Attachment (1) Engine Repair PWS.docx

DOCX document 104 KB Posted

Attached to
KC-130J Depot-Level Engine Repair: Draft Solicitation
Solicitation number
N00019-20-RFPREQ-PMA-207-0367
Issued by

About this file

This is a draft request for proposal issued by the Naval Air Systems Command seeking depot-level repair services for KC-130J Quick Engine Change Assemblies. The contractor will be required to conduct depot repair and buildup of QECAs, survey and repair radiological control exposed QECAs, store QECAs and components, and provide project management. The QECA consists of the Rolls-Royce AE2100D3 turboprop engine and the Lockheed Martin Quick Engine Change Kit. Industry is requested to provide comments on the draft RFP package by March 17th. The Navy will also hold one-on-one pre-solicitation teleconferences with interested offerors on March 22nd to discuss the draft RFP; requests for teleconferences must be submitted by March 17th. This notice does not constitute a solicitation and the government is not obligated to award a contract as a result.

View the file

Other files

File Type Posted
QA Govt Reponses (042121).xlsx XLSX spreadsheet
QA Govt Reponses (033121).xlsx XLSX spreadsheet
Att L-3 Proposed Repair BOM.xlsx XLSX spreadsheet
Appendix F Template.pdf PDF
Eng_Rpr_CDRLS.pdf PDF
Att (8) NAVAIR_AE2100D3 Action Items.xlsx XLSX spreadsheet
Appendix K Template.pdf PDF
Att L-7 Vol 5 P-1 Price.xlsx XLSX spreadsheet
Att (6) AE2100D3_OEM_SB.xlsx XLSX spreadsheet
Appendix I Template.pdf PDF
Attachment (14) C-130 Engine Repair Mission Essential CS.docx DOCX document
Att L-2 Vol 3 T-1 CRM_20210217.xlsx XLSX spreadsheet
Appendix J Template.pdf PDF
Att L-1 Vol 1 ES Tables_20210217.xlsx XLSX spreadsheet
Att L-6 Vol 4 PP-1 PP Cont Data.xlsx XLSX spreadsheet
Appendix C Template.pdf PDF
Att L-5 Vol 4 PPQ.docx DOCX document
Att (2) GFP List.xlsx XLSX spreadsheet
Att L-4 Vol 3 T-2 SBPCD.docx DOCX document
Att (3) RADCON Plan.pdf PDF
Att (7)_NAVAIR Depot Metrics.xlsx XLSX spreadsheet
Att (4) CSI List.xlsx XLSX spreadsheet
N0001921R0014 Engine Repair Draft.docx DOCX document
Appendix D Template.pdf PDF
Appendix G Template.pdf PDF
Appendix H Template.pdf PDF
Appendix E Template.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT FOR

DEPOT-LEVEL REPAIR OF

NAVAIR

KC-130J QUICK ENGINE CHANGE ASSEMBLIES

(AE2100D3 ENGINES)

23 February 2021

Contract Number

TBD

Approved by: __________________________________________

DISTRIBUTION STATEMENT A: Approved for public release. Distribution is unlimited.

CHANGE SUMMARY PAGE

This change summary page is provided to maintain a record of changes to the Performance Work Statement (PWS). Upon receipt of a change or revision, the holder of the PWS shall incorporate the change(s) and/or revision(s) into the PWS and make appropriate entries on the record of changes list below.

RECORD OF CHANGES

Revision
Date
Title or Brief Description
Entered by

Table of Contents

1Scope5
1.1Weapon System Description and Use5
2Support Concept5
2.1Operational Concept5
2.1.1Maintenance Concept5
3Applicable Documents6
3.1Government Documents6
3.2Kuwait Air Force Specific Documents7
3.3Other Documents7
4General Requirements8
4.1Quality8
4.2Operations Security8
4.3Project Management8
4.3.1Project and Risk Management8
4.3.2Supply Chain Risk Management9
4.3.3Counterfeit Parts/SCRM Incidents9
4.3.4Project Manager9
4.4Hazardous Material and Waste9
4.4.1Hazard Material and Waste Management System9
4.4.2Hazard Material and Waste Exposure9
4.5Packaging, Handling, Shipping and Transportation9
4.5.1Shipping, Packaging, Storage, and Containers9
4.5.2Government Furnished Property Shipping10
4.6Export Control Licenses10
4.7Engine Transaction Reporting10
4.8Cyber Security10
4.8.1Information Assurance (IA)10
5Project Requirements (CLINs 0001, 0002)10
5.1Management Plan10
5.2Meetings and Reviews11
5.2.1Post-Award Conference (PAC)11
5.2.2Weekly Teleconferences11
5.2.3Program Management Reviews/Technical Interchange Meetings11
5.2.4Monthly Meetings or Video Teleconferences11
5.2.5Agenda11
5.2.6Meeting Minutes11
5.3Government Furnished Equipment11
5.4Government Furnished Material12
5.5Government Furnished Property Inventory12
5.6Access to Systems12
5.6.1Access to Government Systems12
5.6.2Access to Contractor Systems12
5.7Airworthiness and Configuration Management12
5.7.1Airworthiness Certification Authority12
5.7.2Configuration Control13
5.7.3Trademark Rights Under Government Contracts13
5.7.4Technical Variances and Deviations13
5.8Engineering Investigations and Technical Services (CLIN 0012, 0013)13
5.8.1Engineering Investigation, Analytical Condition Inspection, and Product Quality Deficiency Report13
6QECA Repair Requirements (CLINs 0003, 0004, 0005, 0006)14
6.1General Repair Requirements14
6.1.1Repairs14
6.1.2QECA Repairs14
6.1.3Repair Materials14
6.1.4Perform Repairs14
6.1.5Work Performed Repairs14
6.1.6Repair Action Report14
6.1.7Life Limited Components15
6.1.8Storage15
6.1.9Monthly Preservation Tasks15
6.1.10Security of Government Property15
6.1.11Cannibalization15
6.1.12Condemnation15
6.1.13Disposition of Material15
6.2Induction, Disassembly, and Assembly of QECA (CLIN 0003)16
6.2.1Records Protection16
6.3QECK Repairs (CLIN 0004)16
6.3.1Deviation Requests16
6.4 Power Section Repair (CLIN 0005)16
6.4.1 Operational Test16
6.5 Propeller Gearbox and Gearbox Mounted Accessory Drive Repair (CLIN 0006)17
6.5.1 Operational Test17
6.5.2 Request Disposition17
6.6 Service Bulletins and Technical Directives (CLIN 0011)17
6.7 Shipping Requirements17
6.8 Radiological Control (RADCON)18
6.8.1 RADCON QECA Survey (CLIN 0007)18
6.8.2 RADCON Engine Reassembly (CLIN 0008)19
6.8.3 RADCON QECK Reassembly (CLIN 0009)19
6.8.4 Procurement of Parts Related to RADCON (CLIN 0010)19
6.9 Cost Reporting19
7Cost Reduction Initiatives (Option CLIN 0015)19
A.0Appendix A: KC-130J Quick Engine Change Assembly (QECA) System Description21
QECA System Description21
AE2100D3 Turboprop Engine Description21
KC-130J Nacelle Description21
B.0Appendix B: Projected Utilization Rates23
C.0Appendix C: Metrics24
C.1Metric Introduction24
C.2Metric Definitions24
C.2.1QECA Repair Turn-Around Time24
C.2.2PGB and GMAD Turn-Around Time25
C.2.3RADCON Survey Turn-Around Time25
C.2.4Hold Time25
D.0Appendix D: Repair Processes27
D.1Receipt and Processing27
D.2QECA Repairs - Induction27
D.3Core Engine Teardowns28
E.0Appendix E: List of Acronyms29

Scope This Performance Work Statement (PWS) defines the effort required for the Contractor to provide depot-level repair of KC-130J Quick Engine Change Assemblies (QECA) for the Naval Air Systems Command (NAVAIR) KC-130J aircraft utilized by the U.S. Marine Corps (USMC), U.S. Navy (USN), and NAVAIR-managed Foreign Military Sales (FMS) cases.

Weapon System Description and Use The KC-130J aircraft performs USMC, USN, and Kuwait Air Force (KAF) peculiar mission requirements such as in-flight refueling for fixed and rotary wing aircraft, rapid ground refueling, and other tactical capabilities. The KC-130J aircraft QECA consists of the Rolls-Royce AE2100D3 turboprop engine and the Lockheed Martin Quick Engine Change Kit (QECK). Additional descriptions of the propulsion system are outlined in Appendix A, KC- 130J Quick Engine Change Assembly (QECA) System Description.

Support Concept This PWS details the QECA depot repair requirements and engineering and technical services required to meet the operational concept, maintenance concept, and support dates as defined herein with the repair capability meeting the Government’s annual engine operating hours outlined in Appendix B, Projected Utilization Rates. The Government manages engines as a propulsion package referred to as a “QECA”, which is comprised of the nacelle (QECK), core engine, and the necessary components attached to them in order to make the QECA a complete operational unit. As such, the Government will ship complete QECAs to the Contractor’s depot maintenance center for repair. Propeller Gearbox (PGB) and Gearbox Mounted Accessory Drive (GMAD) will also be shipped as individual components for repair. Attachment 2 Government Furnished Property (GFP) List to the contract provides a list of all QECK and engines currently managed in the NAVAIR inventory and expected to be repaired by the Contractor under this PWS. As the Government continues to procure aircraft and spare engines, Attachment 2 will be updated to include any additions and deletions made to the inventory. This concept includes incorporation of active service bulletins and technical directives as directed by the Government.

Operational Concept The Government operates the KC-130J at sites within the continental United States (CONUS) and outside the continental United States (OCONUS). The projected utilization of QECAs are identified in Appendix B, Projected Utilization Rates from these sites.

Maintenance Concept Government, FMS, and Government-contracted personnel maintain the propulsion system at the organizational-level (O-level) in accordance with the approved maintenance concept as described in the NAVAIR KC-130J Organizational Maintenance Manuals, Interactive Electronic Technical Manuals (IETM), KAF KC-130J Organizational Maintenance Manuals, NAVAIR Technical Directives (TDs), Naval Aviation Maintenance Program (NAMP), and other Government approved data. This support includes servicing, troubleshooting, scheduled and unscheduled maintenance actions, and preservation and packing of retrograde material. The Contractor is responsible for providing facilities, labor, parts, material, and test equipment necessary for depot-level repair of QECAs in performance of this contract. Additionally, the Contractor is responsible for effectively managing repair part inventories, which includes forecasting all material requirements and vendor contracts to ensure all received material is returned to ready-for-issue (RFI) status.

Applicable Documents These documents are for reference purposes only. Specific requirements are identified in the applicable PWS sections.

Government Documents

Document Number
Title
Date
COMNAVIRINST 4790.2D
COMNAIRFORINST 4790.2D, The Naval Aviation Maintenance Program (NAMP)
1 Feb 2021
Department of Defense (DoD) Manual 5220.22-M
Department of Defense (DoD) Manual 5220.22-M, National Industrial Security Program Operating Manual (NISPOM)
18 May 2016
DoD 4160.21
DoD 4160.21, Defense Materiel Disposition Disposal Guidance and Procedures
2 Oct 2019
DoD 4160.28
DoD 4160.28, Defense Demilitarization: Program Administration
9 Aug 2019
DoDI 8520.02
DoDI 8520.02, Public Key Infrastructure (PKI) and Public Key (PK) Enabling
24 May 2011
JSSG-2007C
JSSG-2007C, Joint Services Specification Guide – Engines, Aircraft, Turbine
10 Jun 2011
MIL-HDBK-516C
MIL-HDBK-516C, Airworthiness Certification Criteria
12 Dec 2014
NAS411
National Aerospace Standard (NAS) 411 Hazardous Materials Management Program
30 Sep 2013
NAVAIR 01-75GAJ-6
NAVAIR 01-75GAJ-6 Periodic Maintenance Information Manual (PMIM)
1 Dec 2019
NAVAIRINST 13034.1F
NAVAIRINST 13034.1, Airworthiness and Cybersecurity Safety Policies for Air Vehicles and Aircraft Systems
30 Jun 2016
NAVAIRINST M-13034.1
NAVAIRINST M-13034.1, Airworthiness and Cybersafe Process Manual
13 April 2016
NAVAIRINST 13700.15G
NAVAIRINST 13700.15G, Decision Knowledge Programming for Logistics Analysis and Technical Evaluation (DECKPLATE) Engine/Propulsion System Module (E/PSM) Management
10 Feb 2020
NAVAIRINST 4130.1E
NAVAIRINST 4130.1E, Naval Air Systems Command Configuration Management Policy and Process
14 Nov 2016
NAVAIRINST 5215.12B
NAVAIRINST 5215.12B, NAVAIR Technical Directives System
16 Dec 2013
SECNAVINST 4140.2
SECNAVINST 4140.2 Management of Aviation Critical Safety Items
25 Jan 2006
Title 14 CFR Part 145
Title 14 CFR Part 145, Repair Station Requirements (European Aviation Safety Agency (EASA) Part 145 Certified Repair Station and Transport Canada Civil Aviation regulations in accordance with FAA AC 43-10C, United States-Canada Bilateral Aviation Safety Agreement Maintenance Implementation Procedures are acceptable equivalents to 14 CFR Part 145)
Title 14 CFR Part 21
Title 14 CFR Part 21, Certification Procedures for Products and Parts
Title 14 CFR Part 39
Title 14 CFR Part 39, Airworthiness Directives

Kuwait Air Force Specific Documents

Document Number
Title
Date

KAF KC-130J Organizational Maintenance Manuals

KAF 4790.2G
Kuwait Aviation Maintenance Program 4790.2G

Other Documents

Document Number
Title
Date

AE 2100D3 Maintenance Manual (MM) (CSP 34042)

AE 2100D3 Engine Manual (EM) (CSP 31013)

AE Series Standard Practices Manual (SPM) (CSP 40000)

AE 2100D3 Service Bulletins (SB) (CSP 34043)

AE 2100D3 Operations Manual (CSP 30004)

AE 2100D3 Illustrated Parts Catalog (CSP 33004)

AE 2100D3 Fault Isolation Manual (CSP 34063)

AE2100D3 Component Maintenance Manuals (CSP 34044)

General Requirements This section establishes the requirements for the Contractor to execute this PWS. These requirements apply to all contract line item numbers (CLINs). The Contractor shall use best commercial practices unless otherwise specified. The Contractor shall meet the metrics as defined in Appendix C, Metrics.

Quality The Contractor's project management efforts shall satisfy the requirements of this PWS. The Contractor shall use a commercial quality system that demonstrates a systems approach for managing quality, safety, and compliance with all contractual requirements in accordance with Title 14 CFR Part 145 Requirements. European Aviation Safety Agency (EASA) Part 145 Certified Repair Station and Transport Canada Civil Aviation (TCCA) regulations in accordance with FAA AC 43-10C, United States-Canada Bilateral Aviation Safety Agreement Maintenance Implementation Procedures, are acceptable equivalents to 14 CFR Part 145. The Government reserves the right to perform any necessary inspections, verifications, and evaluations of the Contractor’s repair facilities at any time during contract performance to ascertain the adequacy of the Contractor’s quality system. For safety related visits, the Government will give the Contractor no less than five (5) calendar days’ notice. The Government will give the Contractor no less than 30 calendar days’ notice for all other visits.

Operations Security The Contractor shall establish and maintain a security program with policies and procedures that comply with the requirements of the NISPOM DOD Manual 5220.22-M. The Contractor shall develop, implement, and maintain an OPSEC program to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the contract. The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. This program may include Information Assurance and Communications Security (COMSEC). The OPSEC program shall be in accordance with National Security Decision Directive (NSDD) 298, and at a minimum shall include:

1) Assignment of responsibility for OPSEC direction and implementation.

2) Issuance of procedures and planning guidance for the use of OPSEC techniques to identify vulnerabilities and apply applicable countermeasures.

3) Establishment of OPSEC education and awareness training.

4) Provisions for management, annual review, and evaluation of OPSEC programs.

5) Flow down of OPSEC requirements to subcontractors when applicable.

Project Management Project and Risk Management The Contractor shall provide project management to meet the performance requirements of the PWS. The Contractor shall establish and maintain a risk management program for the purpose of early identification and mitigation of program risks as to not negatively impact contract performance. The Contractor shall present risks and mitigations, performance metrics, and engineering statuses during monthly reviews and Program Management Reviews.

Supply Chain Risk Management The Contractor shall establish a Supply Chain Risk Management (SCRM) Program. The supply chain risk management process shall be conducted per supplier’s specifications as described in the vendor’s Quality Management System. The Contractor shall deliver a Bill of Material (BOM) Attachment 9, spreadsheet as the baseline of information requested for the monitoring and assessment of supply chain risks focusing on electronic components, devices that communicate with the aircraft, read/write devices and any hardware that the Contractor and Government agree present a high risk IAW Contract Data Requirements List (CDRL) (A005). The Contractor shall participate in a collaborative Integrated Product Team (IPT) approach with the Government to manage all SCRM related activities and shall review the results of the supply chain risks assessment with the Government during PMR and monthly program reviews.

Counterfeit Parts/SCRM Incidents The Contractor shall notify the Government regarding any counterfeit parts or SCRM incidents within 24 hours of first identification/detection/notification of the counterfeit parts IAW CDRL (A005).

Project Manager The Contractor shall designate a single point of contact responsible for the overall management and performance of the contract requirements. The Contractor shall provide, in writing, the name and contact information of the designee to the Procurement Contract Officer (PCO) within ten business days of contract award. Any change of Project Manager shall be submitted to the PCO within five business days of the change.

Hazardous Material and Waste The Contractor shall implement hazardous material handling procedures that comply with local, state, and federal laws and regulations concerning the use of Class I Ozone Depleting Compounds and Ozone Depleting Substances identified in NAS411-1.

Hazard Material and Waste Management System The System shall be manufactured, tested, operated, maintained, repaired, and disposed of in accordance with federal, state, local, and international Environment, Safety, and Occupational Health (ESOH) laws and regulations (i.e. OPNAVINST 5090.1C, DoDD 6050.7, and DoD INST 4715.4).

Hazard Material and Waste Exposure The System shall not subject operating personnel to excess limits of toxic substances as specified in the above referenced DoD/DON Occupational Safety and Health standards.

Packaging, Handling, Shipping and Transportation Shipping, Packaging, Storage, and Containers The Contractor shall preserve and package for transport all Government property in accordance with the Original Equipment Manufacturer (OEM) Repair Manuals. The primary method for shipping engines and components will be as QECAs. Components shall be shipped to and from the Contractor in approved shipping containers. In the event engines are shipped for repair on Government engine stands, the Contractor shall ensure Government engine stands, adapters, and protective bag/cover are fully accounted for and returned to the Government in RFI condition.

Government Furnished Property Shipping The Contractor shall ship all Government Furnished Property (GFP) at the request of the Contracting Officers Representative (COR).

Export Control Licenses The Contractor shall have export licenses for all components, parts, and materials that are Export Administration Regulations (EAR) controlled.

Engine Transaction Reporting The Contractor shall comply with the Engine/Propulsion System Module (E/PSM) reporting procedures in accordance with NAVAIRINST 13700.15G as changes in custody, status, or conditions occur, and provide the information to the COR.

Cyber Security The Contractor shall be required to deliver a Program Cybersecurity Implementation Plan (CSIP) or Annex CSIP to address each of the sections of the Cybersecurity Plan (CSP). The contractor shall demonstrate its understanding of the CSP and describe how the requirement of each of the sections of the CSP will be achieved by the contractor. Sections of the CSP that are NOT applicable are required to be addressed. The contractor shall describe why a particular section is not applicable. The final Program CSIP shall be in Adobe Acrobat format with a digital signature from the contractor cognizant authority.

The Program CSIP updates or Annex CSIPs shall be delivered in accordance with CDRL A006.

Information Assurance (IA) The Contractor shall ensure that personnel accessing information systems have the proper and current certifications to access DOD information systems for the purpose of performing IA functions. Public Key Infrastructure (PKI) encryption is the chosen compliant Department of Defense (DoD) standard for protecting Controlled Unclassified Information (CUI) during transmission. CUI encompasses For Official Use ONLY (FOUO) and Sensitive Information. Failure to encrypt CUI during electronic transmission is considered a security weakness and must be reported to the Information Assurance Officer (IAO) and Program Security Manager (PSM) via the Contractor’s responsible individual. The Contractor shall require their personnel to adhere to the required PKI policies stated herein when transmitting CUI. The Contractor shall implement DoD PKI policy per DODI 8520.02. The Contractor shall obtain and utilize PKI certificates issued by approved External Certificate Authority (ECA), for the purposes of protecting all CUI. A substitute to utilizing approved PKI ECA certificates is for the Contractor to become a member of the Federal Bridge Certification Authority in order to issue approved Contractor issued PKI certificates with trust relationships to the DoD PKI. Approved PKI will be utilized by the Contractor and their subcontractors when transmitting CUI via electronic means. A temporary written waiver for such requirements may be granted by the Government provided that the Contractor submits a waiver request in writing to the COR.

Project Requirements (CLINs 0001, 0002) Management Plan The Contractor shall create and maintain a Management Plan to provide processes for providing project management, QECA and component repair, and engineering and technical services required under this PWS. The Contractor shall deliver the Management Plan in accordance with (CDRL A001).

Meetings and Reviews The Contractor’s Project Manager shall attend and participate in the meetings listed below, with the appropriate Subject Matter Experts (SMEs) to support. Meetings will be scheduled by the Government with a minimum of 30-calendar days advance notice.

Post-Award Conference (PAC) The Contractor shall host a post-award conference with the Government at the Contractor’s facility no later than 45 calendar days after contract award. This meeting will cover the topics as set forth in FAR Subpart 42.5, Post-award Orientation. Additionally, the Contractor shall demonstrate its management procedures, provide progress assessments, review technical and other specialty area status, and schedule dates for near-term critical meetings and actions.

Weekly Teleconferences The Contractor shall provide weekly status reports (via email) to the COR of all QECAs. The Contractor shall provide the Weekly Depot metrics for all QECAs going through the depot utilizing Attachment 7. The contractor shall provide the weekly status report utilizing Attachment 8. The agenda at weekly teleconferences shall include assessing any engineering and logistics issues, configuration concerns and any potential or realized impacts to the production schedule.

Program Management Reviews/Technical Interchange Meetings The Contractor shall host semi-annual Program Management Reviews (PMRs) and Technical Interchange Meetings (TIMs) at the Contractor’s facility, the first of which shall occur approximately six months after PAC.

Monthly Meetings or Video Teleconferences The Contractor shall host and conduct monthly meetings by telephone or video teleconference to provide status on all open actions, performance metrics status, engine status highlights, QECA Deficiency Trends, engineering and logistical emergent issues, pending configuration changes, technical and programmatic risks, their potential impacts, and mitigation approaches.

Agenda The Contractor shall prepare an Agenda for the monthly meetings and PMR/TIM(s) and deliver the Agenda in accordance with CDRL A002.

Meeting Minutes The Contractor shall prepare Meeting Minutes for the monthly meetings and PMR/TIM(s) and deliver the Meeting Minutes in accordance with CDRL A003.

Government Furnished Equipment Spare core engines will be provided as Government Furnished Equipment (GFE) in accordance with Attachment 2 to the contract. The contractor may utilize these GFE items only when authorized by the COR. The Contractor shall store the USMC or FMS owned spare core engines and shipping containers in a secure storage area. The Contractor shall utilize OEM methods and procedures for maintaining the engines in a preserved and ready-for-installation state and shall provide status of all GFE items during monthly meetings. The Contractor shall perform monthly preservation tasks to include:

a. Perform general container maintenance; and

b. Ensure cleanliness and legible stenciling; and

c. Ensure all fasteners are in place and properly torqued; and

d. Inspect for damage to the outer surface of the container; and

e. Examine the external shock sensors; and

f. Monitor humidity.

g. Reclaim atmosphere (as needed)

h. Maintain preservation documentation (as needed) Government Furnished Material The Government will provide Government Furnished Material (GFM) listed in Attachment 2 of the contract as needed. GFM includes QECK parts that may not be procurable by the Authorized Maintenance Center (AMC).

Government Furnished Property Inventory The Contractor shall conduct a semi-annual inventory of all GFP at all sites. The Contractor shall deliver a GFP Inventory in accordance with CDRL A007.

Access to Systems Access to Government Systems Within five (5) business days after contract award, the Contractor shall notify the COR via email of the Contractor personnel required to have access to Government systems (e.g. Naval Aviation Technical Engineering Services Command (NATEC)). The Government will provide access to its systems within 45 calendar days after receipt of the notification.

Access to Contractor Systems It is the sole responsibility of the Contractor to obtain and access all necessary data (e.g. OEM technical manuals and services bulletins) to meet the requirements of the PWS throughout the life of the contract.

Airworthiness and Configuration Management Airworthiness Certification Authority NAVAIR is the airworthiness certification authority for the KC-130J aircraft. NAVAIR’s airworthiness certification for KC-130J propulsion system leverages the Federal Aviation Administration (FAA) type certification and civil airworthiness standards as a baseline in accordance with MIL-HDBK-516C, JSSG-2007C, and NAVAIRINST M-13034.1. The current manuals listed in Section 2.0 (IETMS, depot maintenance manuals, illustrated parts breakdown), approved OEM service bulletins per Attachment 6 and formal TDs form the baseline certification for airworthiness of depot-repaired engines.

Configuration Control The Contractor shall review the engine logbooks for NAVAIR TDs requiring incorporation during repair and document the compliance of the TD upon completion. Applicable NAVAIR TDs are available for download from the NATEC website www.natec.navy.mil. The current maintenance manuals, Illustrated Parts Breakdown (IPB), Approved OEM Service Bulletins (Attachment 6), and Formal Technical Directives form the baseline configuration of the KC-130J QECA. Applicable OEM service bulletins are available for download from the engine tracking system (ETS), which is located at https://2100.enginetracking.com. The contractor shall document all incorporated OEM service bulletins in ETS.

Trademark Rights Under Government Contracts The contractor shall not assert any claim, in any jurisdiction, based on trademark or other name or design-based causes of action that are based on rights the contractor believes it has in the term(s) of the KC-130J Super Hercules against the Government or others authorized by the Government to use the C/ KC-130J Super Hercules United States Navy/ Marine Corps acting within the scope of such authorization claims for trademark infringement, dilution, trade dress infringement, unfair competition, false advertising, palming off, passing off, or counterfeiting. Such authorization shall be implied by the award of a Government contract to any party for the manufacture, production, distribution, use, modification, maintenance, sustainment, or packaging of the products and services identified under this contract, and the scope of such implied authorization is defined as the use of the KC-130J Super Hercules in performance under such contract by the prime contractor and its subcontractors and suppliers at any tier. In all other cases, the scope of the authorization will be defined by the Government in writing.

Technical Variances and Deviations The Contractor shall provide a copy of the FAA approved technical variance (TV) via electronic means to the COR when the Contractor deviates from the authorized configuration and/or use of unauthorized parts or components to all AE2100D3 engines repaired under this PWS. A TV is defined as any deviation or variance that is outside the approved configuration, tolerances, or limits defined in the OEM repair manuals. Additionally, the Contractor shall make available all relevant data, analysis, and assumptions for review by NAVAIR technical authority experts to document the nature of the change, support why the change is needed, what testing was completed to ensure safety, and if the change is permanent or temporary. Proposed configuration changes shall be provided to NAVAIR prior to incorporation for downstream logistics and interface considerations.

Engineering Investigations and Technical Services (CLIN 0012, 0013) Engineering Investigation, Analytical Condition Inspection, and Product Quality Deficiency Report The Contractor shall provide, at the request of the Government (PCO) and with COR approval, support investigations of items designated special interest per the COMNAVAIRFORINST 4790.2C and KAF 4790.2G. The Contractor shall perform tasks to include Engineering Investigations (EIs), Analytical Condition Inspections (ACI) and Product Quality Deficiency Reports (PQDR). Government engineering personnel will coordinate with the Contractor on the induction of EI, ACI or PQDR items and provide specific disassembly, inspection, and data recording instructions. The Contractor shall research component history to include hours/cycles accrued, serviceability, repairs, and installations/removals, at a minimum. Disposition instructions and release of the EI, ACI, or PQDR item will be provided by Government engineering upon completion of the EI, ACI, and PQDR. The time required to support the EI and ACI shall not be counted against the Contractor's TAT. The Contractor shall compile root and corrective/preventative actions, analysis and test data and deliver IAW CDRL B001.

QECA Repair Requirements (CLINs 0003, 0004, 0005, 0006) General Repair Requirements Repairs The following requirements shall apply to all repairs performed under sections 5.0 and 6.0 of this PWS.

QECA Repairs The Contractor shall perform all unscheduled and scheduled repairs, maintenance actions, restoration, tests, FAA-approved airworthiness directives in accordance with Title 14 CFR Part 39, and configuration changes in accordance with the baseline configuration, established in section 5.7.2 of this PWS.

Repair Materials The Contractor shall ensure the safety and quality of all materials used in repairs and ensure that all new, repaired, or refurbished parts are FAA-certified (or equivalent TCCA or EASA), in accordance with Title 14 CFR Part 21, and are accompanied by a copy of the work order, FAA Form 8130-3 or an equivalent Contractor Certificate of Conformance (COC), and FAA Form 8110-3 or an equivalent Certificate of Release, Test, and Conformity.

Perform Repairs The Contractor shall provide all labor, parts, and material, excluding Attachment 2 items necessary to perform repairs.

Work Performed Repairs The Contractor shall provide documentation to certify all work was accomplished in accordance with Federal Aviation Regulation Part 145, Repair Station Operators (or equivalent TCCA or EASA), and record all maintenance, modifications, and component life information into the applicable NAVAIR/KAF logbook and engine data disks.

Certificate of Conformance The Contractor shall ensure that all work accomplished has been certified as airworthy and properly documented per FAR Clause 52.246-15.

Critical Safety Items The Contractor shall provide notification of any issue concerning a Critical Safety Item (CSI) part listed in Attachment 4 CSI List to the COR and FAA (or equivalent TCCA or EASA) via email within two business days of issue identification.

Repair Action Report The Contractor shall compile all repair data and deliver a Repair Action Report on repaired QECAs, engines, modules, and components in accordance with CDRL A004.

Life Limited Components The Contractor shall replace all life limited components referenced in the KC-130J PMIM with less than 800 cycles life remaining per the recorded cycles in the Engine Logbook.

Storage The Contractor shall provide indoor storage for NAVAIR or FMS-owned QECAs and shipping containers while under repair.

Monthly Preservation Tasks The Contractor shall use approved OEM methods and procedures for maintaining the engines in a preserved and RFI state.

Security of Government Property The Contractor shall perform the following monthly preservation tasks:

a. Perform general container maintenance; and

b. Ensure cleanliness and legible stenciling; and

c. Ensure all fasteners are in place and properly torqued; and

d. Inspect for damage to the outer surface of the container; and

e. Examine the external shock sensors; and

f. Monitor humidity.

g. Reclaim atmosphere (as needed)

h. Update preservation documentation (as needed) Cannibalization The Contractor shall request, in writing to the COR, for approval from the Government to cannibalize repairable parts, components, or modules from other QECAs. All cannibalization requests shall include supporting rationale and an impact statement. The contractor may not cannibalize any item from the QECA until approved by the COR. CSI components identified in Attachment 4 CSI List will not be authorized for cannibalization. Cannibalization approval or disapproval by the Government shall not constitute grounds to extend the TAT of the QECA from which the parts were cannibalized. Cannibalization changes shall be tracked in Attachment 7 Weekly Depot Metrics.

Condemnation Parts, components, and modules shall be considered for condemnation if their repair exceeds the repairable limits specified in the applicable OEM manuals. The Contractor shall not repair condemned parts unless authorized in writing by the COR. All condemned parts shall be reported in the Final Condition Report / Certificate of Conformance (CoC), and the Contractor shall request the Government provide disposition guidance for all condemned parts.

Disposition of Material The Contractor shall include in its NAVAIR approved Management Plan (CDRL A001) the process for disposal of Government property and shall include the requirements stipulated in the FAR Part 45, Government Property; DoD 4160.21-M, Defense Material Disposition Manual; and DoD 4160.28, Defense Demilitarization: Program Administration. The Contractor shall dispose of all removed Government property in accordance with the Management Plan.

Induction, Disassembly, and Assembly of QECA (CLIN 0003) The Contractor shall notify the COR/Government via email of receipt of a QECA. The Contractor shall receive and induct all QECAs provided by the Government that have identified discrepancies requiring partial or full disassembly. The Contractor shall perform receiving, inspection, removal of core engine, minor repair of QECK, reinstallation of the core engine, final inspections, report preparations, and logbook and record card update actions to return the QECA to RFI condition as outlined in Appendix D, Repair Processes. Flight hours are defined as the amount of hours as recorded by the Government in Naval Aviation Flight Records (NAVFLIR).

The Contractor shall submit Engine Transaction Reports (ETR) to the COR. In the case of lost or missing maintenance records, the ETR entries shall identify what records were not received.

Records Protection The Contractor shall protect all maintenance records from damage or loss IAW COMNAVAIRFORINST 4790.2C Chapter 5.

QECK Repairs (CLIN 0004) A QECK depot-level repair encompasses the structural components, all attaching components, wiring, ducts, and tubing of the QECA that are not part of the core engine. The contractor shall perform QECK depot-level repairs. Repairs of the QECA Transport Dollies/Stands and the QECA protective bag/cover shall be included in the QECK repair effort.

Deviation Requests The Contractor shall obtain Government approval, in writing via the COR, for any change to or deviation from QECK and subcomponents of the QECK prescribed repair procedure or test specification(s) in approved OEM and Government Maintenance manuals. The COR will provide disposition within five business days.

6.4 Power Section Repair (CLIN 0005)

Core engine is defined below and is inclusive of all attaching components, wiring harnesses, tubing, and ducting. The contractor shall perform repairs inclusive of all disassembly, inspections, repairs, component testing, reassembly of Power Section and Torquemeter, and operational testing of the core engine.

a. Power Section; and

b. Torquemeter; and

c. Power Unit Accessory Drive.

6.4.1 Operational Test

Upon reassembly of a core engine, the Contractor shall perform an operational test of the engine to certify as RFI. All engines repaired by the Contractor shall have a maximum measured gas temperature (MGT) value of 1366°F to produce a 100% shaft horse power (SHP) rating of 4637 SHP at Sea Level, Static, Standard Day conditions in order to be considered RFI.

6.5 Propeller Gearbox and Gearbox Mounted Accessory Drive Repair (CLIN 0006) This section applies to the AE2100D3 PGB and GMAD units that are received by the Contractor either installed in a QECA or as stand-alone units. Upon receipt of executed Task Order, the Contractor shall repair the PGB and GMAD.

6.5.1 Operational Test

Upon repair of the PGB and GMAD, the Contractor shall perform an operational test of the units to certify as RFI.

a. For PGB and GMAD units received installed, the operational test shall be accomplished once installed on the core engine.

b. For PGB and GMAD units received as standalone assets, the test may be completed using a standalone test platform or as an installed unit on a core engine.

6.5.2 Request Disposition

Upon successful completion of the operational test of PGB and GMAD standalone assets, the Contractor shall request disposition instructions from the COR.

6.6 Service Bulletins and Technical Directives (CLIN 0011)

The Contractor shall provide pricing of labor and materiel required to incorporate new service bulletins and technical directives as directed by the Government during engine repair. The Contractor shall incorporate new service bulletins and technical directives beyond the baseline established at initial contract award after receipt of formal PCO approval.

Proposed service bulletins to be incorporated shall be assigned one of the below categories by the contractor:

1. No Cost to Incorporate

2. Minor – Inspection requiring abnormal labor burden and/or repair using existing tooling/skillsets

3. Major – Repair using unique tooling/skillsets and/or incorporation of hardware that is outside of the normal repair scope

6.7 Shipping Requirements

The Contractor shall coordinate and ship QECAs and components as directed by the COR. Transportation costs for shipment of the QECAs and components from the Government site to the Contractor’s facility are the responsibility of the Government. The Contractor shall ship QECAs and PGBs from the Contractor’s facility to the Government designated CONUS, OCONUS, or KAF location via the Transportation Account Code (TAC). The contractor shall ensure that all engine shipping bags are RFI prior to shipment, replacing unserviceable protective bag/cover as required. The below listed destinations and supported activities are provided as standard shipping locations but are not all inclusive as other events may require shipments to alternate destinations to support fleet requirements.

CONUS: The following geographical areas are utilized to support USMC, USMCR, activities that are based or operating within the Continental US.

Destination
Activity Supported
Cherry Point , NC
VMGR-252
Patuxent River, MD
VX-20
Newburgh, NY
VMGR-452
Fort Worth, TX
VMGR-234
San Diego, CA
VMGR-352
Pensacola, FL
Naval Flight Demonstration Squadron

OCONUS: The following geographical areas are utilized to support USMC, USMCR, activities that are based or operating outside of the Continental US.

Destination
Activity Supported
Iwakuni, Japan
VMGR-152
Kaneohe Bay, HI
VMGR-153

Kuwait Air Force: QECAs and PGBs shall ship to one of the following locations of the Contractor’s choice in support of KAF activities that are based or operating outside of the Continental US.

Destination
Activity Supported
Jamaica, NY
Kuwait (Freight Forwarding Activity)
Cherry Point, NC
Kuwait (FMS Logistics Lead)

6.8 Radiological Control (RADCON)

The Contractor shall perform repairs for QECA components exposed to radiological contamination under this section. RADCON repairs are considered beyond the scope of sections 6.1-6.5 of this PWS. The Government will provide a Large Area Monitor (LAM) radiation detection instrument as GFE per the GFP Attachment 2. The Contractor shall provide all other radiation detection instruments.

6.8.1 RADCON QECA Survey (CLIN 0007)

The Contractor shall disassemble, survey, inspect, and decontaminate a radiation contaminated QECA in accordance with the AE2100 RADCON Engine Teardown Inspection Plan (Attachment 3) complying with all local laws and regulations, and the following:

a. Radiological control work requires the contractor (or its subcontractor) to possess a Nuclear Regulatory Commission (NRC) or an Agreement State License that authorizes the work required to survey, decontaminate, and store components that are contaminated with radioactive material.

b. The Contractor shall make the radiological survey facility available for Government site survey within 30 business days of contract award.

c. The Contractor shall perform up to three decontamination attempts if the component is found above the limits.

d. If there is less than a 10% reduction in radioactivity between the initial survey and the first decontamination attempt, and the component remains above limits, the item shall be quarantined. If the component remains above limits after the third decontamination attempt, the component shall be quarantined.

e. The Contractor shall retain all quarantined components at the radiological survey facility until the Government provides disposition instructions.

f. The Contractor shall complete and submit all Survey Plan Appendices and associated documentation completely, correctly, and within the guidelines provided in the survey plan. The Contractor shall submit the appendices for each QECA survey as each appendix is completed.

g. The Contractor shall retain all QECAs at the radiological survey facility until the component is cleared for release.

All QECAs surveyed under this CLIN will be reviewed and cleared by the Government prior to release for reassembly. This release shall be provided by the Government via Naval message. The Contractor shall perform reassembly of the QECA as appropriate.

6.8.2 RADCON Engine Reassembly (CLIN 0008)

AE2100 engines processed through RADCON decontamination and cleared by NAVSEA will be shipped to the Contractor in a disassembled state for inspection and reassembly. The Contractor shall perform the reassembly under this CLIN concurrently with the repair procedures performed under Section 6.0.

6.8.3 RADCON QECK Reassembly (CLIN 0009)

QECKs processed through RADCON decontamination and cleared by NAVSEA will be shipped to the Contractor in a disassembled state for inspection and reassembly. The Contractor shall inspect and reassemble a QECK received in a disassembled state. These QECKs were disassembled during RADCON survey and have been cleared for reassembly by NAVSEA. The Contractor shall perform the reassembly under this CLIN concurrently with the repair procedures performed under Section 6.0 of this PWS.

6.8.4 Procurement of Parts Related to RADCON (CLIN 0010)

The Contractor shall provide a list of priced components, parts, and materiel quarantined during RADCON surveys that are required for the reassembly of a QECA. Once approved by the PCO, the Contractor shall incorporate the replacement part(s) into the QECA.

6.9 Cost Reporting

The Contractor shall provide cost actuals data for the repairs defined in sections 6.2, 6.3, 6.4, 6.5, and 6.6 (CDRL B002). Data shall be reported at the CLIN level and will include: engine serial number, engine removal reason, a description of the repair required, the labor hours required to complete the repair, material costs, and total cost.

Cost Reduction Initiatives (CLIN 0015) During Contract Performance, if the Contractor discovers any Cost Reduction Initiatives (CRIs), the Contractor shall propose potential CRIs to the Government for QECK repairs, Power Section Repairs, and Propeller Gearbox and Gearbox Mounted Accessory Drive Repairs. Potential proposed CRIs should help to reduce Total Ownership Costs throughout the lifecycle. CRIs shall only be executed upon approval by the PCO.

A.0 Appendix A: KC-130J Quick Engine Change Assembly (QECA) System Description QECA System Description The KC-130J propulsion system is comprised of the AE2100D3 turboprop engine manufactured by Rolls-Royce and the nacelle (commonly referred to as “QECK”) assembly manufactured by Lockheed Martin. The QECA is maintained as a complete ready to install and operate assembly.

AE2100D3 Turboprop Engine Description The Rolls-Royce AE2100D3 engine is comprised of five major modules:

a) Power Section

b) Torque meter

c) Power Unit Accessory Drive

d) Gearbox Mounted Accessory Drive

e) Propeller Gearbox (PGB)

Each engine includes the below listed major components and Line Replaceable Units (LRU):

1.Starter
11. Starter control valve
21. Torque meter pick-ups
2.Compressor inlet pressure sensors
12. Compressor inlet temperature sensors
22. Thermocouples
3.Full authority digital electronic control (FADEC) (2)
13. Indicating magnetic plugs
23. Fuel pump metering unit
4.Compressor variable geometry actuator
14. Anti-ice valve
24. Permanent magnetic alternator
5.Igniters
15. Ignition exciters
25. Fuel cooled oil cooler
6.NP harness
16. NP speed sensor
26. Power Section lube and scavenge pump
7.Fuel nozzles
17. NG speed sensors
27. PGB lube and scavenge pump
8.Bleed control valve
18. All engine tubing
28. Prop shaft flange adapter
9.FADEC A harness
19. FADEC B harness
29. Compressor bleed valves
10. EMS harness
20. Fuel flow meter

KC-130J Nacelle Description The Lockheed Martin KC-130J Nacelle is comprised of the following:

1.Nacelle structure
8.Engine and aircraft electrical system
2.Engine mounts
9.Engine fuel system
3.Electric generator
10. Engine control and indicating systems
4.Propeller pitch control unit
11. Engine oil system
5.Propeller overspeed governor
12. Engine starting system
6.Brush block and bracket
13. Engine hydraulic system

7. Engine and aircraft pneumatic system

The above lists are intended to detail only the major modules and components of the engine; they are not all- inclusive. A thorough breakdown of the engine that includes all parts, repairable as well as consumable, can be found in the Rolls-Royce AE2100D3 Illustrated Parts Catalog or the NAVAIR KC-130J and KAF Organizational Maintenance Manuals.

B.0 Appendix B: Projected Utilization Rates KC-130J AE2100D3 USMC/USN and KAF Overhauls:

Failure Mode
FY2022
FY2023
FY2024
FY2025
FY2026
Performance
13
16
12
12
11
Oil Leak/Pressure Issues
19
12
16
14
12
Foreign Object Damage (FOD)
9
15
5
10
9
Vibrations
8
8
10
11
13
Metal in Oil
4
4
8
6
7
External Engine Damage
5
4
6
5
4
Totals
58
59
57
58
56

C.0 Appendix C: Metrics C.1 Metric Introduction This Appendix defines the metrics selected to measure the Contractor’s performance effectiveness in meeting the requirements established in the Performance Work Statement. The Contractor shall be held responsible for meeting the established metrics subject to clause H-1, Turn-Around Time Liquidated Damages and any other remedies available under this contract. These metrics were selected in order to institute a program that provides Government operating forces with the QECA readiness necessary to meet their worldwide national security commitments.

Throughout the contract period, Contractor performance to metrics will be continually monitored per the Attachment 5 Quality Assurance Surveillance Plan (QASP). Formal reviews of Contractor performance will be held at each Program Management Review (PMR). At each semi-annual review, the cause and corrective actions associated with non-performance to metrics will be discussed and addressed.

In cases of non-performance to metrics, the following causes and results will be addressed by the NAVAIR and Contractor program management group:

· Validity of metric and measurements or data feeding the metric

· Impact on fleet readiness and operation due to the metric infraction or non-attainment

· Reason or cause for the metric infraction; both Government-caused and Contractor-caused

· Corrective action taken and results (metric performance due to timing associated with corrective action implementation) The Turn-Around Time (TAT) Metrics for performance monitoring and management are:

Table - C.1

Metric Name
Metric
QECA Repair TAT
100 Days
PGB and GMAD TAT (StandAlone)
45 Days
RADCON Survey TAT
90 Days

NOTE: In instances where QECA components are quarantined due to radiological contamination, the Contractor shall notify the Government and provide a proposal for the proposed price of the affected parts. At that time, the QECA repair TAT and the price of the affected parts will be mutually agreed upon by NAVAIR and the Contractor and a modification will be issued delineating agreement.

C.2 Metric Definitions C.2.1 QECA Repair Turn-Around Time The QECA Repair TAT conveys the Government’s requirements for repair responsiveness. The Contractor should use this metric to help determine the proper capacity of its repair facilities, repair part inventories, and subcontract requirements. The TAT starts once the Government issues a task order for repair of a QECA and the Contractor receives the QECA. The TAT ends when the Contractor provides copies of repair documentation and notifies the COR that the QECA is RFI and ready for shipment.

Date RFI – (Date task order issued and QECA received) = Total Days QECA Repair TAT C.2.2 PGB and GMAD Turn-Around Time The PGB and GMAD TAT convey the Government’s requirements for repair responsiveness. The Contractor should use this metric to help determine the proper capacity of its repair facilities, repair part inventories, and subcontract requirements. The TAT starts once the Government issues a task order for repair of a specific module and the Contractor receives the specific module. The TAT ends when the Contractor provides copies of repair documentation and notifies the COR that the module is RFI and ready for shipment.

Date RFI – (Date task order issued and PGB received) = Total Days PGB and GMAD TAT C.2.3 RADCON Survey Turn-Around Time The RADCON Survey TAT conveys the Government’s requirements for survey responsiveness. The Contractor can use this metric to help determine the proper capacity of its radiological survey facility. The TAT starts once the Government issues a task order for survey of a QECA and the Contractor receives the QECA. TAT ends upon the Government’s review and acceptance of all the survey data for the QECA.

If multiple QECA surveys are…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .