Attachment 1 - Statement of Work and Specifications.pdf

PDF 2 MB Posted

Attached to
Replace Boilers at Bldg. 210
Solicitation number
70LGLY22BSSB00002
Issued by

View the file

Other files

File Type Posted
FINAL RFI Question and Answers.pdf PDF
FINAL RFI Question and Answers.pdf PDF
70LGLY22BSSB00002 Amendment 1.pdf PDF
Updated Statement of Work Bldg 210 Replace 2 Boilers August 9 2022.pdf PDF
RFI Question and Answers.pdf PDF
SECTION 22 30 00 Plumbing Equipment (Boiler Spec).pdf PDF
Attachment 9 - WH 347 - Wage and Hour Division.pdf PDF
Attachment 13b - USCIS Form I-9.pdf PDF
Attachment 5 - Format for Irrevocable Letter of Credit.pdf PDF
Attachment 13a - Instructions for Employment Eligibility Verification Form.pdf PDF
Attachment 12 - FLETC Tier 1 Badging Packet.pdf PDF
Attachment 25 - WH 1321 - DOL Poster.pdf PDF
Attachment 21- SF 24 - Bid Bond.pdf PDF
Attachment 24 - DHS 700-3 - Contractor Release Form.pdf PDF
Attachment 18 - GA Construction Requirements Statute Wage Determination Building GA20220315 (20220722).pdf PDF
Attachment 26 - FLETC Form 121-00-02 Visitor Access Request.pdf PDF
Attachment 8 - Instruction for Completing WH-347.pdf PDF
2.2.1 Solicitation Revised Bid Schedule Exhibit A.xlsx XLSX spreadsheet
Attachment 4 - SF 28 - Affidavit of Individual Surety.pdf PDF
Attachment 7 - FTC.FMD -70 Invoice Cover Sheet.pdf PDF
2.2.1 70LGLY22BSSB00002 Remove and Replace Boilers in Bldg. 210 Solicitation.pdf PDF
Attachment 17 - Security Training List.pdf PDF
Attachment 23 - Financial Questionnaire.pdf PDF
Attachment 2 - SF 25 - Performance Bonds.pdf PDF
Attachment 20 - SF 1444 - Request for Authorization of Additional Classification and Rate.pdf PDF
Attachment 6 - Format for Financial Institution.pdf PDF
Attachment 22 - SF LLC - Disclosure of Lobbying Activities.pdf PDF
Attachment 3 - SF 25A - Payment Bonds.pdf PDF
Attachment 10 - FMD 42 - Daily Report.pdf PDF
Attachment 15 - SF 85 - Questionnaire for Non-Sensitive Positions.pdf PDF
Attachment 19 - SF1413 Statement and Acknowledgment.pdf PDF
Attachment 16 - Security Handout.pdf PDF
Attachment 14 - OF 306 - Contractors Declaration of Federal.pdf PDF
Attachment 11 - DHS 11000-6 - Non-Disclosure Agreement.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Law Enforcement Training Center Building 210 Replace 2 Boilers

. Page 1

SECTION 01 11 00

STATEMENT OF WORK

6/1/22

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E 2114 (2008) Standard Terminology for Sustainability Relative to the Performance of Buildings

1.2 DEFINITIONS

Definitions pertaining to sustainable development are as defined in ASTM E 2114, and as specified.

a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.

b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.

c. "Operational performance" is the functional behavior of the building as a whole or of the building components.

d. "Sustainability" is the balance of environmental, economic, and societal considerations.

1.3 SUBMITTALS

Government approval is required for all submittals. See section 01 33 00 for submittal procedures.

