Kraft_Start-up_Form_Editable_(1)_0001.pdf

PDF 543 KB Posted

Attached to
Woods Hole Backup Generator Preventative Maintenan
Solicitation number
1305M326Q0399
Issued by

About this file

This is a Startup Notification form and accompanying checklists from Kraft Power for Kohler generator sets and transfer switches. The form documents the initial startup and commissioning of emergency power systems and is required for warranty coverage under Kohler's limited warranty program.

The Startup Notification form requires completion of authorized Kohler representative and owner information, including company names, addresses, and contact details. The form captures generator set nameplate information (serial numbers, model numbers, specification numbers for up to two generator sets and engines), transfer switch and switchgear details (up to four automatic transfer switches), and application classifications (industrial/residential/commercial, mobile/stationary, prime/rental/standby). A startup date must be documented, along with the round-trip mileage from the nearest authorized Kohler service distributor to the equipment location. Both the Kohler representative and owner representative must sign and date the form, certifying acceptance of the unit and accuracy of all information. The white copy must be submitted to Kohler's Generator Warranty Department using their online warranty processing system, or mailed if online access is unavailable.

The document includes three comprehensive checklists: an Installation Checklist (47 items covering equipment room setup, engine mounting, lubrication, cooling/ventilation, fuel systems, exhaust, AC electrical systems, batteries, and special requirements); a Startup Checklist (51 items addressing pre-startup verification, engine operation, transfer switch testing, and load testing); and a Field Test Report template for load bank testing per NFPA 110 and JCO standards that records operational parameters including oil pressure, water temperature, voltage, frequency, amperage, and equipment settings over a specified time period with witness documentation required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Authorized Kohler Representative Performing Startup

Telephone

Company Name

Address

City

State

ZIP/Postal Code

Country

Owner Name/Unit Location

Telephone

Company Name/Owner

Address of Unit Location

City

State

ZIP/Postal Code

Country

Round-trip miles from nearest authorized Kohler servicing distributor/dealer to the power system equipment:

Generator Set and Engine Nameplate Information

Generator Set. No 1 Engine No. 1 Generator Set No. 2 Engine No. 2

Serial No.

Model No.

Spec. No

Application Information (one item in each column must be checked) q Industrial q Residential/Commercial q Mobile/Towable/Trailer-Mounted q Stationary q Prime q Rental q Standby

Transfer Switch and Switchgear Nameplate Information

ATS No. 1 ATS No. 2 ATS No. 3 ATS No. 4 Switchgear

Serial No.

Spec. No

Contractor Serial No.

Model No.

Kohler Representative’s Name (print) Owner Representative’s Name (print)

Kohler Representative’s Signature and Date Owner Representative’s Signature and Date

mo. _______ day _______ yr. _______ mo. _______ day _______ yr. _______

K-625 (1/13)

Follow the startup checklist on the back of this form. Then complete the form.

This form is required for coverage under the Kohler limited warranty and must be completely filled out at the time of initial startup. Representatives of the distributor/dealer and owner must sign the notification form. Signing this form represents acceptance of the unit and that all information on the startup form is correct. Please submit registration to Kohler Co.

using the online warranty processing system. Users that do not have access to the online warranty site should mail a copy to Kohler.

Startup Notification

Startup Date

mo. __________ day __________ yr. __________

199 Wildwood, P.O. Box 2189, Woburn, MA 01888-0389, Tel • 781-938-9100 / Fax • 781-933-7812 • www.kraftpower.com

* Some models with an Engine Electronic Control Module (ECM) may limit or prohibit adjusting the engine speed or testing shutdowns.

Refer to appropriate documentation available from the manufacturer.

Generator Set/Transfer Switch Startup Checklist

This document has generic content and some itemsmaynot apply to some applications. Check only the items that apply to the specific application.

Read and understand all of the safety precautions found in the Operation and Installation Manuals. Complete the Installation Checklist before performing the initial startup checks. Refer to Service Bulletin 616 for Warranty Startup Procedure Requirements regarding generator set models with ECM-controlled engines.

Yes

Does Not Apply

� � 1. Verify that the engine is filled with oil and the cooling system is filled with coolant/antifreeze.

� � 2. Prime the fuel system.

� � 3. Open all water and fuel valves. Temporarily remove the radiator cap to eliminate air in the cooling system.

Replace radiator cap in step 21.

� � 4. Place the generator set master switch in the OFF/RESET position. Observe Not-in-Auto lamp and alarm, if equipped, on the controller.

� � 5. Press the lamp test, if equipped on controller. Do all the alarm lamps on the panel illuminate?

� � 6. Open the main line circuit breakers, open the safeguard breaker, and/or remove fuses connected to the generator set output leads.

� � 7. Turn down the speed control (electronic governor) or speed screw (mechanical governor).*

� � 8. Verify the presence of lube oil in the turbocharger, if equipped. See the engine and/or generator set operation manual.

� � 9. Place the generator set master switch in the RUN position. Allow the engine to start and run for several seconds.

� � 10. Verify that the day tank, if equipped, is energized.

� � 11. Place the generator set master switch in the OFF/RESET position. Check for oil, coolant, and exhaust leaks.

� � 12. Turn on the water/oil heaters and fuel lift pumps.

� � 13. Check the battery charger ammeter for battery charging indication.

� � 14. Place the generator set master switch in the RUN position. Verify whether there is sufficient oil pressure.

Check for oil, coolant, and exhaust leaks.

� � 15. Close the safeguard circuit breaker. Adjust the engine speed to 50/60 Hz if equipped with an electronic governor or to 52.8/63 Hz if equipped with a mechanical governor.*

� � 16. If the speed is unstable, adjust according to the appropriate engine and/or governor manual.*

� � 17. Adjust the AC output voltage to match the load voltage using the voltage adjusting control. See the generator set/controller operation manual.

� � 18. Allow the engine to reach normal operating coolant temperature.

� � 19. Check the operating temperature on city water-cooled models and adjust the thermostatic valve as necessary.

� � 20. Manually overspeed the engine to cause an engine shutdown (68-70 Hz on 60 Hz models and 58-60 Hz on 50 Hz models). Place the generator set master switch in the OFF/RESET position.*

� � 21. Check the coolant level, add coolant as necessary, and replace the radiator cap. Verify that all hose clamps are tight and secure.

� � 22. Place the generator set master switch in the RUN position.

� � 23. Verify the engine low oil pressure and high coolant temperature shutdowns.*

� � 24. Check the overcrank shutdown.*

� � 25. Place the generator set master switch in the OFF/RESET position.

� � 26. Open the normal source circuit breaker or remove fuses to the transfer switch.

� � 27. Disconnect the power switching device and logic controller wire harness at the inline disconnect plug at the transfer switch.

� � 28. Manually transfer the load to the emergency source.

Yes

Does Not Apply

� � 29. Close the normal source circuit breaker or replace fuses to the transfer switch.

� � 30. Check the normal source voltage, frequency, and phase sequence on three-phase models. The normal source must match the load.

� � 31. Open the normal source circuit breaker or remove fuses to the transfer switch.

� � 32. Manually transfer the load to the normal source.

� � 33. Close the generator set main line circuit breakers, close the safeguard breaker, and/or replace the fuses connected to the transfer switch.

� � 34. Place the generator set master switch in the RUN position.

� � 35. Check the generator set voltage, frequency, and phase sequence on three-phase models. The generator set must match normal source and load.

� � 36. Place the generator set master switch in the OFF/RESET position.

� � 37. Open the generator set main line circuit breakers, open the safeguard breaker, and/or remove the fuses connected to the transfer switch.

� � 38. Reconnect the power switching device and logic controller wire harness at the inline disconnect plug at the transfer switch.

� � 39. Close the normal source circuit breaker or replace fuses to the transfer switch. Place the generator set master switch to the AUTO position.

� � 40. Close the generator set main line circuit breakers, close the safeguard breaker, and/or replace the fuses connected to the transfer switch.

� � 41. Place the transfer switch in the TEST position (load test or open normal source circuit breaker). NOTE: Obtain permission from the building authority before proceeding. This procedure tests transfer switch operation and connects building load to generator set power.

� � 42. Readjust frequency to 50 or 60 Hz with total building loads.*

� � 43. Verify that the current phase is balanced for three phase systems.

� � 44. Release the transfer switch test switch or close the normal circuit breaker. The transfer switch should retransfer to the normal source after appropriate time delay(s).

� � 45. Allow the generator set to run and shut down automatically after the appropriate cool down time delay(s).

� � 46. Set the plant exerciser to the customer’s required exercise period, if equipped.

� � 47. Verify that all options on the transfer switch are adjusted and functional for the customer’s requirements.

� � 48. If possible, run the building loads on the generator set for several hours or perform the load bank test if required.

� � 49. Verify that all the wire connections from the generator set to the transfer switch and optional accessories are tight and secure.

� � 50. Verify that the customer has the appropriate engine/generator set and transfer switch literature.

Instruct the customer in the operation and maintenance of the power system.

� � 51. Fill out the startup notification at this time and send the white copy to the Generator Warranty Dept. Include the warranty form if applicable.

Generator Set/Transfer Switch Installation Checklist

This document has generic content and some items may not apply to some applications. Check only the items that apply to the specific application. Read and understand all of the safety precautions found in the Operation and Installation Manuals. Make the following installation checks before performing the Startup Checklist.

Note: Use this form as a general guide, along with any applicable codes or standards. Comply with all applicable codes and standards.

Improper installation voids the warranty.

Equipment Room or Weather Housing

Yes

Does Not Apply

� � 1. Is the equipment installed in a fire-resistant room (made of non-combustible material) or in an outdoor weather housing?

� � 2. Is there adequate clearance between the engine and floor for service maintenance?

� � 3. Is there emergency lighting available at the equipment room or weather housing?

� � 4. Is there adequate heating for the equipment room or outdoor weather housing?

� � 5. Is the equipment room clean with all materials not related to the emergency power supply system removed?

� � 6. Is the equipment room protected with a fire protection system?

Engine and Mounting

� � 7. Is the mounting surface(s) properly constructed and leveled?

� � 8. Is the mounting surface made from non-combustible material?

� � 9. Was the generator-to-engine alignment performed after attaching the skid to the mounting base?

Generator sets with two-bearing generators require alignment.

Lubrication

� � 10. Is the engine crankcase filled with the specified oil?

Cooling and Ventilation

� � 11. Is the cooling system filled with the manufacturer’s specified coolant/antifreeze and purged of air?

� � 12. Is there adequate inlet and outlet air flow (electric louvers adjusted and ventilation fan motor(s) connected to the corresponding voltage)?

� � 13. Is the radiator duct properly sized and connected to the air vent or louver?

� � 14. Are flexible sections installed in the cooling water lines?

Fuel

� � 15. Is there an adequate/dedicated fuel supply?

� � 16. Are the fuel filters installed?

� � 17. Are the fuel tanks and piping installed in accordance with applicable codes and standards?

� � 18. Is there adequate fuel transfer tank pump lift capacity and is the pump motor connected to the corresponding voltage?

� � 19. Is the fuel transfer tank pump connected to the emergency power source?

� � 20. Are flexible fuel lines installed between the engine fuel inlet and fuel piping?

� � 21. Is the specified gas pressure available at the fuel regulator inlet? Static PSI Starting PSI Running PSI

� � 22. Does the gas solenoid valve function?

� � 23. Are the manually operated fuel and cooling water valves installed allowing manual operation or bypass of the solenoid valves?

Exhaust

� � 24. Is the exhaust line sized per guidelines and does it have flexible connector(s)? Is the flexible connector(s) straight?

Yes

Does Not Apply

� � 25. Is there an exhaust line condensate trap with a drain installed?

� � 26. Is the specified silencer installed and are the hanger and mounting hardware tightened?

� � 27. Is a heat-isolating thimble(s) installed at points where exhaust lines pass through combustible wall(s) or partition(s)?

� � 28. Is the exhaust line free of excessive bends and restrictions? Is the backpressure within specifications?

� � 29. Is the exhaust line installed with a downward pitch toward the outside of the building?

� � 30. Is the exhaust line protected from entry by rain, snow, and animals?

� � 31. Does the exhaust system outlet location prevent entry of exhaust gases into buildings or structures?

� � 32. Are individuals protected from exposure to high temperature exhaust parts and are hot parts safety decals present?

AC Electrical System

� � 33. Does the nameplate voltage/frequency of the generator set and transfer switch match normal/utility source ratings?

� � 34. Do the generator set load conductors have adequate ampacity and are they correctly connected to the circuit breakers and/or the emergency side of the transfer switch?

� � 35. Are the load conductors, engine starting cables, battery charger cables, and remote annunciator leads installed in separate conduits?

� � 36. Is the battery charger AC circuit connected to the corresponding voltage?

Transfer Switch, Remote Control System, Accessories

� � 37. Is the transfer switch mechanism free of binding?

Note: Disconnect all AC sources and operate the transfer switch manually.

� � 38. Are the transfer switch AC conductors correctly connected? Verify lead designations using the appropriate wiring diagrams.

� � 39. Is all other wiring connected, as required?

Batteries and DC Electrical System

� � 40. Does the battery(ies) have the specified CCA rating and voltage?

� � 41. Is the battery(ies) filled with electrolyte and connected to the battery charger?

� � 42. Are the engine starting cables connected to the battery(ies)?

� � 43. Do the engine starting cables have adequate length and gauge?

� � 44. Is the battery(ies) installed with adequate air ventilation?

� � 45. Starting Battery(ies) Voltage VDC

Special Requirements

� � 46. Is the earthquake protection adequate for the equipment and support systems?

� � 47. Is the equipment protected from lightning damage?

NFPA 110-1.5 building LT (1.5 hours loaded – record start delays on checklist) NFPA 110- 2 hour LBT 7. 13.4.1 (30%for 30min.50% for 30 min.100 % for 60 min) JCO-EC.02.05.07EP#7- 4 hour LBT (4 -hours minimum 30%) KW = volts x amps x 1.73 x pf / 1000 (3-phase power)

Tested By____________________________________ Witness_________________________________ Date______________________

NOTE: ALL NFPA/JCO LBT REPORTS MUST HAVE LOADED TIMES ONLY – DO NOT START RECORDING DATA UNTIL LOADED Reference # Field Test Report For:

Time in Minutes 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 Lube Oil Pressure (PSI) Jacket Water Temp (oF) DC Charge (Volts) Frequency (Hertz) AC Volts: Phase 1-2 AC Volts: Phase 2-3 AC Volts: Phase 3-1 AC Amps: Phase 1 AC Amps: Phase 2 AC Amps: Phase 3 Calculated Kw Ambient Temp (oF)

FLA @ 1PF

Model LOP set at (psi) Antifreeze Installed & Checked Serial # HWT set at (oF) For oF Rating: KW KVA OS set at (HZ) Lube Oil Installed & Level Checked 60 HZ 0.8 PF OC set at (sec.) Jacket Water Heater Operating 1800rpm Volts Cycle Crank Rest (sec.) Daytank Pump Operation Checked FLA @ 0.8 PF: HOT set at (oF) Battery Charger Operating TDES: sec Water Heater Thermostat set (oF) Remote Start Contacts Checked Crank to Start TD: sec Low Oil Pressure Prewarn set (psi) Annunciator Contacts Checked Start to Op Speed TD: Hot Water Prewarn set (oF) Alarm Horn Function TD to stable \ Emgcy: Check Hoses and Clamps LBVAR Set _______VDC TDEN TDC Unit in Auto

HBVAR Set _______ VDC

mo:
day:
yr:
Telephone:
Telephone_2:
Company Name:
Company NameOwner:
Address:
Address of Unit Location:
City:
City_2:
State:
State_2:
ZIPPostal Code:
ZIPPostal Code_2:
Country:
CountryRow1:
Roundtrip miles from nearest authorized Kohler servicing distributordealer to the power system equipment:
Generator Set No 1Serial No:
Generator Set No 2Serial No:
Generator Set No 1Model No:
Engine No 1Model No:
Generator Set No 2Model No:
Generator Set No 1Spec No:
Engine No 1Spec No:
Generator Set No 2Spec No:
ATS No 1Serial No:
ATS No 2Serial No:
ATS No 3Serial No:
ATS No 4Serial No:
ATS No 1Spec No:
ATS No 2Spec No:
ATS No 3Spec No:
ATS No 4Spec No:
ATS No 1Contractor Serial No:
ATS No 2Contractor Serial No:
ATS No 3Contractor Serial No:
ATS No 4Contractor Serial No:
ATS No 1Model No:
ATS No 2Model No:
ATS No 3Model No:
ATS No 4Model No:
Kohler Representatives Name print:
Owner Representatives Name print:
mo_2:
day_2:
yr_2:
mo_3:
day_3:
yr_3:
Engine No 2Serial No:
Engine No 1Serial No:
Check Box1: Off
Check Box6: Off
Check Box7: Off
Check Box10:
0:
0:
2:
0:
0:
2: Off
4: Off
1: Off
0: Off
30: Off
0002: Off
001: Off
3009: Off
1:
4: Off
3: Off
2: Off
0: Off
1: Off
004: Off
007: Off
40010: Off
10014: Off
200012: Off
2:
4: Off
2: Off
0: Off
005: Off
006: Off
30011: Off
20012: Off
10013: Off
400010: Off
3:
2: Off
3: Off
0: Off
1: Off
4: Off
4:
0: Off
1: Off
2: Off
3: Off
4: Off
02:
003: Off
2: Off
3: Off
1: Off
0:
1: Off
2: Off
0: Off
3: Off
1:
3: Off
2: Off
1: Off
0: Off
3:
3: Off
1: Off
2: Off
0: Off
1:
3:
3:
1:
2: Off
3: Off
1: Off
0: Off
70: Off
30: Off
40017: Off
20025: Off
00027: Off
10045: Off
30033: Off
20032: Off
40042: Off
0047: Off
10029: Off
400032: Off
2:
2: Off
3: Off
4: Off
1: Off
0: Off
40018: Off
10026: Off
0031: Off
20041: Off
10030: Off
300030: Off
200031: Off
300041: Off
000050: Off
0:
4: Off
3: Off
2: Off
1: Off
0: Off
29: Off
001: Off
30016: Off
10024: Off
40044: Off
30034: Off
400033: Off
3:
4: Off
3: Off
1: Off
2: Off
0: Off
30020: Off
20022: Off
00023: Off
400046: Off
100048: Off
100037: Off
400036: Off
4:
4: Off
3: Off
0: Off
1: Off
2: Off
40019: Off
30028: Off
0039: Off
400038: Off
300039: Off
000051: Off
0: Off
1: Off
2: Off
00021: Off
0:
1:
0:
2:
5:
4: Off
3: Off
2: Off
1: Off
90: Off
008: Off
0:
3: Off
1: Off
4: Off
0: Off
2: Off
1:
0: Off
3: Off
4: Off
1: Off
2: Off
2:
1: Off
0: Off
3: Off
2: Off
4: Off
3:
4: Off
2: Off
0: Off
3: Off
1: Off
4:
1: Off
0: Off
3: Off
2: Off
4: Off
0: Off
3: Off
1: Off
3:
0: Off
1: Off
2: Off
3: Off
1:
1: Off
0: Off
2: Off
3: Off
2:
0: Off
1: Off
3: Off
2: Off
0: Off
3: Off
2: Off
2:
2: Off
3: Off
0: Off
1: Off
1:
1: Off
0: Off
2: Off
3: Off

2: Off

2:
0: Off
1: Off
2: Off
1:
2: Off
0: Off
1: Off
Check Box11: Off
Text13:
Text14:
Text15:
Text12: 12
Text19:
Text20:
0Lube Oil Pressure PSI:
15Lube Oil Pressure PSI:
30Lube Oil Pressure PSI:
45Lube Oil Pressure PSI:
60Lube Oil Pressure PSI:
75Lube Oil Pressure PSI:
90Lube Oil Pressure PSI:
105Lube Oil Pressure PSI:
120Lube Oil Pressure PSI:
135Lube Oil Pressure PSI:
150Lube Oil Pressure PSI:
165Lube Oil Pressure PSI:
180Lube Oil Pressure PSI:
195Lube Oil Pressure PSI:
210Lube Oil Pressure PSI:
225Lube Oil Pressure PSI:
240Lube Oil Pressure PSI:
0Jacket Water Temp oF:
15Jacket Water Temp oF:
30Jacket Water Temp oF:
45Jacket Water Temp oF:
60Jacket Water Temp oF:
75Jacket Water Temp oF:
90Jacket Water Temp oF:
105Jacket Water Temp oF:
120Jacket Water Temp oF:
135Jacket Water Temp oF:
150Jacket Water Temp oF:
165Jacket Water Temp oF:
180Jacket Water Temp oF:
195Jacket Water Temp oF:
210Jacket Water Temp oF:
225Jacket Water Temp oF:
240Jacket Water Temp oF:
0DC Charge Volts:
15DC Charge Volts:
30DC Charge Volts:
45DC Charge Volts:
60DC Charge Volts:
75DC Charge Volts:
90DC Charge Volts:
105DC Charge Volts:
120DC Charge Volts:
135DC Charge Volts:
150DC Charge Volts:
165DC Charge Volts:
180DC Charge Volts:
195DC Charge Volts:
210DC Charge Volts:
225DC Charge Volts:
240DC Charge Volts:
0Frequency Hertz:
15Frequency Hertz:
30Frequency Hertz:
45Frequency Hertz:
60Frequency Hertz:
75Frequency Hertz:
90Frequency Hertz:
105Frequency Hertz:
120Frequency Hertz:
135Frequency Hertz:
150Frequency Hertz:
165Frequency Hertz:
180Frequency Hertz:
195Frequency Hertz:
210Frequency Hertz:
225Frequency Hertz:
240Frequency Hertz:
0AC Volts Phase 12:
15AC Volts Phase 12:
30AC Volts Phase 12:
45AC Volts Phase 12:
60AC Volts Phase 12:
75AC Volts Phase 12:
90AC Volts Phase 12:
105AC Volts Phase 12:
120AC Volts Phase 12:
135AC Volts Phase 12:
150AC Volts Phase 12:
165AC Volts Phase 12:
180AC Volts Phase 12:
195AC Volts Phase 12:
210AC Volts Phase 12:
225AC Volts Phase 12:
240AC Volts Phase 12:
0AC Volts Phase 23:
15AC Volts Phase 23:
30AC Volts Phase 23:
45AC Volts Phase 23:
60AC Volts Phase 23:
75AC Volts Phase 23:
90AC Volts Phase 23:
105AC Volts Phase 23:
120AC Volts Phase 23:
135AC Volts Phase 23:
150AC Volts Phase 23:
165AC Volts Phase 23:
180AC Volts Phase 23:
195AC Volts Phase 23:
210AC Volts Phase 23:
225AC Volts Phase 23:
240AC Volts Phase 23:
0AC Volts Phase 31:
15AC Volts Phase 31:
30AC Volts Phase 31:
45AC Volts Phase 31:
60AC Volts Phase 31:
75AC Volts Phase 31:
90AC Volts Phase 31:
105AC Volts Phase 31:
120AC Volts Phase 31:
135AC Volts Phase 31:
150AC Volts Phase 31:
165AC Volts Phase 31:
180AC Volts Phase 31:
195AC Volts Phase 31:
210AC Volts Phase 31:
225AC Volts Phase 31:
