This is a Bid Schedule attachment for a construction project at the ATF Complex (Solicitation Number 70LGLY26QSSB00067). The schedule outlines 15 distinct tasks divided into two building construction phases: a Warehouse Building and a Simulator Building.
The Warehouse Building tasks (1-9) include management/quality control/safety, site design and preparation, building demolition and removal of existing sheds, pre-engineered metal building construction, concrete slab installation, wall and roof insulation, HVAC design and installation, electrical power and lighting design and installation, and doors. The Simulator Building tasks (10-15) mirror the warehouse scope, encompassing pre-engineered metal building construction, concrete slab, insulation, HVAC systems, electrical power and lighting, and doors. The offeror must provide pricing for each task, with each price including all labor, supervision, key personnel, materials, equipment, tools, transportation, coordination, safety requirements, submittals, testing, cleanup, overhead, profit, and incidentals necessary to complete the work in accordance with the Statement of Work and solicitation requirements. Contractors are required to provide backup data supporting their quotes and should obtain at least three subcontractor bids to ensure fair and reasonable pricing. The bidder acknowledgment section requires completion by the offeror's authorized representative with signature, date, and contact information.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATF COMPLEX ATTACHMENT 1
70LGLY26QSSB00067
Bid Schedule
TASK DESCRIPTION PRICE
1 MANAGEMENT/QUALITY CONTROL/SAFETY
2 SITE DESIGN AND PREP
3 BUILDING DEMO & REMOVAL EXISTING SHEDS
WAREHOUSE BUILDING
4 PRE-ENGINEERED METAL BUILDING
5 CONCRETE SLAB
6 INSULATION WALL/ROOF
7 HVAC DESIGN/INSTALL
8 ELECTRICAL POWER LIGHTING DESIGN/INSTALL
9 DOORS
SIMULATOR BUILDING
10 PRE-ENGINEERED METAL BUILDING
11 CONCRETE SLAB
12 INSULATION WALL/ROOF
13 HVAC DESIGN/INSTALL
14 ELECTRICAL POWER LIGHTING DESIGN/INSTALL
15 DOORS
Contractor should provide or be able to provide any request backup data to support the above quotes if requested by the Contracting Officer. Whenever possible, contractor should strive to obtain at least three subcontractor bids to assure the Government is getting a fair and reasonable price for the work. These bids should be available upon request by the Contracting Officer.
Bidder Acknowledgment The offeror acknowledges that each task price includes all labor, supervision, key personnel, materials, equipment, tools, transportation, coordination, safety requirements, submittals, testing, cleanup, overhead, profit, and incidentals necessary to complete the task in accordance with the SOW and solicitation requirements.
Offeror Name: ______________________________________ Authorized Representative: __________________________ Title: _____________________________________________ Signature: _________________________________________ Date: _____________________________________________ Phone / Email: _____________________________________
| Bid Schedule |
| Bidder Acknowledgment |
File details come from the government source that posted it. Updated .