Att L-5 Vol 4 PPQ.docx
DOCX document 28 KB Posted
- Solicitation number
- N00019-20-RFPREQ-PMA-207-0367
About this file
This document contains a draft solicitation for depot-level engine repair services for the KC-130J aircraft. The Naval Air Systems Command is seeking to conduct depot repair and buildup of Quick Engine Change Assemblies, survey and repair of radiologically exposed assemblies, storage of assemblies and components, and project management. Interested offerors are requested to provide comments on the draft solicitation package by March 17, 2021 and may schedule a pre-solicitation teleconference between March 22-23 to discuss the requirement. The final solicitation is expected to be issued at a later date.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: N0001921R0014 17 Feb 2021
ATTACHMENT L-5 VOLUME 4
PAST PERFORMANCE QUESTIONNAIRE
Within 2 weeks from receipt of this questionnaire return this form to Ms. Kristina Johnson Procuring Contracting Officer, at Kristina.M.Johnson@navy.mil
1. CONTRACTOR IDENTIFICATION
a. Contractor:
b. Program Title:
c. Contract Number:
d. Type of Contract: Percent Complete:
e. Period of Performance being assessed: _________________________________________________
Note: Whether identified or not, if you have any knowledge of other contracts for the identified contractor, you are requested to complete a questionnaire for each contract or subcontract similar to this acquisition.
2. RESPONDENT IDENTIFICATION
a. Name:
b. Agency:
c. Position:
d. Relation to Program:
e. Phone:
f. Fax Number:
g. Email Address:
f. Date Questionnaire Completed:
3. PROGRAM CHARACTERISTICS
3.1. Please provide a short description of the subject contract.
3.2. Please check those activities, which are applicable to your program
a. ____Commercial Off The Shelf (COTS)/Non-Developmental Items (NDI) usage
b. ____Engine Modifications
c. ____Directed subcontracts
d. ____Management of Government Furnished Property (GFP)
e. ____Aircraft Heavy Maintenance to include major aircraft repairs/inspections, engine, propeller and aircraft component overhaul, repair and configuration tracking
f. ____Operation, Development and Maintenance of Computerized Management Information Systems in support Aircraft Field and Heavy Maintenance requirements at multiple sites
g. ____Configuration Management of Aircraft and Aircraft Components
h. ____Engineering support for Field and Heavy Maintenance Activities supporting multiple aircraft sites
i. ____Hazmat/Environmental Program Development, Control and Management
j. ____Flight/Industrial Safety/Quality Assurance Management and Oversight of Field and Heavy Maintenance activities
k. ____Supply Support for Field and Heavy Maintenance activities supporting multiple aircraft sites
l. ____Management of Personnel performing aircraft maintenance at multiple sites to include training, recruitment and transfer of personnel between sites
m. ____Obtaining Customs Clearances for export/import shipment of parts and material
n. ____Engine Overhaul and Repair
o. ____Propeller Overhaul
p. ____Support Equipment Maintenance
q. ____Engineering Services
4. PERFORMANCE LEVELS
4.1. PERFORMANCE GRADES (Use these grades to provide the overall rating where requested below).
Exceptional - Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory - Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal - Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory - Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
4.2. QUESTIONS
4.2.1. TECHNICAL (QUALITY OF PRODUCT OR SERVICES)
a. What kind of technical performance problems or strengths were experienced by the contractor?
b. What was the cause of these technical problems or strengths?
c. To what extent have corrective actions been taken to correct problem(s) identified above and to what extent have the corrective actions been effective? Describe the progress made to date. Also explain to what extent the corrective actions addressed the root cause of the problem(s) and led to systemic improvement such that similar problems would not reoccur.
d. Overall, the contractor's technical performance is rated ________________________.
|_|Exceptional |_|Very Good |_|Satisfactory |_|Marginal |_|Unsatisfactory
4.2.2. SCHEDULE/TIMELINESS
a. What kinds of schedule/timeliness problems or strengths were experienced by the contractor?
b. What was the cause of these schedule/timeliness/delivery problems or strengths?
c. To what extent have corrective actions been taken to correct problem(s) identified above and to what extent have the corrective actions been effective? Describe the progress made to date. Also explain to what extent the corrective actions addressed the root cause of the problem(s) and led to systemic improvement such that similar problems would not reoccur.
d. Overall, the contractor's schedule/timeliness performance is rated _________________.
4.2.3. MANAGEMENT OR BUSINESS RELATIONS
a. What was the contractor’s record of timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals (especially responses to change orders, engineering change proposals, or other undefinitized contract actions), the contractor's history of reasonable and cooperative behavior, effective business relations, and customer satisfaction?
b. What was the contractor’s success with timely award and management of subcontracts, including whether the contractor met or exceeded small business, small disadvantaged business, small business HUBZone, veteran-owned small business, service disabled veteran owned small business, women-owned small business participation and subcontracting goals?
c. To what extent does the contractor discharge their responsibility for integration and coordination of all activity needed to execute the contract; identify and apply resources required to meet schedule requirements; assign responsibilities for tasks/actions required by contract; and communicate appropriate information to affected program elements in a timely manner?
d. What were the contractor’s risk management practices, especially the ability to identify risks and formulate and implement risk mitigation plans?
e. If applicable, identify and provide information on any other areas that are unique to the contract, or that cannot be captured elsewhere under the Management Assessment.
f. Overall, the contractor's management performance is rated____________________.
4.2.4. SMALL BUSINESS SUBCONTRACTING
a. If this contract contains a small business subcontracting goal, assess compliance with all terms and conditions in the contract relating to Small Business participation (including FAR 52.219-8, Utilization of Small Businesses and FAR 52.219-9, Small Business Subcontracting Plan (when required). Assess any small business participation goals which are stated separately in the contract Assess achievement on each individual goal stated within the contract or subcontracting plan including good faith effort if the goal was not achieved.
b. Check one of the boxes below, noting however when applying the rating definitions for this assessment equate “small business goals” to requirements.
4.2.3. REGULATORY COMPLIANCE
a. What kinds of Regulatory Compliance problems were experienced by the contractor?
b. To what extent have corrective actions been taken to correct problem(s) identified above and to what extent have the corrective actions been effective? Describe the progress made to date. Also explain to what extent the corrective actions addressed the root cause of the problem(s) and led to systemic improvement such that similar problems would not reoccur.
c. Overall, the contractor's Cost performance is rated ________________________.
d. Overall, the contractor's management performance is rated____________________.
5. SUMMARY: If you had the option, knowing what you know today, would you (pick one), award this contract to this contractor, given the choice? Please explain.
| a. | definitely not |
| b. | probably not |
| c. | probably |
| d. | definitely |
Signature _____________________________________________ Date _____________
NOTE: Electronic signatures are acceptable. An e-mail from the originator of this document will suffice. Signatures (electronic or hand written) verify that the signator completed this form and agrees with the information contained within it.
File details come from the government source that posted it. Updated .