This document is a set of specifications for a federal construction contract opportunity to rehabilitate the Easton Building located at 15 State Street in Boston, Massachusetts. The key work includes replacing the existing steam heating system with a new hot water system, replacing the emergency generator, replacing fluorescent lighting fixtures with LED fixtures, and restoring the granite-clad facades. The exterior restoration work also involves repairs to steel framing and columns, window restoration, and replacing the sidewalk along Devonshire Street. The specifications provide requirements for submittals, schedules, meetings, hazardous materials handling, and separate contract line items for each scope of work. The solicitation number is 140P2021R0067 and was issued by the National Park Service for the work at the Boston National Historical Park.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Boston National Historical Park
SOLICITATION #140P2021R0067
Rehabilitate Easton Building
BOST 220968 – EXTERIOR RESTORATION
BOST 249576 – HEAT DISTRIBUTION/HEAT GENERATION
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
CD SUBMISSION
6/18/2021
BOST 220968 - 249576 TOC-1
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 26 01 Contract Modification Procedures 01 27 00 Definition of Contract Line Items 01 31 00 Project Management & Coordination 01 32 16 Construction Schedule 01 32 33 Photographic Documentation 01 33 23 Submittal Procedures 01 35 23 Safety Requirements 01 35 91 Historic Preservation Treatment Procedures 01 40 00 Quality Requirements 01 42 00 Reference Standards 01 50 00 Temporary Facilities and Controls 01 57 19.11 Indoor Air Quality Management 01 57 19.12 Noise & Acoustics Management 01 67 00 Product Requirements 01 73 29 Cutting and Patching 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 79 00 Demonstration and Training 01 91 14 Total Building Commissioning
DIVISION 02 – EXISTING CONDITIONS
02 08 00 Asbestos Abatement and Related Work 02 41 19 Selective Demolition 02 83 00 Lead-Based Paint Removal
DIVISION 03 - CONCRETE
03 30 00 Cast-in-Place Concrete
DIVISION 04 – MASONRY
04 20 00 Unit Masonry 04 25 00 Masonry Repair and Cleaning
DIVISION 05 - METALS
05 12 00 Structural Steel 05 31 00 Steel Decking 05 50 00 Metal Fabrications
BOST 220968 - 249576 TOC-2
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 53 Miscellaneous Rough Carpentry
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 10 00 Fluid-applied Reinforced Membrane Waterproofing 07 62 00 Sheet Metal Flashing and Trim 07 81 00 Applied Fireproofing 07 84 13 Penetration Firestopping 07 92 00 Joint Sealants
DIVISION 08 - OPENINGS
080352 Historic Treatment of Wood Windows 08 31 13 Access Doors and Frames
DIVISION 09 - FINISHES
09 01 90.52 Maintenance Repainting 09 22 16 Non-Structural Metal Framing 09 29 00 Gypsum Board 09 51 13 Acoustical Panel Ceilings 09 65 13 Resilient Base and Accessories 09 91 12 Painting
DIVISION 18 – CATHODIC PROTECTION
18 01 00 Cathodic Protection 18 05 00 Masonry – Cathodic Protection 18 05 50 Electrical – Cathodic Protection
DIVISION 22 – PLUMBING
220523.12 Ball Valves for Plumbing Piping
220529 Hangers and Supports for Plumbing Piping and Equipment 220553 Identification for Plumbing Piping and Equipment 220719 Plumbing Piping Insulation 221116 Domestic Water Piping 221119 Domestic Water Piping Specialties 221413 Facility Storm Drainage Piping 221423 Storm Drainage Piping Specialties
DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING
23 05 13 Common Motor Requirements for HVAC Equipment 23 05 16 Expansion Fittings and Loops for HVAC Piping 23 05 17 Sleeves and Sleeve Seals for HVAC Piping 23 05 18 Escutcheons for HVAC Piping 23 05 19 Meters and Gages for HVAC Piping 23 05 23.11 Globe Valves for HVAC Piping
BOST 220968 - 249576 TOC-3
23 05 23.12 Ball Valves for HVAC Piping 23 05 23.13 Butterfly Valves for HVAC Piping 23 05 23.14 Check Valves for HVAC Piping 23 05 23.15 Gate Valves for HVAC Piping 23 05 29 Hangers and Supports for HVAC Piping and Equipment 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting and Balancing for HVAC 23 07 13 Duct Insulation 23 07 16 HVAC Equipment Insulation 23 07 19 HVAC Piping Insulation 23 08 00 Commissioning of HVAC 23 09 00 Direct Digital Control (DDC) System for HVAC 23 11 13 Facility Fuel – Oil Piping 23 21 13 Hydronic Piping 23 21 16 Hydronic Piping Specialties 23 21 23 Hydronic Pumps 23 22 13 Steam and Condensate Heating Piping 23 22 16 Steam and Condensate Heating Piping Specialties 23 23 00 Refrigerant Piping 23 25 00 HVAC Water Treatment 23 31 13 Metal Ducts 23 33 00 Air Duct Accessories 23 34 23 HVAC Fans 23 37 13.23 Air Registers and Grilles 23 57 00 Heat Exchangers for HVAC 23 62 00 Packaged Compressor and Condenser Units 23 73 13.13 Indoor, Basic Air-Handling Units 23 82 36 Finned-Tube Radiation Heaters
DIVISION 26 - ELECTRICAL
26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 20 Cathodic Protection Low-Voltage Electrical Power Conductors 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33 Raceways and Boxes for Electrical Systems 26 05 34 Cathodic Protection Raceways and Boxes 26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 26 05 53 Identification for Electrical Systems 26 08 00 Commissioning of Electrical Systems 26 09 23 Lighting Control Devices 26 24 16 Panelboards 26 27 26 Wiring Devices 26 28 13 Fuses 26 28 16 Enclosed Switches and Circuit Breakers 26 32 13.14 Diesel Engine Generators 26 36 00 Transfer Switches 26 51 19 LED Interior Lighting
BOST 249576 - 220968 011100 - 1
SUMMARY OF WORK
SECTION 01 11 00 – SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Work covered by the Contract Documents.
2. Work phases.
3. Work under other contracts.
4. Contractor use of premises.
5. Occupancy requirements for buildings.
6. Work Restrictions.
7. Special Construction Requirements.
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: 15 State Street, Boston, MA 02109.
B. The Work consists of the following:
1. Scope A – Interior - consists of the following:
a. Replacement of existing steam heating system with new hot water system provided by steam to hot water exchangers, including the following:
1) Preparation of construction work zone along exterior walls at all floor levels, including temporary relocation of furniture and stored materials.
2) Removal and replacement of existing vertical heating pipe enclosures at exterior walls, which include both plaster on masonry and gypsum wallboard on metal stud assemblies.
3) Demolition of all components of the existing steam heating system, including steam piping systems throughout the basement and distribution piping, radiators and controls on all upper floor levels.
4) New heating system equipment in the basement, including heat exchangers, pumps and control systems.
5) New steel grating walkway adjacent to new equipment in basement.
6) New hot water (HW) distribution piping, radiators and direct digital controls
(DDC) on all upper floor levels.
7) Note that this scope of work will include removal of hazardous materials, including asbestos containing pipe insulation, plaster, and joint compounds.
Refer to specification Section 020800 – Asbestos Abatement and Related Work.
b. Replacement of existing emergency generator, including the following:
1) Demolition of existing emergency generator and related systems in basement.
2) New emergency generator (disassembled into components and reassembled in place to accommodate loading into the basement through sidewalk access opening) and associated equipment, including new automatic transfer switch.
BOST 249576 - 220968 011100 - 2
3) New fire rated, double wall diesel fuel tank and associated fuel piping.
4) New generator exhaust with muffler installed above emergency generator room and with new penetration into existing steel-lined masonry stack assembly.
5) New remote generator radiator on building roof, with refrigerant lines extended through the third floor airshaft roof and attached the brick airshaft wall.
6) New split system air conditioning unit, and supply and exhaust fans serving the emergency generator room.
c. Replacement of existing fluorescent lighting fixtures with LED fixtures on seven floor levels, including associated exit signs.
2. Scope B – Exterior – consists of the following:
a. Restoration of granite-clad facades, including the following:
1) Removal of approximately 60% of granite cladding stones, with restoration including both reinstallation of sound existing stone and some replacement with matching new material.
2) Repair of steel backup masonry and steel framing system, including replacement of anchors and loose lintels.
3) New impressed electrical cathodic protection system over entire façade area, including associated power support systems in building interior locations.
4) 100% repointing of all mortar joints.
5) Final cleaning of all masonry façade surfaces.
b. Repairs to deteriorated steel columns and beams at base of State Street façade (in basement)
1) Removal of existing masonry partitions and column fire proofing and metal framed gypsum wallboard ceiling systems as required for access to survey and repair steel framing.
2) Repairs to reconstruct partitions and ceilings, including new metal framed gypsum wallboard partitions, concrete floor topping.
c. Window restoration work including removal and replacement of perimeter sealants, repair of deteriorated sections, repainting of all exterior wood window sash and frames.
1) Note that this work involves removal of hazardous materials, including asbestos containing window sealants and lead containing paint. Refer to specification sections 020800 – Asbestos Abatement and Related Work and 028300 – Lead-Based Paint Removal.
d. Replacement of sidewalk along Devonshire Street, including replacement of the steel support structure over the basement vault.
C. Project will be constructed under a single prime contract.
1.3 WORK PHASES
A. The Work shall be conducted in a single phase, but coordination of the specific scope of work items will be subject to schedule and phasing as proposed by the Contractor and approved by the Contracting Officer.
1. The heating system replacement work is expected to be conducted when the heating system is normally shut down, from May through September, to avoid the need for temporary heating. All interior scope of work items (heating system replacement, emergency
BOST 249576 - 220968 011100 - 3
generator system replacement, lighting fixture replacement) are expected to be completed in a single season/year, so that NPS may re-occupy the building even if the exterior work is extended over two seasons/years.
2. The Devonshire Street sidewalk replacement scope must be timed to coordinate with the remaining project scope.
a. The existing deteriorated sidewalk structure cannot support scaffolding needed for the Devonshire Street façade restoration scope. Temporary shoring to the basement floor slab will be required if scaffolding is erected along this façade before the sidewalk structure is replaced.
b. The replacement sidewalk structure is designed to include a removable section that can be used for loading equipment into the basement. It should be noted that this removable section is in front of the Devonshire Street building entrance, so use of the opening will have to be coordinated with use of the entrance door.
3. The exterior façade restoration work is expected to be conducted between May and September to avoid requirements for enclosing the scaffolding and providing temporary heat. At the Contractor’s option, this work may be planned so as to complete work on both facades in a single season, or it may be phased over two seasons with one façade completed each year.
1.4 CONTRACTOR USE OF SITE
A. General: Contractor shall have full use of the building for construction operations, except the area on the second floor and State Street building entrance, which are reserved for government use, as indicated on drawing L1.
B. Storage of Materials: Construction material storage and staging areas in the building are designated on the first and second floors as indicated.
C. Driveways and Entrances: The construction site is located in downtown Boston on the corner of Devonshire Street and State Street (pedestrian passage), which is an area with very high pedestrian and vehicular traffic.
1. Construction access shall be limited to the first floor entrance and loading door on Devonshire Street.
2. Schedule deliveries to minimize use of disruptions to traffic on Devonshire Street.
3. Schedule deliveries to minimize space and time requirements for storage of materials and equipment in the building.
D. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials.
1.5 BUILDING OCCUPANCY
A. The building will be primarily vacant during the construction period except for the second floor, which will be occupied by the Government as indicated on Drawing L-1. The Contractor shall permit
BOST 249576 - 220968 011100 - 4
limited access to stored materials on upper floor levels by Government personnel, if visits are pre-scheduled and personnel are escorted by the Construction Management Representative (CMR).
1.6 CONDUCT OF OPERATIONS
A. At all times the Contractor shall conduct operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer. Submit requests 24 hours in advance of the work to the Contracting Officer for approval.
C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
1.7 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be performed during normal business working hours of 7:30 a.m.
to 4:00 p.m., Monday through Friday, except as follows:
1. Weekend Hours: as approved by Contracting Officer.
2. Early Morning Hours: as approved by Contracting Officer.
B. Existing Utilities
1. Contractor shall be responsible for locating and preventing damage to known utility systems in the building or within the exterior construction limits. If damage occurs, repair utility at no additional expense to the Government.
2. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Differing Site Conditions clause of the contract.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Contracting Officer not less than two days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Contracting Officer’s written permission.
3. Utility interruptions shall be limited to 4 hours maximum, unless approved in writing by
Contracting Officer.
D. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes.
1.8 SPECIAL CONSTRUCTION REQUIREMENTS
A. Project Website: A project website administered by the NPS will be used for purposes of managing communication and documents during the construction stage.
BOST 249576 - 220968 011100 - 5
1. See Section 01 31 00 “Project Management and Coordination” for requirements on using the Project Website.
B. Hazardous Materials: The work of this project will include handling, removal and disposal of existing building finish materials that have been determined to contain asbestos and lead. Refer to specification sections 020800-Asbestos Abatement and Related Work and 028300-Lead-Based Paint Removal for requirements.
1. A survey of hazardous materials in the building is included at the end of section 020800 – Asbestos Abatement and Related Work: Hazmat Survey, National Park Service, 15 State St., prepared by Environmental Health Inc., Dover, MA, 05/04/2021.
PART 2 – PRODUCTS (Not Used)
PART 3 – EXECUTION (Not Used)
END OF SECTION 01 1100
BOST 249576 - 220968 012601 - 1
CONTRACT MODIFICATION PROCEDURES
SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. The work of this section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with modifications
8. Estimating and preconstruction services
9. Mortgage costs
10. Real estate and corporate taxes
11. Automobile maintenance and travel costs for home office personnel
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets
14. Home office supplies (paper, staples, etc.)
15. Legal services
16. Accounting and data processing
17. Professional fees/registration
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
1. Project Manager, Assistant Project Manager
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
BOST 249576 - 220968 012601 - 2
6. Scheduling
7. Field Office Trailers and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles (i.e., Superintendent pickup trucks)
C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary heating and power
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40 hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: This is the hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums , such as:
1) Social Security
2) Medicare
3) Workers Compensation– Policy and company calculation to be made available.
4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.
5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.
BOST 249576 - 220968 012601 - 3
6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums
2) Cell Phone
3) Clothing
4) 401K and Pensions
5) Vehicle allowances
6) Gas allowance
7) Life insurance premiums
8) Disability insurance
9) Other Fringe Benefits required under an enforceable collective bargaining agreement
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.
H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.
2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement.
Contractor may utilize the government provided Contractor Estimate Form, or their http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank http://www.nps.gov/dscw/publicforms.htm#ct
BOST 249576 - 220968 012601 - 4
own form, provided that it contains the same information and level of detail as the Gov’t provided form.
3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter.
Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.
4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.
5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.
6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.
B. Labor:
1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work.
Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.
2. Itemize labor costs for equipment operators separate from equipment costs.
3. The labor cost for foremen shall only be costs for related work required for the modification.
C. Materials:
1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.
2. No markup shall be applied to any material provided by the NPS.
D. Equipment:
1. Equipment used for the project must be appropriately sized for the work being performed.
2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.
3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:
a. U.S. Army Corps of Engineers , Ownership and Operating Expense Schedule (use latest edition and applicable region)
b. Construction Blue Book
BOST 249576 - 220968 012601 - 5
c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.
4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals.
Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.
5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.
6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.
7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.
8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.
9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.
10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.
E. Establishment and Application of Overhead and Profit Percentages:
1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.
Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:
Overhead………………10% Profit………………4.70%
2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.
3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.
4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.
5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.
BOST 249576 - 220968 012601 - 6
PART 2 - PRODUCTS
PART 3 - EXECUTION
END OF SECTION 012601
BOST 249576 - 220968 01 27 00 - 1
DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of the work, include the costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line Item No. 001 – Restore Easton Building Facades
1. This item consists of the following:
a. Restoration of stone cladding on north and east facades, including removal and replacement of indicated granite stones to repair steel framing and backup masonry.
b. Repair of steel framing and columns at basement level of north exterior wall, including demolition and repair of existing basement construction to provide access to steel framing.
c. Installation of impressed cathodic protection system on entire north and east facades.
d. Repair, preparation and repainting of all windows on the north and east facades, including replacement of perimeter sealant.
e. Repointing of all mortar joints on the north and east facades.
f. Cleaning of all stone surfaces on the north and east facades.
g. Removal and replacement of existing sidewalk along Devonshire Street, including new steel support framing and double concrete slab system with intermediate waterproofing.
2. No separate measurement.
3. Payment will be made at the contract lump sum price.
B. Contract Line Item No. 002 – Replace Heating System and Emergency Generator
1. This item consists of the following:
a. Replacement of the existing building steam heating system with a hot water heating system. The scope includes the following:
1) two new steam to hot water head exchangers in the basement mechanical room, including associated pumps and controls.
BOST 249576 - 220968 01 27 00 - 2
2) Removal of existing radiators and steam distribution piping throughout the building, including demolition of existing plaster and gypsum board piping enclosures (plaster and pipe insulation contains asbestos and demolition must be conducted according to hazardous materials removal regulations). New radiators, distribution piping and piping enclosures throughout the building.
3) Temporary relocation of existing furniture and stored materials from the exterior wall construction zones.
b. New emergency generator to replace existing, including the following:
1) new ATS and associated electrical system modifications.
2) New ventilation and air conditioning systems serving the generator room.
3) New diesel fuel tank and associated piping.
C. Contract Line Item No. 003 – Replace Deteriorated Roof Drains and Piping
1. This item consists of replacing existing roof drains along with selected drainage piping.
2. No separate measurement.
3. Payment will be made at the contract lump sum price.
D. Contract Line Item No. 004 – Column Web Repair
1. This item consists of repairs to deteriorated existing built-up steel column webs, per Detail 1/Drawing S3.1 (Detail 1).
2. Measurement for payment will be by length of new welded channels.
3. Payment will be made by price per linear foot.
E. Contract Line Item No. 005 – Column Flange Repair
1. This item consists of repairs to deteriorated existing built-up steel column flanges, per Detail 1/Drawing S3.1 (Detail 2)
2. Measurement for payment will be by length of new welded plates.
3. Payment will be made by price per linear foot.
F. Contract Line Item No. 006 – Column Rivet Repair
1. This item consists of repairs to deteriorated existing built-up steel column rivets, per Detail 1/Drawing S3.1 (Detail 3)
2. Measurement for payment will be by number of new rivets.
3. Payment will be made by price per new rivet.
G. Contract Line Item No. 007 – Beam Repair (Types 1F and 1W)
1. This Item consists of repairs to deteriorated beam flanges, per Details 2 and 3/Drawing S3.1
2. Measurement for payment will be by length of repair (consisting of added steel plates welded to bottom flange and web).
3. Payment will be made by price per linear foot.
H. Contract Line Item No. 008 – Beam Repair (Types 2F and 2W)
BOST 249576 - 220968 01 27 00 - 3
1. This item consists of repairs to deteriorated existing steel beam webs, per Details 2 and 3/Drawing S3.1.
2. Measurement for payment will be by length of repair (consisting of added steel plates welded to beam web).
3. Payment will be made by price per linear foot.
I. Contract Line Item No. 09 – Beam Repair (Types 3F and 3W)
1. This item consists of repairs to deteriorated existing steel beam webs, per Details 2 and 3/Drawing S3.1
2. Measurement for payment will be by length of repair (consisting of added steel plates welded to beam web).
3. Payment will be made by price per linear foot.
J. Contract Line Item No. 010 – OPTION 1: Replace Lighting Fixtures on Seven Floors
1. This item consists of replacing existing fluorescent lighting fixtures on floors 4, 5, 6, 7, 9, 10 and 11 with energy efficient LED lighting fixtures. The scope includes adding occupancy sensors and exit signs where currently missing.
2. No separate measurement.
3. Payment will be made at the contract lump sum price.
END OF SECTION 01 27 00
BOST 249576 - 220968 01 31 00 - 1
PROJECT MANAGEMENT AND COORDINATION
SECTION 01 31 00 – PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Definitions
2. Construction Coordination.
3. Submittals
4. Coordination Drawings.
5. Requests for Information (RFIs).
6. NPS/DSC SharePoint Project Website.
7. Project meetings.
8. Environmental Coordination.
9. Permits
B. Related Requirements:
1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.
2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.
1.2 CONSTRUCTION COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.
5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.
BOST 249576 - 220968 01 31 00 - 2
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Permit requirements.
7. Pre-installation conferences.
8. Project closeout activities.
9. Commissioning activities.
1.3 SUBMITTALS
A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.
1. Content: Project-specific information, drawn accurately to scale. Do not base Coordination Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:
a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.
b. Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to the Contracting Officer (CO) for resolution of such conflicts.
c. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.
d. Show location and size of access doors required for access to concealed dampers, valves, and other controls.
e. Indicate required installation sequences.
2. Sheet Size: At least 8-1/2 by 11 inches but no larger than 30 by 40 inches .
3. Number of Copies: Submit two opaque copies of each submittal. Contracting Officer will return one copy.
4. Refer to individual Sections for Coordination Drawing requirements for Work in those
Section
B. Coordination Drawing Organization: Organize coordination drawings as follows:
1. Floor Plans and Reflected Ceiling Plans: Show architectural and structural elements, and mechanical, plumbing, fire-protection, fire-alarm, and electrical Work. Show locations of
BOST 249576 - 220968 01 31 00 - 3
visible ceiling-mounted devices relative to acoustical ceiling grid. Supplement plan drawings with section drawings where required to adequately represent the Work.
2. Plenum Space: Indicate subframing for support of ceiling and wall systems, mechanical and electrical equipment, and related Work. Locate components within ceiling plenum to accommodate layout of light fixtures indicated on Drawings. Indicate areas of conflict between light fixtures and other components.
3. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of mechanical, plumbing, fire-protection, fire-alarm, and electrical equipment.
4. Structural Penetrations: Indicate penetrations and openings required for all disciplines.
5. Mechanical and Plumbing Work: Show the following:
a. Sizes and bottom elevations of ductwork, piping, and conduit runs, including insulation, bracing, flanges, and support systems.
b. Dimensions of major components, such as dampers, valves, diffusers, access doors, cleanouts and electrical distribution equipment.
c. Fire-rated enclosures around ductwork.
6. Electrical Work: Show the following:
a. Runs of vertical and horizontal conduit 1-1/4 inches in diameter and larger.
b. Light fixture, exit light, emergency battery pack, smoke detector, and other fire-alarm locations.
c. Panel board, switch board, switchgear, transformer, busway, generator, and motor control center locations.
d. Location of pull boxes and junction boxes, dimensioned from column center lines.
7. Fire-Protection System: Show the following:
a. Locations of standpipes, mains piping, branch lines, pipe drops, and sprinkler heads.
8. Review: Contracting Officer (CO) will review coordination drawings to confirm that the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility. If CO determines that coordination drawings are not being prepared in sufficient scope or detail, or are otherwise deficient, CO will so inform Contractor, who shall make changes as directed and resubmit.
9. Coordination Drawing Prints: Prepare coordination drawing prints according to requirements in Section 01 33 23 "Submittal Procedures."
C. Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements:
1. File Preparation Format: Same digital data software program, version, and operating system as original Drawings.
2. File Preparation Format: AutoCad.dwg, Version 2018, operating in Microsoft Windows operating system.
3. File Submittal Format: Submit or post coordination drawing files using Portable Document Format (PDF) file format.
4. Contracting Officer (CO) will furnish Contractor one set of digital data files (AutoCad.dwg) of Drawings for use in preparing coordination digital data files.
BOST 249576 - 220968 01 31 00 - 4
a. CO makes no representations as to the accuracy or completeness of digital data files as they relate to Drawings.
b. Digital Data Software Program: Drawings are available in AutoCad.dwg.
D. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference.
1. Letter designating Project Superintendent.
2. Construction Schedule.
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention Plan.
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.
7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the
Contactor and all subcontractors.
8. Waste Management Plan.
9. Quality Control Plan.
10. Indoor Air Quality (IAQ) Management Plan.
11. Contractors Commissioning Plan.
E. All items listed must be provided to the Contracting Officer before the Pre-Construction Conference is held. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.
1.4 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI utilizing the form created on the NPS/DSC SharePoint Project website.
1. CO will not respond to RFIs submitted by other entities controlled by Contractor.
2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
1. RFI number, numbered sequentially.
2. Date.
3. RFI subject.
4. Specification Section number and title and related paragraphs, as appropriate.
5. Drawing number and detail references, as appropriate.
6. Field dimensions and conditions, as appropriate.
7. Contractor's suggested resolution. If Contractor's suggested resolution impacts the
Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
8. Contractor's signature.
9. Requested date for response.
BOST 249576 - 220968 01 31 00 - 5
10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
C. RFI Form: Complete the RFI Form on the NPS/DSC SharePoint website as follows:
1. Enter the general information at the top of the form.
2. Under the “Action” section at the bottom of the form, select “Question” then select “CMR” in the drop-down of the “Send to” box.
3. Enter the details of the question and attach related documents.
4. Select “Submit Form” at the bottom of the page.
D. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond.
CO will determine the critical nature of each RFI and issue a response accordingly.
1. The following are not considered to be RFIs and will receive no action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for approval of Contractor's means and methods.
d. Requests for coordination information already indicated in the Contract Documents.
e. Requests for adjustments in the Contract Time or the Contract Sum.
f. Requests for interpretation of Architect's actions on submittals.
g. Incomplete RFIs or inaccurately prepared RFIs.
2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.
3. CO's action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.
1.5 PROJECT WEB SITE
A. Use the NPS/DSC SharePoint Project website for communication throughout the contract period.
The NPS/DSC SharePoint Project website will be used for the following functions:
1. Project directory.
2. Project correspondence.
3. Meeting agendas and minutes.
4. Contract modifications forms and logs.
5. RFI form and processing.
6. Task and issue management.
7. Photo documentation.
8. Baseline schedule, schedule updates and calendar management.
9. Submittal form and processing.
10. Payment coordination documentation.
11. Drawing and specification document hosting, viewing, and updating.
BOST 249576 - 220968 01 31 00 - 6
12. Online document collaboration.
13. Reminder and tracking functions.
14. Archiving functions.
15. Notification of submittal and RFI statuses and current responsible party.
16. Permits and addendums
B. Some documents however are not suitable to be shared using the NPS/DSC SharePoint Project website. Documents containing Personal Identifying Information (PII) (i.e. certified payrolls) shall not be shared using the NPS/DSC SharePoint Project website and shall be coordinated with the SharePoint Project team as appropriate.
C. Submit to the CO a list of all employees who will need access to the website. The users will receive an invitation to register from the Department of Interior (DOI). Once the user is registered on the DOI website, they will be given access to the NPS/DSC SharePoint Project website. For login procedures and other SharePoint information, refer to the Workflows website at http://www.nps.gov/dscw/precon_spproj.htm.
D. All users will be required to have the following software packages:
1. Microsoft Edge.
2. Adobe Acrobat Professional (Pro) version 9 or later
1.6 PROJECT MEETINGS
A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor. The meeting agenda will include the following as a minimum:
1. Roles & Responsibilities/ Lines of Authority.
2. Park rules and regulations.
3. Jobsite Safety.
4. Resolution of comments on required Division 01 documents.
5. Coordination of Subcontractors.
6. Labor law application.
7. Modifications.
8. Payments to Contractor.
9. Schedule of Values
10. Payroll reports.
11. Contract time.
12. Liquidated damages.
13. Contractor Performance Evaluation.
14. Display of Hotline posters.
15. Notice to proceed.
16. Correspondence procedures.
17. NPS/DSC SharePoint Project website.
18. Acceptance/rejection of work.
19. Progress meetings.
20. Submittal procedures.
21. NPS Final Accessibility Inspection.
22. Environmental requirements.
23. Permit requirements.
http://www.nps.gov/dscw/precon_spproj.htm
BOST 249576 - 220968 01 31 00 - 7
24. As-constructed drawings/operation and maintenance (O&M) manuals.
25. Saturday, Sunday, holiday and night work.
26. Reference materials.
27. Value engineering.
B. Progress Meetings: The Contracting Officer will schedule weekly meetings with the Contractor.
1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.
2. Meeting Agendas and Minutes will be prepared by the NPS Construction Management Representative (CMR).
3. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include the following:
a. Approval of minutes of previous meetings.
b. Submittal status.
c. Review of off-site fabrication and delivery schedules.
d. Requests for information (RFI) and other issues.
e. Modifications.
f. Work in progress and projected.
1) Status of required inspections (Special Inspections, Accessibility, etc.)
g. Inspections of work in progress and projected (Special inspections,
h. Construction Schedule update (provide updated CPM).
i. Status of Project Record Drawings and O&M manuals.
j. Other business relating to work.
k. Permit requirements.
C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.
1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other…