This is a Statement of Work (SOW) for the National Oceanic and Atmospheric Administration (NOAA) Northeast Fisheries Science Center (NEFSC) in Woods Hole, Massachusetts, covering the recommissioning and testing of backup power systems.
The scope of work requires the contractor to perform factory recommissioning on one existing Kohler 350REOZV 350KW diesel generator and one General Electric (GE) V-1752-B automatic transfer switch, along with replacement of the existing GE EMP5200P display panel with a new GE (brand name or equal) display panel. The contractor must also conduct major preventative maintenance on both the generator and transfer switch in accordance with manufacturer specifications, safely dispose of all waste including oil, and perform comprehensive testing including load bank testing per manufacturer specifications, starter condition testing, and fuel condition testing for impurities. All test results and recommended repairs must be reported to the Contracting Officer and Technical Point of Contact (TPOC).
The contract period of performance is 45 calendar days from the date of award, with work to be performed at the Northeast Fisheries Science Center, 166 Water Street, Woods Hole, MA 02543, generally between 0700 and 1530 EST Monday through Friday (except Federal holidays). The contractor must provide qualified personnel, maintain a responsive primary point of contact available within 24 hours, and submit weekly progress reports via email. A one-year written warranty covering labor and materials with no dollar limitation must be provided from the date of startup. The contractor shall furnish all facilities, materials, equipment, and services necessary to complete the work, and contractor employees must comply with REAL ID requirements, wear identification badges, and adhere to all applicable OSHA, NEC, NFPA, EPA, and local/state/federal safety and environmental regulations. The TPOC is Kelson Baird (kelson.baird@noaa.gov, 206-579-9794).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)
NORTHEAST FISHERIES SCIENCE CENTER (NEFSC)
Woods Hole Backup Generator and Transfer Switch Recommissioning
1.0 GENERAL
1.1 BACKGROUND
The existing generator and automatic transfer switch (Installed 2004) shall be factory recommissioned for the Woods Hole, MA Laboratory. This generator and automatic transfer switch provide power during the frequent power outages on Cape Cod and achieve compliance with National Fire Protection Association NFPA 110 Standard for Emergency and Standby Power Systems. Without this generator and automatic transfer switch during a power outage the laboratory will not have electricity and all systems would be not functioning to include heat, air conditioning, IT server rooms, lights, exposing the property to property and life risks.
1.2 SCOPE
The Contractor shall factory recommission one (1) existing Kohler 350REOZV 350KW Diesel Generator, factory recommission one (1) existing General Electric (GE) V-1752-B Automatic Transfer Switch, and provide and install one (1) GE (brand name or equal) display panel in place of the existing GE EMP5200P. Additionally, the Contractor shall also perform major preventative maintenance, load bank testing, generator starter condition test, and a fuel condition test.
1.3 OBJECTIVE
Completed Testing will be done to ensure that the backup power systems seamlessly start and take the full load of the facility as intended by manufacturer and original installation. With service done to these systems the facility will be able to rely on backup generators for power during the upcoming years. Without this work being accomplished power failure will endanger animals in the aquarium and years of scientific research and samples.
1.4 APPLICABLE DOCUMENTS
Appendix A: Pictures of existing equipment
Appendix B: Volvo Generator Engine Operator’s Manual about:blank
2.0 SPECIFIC REQUIREMENTS/TASKS
Requirements:
The contractor shall provide a report to the TPOC to include test results and recommended repairs. The contractor shall not leave the generator system inoperable for more than 24 hours if there is a forecasted named weather system or a forecasted blizzard for the Woods Hole Area.
2.1 TASK ONE - Major Preventative Maintenance for (1) Kohler Diesel Generator 350REOZV and (1) GE Automatic Transfer Switch V-1752-B.
2.1.1 The contractor shall perform major preventative maintenance on the diesel generator in accordance with manufacturer's specifications, recommendations, and industry standards.
2.1.2 The contractor shall perform major preventative maintenance on the automatic transfer switch in accordance with manufacturer's specifications, recommendations, and industry standards.
2.1.3 The contractor shall safely dispose of all waste produced to include oil.
2.2 TASK TWO - Factory Recommission of (1) Kohler Diesel Generator 350REOZV
2.2.1 The contractor shall factory recommission one (1) Kohler Diesel Generator 350REOZV in accordance with manufacturer's specifications.
2.2.2 The contractor shall provide a report to the Contracting Officer and TPOC to include test results, and recommended repairs.
2.3 TASK THREE - Factory Recommission of (1) General Electric (GE) Automatic Transfer Switch V-1752-B and Replace EMP5200P Display panel on service switch with GE (brand name or equal).
2.3.1 The contractor shall factory recommission (1) GE Automatic Transfer Switch V-1752-B in accordance with manufacturer's specifications.
2.3.2 Replace the GE EMP5200P display panel on the main Service switch with a new, GE (brand name or equal) display panel with same or better functionality as existing panel.
2.4 TASK FOUR -Test functionality of recommissioned one (1) Generator and one (1) Automatic Transfer switch.
2.4.1 - Load Bank Test
1. The contractor shall perform a load bank test per manufacturer's specifications and recommendations.
2. The contractor shall provide a report to the COR to include test results,and cost of recommended repairs.
2.4.2 - Starter Condition Test
1. The contractor shall perform a starter condition test per manufacturer's specifications and recommendations.
2. The contractor shall provide a report to the COR to include test results, and cost of
2.4.3 - Fuel Condition Test
1. The contractor shall test the condition of the fuel supplying the generator for any impurities.
2. The contractor shall provide a report to the COR to include test results, and cost for
2.5.1 - FINAL ACCEPTANCE AND INSPECTIONS
1. Inspection of work to be performed by the TPOC and/or the NEFSC Facilities Operations Manager. Any corrective action required because of the inspection shall be accomplished prior to final billing.
2. The Contractor may be notified of deficiencies in performance in writing by the TPOC.
Oral deficiency notifications will be confirmed in writing. The Contractor shall take prompt corrective action upon notice of deficiency.
3. The Contractor shall advise the Government when all work is completed. The
Government will not accept the work until it determines that all work has been satisfactorily completed within the terms of the contract.
2.6.1 OPTIONAL ITEM - Unexpected Repairs Found During Testing
3.0 CONTRACTOR PERSONNEL
The Contractor must provide qualified personnel, maintain full operational support, and designate a primary point of contact. The primary point of contact must remain responsive to all communications across email and phone, respond to Government requests or technical issues within 24 hours, and promptly notify the Contracting Officer and TPOC of any contract issues.
3.5 EMPLOYEE IDENTIFICATION
3.5.1 Contractor employees visiting Government facilities shall have a REAL ID and wear an identification badge that, at a minimum, displays the Contractor name, the employee’s photo, name, clearance-level and badge expiration date. Visiting Contractor employees shall comply with all Government escort rules and requirements. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.
3.5.2 Contractor employees working on-site at Government facilities shall wear a Government issued identification badge. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent (in meetings, when answering Government telephones, in e-mail messages, etc.) and display the Government issued badge in plain view above the waist at all times.
3.6 EMPLOYEE CONDUCT
Contractor’s employees shall comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, etc.) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees present a professional appearance at all times and maintain a professional conduct that would not reflect discredit on the United States or the Department of Commerce. The Project Manager shall ensure Contractor employees understand and abide by Department of Commerce established rules, regulations and policies concerning safety and security.
4.0 OTHER APPLICABLE CONDITIONS
4.1 FACILITIES AND CONTROLS
A. The contractor shall remove and dispose of all debris and trash from the job site in a timely and legally acceptable manner to not detract from the aesthetics or the functions of the building.
B. The contractor shall comply with all applicable Federal, State, and local laws and regulations concerning environmental pollution prevention control and waste disposal.
C. The contractor shall immediately inform the COR of any environmentally hazardous situations that may arise as well as contact required regulatory agencies.
D. Due to windy weather in Woods Hole, the contractor shall perform daily site cleanups to collect all wrappings, empty containers, paper, and other debris to prevent environmental contamination and off-site migration. Upon completion, all debris must be disposed of in a legally compliant manner.
E. The Contractor shall ensure that the project area and areas adjacent to the project area are maintained in a clean and safe condition.
4.3 SAFETY
A. The Contractor shall be responsible for all means and methods as they relate to safety and shall comply with all applicable OSHA, NEC, NFPA, and EPA, local, state and federal requirements. Safety shall be the responsibility of the general Contractor.
All related personnel shall be instructed daily to be mindful of the full-time requirement to maintain a safe environment for the facility’s occupants including staff, visitors, customers and the occurrence of the public on or near the site.
B. The Contractor shall comply with the requirements of 29 CFR, Part 1910: Occupational Safety and Health Administration (OSHA) General Industry and Health Standards, and Health Administration (OSHA) General Industry and Health Standards and 29 CFR, part 1926 Construction Standards. The Contractor shall promptly correct any non-complying work or conditions. The contractor shall be responsible to ensure its work does not affect the safety of the public or employees of the Government. Neither the Government nor its representatives shall bear any responsibility for safety precautions at the project work site. If, however, in the opinion of the COR a life-threatening condition exists, the COR will orally (to be confirmed in writing) require the Contractor to immediately suspend work in the affected area until the condition is corrected. Whenever Contractor’s operations may create a hazardous condition, it shall at its sole expense, furnish, install and maintain such guards, fences, barricades, railing, light, signs, or other devices necessary to prevent accident, injury or damage to people or equipment.
C. It is the Contractor’s responsibility to ensure all employees; sub-Contractors, vendors, and other company representatives adhere to all safety rules, regulations, policies and practices.
D. Contractor shall observe lock/out tag/out regulations and as required by OSHA.
E. The Contractor shall keep the project site in a neat and orderly condition at all times.
4.4 WARRANTY
The Contractor shall provide a written warranty for service including labor and materials for a period of one year from the date of startup with no dollar limitation; including but not limited to all manufacturer’s warranties.
4.5 SECURITY
Contractor access to classified information is not currently required under this SOW.
4.6 PERIOD OF PERFORMANCE
The period of performance for this contract shall be 45 calendar days from the date of award.
4.7 PLACE OF PERFORMANCE
Northeast Fisheries Science Center
166 Water Street
Woods Hole, MA 02543
4.8 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0700 and 1530 EST, Monday through Friday (except Federal holidays). 4.12 PROGRESS REPORTS
The Project Manager shall provide a weekly progress report to the Contracting Officer and TPOC via email. This report shall include a summary of all Contractor work performed, including a breakdown of labor hours by labor category, all direct costs by line item, an assessment of technical progress, schedule status, any travel conducted and any Contractor concerns or recommendations for the previous reporting period.
5.0 GOVERNMENT POINT OF CONTACT
Kelson Baird, Technical POC (TPOC)
Email: kelson.baird@noaa.gov
Phone: 206-579-9794
6.0 GOVERNMENT FURNISHED RESOURCES
The Government will not furnish any resources to the Contractor in support of this contract.
7.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract. However, the contractor shall be accountable for, and have stewardship of, the existing property in the performance of this contract. This property shall be used and maintained by the contractor in accordance with provisions of the "Government Property" clause included in this contract.
8.0 GOVERNMENT ACCEPTANCE PERIOD
The TPOC will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
8.1 The Government will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the Contracting Officer and TPOC of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it in a prompt manner per delivery instructions.
mailto:kelson.baird@noaa.gov