Attachment 1 - Mission Support Services Proposal Worksheet.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Mission Support Services BPA
- Solicitation number
- FA706026Q0028
About this file
This is a proposal worksheet template for a Mission Support Services Blanket Purchase Agreement (BPA) being established by the Civil Engineer Squadron under the Department of the Air Force Headquarters District Washington. The BPA is a multiple-award, open market vehicle designed to provide rapid access to qualified commercial vendors capable of supporting National Special Security Events (NSSEs) and other contingency-driven special events on short notice. The agreement will utilize commercial item simplified procedures under FAR Part 12 and RFO 12.201-1(e)(3).
The worksheet template is designed to guide vendors in submitting proposals for commercial rental equipment, incidental purchase items, delivery services, setup support, operational support, emergency evacuation logistics support, lodging coordination, and recovery services in support of government facility and temporary event location operations. As a template document, it establishes the framework for vendor responses but does not specify individual pricing terms, response deadlines, or award dates, which would be detailed in the actual solicitation (FA706026Q0028).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
MISSION SUPPORT SERVICES BPA
OFFEROR PROPOSAL WORKSHEET
| A. OFFEROR INFORMATION | |||
| Legal Business Name | UEI | CAGE Code | Proposal Date |
| Proposal POC | Telephone | SAM Active? | |
| Business Size / Socioeconomic Status | Joint Venture? | Prime / Teaming Approach | Amendments Acknowledged? |
| B. CAPABILITY CATEGORY SELECTION | |||||||
| Category | Capability Area | Proposing? | Performance Method | Primary Team Member / Supplier | Key Limitation or Exception | Proposal Section | Government Use |
| Category 1 | Temporary Power, Climate Control, and Lighting | ||||||
| Category 2 | Temporary Facilities and Site Infrastructure | ||||||
| Category 3 | Emergency Logistics and Recovery | ||||||
| Category 4 | Lodging Coordination and Transportation | ||||||
| C. PROPOSAL COMPLETION INSTRUCTIONS | |||||||
| 1 | Complete the offeror information and identify every capability category proposed. | ||||||
| 2 | Provide no more than three prior-experience examples on the Prior Experience tab. Examples may be evaluated cumulatively. | ||||||
| 3 | Map each experience example to the capability category or categories it supports and identify the critical elements demonstrated. | ||||||
| 4 | Complete every minimum capability row for each category proposed. Identify whether the capability is self-performed or provided through a team member or supplier network. | ||||||
| 5 | Complete the Pricing Schedule using the pricing basis selected by the Government. Do not alter the item descriptions or units without clearly identifying the exception. |
| D. COMPLETENESS CHECK | |||
| Check | Workbook Element | Result | Explanation |
| 1 | Capability categories selected | Incomplete | At least one category must be marked Yes. |
| 2 | Prior-experience examples entered | Incomplete | Up to three examples may be submitted. |
| 3 | Technical capability responses entered | Not Started | Every requirement in a proposed category should be answered. |
| 4 | Pricing rows entered | Not Started | Complete all applicable market-basket rows. |
Technical Capability
TECHNICAL CAPABILITY MATRIX — PASS / FAIL
Complete every row for each capability category proposed. A “Yes” response should be supported by a concise explanation and a proposal-page or attachment reference. A capability may be self-performed or provided through an identified team member, subcontractor, or commercial supplier network.
| Item ID | Capability Category | Minimum Capability Requirement | Offeror Response | Performance Method | Resource / Approach Description | Backup / Surge Approach | Limitation / Exception | Proposal Page / Attachment Ref. |
| 1.1 | Category 1 | Access to commercial generators in multiple capacities appropriate for temporary or emergency operations. | ||||||
| 1.2 | Category 1 | Access to power-distribution equipment, cabling, panels, and related accessories. | ||||||
| 1.3 | Category 1 | Access to portable HVAC or climate-control equipment suitable for temporary facilities. | ||||||
| 1.4 | Category 1 | Access to temporary lighting equipment, including towable or comparable light towers. | ||||||
| 1.5 | Category 1 | Ability to deliver, install, test, operate, maintain, and remove equipment. | ||||||
| 1.6 | Category 1 | Qualified operators or technicians available when required by the call. | ||||||
| 1.7 | Category 1 | Backup and replacement procedures for failed or unavailable equipment. | ||||||
| 1.8 | Category 1 | Safety, environmental, spill-prevention, and fuel-management procedures. | ||||||
| 2.1 | Category 2 | Access to tents, shelters, or temporary structures in multiple sizes and configurations. | ||||||
| 2.2 | Category 2 | Access to portable sanitation and handwashing equipment. | ||||||
| 2.3 | Category 2 | Access to barriers, fencing, or crowd-control equipment. | ||||||
| 2.4 | Category 2 | Access to temporary flooring, tables, chairs, furnishings, or related site infrastructure. | ||||||
| 2.5 | Category 2 | Ability to deliver, install, inspect, service, teardown, and remove equipment. | ||||||
| 2.6 | Category 2 | Ability to coordinate fire-marshal, safety, utility-location, and installation requirements. | ||||||
| 2.7 | Category 2 | Cleaning, servicing, maintenance, and replacement procedures. | ||||||
| 2.8 | Category 2 | Backup supplier or inventory approach for surge requirements. | ||||||
| 3.1 | Category 3 | Short-notice emergency or contingency mobilization capability. | ||||||
| 3.2 | Category 3 | Logistics planning, scheduling, and on-site coordination capability. | ||||||
| 3.3 | Category 3 | Transportation, staging, material-handling, or temporary warehousing resources. | ||||||
| 3.4 | Category 3 | Ability to coordinate multiple commercial suppliers or subcontractors. | ||||||
| 3.5 | Category 3 | On-site management and communications procedures. | ||||||
| 3.6 | Category 3 | Surge staffing and continuity-of-operations approach. | ||||||
| 3.7 | Category 3 | Evacuation, relocation, recovery, or comparable contingency-support capability. | ||||||
| 3.8 | Category 3 | Demobilization, equipment recovery, and site-restoration capability. | ||||||
| 3.8 | Category 4 | Ability to book and coordinate transportationand temporary warehousing | ||||||
| CATEGORY COMPLETENESS SUMMARY | ||||||||
| Category | Proposed? | Worksheet Status | ||||||
| Category 1 | 0 | Not Proposed | ||||||
| Category 2 | 0 | Not Proposed | ||||||
| Category 3 | 0 | Not Proposed | ||||||
| Category 4 | 0 | Not Proposed |
Past Performance
PRIOR EXPERIENCE GATE — OFFEROR WORKSHEET
Submit no more than three recent and relevant examples. The Government may evaluate examples cumulatively. A vendor that does not demonstrate the minimum prior experience for a proposed capability category may fail that category.
| Example | Project / Contract Title | Entity Whose Experience Is Submitted | Relationship to Offeror | Customer / Organization | Contract / Order Number | Customer POC | POC Email / Phone | Start Date | End Date / Ongoing | Total Project Value | Value Performed by Proposed Team | Role | Category 1? | Category 2? | Category 3? | Mobilization / Scale / Complexity Facts | Scope Similarity Narrative | Critical Elements Demonstrated | Resources / Personnel Available to Proposed BPA | Proposal Page / Attachment Reference |
| Example 1 | ||||||||||||||||||||
| Example 2 | ||||||||||||||||||||
| Example 3 |
Pricing Schedule
CEILING RATE SCHEDULE
Pricing Basis
| Item ID | Capability Category | Item / Service | Unit | Daily Rate | Weekly Rate | Monthly Rate | Delivery / Mobilization | Emergency / After-Hours Surcharge | Commercial Catalog / Basis | Notes / Assumptions |
| P-01 | Category 1 | Generator, 20–25 kW towable diesel | Per Day | |||||||
| P-02 | Category 1 | Generator, 60–100 kW towable diesel | Per Day | |||||||
| P-03 | Category 2 | Portable toilet, standard event configuration | Per Day | |||||||
| P-04 | Category 2 | Portable toilet, ADA / deluxe | Per Day | |||||||
| P-05 | Category 1 | Lighting tower, LED towable | Per Day | |||||||
| P-06 | Category 1 | Portable AC / spot cooler, 2–5 ton | Per Day | |||||||
| P-07 | Category 2 | Tent, 20 x 40 frame | Per Day | |||||||
| P-08 | Category 2 | Tent, 40 x 80 large event | Per Day | |||||||
| P-09 | Category 2 | Barrier, bike-rack section, approximately 8 feet | Per Day | |||||||
| P-10 | Categories 1–3 | Operator / technician labor | Per Person-Day | |||||||
| P-11 | Categories 1–3 | Delivery / mobilization | Per Event | |||||||
| P-12 | Categories 1–3 | Emergency / after-hours surcharge | Percent | |||||||
| P-13 | Category 4 | 56-passenger charter bus | Per Day | |||||||
| P-14 | Offeror-Defined | Other commonly offered item or service | Specify |
File details come from the government source that posted it. Updated .