ATTACHMENT 1 - Specifications - Volume 1.pdf
PDF 7 MB Posted
- Solicitation number
- 36C77623B0016
About this file
This document outlines specifications for a construction project. It details requirements for a Specialty Treatment Expansion at the James A. Haley Veterans Hospital in Tampa, Florida, including architectural, mechanical, electrical, plumbing and interior design work. Key milestones include submitting all required documentation within 30 days of the notice to proceed and completing all work within 550 calendar days of receiving that notice. Safety, security and coordination requirements are extensive. The contractor must protect existing infrastructure and operations, dispose of all waste properly, and obtain approvals for any utility disruptions or work outside normal hours. Special inspections of concrete work are also specified.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIALTY TREATMENT EXPANSION PROJECT
JAMES A. HALEY VETERAN’S HOSPITAL
TAMPA, FLORIDA
VOLUME 1
Specifications for
DEPARTMENT OF VETERANS AFFAIRS
VA Project Number 673-CSI-100
PHYSICAL AND ELECTRIC SECURITY UPDATE
August 19, 2022
UPDATED PER VA COMMENTS
January 09, 2023
115 East Forsyth St. • Jacksonville, Florida 32202 USA • (904)798-8333 • Fax (904)798-8335 www.ttvarch.com • Lic.#AA0002609 • info@ttvarch.com http://www.ttvarch.com/ mailto:info@ttvarch.com
THIS PAGE INTENTIONALLY LEFT BLANK
Table of Contents, Section 00 01 10 - Page 1
JAMES A. HALEY VETERAN’S HOSPITAL
TAMPA, FLORIDA
PHYSICAL AND ELECTRIC SECURITY UPDATE
08/19/22
TABLE OF CONTENTS
Section 00 01 10
VOLUME 1
DIVISION 0 - SPECIAL SECTIONS
00 01 10 Table of Contents
00 01 15 List of Drawing Sheets
DIVISION 1 - GENERAL REQUIREMENTS
01 00 00 General Requirements
Appendix Special Inspections
01 32 16.15 Project Schedules
01 33 23 Shop Drawings, Product Data, and Samples
01 35 26 Safety Requirements
01 42 19 Reference Standards
01 45 29 Testing Laboratory Services
01 57 19 Temporary Environmental Controls
01 58 16 Temporary Interior Signage
01 74 19 Construction Waste Management
01 91 00 General Commissioning Requirements
DIVISION 2 – EXISTING CONDITIONS
02 41 00 Demolition
02 82 11 Traditional Asbestos Abatement
02 82 13.19 Asbestos Floor Tile and Mastic Abatement
DIVISION 3 – CONCRETE
03 30 00 Cast-In-Place Concrete
DIVISION 4 – MASONRY
04 05 13 Masonry Mortaring
04 05 16 Masonry Grouting
04 20 00 Unit Masonry
DIVISION 5 – METALS
05 12 00 Structural Steel Framing
05 31 00 Steel Decking
05 36 00 Composite Metal Decking
Section 00 01 10 - Page 2
05 40 00 Cold Formed Metal Framing
05 50 00 Metal Fabrications
05 51 00 Metal Stairs
DIVISION 6 - WOOD AND PLASTIC
06 10 00 Rough Carpentry
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07 13 52 Modified Bituminous Sheet Waterproofing
07 22 00 Roof Deck Insulation
07 27 26 Fluid-Applied Membrane Air Barriers, Vapor Permeable
07 54 23 Thermoplastic Polyolefin (TPO) Roofing
07 60 00 Flashing and Sheet Metal
07 71 00 Roof Specialties
07 72 00 Roof Accessories
07 81 00 Applied Fireproofing
07 84 00 Firestopping
07 92 00 Joint Sealants
07 95 13 Expansion Joint Cover Assemblies
DIVISION 8 - DOORS AND WINDOWS
08 00 01 Blast Performance Requirements
08 11 13 Hollow Metal Doors and Frames
08 11 74 Automatic Sliding Doors
08 14 00 Interior Wood Doors
08 31 13 Access Doors and Frames
08 33 00 Coiling Doors and Grilles
08 33 43 Fire and Smoke Curtains
08 44 13 Glazed Aluminum Curtain Walls
08 51 13 Aluminum Windows
08 71 00 Door Hardware
08 71 13 Automatic Door Operators
08 80 00 Glazing
DIVISION 9 – FINISHES
09 22 16 Non-Structural Metal Framing
09 24 00 Portland Cement Plastering (Stucco)
09 29 00 Gypsum Board
09 30 13 Ceramic Tiling
09 51 00 Acoustical Ceilings
09 65 13 Resilient Base and Accessories
09 65 16 Resilient Sheet Flooring
09 65 19 Resilient Tile Flooring
