This document is a Performance Work Statement (PWS) Supplement for providing grounds maintenance services at various United States Visiting Forces (USVF) locations in the United Kingdom, including RAF Croughton, RAF Caversfield, and RAF Barford St. John.

The PWS Supplement outlines additional requirements beyond the overarching IDIQ PWS, such as maintaining ballfields at RAF Croughton, including mowing, fertilizing, and replenishing dirt and topsoil. It also details special requirements for the conservation area north of Croughton Brook, where grass must be maintained at a specific height range using hand tools. Additionally, the PWS Supplement specifies the contractor will be responsible for providing their own facilities, including toilets and wash areas, at the RAF Croughton location.

This PWS Supplement is related to the pre-solicitation for the "UK Wide Grounds Maintenance Services" contract opportunity, solicitation number FA558724R0005, issued by the 48th Contracting Squadron, Royal Air Force (RAF) Lakenheath. The contract will cover grounds maintenance services at various USVF locations throughout the UK.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUNDS MAINTENANCE SERVICES

FOR

RAF CROUGHTON - RAF CAVERSFIELD - RAF BARFORD ST JOHN

TASK ORDER PERFORMANCE WORK STATEMENT (PWS) SUPPLEMENT

DATE 14 March 2024

Prepared by

422nd CIVIL ENGINEER SQUADRON

Contents

1 DESCRIPTION OF SERVICES

1.1 MAINTAIN improved grounds

1.1.7 Ballfields at RAF Croughton *Addition* ......................................................... Error! Bookmark not defined.

1.8 Special requirements

1.8.7.3 Conservation Area North of Croughton Brook (Watervole Habitat) *Addition*

3.2 FACILITIES

3.2.1.3 *Addition* RAF Croughton

1 DESCRIPTION OF SERVICES

This Task Order Performance Work Statement Supplement for Royal Air Force Croughton, Caversfield, Barford St John and Blenheim Crescent is for additional work requirements and to be completed in conjunction the IDIQ Performance Work Statement titled “GROUNDS

MAINTENANCE FOR U.S. VISITING FORCES (USVF) IN THE UNITED KINGDOM

PERFORMANCE WORK STATEMENT (PWS)”. This document outlines further guidance in the performance specific to the sites covered by this Task Order. Requirements and guidance in this document concern only the work performed under this Task Order. This Task Order PWS will cover only the sections that required further information beyond the IDIQ PWS; therefore, all requirements from the IDIQ PWS flow to this task order only modified as stated within.

1.1 MAINTAIN IMPROVED GROUNDS

1.1.17 BALLFIELDS AT RAF CROUGHTON *ADDITION*

Ballfields shall be maintained to the Improved Grounds level. Maintaining ballfields shall include: mowing and trimming of grass, fertilizing, and replenishing dirt (red gravel) on the infield and replenishing topsoil in all ballfields as needed.

1.8 SPECIAL REQUIREMENTS

1.8.7 SPECIAL FLORA AREAS

1.8.7.3 Conservation Area North of Croughton Brook (Watervole Habitat) *Addition*

Grassland area to be maintained all year round at a height of no less than 4 inches (100mm) and not to exceed a length of 8 inches (200mm). The area to be maintained includes all grassland within the perimeter security fence north of the brook and to within 13 ft. (4m) from the brook bank.

The 13 ft. (4m) grassland strip area either side of the brook bank will be cut using extreme care and without motorized vehicles. These areas will be cut once a year to a minimum height of 12 inches (300mm). All arising from the cutting will be raked off by hand and cleared from the area.

3.2 FACILITIES

3.2.1.3 * RAF CROUGHTON * ADDITION *

The COR will make available to the Contractor a compound area adjacent to Bldg. 62.

Electricity supply is available. There is no water supply in the compound. No toilets or wash areas will be made available by the COR. As required by Health and Safety legislation the