Attachment 1 - Performance Work Statement (PWS).pdf

PDF 768 KB Posted

Attached to
Surveillance Tracking and Radar Processor
Solicitation number
FA489022R0004
Issued by

About this file

This is a performance work statement (PWS) for a surveillance and tracking radar processor (STRAP) program support services contract. The PWS requires the contractor to provide engineering, technical, and logistics support services to maintain a family of radar data processors and associated infrastructure. This is necessary to route radar data from locations in the US Central Command area of responsibility to air traffic control and command and control facilities. The contractor must perform work at their facility or in the CENTCOM area of operations. Services include program management, systems engineering, technical support, sustainment, logistics, and supply chain management. The contractor will also provide reports, plans, designs, and evaluations as delineated in the PWS.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: FA4890-22-R-0004 STRAP Support Services PWS

Headquarters Air Combat Command (HQ ACC)

Acquisition Management and Integration Center (AMIC)

Performance Work Statement (PWS)

For

9th Air Force (Air Forces Central) (AFCENT), Communications Directorate (A6)

Surveillance and Tracking RADAR Processors (STRAP) Support Services

Solicitation Number: FA4890-22-R-0004

Contract Number: FA4890-22-C-xxxx

Original Date: 22 Oct 2021

Revision 1: [to be completed & updated post award]

1 SCOPE

1.1 MISSION

Ninth Air Force (9AF) (Air Forces Central) (AFCENT) is the air component of the United States Central Command (USCENTCOM), a regional unified command. 9AF (AFCENT) is responsible for air operations and for developing contingency plans in support of national objectives for USCENTCOM's 20-nation Area of Responsibility (AOR) in Southwest Asia and bordering areas of interest. 9AF (AFCENT) has a requirement to provide Radio Detection and Ranging (RADAR) data to the Battlespace Command and Control Center-Theater (BC3-T). Surveillance and Tracking RADAR Processors (STRAP) and associated equipment dispersed through throughout the USCENTCOM AOR transmits RADAR and sensor data from multiple locations to the BC3-T. The BC3-T uses this data to generate a common air picture; facilitate command and control capabilities for all air traffic; and provide Close Air Support for ground troops engaged in hostile actions.

9AF (AFCENT) Communications Directorate (A6), located at Shaw Air Force Base (AFB), South Carolina (SC) is the mission owner. The Acquisition Management and Integration Center (AMIC), located near Langley AFB in Hampton, Virginia, will provide contract and program management oversight on behalf of the mission owner by way of the AMIC Contracting Officer (CO) and AMIC Program Manager (PM). The Contracting Officer’s Representative (COR) will be assigned by the CO and be located within 9AF (AFCENT) A6.

1.2 OBJECTIVE

The objective of this requirement is to provide RADAR and sensor data services to the BC3-T, USCENTCOM AOR Air Traffic Control (ATC) facilities, and other sensor/nodes as designated by the 9AF (AFCENT) Operations Directorate. RADAR data services include optimization of ATC RADAR systems (including United States Air Force (USAF) deployable RADAR systems) in order to prepare for and pass Federal Aviation Administration (FAA) Flight Checks, and integrate the air picture into ATC towers. The contractor shall provide services supporting both C2 and ATC missions that encompass the delivery of design, engineering and integration; hardware and software installation; distant-end and on-site training; remote monitoring capabilities and assessments; and sustainment and logistics support for all equipment managed under 9AF (AFCENT) STRAP program.

1.3 PERFORMANCE LOCATIONS

This Performance Work Statement (PWS) requires performance within the Continental United States (CONUS) and outside the Continental United States (OCONUS).

1.3.1 Principal place of performance will be within CONUS at the contractor’s facility.

1.3.2 Frequent temporary duty (TDY) travel to CONUS and OCONUS locations will be required.

OCONUS travel will include locations within the USCENTCOM AOR and other combatant command (COCOM) locations necessary to support operational requirements, as directed by 9AF (AFCENT) A6.

1.4 WORK HOURS

1.4.1 CONUS Operating Hours

This PWS includes requirements for 24/7 support and normal business day support. Work centers with 24/7 operations provide support services 24 hours per day and 7 days per week, including weekends and federal holidays. Work centers that do not operate 24/7 typically provide support services during the core business hours of 0700-1700, Monday through Friday, except Federal holidays. On-call support after-hours and on weekends/holidays is required.

1.4.2 OCONUS Operating Hours While On Temporary Duty

At OCONUS Temporary Duty (TDY) locations, the shift lengths and times may vary. Mission needs normally require personnel to work additional hours beyond a standard 40-hour workweek. Workweeks OCONUS are typically 60 hours (e.g., six, 10-hour days), depending on location.

1.4.3 Overtime

Overtime for Service Contract Act (SCA) labor categories is permitted. Prior to overtime hours being worked, the contractor shall obtain pre-approval from the AMIC PM or CO. Requests shall include date(s) of projected overtime and specific hours per labor category. The contractor shall not exceed the estimated overtime total cost associated with the allowable hours as identified at time of contract award.

Overtime shall be invoiced against the Overtime Contract Line Item Number (CLIN) x004.

2 CURRENT STRAP ENVIRONMENT

RADAR sensor data format translation and interface networking consists of a wide range of radar systems including, but not limited to: AN/GPN-20; AN/GPN- 27; AN/MPN-14K; AN/TPN-19; AN/MPN-25;

AN/TPS-75; AN/TPX-54; AN/UPX-37; AN/UPX-27; AN/TPX-49; AN/FPS-117; STAR-2000;

AN/GPN-30; AN/TPS-78 and TDX 2000/BDX 2000.

3 PERFORMANCE REQUIREMENTS

The contractor shall provide necessary resources and knowledge to meet PWS requirements. Support provided on this contract will create specific objectives; however, the ultimate objective is to control and track goals in terms of costs, schedules, and performance.

3.1 PROGRAM MANAGEMENT

The contractor shall provide and maintain comprehensive, pro-active, integrated program management that focuses on meeting or exceeding government requirements and ensures compliance with mandatory, statutory and regulatory requirements.

3.1.1 Program Manager

The contractor shall identify and designate a Contractor Program Manager (C-PM), by name, who shall provide management, direction, administration, quality assurance, and leadership in the execution of this contract. This includes the management and oversight of activities performed by contractor personnel, including subcontractors and teaming partners, to satisfy the requirements identified in this PWS. The C- PM shall have authority to manage government material and assets, personnel and facility security, and approve contract proposals in emergent situations. The C-PM shall have the authority to address urgent requirements. Additionally, the C-PM shall establish a process during business and non-business hours to provide necessary documentation and resources to facilitate timely contract modifications and respond to urgent government inquiries. In support of open communication, the C-PM shall initiate periodic meetings with the AMIC PM and COR.

3.1.2 Contractor Transition-In

The contractor shall work closely with the government and the incumbent contractor transitioning out ensure minimum service disruptions and no service degradation during and after transition. During the transition-in period, the contractor shall prepare to assume responsibility for all performance requirements, staffing, and physical resources. The contractor shall assume full responsibility on day one of contract performance start. The contractor shall implement and transition activities in accordance with (IAW) its final Transition Plan. (Deliverable: Transition-in Plan)

3.1.3 Kick-off Meeting

The contractor shall schedule, coordinate and participate in a kick-off meeting with the government within 5 calendar days of award. The meeting will provide an introduction between contractor personnel and government personnel, and provide the opportunity to discuss transition, technical, management and security issues, and travel authorizations and reporting procedures.

3.1.3.1 The kick-off meeting will be at a mutually agreeable location (either at the contractor’s facility or in the Shaw AFB, SC area). When practical and appropriate, the government may conduct the kick-off meeting via teleconference. Contractor travel for the kick-off meeting shall be considered a cost of doing business and is not reimbursable.

3.1.3.2 The contractor shall draft and provide a kick-off meeting agenda for government review and approval prior to finalizing. (Deliverable: Kick-off Meeting Agenda).

3.1.3.3 The contractor shall provide sufficient copies of contractor presentation materials for government participants. The government will provide the contractor with a list (or the number) of government participants attending the kick-off meeting.

3.1.3.4 The contractor shall draft and provide kick-off meeting minutes for government review and approval prior to finalizing. This report shall document discussions and action items. (Deliverable: Kick-off Meeting Minutes)

3.1.4 Monthly Program Status Reporting

The contractor shall develop and provide a monthly status report. The purpose of this report is to inform the CO, PM and COR and other government stakeholders of significant activities occurring during the reporting period as well as cost, schedule and performance status, issues and concerns. (Deliverable:

Monthly Program Status Report.)

3.1.5 Meetings

The contractor shall participate in meetings, conferences, and teleconferences. These meetings may be regularly recurring or ad hoc, and may be conducted via telephone, video conference or in-person, as requested by the CO, PM, COR or Mission Owner. Upon government request, the contractor shall prepare an agenda, generate meeting minutes, and track action items. (Deliverable: Meetings (Agenda/Minutes/Action Items))

3.1.6 Data Calls

As required, a data call report shall be e-mailed to the CO, PM, COR, or Mission Owner within one (1) business day of the request, unless otherwise specified by contract. All information provided shall be the most current. Cost and funding data shall reflect real-time balances. Report shall account for all planned, obligated, and expended charges and hours. (Deliverable: Data Calls)

3.1.7 Program Management Reviews

The contractor shall attend Program Management Reviews (PMRs) as requested by the government. The CO, PM, COR, Mission Owner and other government stakeholders will meet periodically with the contractor to review contract performance. The PMRs will be conducted at a minimum annually;

however, the government reserves the right to conduct PMRs semi-annually and schedule additional reviews or working groups when necessary as critical issues arise, or significant events or changes occur.

3.1.7.1 PMRs will be held at a mutually agreeable location (either at the contractor’s facility or in the Shaw AFB, SC or Langley AFB, VA area). When practical and appropriate, the government may conduct PMRs via teleconference. Contractor travel for the PMRs shall be considered a cost of doing business and is not cost reimbursable.

3.1.7.2 The contractor shall review and provide inputs to PMR agendas, presentation materials and minutes in the format and timelines requested by the government. The government will provide the contractor advance copies of PMR agendas, presentation materials and minutes for review and comment prior to finalization.

3.1.8 General Information Technology Requirements

When applicable, the contractor shall:

3.1.8.1 Ensure no production systems are operational on any Research Development Test and Evaluation (RDT&E) network.

3.1.8.2 Follow DoDI 8510.01, Risk Management Framework (RMF) for DoD Information Technology (IT), when deploying, integrating, and implementing IT capabilities.

3.1.8.3 Ensure compliance with all current Air Force IT & cybersecurity policies IAW DoD 8570.01-M Information Assurance Workforce Improvement Program, AFMAN 17-1303, Air Force Cybersecurity Workforce Improvement Program, paragraph 3.2 and DFAR PGI 239.7102-3 Information Assurance Contractor Training and Certification. (Deliverable: Cyber Security Workforce Report)

3.1.8.4 Register and maintain any contractor-owned or contractor-maintained IT systems utilized on this contract through USAF Enterprise Mission Assurance Support Service (eMASS), per 9AF (AFCENT) A6 guidance.

3.1.9 Contractor Transition-Out

The contractor shall provide transition-out support when requested by the government.

3.1.9.1 The contractor shall provide draft and final Transition-out Plans to facilitate the seamless transfer of support services to an incoming contractor/government personnel at the expiration of this contact. The government will work with the contractor to finalize the Transition-out Plan. At a minimum, the plan shall be reviewed and updated on an annual basis upon award of each Option Period, and reviewed and updated quarterly during the final Option Period. (Deliverable: Transition-out Plan)

3.1.9.2 The contractor shall establish and maintain effective communications and fully cooperate with successor contractor/government personnel during the transition-out period. This includes facilitating familiarization and information/knowledge transfer.

3.1.9.3 The contractor shall update and provide the government with current operating and maintenance manuals, drawings, specifications, procedures, inventories, software, and all other data or documentation developed for or acquired under this contract (and its predecessor contracts).

3.1.10 Contract Closeout Report

The contractor shall prepare and submit a contract closeout report no later than 30 days after the contract completion date. The contractor shall be responsible for collecting, integrating, and reporting all subcontracting information. (Deliverable: Contract Closeout Report)

3.2 QUALITY CONTROL / QUALITY ASSURANCE

The contractor is responsible for quality control and quality assurance. The contractor shall provide and maintain a Quality Control Plan (QCP) that ensures successful accomplishment of all tasks and services identified in this contract. Complete records of all inspection work performed by the contractor shall be maintained and made available to the government during contract performance. (Deliverable: Quality Control Plan)

The government reserves the right to perform any inspections deemed necessary to assure that the contractor provided services, documents, and material meet the prescribed requirements and to reject any or all services, documents, and material in a category when a nonconformance is established. The government will perform inspections and tests in a manner that will not delay work.

3.2.1 Quality Control Plan (QCP)

3.2.1.1 The QCP shall document the organization's quality management structure, personnel authority and responsibility, and identify personnel designated to perform Quality Control (QC) functions.

3.2.1.2 The QCP shall document the scope of the quality system, the company quality policy and company quality objectives. The QCP shall include the Operating Instructions, Site Operating Procedures, Work Instructions, etc. required to meet contract requirements at the site level. In addition, the QCP shall describe the processes and procedures used to:

- Enforce strict use of tech data/Original Equipment Manufacturer (OEM) data, ensuring all applicable manuals and directives are complete, current with applicable changes, and available in the immediate work area;

- Establish and maintain proficiency of personnel;

- Establish and maintain the training program; and

- Identify, report, and correct non-conforming performance.

3.2.2 Quality Requirements After Contract Award

3.2.2.1 The draft QCP and documented information necessary to support the operation of processes are due to the government no later than 10 calendar days after contract award. The final QCP is due to the government on the last day of the transition period. The government will perform a desktop review of the

QCP.

3.2.2.2 The contractor’s comprehensive QCP (consisting of Operating Instructions, Site Operating Procedures, Work Instructions, etc. required to meet contract requirements) shall be in place and performing on day one of contract performance start.

3.2.2.3 The contractor shall notify AMIC Quality Division (DRQ) of any changes to the QCP within two business days of implementation and provide AMIC DRQ with the changed document(s) with changes highlighted.

3.2.2.4 The contractor shall maintain and make available to the government their measurement, analysis and improvement processes and supporting documentation upon request.

3.2.2.5 The contractor shall be responsible for the quality of all products and/or services regardless of a validated QCP.

3.3 STRAP SUPPORT SERVICES REQUIREMENTS

The contactor shall provide functional and technical expertise in RADAR sensor data format translation and interface networking. The contractor shall possess knowledge and expertise with ancillary RADAR equipment, such as the TDX-2000 and BDX-2000, and have the skillsets required to configure and optimize these systems to support airfield operations and command and control (C2) correlator requirements.

3.3.1 Program/Project Management Support Services

3.3.1.1 The contractor shall attend meetings, conferences, and teleconferences.

3.3.1.2 The contractor shall provide subject matter expertise and recommendations for RADAR data conversions and translations for various RADAR surveillance systems.

3.3.1.3 The contractor shall plan and manage the cost, schedule, and performance of each PWS requirement (PWS paragraphs 3.3-3.6); baseline, status and deviations shall be provided in the Monthly Program Status Report. (Deliverable: Monthly Program Status Report)

3.3.1.4 The contractor shall advise the CO, PM and COR of risks involving changes in budget, schedule, and other significant project factors.

3.3.1.5 The contractor shall update the CO, PM and COR concerning on-going progress by submitting meeting minutes after each meeting. (Deliverable: Meetings (Agenda, Minutes, Action Items)

3.3.1.6 The contractor shall prepare and provide technical program/project reports. (Deliverable:

Technical Program/Project Reports)

3.3.1.7 The contractor shall recommend solutions for resolving deficiencies identified during inspections.

3.3.1.8 The contractor shall identify trends that may lead to service, network, or mission degradation and provide trend analysis and recommended remediation actions. (Deliverable: Trend Analysis Report)

3.3.2 Systems Engineering Support Services

3.3.2.1 The contractor shall identify key technical requirements, perform investigation, perform site surveys, and provide proposed solutions via initial design plans and drawings for implementation approval to support 9AF (AFCENT) requirements. (Deliverable: Engineering Designs)

3.3.2.2 The contractor shall provide engineering support in the development of the Project Support Agreement (PSA) for STRAP integration projects, as required. The PSA is a formal document that details all host base project support requirements. Support items identified in the PSA include:

equipment being installed or removed; sites or locations agreed upon; services required; supporting construction; waivers; limitations; restrictions; and operational, technical, or other constraints affecting the communications and information systems requirement. The PSA also designates the responsibilities of the host base civil engineer, other supporting activities, and the customer. (Deliverables: Engineering Designs and STRAP Integration Plan)

3.3.2.3 The contractor shall utilize systems engineering management methods to sustain current STRAP support. Methods include system integration and design processes; verification and validation methods to verify proper functionality of their design; and configuration management to maintain system operation. (Deliverable: Testing and Evaluation)

3.3.2.3.1 As outlined in MIL-HDBK-61A Configuration Management Guidance, the contractor shall apply engineering analytical disciplines to identify, document, and verify functional, performance, and physical characteristics of systems to control changes and non-conformance, and to track actual configurations of systems and platforms. (Deliverable: Technical Program/Project Reports)

3.3.2.4 The contractor shall recommend the best approach and procedures for performing installation and/or integration identified by 9AF (AFCENT). (Deliverable: STRAP Integration Plan)

3.3.2.5 The contractor shall identify and provide the various support elements required to complete required installation and/or integration. This will include, but is not limited to power requirements, cabling requirements, ventilation and cooling requirements, equipment location and space (floor/rack) requirements, and site support requirements necessary for proper integration of the required equipment.

(Deliverables: Engineering Designs)

3.3.2.6 The contractor shall determine equipment interface requirements with installation site personnel including planning; staging of equipment; site access; coordination of daily installation and/or integration activities with site operational activities; access/installation/test/acceptance liaison points of contact; and other necessary interfaces. (Deliverables: Engineering Designs)

3.3.2.7 The contractor shall provide support to evaluate end-to-end validation of sensor data to fulfill 9AF (AFCENT) requirements and make recommendations for the best solution to fulfill the requirements and apply a standardized methodology to create and validate that the concept will work prior to installation and/or integration. The contractor shall be able to use models, including emulators, prototypes, simulators, and stimulators, either statically or over time, to develop data as a basis for making managerial, technical, strategic, or tactical decisions. (Deliverable: Testing and Evaluation)

3.3.2.8. The contractor shall support the engineering effort required to prepare and assure detailed technical data documentation necessary to support system development reflects the latest design, configuration, integration, and installation concepts. (Deliverable: Technical Program/Project Reports and Engineering Designs)

3.3.2.8.1 Design Changes. Any equipment/system installed and/or integrated into an Air Force platform shall meet the cybersecurity requirements as specified under DoDI 8500.01.

3.3.3 Technical Support Services

3.3.3.1 The contractor shall provide the knowledge and expertise on equipment such as the TDX-2000 and BDX-2000, and have the knowledge and skills to configure and optimize this equipment and other STRAP related equipment in the network to provide the desired information and formats to be displayed at the remote centers.

3.3.3.2 The contractor shall provide the knowledge and expertise on various sensor data formats, both standard (i.e. CD-1, CD-2, ASTERIX, and ASR-9) and non-standard, with minimal system documentation.

3.3.3.3 The contractor shall provide the skills and resources required to capture the required RADAR sensor data, analyze the sensor data, and configure or modify the data to provide the required information to be displayed at remote centers specified by 9AF (AFCENT).

3.3.3.4 The contractor shall provide network engineering knowledge and expertise to design and route the required information through various networks, both secure and unsecure, and have remote monitoring capability of the integrated network when authorized by the government.

3.3.3.5 The contractor shall travel to sites within the USCENTCOM AOR and other COCOMs, as required, to conduct site surveys for determining the optimum location and configuration for equipment/system installation including any site preparation requirements. The contractor must be capable of gathering all pertinent engineering, configuration and design information relevant to site conditions, analyzing any collected data, and performing necessary calculations to make technical recommendations. (Deliverable: Testing and Evaluation) In addition, the contractor shall travel to integrate STRAP equipment and provide on-site maintenance support for STRAP equipment issues that cannot be resolved by local site support, as necessary.

3.3.3.6 The contractor shall provide design and testing support for solutions to integrate various sensors identified by 9AF (AFCENT). (Deliverable: Testing and Evaluation)

3.3.3.6.1 The contractor shall test and modify the designs to satisfy 9AF (AFCENT) system requirements. 9AF (AFCENT) A6 will review and approve of the designs prior to implementation.

3.3.3.6.2 The contractor shall provide engineering and technical support for research, design, and integration of the required sensor data feeds to the BC3-T. (Deliverable: STRAP Integration Plan)

3.3.3.6.3 The contractor shall provide engineering documentation following installation and/or integration. (Deliverables: Technical Program/Project Reports, Engineering Designs and Installation/As-built Drawings) The contractor shall use existing resources to examine the functionality of their design prior to integration and also complete testing and checkout after integration to verify proper integration.

(Deliverable: Testing and Evaluation)

3.3.3.6.4 The contractor shall provide technical preliminary documentation (Deliverable: Engineering Designs) and as-built designs for the circuits installed and/or integrated (Deliverable: Installation/As-built Drawings). The intent of these technical documentation requirements is to fully document the final configuration.

3.3.3.7 The contractor shall provide integration support to implement the designed solutions to satisfy 9 AF (AFCENT) requirements for STRAP support.

3.3.3.7.1 The contractor shall provide functional and technical expertise integrating various RADAR sensors and networking components with ATC Systems, C2 Centers (i.e., BC3-Ts) and RADAR displays including Position Plan Indicators, C-Scopes, G-Scopes, New Technology RADAR Display, and various mosaic RADAR displays (i.e. Microprocessor En Route Automated Terminal System, Tactical Display Framework, Multi Source Correlator Tracker) and various networks identified by 9 AF (AFCENT).

3.3.3.7.2 The contractor shall provide support to integrate various U.S. and Host Nation sensors identified by 9 AF (AFCENT) to the BC3-T and C2 centers identified by 9 AF (AFCENT). Current RADAR systems include, but are not limited to, AN/GPN-27, AN/GPN-30, AN/TPS-75, AN/UPX-27, AN/UPX-37, AN/TPS-78, AN/FPS-117 and AN/TPX-49.

3.3.3.7.3 The contractor shall provide training on integrated STRAP equipment. Training shall be provided at site locations within the CENTCOM AOR, to on-site personnel (military, civilian, contractors) assigned to support and maintain the system. Training may consist of new operator/initial training to support new installations and/or integrations; and recurring/refresher training, as needed to support military rotations. Training on the integrated system to site personnel will be conducted within a day at the conclusion of the integration. Training shall address the following areas System Maintenance, System Trouble-shooting, and System Operations. Technical references and site specific documentation will be provided to on-site maintenance personnel for general STRAP maintenance. In connection with the upgrade of an existing remote RADAR network system, the contractor shall provide on-site maintenance and operating instruction/training on the network connection and operating system.

(Deliverable: Training Documentation)

3.3.4 Sustainment Support Services

3.3.4.1 The contractor shall maintain and provide a Secret Internet Protocol Router Network (SIPRNet) capability at the contractor’s site for secure communications to remotely monitor the sensor data and integrated networks when approved by the government. The contractor shall follow the standards required for secure installations and maintenance under the Security Technical Implementation Guide and DoD Instructions and Protocols for secure networks.

3.3.4.2 The contractor shall provide 24/7 Help Desk/Customer Support to 9AF (AFCENT) for STRAP equipment.

3.3.4.3 The contractor shall provide on-site technical assistance in the USCENTCOM AOR when remote support efforts are not effective and prior coordination with 9 AF (AFCENT) and AMIC has confirmed a need. After completing each technical assistance visit, the contractor shall prepare a report that includes all maintenance actions completed. (Deliverable: Technical Program/Project Reports)

3.3.4.4 The contractor shall monitor and control the STRAP equipment to maintain continuous sensor data feeds to the control centers when approved by the government.

3.3.4.5 The contractor shall provide support to resolve issues involving STRAP equipment, as well as issues related to sensor data feeds to the control centers.

3.3.4.6 Prior to disposing of any equipment and/or system, the contractor shall notify the CO, PM and COR, and receive approval from the AMIC CO.

3.3.5 Logistics Support Services

3.3.5.1 The contractor shall provide logistics support (technical data, hardware and software changes/upgrades, engineering support, spares or support equipment, etc.) for STRAP.

3.3.5.2 The contractor shall provide logistical support for the procurement of equipment and material and packing, shipping, handling, and tracking of equipment and material, as required.

3.3.5.2.1 The contractor shall be responsible for packing, shipping, and delivery of items to 9 AF (AFCENT)/A6X at Shaw AFB, SC. 9 AF (AFCENT) will ship all material to and from the 9AF (AFCENT) AOR via the Transportation Management Office.

3.3.5.3 The contractor shall be responsible for all associated taxes, duties and customs fees, and other related charges for each country of performance when transporting equipment outside of the standard process outlined in PWS paragraph 3.3.5.2.1.

3.3.6 Supply Support Services

3.3.6.1 The contractor shall establish, document, and implement an effective and economical supply support system to control all government provided and contractor-acquired equipment and supplies.

3.3.6.2 The contractor shall manage equipment items IAW Air Force Instruction (AFI) 23-101 Materiel Management, Chapter 2, paragraph 2.2.3.3.5, Equipment Authorized In-Use Details.

3.3.6.3 The contractor shall manage Special Purpose Recoverables Authorized Maintenance assets IAW AFI 23-101, Chapter 5, Section 5.8.

3.3.6.4 The contractor shall safely handle and store materiel IAW AFJMAN 23-210 Joint Service Manual for Storage and Materials Handling, Chapter 5, Section V-VIII, Chapter 6 and AFI 23-101, Chapter 5, Paragraph 5.3.

3.3.6.5 The contractor shall safeguard Controlled Item Coded IAW AFI 23-101, Chapter 10, Paragraph 10.2-10.2.9.4

3.3.6.6 Equipment and Material Support. The contractor shall provide various equipment/material support services that range from research, procurement, fabrication, integration and delivery. The additional equipment/materials may include, but not limited to, Target Data Extractors (TDXs), Real Time Interface Conversion Items (RICIs), Serial Interface Units (SIUs), routers, switches, Remote Sensing 4 (RS4) software licenses and spares necessary to support the design to remote the data securely to the desired displays.

3.3.6.6.1 Equipment/Material Research. The contractor shall research specified equipment and/or material to support their design for integrating the RADAR sensor feeds to the BC3-T as required by 9

AF (AFCENT).

3.3.6.6.2 Equipment/Material Procurement.

3.3.6.6.2.1 The contractor shall submit for CO acceptance a DCAA approved purchasing system for items not procurable via the Material Management System IAW FAR 44.3. The contractor shall provide purchasing capability not provided by the government for replacement parts and consumable materials in sufficient time to meet mission requirements. The contractor shall identify and establish controls to mitigate fraud, waste, and abuse. All contractor-acquired supplies shall become government property.

The contractor shall provide a consolidated monthly report of all purchases within the Monthly Program Status Report. (Deliverable: Monthly Program Status Report)

3.3.6.6.2.2 The contractor shall obtain government approval before initiating acquisition action for new or replacement equipment or supplies for the following:

- Procurement of equipment, hardware, components, parts, software and license/maintenance agreements and/or warranties. The contractor shall provide competitive price analyses and, if applicable, sole source justifications for all purchases over $10,000.

- All prime mission equipment, operational support requirements/assets having an extended cost equal to or greater than $1,000

- All furniture, appliances, storage equipment, IT hardware and administrative office equipment

- All new tool requirements and machine tools including tool boxes and tool storage equipment

- Test, Measurement and Diagnostic Equipment

3.3.6.6.2.3 Purchases Exceeding Micro-Purchase Threshold. All purchases must be verified and approved by CO if they exceed the Micro-purchase threshold in FAR part 8.

3.3.6.6.2.4 Beyond Economical Repair. The contractor shall obtain government approval in writing, prior to beginning repair, when the estimated material cost, is in excess of 75% of the acquisition costs.

Disposition and/or replacement of the item shall be requested from AMIC Logistics Division (PLG) when the repair is not accomplished.

3.3.6.6.2.5 The contractor shall procure items as Contractor Acquired Property (CAP). Acquisition selection factors shall include price, availability, reliability, and supportability within current supply system. This information shall be tracked and available for government review as needed. The contractor shall provide all support data and cost estimates necessary to justify a fair and reasonable price per item procured. The contractor shall have an adequate accounting system to track all items and the delivery status per item. After receipt, the contractor shall have a property management system to track the item location per item. Unless otherwise noted, all items procured by the contractor shall be stored at the contractor’s facilities and integrated into a system or transported by the contractor. The contractor shall generate recurring inventory tracking report(s) (Deliverable: Inventory Tracking Report).

3.3.6.6.2.6 The contractor shall recommend items that conform to applicable product validation, identification, and tracking requirements.

3.3.6.6.2.7 The contractor shall purchase and deliver, when required to replenish site spares, and as part of their designs, various STRAP equipment components. The equipment shall be purchased, as required, based on the designs approved to support 9 AF (AFCENT) requirements that arise.

(a) Product Validation – The contractor shall certify that it purchases supplies from authorized resellers and/or distributers. Unless otherwise specified, the contractor shall warrant that the products are new, in their original box. The contractor shall obtain all manufacturer products submitted from authentic manufacturers or through legal distribution channels only, IAW all applicable laws and policies at the time of purchase.

(b) Information Assurance/Computer Security Requirements – The contractor shall ensure that all products recommended and/or procured that impact Information Assurance (IA) shall be selected from the National Information Assurance Program (NIAP) Product Compliant Lists (PCL). The products chosen shall be based on the appropriate Protection Profile (PP) for the network involved, and utilized IAW latest Defense Information Systems Agency (DISA) policy at time of order. This information shall be tracked and available for government review as needed.

(c) Item Unique Identification (IUID) and Radio Frequency Identification (RFID) – IAW DFARS clause 252.211-7003/7007, the contractor shall ensure that all items manufactured, integrated or purchased with a unit cost equal to or exceeding $5,000 (or less if item is serially managed or if government specifies items on individual contract) is labeled with an item unique identification number or Unique Item Identifier (UII). At time of delivery of the item to the government, the contractor shall clearly mark and identify each applicable item based on the criteria provided in DoD MIL-STD- 130N for those items not already marked. The contractor shall ensure all IUID information is recorded and is available for all IUID information shall be subject to government review as needed. The contractor shall track IUID items and maintain information being recorded.

(i) The contractor shall be responsible maintaining and updating information in the IUID Registry. The contractor shall update custody status when items are designated as government furnished material, returned to government position, change physical location, or has been consumed, destroyed, scrapped, lost or abandoned during contract performance.

3.3.6.6.3 Property/Inventory Tracking. In accordance with FAR 52.245-1, the contractor shall create and maintain internal records of all government property accountable to the contract, including government-furnished and contractor-acquired property. Each item delivered and/or ordered shall be recorded in an inventory tracking report. (Deliverable: Inventory Tracking Report) At a minimum, the report shall track the following information: item description, order date, serial number, model number, lot number, delivery location, and the manufacturer warranty period and expiration date, if applicable.

This information shall be tracked and available for government review as needed, and the information shall have the ability to be sorted and manipulated by any of the input fields. Separate from the government tracking system, the information in the contractor’s records is a backup to the government records; therefore, the government will own all data rights to the collected information.

3.3.6.7 Warranty Tracking of Serialized Items. As specified in DFARS 252.246-7006 the contractor shall follow the requirements for any serialized item manufactured or acquired that come with a warranty. (Deliverable: Warranty Tracking)

3.3.6.7.1 For contractor/vendor specified warranty terms, the contractor shall complete all data elements for both the Warranty Tracking Information (WTI) and Warranty Source of Repair Instructions (WSRI) and shall forward the forms electronically to the COR. (Deliverable: Warranty Tracking) The WTI shall be returned to the CO, PM and COR at contract award. The WSRI shall be returned to the CO, PM and COR at time of delivery of the warranted serialized item(s).

3.3.6.7.2 For receipt and acceptance of items, the contractor shall comply with the following requirements:

3.3.6.7.2.1 If the WTI and WSRI are submitted manually (as a PDF file), the contractor shall forward documents to the PM and AMIC PLG for review. As required, the contractor shall forward approved documents to government personnel responsible for posting the forms to Electronic Document Access

(EDA).

3.3.6.7.2.2 If utilizing DoD PIEE, the contractor shall ensure that the required warranty data is electronically submitted using the CDRL exhibit line item number functionality within DoD PIEE, as part of the Material Inspection and Receiving Report or Reparable Receiving Report, as applicable.

3.3.6.8 Warranty Management. The contractor shall serve as the warranty manager by tracking the applicable government acceptance dates/receipt dates against the serial number of equipment or the lowest replaceable unit of a system. As warranty manager, the contractor shall, unless otherwise directed, submit warranty data on WTI and WSRI as specified on the Warranty Tracking and Administration for Serialized Items. (Deliverable: Warranty Tracking) The contractor shall upload data to DoD PIEE.

3.3.6.8.1 If there is no compatible government database to maintain and track warranty life spans for the government furnished property and/or contractor acquired property under contract, the contractor shall internally track items by serial numbers and the information shall be updated monthly to identify the time left on the original warranty. The contractor shall provide the government a copy of the warranty information in an inventory tracking report. (Deliverable: Inventory Tracking Report)

3.3.6.8.2 When an item has failed, the contractor shall determine if the item is still under warranty. If the item is under warranty, the contractor shall obtain a Return for Maintenance Authorization number and instructions on how to get the product repaired or replaced from the manufacturer or authorized distributor. As required, a Warranty and Non-Warranty Failure Status Repair Report shall be submitted to the COR on all warranty and non-warranty actions taken during the preceding quarter and collected cumulatively. The reports shall be submitted within 15 days after the completion of the quarter; quarters shall be based on the fiscal year beginning October. (Deliverable: Failure Status Report)

4 GOVERNMENT FURNISHED INFORMATION, PROPERTY, EQUIPMENT AND SUPPORT

4.1 GOVERNMENT FURNISHED INFORMATION (GFI)

The contractor shall use online sources to obtain copies of any necessary documentation (specifically listed under Paragraph 3.0) needed for performance of this contract. The contractor shall use the GFI provided only in support of this contract. Unless otherwise specified, all GFI will be provided by the government by the estimated delivery date listed below in Table 1, and the contractor shall return all GFI to the government at completion of the contract. If the contractor requires additional GFI other than what is listed, the contractor shall submit a request to the COR within 30 days after award.

Table 1: GFI Delivery Dates

GFI Description Estimated Delivery Date From Government to Contractor

Internet Protocol Information for Tasked Integration Efforts Within 21 days of assigned task/project Architectural Drawings (site, facility, etc.) for Work Locations Within 21 days of assigned task/project Work Location Points of Contact Within 21 days of assigned task/project Technical Documentation (i.e., Interface Control Documentation) for Government Furnished Sensors the Contractor is Tasked to Interface With

Within 21 days of assigned task/project

4.2 GOVERNMENT FURNISHED PROPERTY (GFP)

4.2.1 The government will transfer contractor acquired Government Furnished Property (GFP) from the predecessor contract to the contractor within 30 days of contract performance start.

4.2.2 The government will provide the contractor a list of Government Furnished Equipment (GFE) within 30 days of contract performance start.

4.2.3 The government will provide the contractor a list of Government Furnished Material (GFM) within 30 days of contract performance start.

4.2.4 No Special Test Equipment (STE) is provided on this contract.

4.2.5 No Special Tooling (ST) is provided on this contract.

4.2.6 Government Property Administrator

In accordance with FAR 42.201, the contract property administrator under this contract is AMIC PLG.

The contractor shall work with AMIC PLG to ensure compliance with the contract’s property requirements. CAP procured and installed by the contractor at a government site/location will be transferred to the using unit and accounted for under government internal controls.

4.2.7 Property Transfer Between Government and Contracts

Contractors shall not take receipt or transfer custody of any government property without possessing proper contractual authority. Per DoDI 4161.02, the government will utilize electronic transaction when transferring GFP to the contractor (specified by contract number) and upon return of the property to the government. The contractor shall use DoD PIEE to receipt property transfer.

4.2.8 Property / Inventory Tracking

In accordance with FAR 52.245-1, the contractor shall create and maintain internal records of all government property accountable to the contract, including government-furnished and contractor-acquired property. Each item delivered and/or ordered shall be recorded in an inventory tracking report.

(Deliverable: Inventory Tracking Report) At a minimum, the report shall track the following information: item description, order date, serial number, model number, lot number, delivery location, and the manufacturer warranty period and expiration date, if applicable. This information shall be tracked and available for government review as needed, and the information shall have the ability to be sorted and manipulated by any of the input fields. Separate from the government tracking system, the information in the contractor’s records is a backup to the government records; therefore, the government shall own all data rights to the collected information.

4.2.8.1 The contractor shall manage an effective process for ensuring sufficient equipment, spare parts, materials, and tools to sustain operations and maintenance efforts. The contractor shall be responsible for all on-site storage management and tracking of spare parts.

4.2.8.2 The contractor shall perform a complete physical inventory during contract transition of all GFP and annually conduct inventory IAW FAR Part 52.245. Inventory losses and gains shall be identified and explained on an inventory adjustment document (Deliverable: Inventory Tracking Report). Review and update the inventory list as changes occur. Submit any report of loss, damage, destruction or theft of government property IAW requirements in FAR 52-245-1.

4.2.8.3 Contractor’s forms which indicate serviceable condition shall be labeled yellow.

4.2.8.4 The contractor shall affix an Equipment Serial Number (ESN) to all nonexpendable property, control the property by the assigned ESN, perform equipment custodial responsibilities, and maintain auditable equipment authorization and in-use data records IAW FAR Part 52.245-1. These records shall become the property of the government and shall be made available upon request.

4.2.8.5 The contractor shall utilize the Item Unique Identification (IUID) Registry, located on the internet at http://www.dodprocurementtoolbox.com/page/gfp/resources to manage GFP valued at or more than $5,000 (government acquisition cost) and those items listed in Appendix D as Low-Valued Property (LVP) less than $5,000. Affix tags/labels IAW MIL-STD-129P and MIL-STD-130M. Any deviations shall require AMIC PM approval.

4.2.8.6 The contractor shall assign a Virtual UII for Legacy GFP currently in use or in stock, IAW the Virtual UII Guide.

4.2.8.7 The contractor shall ensure newly purchased equipment and repairables meet the UID requirement IAW DFARS clause 252.211-7003.

4.2.8.8 The contractor shall include manufacturer name, trademark or manufacturer code (from Cataloging Handbook H4-1 or H4-2, FEDLOG or industry standard), identifying number, and serial number, when applicable, in the identification marking.

4.3 GOVERNMENT FURNISHED SERVICES

4.3.1 Government Furnished Life Support

The government will provide life support services to contractor personnel while TDY OCONUS to the USCENTCOM AOR on an “as-available” basis and IAW applicable regulations, instructions and policy.

Services will be authorized by Letter of Authorization (LOA).

4.3.1.1 OCONUS Medical. Emergency medical and dental care is the default level. All other medical and dental necessities shall be the contractor's responsibility. All government-provided medical and dental care is reimbursable to the government.

http://www.dodprocurementtoolbox.com/page/gfp/resources

4.3.1.2 OCONUS Meals/Dining. The government will provide meals at Dining Facilities, subject to availability at the installation, camp or base. At some locations, government furnished meals are reimbursable to the government IAW local policy. At some locations, meals may be at the lower expeditionary standard (e.g., meals-ready-to-eat).

4.3.1.3 OCONUS Base Services. The government will allow contractor use of/access to laundry facilities, military banking facilities, Commissary and Base Exchange, Post Office, gym and morale centers, subject to availability at each location.

4.3.1.4 OCONUS Billeting. The government will authorize contractor use of/access to on-base billeting, subject to availability at each location. At some locations, these services may be at the lower expeditionary standard (e.g., tents or shared living spaces).

4.4 GOVERNMENT FURNISHED FACILITIES

No government facilities (i.e., office space, computer hardware/software, or lab space) will be provided on this contract.

5 MATERIALS/EQUIPMENT/TRAVEL & OVERTIME COSTS

5.1 The contractor shall monitor these costs as part of the monthly contract status reports. (Deliverable:

Monthly Program Status Report) For this monitoring purpose, cost shall include incidental material, travel, and other non-labor costs (excluding subcontracting and consultant labor cost) required in performance of the service. IAW FAR Clauses FAR Clauses 52.232-20 Limitation of Cost or 52.232-22 Limitation of Funds the contractor shall immediately notify the government when funds have been expended prior to work being completed. Additionally, the contractor shall notify the government as soon as possible, but no later than three calendar days of reaching 75% of the funded value.

5.2 Anticipated costs shall be justified, coordinated and preapproved in writing by the AMIC PM. The contractor shall provide vendor quotes/invoices/receipts to the AMIC PM for allowable costs.

5.3 Table 2 below are the CLIN ceilings (inclusive of applicable indirect rates, but exclusive of fee) established by the government:

Table 2: CLIN Ceilings

Period of Performance

Start

End

Mat/Equip CLIN x002

NTE

Travel CLIN x003

NTE

Overtime CLIN x004

NTE

Base Period 17-May-2022 16-Feb-2023 $1,000,000 $438,600 $5,000 Option Period 1 17-Feb-2023 16-Feb-2024 $850,000 $438,900 $5,000 Option Period 2 17-Feb-2024 16-Feb-2025 $785,000 $439,500 $5,000 Option Period 3 17-Feb-2025 16-Feb-2026 $612,000 $439,800 $5,000 Option Period 4 17-Feb-2026 16-Feb-2027 $612,000 $439,800 $5,000 6-month Extension 17-Feb-2027 16-Aug-2027 $306,000 $219,900 $2,500

6 TRAVEL

6.1 TEMPORARY DUTY (TDY)

The contractor shall perform TDY travel to support USCENTCOM mission objectives. TDY travel is required to conduct site surveys and capture necessary data required for design and integration of equipment to provide information to remote centers.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .