This document contains questions and answers regarding solicitation number 140P2021R0067 from the National Park Service to replace the steam heat and distribution system and repair the exterior structure and facade of the Easton Building. The questions and answers provide clarification on the project experience and past performance requirements, confirming that responses to subfactors 3a and 3b should be separate sections in addition to the project experience questionnaire. It is also clarified that the Easton Building does not have an existing automatic temperature control system, and the solicitation specifies installation of a new direct digital control system to control heating and cooling.

View the file

Other files

File Type Posted
Sol_140P2021R0067_Amd_0008.pdf PDF
Sol_140P2021R0067_Amd_0007.pdf PDF
Sol_140P2021R0067_Amd_0006.pdf PDF
Contractor_Questions___Answers_Revised_08-02-21_0005.docx DOCX document
Sol_140P2021R0067_Amd_0005.pdf PDF
21_S0_2_Structural_General_Notes_0004.pdf PDF
Contractor_Questions___Answers_Revised_07-30-21_0004.docx DOCX document
Sol_140P2021R0067_Amd_0004.pdf PDF
Contractor_Questions___Answers_Revised_07-26-21_0003.docx DOCX document
Sol_140P2021R0067_Amd_0003.pdf PDF
Sol_140P2021R0067_Amd_0002.pdf PDF
Contractor_Questions___Answers_Revised_07-19-21_0002.docx DOCX document
Revised_Specifications_0002.pdf PDF
Revised_Drawings_0002.pdf PDF
2012_Condition_Assessment_Report_(FOR_INFORMATION_ONLY)_0001.pdf PDF
Sol_140P2021R0067_Amd_0001.pdf PDF
Revised_Contract_Price_Schedule___Section_L_0001.docx DOCX document
Attendance_Roster_0001.pdf PDF
2018_Condition_Assessment_Report_(FOR_INFORMATION_ONLY)_0001.pdf PDF
B11_Pre-Proposal_Presentation_0001.pdf PDF
Amendment_0001_140P2021R0067_0001.pdf PDF
Attachment_5_Proposal_Submission_Package.pdf PDF
Attachment_3_Construction_Wage_Decision.pdf PDF
B08_Solicitation_140P2021R0067.pdf PDF
Attachment_2_Drawings.pdf PDF
Attachment_1_Specifications.pdf PDF
Sol_140P2021R0067.pdf PDF
Attachment_4_Product_File.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR QUESTIONS/ANSWERS

Amendment 0001

Question 1 Project Experience/Performance in Last 3 Years – Section L (page 51) of the solicitation requires project experience be provided for up to 5 relevant projects in the most-recent 3 years (Factor 3). A similar requirement applies to Past Performance for those project (Factor 4). The 3-year period is overly restrictive, especially with substantial reductions in Federal budgets imposed by the last Administration plus COVID-19 impacts. Client delays while awaiting funding for partially-funded projects in that same timeframe have also adversely impacted the Government’s and contractors’ ability to complete many projects. Given that reality and to provide NPS with the greatest number and most responsive proposals to evaluate, project experience over a longer duration is desirable – for both the Government and contractors. Other Federal Government solicitations we have reviewed and responded to in the last several years have required project experience in the last 5-10 years. We respectfully request NPS change the duration for project experience and associated past performance be 7 years, the approximate mid-point between the 5 and 10-year durations Federal Agencies have been using.

Answer 1 The project experience duration and associated past performance has been extended from three years to five.

Question 2 Subfactors 3a and 3b – Please confirm that responses to Subfactors 3a and 3b are to be sections separate from/in addition to the Project Experience Questionnaire forms cited in the introductory paragraph of Factor 3 (in Section L, page 51) of the solicitation.

Answer 2 Responses to Subfactors 3a and 3b are separate from and in addition to the Project Experience Questionnaire.

Question 3 Who is the in-house ATC contractor?

Answer 3 The Easton Building does not have an Automatic Temperature control system. Section 230900 Direct Digital Control specifies the installation of a new system to control heating and cooling.