09 65 20 Resilient Plank Flooring
09 67 23 Resinous Flooring
09 91 00 Painting
DIVISION 10 – SPECIALTIES
Section 00 01 10 - Page 3
10 11 13 Markerboards
10 14 00 Signage
10 21 23 Cubicle Curtain and Tracks
10 25 13 Patient Bed Service Walls
10 26 00 Wall and Door Protection
10 44 13 Fire Extinguisher Cabinets
10 51 19 Metal Lockers
DIVISION 11 – EQUIPMENT
11 73 00 Ceiling Mounted Patient Lift Systems
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades
12 32 00 Manufactured Wood Casework
12 36 00 Countertops
DIVISION 13 - SPECIAL CONSTRUCTION
13 49 00 Radiation Protection
DIVISION 14– CONVEYING EQUIPEMENT
Not Used
VOLUME 2
DIVISION 21- FIRE SUPPRESSION
21 05 11 Common Work Results For Fire Suppression
21 13 13 Wet-Pipe Sprinkler Systems
DIVISION 22 – PLUMBING
22 05 11 Common Work Results For Plumbing
22 05 12 General Motor Requirements For Plumbing Equipment
22 05 19 Meters And Gages For Plumbing Piping
22 05 23 General-Duty Valves For Plumbing Piping
22 11 00 Facility Water Distribution
22 11 23 Domestic Water Pumps
22 11 93 Water Quality Monitoring Station for Domestic Water
22 13 00 Facility Sanitary Sewerage
22 14 00 Facility Storm Drainage
22 33 00 Electric Domestic Water Heaters
22 40 00 Plumbing Fixtures
22 62 00 Vacuum Systems For Laboratory And Healthcare Facilities
22 63 00 Gas Systems For Laboratory And Healthcare Facilities
DIVISION 23 – HEATING, VENTILATING, & AIR CONDITIONING
Section 00 01 10 - Page 4
23 05 11 Common Work Results For Hvac And Steam Generation
23 05 12 General Motor Requirements For Hvac And Steam Generation
Equipment
23 05 41 Noise And Vibration Control For Hvac Piping And Equipment
23 05 93 Testing, Adjusting, And Balancing For Hvac
23 07 11 Hvac, Plumbing, And Boiler Plant Insulation
23 09 23 Direct-Digital Control System For Hvac
23 21 13 Hydronic Piping
23 21 23 Hydronic Pumps
23 22 13 Steam And Condensate Heating Piping
23 22 23 Steam Condensate Pumps
23 25 00 Hvac Water Treatment
23 29 23 Variable-Frequency Motor Controllers
23 31 00 Hvac Ducts And Casings
23 33 13 Blast Suppression Damper
23 34 00 Hvac Fans
23 36 00 Air Terminal Units
23 37 00 Air Outlets And Inlets
23 40 00 Hvac Air Cleaning Devices
23 64 00 Packaged Water Chillers
23 73 00 Central-Station Air-Handling Units
23 82 16 Air Coils
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations
26 05 21 Low-Voltage Electrical Power Conductors and Cables (600
Volts and Below)
26 05 26 Grounding and Bonding for Electrical Systems
26 05 33 Raceway and Boxes for Electrical Systems
26 20 11 Isolated Power Systems
26 22 00 Low-Voltage Transformers
26 24 16 Panelboards
26 27 26 Wiring Devices
26 41 00 Facility Lightning Protection
26 51 00 Interior Lighting
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations
27 05 12 Telecommunications
27 05 26 Grounding and Bonding for Communications Systems
27 10 00 Structured Cabling
27 15 00 Communications Horizontal Cabling
27 51 16 Public Address Systems
27 52 23 Nurse Call/Code Blue Systems
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 00 00 Cabling for Safety and Security
28 05 00 Common Work Results for Electronic Safety and Security
Section 00 01 10 - Page 5
28 13 00 Access Control Requirements
28 23 00 Video Surveillance Requirements
28 31 00 Fire Detection and Alarm
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form)
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements
32 12 16 Asphalt Paving
32 17 23 Pavement Markings
DIVISION 33 – UTILITIES
33 40 00 Storm Sewer Utilities
DIVISION 34 – TRANSPORTATION
Not Used
VOLUME 3 – OWNER-PROVIDED MANUFACTURER'S EQUIPMENT DRAWINGS & INFORMATION
FOR THE EQUIPMENT WITHIN THE SPECIALTY TREATMENT EXPANSION
JAMES A. HALEY VETERANS’ HOSPITAL
List of Drawing Sheets, Section 00 01 15 - Page 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specifi cation form a part of the contract.
Drawing No. Title
GENERAL
GI000 COVER SHEET
GI001 LEGEND, ABBREVIATIONS, CODE SUMMARY, AND
GENERAL NOTES
GI101 LIFE SAFETY PLANS
ABESTOS ABATEMENT
AA001 ASBESTOS ABATEMENT
CIVIL
CD100 DEMOLITION PLAN
CD101 SITE AND UTILITY PLAN
CD102 GRADING AND DRAINAGE PLAN
CD103A CIVIL DETAILS
CD103B CIVIL DETAILS
CD103C CIVIL DETAILS
ARCHITECTURAL
AD100 SITE DEMOLITION PLAN
AD101 GROUND FLOOR DEMOLITION PLAN
AD102 FIRST FLOOR DEMOLITION PLAN
AS100 NEW GROUND FLOOR PLAN
AS101 NEW FIRST FLOOR PLAN
AS102 NEW ROOF PLAN
AS103 GROUND FLOOR / REFLECTED CEILING PLAN / CEILI NG
EQUIPMENT PLAN
AS104 FIRST FLOOR / REFLECTED CEILING PLAN + /
CEILING EQUIPMENT PLAN
AS105 GROUND FLOOR EQUIPMENT PLAN
AS106 1ST FLOOR EQUIPMENT PLAN
AS200 ELEVATIONS, WALL SECTIONS AND DETAILS
AS300 BUILDING WALL SECTIONS
Section 00 01 15 - Page 2
AS400 STAIR PLANS AND DETAILS
AS401 ACCESSIBLE RAMP PLAN
AS402 ACCESSIBLE RAMP SECTIONS
AS500 WALL SECTIONS AND DETAILS
AS501 WALL SECTIONS AND DETAILS
AS502 WALL SECTIONS AND DETAILS
AS503 WALL SECTIONS AND DETAILS
AS504 WALL TYPES AND DETAILS
AS505 INTERIOR ELEVATIONS
AS506 INTERIOR ELEVATIONS
AS507 INTERIOR ELEVATIONS AND MILLWORK
AS508 MISC. DETAILS
AS600 ROOF DETAILS
AF100 DOOR SCHEDULES
AF200 DETAILS
AF201 PERMANENT ROOM SIGNAGE
IN100 NEW INTERIOR GROUND FLOOR PLAN
IN101 NEW INTERIOR FIRST FLOOR PLAN
IN500 INTERIOR ELEVATIONS
IN600 ROOM FINISH SCHEDULES
IN700 RENDERINGS
STRUCTURAL
SF001 GENERAL NOTES
SF002 GENERAL NOTES
SF101 FOUNDATION AND GROUND FLOOR PLAN
SF102 FIRST FLOOR FRAMING PLAN
SF103 ROOF FRAMING PLAN
SF201 SECTIONS
SF202 SECTIONS
SF203 SECTIONS
SF204 SECTIONS
SF205 SECTIONS
SF301 BRACING ELEVATIONS AND DETAILS
SF302 PARTIAL EXISTING SOUTH ELEVATION
SF501 TYPICAL DETAILS
SF502 TYPICAL DETAILS
Section 00 01 15 - Page 3
MECHANICAL
MH101 MECHANICAL LEGEND, NOTES AND SCHEDULES
MH102 MECHANICAL SCHEDULES AND DETAILS
MH103 MECHANICAL DETAILS
MH201 GROUND FLOOR MECHANICAL PLAN - HVAC
MH202 FIRST FLOOR MECHANICAL PLAN - HVAC
MH203 ROOF MECHANICAL PLAN - HVAC
MH301 GROUND FLOOR MECHANICAL PLAN - HYDRONIC
MH302 FIRST FLOOR MECHANICAL PLAN - HYDRONIC
MH401 MECHANICAL CONTROLS
MH402 MECHANICAL CONTROLS
MH403 MECHANICAL CONTROLS
MH404 MECHANICAL CONTROLS
ELECTRICAL
EI100 ELECTRICAL LEGEND, SCHEDULES, DETAILS AND
DEMOLITION SITE PLAN
EL100 GROUND FLOOR ELECTRICAL PLAN- LIGHTING
EL101 FIRST FLOOR ELECTRICAL PLAN- LIGHTING
EP100 GROUND FLOOR ELECTRICAL PLAN- POWER
EP101 FIRST FLOOR ELECTRICAL PLAN- POWER
EP102 ELECTRICAL BI-PLANE DIAGRAMS AND NOTES
EP103 ELECTRICAL BI-PLANE DIAGRAMS AND NOTES
EP104 ELECTRICAL MONOPLANE DIAGRAMS AND NOTES
EP105 ELECTRICAL MONOPLANE DIAGRAMS AND NOTES
EP106 ROOF ELECTRICAL PLAN - POWER
EP107 LIGHTNING PROTECTION PLAN
EP108 ELECTRICAL DIAGRAMS AND NOTES
EP109 ELECTRICAL RISER DIAGRAMS
EP110 ELECTRICAL PANEL SCHEDULES
EP111 GROUNDING DETAILS
EP112 GROUND FLOOR ELECTRICAL PLANS - RTU CORRIDOR
ES100 GROUND FLOOR ELECTRICAL PLAN -SYSTEMS
ES101 FIRST FLOOR ELECTRICAL PLAN -SYSTEMS
ES102 SYSTEM RISER DIAGRAMS AND NOTES
Section 00 01 15 - Page 4
ES103 TELECOMMUNICATION RISER DIAGRAMS, DETAILS AND
NOTES
ES104 SYSTEM RISER DIAGRAMS, NOTES AND DETAILS
ELECTRICAL SECURITY AND ACCESS CONTROL
ESS100 NEW GROUND FLOOR PLAN
ESS101 NEW FIRST FLOOR PLAN
ESS200 SCHEDULES
ESS201 DETAILS
ESS202 DETAILS
PLUMBING
PL101 PLUMBING LEGEND, SCHEDULES, DETAILS, AND GROUND
FLOOR PLAN DEMO
PL102 PLUMBING GROUND FLOOR PLAN EXISTING BUILDING-
DOMESTIC WATER
PL201 GROUND FLOOR PLAN - SANITARY
PL202 FIRST FLOOR PLAN - SANITARY
PL203 ROOF DRAINAGE PLAN
PL204 PLUMBING SANITARY RISER DIAGRAM
PL301 GROUND FLOOR PLUMBING PLAN – DOMESTIC WATER
PL302 GROUND FLOOR PLUMBING PLAN – DOMESTIC WATER
PL303 PLUMBING DOMESTIC WATER RISER DIAGRAM
MEDICAL GAS
MG101 MEDICAL GAS BASEMENT FLOOR PLAN
MG201 MEDICAL GAS GROUND FLOOR PLAN
MG202 MEDICAL GAS FIRST FLOOR PLAN
FIRE PROTECTION
FA100 FIRE PROTECTION NOTES AND DETAILS
FA200 EXISTING GROUND FLOOR PLAN - FIRE PROTECTION
FA300 GROUND FLOOR PLAN - FIRE PROTECTION
FA400 FIRST FLOOR PLAN - FIRE PROTECTION
Section 00 01 15 - Page 5
MEDICAL EQUIPMENT
REFER TO OWNER PROVIDED REFERENCE MANUFACTURER'S MEDICAL EQUIPMENT DRAWINGS &
INFORMATION INCLUDED HEREIN.
