BLDG. 210 Boiler Replacement
Request for Information Questions and Answers
Q.1 Will the installing contractor be required to hold a current Certificate of Authority from the Office of Insurance and safety fire commissioner State Fire Marshal's office, State of Georgia?
A1. Yes. See boiler spec and applicable codes.
Q2. Will the installing contractor be required to include in there cost new Boiler operating permits from the Georgia Department of Labor?
A2. Will the installing contractor be required to include in there cost new Boiler operating permits from the Georgia Department of Labor?
Q3. Will temporary boiler be required during construction?
A3. No. See amended SOW. Only one boiler may be changed at a time.
Q4. The existing Heaters have two condenser water lines above it that appear to be abandoned. Do we need to include removing these two pipes in the proposal?
A4. Yes. See amended SOW
Q5. Is it the user's expectation that the boilers be replaced one at a time?
A5. Yes. See amended SOW.
Q6. Will NTP be held until materials arrive?
A6. NTP will be coordinated with contractor. FLETC understands the current supply chain issues.
Q7. Are chemical treatment records available?
A7. No
Q8. Does the government want the inactive chilled water lines removed while the boilers are removed?
A8. Yes. See amended SOW.
Q9. Due to the size of the project can the superintendent/SSHO and quality control manager be the same person?
A9. Yes. See amended SOW.