Submittals for this project include:

1. Key Personnel Qualifications

2. AHA/CPL

3. Project Schedule

4. Product Data

5. O&M Data

6. Warranty Data

1.4 WORK COVERED BY CONTRACT DOCUMENTS

Federal Law Enforcement Training Center Building 210 Replace 2 Boilers

. Page 2

1.4.1 Project Description

The contractor shall provide all necessary labor, materials, and equipment to accomplish the following:

1. Field verify all existing conditions.

2. Demo, remove, and dispose of existing boilers in accordance with all contract documents and applicable codes.

Boiler 1: Chemline Model # VB450FTB640C3-RL Serial # 42303 Boiler 2: Chemline Model # VB450FTB640C3-RL Serial # 42302

3. Provide new like-in-kind boiler that meets or exceeds all existing boiler specifications.

a. Chemline M VB450FTB640C3-RL or equivalent

b. 480VAC, 3phase

c. 450 gallon hot water storage tank

d. 125 psi water pressure

e. 640KW

f. 240 dF max water temperature

4. Install boiler per manufacturer’s specifications.

5. Provide necessary modifications to existing piping, wiring, power, and controls as necessary to insure complete and useable equipment operation.

6. Perform equipment start-up and test procedure in accordance with manufacturer’s instructions.

7. Ensure all work is done in accordance with manufacturer’s installation and start-up instructions and maintains all manufacturer warranties.

8. Provide one (1) year warranty on all workmanship.

9. Provide 2 hour training to plant personnel on sequence of operation and periodic maintenance.

See reference drawings and pictures for further information.

1.4.2 Location

The work shall be located at building 210 on the FLETC, Glynco campus approximately as indicated.

The exact location will be shown by the Contracting Officer.

1.5 NOT USED

1.6 WORK SCHEDULING

Normal duty hours for work shall be from 7:00 a.m. to 5:30 p.m., Monday through Friday. Requests for additional work shall require written approval from the Contracting Officer 7 days in advance of the proposed work period.

Federal Law Enforcement Training Center Building 210 Replace 2 Boilers

. Page 3

1.7 PROJECT ENVIRONMENTAL GOALS

Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the functional program needs and incorporates the principles of sustainability. Specifically:

a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion.

Minimize offsite environmental impact.

b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.

c. Use environmentally preferable products and decrease toxicity level of materials used.

d. Use renewable energy and material resources.

e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended. Consider the durability, maintainability, and flexibility of building systems.

f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.

g. Reduce construction waste through reuse, recycling, and supplier take-back.

1.8 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.9 ON-SITE PERMITS

1.9.1 Utility Outage Requests and Utility Connection Requests

Notify the Contracting Officer at least 48 hours prior to starting excavation work. Contractor is responsible for marking and verifying all utilities not marked.

The Contractor shall verify the elevations of existing piping, utilities, and any type of underground

Federal Law Enforcement Training Center Building 210 Replace 2 Boilers

. Page 4 obstruction not indicated or specified to be removed. But indicated in locations to be traversed by piping, ducts, and other work to be installed.

Work shall be scheduled to hold outages to a minimum.

Requests for utility outages and connections shall be made in writing to the Contracting Officer at least 2 calendar days in advance of the time required. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.

1.10 LOCATION OF UNDERGROUND FACILITIES

1.10.1 Notification Prior to Excavation

Notify the Contracting Officer at least 48 hours prior to starting excavation work. Contact Georgia and Glynn county utility locate organizations 48 hours prior to excavating. Contractor is responsible for marking all utilities not marked by locate service.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Contractor shall have a total of 90 days from notice to proceed to complete the work. Photos of job site, equipment and piping shown below for reference.

-- End of Section --

Federal Law Enforcement Training Center Building 210 Replace 2 Boilers

. Page 5

Federal Law Enforcement Training Center Bldg.210 Boiler Replacement

01 14 00 - 1 7/26/2022

SECTION 01 14 00

WORK RESTRICTIONS

1.1 DEFINITIONS

1.1.1 NOT USED

1.2 NOT USED

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials shall be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.

1.3.1.1 Subcontractors and Personnel Contacts

Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 Identification Badges and Installation Access

Identification badges are required and will be furnished without charge. Application for and use of badges will be as directed by the Contracting Officer. Immediately report instances of lost or stolen badges to the Contracting Officer. See Section H regarding lost badges. All badges must be immediately returned to the point of issue upon badge expiration, contract completion, firing or removal of employee, or at the request of the approving authority.

1.3.1.3 Employee List

The Contractor shall provide to the Contracting officer, in writing, the names of two designated representatives authorized to request personnel and vehicle passes for employees and subcontractor's employees prior to commencement of work under this contract.

1.3.1.4 Personnel Entry Approval

Failure to obtain entry approval will not affect the task order price or time of completion.

1.3.1.5 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installations under the cognizance of FLETC except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

Federal Law Enforcement Training Center Bldg.210 Boiler Replacement

01 14 00 - 2

1.3.2 Working Hours

Regular working hours shall consist of a 10 hour period established by the Contractor Officer, between 7:00 a.m. and 5:00 p.m., Monday through Friday, excluding Government holidays.

1.3.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval. Make application 3 to 5 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work shall be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.3.4 Occupied and Existing Buildings

The Contractor will be working in existing occupied buildings.

The existing buildings and their contents shall be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the building during the construction period.

1.3.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and sprinkler shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours." Such interruption shall be further limited to 8 hours. This time limit includes time for deactivation and reactivation.

d. Operation of Station Utilities: The Contractor shall not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor shall notify the Contracting Officer giving reasonable advance notice when such operation is required.

1.4 SECURITY REQUIREMENTS

1.4.1 Citizenship Requirements

Aliens are not allowed on the project site. Work under this contract is restricted to U.S. citizens.

1.4.2 Documents Acceptable for Proof of Citizenship

a. Birth registration card

Federal Law Enforcement Training Center Bldg.210 Boiler Replacement

01 14 00 - 3

b. Certificate of live birth, birth certificate

c. Certificate of registration

d. Delayed birth certificate

e. Hospital birth certificate

f. Military officer ID card

g. USA passport

1.4.3 Passes

Submit request for personnel and vehicle passes together. Include the Certificate of Insurance for Contractor and Subcontractor(s) and the Statement of Acknowledgement Form SF 1413 with the submittal. Passes will normally be issued within 21 days, see Section H.

1.4.3.1 Control

Maintain strict accountability over passes. Immediately report to the source of issue, passes missing or lost and the circumstances.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Federal Law Enforcement Training Center Bldg. 210 Boiler Replacement

01 33 00 - 1

SECTION 01 33 00

SUBMITTAL PROCEDURES

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Contractor's Quality Control (CQC) System Manager and the Designer of Record, if applicable, to check and approve all items prior to submittal and stamp, sign, and date indicating action taken.

Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.

Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Picked up and disposed of samples in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations samples remaining upon completion of the work.

1.1 DEFINITIONS

1.1.1 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections. Submittals are identified by Submittal Description (SD) numbers and titles as follows:

SD-01 Preconstruction Submittals

Submittals which are required prior to a notice to proceed commencing work on site. Submittals required prior to the start of the next major phase of the construction on a multi-phase contract. Schedules or tabular list of data or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work, submitted prior to contract notice to proceed or next major phase of construction.

Certificates of insurance Surety bonds Key Personnel certification and appointment letters Accident Prevention Plan Health and Safety Plan Quality Control Plan Project Schedule

SD-03 Product Data

Federal Law Enforcement Training Center Bldg. 210 Boiler Replacement

01 33 00 - 2

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.

Samples of warranty language when the contract requires extended product warranties.

SD-06 Test Reports

Test and Balance Report

Final acceptance test and operational test procedure.

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements.

Must be dated after award of project contract and clearly name the project.

SD-08 Manufacturer's Instructions

Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.

SD-10 Operation and Maintenance Data

Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.

This data is intended to be incorporated in an operations and maintenance manual or control system.

SD-11 Closeout Submittals

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.

Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.

1.1.2 Approving Authority

Office or designated person authorized to approve submittal.

1.1.3 Work

As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.

1.2 SUBMITTALS

Government approval is required for all submittals. Submit the following in accordance with this section.

Federal Law Enforcement Training Center Bldg. 210 Boiler Replacement

01 33 00 - 3

Submittal register

1.3 SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

1.3.1 Government Approved

Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer. Government approval is required for any deviations from the Solicitation or Accepted Proposal and other items as designated by the Contracting Officer. Within the terms of the Contract Clause entitled "Specifications and Drawings for Construction," they are considered to be "shop drawings."

1.4 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL

1.4.1 Submittals Required from the Contractor

As soon as practicable after award of contract, and before procurement of fabrication, forward to the Contracting Officer submittals required in the technical sections of this specification, including shop drawings, product data and samples. One copy of the transmittal form for all submittals shall be forwarded to the Resident Officer in Charge of Construction.

1.4.1.1 O&M Data

The government will review and approve for the Contracting Officer O&M Data to verify the submittals comply with the contract requirements; submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.

a. In the event the Contractor fails to deliver O&M Data within the time limits specified, the

Contracting Officer may withhold from progress payments 50 percent of the price of the item with which such O&M Data are applicable.

1.5 PREPARATION

1.5.1 Transmittal Form

1.5.2 Identifying Submittals

When submittals are provided by a lower tier contractor the Prime Contractor is to prepare, review and stamp with Contractor's approval all specified submittals prior to submitting for Government approval.

Identify submittals, except sample installations and sample panels, with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal form. Mark each copy of each submittal identically, with the following:

a. Project title and location.

b. Construction contract number.

c. Date of the drawings and revisions.

Federal Law Enforcement Training Center Bldg. 210 Boiler Replacement

01 33 00 - 4

d. Name, address, and telephone number of subcontractor, supplier, manufacturer and any other second tier Contractor associated with submittal.

e. Section number of the specification section by which submittal is required.

f. Submittal description (SD) number of each component of submittal.

g. When a resubmission, add alphabetic suffix on submittal description, for example, submittal

18 would become 18A, to indicate resubmission.

h. Product identification and location in project.

1.5.3 Not Used

1.5.4 Format of SD-03 Product Data and SD-08 Manufacturer's Instructions

a. Present product data submittals for each section as a complete, bound volume. Include table of contents, listing page and catalog item numbers for product data.

b. Indicate, by prominent notation, each product which is being submitted; indicate specification section number and paragraph number to which it pertains.

c. Supplement product data with material prepared for project to satisfy submittal requirements for which product data does not exist. Identify this material as developed specifically for project, with information and format as required for submission of SD-07 Certificates.

d. Provide product data in metric dimensions. Where product data are included in preprinted catalogs with English units only, submit metric dimensions on separate sheet.

e. Include the manufacturer's name, trade name, place of manufacture, and catalog model or number on product data. Also include applicable federal, military, industry and technical society publication references. Should manufacturer's data require supplemental information for clarification, submit as specified for SD-07 Certificates.

f. Where equipment or materials are specified to conform to industry and technical society reference standards of the organizations such as American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's Association (NEMA), Underwriters Laboratories (UL), and Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer. State on the certificate that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.

g. Collect required data submittals for each specific material, product, unit of work, or system into a single submittal and marked for choices, options, and portions applicable to the submittal. Mark each copy of the product data identically. Partial submittals will not be accepted for expedition of construction effort.

h. Submit manufacturer's instructions prior to installation.

1.5.5 Not Used

1.5.6 Format of SD-05 Design Data and SD-07 Certificates

Federal Law Enforcement Training Center Bldg. 210 Boiler Replacement

01 33 00 - 5

Provide design data and certificates on 8 1/2 by 11 inches paper. Provide a bound volume for submittals containing numerous pages.

1.5.7 Format of SD-06 Test Reports and SD-09 Manufacturer's Field Reports

a. Provide reports on 8 1/2 by 11 inches paper in a complete bound volume.

b. Indicate by prominent notation, each report in the submittal. Indicate specification number and paragraph number to which it pertains.

1.5.8 Format of SD-01 Preconstruction Submittals and SD-11 Closeout Submittals

a. When submittal includes a document which is to be used in project or become part of project record, other than as a submittal, do not apply Contractor's approval stamp to document, but to a separate sheet accompanying document.

b. Provide all dimensions in administrative submittals in metric. Where data are included in preprinted material with English units only, submit metric dimensions on separate sheet.

1.6 NOT USED

1.7 VARIATIONS / SUBSTITUTION REQUESTS

Variations from contract requirements require Government approval pursuant to contract Clause FAR 52.236-21 and will be considered where advantageous to Government.

1.7.1 Considering Variations

Discussion with Contracting Officer prior to submission, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP).

Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.

1.7.2 Proposing Variations

When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.

Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.

1.7.3 Warranting That Variations Are Compatible

When delivering a variation for approval, Contractor warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.

Federal Law Enforcement Training Center Bldg. 210 Boiler Replacement

01 33 00 - 6

1.7.4 Review Schedule Is Modified

In addition to normal submittal review period, a period of 14 working days will be allowed for consideration by the Government of submittals with variations.

1.8 NOT USED

1.9 NOT USED

1.10 GOVERNMENT APPROVING AUTHORITY

When approving authority is Contracting Officer, the Government will:

a. Note date on which submittal was received from QC Manager.

b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.

c. Identify returned submittals with one of the actions defined in paragraph entitled "Review

Notations" and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. 1 copies of the approved submittal will be retained by the Contracting Officer and 1 copies of the submittal will be returned to the Contractor. If the Government performs a conformance review of other Designer of Record approved submittals, the submittals will be so identified and returned, as described above.

1.10.1 Review Notations

Contracting Officer review will be completed within 15 calendar days after date of submission.

Submittals will be returned to the Contractor with the following notations:

a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.

b. Submittals marked "approved as noted" "or approved except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.

c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.

d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required , does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.

1.11 DISAPPROVED SUBMITTALS

Federal Law Enforcement Training Center Bldg. 210 Boiler Replacement

01 33 00 - 7

Contractor shall make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the clause entitled, "Changes" is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work. Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.

If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.12 APPROVED SUBMITTALS

The Contracting Officer's approval or acceptance of submittals is not be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory design, general method of construction, materials, detailing and other information appear to meet the Solicitation and Accepted Proposal. Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for . After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.13 APPROVED SAMPLES

Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.

Match the approved samples for Materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.

Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapproved any material or equipment which previously has proved unsatisfactory in service.

Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals. Contractor to replace such materials or equipment to meet contract requirements.

Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.

1.14 WITHHOLDING OF PAYMENT

Payment for materials incorporated in the work will not be made if required approvals have not been obtained. No payment for materials incorporated in the work will be made if all required Designer of Record or required Government approvals have not been obtained. No payment will be made for any materials incorporated into the work for any conformance review submittals or information only submittals found to contain errors or deviations from the Solicitation or Accepted Proposal.

Federal Law Enforcement Training Center Bldg. 210 Boiler Replacement

01 33 00 - 8

1.15 PROGRESS SCHEDULE

1.15.1 Gannt Chart

Submit the initial progress schedule within 21 calendar days of notice to proceed. Schedule is to be updated and resubmitted monthly beginning 7 calendar days after return of the approved initial schedule. Updating to entail complete revision of the graphic and data displays incorporating changes in scheduled dates and performance periods. Redlined updates will only be acceptable for use as weekly status reviews.

Contractor to provide a single point contact from his on-site organization as his Schedule Specialist.

Schedule Specialist is to have the responsibility of updating and coordinating the schedule with actual job conditions. Schedule Specialist to participate in weekly status meetings and present current information on the status of purchase orders, shop drawings, off-site fabrication, materials deliveries, Subcontractor activities, anticipated needs for Government furnished equipment, and any problem which may impact the contract performance period.

Include the following in the project network analysis:

a. Graphically display with the standard network or arrow diagram capable of illustrating the required data. Drafting to be computer generated on standard 24 by 36 inch (nominal size) drafting sheets or on small (11 by 17 inch minimum) sheets with separate overview and detail breakouts. Provide a project network analysis that is legible with a clear, consistent method for continuations and detail referencing. Clearly delineate the critical path on the display. Clearly indicate the contract milestone date on the project network analysis graphic display.

b. Data is to be presented as a separate printout on paper or, where feasible, may be printed on the same sheet as the graphic display. Data is to be organized in a logical coherent display capable of periodic updating.

c. Include within the data verbal activity descriptions with a numerical ordering system cross referenced to the graphic display. Additionally, costs (broken down into separate materials and costs), duration, early start date, early finish date, late start date, late finish date, and float are to be detailed for each activity. A running total of the percent completion based on completed activity costs versus total contract cost is to be indicated. A system for indicating scheduled versus actual activity dates and durations is also to be provided.

d. Sufficient detail to facilitate the Contractor's control of the job and to allow the Contracting

Officer to readily follow progress for portions of the work should be shown within the schedule.

Federal Law Enforcement Training Center Bldg. 210 Boiler Replacement

01 33 00 - 9

SECTION 01 45 00 Page 2

SECTION 01 45 00

CONSTRUCTION QUALITY CONTROL AND KEY PERSONNEL

1.1 SUMMARY

1.1.1 Related Sections

Requirements of this Section apply to, and are component of, each section of the specifications.

1.2 DEFINITIONS

Reference to the Government Project Manager and Construction Representative (ConRep) herein refers to the FLETC Facilities Management Division Project Manager and Construction Representative.

1.3 SUBMITTALS

Approval is required for submittals as identified by each task order.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

The below listed Pre-Construction Submittals are critical to start of work activities and are required to be provided to the Government a minimum of seven (7) calendar days prior to the scheduled kick-off Preconstruction Conference All Pre-Construction submittals require Government approval. Make any required Pre-Construction Re- Submittals within five (5) calendar days after Government rejection.

Neglect to provide timely approved Pre- Construction submittals and to employ approved key on-site Quality Control and Superintendent personnel will have dual roles, claim under the Contract.

Key Personnel

Key personnel required shall be Superintendent and Quality Control manager onsite during work process.

Contractor Safety Plan;

Provide a comprehensive Safety Plan in accordance with the related Section for SAFETY REQUIREMENTS. The Safety Plan comprises, but is not limited to, an Accident Prevention Plan (APP), Activity Hazard Analysis (AHA), Health and Safety Plan.

1.4 REPORTING FORMS

Use reporting forms provided in the contract or obtain a single copy of forms from the Facilities Management COR. The report forms will consist of

SECTION 01 45 00 Page 3 the Superintendent's Daily Report (FTC-FMD-42) Other forms shall be developed by the Contractor and submitted for approval of the Government for reporting of QC Meeting Agendas and Minutes, Preparatory Phase Checklist, Initial Phase Checklist, Rework Items List, Requests For Information (RFI), Field Test

SECTION 01 45 00 Page 4

Reports, and Testing Plan and Log. Submit electronic daily reports via email to both the Facilities Management Division and Procurement Division.

Copy the Government PM, CO, and ConRep (if assigned).

Deliver the following to the assigned Government task order Project Manager during Construction:

a. Superintendent's and QCM’s Reports: Electronically transfer completed and signed daily reports to the Facilities Management Division assigned Project Manager and Contracting Officer by 10:00 AM the next working day. Provide daily reports for all working and non-working days through the date of final acceptance of all work.

Annotate non-working days accordingly on reports.

1.7 COORDINATION AND MUTUAL UNDERSTANDING MEETINGS

Prior to the start of construction work, the contractors designated key personnel will meet with the COR to present the safety and work plan required by this contract. If new key personnel is appointed, the coordination and mutual understanding meeting shall be repeated.

1.7.1 Purpose

The purpose of this meeting is to develop a mutual understanding of the details, including documentation, administration for on-site and off-site work, design intent, environmental requirements and procedures, coordination of activities to be performed, and the coordination of the Contractor's management, production, and QC personnel. At the meeting, the Contractor will be required to explain in detail how phases of control will be implemented.

a. Work Plan

b. Safety Plan

c. Schedule

1.7.2 Coordination of Activities

Activities included in various sections shall be coordinated to assure efficient and orderly installation of each component.

1.7.3 Attendees

As a minimum, the Contractor's designated key personnel required to attend shall include Superintendent, and/or Job Foreman. The Contractor shall provide a copy of the signed minutes.

1.12 THREE PHASES OF CONTROL

The Three Phases of Control shall adequately cover both on-site and off-site work and shall include the following.

SECTION 01 45 00 Page 5

1.12.1 Preparatory Phase

Notify the Government PM at least two work days in advance of each preparatory phase meeting. When the DFOW will be accomplished by a subcontractor, that subcontractor's foreman shall attend the preparatory phase meeting. Document the results of the preparatory phase actions in the daily Contractor Quality Control Report and in the Preparatory Phase Checklist. Perform the following prior to beginning work on each DFOW:

a. Review each paragraph of the applicable specification sections;

b. Review the Contract drawings;

c. Verify that field measurements are as indicated on construction and/or shop drawings before confirming product orders in order to coordinate work and avoid dimensional errors and rework;

d. Verify that appropriate shop drawings and submittals for materials and equipment have been submitted and approved. Verify receipt of approved factory test results, when required;

e. Examine the work area to ensure that the required preliminary work has been completed;

f. Coordinate the schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials;

g. Examine the required materials, equipment and sample work to ensure that they are on hand and conform to the approved shop drawings and submitted data;

h. Discuss construction methods, construction tolerances, workmanship standards, and the approach that will be used to provide quality construction by planning ahead and identifying potential problems for each DFOW;

i. Review the Accident Prevention Plan (APP) and appropriate Activity

Hazard Analysis (AHA) to ensure that applicable safety requirements are met, and that required Material Safety Data Sheets (MSDS) are submitted; and

1.12.2 Initial Phase

Notify the Government PM at least two work days in advance of each initial phase. When construction crews are ready to start work on a DFOW, conduct the initial phase with the Project Superintendent, and the foreman responsible for that DFOW. Observe the initial segment of the DFOW to ensure that the work complies with Contract requirements. Document the

SECTION 01 45 00 Page 6 results of the initial phase in the daily CQC Report and in the Initial Phase Checklist. Repeat the initial phase for each new crew to work on-site, or when acceptable levels of specified quality are not being met.

Perform the following for each DFOW:

a. Establish the quality of workmanship required;

b. Resolve conflicts;

c. Ensure that testing is performed by the approved laboratory;

d. Check work procedures for compliance with the APP and the appropriate AHA to ensure that applicable safety requirements are met; and

e. If applicable, review the Cx Plan and ensure all preparatory work items have been completed and documented.

1.12.3 Follow-Up Phase

Perform the following for on-going work daily, or more frequently as necessary, until the completion of each DFOW and document in the daily CQC Report:

a. Ensure the work is in compliance with Contract requirements;

b. Maintain the quality of workmanship required;

c. Ensure that testing is performed by the approved laboratory;

d. Ensure that rework items are being corrected;

e. Perform safety inspections; and

SECTION 01 45 00 Page 7

1.15.1 Completion Certification

Upon completion of work under this Contract, the QC Manager shall furnish a certificate to the Government attesting that "the work has been completed, inspected, tested and is in compliance with the Contract."

1.16 COMPLETION INSPECTIONS

1.16.1 Punch-Out Inspection

Near the completion of all work on a task order or any increment thereof, established by a completion time stated in the task order, the QC Manager shall self-perform an inspection of the work and develop a "punch list" of items which do not conform to the contract documents. Include in the punch list any remaining items on the "Rework Items List", which were not corrected prior to the Punch-Out Inspection. The punch list shall include the estimated date by which the deficiencies will be corrected. Four copies of the punch list shall be provided to the Government. The QC Manager shall make follow-on inspections to ascertain that all deficiencies have been corrected. Once this is accomplished, the Contractor shall certify in writing to the Government that Punch-Out work is satisfactorily completed and the facility is ready for the Government "Pre-Final Inspection". Allow a minimum of two (2) working days for Government coordination of the start of Pre-Final Inspection.

1.16.2 Pre-Final Inspection

The Government will perform this inspection to verify that the task order is complete. The Government may terminate Pre-Final Inspection at any time should it be determined the work has not been satisfactorily completed or that previously documented deficiencies remain incomplete. In such an instance the Contractor shall resume and progress Punch-Out work and the QCM shall repeat the Punch-Out Inspection. A Government "Pre-Final Punch List" may be developed as a result of this inspection. The QC Manager shall ensure that all items on this list are corrected prior to notifying the Government that a "Final" inspection with the Client can be scheduled. Any items noted on the "Pre-Final" inspection shall be corrected in a timely manner and shall be accomplished before the task order completion date for the work, or any particular increment thereof, if the project is divided into increments by separate completion dates.

1.16.3 Final Acceptance Inspection

The QCM shall coordinate with the Government PM the date a task order final acceptance inspection can be held. The notice shall certify in writing that all items previously identified on the pre-final punch list will be corrected and acceptable, along with any other unfinished Contract work, by the proposed date of the final acceptance inspection. The Contractor shall be represented by the QC Manager, Superintendent, the CA if applicable, and

SECTION 01 45 00 Page 8 others deemed necessary. Attendees for the Government may include the Project Manager, COR, and personnel representing the Client.

1.19 NOTIFICATION OF NON-COMPLIANCE

The Government will notify the Contractor of detected non-compliance with the Contract. Such notice, when verbally delivered to the Contractor at the work site, shall be deemed sufficient for the purpose of notification.

The Government may, at its discretion, issue Construction Contractor Compliance Notices (CNNN's) or other written documentation concerning a non-complaint work. The Contractor shall take immediate steps to bring work into compliance. When a Corrective Action Plan is required by the Government, no corrective work shall occur prior to Government Project Manager approval of the Corrective Action Plan. If the Contractor fails or refuses to promptly bring work into compliance, the Government may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders shall be made the subject of claim for extension of time for excess costs or damages by the Contractor.

3.1 PREPARATION

Designate receiving/storage areas for incoming material to be delivered according to installation schedule and to be placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication. Store and handle materials in a manner as to prevent loss from weather and other damage. Keep materials, products, and accessories covered and off the ground, and store in a dry, secure area. Prevent contact with material that may cause corrosion, discoloration, or staining.

Protect all materials and installations from damage by the activities of other trades.

SECTION 01 45 00 Page 9

3.2 GOVERNMENT QUALITY ASSURANCE

In accordance with FAR 52.246-12, Inspection of Construction:

a. Government inspections and tests are for the sole benefit of the Government and do not-

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

b. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the task order specification.

c. The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Project Manager. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work.

d. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

e. If the Contractor does not promptly replace or correct rejected work, the Government may-

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor's right to proceed.

f. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Government shall make an equitable adjustment for the additional services involved in the examination and

Section 09 29 00 Page reconstruction, including, if completion of the work was thereby delayed, an extension of time.

3.3 GOVERNMENT ACCEPTANCE

The performance and quality of work delivered by the Contractor, including services rendered and any documentation, shall be subject to inspection, review, and acceptance by the Government. All work shall be completed within the time specified in the contract, including provision of close-out documents and correction of deficiencies noted during the final inspection.

SECTION 01 52 50 Page 1

SECTION 01 52 50

SAFETY REQUIREMENTS

PART 1 GENERAL

1.1 SUMMARY

1.1.1 Related Sections

Requirements of this Section apply to, and are component of, each section of the specifications.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI A10.14 (1991) Construction and Demolition Operations

- Requirements for Safety Belts, Harnesses, Lanyards and Lifelines for Construction and Demolition Use

CODE OF FEDERAL REGULATIONS (CFR)

29 CFR 1910.94 Ventilation

29 CFR 1910.120 Hazardous Waste Operations and Emergency

Response

29 CFR 1926.65 Hazardous Waste…

This is the start of the file's text. The full file is on GovTribe.