-G.C. TO COORDINATE MANUFACTURER'S EQUIPMENT REQUIREMENTS & RECOMMENDATIONS
W/ ALL DISCIPLINES.
-WHERE THERE IS A CONFLICT BETWEEN THE REFERENCED MANUFACTURER'S DOCUMENTS
AND ANY OTHER DISCIPLINES- CONSULT ARCHITECT FOR DIRECTION.
-THE GC IS RESPONSIBLE FOR THE SCOPE OF THE WORK LISTED IN THE CONTRACT
DOCUMENTS AND IN REFERENCED MANUFACTURER'S EQUIPMENT DOCUMENTS (EVEN IF THEY
ARE IN CONFLICT.)
- - - E N D - - -
Section 01 00 00, General Requirements Page i
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
1.10 RESTORATION
1.11 PHYSICAL DATA
1.12 PROFESSIONAL SURVEYING SERVICES
1.13 LAYOUT OF WORK
1.14 AS-BUILT DRAWINGS
1.15 USE OF ROADWAYS
1.16 NOT USED
1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.18 TEMPORARY USE OF EXISTING ELEVATORS
1.19 TEMPORARY TOILETS
1.20 AVAILABILITY AND USE OF UTILITY SERVICES
1.22 NEW TELEPHONE EQUIPMENT
1.23 TESTS
1.24 INSTRUCTIONS
1.25 GOVERNMENT-FURNISHED PROPERTY
1.26 RELOCATED EQUIPMENT ITEMS
General Requirements Page ii
1.28 CONSTRUCTION SIGN
1.29 SAFETY SIGN
1.30 PHOTOGRAPHIC DOCUMENTATION
1.31 FINAL ELEVATION Digital Images
1.32 HISTORIC PRESERVATION
Appendix A - Approved OSHA Training Providers List
Appendix B - VA Adopted Codes
Appendix C - Facilities Management Service - Alert
Appendix D - Safety and Infection Control Guide
Attachments 1a & 1b - Fire Protection Notifications
Attachment 2 - Notification of Hot Work Operations by Contractor Personnel (Burn Permit)
Attachment 3 - Fire Safety Inspection Checklist for Hot Work Operations Area
Attachment 4 - Construction Fire Safety Check List
Attachments 5a & 5b - Contractor Work Plan & Peer R eview
Attachment 6 - VA Information and Information Syste m Security/Privacy Language
Construction General Requirements Page 1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. CONTRACTOR SHALL COMPLETELY PREPARE SITE FOR BUILDING OPERATIONS,
INCLUDING DEMOLITION AND other items as indicated herein. The
Contractor shall FURNISH all necessary equipment, LABOR, MATERIALS, temporary equipment and items, tools, specialty services, supervision, AND PERFORM WORK FOR RM PROJECT NO. 673-CSI-100, “SPECIALTY TREATMENT
EXPANSION PROJECT” at the James A. Haley Veterans Hospital located in
Tampa, Florida AS REQUIRED BY DRAWINGS AND SPECIFICATIONS.
B. Normal working hours for this contract will be from 7:00AM to
4:30PM (local time) Monday through Friday except for weekends and established Federal Holidays.
C. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.
D. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting
Officer.
E. Offices of TTV ARCHITECTS, INC., as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
F. Before placement and installation of work subject to tests by testing laboratory retained and paid for by Contractor, the Contractor shall notify the COR in sufficient time to enable testing laboratory
Section 01 00 00, Construction General Requirements Page 2 personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than seven (7) calendar days unless otherwise designated by the COR.
G. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. The current version of hospital HPMs and SOPs listed below shall be followed:
• HPM 138-03 Safety and Health During Construction Activities
• HPM 138-04 Lockout – Tagout Program
• HPM 138-15 Interim Life Safety Measures
• HPM 138-23 Utility Shutdown Procedures
• HPM 138-24 Infection Control During Construction And Renovation
• SOP 138d-03 Ceiling, Floor, Wall or Partition Penetration Permit
System
• SOP 138e-02 Fire Sprinkler Valve Supervision Program.
• SOP 138e-10 Hot Work Operations
• SOP 138e-11 Notification of Fire Alarm Impairement
• SOP 138e-17 Smoke Detector Cover Log
H. Prior to commencing work, general contractor shall provide proof that an OSHA certified “competent person” (CP) [(29 CFR 1926.20(b)(2)] will maintain a presence at the work site whenever the general or subcontractors are present.
I. N/A
Construction General Requirements Page 3
J. Training:
(1) Beginning July 31, 2005, all supervisory type personnel/ employees of general contractor and subcontractors shall have the
30-hour OSHA certified Construction Safety course and other relevant competency training, as determined by VA CP with input from the ICRA team.
(2) Beginning July 31, 2005, all non-supervisory type personnel/ employees of general contractor and subcontractors shall have the
10-hour OSHA certified Construction Safety Course and other relevant competency training, as determined by VA CP with input from the ICRA team.
(3) Submit copies of certificates and training records for all such personnel and employees that may be and/or will be on the work site(s) to the COTR and Contracting Officer for approval before the start of any work on-site.
K. Related Work: This specification section applies to ALL Divisions (0 through 34) of work under ALL other specification sections. A partial list of Codes and Standards adopted by the Department of Veterans Affairs is attached in Appendix B.
I. Normal Operation / Construction Hours: Construction operations at the James A. Haley VA Hospital are 7:30 AM to 4:30 PM, Monday through Friday, with the exception of Federal Holidays. Requests to work beyond normal work hours shall be submitted in writing to the COR for approval and will include a description of work to be performed. Approval is subject to availability of the COR, type of work to be performed, and the specific hours requested.
Contractors are reminded that patients are generally asleep after 10:00 PM.
Approval to work beyond this time will also include an evaluation of the anticipated noise level generated by the contractor. Under no circumstances will the contractor proceed without express, written approval of the COR
Section 01 00 00, Construction General Requirements Page 4
1.3 STATEMENT OF BID ITEM(S)
ITEM I, General Construction: Provide all necessary equipment, labor, materials , specialt y services , supervision , an d tool s t o complet e N RM
Projec t No . 673-CSI-100 , “SPECIALT Y TREATMENT EXPANSION PROJECT”. Work include s architectural , mechanical , electrical , plumbin g an d interior designs and certain other items of work required by the drawings and specifications. All work is to be completed in 550 calendar days after receipt of the Notice to Proceed.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
Construction General Requirements Page 5
3. The General Contractor shall furnish to the COR and Contracting
Officer lists of employees that will be or may be o n the construction site(s). The List shall be on Company letter head that provides all of the company contact information, shall provide the project number and title, locations of work, names of the employees, t heir titles, their job types, and personal contact numbers (i.e. cell phone). All sub-contractors, vendors and suppliers for the project shall furnish the same listing on their individual company letter hea ds to the GC whom will provide the lists to the COR and Contracting O fficer. These lists shall be updated as necessary during the entire dur ation of the project. These lists may be used to provide a chec k list record of personnel on-site each day to be provided with the contractors Daily
Log reports. These lists may be used to provide a check list record of personnel on-site each day to be provided to the VA Police Department and their Dispatch Office where normal sign in and sign out occurs.
4. The General Contractor shall provide 2 ea Kaba Eplex E5731BWL-626- 41, Electronic Pushbutton - Prox - Lock, IC “7 Pin O Bitted” BEST CORE.
To be installed on the jobsite access doors. Locks are to be turned over to the COR upon completion of the project.
B. Security Procedures:
1. General Contractor’s employees shall not enter t he project site without appropriate badge.(See hospital HPM 132-05) They may also be subject to inspection of their personal effects when entering or leaving the project site..
2. For working outside the “regular hours” as defin ed in the contract, the General Contractor shall provide a request for approval 21 calendar days prior to the requested date to the Co ntracting Officer
Representative so that security escort arrangements can be provided for the employees. This notice is separate from an y notices required for utility shutdown described later in th is section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
Construction General Requirements Page 6
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the pr emises in the event of a national emergency. The General Contrac tor may return to the site only with the written approval of the Cont racting Officer.
C. N/A
D. Key Control:
1. THE GENERAL CONTRACTOR SHALL make available AS requested keys and lock combinations to the Contracting officers repre sentative (COR) for the purpose of security inspections of every ar ea of project including tool boxes and parked machines and take a ny emergency action.
2. The General Contractor shall turn over all perma nent lock cylinders to the COR for permanent installation. See Section 08 71 00, DOOR
HARDWARE and coordinate.
3. Contractor may be issued keys for construction t hru the COR as required.
4. All keys must be turned in at the end of the Con tract.
5. Any key assigned to the contractor, which is los t or stolen will result in a replacement cost of $100.00 per key eit her lost or stolen. Any key either lost or stolen shall be rep orted to the COR;
it is the contractor’s responsibility to inform the VA Police and give a detailed report about the key loss. The con tractor shall take a copy of the official police report and make payment to the
Agent Cashier before any additional replacement key s are made.
Final payment may be withheld and/or reduced until keys are returned or accounted for. A copy of the police report and receipt of payment shall be provided to the VA COR.
E. Document Control:
1. Before starting any work, the General Contractor /Sub Contractors shall submit an electronic security memorandum desc ribing the approach to following goals and maintaining confide ntiality of
“sensitive information”.
Construction General Requirements Page 7
2. The General Contractor is responsible for safeke eping of all drawings, project manual and other project informat ion. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photograp hs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Re turn the information to the Contracting Officer upon request .