240AC Volts Phase 31:
0AC Amps Phase 1:
15AC Amps Phase 1:
30AC Amps Phase 1:
45AC Amps Phase 1:
60AC Amps Phase 1:
75AC Amps Phase 1:
90AC Amps Phase 1:
105AC Amps Phase 1:
120AC Amps Phase 1:
135AC Amps Phase 1:
150AC Amps Phase 1:
165AC Amps Phase 1:
180AC Amps Phase 1:
195AC Amps Phase 1:
210AC Amps Phase 1:
225AC Amps Phase 1:
240AC Amps Phase 1:
0AC Amps Phase 2:
15AC Amps Phase 2:
30AC Amps Phase 2:
45AC Amps Phase 2:
60AC Amps Phase 2:
75AC Amps Phase 2:
90AC Amps Phase 2:
105AC Amps Phase 2:
120AC Amps Phase 2:
135AC Amps Phase 2:
150AC Amps Phase 2:
165AC Amps Phase 2:
180AC Amps Phase 2:
195AC Amps Phase 2:
210AC Amps Phase 2:
225AC Amps Phase 2:
240AC Amps Phase 2:
0AC Amps Phase 3:
15AC Amps Phase 3:
30AC Amps Phase 3:
45AC Amps Phase 3:
60AC Amps Phase 3:
75AC Amps Phase 3:
90AC Amps Phase 3:
105AC Amps Phase 3:
120AC Amps Phase 3:
135AC Amps Phase 3:
150AC Amps Phase 3:
165AC Amps Phase 3:
180AC Amps Phase 3:
195AC Amps Phase 3:
210AC Amps Phase 3:
225AC Amps Phase 3:
240AC Amps Phase 3:
0Calculated Kw:
15Calculated Kw:
30Calculated Kw:
45Calculated Kw:
60Calculated Kw:
75Calculated Kw:
90Calculated Kw:
105Calculated Kw:
120Calculated Kw:
135Calculated Kw:
150Calculated Kw:
165Calculated Kw:
180Calculated Kw:
195Calculated Kw:
210Calculated Kw:
225Calculated Kw:
240Calculated Kw:
0Ambient Temp oF:
15Ambient Temp oF:
30Ambient Temp oF:
45Ambient Temp oF:
60Ambient Temp oF:
75Ambient Temp oF:
90Ambient Temp oF:
105Ambient Temp oF:
120Ambient Temp oF:
135Ambient Temp oF:
150Ambient Temp oF:
165Ambient Temp oF:
180Ambient Temp oF:
195Ambient Temp oF:
210Ambient Temp oF:
225Ambient Temp oF:
240Ambient Temp oF:
0FLA 1PF:
15FLA 1PF:
30FLA 1PF:
45FLA 1PF:
60FLA 1PF:
75FLA 1PF:
90FLA 1PF:
105FLA 1PF:
120FLA 1PF:
135FLA 1PF:
150FLA 1PF:
165FLA 1PF:
180FLA 1PF:
195FLA 1PF:
210FLA 1PF:
225FLA 1PF:
240FLA 1PF:
Text210:
model: Off
LOP set at psi:
Check Box20: Off
Check Box2: Off
Text21:
Serial: Off
HWT set at oF:
Check Box30: Off
af temp:
Check Box4: Off
rating kw:
rating kva:
Rating: Off
OS set at HZ:
Check Box3: Off
Check Box40: Off
Check Box8: Off
OC set at sec:
Check Box50: Off
Check Box5: Off
1800rpm volts:
Check Box: Off
Cycle Crank Rest sec:
Check Box120: Off
Check Box12: Off
Text211:
Check Box130: Off
Check Box9: Off
Text212:
Check Box90: Off
HOT set at oF:
Check Box14: Off
Check Box13: Off
Water Heater Thermostat set oF:
Check Box140: Off
CTS TD:
Low Oil Pressure Prewarn set psi:
Check Box15: Off
Check Box100: Off
stop td:
Check Box150: Off
Hot Water Prewarn set oF:
Check Box160: Off
Check Box16: Off
tds emer:
Check Box110: Off
Check Box170: Off
LBVAR Set:
Check Box17: Off
TDEN:
TDC:
Check Box180: Off
Check Box18: Off
HBVAR Set:
Tested By:
Witness:
Date:
Check Box 50: Off