BID SCHEDULE INSTRUCTIONS
PROJECT: NP-DEWA 14(18), 121(1)
BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to Bidders. While preparing the bid, comply with the following:
COMPLETING THE BID SCHEDULE
Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Bid Total by adding the amounts of the listed items, and show in the block provided on Page B-5. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.
To be eligible for award, bidders must submit prices for each pay item.
Review Subsection 109.05 of the FP (standard specifications book) regarding scope of payment for direct and indirect payment work.
Fill in the Bid Total as directed on the Bid Summary page.
SCHEDULE OF WORK
The Bid Schedule is comprised of the following:
Schedule A - Pages B-1 thru B-5
COMPLETION OF WORK
The Government has estimated the number of calendar days necessary to complete all contract work from the effective date of the Notice to Proceed to contract completion. The maximum number of calendar days allowed (i.e., the contact performance period) is shown in Block 11 of the SF-1442 and described below.
The performance period to complete all Schedule A work will be 395 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
In developing a construction schedule to determine the number of calendar days, the Government considered and included the work limitations shown in Sections 108 and 156 of the FP and Special Contract Requirements (SCR’s). Specific work limitations may be (but are not limited to): National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. The Government also considered those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc). The Government also considered time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCR’s).
Bidders are to assume that the award of the contract and approval of the Contractor’s Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-
15) may result in the start of construction activities to be no earlier than September 2020.
See Subsection 108.01 of the SCR’s for additional details.
BASIS FOR AWARD
The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation Total Price of Project, which is defined as:
Schedule A Bid Total.
B - 1
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0100 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0120 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0140 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0160 15401-0000 CONTRACTOR TESTING (ARCHAEOLOGICAL MONITORING)
ALL LPSM $___LPSM_____ $____________
A0180 15702-4000 SOIL EROSION CONTROL, FILTER BAG
ALL LPSM $___LPSM_____ $____________
A0200 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
1,600 LNFT $____________ $____________
A0220 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
1,000 LNFT $____________ $____________
A0240 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
1 EACH $____________ $____________
A0260 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
3 EACH $____________ $____________
A0280 15706-2300 SOIL EROSION CONTROL, ON-SITE CONCRETE WASHOUT STRUCTURE
1 EACH $____________ $____________
A0300 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
A0320 20103-0000 CLEARING AND GRUBBING
2,400 SQYD $____________ $____________
A0340 20202-0000 SELECTIVE CLEARING
20 SQYD $____________ $____________
A0360 20206-0000 SELECTIVE CLEARING AND GRUBBING
1,300 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP DEWA 14(18), 121(1)
Project Name:Rehabilitation and preventative maintenance of bridges
B - 2
A0380 20301-2300 REMOVAL OF SIGN/MARKER
4 EACH $____________ $____________
A0400 20302-1200 REMOVAL OF GUARDRAIL
680 LNFT $____________ $____________
A0420 20304-9000 REMOVAL OF STREAM DEBRIS
ALL LPSM $___LPSM_____ $____________
A0440 20401-0000 ROADWAY EXCAVATION (GRAVEL BAR REMOVAL)
3,200 CUYD $____________ $____________
A0460 20420-0000 EMBANKMENT CONSTRUCTION
55 CUYD $____________ $____________
A0480 20466-0000 CONSERVE AND STOCKPILE TOPSOIL
10 CUYD $____________ $____________
A0500 25102-0600 PLACED RIPRAP, METHOD A, CLASS 6
1,250 TON $____________ $____________
A0520 25210-0000 ROCKERY (WALL)
80 SQFT $____________ $____________
A0540 30110-0000 AGGREGATE SURFACE COURSE
75 TON $____________ $____________
A0560 30303-4000 SHOULDER RECONDITIONING
600 SQYD $____________ $____________
A0580 31302-0400 AGGREGATE-TOPSOIL COURSE, 4-INCH DEPTH
840 SQYD $____________ $____________
A0600 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
260 SQYD $____________ $____________
A0620 41801-3000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3
30 SQYD $____________ $____________
A0640 55201-1200 STRUCTURAL CONCRETE, CLASS S (SEAL)
5 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 3
A0660 55220-0000 REPAIR CONCRETE
120 SQYD $____________ $____________
A0680 55224-0000 SEAL CONCRETE SURFACE
560 SQYD $____________ $____________
A0700 55225-0000 CLEAN AND RESEAL JOINTS
510 LNFT $____________ $____________
A0720 55235-0000 EXPANSION JOINTS (STRIP SEAL)
100 LNFT $____________ $____________
A0740 55506-0000 MISCELLANEOUS STEEL (ANCHOR BOLT WASHER)
28 EACH $____________ $____________
A0760 55601-1000 BRIDGE RAILING, STEEL, ONE RAIL
190 LNFT $____________ $____________
A0780 60706-0000 CLEANING DRAINAGE STRUCTURE (SCUPPER)
4 EACH $____________ $____________
A0800 60902-1100 CURB AND GUTTER, CONCRETE, 13-INCH DEPTH
110 LNFT $____________ $____________
A0820 61701-1200 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
70 LNFT $____________ $____________
A0840 61701-3900 GUARDRAIL SYSTEM SBTA
20 LNFT $____________ $____________
A0860 61701-4000 GUARDRAIL SYSTEM SBTB
440 LNFT $____________ $____________
A0880 61702-0100 TERMINAL SECTION, TYPE SBT-BAT
1 EACH $____________ $____________
A0900 61702-0510 TERMINAL SECTION, TYPE SBT-FAT
5 EACH $____________ $____________
A0920 61707-1000 STRUCTURE TRANSITION RAILING, G4 SYSTEM
25 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 4
A0940 61707-2000 STRUCTURE TRANSITION RAILING, SBT SYSTEM
65 LNFT $____________ $____________
A0960 61708-1000 REMOVE AND RESET, GUARDRAIL
160 LNFT $____________ $____________
A0980 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
30 SQYD $____________ $____________
A1000 62502-0000 TURF ESTABLISHMENT
2,150 SQYD $____________ $____________
A1020 62630-0300 PLANTINGS, SEEDLINGS, CONTAINER GROWN
245 EACH $____________ $____________
A1040 62901-0600 ROLLED EROSION CONTROL PRODUCT, TYPE 2.B
2,150 SQYD $____________ $____________
A1060 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
30 SQFT $____________ $____________
A1080 63308-3000 OBJECT MARKER, TYPE 3
8 EACH $____________ $____________
A1100 63309-0900 DELINEATOR, TYPE FLEXIBLE
18 EACH $____________ $____________
A1120 63316-1000 REMOVE AND RESET SIGN
1 EACH $____________ $____________
A1140 63316-3000 REMOVE AND RESET OBJECT MARKER
3 EACH $____________ $____________
A1160 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID
2,100 LNFT $____________ $____________
A1180 63403-0400 PAVEMENT MARKINGS, TYPE D
110 SQFT $____________ $____________
A1200 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
30 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 5
A1220 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
1 EACH $____________ $____________
A1240 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
140 LNFT $____________ $____________
A1260 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS (STOP LINES)
80 LNFT $____________ $____________
A1280 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
770 SQFT $____________ $____________
A1300 63507-0800 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
21 DAY $____________ $____________
A1320 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
B - 6
BID SUMMARY
Project NP-DEWA 14(18), 121 (1)
(1) Schedule A (Base Contract) Bid Total (from Page B-5) = (1) $____________________
The performance period for the completion of Schedule A is 395 calendar days.