4. These security documents shall not be removed or transmitted from the project site without the written approval of Co ntracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Off icer immediately when there is a loss or compromise of “sensitive in formation”.
7. All electronic information shall be stored in sp ecified location following VA standards and procedures using an Engi neering Document
Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and track ed through the
EDMS system.
b. “Sensitive information” including drawings and o ther documents may be attached to e-mail provided all VA encryptio n procedures are followed.
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitt ed at least 24 hours before the date and time of access. Access sh all be restricted to picking up and dropping off materials and suppli es.3. Contractor parking is allowed on the 6 th floor of the parking garage or in the
Freedom lot (location subject to change at any time during contract).
Construction General Requirements Page 8
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (inc luding storage of materials) on Government premises to areas authoriz ed or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harml ess from liability of any nature occasioned by the Contractor's perfor mance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the appr oval of the
Contracting Officer and shall be built with labor a nd materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor a t its expense upon completion of the work. With the written consent of the Contracting
Officer, the buildings and utilities may be abandon ed and need not be removed.
C. The Contractor shall, under regulations prescrib ed by the Contracting
Officer, use only established roadways, or use temp orary roadways constructed by the Contractor when and as authorize d by the Contracting
Officer. When materials are transported in prosecut ing the work, vehicles shall not be loaded beyond the loading cap acity recommended by the manufacturer of the vehicle or prescribed by an y Federal, State, or local law or regulation. When it is necessary to cr oss curbs or sidewalks, the Contractor shall protect them from d amage. The
Contractor shall repair or pay for the repair of an y damaged curbs, sidewalks, or roads.
(FAR 52.236-10)
D. Working space and space available for storing ma terials shall be as determined by the COR . The contractor shall keep a ll work areas, storage areas, staging areas, access areas and rout es clean and neat.
The contractor shall provide sufficient trash conta iners so that there is no debris lying around. The containers shall be emptied at least daily and trash disposed of by the contractor.
E. Workmen are subject to rules of Medical Center applicable to their conduct. Execute work in such a manner as to interf ere as little as possible with work being done by others. Keep roads clear of
Construction General Requirements Page 9 construction materials, debris, standing constructi on equipment and vehicles at all times.
F. Execute work so as to interfere as little as pos sible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any e xisting equipment, and with work being done by others. Use of equipmen t and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during co nstruction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other th an assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not m ore than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vaca ted portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and saf ety requirements.
F*. Utilities Services: Where necessary to cut exis ting pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (excep t telephone), they shall be cut and capped at suitable places where sh own; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involve d:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the c onstruction project, for such items as water, sewer, electricit y, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
G. Phasing:
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses i n operation occur.
Construction General Requirements Page 10
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim lif e safety measure to be used during the work, and a schedule defining th e duration of the work with milestone subtasks. The work to be outli ned shall include, but not be limited to:
To insure such executions, Contractor shall furnis h the COR with a schedule of approximate dates on which the Contract or intends to accomplish work in each specific area of site, buil ding or portion thereof. In addition, Contractor shall notify the C OR twenty-one (21) calendar days in advance of the proposed date of st arting work in each specific area of site, building or portion thereof. Arrange such dates to insure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR, and Cont ractor.
All work, such as corridor work, which is outside t he main construction area, shall be done on evenings or weekends, so as not to disrupt the normal operations of the facility.
The contractor shall have all submittals completed and turned in to the Government for review no later than thirty (30) cal endar days from the date of the signed Notice to Proceed. The government wi ll return submittals within twenty-one (21) calendar days from acceptanc e from the contractor. No work shall be started until all related submittals are approved. All materials shall be approved by the Government prior to delivery to the job site and start of work.
No work shall start until the preconstruction surve y and inspection is completed.
The contractor shall provide a detailed asbestos ab atement schedule, if asbestos abatement is required by the project scope .
H. Building(s) No.(s) 1 will be occupied during per formance of work;
but immediate areas of alterations will be vacated.
Contractor shall take all measures and provide all material necessary for protecting existing equipment and pro perty in affected areas of construction against dust and debris, so t hat equipment and affected areas to be used in the Medical Centers op erations will not be hindered. Contractor shall permit access to Depa rtment of
Veterans Affairs personnel and patients through oth er construction areas which serve as routes of access to such affec ted areas and
Construction General Requirements Page 11 equipment. These routes whether access or egress s hall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and s taff access.
Coordinate alteration work in areas occupied by Dep artment of
Veterans Affairs so that Medical Center operations will continue during the construction period.
2. Immediate areas of alterations not mentioned in preceding
Subparagraph 1 will be temporarily vacated while al terations are performed.
I. Construction Fence: Before construction operatio ns begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indica ted on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fenc e fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches).
Bottom of fences shall extend to 25mm (one inch) ab ove grade. Remove the fence when directed by COR.
J. When a building and/or construction site is turn ed over to Contractor, Contractor shall accept entire responsibility inclu ding upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specif ied.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for p re-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
K. Utilities Services: Maintain existing utility se rvices for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uni nterrupted services.
