Attachment 1 - SOW - IDS replacement_Redacted.pdf

PDF 2 MB Posted

Attached to
Amendment 5 Re-Solicitation Intrusion Detection System Grosslittgen Niederkail
Solicitation number
FA560625Q2016
Issued by

About this file

This document is a Statement of Work (SOW) for an Intrusion Detection System (IDS) replacement project at Grosslittgen and Niederkail wells located at Spangdahlem Air Base. The project involves replacing existing intrusion detection systems in four buildings (2120, 2140, 2300, and 2016), with comprehensive requirements including installing new alarm systems, cameras, sensors, control panels, and associated infrastructure. The contractor must provide all labor, tools, materials, equipment, and services necessary for the installation, with specific technical specifications such as using halogen-free cables, surface-mounted aluminum ducts, multi-cable conduits, and implementing lightning protection and grounding systems.

The work scope includes detailed installation requirements for multiple locations: Niederkail north and south wells, a water treatment plant, and various buildings, with precise technical specifications for camera placement, cable routing, and system integration. The project requires adherence to German regulations, standards, and guidelines, with contractors responsible for documentation, daily cleaning, safety compliance, and restoration of job sites to original condition. The project is scheduled for completion in June 2025, with work to be performed during normal operating hours between 0700-1600 hours, Monday through Friday, excluding federal holidays. Contractors must also comply with base entry, security, and access regulations, including obtaining necessary passes and following strict security protocols.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: Intrusion detection system replacement Grosslittgen and Niederkail

Final Design English

Statement of Work

Title: Intrusion detection system replacement Grosslittgen and Niederkail Bldg.2120,2140,2300,2016

Spangdahlem, Jun 2025

52 CES/CEOERP

File details come from the government source that posted it. Updated .