This is a Performance Work Statement (PWS) for a Defense Logistics Agency (DLA) contract to provide Building Control Systems (BCS) and Utility Control Systems (UCS) maintenance services at five DLA locations: DLA Headquarters (Fort Belvoir, VA), Defense Supply Center Richmond (VA), Defense Distribution Center Susquehanna (PA), Defense Supply Center Columbus (OH), and DLA Distribution Depot San Joaquin (CA).
The PWS outlines requirements for routine/preventive maintenance, non-routine repairs, and cybersecurity support for elevator systems, potable water and wastewater systems, electrical and lighting systems, building automation systems (BAS)/HVAC systems, and utility metering systems. The contract will be structured as a firm-fixed-price IDIQ with a one-year base period and four one-year options. Work under $3,000 in material costs will be included in the fixed-price portion, while work over $3,000.01 will be issued as separate task orders. Key personnel requirements include a Site Manager and Alternate Site Manager/Quality Control Manager with minimum five years' experience. Contractors must provide 24/7 emergency response capabilities with specific response times to be defined in task orders. The contract requires development of quality control plans, preventive maintenance schedules, and monthly status reporting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002_Questions_Answers_24 JAN 2025_FINAL.xlsx | XLSX spreadsheet | |
| Attachment 1.1 DLA HQC HVAC Equipment List.xlsx | XLSX spreadsheet | |
| DFAFT RFP SP4705-25-R-2026_BCS_UCS_.pdf | ||
| Attachment 4 - Key Personnel Resume Template.pdf | ||
| Attachment 2A - Pricing Sheet_BCS UCS TO Schedule B.xlsx | XLSX spreadsheet | |
| Attachment 2 - Pricing Sheet_BCS UCS IDIQ Schedule B R1.xlsx | XLSX spreadsheet | |
| Attachment 1.4 TO IDIQ Facility Equipment List for Columbus.xlsx | XLSX spreadsheet | |
| Attachment 1.5 TO_and IDIQ Equipment List for DDJC.xlsx | XLSX spreadsheet | |
| Attachment 5 - Contractor NDA.pdf | ||
| Attachment 1.2 TO_and_IDIQ Equipment List Richmond.xlsx | XLSX spreadsheet | |
| Attachment 1A - Draft BCS_UCS PWS HQ Task Order 12.17.pdf | ||
| Attachment 3 ABCS UCS - Cross Reference Matrix12.19.xlsx | XLSX spreadsheet | |
| Attachment 1.3 TO IDIQ Facility Equipment List _DDSP_.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement Sensitive Information-See FAR 3.104
PERFORMANCE WORK STATEMENT (PWS)
Defense Logistics Agency (DLA)
Defense Contracting Services Office (DCSO)
Building Control Systems/Utility Control Systems (BCS/UCS) Maintenance Services
Elevators and Vertical Lifts
Potable Water and Wastewater Systems
Electrical and Lighting Systems
Building Automation System (BAS)/Heating, Ventilation, Air Conditioning, and
Refrigeration (HVACR) Systems, and Utility Metering System (UMS)
Electrical Distribution Systems (Site)
Firm Fixed Price (FFP), Indefinite Delivery/Indefinite Quantity (IDIQ) Contract for
Routine/Preventive, and Non-Routine/Ad-Hoc Maintenance
Return to Table of Contents
TABLE OF CONTENTS
SECTION C – DESCRIPTIONS AND SPECIFICATIONS
C.1 DLA HOST SITES/LOCATIONS
C1.1 DLA HEADQUARTERS COMPLEX, FORT BELVOR (HQC)
C1.2 DEFENSE SUPPLY CENTER RICHMOND (DSCR)
C1.3 DEFENSE DISTRIBUTION CENTER SUSQUEHANNA, NEW CUMBERLAND, PA
(DDSP)
C1.4 DEFENSE SUPPLY CENTER COLUMBUS, OH (DSCC)
C1.5 DLA DISTRIBUTION DEPOT, SAN JOAQUIN, CA (DDJC)
C.2 GENERAL/BACKGROUND REQUIREMENTS INFO
C2.1 DESCRIPTION OF SERVICES/INTRODUCTION
C2.2 BACKGROUND
C2.3 OBJECTIVES
C2.4 DEFINITIONS/ACRONYMS – SEE ATTACHMENT 1
C2.5 ROLES AND RESPONSIBILITIES
C.2A GENERAL INFORMATION
C2.10 CONTRACT INFORMATION
C2.10.1 INDEFINITE DELIVERY/INDEFINITE QUANTITY GUIDELINES
C2.10.2 CLIN STRUCTURE
C2.10.3 PRICING OF TASK ORDERS
C2.10.4 LABOR RATES
C2.10.5 WORK CLASSIFICATION & MINIMUM WAGES
C2.11 PLACE(S) OF PERFORMANCE
C2.12 PERIOD OF PERFORMANCE
C2.13 HOURS OF OPERATION
C2.14 WORK OUTSIDE REGULAR WORKING HOURS
C2.15 FEDERAL GOVERNMENT HOLIDAYS
C2.16 CONTINUITY OF SERVICES
C2.17 DELIVERY, INSPECTION/ACCEPTANCE THE GOVERNMENT AND INVOICING –
SEE ATTACHMENT 7
C2.18 COMMON ACCESS CARD PROCEDURES - SEE ATTACHMENT 5
C.2B GOVERNMENT INFORMATION
C2.20 COR
C2.21 TPOC
C2.22 GOVERNMENT FURNISHED FACILITIES
C2.23 GOVERNMENT FURNISHED EQUIPMENT
C2.24 GOVERNMENT FURNISHED SERVICES/UTILITIES
C2.25 GOVERNMENT FURNISHED MATERIALS
C.2C CONTRACTOR INFORMATION
C2.32 TRANSITION IN/OUT PERIODS
C2.33 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES
C2.34 CONTRACTOR FURNISHED MATERIAL
C2.35 CONTRACTOR FURNISHED EQUIPMENT
C2.36 FACILITY SECURITY CLEARANCE(S)
C2.37 SECURITY REQUIREMENTS
C2.37.1 PHYSICAL SECURITY
C2.37.2 KEY CONTROL
C2.37.3 LOCK COMBINATIONS
C2.38 REQUIRED CONTRACTOR TRAINING AND CERTIFICATIONS
C2.39 CONTRACTOR MANAGEMENT OF THE IDIQ CONTRACT
C2.40 CONTRACT PROGRAM MANAGEMENT SUPPORT
C2.40.1 PROGRAM MANAGEMENT PLAN
C2.40.2 POST AWARD CONFERENCE/PERIODIC PROGRESS MEETINGS
C2.41 INTERFACE WITH OTHER CONTRACTORS AND GOVERNMENT PERSONNEL
C2.42 KEY PERSONNEL
C2.43 IDENTIFICATION OF CONTRACTOR EMPLOYEES
C2.44 CONTRACTOR TRAVEL
C2.45 OTHER DIRECT COSTS
C2.46 MATERIAL OVERHEAD COSTS
C.2D QUALITY CONTROL
C2.50 QUALITY CONTROL PLAN
C2.51 ISSUE RESOLUTION PROCESS/REPORT
C2.52 QUALITY DEFICIENCIES
C2.53 CPARS
C.2E OTHER INFORMATION
C2.60 DATA RIGHTS
C2.61 ORGANIZATIONAL CONFLICT OF INTEREST
C.3 REQUIREMENTS / SPECIFICATIONS
C3.1 DESCRIPTION OF FACILITIES
C3.2 GENERAL SCOPE AND LOCATION BREAKDOWN
C3.3 REPLACEMENT, MODERNIZATION, RENOVATION
C3.4 ROUTINE/PREVENTIVE MAINTENANCE PROGRAM
C3.5 AS-BUILT DRAWINGS
C3.6 HISTORICAL DATA
C3.7 EQUIPMENT/INVENTORY LISTS – SEE ATTACHMENT 2
C3.8 DIRECTIVES/APPLICABLE STANDARDS – SEE ATTACHMENT 3
SERVICE ORDERS/AD-HOC TASK ORDERS
C3.10 SERVICE ORDERS/CALLS
C3.11 SERVICE ORDER/CALL CATEGORIES
C3.12 TYPES OF WORK AND MONTHLY REPAIR LOG
C3.13 RESPONSE TO SERVICE ORDERS/CALLS
C3.14 URGENT CALL
C3.15 EMERGENCY CALLS
C3.16 ALTERATIONS, MINOR REPAIRS, AND EQUIPMENT REPLACMENT (At or Below
$3,000.00 – Material Cost Only/No Labor)
C3.17 NON-ROUTINE/AD HOC REPAIRS RESULTING IN TASK ORDERS (At or Above
$3,000.01 – Material Cost and Non-Direct Labor Only)
C3.18 PRICING NON-ROUTINE/AD HOC REPAIRS
C.4 SECURITY / CYBERSECURITY
C4.1 PERSONNEL REQUIREMENTS – SEE ATTACHMENT 8
C4.2 PRIVILEGED ACCESS
C4.3 CYBERSECURITY STRENGTH REQUIREMENTS
C4.4 CYBERSECURITY ASSURANCE REQUIREMENTS
C4.5 TASKS AND DELIVERABLES
C4.6 SYSTEM AND NETWORK REQUIREMENTS
C4.7 INFORMATION AND OPERATIONAL TECHNOLOGY INFRASTRUCTURE
C4.8 INSTALLATION SECURITY
C4.9 INFORMATION SECURITY
C4.10 PRIVACY ACT INFORMATION
C4.11 SENSITIVE INFORMATION
C.5 DELIVERABLES
C5.1 MONTHLY STATUS REPORT
C5.2 CYBER DELIVERABLES
C.6 TASKS AND DELIVERABLES (BY SITE) – SEE ATTACHMENT 2 FOR
INVENTORY
C6.1 DLA HEADQUARTERS COMPLEX, FORT BELVOIR, VA (HQC)
C6.2 DEFENSE SUPPLY CENTER, RICHMOND, VA (DSCR)
C6.3 DEFENSE DISTRIBUTION CENTER SUSQUEHANNA, NEW CUMBERLAND, PA
(DDSP)
C6.4 DEFENSE SUPPLY CENTER COLUMBUS, OH (DSCC)
C6.5 DLA DISTRIBUTION DEPOT, SAN JOAQUIN, CA (DDJC)
LIST OF ATTACHMENTS:
ATTACHMENT 1: DEFINITIONS AND ACRONYMS
ATTACHMENT 2: INVENTORY LIST
HQC – FT. BELVOIR
DDRV – RICHMOND
DDSP – NEW CUMBERLAND
DSCC - COLUMBUS
DDJC – SAN JOAQUIN
ATTACHMENT 3: REFERENCES/CODES
ATTACHMENT 4: PERFORMANCE REQUIREMENTS SUMMARY (PRS)
ATTACHMENT 5: COMMON ACCESS CARD (CAC) LANGUAGE
ATTACHMENT 6: INSPECTION REPORT
ATTACHMENT 7: INVOICING AND PAYMENT SCHEDULE
ATTACHMENT 8: CONTRACTOR PERSONNEL SECURITY
ATTACHMENT 9: SITE MAP
SECTION C
DESCRIPTIONS AND SPECIFICATIONS
C.1 DLA HOST SITES / LOCATIONS
C1.1 DLA HEADQUARTERS COMPLEX, FORT BELVOR (HQC)
DLA HQ Installation Management description: oversight for installation and facilities management support for all DLA organizations. Advises and assists the Installation Management director and DLA director with meeting and sustaining current and future logistics support capabilities for the U.S. military services and other valued customers. The Facilities and
Equipment business areas include Military Construction (MilCon); Sustainment, Restoration, and Modernization (SRM); Energy Resource Management (ERM); Real Estate Management;
Accountability of Property, Plant, and Equipment (PP&E); and Facility Related Control System
(FRCS).
C1.2 DEFENSE SUPPLY CENTER RICHMOND (DSCR)
DLA Aviation Richmond: DLA Aviation is the aviation demand and supply manager for
Defense Logistics Agency with more than 4,300 civilian and military personnel in 22 locations across the United States – and, as of 2023, at Kadena Air Base in Okinawa, Japan – supporting more than 2,341 major weapon systems. The U.S. military relies on us as the integrated aviation material manager for roughly 1.8 million national stock number items, providing direct support through weapons systems management, industrial retail supply and strategic acquisition support operations. DLA Aviation plays a pivotal role in the success of Army, Navy, Marine Corps, Air
Force and Space Force by providing targeted solutions and full-spectrum logistics support as part of the Nation's Combat Logistics Support Agency.
C1.3 DEFENSE DISTRIBUTION CENTER SUSQUEHANNA, NEW CUMBERLAND, PA
(DDSP)
The mission of DLA Distribution Susquehanna, Pennsylvania, is to provide world-class distribution services to enhance the readiness of the Department of Defense and other customers, through effective and efficient receipt, storage, control, packaging, and shipment of material.
We strive to be a values-based team known for workforce excellence and providing superior distribution services on time, every time.
C1.4 DEFENSE SUPPLY CENTER COLUMBUS, OH (DSCC)
Defense Supply Center Columbus hails as the Land and Maritime Supply Chain headquarters for the Defense Logistics Agency with over 2,700 employees in 30 locations around the world.
Today, the Defense Supply Center Columbus is host to 33 tenant organizations on the 520-acre site.
C1.5 DLA DISTRIBUTION DEPOT, SAN JOAQUIN, CA (DDJC)
DLA Distribution San Joaquin, California, receives, stores and ships materiel in support of
America's Armed Forces around the clock, around the world. The Distribution Center is in the military readiness business and is the Department of Defense's western strategic distribution platform, serving as a hub of logistics activities for America's Warfighter.
C.2 GENERAL / BACKGROUND INFO
C2.1 Description of Services / Introduction
C2.1.1 This is a regular and Routine/Preventive Maintenance (PM) contract to provide and implement a comprehensive program for the operation, maintenance, repairs, service, testing, inspection and certification of Building Control System (BCS) and Utility Control Systems (UCS) at the following locations:
• Defense Supply Center Columbus, OH (DSCC)
• Defense Supply Center Richmond, VA (DSCR)
• DLA Distribution Depot, San Joaquin, CA (DDJC)
• DLA Distribution Center Susquehanna, PA (DDSP), New Cumberland, Pennsylvania
• DLA Headquarters Complex, Fort Belvoir, VA (HQC)
C2.1.2 The BCS/UCS systems included in this requirement are:
• Elevator and Vertical Lift Systems
• Potable Water and Wastewater Systems
• Electrical and Lighting Systems
• Building Automation System (BAS)/Heating, Ventilation, Air Conditioning, and
Refrigeration (HVACR) Systems, and Utility Metering System (UMS)
• Electrical Distribution Systems (Site)
C2.1.3 The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform
BCS/UCS Systems Maintenance services as defined in this PWS except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
Note: There is a mixture of Government and Contractor personnel performing the above services at each site. Some sites/systems are almost exclusively worked by Government personnel, while other sites/systems have a heavier contractor presence. Richmond and New
Cumberland/Susquehanna are staffed with Government personnel to do most of the work and will most likely only need the contractor to perform the cyber security work and potentially some minor ad-hoc maintenance/repair work. DLA Headquarters at Fort
Belvoir, Columbus and San Joaquin have less Government staff and will need extensive contractor maintenance and repair support as well as cyber security work.
C2.1.4 In support of these missions, DLA Installation Management (DM) maintains the DLA physical real property infrastructure as the Authority Having Jurisdiction at our host installations, which includes Richmond, VA; New Cumberland, PA; Columbus, OH; and San Joaquin, CA, as well as our DLA Headquarters facility at Ft. Belvoir, VA. DM is responsible for new construction
(MILCON or Capital expenditures), and Equipment or System Maintenance of Heating, ventilation, Air conditioning and Refrigeration (HVACR),and Facilities Related Control Systems
(FRCS). DM serves as the functional and doctrinal proponent for all real property system requirements, policies, and procedures including industry standards, The American Society of
Heating, Refrigeration and Air Conditioning Engineers (ASHRAE), United Facilities Criteria
(UFC) and National Fire Protection Association (NFPA), State and Local Codes, and Department of Defense (DoD) installation policy.
C2.1.5 This contract will encompass a wide array of BCS/UCS systems. These control systems ensure the proper function of the systems to meet minimum efficiency and code related criteria.
A control system (CS) as it pertains to FRCS can have many levels. The Equipment level can include multiple pieces of factory supplied equipment directly connected to create a manufacturer system to optimize efficiency. The Building Level consists of a building level controller(s), dedicated communication trunks (LON, BACnet, MODBUS, N2, other proprietary communications protocols), field level devices, sensors, actuators, or other devices. The Site level
(Installation Wide) is an overarching system that allows a single system to monitor and provide user access to monitor, trend, and operate systems. These systems are currently operated and managed on a site-by-site basis with unique hardware, firmware, and equipment. Sites currently operate multiple disparate FRCS requiring varying levels of support including some legacy systems; which are manufacturer obsolesce and/or unsupported hardware/ firmware systems.
C2.1.6 This PWS contains the broad requirements for supporting the numerous sites and disparate systems throughout DLA. In support of these numerous sites and systems, DLA intends to award an IDIQ contract where DLA will issue separate task orders (TOs) to provide specific tailored site-level requirements. This intended Enterprise approach to FRCS allows for the appropriate level of
DoD-required cybersecurity measures to be integrated throughout the planning, design, and renovation, and repair of new and existing facility systems based on the CS architecture of the equipment/systems. Each TO will have a detailed Performance Work Statement (PWS) outlining the requirements for the site. The TO PWS will align with the requirements and scope of the IDIQ contract PWS.
C2.2 Background
C2.2.1 The overall technical monitoring and administration of this Performance Work Statement
(PWS) will be accomplished by the Defense Logistics Agency (DLA) Information Operations (J6).
J6 is responsible for executing program management responsibility through their Enterprise
Capabilities Portfolio, Technology Services Program Management Office (PMO), providing enterprise-wide policy, program, and worldwide operational support for DLA’s overall need for
Building and Utility Automation System as the enterprise solution. The Defense Logistics Agency
(DLA) Installation Management (DM) and J6 Enterprise Capabilities (EC) Portfolio Technology
Services PMO require Building Controls and Utilities Controls services to include operations and sustainment support for Routine/Preventive maintenance, testing, inspection and unplanned maintenance and repair, service tickets, cybersecurity support and configuration management.
C2.2.2 The system connects several different types of control systems into a central user operated front end. This configuration shall provide the warfighter with improved operational control and monitoring functional capabilities for all DLA sites infrastructure.
C2.2.3 Over the years, management at each DLA site purchased BCS/UCS technology from different manufacturers to replace faulty components and upgrade equipment/outdated operating systems. Previously, the BCS/UCS programs required multiple contracts and specialized contractor support which led to more oversight by DLA Installation Management. Moreover, the differing equipment forced DLA Installation Management to pursue specialized training to gain proficiency using these additional platforms to perform daily operations. This enterprise solution, as part of the BCS and UCS pillars, is an effort to streamline the program management, sustainment, and lifecycle replacement of DLA’s BCS/UCS components and software.
C2.2.4 DLA is seeking to identify the most suitable enterprise solution(s) for integrating building controls and utility controls and monitoring application areas to enable more effective management and improve energy-efficient facility operations. The architecture of buildings at each DLA site will vary. The nature of user needs at each site may require more than one enterprise solution. This initiative is set to implement improved cybersecurity measures in all BCS/UCS platforms within the enterprise.
C2.3 Objectives
C2.3.1 The contractor shall ensure the BCS/UCS Systems at all sites remain in exceptional operating condition to include compliance with current Government cybersecurity standards, optimize equipment performance, and enable the anticipation for repair/replacement of major components prior to equipment failure and to minimize down time due to equipment failure. In the event there are differences in the level of performance prescribed in the PWS or the references associated with this document, the services provided at a minimum shall comply with the most stringent requirement.
C2.3.2 The BCS/UCS Systems at these locations are often integrated with the military service host’s BCS/UCS Systems but in some cases are stand-alone. The BCS/UCS at the DLA locations will be evaluated by DLA on a case-by-case basis to determine if that site can be executed/supported under this requirement.
C2.3.3 This acquisition is intended to support BCS/UCS system requirements for the DLA
Headquarters at Ft. Belvoir, VA and four (4) DLA host sites (Defense Supply Center Richmond
(DSCR), Richmond, VA; Defense Distribution Center Susquehanna (DDSP) New Cumberland, PA; Defense Supply Center Columbus (DSCC) Columbus, OH; and Defense Distribution Depot
San Joaquin (DDJC), Tracy, CA. - These duties include, but are not limited to:
• Day to day maintenance and sustainment for both equipment and FRCS.
• Performing scheduled preventive, predictive maintenance, and asset management functions to ensure the long-term efficient operation of facility infrastructure.
• Performing scheduled and unscheduled maintenance, repairs, and replacements as needed on infrastructure components.
• Maintaining operations and maintenance & repair records for all infrastructure components in electronic format.
• Maintaining the inventory and electronic inventory records for the consumable supplies needed for system sustainment and maintenance.
• On-going evolution and development of automated systems and capabilities
• Preparation for anticipated new regulatory requirements
• Information technical networking support (ITNS) of the systems includes but not limited to cybersecurity, networking, server and client administration, database management, and
Information System Security Engineering (ISSE), cybersecurity/system administration for the FRCS.
C2.3.4 The operations will be performed to comply with all federal, state, and local laws and regulations. The services shall be provided in a safe, secure, effective, and efficient manner and shall meet the highest standards prevalent in the industry.
C2.4 Definitions / Acronyms
See ATTACHMENT 1 DEFINITIONS & ACRONYMS
C2.5 Roles and Responsibilities
C2.5.1 The roles of the Government Personnel are to ensure contract requirements are accepted per the contract terms and conditions. Contractor Personnel are responsible for management and quality control actions to meet the terms of the contract.
Contracting Officer (KO) - A person duly appointed with the authority to enter, administer and terminate contracts on behalf of the Government. The KO is the only person who can legally commit the Government and only the KO, as the Government’s agent, can modify the contract/order. The KO is the final authority for determining the adequacy of the Contractor’s performance. KO decisions arising under or relating to the contact are final.
Contracting Officer’s Representatives (CORs) – Individuals designated in writing by the KO to perform specific technical and administrative functions within the scope and limitations of their written appointment (e.g., surveillance of Contractor’s performance, accept services). CORs inspect completed requirements and will use the overall inspection results to answer the KO’s and
Contractor’s periodic requests and to complete performance surveys. CORs are not empowered to make any contractual commitments or authorize any changes to the order/contract or in any way obligate additional funds by the Government, such authority rests solely with the KO.
Task Order (TO) Contracting Officer Representative (COR) - The COR is designated in writing by the KO to act as his/her authorized representative to assist in administering each IDIQ contract. The COR is authorized to monitor Contractor compliance with the IDIQ PWS requirements. The COR will inspect completed requirements to ensure Contractor compliance with IDIQ Performance Requirements Summary (PRS) metrics with input from the Technical
Point of Contact (TPOC). The COR/TPOC will record the results of each inspection, noting the date and time of inspection. The COR/TPOC regularly reports surveillance results to the KO.
The COR/TPOC promptly furnishes the KO with any requests for changes, deviations, or waivers to the contract (whether generated by Government personnel or the Contractor). A COR will be assigned at the IDIQ level and Task Order level.
Technical Point of Contact (TPOC) - TPOC, designated in writing by the KO, are authorized to perform the actual on-site surveillance for individual task orders and will report to the COR. The
TPOC(s) will be appointed for each task order. Key duties of TPOCs include the following:
• Performs surveillance; receives, accepts, and inspects all deliverables; and makes recommendations to the COR for administrative actions.
• Completes inspections of specific work in task orders/divisions by following individual task order QASP inspection plans and report results to the COR.
• Documents any matters pertaining to the Contractor’s failure to perform using an
Inspection Report (Attachment 6 INSPECTION SHEET) and reports the matter directly to the COR and KO.
• Furnishes the COR with any requests for changes, deviations, or waivers to the contract
(whether generated by Government personnel or the Contractor).
C2.5.2 Standards of Behavior. CORs will be honest and professional in their official dealings and treat others in a fair and courteous manner. CORs should be especially careful in dealing with Contractor personnel. CORs must maintain good professional working relationships with
Contractor personnel but they must guard against undue friendliness or intimate social association with the Contractor’s personnel. When possible, CORs should only work with the
Contractor’s program manager, an official representative designated by the Contractor.
Sometimes CORs will also have to work with various subordinates and sub-contractor representatives. CORs must make sure that all such contacts are made with the full knowledge and consent of the Contractor’s program manager or designated representative.
C2.5.3 Relationships with Contractor Personnel. CORs must establish cordial but professional relationships:
• CORs must be strict about compliance with the contract but reasonable in interpretation of subjectively judged requirements.
• CORs must maintain a good working relationship with Contractor personnel, although
CORs must not let anything divert them from faithful protection of the Government’s interests.
C2.5.4 Program Management Support. The Contractor will provide Program Management support at the IDIQ and task orders level to include the following duties:
• Responsible for running complex programs and projects
• Supervises the project team and manages conflicts within different departments
• Plans and sets project goals and milestones and develops risk management strategies
• Defines resources and schedules for the implementation of the program
• Clearly defines requirements and sets targets accordingly
• Recognizes areas for internal improvement and develops plans for implementing the improvements
• Promotes achievement and performance improvement throughout the duration of the contract
• Develops, implements, communicates, and maintains a quality plan to bring the
Company's Quality Systems and Policies into compliance with quality system requirements
• Direct the activities of contract personnel to measure key quality characteristics of processes from inception to completion
• Establishes the standards of service for customers or clients
• Provides monthly updates to the Government of status of IDIQ level and TO level work
C.2A GENERAL INFORMATION
C2.10 CONTRACT INFORMATION
C2.10.1 IDIQ Guidelines
C2.10.1.2 Per Far 52-.216-22. This is a Firm Fixed Priced contract with a Non-Routine/Ad Hoc
CLIN for the period stated in the schedule. Multiple task orders may be issued under this contract on a Fixed Price basis. Work items for the fixed-price portion are identified in the schedule include all work except that identified as Non-Routine/Ad Hoc work. The fixed price quantities shown in the schedule are considered accurate estimates for this contract period.
C2.10.1.3 The contract consists of a five-year period of performance: one (1) 12-month base year and four (4) 12-month option years, which will commence on award.
C2.10.1.4 Work items for the IDIQ contract are identified within the performance work statement of each Task Order.
C2.10.1.5 Task performance shall be made only as authorized by task orders issued in accordance with FAR 52.216-18. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the PWS up to the contract stated maximum. The Contractor shall be responsible for all Routine/Preventive maintenance, alterations or minor repairs or equipment replacement below $3,000.00 (material and non-direct labor cost only). The cost of these
Routine/Preventive maintenance, alterations, minor repairs, and replacement shall be part of CLIN
0001 and its corresponding option CLINs.
C2.10.1.6 Except for any limitation of quantities in FAR 52.216-19 or in the PWS, there is no limit on the number of task orders that may be issued.
C2.10.1.7 Any task order issued during the effective period of the IDIQ contract and not completed within that period shall be completed by the Contractor within the time specified in the task order.
The contract shall govern the contractor’s and government’s rights and obligations with respect to that task order to the same extent as if the task order was completed during the contract’s effective period.
C2.10.1.8 For Issuing Indefinite Delivery Indefinite Quantity Task Orders. Some of the services under this contract shall be furnished at such times as ordered by the issuance of task orders on SF
1449 by the Contracting Officer. All orders issued hereunder are subject to the terms and conditions of this contract. This contract shall control in the event of conflict with any task order.
Any task order issued under this IDIQ contract with a total value of $50,000.00 or less may be issued unilaterally by the Contracting Officer.
C2.10.2 CLIN Structure
C2.10.2.1 CLINs 0001, 1001, 2001, 3001, and 4001 Routine/Preventive Maintenance, Minor
Repairs, Alterations, and Equipment Replacement
The contractor shall provide all labor, material, equipment, supplies, and supervision necessary to perform Routine/Preventive maintenance services for the Elevators at all applicable DLA Site(s) in accordance with the Performance Work Statement. In addition, the contractor shall include in its proposal a firm-fixed price for these CLINs for all minor repairs, alterations, and equipment replacement (at or below $3,000.00 (material only, no labor added)). The Service Contract Labor
Standards (formerly known as the Service Contract Act of 1965) will apply to this work.
C2.10.2.2 CLINs 0002, 1002, 2002, 3002, and 4002 Non-Routine/Ad Hoc Repairs to Include
Major Repairs, Alterations, and Equipment Replacement
The contractor shall provide all labor, materials equipment, supplies, and supervision necessary to perform Non-Routine/Ad Hoc repairs (at or above $3,000.01 (material only, non-direct labor) for the Elevators at all applicable DLA site(s) in accordance with the Performance Work Statement.
These Indefinite-Delivery, Indefinite Quantity (IDIQ) Ad-Hoc/Unknown repairs defined as maintenance, repair, alteration, and equipment replacement work requirements beyond the scope of the services performed under the Routine/Preventive Maintenance, Minor Repairs, Alterations, and Equipment Replacement CLIN(s). Non-Routine/Ad Hoc repair work is included under this
IDIQ portion of the contract in accordance with Section C4.15. The Wage Rate Requirements
(Construction), formerly known as the Davis-Bacon Act, will apply to this work. See period of performance in Section C4.1.
CLIN DESCRIPTION
0001 ________________________________
Routine/Preventive Maintenance, Minor Repair, Alterations, and Equipment Replacement Services, Firm
Fixed Price (FFP), Base Year
0002 ________________________________ Non-Routine/Ad
Hoc Repairs to Include Major Repairs, Alterations, and
Equipment Replacement, DLA Site(s), Firm Fixed Price
(FFP), Base Year
1001 ________________________________
Routine/Preventive Maintenance, Minor Repair, Fixed Price (FFP), Option Year 1
1002 ________________________________ Non-Routine/Ad
(FFP), Option Year 1
2001 ________________________________
Fixed Price (FFP), Option Year 2
2002 ________________________________ Non-Routine/Ad
Hoc Repairs to Include Major Repairs, Alterations, and
(FFP), Option Year 2
3001 ________________________________
Fixed Price (FFP), Option Year 3
3002 ________________________________ Non-Routine/Ad
(FFP), Option Year 3
4001 ________________________________
Fixed Price (FFP), Option Year 4
4002 ________________________________ Non-Routine/Ad
(FFP), Option Year 4
C2.10.3 Pricing of Task Order(s)
Individual Task Orders will be issued as requirements arise and become known. Task Orders will specify work to be performed and will reflect the labor rates of the proposed staff in effect when the task order is issued (in accordance with the provisions contained in the IDIQ contract and the award task orders). The proposed labor rates will be included within the IDIQ contract. The
Contractor shall perform all services in accordance with the task order performance work statement/specifications. The terms and conditions set forth in the IDIQ contract will always apply.
All Task Orders will be fixed price.
C2.10.4 Labor Rates
The proposed labor rates shall be used by the contractor as the ceiling labor rates when submitting price proposals in response to requests for task orders issued under this contract. The proposed labor rates of the successful awardee will be included as a separate table with the IDIQ contract.
The contractor may propose at or below these labor rates, as each task order award will be negotiated on an individual basis.
C2.10.5 Work Classification & Minimum Wages
C2.10.5.1 All work performed pursuant to this IDIQ contract, firm-fixed price CLINs are subject to a Collective Bargaining Agreement. FAR Clause 52.222-41, Service Contract Labor Standards
(Aug 2018). All work performed pursuant to follow-on task orders are subject to FAR Clause
52.222-6, Construction Wage Rate Requirement (Aug 2018). Department of Labor Wage
Determinations are attached to this solicitation.
C2.10.5.2 Construction Wage Rate Requirements Statute/Collective Bargaining Agreement - All work performed pursuant to this contract is subject to the provision of either the McNamara–
O'Hara Service Contract Act of 1965 (SCA), codified at 41 U.S.C. §§ 6701–6707, or the Davis-
Bacon Act (DBA), Public Law 107–217 (as amended)1, as defined herein.
C2.11 Place(s) of Performance
Individual task orders will specify the place of performance. However, work under this IDIQ shall be performed predominately at Government facilities to include Defense Supply Center Columbus, OH (DSCC), Defense Supply Center Richmond, VA (DSCR), DLA Distribution Depot, San
Joaquin, CA (DDJC), DLA Distribution Center Susquehanna, PA (DDSP), and DLA Headquarters
Complex, Fort Belvoir, VA (HQC).
C2.12 Period of Performance
The period of performance shall be for one (1) base year of 12 months and four (4) 12-month option years.
C2.13 Hours of Operation
Regular Working Hours have historically been from 0600 – 1800 local time. The Government’s regular core working hours are Monday through Friday from 0700 – 1530 local time. Contractor’s must have qualified on-site technician(s) and/or a Designee(s) must be available for emergency responses during the core hours. No regular work shall be done or billed on the weekends or federal holidays. (See C4.15 for federal holiday listings). Additional information about site specific working hours will be provided at the Task Order level.
C2.14 Work Outside Regular Working Hours
C2.14.1 Certain tasks may require the Contractor to work outside of the normal working hours, including weekends and holidays. Any work outside the normal working hours of the installation will require the approval of the COR/TPOC and shall be included in the contract cost. Any work that is not included in the contract cost, will need to be approved in writing by the Contract Officer.
C2.14.2 Additionally, after hours service orders/calls are automatically forwarded to the Police
Department or other designee as identified by the COR. The Contractor shall provide to the KO or
COR/designee a work reception desk that is manned twenty-four (24) hours a day, seven (7) days a week, including weekends and holidays or a Call Out Roster of personnel to contact for afterhours support. The Contractor shall respond with personnel with the correct skillset to come in and alleviate the emergency. The Contractor shall arrive on-site within the timeframe outlined in the specific T.O. by site from the Government. The Contractor shall notify the Police
Department or other designee when they arrive and depart the installation. The Contractor shall keep a log of all Call Outs with the following information:
1. Time employee called
2. Time 1st employee arrived on site
3. Name of employee/s
4. Reason for Call Out
5. Description of work performed to correct the problem
6. Time employee departed the site
C2.15 Federal Government Holidays
The Contractor is not required to perform services on holidays unless an exception is specified in the individual task orders. Federal Government holidays are as follows:
New Years Day 1st day of January
Martin Luther King Jr.'s Birthday 3rd Monday of January
Washington’s Birthday 3rd Monday of February
Memorial Day Last Monday of May
Juneteenth 19th Day of June
Independence Day 4th day of July
Labor Day 1st Monday of September
Columbus Day 2nd Monday of October
Veterans Day 11th day of November
Thanksgiving Day 4th Thursday of November
Christmas Day 25th day of December
C2.16 Continuity of Services
C2.16.1 To ensure continuity of essential services, the Contractor shall be fully prepared to commence work on the start date of this contract and be prepared to accept approximately thirty
(30) backlogged service orders/calls. Work must be completed on all assigned backlogged service orders/calls within twenty (20) business days after the contract start date. Correction of defective or deficient work on the backlogged service orders/calls is the responsibility of the Contractor.
C2.16.2 Strike Contingency Plan (SCP)
C2.16.3 The Contractor shall prepare a Strike Contingency Plan to be used in the event of a strike by Contractor employees. The SCP shall be submitted to the COR for approval fifteen (15) days after contract start. At a minimum, the SCP shall include the following information:
1. The names, addresses, telephone numbers, and contact persons of proposed firms the
Contractor intends to utilize to provide the services defined in this PWS during strikes by
Contractor employees.
2. Copies of current licenses and certifications of experience assuring the Government that all temporary or replacement employees (including Subcontractor employees) will meet the experience and licensing requirements of this contract.
C2.16.4 Contractor Emergency Plan (CEP)
The Government's Occupant Emergency Plan (OEP) and Damage Control Plan (DCP) are used by the Government during building emergencies. The Contractor shall prepare a Contractor
Emergency Plan that will define the Contractor’s procedures and actions it will take to provide support to the Government's OEP and DCP. The CEP will be provided at the Task Order level.
The CEP shall be provided for approval to the COR in writing fifteen (15) calendar days after contract start. Designated Contractor personnel, including the On-site Supervisor, shall be thoroughly familiar with the Government's OEP and DCP, and shall be trained by the Contractor to fully understand their responsibilities relative to each emergency plan.
C2.16.5 The Contractor will not be penalized for delay of normal work if the work force has been diverted for emergency support. Additional Contractor costs incurred for emergency situation support are included in the Routine/Preventive work (firm-fixed price) portion of the contract.
C2.16.6 The Contractor shall be required to operate the facility during all emergency situations including, but not limited to; fires; accident and rescue operations; strikes; civil disturbances;
natural disasters; utility service outages; and military contingency operations. The Contractor's
Emergency Plan shall be submitted to the COR for approval within 15 days of contract start or award and shall include, at a minimum, the following:
1. The Contractor's procedures and actions used to provide support to the Government during emergencies.
2. The name, address, telephone number, and current position of each employee that will participate in the Contractor Emergency Plan.
3. The specific functions that each employee will perform during emergency situations.
4. If temporary or Subcontractor employees are to be used, the same information is required as in the Strike Contingency Plan.
C2.17 Delivery, Inspection/Acceptance
See ATTACHMENT 7 INVOICING AND PAYMENT SCHEDULEfor more information.
C2.18 Common Access Card (CAC) Procedures (See Attachment 5 COMMON ACCESS
CARD LANGUAGE)
Prior to gaining access to any DLA facility, contractor personnel must be vetted through the local security office. Due to DoD security requirements, foreign nationals and illegal aliens will not be permitted access to any DLA facility. Individuals with outstanding warrants or certain convictions also will be denied access. Contractor personnel must ensure they have the appropriate identification required to access DLA facilities. Contractor personnel entering a DLA facility should anticipate their vehicle will undergo a security check by DLA Security, and should ensure that no drugs, alcohol, or weapons of any kind are found within the vehicle. It is the contractor’s responsibility to ensure the personnel performing under this contract can and will meet these requirements for accessing DLA facilities. Names of contractor personnel will be provided to the local POC for vetting purposes no less than one week prior to the class start date.
C.2B GOVERNMENT INFORMATION
C2.20 COR
See Section 2.5 Roles and Responsibilities.
C2.21 TPOC
See Section 2.5 Roles and Responsibilities.
C2.22 Government Furnished Facilities
All Government-furnished property will be provided in accordance with FAR 52.245-1, and FAR
52.245-9, and may include: office / workspace, office supplies, telephone service, computer access, and storage space. Government property shall be used ONLY in performance of this contract and its task orders. The Contractor shall account for all property provided by the
Government and shall be responsible for the security and condition of said property. Serialized items shall be annotated at the time of issue, with a signature of acknowledgement by the individual
Contractor(s). All GFP is the property of the U.S. Government and shall not be transferred to any individual, or agency, public or private without the express written approval of the Contracting
Officer.
C2.23 Government Furnished Equipment
GFE will be specified in the individual TOs on an as-needed basis with specified delivery dates and in specified condition. Office equipment and office supplies may be provided as GFE at the
TO level at the discretion of the Government. Non-expendable equipment shall be returned to the
Government upon the conclusion of the TO.
C2.24 GOVERNMENT FURNISHED SERVICES/UTILITIES
See TO PWS for specific information.
C2.25 GOVERNMENT FURNISHED MATERIALS
C.2C CONTRACTOR INFORMATION
C2.32 Transition In/Out Periods
C2.32.1 Phase-In Period
During the transition-in period, the Contractor shall provide a weekly written report to the KO or designee on the status of the tasks outlined in the Transition Plan. The KO or designee may accept the completion of tasks as identified in each weekly report. The Contractor shall complete all tasks required under the Transition-in Plan and provide the KO or designee with a detailed final report outlining all tasks accomplished five (5) working days prior to the conclusion of the transition period. If the KO or designee accepts the Contractor’s transition performance, the KO or designee may perform a walkthrough with the Contractor to document completion of the transition plan.
The walkthrough will be conducted at the COB on the final workday of the transition period.
C2.32.2 The Contractor shall provide documentation of completion of required training and certifications prior to the end of the transition period IAW the requirements identified in section
C.
C2.32.3 The Contractor recognizes the services under this contract are vital to the Government and must be continued without interruption and that, upon contract expiration, a successor, either the Government or another contractor, may continue the services. The Contractor agrees to:
C2.32.4 1. Furnish phase-in training (for the new contractor/Government employees), see
Section C2.38.2 for additional details.
C2.32.5 2. Exercise its best efforts and cooperation to affect an orderly and efficient transition to a successor.
C2.32.6 The Contractor will be allowed to bring their employees on-site up prior to the start of the contract to become familiar with the buildings, equipment locations and to start the process for obtaining security badges and computer access. During and prior to completion of the transition-in period, the KO or designee will continually assess the Contractor’s ability to perform the mission and discussions held during transition meetings. The Contractor shall complete the necessary steps for assumption of the facility and equipment during the transition-in period and shall meet all requirements as specified in the contract with the beginning of full performance.
C2.32.7 The Government will determine the carry-over for work-in-process (WIP). Throughout the transition period, the Government will monitor work-in-process and provide the new
Contractor weekly WIP reports during the transition. Not later than (NLT) five (5) working days prior to the end of the transition period, the Government will review all work-in-process that is the responsibility of the incumbent Contractor and assess any impacts to the new Contractor’s performance on the scheduled start date.
C2.32.8 Additionally, if the outgoing Contractor fails to successfully complete all tasks required under transition, the Government reserves the right to extend transition until all tasks are completed or take other remedies available.
C2.32.9 Phase-Out Period
In order to allow for a smooth and orderly transfer of responsibility from the incumbent Contractor to the new Contractor, the Contractor shall, upon the Contracting Officer’s written notice, (1) furnish phase-out services and (2) negotiate in good faith a plan with a successor to determine the nature and extent of phase-in, phase-out services required. The Contractor shall provide sufficient experienced personnel during the phase-in, phase-out period to ensure the services called for by this contract are maintained at the required level of proficiency.
C2.32.10 The Contractor shall allow as many personnel as practicable to remain on the job to help the successor maintain the continuity and consistency of the services required by this contract. The
Contractor also shall disclose necessary personnel records and allow the successor to conduct on-site interviews with these employees. If selected employees are agreeable to the change, the
Contractor shall release them at a mutually agreeable date and negotiate transfer of their earned fringe benefits to the successor. All costs incurred will be included in the appropriate CLINS for the phase out period.
C2.33 Contractor Furnished Items and Responsibilities
C2.34 Contractor Furnished Material
The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract.
C2.35 Contractor Furnished Equipment
C2.36 Facility Security Clearance(s)
Most work to be performed under this requirement is unclassified, however, a security clearance may be required at some locations to allow unescorted access within certain buildings. Security clearance requirements will be further defined at the Task Order level and may require at DD254
Department of Defense Contract Security Classification Specification. All Contractor personnel proposed to work on the network, or any IT capabilities/functions (at a minimum) will be required to have an IT III (Non-Sensitive), IT II (Non-Critical Sensitive), or IT I (Critical Sensitive). See
Attachment 8 CONTRACTOR PERSONNEL SECURITY for specific requirements.
C2.37 Security Requirements
C2.37.1 Physical Security
Contractor Control Access
C2.37.1.2 The Contractor shall control access by locking or unlocking the areas or facilities used by the Contractor in the performance of the contract requirements. The Contractor shall lock all overhead doors, cages, vaults, warehouse doors, windows, and other areas for reasons of internal security before leaving an area unattended and prior to the conclusion of any working day.
C2.37.1.3 The Contractor shall operate under the site’s approved security plan.
C2.37.1.4 In the event a Contractor area is found unsecured or there is an alarm response during non-duty hours, the Contractor’s designated Point of Contact (POC) will be required to secure the area. The Contractor shall inform the KO or designee of the results of the alarm response. The
Contractor shall report any facility security violations to the KO or designee within one (1) hour of discovery.
Physical Security Reporting and Working Groups
C2.37.1.5 Upon request of the KO or designee, the Contractor shall prepare and provide reports to update progress on all recommended corrective actions stemming from Government inspections or assessments conducted at the site (i.e., Security Program Review (SPR), OPSEC/INFOSEC inspections, Vulnerability Assessments (VA), DoD and DLA regulations or policies etc.)
C2.37.1.6 The Contractor’s Security Specialist shall participate in working groups (i.e., Physical
Security Anti-terrorism, Force Protection and OPSEC), if requested.
C2.37.2 Key Control
C2.37.2.1 The Contractor shall establish and maintain a Key and Lock Control Program as part of their Physical Security SOP, IAW DLAM 5200.08 DLA Physical Security Manual. The Contractor shall safeguard keys provided by the Government. The Contractor shall designate in writing to the
KO or designee a key custodian to manage the key control program by the start of full performance.
C2.37.2.2 The Contractor shall develop and maintain a roster of employees with key or lock access requirements for key control boxes or equivalent system IAW DLAM 5200.08 DLA Physical
Security Manual. The Contractor shall provide the KO or designee updated rosters as information changes. At all times the Contractor shall keep all keys within the Key and Lock Control Program under continuous accountability and shall limit the number of individuals authorized to draw keys to the minimum required by security and operational requirements.
C2.37.2.3 The Contractor shall not duplicate keys or allow their use by unauthorized Contractor personnel. The Contractor shall report any deviation from these rules or lost keys to the KO or designee within one (1) hour after discovery of occurrence and submit a detailed written report by close of business (COB) the same working day. If lost keys are discovered at the end of the day, and it is not possible to submit a written report to the KO or designee by COB the same working day, the Contractor shall submit the report within two (2) hours of the beginning of business on the next working day. The Contractor shall reimburse the Government for all costs associated with replacing locks or re-keying as a result of key duplication or loss.
C2.37.3 Lock Combinations
C2.38 Required Contractor Training and Certifications
C2.38.1 The Contractor shall describe how the workforce (management and labor) with the requisite knowledge, skills, abilities, and applicable licenses and certifications to perform the requirements will be trained and/or certifications/licenses obtain to perform PWS requirements and/or the validation of current training from review training records of personnel hired from the preceding contractor/contract. All training certifications must be provided to the COR within the timelines annotated in this PWS or at the Task Order level PWS.
C2.38.2 A phase-in period shall be established to allow the Contractor sufficient time to integrate personnel and transition into duties required to perform the requirements of the contract and ensure employees who will require access to the Installation and DoD Information Technology
(IT) systems obtain a Common Access Card (CAC) IAW PWS. Instructions for all Phase in
Training are available upon request.
• The phase-in period shall begin at the effective date of the TO and shall not exceed one
(1) month, at which time full performance shall commence.
• The Contractor shall ensure that all Contractor personnel are ready to begin working on the first day of full performance including obtaining any account access, permissions, and/or roles required to administer the application software/hardware. Training and documentation such as rules of behavior and cyber awareness are required for accesses.
C2.38.3 During the phase-in period, Contractor personnel shall complete security and safety training on site. Training will be scheduled through the DLA site’s training office and will at a minimum include the following classes. Estimated time to complete is three (3) hours.
• Active Shooter Briefing
• Safety Briefing
• Shelter in Place/Evacuation Awareness Briefing
C2.38.3 During the one-month phase-in period ensure all Contractor personnel know and understand regulations and policy pertaining to physical, information, operations, and personnel security. The Contractor shall provide security and antiterrorism training to all employees in accordance with applicable DoD regulatory requirements. Training, as required by the DLA
Issuances and other applicable DoD guidance, will be completed annually for the following on-line training.
• Cyber Awareness Challenge
• Safety Briefing
• Shelter in Place/Evacuation Awareness Briefing
• Antiterrorism (AT) Level 1
• Operations Security (OPSEC)
•…