Where necessary to cut existing water, steam, gases , sewer or air
Construction General Requirements Page 12 pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (incl uding telephone), they shall be cut and capped at suitable places whe re shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, se wers or electricity, or fire protection systems and communications syste ms may be interrupted without prior approval of, COR, or [Chi ef
Engineer][Chief of Facilities Management]. Electric al work shall be accomplished with all affected circuits or equipmen t de-energized.
When an electrical outage cannot be accomplished, w ork on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s p rior knowledge and written approval. Refer to specification Sectio ns 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON W ORK RESULTS FOR
ELECTRONIC SAFETY AND SECURITY for additional requi rements.
2. Contractor shall submit a request to interrupt a ny such services to
COR , in writing, 21 calendar days in advance of pr oposed interruption. Request shall state reason, date, exa ct time of, and approximate duration of such interruption. Refer t o Attachment 5A.
3. Contractor will be advised (in writing) of appro val of request, or of which other date and/or time such interruption w ill cause least inconvenience to operations of Medical Center. Inte rruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions (deemed by the COR) of any s ystem must be requested, in writing, at least 30 calendar days pr ior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, se rvice will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical. On the next business day, the contractor’s daily log report shall explain the cir cumstances causing the emergency and the corrective actions ta ken.
Construction General Requirements Page 13
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the c onstruction project, for such items as water, sewer, electricit y, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
L. Abandoned Lines: All service lines such as wires , cables, conduits, ducts, pipes and the like, and their hangers or sup ports, which are to be abandoned but are not required to be entirely re moved, shall be sealed, capped or plugged at the main, branch or pa nel they originate from. The lines shall not be capped in finished are as, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or par titions; so that they are completely behind the finished surfaces un less otherwise directed by the COR.
M. To minimize interference of construction activit ies with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to p arking and to occupied areas of buildings clear of construction m aterials, debris and standing construction equipment and vehicles. W herever excavation for new utility lines cross existing roa ds, at least one lane must be open to traffic at all times with appr oval.
2. Method and scheduling of required cutting, alter ing and removal of existing roads, walks and entrances must be approve d by the COR.
3. Interruptions to these areas must be requested, in writing, at least twenty-one (21) calendar days prior to the desired time and shall be performed as directed by the COR.
N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the sc heduling of traffic and the use of roadways, as specified in Article, U SE OF ROADWAYS.
O. Coordination of Construction with Medical center Director: The activities at the Medical Center shall take precede nce over construction activities. The Contractor must cooper ate and coordinate with the Medical Center Director, through the COR, in arranging
Construction General Requirements Page 14 construction schedule to cause the least possible i nterference with
Medical Center activities. Construction noise durin g the interment services shall not disturb the service. Trucks and workmen shall not pass through the service area during this period:
1. The Contractor is required to discontinue his wo rk sufficiently in advance of Easter Sunday, Mother's Day, Father's Da y, Memorial Day, Veteran's Day and/or Federal holidays, to permit hi m to clean up all areas of operation adjacent to existing burial plot s before these dates.
2. Cleaning up shall include the removal of all equ ipment, tools, materials and debris and leaving the areas in a cle an, neat condition.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contract or shall make a thorough survey with the COR of areas of buildings in which alterations occur and areas which are anticipated routes of acc ess, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient floori ng, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building
2. Existence and conditions of items such as plumbi ng fixtures and accessories, electrical fixtures, equipment, veneti an blinds, shades, etc., required by drawings to be either reu sed or relocated, or both.
3. Shall note any discrepancies between drawings an d existing conditions at site.
4. Shall designate areas for working space, materia ls storage and routes of access to areas within buildings where al terations occur and which have been agreed upon by Contractor and C OR.
B. Any items required by drawings to be either reus ed or relocated or both, found during this survey to be nonexistent, o r in opinion of COR, to be in such condition that their use is impossibl e or impractical, Construction General Requirements Page 15 shall be furnished and/or replaced by Contractor wi th new items in accordance with specifications which will be furnis hed by Government.
Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under pr ovisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR
52.243-4 and VAAR 852.236-88).
C. Re-Survey: Thirty days before expected partial o r final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furn ish a report on conditions then existing, of resilient flooring, do ors, windows, walls and other surfaces as compared with conditions of s ame as noted in first condition survey report:
1. Re-survey report shall also list any damage caus ed by Contractor to such flooring and other surfaces, despite protectio n measures; and, will form basis for determining extent of repair wo rk required of
Contractor to restore damage caused by Contractor's workmen in executing work of this contract.
D. Protection: Provide the following protective mea sures:
1. Wherever existing roof surfaces are disturbed th ey shall be protected against water infiltration. In case of le aks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, ma terials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protecti on shall be maintained intact until all work in the area is com pleted.
4. Once the contractor is notified by the VA of pro blems or damage to
VA property, the contractor shall take immediate co rrective action to protect and restore said property. During norma l duty hours, corrective action shall be initiated within two (2) hours. After normal duty hours, corrective actions shall be init iated within four
Construction General Requirements Page 16
(4) hours. The daily log for that day shall explai n the problem(s) and corrective action(s) taken.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work remov ed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows and/or in accordance with Section 01 74 19, CONSTRU CTION WASTE MANAGEMENT:
1. Reserved items which are to remain property of t he Government are identified by attached tags, or, noted on drawings or in specifications as items to be stored. Items that re main property of the Government shall be removed or dislodged from p resent locations in such a manner as to prevent damage which would b e detrimental to re-installation and reuse. Store such items where d irected by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings loca ted in rooms and spaces in which work is to be done under this contr act shall remain the property of the Government. When rooms and spac es are vacated by the Department of Veterans Affairs during the alter ation period, such items which are NOT required by drawings and s pecifications to be either relocated or reused will be removed by th e Government in advance of work to avoid interfering with Contracto r's operation.
4. During above ceiling work, the contractor will h ave to clear rooms, protect VA property/finishes and move furnishings a s necessary to protect the area and items from dust and debris, in the performance of the work above the ceiling.
5. PCB Transformers and Capacitors: The Contractor shall be responsible for disposal of the Polychlorinated Biphenyl (PCB) transformers and capacitors. The transformers and capacitors shall be taken out of service and handled in accordance with the procedur es of the
Environmental Protection Agency (EPA) and the Depar tment of
Transportation (DOT) as outlined in Code of Federal Regulation
(CFR), Titled 40 and 49 respectively. The EPA's Tox ic Substance
Control Act (TSCA) Compliance Program Policy Nos. 6 -PCB-6 and 6-PCB-
Construction General Requirements Page 17
7 also apply. Upon removal of PCB transformers and capacitors for disposal, the "originator" copy of the Uniform Haza rdous Waste
Manifest (EPA Form 8700-22), along with the Uniform Hazardous Waste
Manifest Continuation Sheet (EPA Form 8700-22A) sha ll be returned to the Contracting Officer who will annotate the contr act file and transmit the Manifest to the Medical Center's Chief & COR.
a. Copies of the following listed CFR titles may be obtained from the Government Printing Office:
40 CFR 261........Identification and Listing of Haz ardous Waste
40 CFR 262........Standards Applicable to Generator s of Hazardous
Waste
40 CFR 263........Standards Applicable to Transport ers of
Hazardous Waste
40 CFR 761........PCB Manufacturing, Processing, Di stribution in
Commerce, and use Prohibitions
49 CFR 172........Hazardous Material tables and Haz ardous
Material Communications Regulations
49 CFR 173........Shippers - General Requirements f or Shipments and Packaging
49 CRR 173........Subpart A General
49 CFR 173........Subpart B Preparation of Hazardou s Material for
Transportation
49 CFR 173........Subpart J Other Regulated Materia l; Definitions and Preparation
TSCA..............Compliance Program Policy Nos. 6- PCB-6 and 6-
PCB-7
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
A. The Contractor shall preserve and protect all st ructures, equipment, and vegetation (such as trees, shrubs, and grass) o n or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contrac t. The Contractor
Construction General Requirements Page 18 shall only remove trees when specifically authorize d to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract per formance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and p aint the cut with a tree-pruning compound as directed by the Contractin g Officer
Representative.
B. The Contractor shall protect from damage all exi sting improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any dam age to those facilities, including those that are the property o f a third party, resulting from failure to comply with the requireme nts of this contract or failure to exercise reasonable care in performin g the work. If the
Contractor fails or refuses to repair the damage pr omptly, the
Contracting Officer may have the necessary work per formed and charge the cost to the Contractor.
(FAR 52.236-9)
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENT AL CONTROLS, for additional requirements on protecting vegetation, s oils and the environment. Refer to Articles, "Alterations", "Res toration", and
"Operations and Storage Areas" for additional instr uctions concerning repair of damage to structures and site improvement s.
D. Refer to FAR clause 52.236-7, "Permits and Respo nsibilities," which is included in General Conditions. A National Pollutan t Discharge
Elimination System (NPDES) permit is required for t his project. The
Contractor is considered an "operator" under the pe rmit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the ( appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and ce rtifications that are required to comply with the permit process and permit requirements.
Many of the permit requirements will be satisfied b y completing
Construction General Requirements Page 19 construction as shown and specified. Some requireme nts involve the
Contractor's method of operations and operations pl anning and the
Contractor is responsible for employing best manage ment practices. The affected activities often include, but are not limi ted to the following:
- Designating areas for equipment maintenance and r epair;
- Providing waste receptacles at convenient locatio ns and provide regular collection of wastes;
- Locating equipment wash down areas on site, and p rovide appropriate control of wash-waters;
- Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and
- Providing adequately maintained sanitary faciliti es.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair ex isting work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, an d do not disturb any ducts, plumbing, steam, gas, or electric work witho ut approval of the
COR. Existing work to be altered or extended and th at is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restor ing work, shall conform in type and quality to that of original exi sting construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work comple te and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work , shall be patched, repaired, reinstalled, or replaced with new work, a nd refinished and left in as good condition as existed before commenc ing work.
C. At Contractor's own expense, Contractor shall im mediately restore to service and repair any damage caused by Contractor' s workmen to existing piping and conduits, wires, cables, etc., of utility services
Construction General Requirements Page 20 or of fire protection systems and communications sy stems (including telephone) which are not scheduled for discontinuan ce or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered b y adjustment to contract time and price in accordance with clause e ntitled "CHANGES"
(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING S ITE CONDITIONS" (FAR
52.236-2).
1.11 PHYSICAL DATA
A. Data and information furnished or referred to be low is for the
Contractor's…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .