INSIDE OF SYMBOL MATCH
CONTACTS CONTROLLEDC
RELAY OR CONTACTOR CONTACTS
EQUIPMENT ENCLOSURE
MOTORIZED GENERATOR
ATS AUTOMATIC TRANSFER SWITCH
EXPLOSION PROOFEP
KEYED NOTE, NUMBER IN POSITION "1" INDICATES NOTE NUMBER
SWITCHED POWER PACK ABOVE CEILING, UONPP
RECESSED SPLIT BOX MOUNTED 72" AFF, UON, WITH 1.25" RACEWAY STUBOUT FOR CATV TO ACCESSIBLE CEILING SPACE. BOX SHALL INCLUDE POWER (SIMPLEX 5-20R), COAX CABLE WITH F CONNECTOR, DATA, VGA, AND HDMI. ROUTE BACK TO MAIN SERVER ROOM.
JUNCTION BOX, WALL MOUNTEDJ
JUNCTION BOX, CEILING MOUNTEDJ
JUNCTION BOX, FLOOR MOUNTEDJ
M OVERHEAD DOOR MOTOR AND CONTROLS
AMPERES OR TRIP AMPERESA
ABOVE COUNTERAC
ABOVE FINISHED FLOORAFF
ABOVE FINISHED GRADEAFG
SYMMETRICAL AMPS
INTERRUPTING CAPACITY
AIC
CIRCUITCKT
EMERGENCY MONITORING
AND CONTROL SYSTEM
EMCS
ELECTRIC WATER COOLEREWC
FIRE ALARM CONTROL PANELFACP
FEETFT
GROUND FAULT INTERRUPTERGFI
GROUNDGND
HIGH PRESSURE SODIUMHPS
HEAVY DUTYHD
KILOVOLTSKV
KILOVOLT AMPERESKVA
KILOVOLT AMPS REACTIVEKVAR
KILOWATT HOURSKWH
MANHOLEMH
NATIONAL ELECTRIC CODENEC
NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEMA
NEUTRALN
NOT IN THIS CONTRACTNIC
OVERHEADOH
PANELBOARDPNL
POLYVINYL CHLORIDEPVC
RURAL ELECTRIFICATION
ADMINISTRATION
REA
REQUIREDREQ'D
GALVANIZED RIGID STEEL
CONDUIT
GRC
ROOMRM
SPARE BREAKER OR DEVICESPARE
CONTRACT SPECIFICATIONSSPECS
SWITCHBOARDSWBD
TELEPHONE BACKBOARDTB
UNDERWRITERS LABORATORIESUL
UNLESS OTHERWISE NOTEDUON
VOLTSV
VOLTS-AMPERESVA
WATTSW
ELECTRICAL METALIC
TUBING
EMT
PHASEPH
USED WITH A NUMERAL, WHICH
INDICATES HEIGHT OF ITEM IN
INCHES AFF LEVEL
SINGLE CONDUCTOR CABLE1/C
THREE CONDUCTOR CABLE3/C
COMPUTERCP
CONDUITC
EXISTINGEX
WEATHERPROOFWP
ABV. DESCRIPTION
AUDIBLE AND VISUALAV
FIXED TEMPERATUREF
KEYEDK
TELEPHONE TERMINAL BOARD (4' x 8' x 3/4", UON)
DATA OUTLET, INSTALLED IN FLOOR, "X" INDICATES
NUMBER OF OUTLETS
(X)
ANTENNA
SPEAKER, WALL MOUNTEDSP
RECEPTACLE, DUPLEX, NEMA 5-20R, 18" AFF, UON. "S" INDICATES THE RECEPTACLE
IS SWITCHED BY THE OCCUPANCY SENSOR IN THE ROOM.
(S)
RECEPTACLE, QUADRUPLEX, MOUNTED IN CEILING
CR CARD READER
MS MOTION SENSOR
RX REQUEST TO EXIT
RECEPTACLE, DUPLEX, NEMA 5-20R, 18" AFF, UON. "TR" INDICATES THE RECEPTACLE IS TAMPER RESISTANT.(TR)
SYMBOLS
ELECTRICAL LEGEND
ON CENTER EACH WAYOCEW
BUSWAY
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
UC
PB-X
PB-X
MH-X
MH-X
HH-X
HH-X
PULL BOX , NEW, "X" INDICATES PULL BOX NUMBER
PULL BOX , EXISTING, "X" INDICATES PULL BOX NUMBER
MANHOLE , NEW, "X" INDICATES PULL BOX NUMBER
MANHOLE , EXISTING, "X" INDICATES PULL BOX NUMBER
HAND HOLE , NEW, "X" INDICATES PULL BOX NUMBER
HAND HOLE , EXISTING, "X" INDICATES PULL BOX NUMBER
CONDUIT, CONCRETE ENCASED (DUCT) SYSTEM; QUANTITY OF CIRCLES
IN SYMBOL DENOTES QUANTITY AND ARRANGEMENT OF CONDUIT;
DARKENED CIRCLE INDICATES CONDUIT WITH CONDUCTORS
CONDUIT AND WIRING RUN, UNDERGROUND; QUANTITY AND SIZE AS NOTED
2'-3"
NEW RISER (PRIMARY OR SECONDARY)
EXISTING RISER (PRIMARY OR SECONDARY)
UE
OHE ELECTRICAL OVERHEAD
UNDERGROUND ELECTRICAL
UNDERGROUND COMMUNICATIONS
POLE MOUNTED SITE LIGHT FIXTURE
INDICATES NEW OVERHEAD POLE
INDICATES EXISTING OVERHEAD POLE
FAA PANELBOARD NAMING CONVENTION:
1 N 2 E 20
FLOOR LEVEL
POWER (N=NORMAL; E=EMERGENCY; U=UPS )
VOLTAGE (4=480V; 3=240V, 1 PH; 2=208V, 3PH)
LOCATION (GRIDLINES)
SYMBOL DESCRIPTION
INDICATOR LIGHTS
PUSHBUTTON
SELECTOR SWITCH
SERVICE ENTRANCESE
NORMALLY OPENN.O.
C .A
. E N
G
IN
E E
R
IN
G
E
X P
IR
E
S J
U N
E
0, C .A
. A R
C H
IT
E
C T
U R
E
E
X P
IR
E
S J
U N
E
0, C .H
. G U
E R
N S
E Y
C
O M
P A
N Y
N . G
R A
N D
B
LV
D
O K
LA
H
O M
A C
IT
Y
, O K
.4
.8
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S. C. 552 and 49 CFR parts 15 and 1520.
REV DATE DESCRIPTION CHECK APP'D
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
TPS-027 REPLACE SWITCHGEAR MCC
PREPARED BY
DESIGNED DATE
OF
THOMAS P. STAFFORD BUILDING
APPROVED BY
DRAWN
WORK ORDER # 25-003967
GUERNSEY
ISSUED BY
28 AUGUST 202570
8-
2 NABYOLLAH GHARAJEH
/2
/2
:4
:4
A
M
E-001
ELECTRICAL ABBREVIATIONS, LEGEND, AND NOTES
ZMN
ZMN
GENERAL ELECTRICAL NOTES
1 ALL WORK SHALL BE COORDINATED WITH THE OTHER TRADES BEFORE INSTALLATION. MATERIALS INSTALLED IN AN ARBITRARY MANNER OR CREATES AN UNFAIR CONDITION OR HARDSHIP FOR
ANOTHER TRADE WILL NOT BE ACCEPTED. CONTRACTOR SHALL VERIFY PHYSICAL CHARACTERISTICS, VOLTAGE, LOAD, AND WIRING REQUIREMENTS FOR ALL EQUIPMENT PRIOR TO ROUGH-IN.
2 ALL MATERIALS PROVIDED FOR CONSTRUCTION SHALL BE UL LISTED AND NEW, UNLESS OTHERWISE NOTED (UON).
3 ALL WORK PERFORMED SHALL BE BY AN OKLAHOMA LICENSED ELECTRICIAN.
4 ALL PENETRATIONS THROUGH WALL, FLOOR, OR CEILING ASSEMBLIES SHALL BE SEALED WITH SEALANT APPROVED FOR THE APPLICATION FOR WHICH IT IS BEING USED. FIRE STOP SHALL BE PROVIDED AT ALL LOCATIONS WHERE ELECTRICAL EQUIPMENT OR SYSTEMS PENETRATE FIRE RATED WALLS.
5 EQUIPMENT INTERRUPTING CAPACITIES SPECIFIED IN THE CONTRACT DOCUMENTS ARE BASED UPON EQUIPMENT CHARACTERISTICS AND IMPEDANCES. THE CONTRACTOR SHALL INCREASE THE INTERRUPTING CAPACITIES OF ALL ITEMS ON THE LOAD SIDE OF THE DEVIANT EQUIPMENT IN DIRECT PROPORTION TO THE CHANGED CHARACTERISTICS. INTERRUPTING CAPACITIES SHALL NOT BE
REDUCED TO VALUES LESS THAN THOSE REQUIRED BY THE CONTRACT DOCUMENTS.
6 RISER AND ONE-LINE DIAGRAMS ARE MEANT TO SHOW ONLY ELECTRICAL RELATIONSHIPS, AND THEREFORE MAY NOT INCLUDE ALL REQUIRED EQUIPMENT, DEVICES, AND ACCESSORIES.
7 ALL CONDUCTOR SIZES ARE BASED ON THE USE OF COPPER CONDUCTORS, UNLESS OTHERWISE NOTED.
8 ALL BUSES SHALL BE COPPER, UNLESS OTHERWISE NOTED.
9 NOT ALL SYMBOLS AND ABBREVIATIONS SHOWN ARE USED ON THIS PROJECT.
10 ALL EXISTING ELECTRICAL ITEMS SHALL REMAIN AND BE MAINTAINED IN SERVICE, UNLESS OTHERWISE NOTED.
11 VERIFY THAT THE WIRING BEING REMOVED SERVES ONLY THE ITEM SHOWN TO BE REMOVED ON THESE DRAWINGS. PROVIDE ALL MATERIALS AND LABOR REQUIRED TO RESTORE CONTINUITY TO
CIRCUITS DISRUPTED BY DEMOLITION.
12 REMOVE ALL EXISTING UNUSED WIRING, CONDUIT, BOXES, DEVICES, ETC. UNCOVERED DURING DEMOLITION.
13 SYMBOL ORIENTATION DOES NOT IMPLY DEVICE OR EQUIPMENT ORIENTATION UNLESS NOTED AS SUCH. SEE REFLECTED CEILING PLANS FOR LIGHT FIXTURE POSITIONS AND ORIENTATIONS.
14 SYMBOL SIZE DOES NOT IMPLY EQUIPMENT SIZE, UON
15 ONLY ELECTRIC AND PNEUMATIC POWER TOOLS ARE PERMITTED FOR USE INSIDE THE BUILDING.
16 ALL REQUESTS TO PERFORM ENERGIZED ELECTRICAL WORK MUST GO THROUGH AMP-100.
17 WHERE ACCEPTABLE BY OWNER EXISTING PANELBOARD ENCLOSURES MAY BE REUSED WITH COMPLETE NEW BUSSING AND BREAKER.
18 A 10% LINE ITEM IS REQUIRED IN THE SCHEDULE OF VALUES FOR PROJECT CLOSEOUT TURNOVER. REFER TO SPECIFICATIONS 012000 PART 1.02.
19 COORDINATE BREAKER LOCATION TO AVOID SPLICING FEEDERS. DUE TO OUTAGE CONTRAINTS, INSTALLER MAY USE SPLICES IN TEMPORARY POWER CONDUCTOR RUNS. PERMANENT POWER CONDUCTOR RUNS CANNOT HAVE SPLICES. IF EXISTING CONDUCTOR IS NOT LONG ENOUGH, THEN INSTALLER MUST RUN NEW POWER CONDUCTOR.
20 POWER OUTAGE WORK ONLY ON WEEKENDS AND HOLIDAYS. INSTALLER MUST PLAN FOR POWER TO BE AVAILABLE TO THE BUILDING DURING FAA OPERATIONAL HOURS. FOR NORMAL WEEKEND OUTAGE: OUTAGE CAN START AT 2AM SATURDAY AND END 11PM SUNDAY FOR A TOTAL OF 45 HOURS. FOR WEEKEND OUTAGE PLUS MONDAY HOLIDAY: OUTAGE CAN START AT 2AM SATURDAY AND END 11PM MONDAY FOR A TOTAL OF 69 HOURS. INSTALLER MAY BE REQUIRED TO HAVE MULTIPLE CREWS WORKING 24/7 DURING WEEKEND OUTAGES IN ORDER TO COMPLETE WORK IN THE OUTAGE
TIMEFRAME. SEE PROJECT PHASING NOTES.
21 ARC FLASH STUDY WILL BE PERFORMED BY ENGINEER OF RECORD. PROTECTIVE DEVICE SETTINGS AND ARC FLASH WARNING LABELS WILL BE PROVIDED BY ENGINEER OF RECORD. INSTALLER TO PROVIDE ASSISTANCE WITH PHYSICAL APPLICATION OF ARC FLASH LABELS AND PROTECTIVE DEVICE SETTINGS. THIS COULD INCLUDE COORDINATING OUTAGES, OPENING EQUIPMENT THAT HAS BEEN DE-ENERGIZED, AND WORKING OFF HOURS. THIS APPLIES TO THE ENTIRE BUILDING’S POWER DISTRIBUTION SYSTEM. THIS IS NOT LIMITED TO THE EQUIPMENT BEING INSTALLED FOR THIS PROJECT. THE ENTIRE BUILDING WILL RECEIVE AN UPDATED ARC FLASH STUDY AND THE INSTALLER MUST PROVIDE ASSISTANCE ACCORDINGLY.
22 REFER TO SPECIFCATIONS 017419 FOR CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PLAN REQUIREMENTS.
23 REFER TO SPECIFCATIONS DIVISION 26 FOR ADDITONAL ELECTRICAL REQUIREMENTS.
24 REFER TO SPECIFCATIONS DIVISION 01 FOR ADDITONAL GENERAL REQUIREMENTS AS APPLICABLE.
25 IF THE WEATHER FORECAST TEMPERATURE IS BELOW 33 DEGREES FAHRENHEIT DURING A SCHEDULED OUTAGE TIMEFRAME, THEN THE OUTAGE MUST BE RESCHEDULED.
26 ALL NEW CONDUCTORS MUST BE INSPECTED AND TESTED IN ACCORDANCE WITH NETA ATS. REFER TO SPECIFICATIONS SECTION 260519, PART 3.04.
27 ALL EQUIPMENT THAT ARE BEING REPLACED THE CONTRACTOR SHALL ENSURE THAT THE EQUIPMENT HAS APPROPRIATE GROUNDING PER NEC CODE. NO USING CONDUIT AS MEANS OF GROUNDING.
28 ALL MEDIUM-VOLTAGE WORK SHALL BE COORDINATED WITH AND PERFORMED BY OCAT.
1N2K1
1N2K1
1N2K1
1N2K1
DOWN
1 - 2 " E M T
U F1-2"EMT
OH
UNDERFLOOR
1 1 / 2 "E MT
U F
1 - 1 1 / 2 " E M T O H
1 1 / 2 "E MT
U F
1 1/2"EMT
UNDERFLOOR
TRANS.
24v
T
W.H.
AHU
COND.
480V 800A
NEW PNL
1U4AA
NEW
MBP480V
800A
GUTTER
UPS
NEW 500
KVA
BATT
CAB
BATT
CAB
BATT
CAB
T R
A N
S F
O R
M E
R
T R
A N
S F
O R
M E
R
TV
134010LB134009LB
128059LA
128059LB
128059LC
151101LA
151101LB
151101LC
157101LA
157101LB
157101LC
225KVA
T - 3 4
1N2S1N2T-1
1EU2A
PANEL
PANEL
1N2E
W .P
D E
LU
G
E P
A N
E L
A C
-1
C H
N
D
-7
1E 2A
-1
E
A
-6
A C
-2
P -2
P
M C
C A
-1 M
C C
A -2
T T
TR
AN
SF
O
R M
ER
T
TT
T T T
T
TR
AN
SF
O
R M
ER
T
P A
N E
L
IN
2C
P A
N E
L
N
C
PA
N
E L
1N 4E
TB
-2
PA
N
E L
1N 4B
TR
AN
SF
O
R M
ER
T
PA
N
E L
1N 2B
PA
N
EL
IN
2A
TR
AN
SF
O
R M
ER
T
M C
C A
-5
B -1
TR
AN
SF
O
R M
ER
T
TR
AN
SF
O
R M
ER
T
T
PA
N
E L
1E 4B
PANEL
IN2W
P A
N E
L
N
B
P A
N E
L
E
A
FU
TU
RE
TR
AN
SF
O
R M
ER
T
PA
N
EL
E2 A
TR
AN
SF
O
R M
ER
T
PANEL
IU2U
C H
-2
N
F
-1
G F
C I
N
F
PANEL
IN2Z
IN2A1
PANEL
IE4G
PANEL
IN2R
PANEL
IN2Q
PANEL
IN4K
PANEL
IE4E
T - 1 8
PANEL
IN2X
T
L C
TTRANSFORMER
T23
TRANSFORMER
T22
PANEL
IN4J
PANEL
1E2D
TRANSFORMER
T18
PANEL
IN2Y3
I N 2 C 1 - 21 N 2 Y - 1
PANEL
1N2V
FED FROM PANEL
IN2Y2
TTC-6
1N 2U
-1
1 N 2 Y - 2 I N 2 C 1 - 1
TR
AN
SF
O
RM
ER
T
N
G
N
F
N
D
12"X12"METAL
PLATE
METAL
PLATE
12"X12"
SWITCH
BOARD
1E4C
1N2AB
PANEL
T - 3 2
300KVA
T17
75 KV A
1E2C
1U4D
PULL
BOX
T16
1E2B
PANEL
1E4I
PANEL
30KVA
T
1 2 0 / 2 0 8 V 1N2K
1 2 0 / 2 0 8 V 1N2J
T21
PANEL
IN4H
PANEL
IE4H
T19
PANEL
IE2E
PANEL
IE4F
PANEL
IN4I
PANEL
IN2I
PANEL IN20 SECTION
IPANEL IN20 SECTION
II
PANEL
IN2P
PANEL
IN2TSSA
PANEL
IN2TSSB
PANEL
1N2A
PANEL
1N2B
PANEL
TTC-9
TTC-10
PANEL 1E2D &
1EU2A
RACEWAY No. 2 RACEWAY No.
D
IV
ID
E
R
TR
AY
R A
C E
W A
Y N o
R A
C E
W A
Y N
O .1
R A
C E
W A
Y N
O .2
R A
C E
W A
Y N
O .1
R A
C E
W A
Y N
O .2
R A
C E
W A
Y N
O .1
R A
C E
W A
Y N
O .2
R A
C E
W A
Y N
O .2
R A
C E
W A
Y N
O .1
R A
C E
W A
Y N
O .2
RACEWAY
NO.2
RACEWAY No. 2 RACEWAY No.
D
IV
ID
E
R
TR
AY
R A
C E
W A
Y N
O .1
R A
C E
W A
Y N
O .2
RACEWAY
NO.1
R A
C E
W A
Y N
O .1
R A
C E
W A
Y N
O .2
R A
C E
W A
Y N
O .1
RACEWAY
NO.1
R A
C E
W A
Y N
O .2
R A
C E
W A
Y N o
J
EF
F
J
J
J
J
J
J
J
J
J
J
MECHANICAL
MECHANICAL
CHASE
TELEPHONE
CHASE
ELECTRIC
CHASE
ELECTRIC
JANITOR
TELEPHONE
CHASE
MECHANICAL
ELECTRIC
MECHANICAL
BOILER
ROOM
MECHANICAL
MECHANICAL
CHASE
TELEPHONE
ELECTRIC
CHASE
MECHANICAL
MECHANICAL
ELECTRIC
ELECTRIC TELEPHONE
C H
A S
E
JANITORELECTRIC
E L
E C
T R
IC
E
L E
C T
R
IC
E L
E C
T R
IC
TELEPHONE
CHASE
MECHANICAL
MECHANICAL
OFFICE
OFFICE
TIE MSWB-AMSWB-B
SERVICE ENTRANCE
FEEDERS
EXISTING - UNDERGROUND
BUSWAY
XFMR
#39
XFMR
#38
+48"
METER
+48"METER
METASYS
PANEL
EXTERNAL
EXTERNAL
LOAD BANK
PULL/SPLICE BOX
HOUSEKEEPING
PAD
1E4C
CHILLER 1 CHILLER 3CHILLER 2
TWO EACH RENTAL MV UNIT SUBSTATIONS - 2500KVA
WITH 4000 AMP SWITCHBOARDS.
COORDINATE PLACEMENT WITH FAA.
LIFE
SAFETY
ATS
MCCA
1N4A
MCC-B
(FORMERLY MCC-1)
1N4G
2 REMOTE
OPEN/CLOSE
@ +48" AFF.
TEMPORARY POWER - A TEMPORARY POWER - B
C .A
. E N
G
IN
E E
R
IN
G
E
X P
IR
E
S J
U N
E
0, C .A
. A R
C H
IT
E
C T
U R
E
E
X P
IR
E
S J
U N
E
0, C .H
. G U
E R
N S
E Y
C
O M
P A
N Y
N . G
R A
N D
B
LV
D
O K
LA
H
O M
A C
IT
Y
, O K
.4
.8
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S. C. 552 and 49 CFR parts 15 and 1520.
REV DATE DESCRIPTION CHECK APP'D
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
TPS-027 REPLACE SWITCHGEAR MCC
PREPARED BY
DESIGNED DATE
OF
THOMAS P. STAFFORD BUILDING
APPROVED BY
DRAWN
WORK ORDER # 25-003967
GUERNSEY
ISSUED BY
28 AUGUST 202570
8-
2 NABYOLLAH GHARAJEH
/2
/2
:4
:4
A
M
E-101
ELECTRICAL PLAN
ZMN
ZMN
1/16" = 1'-0"1
ELECTRICAL PLAN - FIRST FLOOR - COMPOSITE
16' 8' 0 16'
SCALE: 1/16" = 1'-0"
PLAN NORTH
TEMPORARY POWER & OUTAGE NOTES:
1. GENERAL: COORDINATE ALL ELECTRICAL DISTRIBUTION EQUIPMENT REPLACEMENT WITH OWNER. SCHEDULE AND PLAN OUTAGE TIMES ACCORDINGLY WITHIN THE BOUNDS OF THE PHASING
PLAN OR OWNER APPROVED SCHEDULE.
2. TEMPORARY UNIT SUBSTATIONS REQUIREMENTS:
A. PROVIDE UNIT SUBSTATION SUBMITTAL FOR FAA APPROVAL.
B. AIC RATINGS FOR UNIT SUBSTATION OVERCURRENT DEVICES SHALL BE SIZED BASED UPON TRANSFORMER IMPEDANCE
C. MEDIUM-VOLTAGE SWITCH
D. 2,500 kVA TRANSFORMER (12.47 kV DELTA PRIMARY, 480 WYE SECONDARY) WITH IMPEDANCE RATING.
E. 4,000 AMP SWITCHBOARD RATED FOR TRANSFORMER IMPEDANCE RATING.
F. SWITCHBOARD BREAKERS (WITH AIC RATINGS):
I. SUB #1 – 4,000A (MAIN); 3,000A (TIE); 1,600A; 1,600A; (3) EACH 800A; 350A AND 60A
ii. SUB #2 – 4,000A (MAIN); 3,000A (TIE); 1,000A; 1,000A; 800A; 400A AND 60A
G. ONE-LINE OR SKETCH OF HOW COMPONENTS WILL ELECTRICALLY CONNECT AND ANY APPLICABLE GROUNDING DETAILS.
3. PROJECT PHASING NOTES:
A. COORDINATE ORDER AND EXTENT OF PHASES WITH BUILDING OCCUPANTS AND AMP-400 (FAA). ANY NOISY WORK MUST BE PERFORMED AFTER-HOURS. INSTALLER MAY BE REQUIRED TO HAVE MULTIPLE CREWS WORKING 24/7 DURING WEEKEND OUTAGES IN ORDER TO COMPLETE AND TEST WORK DURING THE OUTAGE TIMEFRAME.
a. OBTAIN ALL MATERIALS NEEDED FOR EACH CONSTRUCTION PHASE AND HAVE ON-SITE BEFORE STARTING WORK.
b. INDIVIDUAL POWER OUTAGES MUST BE COORDINATED WITH FAA 21 DAYS IN ADVANCE. POWER OUTAGE WORK ONLY ON WEEKENDS AND HOLIDAYS. SEE SHEET E-001, GENERAL
ELECTRICAL NOTE 20
c. REFERENCE SWITCHBOARD, PANELBOARD, AND MCC SCHEDULES (E-600 SERIES DRAWINGS) FOR OVERCURRENT DEVICES AND STARTERS.
d. COORDINATE ROUTING OF TEMPORARY POWER TO AVOID BLOCKING ACCESS TO EQUIPMENT AND PROVIDE A RELATIVELY CLEAR PATHWAY THROUGH THE AREAS.
e. DO NOT LOCATE TEMPORARY UNIT SUBSTATIONS IN THE GRASSY AREA.
B. PHASE ONE. NO WORK ASSOCIATED WITH THIS PHASE. PROCEED TO THE NEXT PHASE.
C. PHASE TWO. SUBMITTALS AND ORDERING EQUIPMENT. LONG LEAD TIME IS ANTICIPATED FOR THE NEW SWITCHBOARD. PROVIDE PRELIMINARY WORK SCHEDULE TO FAA BASED UPON
EXPECTED DELIVERY OF EQUIPMENT.
D. PHASE THREE. SCHEDULING. WHEN DELIVERY OF NEW MAIN SWITCHBOARD IS 30 DAYS FROM ARRIVAL, PROVIDE DETAILED WORK SCHEDULE TO FAA. START REQUESTING WEEKEND
OUTAGES. CONFIRM AVAILABILITY OF TEMPORARY POWER EQUIPMENT. UPDATE ANY SUBMITTALS IF CHANGED FROM PHASE TWO.
E. PHASE FOUR. SETUP TEMPORARY SUBSTATION TRAILERS. WEEKEND (2 DAYS). COORDINATE LOCATION AND POSITION TWO RENTAL TEMPORARY 2500 kVA UNIT SUBSTATIONS EACH WITH
4,000 AMP SWITCHBOARD NEAR MECHANICAL ROOM ROLLUP DOOR. CONNECT WITH LOAD BREAK ELBOWS AND APPLICABLE BUSHING INSERTS AS APPROPRIATE TO OPEN MEDIUM-VOLTAGE TERMINALS ON TRANSFORMERS #38 AND #39. TEMPORARY SWITCHBOARDS SHALL HAVE CIRCUIT BREAKERS, INCLUDING 3,000 AMP TIE BREAKERS BETWEEN THEM, AND PREPARED (AMPACITY AND LENGTH) COPPER MULTI-CONDUCTOR CABLES, SUITABLE FOR EXPOSED WET LOCATIONS AND SUNLIGHT FOR TEMPORARY FEEDERS FROM THE TEMPORARY SWITCHBOARDS, ACROSS THE GROUND, AND INTO THE BUILDING. PROVIDE PHYSICAL PROTECTION FOR ALL EXPOSED CABLING AS ACCEPTABLE TO FAA. CONNECT TEMPORARY SWITCHGEAR GROUNDING TO EXISTING BUILDING GROUND SYSTEM USING #500 KCMIL COPPER GROUND CONDUCTORS.FABRICATE TEMPORARY CABLE ENTRY STRUCTURE FOR THE OVERHEAD DOOR OPENING TO BE ABLE TO MAINTAIN BUILDING SECURITY AND AVOID WATER INFILTRATION. AT THE END OF THIS PHASE, TEMPORARY POWER MUST BE TESTED, PROTECTED, AND READY TO BE USED.
F. PHASE FIVE. TRANSITION FEEDERS FROM MSWB TO TEMPORARY POWER. PULL LOAD SIDE FEEDERS OUT OF MSWB AND TRANSITION TO TEMPORARY POWER. INSTALL 2,000 AMP CABLE TAP BOXES IN PLACE OF DOWNTURN ELBOWS ON THE BUSWAYS. CONNECT TEMPORARY FEEDERS TO ALL LOADS FROM THE TEMPORARY UNIT SUBSTATIONS. THIS CAN BE PERFORMED OVER MULTIPLE WEEKEND OUTAGES IF NECESSARY. ALL BUILDING EQUIPMENT MUST BE RE-ENERGIZED AT THE END OF EACH WEEKEND OUTAGE. OPEN LOAD BREAK SWITCH AT TRANSFORMERS # 38 AND #39 TO DE-ENERGIZE THE EXISTING SWITCHGEAR. AT THE END OF THIS PHASE, ALL BUILDING LOADS MUST BE ON TEMPORARY POWER.
G. PHASE SIX. REMOVE AND RETAIN EXISTING JCI ENERGY METERS.
H. PHASE SEVEN. REMOVE SERVICE LATERAL CONDUCTORS FROM TRANSFORMER #38 AND #39 TO SWITCHGEAR MSWB-A AND MSWB-B.
I. PHASE EIGHT. REMOVE EXISTING SWITCHGEAR.
J. PHASE NINE. INSTALL NEW SWITCHBOARDS MSWB-A AND MSWB-B REUSING EXISTING SERVICE LATERAL CONDUCTORS FROM TRANSFORMER #38 AND #39. TEST SWITCHBOARDS. REINSTALL
EXISTING JCI ENERGY METERS.
K. PHASE TEN. CONNECT ALL ENERGY METERS TO METASYS JCI WORK. RECLOSELOAD BREAK SWITCH AT TRANSFORMER #38 AND #39. THIS WILL ENERGIZE THE MAIN SWITCHBOARDS. THE
BUILDING WILL CONTINUE TO RECEIVE POWER FROM THE TEMPORARY SUBSTATIONS.
L. PHASE ELEVEN. TEST CABLES AND TRANSFER LOADS FROM TEMPORARY UNIT SUBSTATIONS BACK TO NEW SWITCHBOARDS. THIS CAN BE PERFORMED OVER MULTIPLE WEEKEND OUTAGES
IF NECESSARY. ALL BUILDING EQUIPMENT MUST BE RE-ENERGIZED AT THE END OF EACH WEEKEND OUTAGE. AT THE END OF THIS PHASE, ALL BUILDING LOADS MUST BE FED FROM THE NEW
MAIN SWITCHBOARDS.
M. PHASE TWELVE. REMOVE MEDIUM-VOLTAGE TEMPORARY CABLES FROM TRANSFORMER #38 AND #39. REMOVE TEMPORARY SUBSTATION TRAILERS.
N. PHASE THIRTEEN. WITH BUILDING LOADS ON THE NEW SWITCHBOARDS, TEST THE ENERGY METERS WITH AMP-100 (FAA). ENERGY METERS MUST SEND ALL SPECIFIED DATA TO METASYS.
O. PHASE FOURTEEN. REMOVE EXISTING STARTERS AND DISCONNECTS IN EXISTING MOTOR CONTROL CENTER MCC-A. REPLACE ALL DEVICES WITH NEW TO MATCH EXISTING FUNCTIONS AND
RECONNECT CONTROLS. VERIFY PROPER CONTROL FUNCTIONS.
P. PHASE FIFTEEN. REMOVE EXISTING STARTERS AND DISCONNECTS IN EXISTING MOTOR CONTROL CENTER MCC-B (FORMERLY MCC-1). REPLACE ALL DEVICES WITH NEW TO MATCH EXISTING
FUNCTIONS AND RECONNECT CONTROLS. VERIFY PROPER CONTROL FUNCTIONS.
Q. PHASE SIXTEEN. REMOVE AND REPLACE EXISTING PANELBOARD 1N4A. NEW PANELBOARDS SHALL MATCH EXISTING BREAKERS AND INCLUDE SPARES AS INDICATED IN PANELBOARD
SCHEDULES. RECONNECT EXISTING FEEDERS AND BRANCH CIRCUITS.
R. PHASE SEVENTEEN. REMOVE AND REPLACE EXISTING PANELBOARD 1N4G. NEW PANELBOARDS SHALL MATCH EXISTING BREAKERS AND INCLUDE SPARES AS INDICATED IN PANELBOARD
SCHEDULES. RECONNECT EXISTING FEEDERS AND BRANCH CIRCUITS.
S. PHASE EIGHTEEN. APPLICATION OF ARC FLASH LABELS AND ADJUSTING PROTECTIVE DEVICE SETTINGS.
T. PHASE NINETEEN. PROJECT CLOSEOUT.
4. WEEKEND OUTAGE IMPACTS:
A. PHASE ONE – ENTIRE BUILDING. (SURVEYING/VERIFYING CONDITIONS)
B. PHASE TWO – NONE
C. PHASE THREE – NONE
D. PHASE FOUR – ENTIRE BUILDING (MV CONNECTIONS TO TRANSFORMERS)
E. PHASE FIVE – ENTIRE BUILDING (TRANSITIONS TO TEMP POWER)
F. PHASE SIX – NONE (BUILDING ON TEMP POWER)
G. PHASE SEVEN – NONE (BUILDING ON TEMP POWER)
H. PHASE EIGHT – NONE (BUILDING ON TEMP POWER)
I. PHASE NINE – NONE. (BUILDING ON TEMP POWER)
J. PHASE TEN – NONE. (BUILDING ON TEMP POWER)
K. PHASE ELEVEN – ENTIRE BUILDING (TRANSITION TO NEW SWITCHBOARDS)
L. PHASE TWELVE – ENTIRE BUILDING (REMOVE MV CONNECTIONS)
M. PHASE THIRTEEN – NONE
N. PHASE FOURTEEN – LOADS SERVED FROM MCC-A
O. PHASE FIFTEEN – LOADS SERVED FROM MCC-B (FORMERLY MCC-1)
P. PHASE SIXTEEN – LOADS SERVED FROM PANELBOARD 1N4A, INCLUDING LOADS ON MCC-A
Q. PHASE SEVENTEEN – LOADS SERVED FROM PANELBOARD 1N4G
R. PHASE EIGHTEEN – INDIVIDUAL LOADS AS PROTECTIVE DEVICE SETTINGS ARE FINALIZED
S. PHASE NINETEEN - NONE
KEYED NOTES:
1. EXISTING MAIN-TIE-MAIN SWITCHGEAR TO BE REPLACED WITH A MAIN TIE-MAIN SWITCHBOARD. RE: E-601 FOR SCHEDULE, SIZING, AND NOTES AND SPECIFICATION SECTION 262413.
2. REMOTE OPEN/CLOSE FOR MAIN BREAKERS OF BOTH SIDES OF MAIN SWITCHBOARD MSWB. ROUTE SHUNTING/CONTROLS WIRING ACCORDING TO MANUFACTURER RECOMMENDATIONS, OVERHEAD IN AVAILABLE SPACE TO MSWB. CONTROLS TO OPEN/CLOSE THE TIE BREAKER AS WELL. THE CONTROLLER SHALL HAVE PILOT LIGHTS FOR OPEN/CLOSE POSITIONS.
3. EXISTING SWITCHBOARD TO BE REPLACED. RE: E-601 FOR SCHEDULE, SIZING, AND NOTES. DEMOLISH EXISTING SWITCHBOARD. RETAIN ALL FEEDING CIRCUITS FOR REUSE. RECONNECT, IN
KIND, TO NEW SWITCHBOARD.
4. REPLACE MOTOR STARTERS IN EXISTING MOTOR CONTROL CENTER. RE: E-601 FOR SCHEDULE, SIZING, AND NOTES. KEEP EXISTING MOTOR CONTROL CENTER. RETAIN ALL FEEDING CIRCUITS
AND CONTROLS FOR REUSE. RECONNECT IN KIND TO MOTOR CONTROL CENTER. FIELD VERIFY THAT EXISTING CONTROLS MAINTAIN INTEROPERABILITY WITH NEW.
5. NEW UL 1449 5TH EDITION SURGE PROTECTION DEVICE, IN NEMA 1 ENCLOSURE, EXTERIOR TO NEW SWITCHBOARD. MOUNT SPD ON TOP OF SWITCHBOARD. SPD CAN BE MOUNTED ON
ADJACENT WALL IF APPLICABLE. ROUTE MANUFACTURER RECOMMENDED CONDUIT AND CONDUCTORS. REFER TO SPECIFICATION SECTION 264300.
A. SPD WILL BE INSTALLED AT THE TOP OF THE SWITCHBOARD VIA SHORT DIRECT NIPPLE CONNECTION.
B. PROVIDE BRACING TO SUPPORT THE EQUIPMENT IF NEEDED.
6. PROVIDE CABLE TAP BOX ON EXISTING BUSWAY FOR TEMPORARY CONNECTION AND REUSE FOR FINAL CONNECTION TO NEW SWITCHBOARD.
7. EXISTING PULL BOX SERVING NEW LIFE SAFETY ATS. USE AS CONNECTION POINT FOR TEMPORARY FEEDER.
8. EXISTING PULL BOX FOR 1N4A (AND MCC-A). USE AS CONNECTION POINT FOR TEMPORARY FEEDER.
9. THE INFILL STRUCTURE MUST PROTECT THE TEMPORARY FEEDERS FROM THE WEIGHT OF THE EXISTING ROLLUP DOOR AND BLOCK WATER PENETRATION INTO THE BUILDING.
10. EXISTING 2500 KVA TRANSFORMER FOR CONNECTION TO TEMPORARY MV UNIT SUBSTATION.
11. EXISTING CHILLER DISCONNECT SWITCH. USE AS CONNECTION POINT FOR TEMPORARY FEEDER.
12. TIE TO AND EXTEND EXISTING HOUSEKEEPING PAD FOR SWITCHBOARD, REFER TO DETAIL #6 ON SHEET E-602 FOR PAD EXTENSION.
13. ANY WORK ON THE EXISTING BUILDING TRANSFORMERS T38 AND T39 MUST BE CONTRACTED THROUGH OCAT MEDIUM VOLTAGE CONTRACTOR, LIBRA ELECTRIC. THIS INCLUDES CONNECTIONS
TO THE TRANSFORMERS AND ANY PENETRATIONS.
14. BUSWAY TAP BOX LOCATION NEEDS TO ALLOW FOR DEMOLITION AND INSTALLATION OF MSWB.
BASE BID – CAREFULLY REMOVE AND SAVE/REUSE ALL EXISTING CONDUCTORS. REPLACE BUSWAY CONNECTIONS WITH TAP BOX AND CONDUCTORS IN RACEWAY.
BID OPTION #1 – REPLACE SERVICE LATERAL TO MSWB-A, FEEDER #1.
BID OPTION #2 – REPLACE SERVICE LATERAL TO MSWB-B, FEEDER #2.
BID OPTION #3 – REPLACE CHILLER #1 CIRCUIT, FEEDER #13.
BID OPTION #4 – REPLACE CHILLER #2 CIRCUIT, FEEDER #4.
BID OPTION #5 – REPLACE CHILLER #3 CIRCUIT, FEEDER #5.
BID OPTION #6 – REPLACE 1N4A FEEDER CIRCUIT, FEEDER #11.
BID OPTION #7 – REPLACE MCC-B FEEDER CIRCUIT, FEEDER #3.
BID OPTION #8 – REPLACE ATS (1E4C) FEEDER CIRCUIT, FEEDER #8.
BID OPTION #9 – REPLACE 1N4G FEEDER, FEEDER #12.
BID OPTION #10 – REPLACE LIFE SAFETY ATS FEEDER, FEEDER #6.
1N4G
MCC-A
XFMR #39
2500KVA
12470-480/277V 3-PHASE
SWGR MSWB-B
400A
400A
800A
4000A
4000A, 480Y/277V
400A, 480Y/277V
400A, 480Y/277V
SWGR MSWB-A 4000A, 480Y/277V
3000A
OPEN
1N4A
1600A
1600A
1600A, 480Y/277V
MCC-1 800A, 480Y/277V
EM
SPD
XFMR #38
2500KVA
12470-480/277V 3-PHASE
4000A
EM
SPD
SPD
6 6
1N4G
MCC-A
MSWB-B
400A
4000A, 480Y/277V
400A, 480/277V
400A, 480/277V
MSWB-A 4000A, 480Y/277V
4000A
OPEN
1N4A
1600A 1600A, 480/277V
XFMR #39
2500KVA
12470-480/277V 3-PHASE
4000A
XFMR #38
2500KVA
12470-480/277V 3-PHASE
4000A
EM
REMOTE OPEN/CLOSE
COMM.
REMOTE OPEN/CLOSE
COMM.
EM
DISPLAY
EXTERNAL
EM
EM
INTERNAL
30A
DISPLAY
EXTERNAL
INTERNAL
1 2
125A 100A 125A
AHU 3 XFMR T-20 AHU 4 SPD
60A
MUA 1
15 16 17 18
SPD
60A
225A
225A
1N4F
250A
XFMR T-6
300A
CHILLER
250A
2N4H
150A
XFMR T-7
800A
1N4B
225A
225A
1N4C 1N4D 1N4E
60A
SPD 5
MCC-B 800A, 480/277V
800A
TO LIFE SAFETY ATS NORMAL
POWER IN ELECTRICAL ROOM
102A ON SEPARATE OCAT PROJECT
350A
800A
CHILLER 2
800A
CHILLER 3
2000A
BUSWAY #1
400A
400A
SPD 5
60A
800A
CHILLER 1
1600A
2000A
BUSWAY #2
ATS
1600A
12 12
ENERGY
METER
PT
CONNECT OUTPUT TO
JCI METASYS SYSTEM
2-WIRE TWISTED
SHIELDED IN 3/4"C
CT
NOT TO SCALE
DEMOLITION - PARTIAL ONE-LINE
NOT TO SCALE
NEW - PARTIAL ONE-LINE
NOT TO SCALE
ENERGY METER CONNECTION DETAIL
C .A
. E N
G
IN
E E
R
IN
G
E
X P
IR
E
S J
U N
E
0, C .A
. A R
C H
IT
E
C T
U R
E
E
X P
IR
E
S J
U N
E
0, C .H
. G U
E R
N S
E Y
C
O M
P A
N Y
N . G
R A
N D
B
LV
D
O K
LA
H
O M
A C
IT
Y
, O K
.4
.8
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S. C. 552 and 49 CFR parts 15 and 1520.
REV DATE DESCRIPTION CHECK APP'D
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
TPS-027 REPLACE SWITCHGEAR MCC
PREPARED BY
DESIGNED DATE
OF
THOMAS P. STAFFORD BUILDING
APPROVED BY
DRAWN
WORK ORDER # 25-003967
GUERNSEY
ISSUED BY
28 AUGUST 202570
8-
2 NABYOLLAH GHARAJEH
/2
/2
:4
:4
A
M
E-600
ELECTRICAL CABLE CONDUIT AND WIRE SCHEDULE
ZMN
ZMN
GENERAL NOTES:
1. SEVERAL BID OPTIONS HAVE BEEN IDENTIFIED FOR REPLACING CONDUCTORS. FOR THE BASE BID, INSTALLER TO PRESUME THAT EXISTING POWER CONDUCTORS (THAT ARE LISTED IN THE BID OPTIONS) WILL FIT IN THE NEW EQUIPMENT. ANY REQUIRED CONDUIT IS COVERED BY THE PROJECT’S BASE BID. ANY REQUIRED CONDUCTOR NOT LISTED IN THE BID OPTIONS IS COVERED BY
THE PROJECT’S BASE BID.
2. DURING THE SURVEY OUTAGE, INSTALLER TO FIELD VERIFY THE SIZE AND QUANTITY ALL POWER CONDUCTOR AND CONDUIT THAT CONNECTS TO MSWB-A, MSWB-B, 1N4A AND 1N4G.
INSTALLER TO PROVIDE SUBMITTAL CONFIRMING, CORRECTING, OR FILLING IN MISSING INFORMATION ON SHEET E-600. INSTALLER TO RECOMMEND ANY CONDUCTORS THAT NEED TO BE
REPLACED.
3. IF CONDUCTORS ARE DEEMED NOT LONG ENOUGH DURING A WEEKEND OUTAGE WHEN EQUIPMENT IS BEING REPLACED, THEN INSTALLER MUST TEMPORARILY EXTEND CONDUCTORS USING A SPLICE. ANY LABOR AND MATERIAL COST FOR UTILIZING TEMPORARY CONDUCTORS IS COVERED BY THE PROJECT’S BASE BID.
4. ITEMS SHOWN AS HALF-TONED ARE EXISTING TO REMAIN, UON. REPLACE POWER CONDUCTOR IF EXISTING FEEDER LENGTH IS INSUFFICIENT TO SERVE NEW EQUIPMENT.
SPLICES CAN BE USED FOR TEMPORARY CONNECTIONS. SEE SHEET E-600.
5. REFERENCE DRAWING E-603 FOR TEMPORARY ONE-LINE AND FEEDER SCHEDULE.
FEEDER SCHEDULE (INSTALLER TO FIELD VERIFY ALL INFORMATION DURING SURVEY OUTAGE).
(#) FEEDER
FROM (STARTING
EQUIPMENT) TO (ENDING EQUIPMENT) CONDUCTOR SIZE
APPROXIMATE CONDUCTOR LENGTH
EACH TYPE
CONDUIT
SIZE SERVING/REMARKS
1 XFMR #38 MSWB-A 15 SETS 4-#500 KCMIL 90' THHN/THWN-2 15-3" BID OPTION #1 – REPLACE SERVICE LATERAL TO MSWB-A, FEEDER #1.
2 XFMR #39 MSWB-B 15 SETS 4-#500 KCMIL 90' THHN/THWN-2 15-3" BID OPTION #2 – REPLACE SERVICE LATERAL TO MSWB-B, FEEDER #2.
3 MSWB-A MCC-B (FORMERLY MCC-1) 3 SETS 4-#350 KCMIL, #1/0GND 120' THHN 3-3" BID OPTION #7 – REPLACE MCC-B FEEDER CIRCUIT, FEEDER #3.
4 MSWB-A CHILLER 2 3 SETS 4-#300 KCMIL, #1/0GND 110' THHN 3-3" BID OPTION #4 – REPLACE CHILLER #2 CIRCUIT, FEEDER #4.
5 MSWB-A CHILLER 3 3 SETS 4-#300 KCMIL, #1/0GND 130' THHN 3-3" BID OPTION #5 – REPLACE CHILLER #3 CIRCUIT, FEEDER #5.
6 MSWB-A LS ATS (OCAT PROJECT) 1 SET 4-#500 KCMIL, 1-#3GND 450' THHN 3 1/2" BID OPTION #10 – REPLACE LIFE SAFETY ATS FEEDER, FEEDER #6.
8 MSWB-A ATS (SERVING 1E4C) 5 SETS 4-500KCMIL, #4/0GND 100' THHN 5-3 1/2" BID OPTION #8 – REPLACE ATS (1E4C) FEEDER CIRCUIT, FEEDER #8.
9 MSWB-A SPD 1 SET 4-#4 AWG, #10GND 20' THHN 1" PROVIDE WIRE SIZE AS PER MANUFACTURER RECOMMENDATION
11 MSWB-B 1N4A 5 SETS 4-500KCMIL, #4/0GND 325' THHN 5-3" BID OPTION #6 – REPLACE 1N4A FEEDER CIRCUIT, FEEDER #11.
12 MSWB-B 1N4G 2 SETS 4-3/0 AWG, #2GND 125' THHN 2-2" BID OPTION #9 – REPLACE 1N4G FEEDER, FEEDER #12.
13 MSWB-B CHILLER 1 3 SETS 4-#300 KCMIL, #1/0GND 110' THHN 3-3" BID OPTION #3 – REPLACE CHILLER #1 CIRCUIT, FEEDER #13.
14 MSWB-B SPD 1 SET 4-#4 AWG, #10GND 20' THHN 1" PROVIDE WIRE SIZE AS PER MANUFACTURER RECOMMENDATION
19 1N4G SPD 1 SET 4-#4 AWG, #10GND 2' THHN 1" PROVIDE WIRE SIZE AS PER MANUFACTURER RECOMMENDATION
30 1N4A SPD 1 SET 4-#4 AWG, #10GND 2' THHN 1" PROVIDE WIRE SIZE AS PER MANUFACTURER RECOMMENDATION
KEYED NOTES:
1. EXISTING MAIN-TIE-MAIN SWITCHGEAR TO BE REPLACED WITH A MAIN TIE-MAIN SWITCHBOARD. RE: E-601 FOR SCHEDULE, SIZING, AND NOTES AND SPECIFICATION SECTION 262413.
2. REMOTE OPEN/CLOSE FOR MAIN BREAKERS OF BOTH SIDES OF MAIN SWITCHBOARD MSWB. ROUTE SHUNTING/CONTROLS WIRING ACCORDING TO MANUFACTURER RECOMMENDATIONS, OVERHEAD IN AVAILABLE SPACE TO MSWB. CONTROLS TO OPEN/CLOSE THE TIE BREAKER AS WELL. THE CONTROLLER SHALL HAVE PILOT LIGHTS FOR OPEN/CLOSE POSITIONS.
3. EXISTING SWITCHBOARD TO BE REPLACED. RE: E-601 FOR SCHEDULE, SIZING, AND NOTES. DEMOLISH EXISTING SWITCHBOARD. RETAIN ALL FEEDING CIRCUITS FOR REUSE. RECONNECT, IN KIND, TO NEW SWITCHBOARD.
4. REPLACE EQUIPMENT IN EXISTING MOTOR CONTROL CENTER. RE: E-601 FOR SCHEDULE, SIZING, AND NOTES. KEEP EXISTING MOTOR CONTROL CENTER. RETAIN ALL FEEDING CIRCUITS AND
CONTROLS FOR REUSE. RECONNECT IN KIND TO MOTOR CONTROL CENTER. FIELD VERIFY THAT EXISTING CONTROLS MAINTAIN INTEROPERABILITY WITH NEW.
5. NEW UL 1449 5TH EDITION SURGE PROTECTION DEVICE, IN NEMA 1 ENCLOSURE, EXTERIOR TO NEW SWITCHBOARD. MOUNT SPD ON TOP OF SWITCHBOARD. SPD CAN BE MOUNTED ON ADJACENT
WALL IF APPLICABLE. ROUTE MANUFACTURER RECOMMENDED CONDUIT AND CONDUCTORS. REFER TO SPECIFICATION SECTION 264300.
A. SPD WILL BE INSTALLED AT THE TOP OF THE SWITCHBOARD VIA SHORT DIRECT NIPPLE CONNECTION.
B. PROVIDE BRACING TO SUPPORT THE EQUIPMENT IF NEEDED.
6. RETAIN EXISTING EXTERNAL JCI ENERGY METERS AND ALL ASSOCIATED COMPONENTS. REINSTALL ON WALL SOUTH OF SWITCHBOARD. REPLACE OR EXTEND CONDUIT, CABLING AND ASSOCIATED COMPONENTS AS NECESSARY FOR PROPER METER FUNCTION. VOLTAGE MONITORING CABLES ALSO POWER THE METER. REINSTALL EXISTING MOTOR STARTER POWER SWITCH NEAR EXTERNAL METER. RECONNECT EXISTING EXTERNAL ENERGY METER TO JCI METASYS USING 2-WIRE SHIELDED RS-485 N2 OR BACNET MSTP COMMUNICATIONS AS APPLICABLE. CONTRACT WITH JCI FOR
COMMUNICATIONS WORK. SEE DETAIL 4.
7. CONNECT NEW INTERNAL ENERGY METERS TO JCI METASYS USING 2-WIRE SHIELDED RS-485 BACNET MSTP COMMUNICATIONS. CONTRACT WITH JCI FOR COMMUNICATIONS WORK. SEE DETAIL 4.
8. ALL FOUR ENERGY METERS MUST SEND ALL MEASURED PARAMETERS DATA TO JCI METASYS. REFERENCE SPECIFICATIONS 262413 PART 2.01-Q FOR LIST OF MEASURED PARAMETERS.
COORDINATE WITH FAA FOR TESTING ENERGY METERS.
9. POTENTIAL TRANSFORMERS MAY OR MAY NOT HAVE BEEN UTILIZED IN THE EXISTING EXTERNAL ENERGY METER. DURING REINSTALLATION, ENSURE APPROPRIATE FUSE IS INSTALLED ON EACH
VOLTAGE MONITORING CABLE IN ACCORDANCE WITH MANUFACTURER INSTALLATION INSTRUCTIONS. TYPICAL 0.5 AMP.
10. EXISTING PULL BOX SERVING NEW LIFE SAFETY ATS. USE AS CONNECTION POINT FOR TEMPORARY FEEDER.
11. EXISTING PULL BOX FOR 1N4A (AND MCC-A). USE AS CONNECTION POINT FOR TEMPORARY FEEDER.
12. BUSWAY TAP BOX.
BID OPTION SCHEDULE
C .A
. E N
G
IN
E E
R
IN
G
E
X P
IR
E
S J
U N
E
0, C .A
. A R
C H
IT
E
C T
U R
E
E
X P
IR
E
S J
U N
E
0, C .H
. G U
E R
N S
E Y
C
O M
P A
N Y
N . G
R A
N D
B
LV
D
O K
LA
H
O M
A C
IT
Y
, O K
.4
.8
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S. C. 552 and 49 CFR parts 15 and 1520.
REV DATE DESCRIPTION CHECK APP'D
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
TPS-027 REPLACE SWITCHGEAR MCC
PREPARED BY
DESIGNED DATE
OF
THOMAS P. STAFFORD BUILDING
APPROVED BY
DRAWN
WORK ORDER # 25-003967
GUERNSEY
ISSUED BY
28 AUGUST 202570
8-
2 NABYOLLAH GHARAJEH
/2
/2
:4
:4
A
M
E-601
ELECTRICAL PANEL SCHEDULES
ZMN
ZMN
1. TOTAL CONNECTED LOAD IS UNKNOWN. EXISTING LOADS ARE ASSUMED TO BE <80% MCB RATING. BASIS OF DESIGN: ABB/GE RELIABOARD LV SWITCHBOARD, MCB - E.62H-A 4000 EKIP
HI-TOUCH LSIG, TIE-BREAKER - E4.2S-A 3200 EKIP HI-TOUCH LSIG.
2. ABB/GE A2SCUFAKBY (EKIP TOUCH, LSIG).
3. ABB/GE A2SCUFAKBY (LSIG, RELT, 100% RATED).
Notes:
Total Est. Demand Current: 0 A
Total Conn. Current: 0 A
Total Est. Demand: 0 VA
Total Conn. Load: 0 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 0 A
Total Conn. Load: 0 VA
11 PREPARED SPACE 3 -- -- --
10 PREPARED SPACE 3 -- -- --
9 PREPARED SPACE 3 -- -- --
8 PREPARED SPACE 3 -- -- --
7 LIFE SAFETY ATS (NORMAL POWER) 3 400 A 350 A 0 VA 80% RATED, LSIG
6 ATS (FEEDS 1E4C) 3 2000 A 1600 A 0 VA REFER TO NOTE 3 BELOW
5 BUSWAY 1 3 2000 A 2000 A 0 VA REFER TO NOTE 3 BELOW
4 CHILLER 3 3 800 A 800 A 0 VA REFER TO NOTE 2 BELOW
3 CHILLER 2 3 800 A 800 A 0 VA REFER TO NOTE 2 BELOW
2 MCCB (MCC1) 3 800 A 800 A 0 VA REFER TO NOTE 2 BELOW
1 EXTERNAL SPD 3 60 A 60 A 0 VA ABB/GE XTH125, 80% RATED
CKT Circuit Description # of Poles Frame Size Trip Rating Load Remarks
Notes:
Enclosure: Type 1 MCB Rating: 4000 A
Mounting: Surface Wires: 4 Mains Rating: 4000 A
Supply From: Phases: 3 Mains Type: COPPER
Location: Volts: 480/277 WYE A.I.C. Rating: 100,000 A
SWBD: MSWB-A
1. TOTAL CONNECTED LOAD IS UNKNOWN. EXISTING LOADS ARE ASSUMED TO BE <80% MCB RATING. NO NEW LOADS ARE EXPECTED OR INCLUDED WITHIN THE SCOPE OF THIS
PROJECT. BASIS OF DESIGN: ABB/GE RELIABOARD LV MCC.
2. GE CURRENT LIMITER CAT. NO. TECL36003.
Notes:
Total Est. Demand Current: 0 A
Total Conn. Current: 0 A
Total Est. Demand: 0 VA
Total Conn. Load: 0 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 0 A
Total Conn. Load: 0 VA
16 PREPARED SPACE 3 -- -- --
15 PREPARED SPACE 3 -- -- --
14 COOLING TOWER 2 W 3 80 A 80 A 0 VA ABB/GE XT2H125 (80% RATED)
13 COOLING TOWER 1 E 3 80 A 80 A 0 VA ABB/GE XT2H125 (80% RATED)
12 COND WTR PUMP 3 3 80 A 80 A 0 VA ABB/GE XT2H125 (80% RATED)
11 HOT WTR PUMP 1 3 80 A 80 A 0 VA ABB/GE XT2H125 (80% RATED)
10 HOT WTR PUMP 3 3 80 A 80 A 0 VA ABB/GE XT2H125 (80% RATED)
9 HOT WTR PUMP 2 3 80 A 80 A 0 VA ABB/GE XT2H125 (80% RATED)
8 COND WTR PUMP 2 3 80 A 80 A 0 VA ABB/GE XT2H125 (80% RATED)
7 CLNG TWR FAN CHILL 4 3 30 A 30 A 0 VA ABB/GE XT2H125 (80% RATED)
6 VENTILATION FAN 3 20 A 3 A 0 VA REFER TO NOTE 2 BELOW
5 CHILLED WTR PUMP 1 3 125 A 125 A 0 VA ABB/GE XT4H250 (80% RATED)
4 COND WTR PUMP 1 3 80 A 80 A 0 VA ABB/GE XT2H125 (80% RATED)
3 AIR HNDL 5 3 20 A 20 A 0 VA -
2 CHILLED WTR PUMP 3 3 125 A 125 A 0 VA ABB/GE XT4H250 (80% RATED)
1 CHILLED WTR PUMP 2 3 125 A 125 A 0 VA ABB/GE XT4H250 (80% RATED)
CKT Circuit Description # of Poles Frame Size Trip Rating Load Remarks
ALL FINAL DEVICE SETTINGS SHALL BE PROVIDED BY ENGINEER, DURING CONSTRUCTION, ONCE EQUIPMENT SELECTION AND COORDINATION HAS BEEN COMPLETED. WITH OFF-ON AUTO SELECTOR SWITCH.
BASIS OF DESIGN: STARTERS - FULL VOLTAGE NON-REVERSING, 300 CONTACT TYPE, NEMA SIZE(S) DEPENDENT ON THE SIZE(S) OF THE HORSEPOWER ON MOTOR(S).
Notes:
Enclosure: Type 1 MCB Rating: MLO
Mounting: Surface Wires: 4 Mains Rating: 800 A
Supply From: Phases: 3 Mains Type: COPPER
Location: Volts: 480/277 WYE A.I.C. Rating: 65,000 A
EXISTING MCC: MCC-B (FORMERLY MCC-1)
TOTAL CONNECTED LOAD IS UNKNOWN. EXISTING LOADS ARE ASSUMED TO BE <80% MCB RATING. NO NEW LOADS ARE EXPECTED OR INCLUDED WITHIN THE SCOPE OF THIS PROJECT.
BASIS OF DESIGN: PANEL- ABB/GE RELIAGEAR RE E2.BF
BASIS OF DESIGN: MCB SHALL BE 400A 3 POLE XT5S400, 100% RATED, LSIG, COPPER BUS HEAT RATED, GROUND-BOX BONDED THL2, GROUND MAIN LUG TGL20, NEMA 1 ENCLOSURE AND
100% RATED.
Notes:
Total Est. Demand Current: 0 A
Total Conn. Current: 0 A
Total Est. Demand: 0 VA
Total Conn. Load: 0 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 0 A
Total Conn. Load: 0 VA
13 PREPARED SPACE 3 -- -- --
12 PREPARED SPACE 3 -- -- --
11 SPARE 1 20 A 20 A 0 VA
10 SPARE 1 20 A 20 A 0 VA
9 SPARE 1 20 A 20 A 0 VA
8 SPARE 1 20 A 20 A 0 VA
7 SPARE 1 20 A 20 A 0 VA
6 SPARE 1 20 A 20 A 0 VA ABB/BE TEYL3020B (80% RATED)
5 SPD 3 60 A 60 A 0 VA ABB/BE TEYL1020B (80% RATED)
4 MUA 1 3 30 A 30 A 0 VA ABB/BE TEYL3030B (80% RATED)
3 AHU 4 3 125 A 125 A 0 VA ABB/BE TEYL3125B (80% RATED)
2 XFMR T-20 3 100 A 100 A 0 VA ABB/BE TEYL3100B (80% RATED)
1 AHU 3 3 125 A 125 A 0 VA ABB/BE TEYL3125B (80% RATED)
CKT Circuit Description # of Poles Frame Size Trip Rating Load Remarks
ALL FINAL DEVICE SETTINGS SHALL BE PROVIDED BY ENGINEER OF RECORD AFTER EQUIPMENT SELECTION AND COORDINATION HAS BEEN COMPLETED. SWITCHBOARD TO HAVE
EXTERNAL SPD. REFERENCE SPECIFICATION 264300.
Notes:
Enclosure: Type 1 MCB Rating: 400 A
Mounting: Surface Wires: 4 Mains Rating: 400 A
Supply From: Phases: 3 Mains Type: COPPER
Location: Volts: 480/277 WYE A.I.C. Rating: 65,000 A
SWBD: 1N4G
1. TOTAL CONNECTED LOAD IS UNKNOWN. EXISTING LOADS ARE ASSUMED TO BE <80% MCB RATING. NO NEW LOADS ARE EXPECTED OR INCLUDED WITHIN THE SCOPE OF THIS
PROJECT. BASIS OF DESIGN: ABB/GE RELIAGEAR LV MCC.
2. GE CURRENT LIMITER CAT. NO. TECL36030.
Notes:
Total Est. Demand Current: 0 A
Total Conn. Current: 0 A
Total Est. Demand: 0 VA
Total Conn. Load: 0 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 0 A
Total Conn. Load: 0 VA
9 PREPARED SPACE 3 -- -- --
8 SPARE 3 20 A 20 A 0 VA
7 COND WTR PMP PP-6 3 125 A 50 A 0 VA ABB/GE XT2H125 (80% RATED)
6 CND WTR PMP PP-5 3 125 A 50 A 0 VA ABB/GE XT2H125 (80% RATED)
5 CWP PMP PP-2 3 30 A 30 A 0 VA REFER TO NOTE 2 BELOW
4 AHU 1 RM101 3 250 A 150 A 0 VA ABB/GE XT2H125 (80% RATED)
3 CWP PMP PP-1 3 30 A 30 A 0 VA REFER TO NOTE 2 BELOW
2 HTG WTR PMP PP-4 3 125 A 15 A 0 VA ABB/GE XT2H125 (80% RATED)
1 HTG WTR PMP PP-3 3 125 A 15 A 0 VA ABB/GE XT2H125 (80% RATED)
CKT Circuit Description # of Poles Frame Size Trip Rating Load Remarks
ALL FINAL DEVICE SETTINGS SHALL BE PROVIDED BY ENGINEER, DURING CONSTRUCTION, ONCE EQUIPMENT SELECTION AND COORDINATION HAS BEEN COMPLETED. WITH OFF-ON AUTO SELECTOR SWITCH.
BASIS OF DESIGN: STARTERS - FULL VOLTAGE NON-REVERSING, 300 CONTACT TYPE, NEMA SIZE(S) DEPENDENT ON THE SIZE(S) OF THE HORSEPOWER ON MOTOR(S).
Notes:
Enclosure: Type 1 MCB Rating: MLO
Mounting: Surface Wires: 4 Mains Rating: 400 A
Supply From: Phases: 3 Mains Type: COPPER
Location: Volts: 480/277 WYE A.I.C. Rating: 65,000 A
EXISTING MCC: MCC-A
TOTAL CONNECTED LOAD IS UNKNOWN. EXISTING LOADS ARE ASSUMED TO BE <80% MCB RATING. NO NEW LOADS ARE EXPECTED OR INCLUDED WITHIN THE SCOPE OF THIS PROJECT.
BASIS OF DESIGN: PANEL: ABB/GE RELIAGEAR AV2
BASIS OF DESIGN: MCB SHALL BE 1600A 3 POLE E2.2BF 100% RATED, LSIG.
Notes:
Total Est. Demand Current: 0 A
Total Conn. Current: 0 A
Total Est. Demand: 0 VA
Total Conn. Load: 0 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 0 A
Total Conn. Load: 0 VA
15 PREPARED SPACE 3 -- -- --
14 PREPARED SPACE 3 -- -- --
13 PREPARED SPACE 3 -- -- --
12 SPARE 3 -- -- --
11 XFMR T-6 3 250 A 250 A 0 VA ABB/GE XT4H250 (80% RATED, LSIG)
10 MCCA 3 400 A 400 A 0 VA ABB/GE XT5S400 (80% RATED, LSIG)
9 1N4F 3 250 A 225 A 0 VA ABB/GE XT4H250 (80% RATED, LSIG)
8 1N4E 3 250 A 225 A 0 VA ABB/GE XT4H250 (80% RATED, LSIG)
7 1N4D 3 250 A 225 A 0 VA ABB/GE XT4H250 (80% RATED, LSIG)
6 1N4C 3 250 A 225 A 0 VA ABB/GE XT4H250 (80% RATED, LSIG)
5 1N4B 3 800 A 800 A 0 VA ABB/GE XT6S800 (80% RATED, LSIG)
4 XFMR T-7 3 250 A 150 A 0 VA ABB/GE XT4H250 (80% RATED, LSIG)
3 2N4H 3 250 A 250 A 0 VA ABB/GE XT4H250 (80% RATED, LSIG)
2 CHILLER 3 400 A 300 A 0 VA ABB/GE XTS400 (80% RATED, LSIG)
1 SPD 3 250 A 60 A 0 VA ABB/GE XT4H250 (80% RATED)
CKT Circuit Description # of Poles Frame Size Trip Rating Load Remarks
ALL FINAL DEVICE SETTINGS SHALL BE PROVIDED BY ENGINEER OF RECORD AFTER EQUIPMENT SELECTION AND COORDINATION HAS BEEN COMPLETED. SWITCHBOARD TO HAVE
EXTERNAL SPD. REFERENCE SPECIFICATION 264300.
Notes:
Enclosure: Type 1 MCB Rating: 1600 A
Mounting: Surface Wires: 4 Mains Rating: 1600 A
Supply From: Phases: 3 Mains Type: COPPER
Location: Volts: 480/277 WYE A.I.C. Rating: 65,000 A
SWBD: 1N4A
1. TOTAL CONNECTED LOAD IS UNKNOWN. EXISTING LOADS ARE ASSUMED TO BE <80% MCB RATING. BASIS OF DESIGN: ABB/GE RELIABOARD LV SWITCHBOARD, MCB - E.62H-A 4000 EKIP
HI-TOUCH LSIG.
2. ABB/GE A2SCUFAKBY (LSIG, RELT, 100% RATED).
3. ABB/GE A2SCUFAKBY (EKIP TOUCH, LSIG).
Notes:
Total Est. Demand Current: 0 A
Total Conn. Current: 0 A
Total Est. Demand: 0 VA
Total Conn. Load: 0 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 0 A
Total Conn. Load: 0 VA
9 PREPARED SPACE 3 -- -- --
8 PREPARED SPACE 3 -- -- --
7 PREPARED SPACE 3 -- -- --
6 PREPARED SPACE 3 -- -- --
5 CHILLER 1 3 800 A 800 A 0 VA REFER TO NOTE 3 BELOW
4 SWBD 1N4G 3 800 A 400 A 0 VA REFER TO NOTE 3 BELOW
3 SWBD 1N4A 3 2000 A 1600 A 0 VA REFER TO NOTE 2 BELOW
2 BUSWAY 2 3 2000 A 2000 A 0 VA REFER TO NOTE 2 BELOW
1 EXTERNAL SPD 3 60 A 60 A 0 VA ABB/GE XTH125, 80% RATED
CKT Circuit Description # of Poles Frame Size Trip Rating Load Remarks
Notes:
Enclosure: Type 1 MCB Rating: 4000 A
Mounting: Surface Wires: 4 Mains Rating: 4000 A
Supply From: Phases: 3 Mains Type: COPPER
Location: Volts: 480/277 WYE A.I.C. Rating: 100,000 A
SWBD: MSWB-B
ELECTRICAL ROOM
MSWB-A
ELECTRICAL ROOM
XFMR XFMR
ELECTRICAL ROOM MECHANICAL ROOM
MSWB-B
MSWB-B
ELECTRICAL ROOM
MECHANICAL ROOM
SWBD 1N4A
KEYED NOTES:
1. DESIGN REFLECTS ANTICIPATED CHANGES IN "MSWB-A" FROM ONGOING OCAT EMERGENCY
GENERATOR REPLACEMENT PROJECT. CONFIRM EQUIPMENT RATINGS AND REQUIREMENTS
PRIOR TO ORDERING SWITCHBOARD.
2. ALL FINAL DEVICE SETTINGS SHALL BE PROVIDED BY ENGINEER OF RECORD AFTER EQUIPMENT
SELECTION AND COORDINATION HAS BEEN COMPLETED. MSWB-A TO HAVE EXTERNAL ENERGY
METER, INTERNAL ENERGY METER, AND EXTERNAL SPD. 1200A AND LARGER FEEDER BREAKERS
MUST HAVE ARC FLASH ENERGY-REDUCING MAINTENANCE SWITCH. MAIN AND TIE BREAKERS DO
NOT REQUIRE ARC FLASH ENERGY-REDUCING MAINTENANCE SWITCH. ALL BREAKERS TO BE
LSIG, EXCEPT SPD FEEDER BREAKER. PROVIDE KIRK KEY INTERLOCK FOR MAIN BREAKERS AND
TIE BREAKER IN MSWB-A AND MSWB-B. ONLY TWO OF THE THREE BREAKERS TO BE CLOSED AT
THE SAME TIME. MSWB-A MUST HAVE EMPTY SPACE FOR AT LEAST FOUR LARGE 3-POLE
BREAKERS. MSWB-B MUST HAVE EMPTY SPACE FOR AT LEAST FOUR LARGE 3-POLE BREAKERS.
GENERAL NOTES:
1. COORDINATE OVERCURRENT PROTECTION DEVICES WITH EXISTING FEEDER CONDUCTORS TO
ELIMINATE SPLICES. SEE SHEET E-600.
600 A
400 A
400 A
400 A
125 A
125 A
800 A
800 A
800 A
800 A
800 A
800 A
800 A
800 A
125 A
125 A
125 A
MSWB-A 1N4G
MCC-B 1N4A
MSWB-B
MCC-A
600 A
FRONT VIEW
320"
UL
40"
4000A
E6.2HF
K
MAIN 1
UL
E
SE
40"
4000A
E6.2HF
TIE
N.O.
CONTROL POWER
TRANSFORMER
UL
E
40"
UL
E
SE
E
K
4000A
E6.2HF
MAIN 2 K
MSWB-A MSWB-B
METERING
COVER
COVER
METERING
COVER
COVER
E E
UL
40"40"
UL
SPD
PREPARED SPACE
PREPARED SPACE
PREPARED SPACE
PREPARED SPACE
PREPARED SPACE
COVER
40"
UL
E
40"
90"
E
PREPARED SPACE
UL
40"
COVER
SPD
3 4 5 61 2 7 8
BUSWAY #2
1N4A
1N4G
CHILLER #1
RELT
RELT
COVER
RELT
RELT
BUSWAY #1
ATS
(FEEDS 1E4C)
PREPARED SPACE
COVER
COVER
CHILLER #2
CHILLER #3
PREPARED SPACE
PREPARED SPACE
COVER
MCCB
LSATS NORMAL MAIN
PREPARED SPACE
PREPARED SPACE
KEY INTERLOCK
B U S S T A C K
COVER
B U S S T A C K
B U S S T A C K
COVER
COVER
1600 A
MAIN BREAKER
B U S S T A C K
FRONT VIEW
1N4D
1N4B
1N4C
1N4E
1N4F
SPARE
XFMR T-6
MCCA
PREPARED SPACE
PREPARED SPACE
CHILLER
2N4H
XFMR T-7
SPD
PREPARED SPACE
PREPARED SPACE
WIREWAY WIREWAY
B U S S T A C K
B U S S T A C K
COVER COVER
FRONT VIEW
400A MAIN CB
XFMR T-20 MUA-1
AHU-3 AHU-4
SPARE
SPARE
SPARE
SPARE
SPARE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
C O V E R
SPD SPARE
COVER
INCOMING
LINE
CHILLED WATER
PUMP 2
CHILLED WATER
PUMP 3
SPACE
AIR HANDLER
UNIT 5
HOT WATER
PUMP 2
HOT WATER
PUMP 3
WIREWAY WIREWAY WIREWAY WIREWAY WIREWAY WIREWAY
COVER COVER COVER COVER COVER COVER
SPACE
CHILLED WATER
PUMP 1
COND. WATER
PUMP 1
VENTILATION FAN
COOLING TOWER FAN
CHILLER 4
COND. WATER
PUMP 2
HOT WATER
PUMP 1 COOLING TOWER
FAN 1 E
COOLING TOWER
FAN 2 W
COND. WATER
PUMP 3
FRONT VIEW
INDICATOR LIGHTS
PUSHBUTTON
SELECTOR SWITCH
INCOMING
LINE
HTG. WATER
PUMP PP-3
AHU-1
HTG. WATER
PUMP PP-4
CHILLED WATER
PUMP PP-1
CHILLED WATER
PUMP PP-2
COND. WATER
PUMP PP-5
COND. WATER
PUMP PP-6
SPARE
WIREWAY WIREWAY
SPACE
FRONT VIEW
INDICATOR LIGHTS
PUSHBUTTON
SELECTOR SWITCH
NEW CONCRETE
HOUSEKEEPING PAD
EXTENSION. EXISTING EQUIPMENT
PAD FLOOR
#4 X 2'-0" DOWELS AT 12" OC
PROVIDE 6" EMBEDMENT INTO
EXISTING SLAB, USING EPOXY
4' - 0" 0' - 6"
#4 @12" OCEW
C .A
. E N
G
IN
E E
R
IN
G
E
X P
IR
E
S J
U N
E
0, C .A
. A R
C H
IT
E
C T
U R
E
E
X P
IR
E
S J
U N
E
0, C .H
. G U
E R
N S
E Y
C
O M
P A
N Y
N . G
R A
N D
B
LV
D
O K
LA
H
O M
A C
IT
Y
, O K
.4
.8
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S. C. 552 and 49 CFR parts 15 and 1520.
REV DATE DESCRIPTION CHECK APP'D
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
TPS-027 REPLACE SWITCHGEAR MCC
PREPARED BY
DESIGNED DATE
OF
THOMAS P. STAFFORD BUILDING
APPROVED BY
DRAWN
WORK ORDER # 25-003967
GUERNSEY
ISSUED BY
28 AUGUST 202570
8-
2 NABYOLLAH GHARAJEH
/2
/2
:4
:4
A
M
E-602
ELECTRICAL EQUIPMENT ELEVATIONS
ZMN
ZMN
NOT TO SCALE
MSWB-A & MSWB-B ELEVATION NOT TO SCALE
1N4A ELEVATION
NOT TO SCALE
1N4G ELEVATION
NOT TO SCALE
MCC-B (FORMERLY MCC-1) ELEVATION
NOT TO SCALE
MCC-A ELEVATION
GENERAL NOTES:
1. EQUIPMENT ELEVATION BOUND TO CHANGE UPON RECIEVING SHOP DRAWINGS FROM VENDOR.
MSWB-A 1N4G
MCC-B 1N4A
MSWB-B
MCC-A
1" = 1'-0"6
PAD EXTENSION DETAIL
KEYED NOTES:
1. INDICATOR LAMPS AND SELECTOR SWITCHES (TYPICAL FOR ALL COMPARTMENTS).
2. SPD TO MOUNTED ON THE SIDE OF 1N4A.
1N4G
400A
4000A, 480Y/277V
400A, 480/277V
TEMPORARY POWER - A 4000A, 480Y/277V
1N4A
1600A 1600A, 480/277V
30A125A 100A 125A
AHU 3 XFMR T-20 AHU 4 SPD
60A
MUA 1
SPD
60A225A 225A
1N4F
250A
XFMR T-6
300A
CHILLER
250A
2N4H
150A
XFMR T-7
800A
1N4B
225A 225A
1N4C 1N4D 1N4E
60A
SPD
TP10
MCC-B 800A, 480/277V
800A
TO LIFE SAFETY ATS NORMAL
POWER IN ELECTRICAL ROOM
102A ON SEPARATE OCAT PROJECT
350A
TP4
800A
CHILLER 2
TP5
800A
CHILLER 3
TP6
TP7
1600A
BUSWAY #1
400A
400A
SPD
60A
TP15
TP13
800A
CHILLER 1
TP14
1000A
TP12
1000A
TP11
ATS
1600A
TP9
3000A
4000A
UNIT
SUB-1
2500KVA
XFMR
4000A
UNIT
SUB-2
2500KVA
XFMR
EXISTING
T-#38
EXISTING
T-#39
TP1 TP2
3000A
1 1
TP3
MCC-A
BUSWAY #2
TP8
3 3
TEMPORARY POWER - B
(#) FEEDER
FROM (STARTING
EQUIPMENT)
TO (ENDING EQUIPMENT) CONDUCTOR SIZE
TP1
TP2
TP3
TP4
TP5
TP6
TP7
TP8
TP9
TP10
TP11
TP12
TP13
TP1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .