Attachment 1 Performance Work Statement_Redacted.pdf

PDF 453 KB Posted

Attached to
Floating Crane Fire Suppression System Maintenance, Repair, and Re-Certification Services
Solicitation number
N4523A26Q5727
Issued by

About this file

This is a Performance Work Statement (PWS) for maintenance, repair, and recertification of a floating crane barge machinery house Kidde CO2 Fire Suppression System at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF).

The contractor shall provide full maintenance, repair, and recertification services for the fire suppression system, which was inadvertently discharged while the barge was tied up pierside. The contract period runs from August 17, 2026 through September 16, 2026, with work performed during standard business hours (0700-1600, Monday through Friday) at PSNS & IMF. The contractor must be qualified by the National Fire Protection Association (NFPA) per Washington Administrative Code 212-80-018. Key specific tasks include: (1) comprehensive inspection of all system components with findings and repair recommendations submitted to PSNS; (2) replacement of three existing 100-pound cylinders and hoses; (3) replacement of any deficient smoke, thermal, or flame detectors; (4) performance of recommended repairs upon Contracting Officer approval; (5) replacement of backup battery; and (6) final annual certification of the entire system. The contractor must provide three deliverables: a condition found report within 24 hours, a report of replaced components with part numbers within 24 hours of completion, and a test report and final condition assessment one week after completion, all submitted as PDF to the Contracting Officer Representative (COR). Contractor personnel must possess secret security clearance and comply with badging requirements. The Government will furnish rigging and crane operation support for lifting fire suppression bottles and provide air hookups, power hookups, and the crane. The contractor is responsible for all other supplies, equipment, facilities, and services necessary to complete the work. Performance requirements include zero deviation from standards, with the contractor providing assessment reports to the COR.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Floating Crane Barge Fire Suppression System Maintenance, Repair, & Certification, PSNS

PART 1

GENERAL INFORMATION

1. GENERAL: This is a non-personal services contract to provide full maintenance, repair, and re-certification of floating crane barge machinery house Kidde CO2 Fire Suppression System.

The Government shall not exercise direct supervision or control over any contractor employees.

Notwithstanding, contractor shall ensure employees comply with all requirements of this Performance Work Statement (PWS) and contract.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform full maintenance, repair, and re-certification of floating crane barge machinery house Kidde CO2 Fire Suppression System as defined in this PWS except for those items specified as government furnished property and services. The contractor shall meet the standards in this contract.

1.2 Background: The floating crane barge's machinery house fire suppression system was discharged while tied up pierside at Puget Sound Naval Shipyard. It is unknown why the fire suppression system was discharged. No fire was evident to have occurred. By performing full maintenance, repair, and re-certification of the machinery house fire suppression system the crane can be continued to be used.

1.3 Objectives: To provide full fire system maintenance, repair all faulty and/or deficient components, and recertify floating crane barge's machinery house fire suppression system as described in Part 5, Specific Tasks, such that repaired equipment functions as intended.

Contractor maintains close liaison and good communications with Government personnel. Also, provide a final condition and status report, as outlined in Technical Exhibits.

1.4 Scope: To provide a full fire system maintenance, repair faulty components, and recertify floating crane barge's machinery house fire suppression system, as outlined in Part 5, Specific

Tasks. The contractor shall accomplish certification, and the Technical Exhibits provided at the end of this PWS.

1.5 Period of Performance: 17 August 2026- 16 September 2026. This period encompasses all on-site maintenance, repairs, system testing, and final third-party or manufacturer recertification.

1.6 Location:

1.6.1 Place of Performance: The work to be performed under this contract will be performed at

Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF).

1.6.2 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0700-1600 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor should keep in mind that the stability and continuity of the workforce are essential.

1.6.3 Recognized Holidays: Contractor is not required to perform services on federal holidays.

The list of current federal holidays can be found here: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/

In addition to the above listed holidays, PSNS & IMF is normally closed for all except necessary services during the week between Christmas Day and New Year's Day (curtailment). Necessary services/ frequencies for various facilities are noted on the detail sheets and work contracted for shall be performed during this period unless otherwise directed by the Contracting Officer (KO).

Exact number of closure days may vary from year to year. Actual requirements will be determined in advance of the closure. On site work performed by the Contractor for the

Contractor's convenience during this time must also be specifically requested by the Contractor in writing and approved by the Contracting Officer in advance.

1.7 Security Requirements: Contractor personnel performing work under this contract must have secret clearance at time of contract performance and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the attached DD254.

Contractor Employees, in order to gain access to the government facility to perform work under this contract, shall comply with the Badging and Access Requirements Attachment to the solicitation/contract.

1.8 Special Qualifications: Contractor must have the ability to test the unit fully described in Part

5, Specific Tasks.

1.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The KO, Contracting Officer Representative, and other

Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.11 Contracting Officer Representative (COR): The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of

Contractor personnel.

The COR is NOT authorized to change any of the terms and conditions of this contract. Only the warranted KO is authorized to make modifications/changes to the terms and conditions of this contract. If the Contractor believes any Government personnel has effectively issued a change resulting in a change in effort and price/cost of the contract, the Contractor shall immediately notify the KO in writing.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. COMMON DEFINITIONS: Per Clause 52.212-4(e), clause 52.202-1 is incorporated by reference to this contract.

2.2. DEFINITIONS:

2.2.1. All Definitions unless defined within the Contract are as defined within FAR Part 2.

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: The Government will provide rigging and operation support to the contractor for lifting and handling capabilities with a mobile crane. This is to assist with the removal and installation of fire suppression bottles.

3.2 Utilities: The Government will provide air hook ups, power hook ups, and the crane. The

Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 5 of this PWS.

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS:

5.1. Basic Services: The contractor shall provide services for full maintenance, repair, and re-certification of floating crane barge machinery house Kidde CO2 Fire Suppression System. The contractor must be qualified by the National Fire Protection Association (NFPA) as outlined by

WAC 212-80-018.

5.2. Task Heading: The objectives to be accomplished in Paragraph 1.3 are outlined below:

5.2.1 Inspection: Inspect all components of the machinery house Kidde CO2 fire suppression system and submit findings to PSNS, and any recommendations for repair beyond the items authorized for repair in 5.2.2.

5.2.2 Do not repair these items unless approved in writing by Contracting Officer via a

Task Order

5.2.3 Repair Actions:

A. Perform inspection directions above.

B. Replace the three existing 100-pound cylinders and hoses.

C. Replace any deficient smoke, thermal or flame detectors

D. Upon approval, perform recommended repairs/maintenance following provided quote from inspection.

E. Replace backup battery.

F. Final annual certification of the entire system

File details come from the government source that posted it. Updated .