Attachment 1-A MI DNR Research Vessel - Resume Template.docx
DOCX document 20 KB Posted
- Attached to
- LED - Renovate Four Patrol Boats - Addendum #1
- Solicitation number
- RFP 751 230000000367 5
- Issued by
- Emmet County, Mcbride Village, Michigan
About this file
This is a resume template attachment for the Michigan Department of Natural Resources Request for Proposal No. 230000000367 for the renovation of four Great Lakes patrol boats. The template establishes standardized requirements for bidders to submit information on their proposed Principal Construction Manager, including classification of personnel (direct employee, subcontract, or contract), work time allocation percentage, physical work location, years of experience, and relevant project history. Bidders must document the Principal Construction Manager's qualifications against specific required skills, provide management experience details, and include comprehensive educational background with degree types, institutions, attendance dates, and areas of study.
The template requires bidders to detail technical and professional training relevant to the Principal Construction Manager's role, including course names, topics with applicable credit hours, and completion dates. Additionally, bidders must list certifications and affiliations with completion dates. The document serves as a standardized evaluation tool to ensure consistent presentation of key personnel qualifications across all proposals submitted for this Great Lakes patrol boat renovation project, enabling the Michigan DNR to uniformly assess bidder capacity and personnel expertise for the contract award process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hill_cummins_drawing.jpeg.jpg | JPG image | |
| Sign in sheet.jpg | JPG image | |
| Hill_engine_drawing.jpg | JPG image | |
| Hill_defrost.jpg | JPG image | |
| Attachment 1-B Example of Schedule of Values.xlsx | XLSX spreadsheet | |
| Revised 2022 Great Lakes Patrol Boat Specs - Huldah Neal (002).docx | DOCX document | |
| Revised_2022 Great Lakes Patrol Boat Specs - Wm Alden Smith.docx | DOCX document | |
| Revised 2022 Great Lakes Patrol Boat Specs - Ransom H. Hill 1.docx | DOCX document | |
| Revised MI DNR RFP 23-367 Renovation of Four Great Lakes Patrol Boats.docx | DOCX document | |
| Hill_fuelpipping.jpg | JPG image | |
| Hill_engine cooling.jpg | JPG image | |
| Hill_drawing_Genset_5kw.jpg | JPG image | |
| Addendum_1 Vendor Q & A.docx | DOCX document | |
| Hill_breakerpanel.jpg | JPG image | |
| Hill_engine_prop.jpg | JPG image | |
| Hill_defrost_drawing.jpg | JPG image | |
| Hill_cummins_drawing.jpg | JPG image | |
| Hill_drawing_stern.jpg | JPG image | |
| Revised_2022 Great Lakes Patrol Boat Specs - Rick Asher.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Michigan Dept. of Natural Resources -
- Renovate Four (4) Great Lakes Patrol Boats
Request for Proposal “RFP” No. 230000000367
ATTACHMENT 1-A
RESUME TEMPLATE
BIDDER’S SENIOR LEVEL PRINCIPAL CONSTRUCTION MANAGER
Classification
Identify if Key Personnel is a direct, subcontract, or contract employee
If resource is associated with a subcontractor provide name of company:
Identify Key Personnel’s percentage of work time devoted to this Contract versus Key Personnel’s staff member’s total overall workload.
Identify Key Personnel’s percentage of work time devoted to this Contract versus Key Personnel’s staff member’s total overall workload.
Identify where Key Personnel staff member will be physically located (city and state) during the Contract period.
Years of Experience and title in their current classification
Bidder: List the skills and experience that qualify the individual for the duties and responsibilities on this project for the proposed role. Provide the name of the project(s) and the year(s) the experience was obtained. Yellow highlight was provided for example or instruction. Bidder must complete the information within the provided cells.
The experience requirements detailed in the RFP are restated as follows:
| Required Skills |
| Bidder’s Response |
| PRINCIPAL CONSTRUCTION MANAGER |
| Does resource have this required skill: Yes or No |
Description of skills and experience: Example: 10 yrs exp with (vendor name) implementing multimillion-dollar, statewide implementations of IT Security Software and Protocol (and elaborate with detail about it)
Name of project(s) and year(s) experience was obtained: Michigan Infinity Project – 2006 - 2010 Ohio Intelligence Center Project – 2011 - 2015
| MANAGEMENT EXPERIENCE OF OTHER TEAM MEMBERS |
| Does resource have this required skill: Yes or No |
Description of skills and experience:
Name of project(s) and year(s) experience was obtained:
EDUCATION
Education
| Degree (i.e. PhD, Master’s, Bachelors) |
| Example: Bachelor’s of Science in Engineering |
| Years Attended: 1998 - 2002 |
| Program |
| Major(s) area of study: Civil Engineering |
| Year Graduated 2002 |
| University/College/Trade School |
| (include address)Example: MSU – East Lansing, Michigan |
Additional Education
| Degree (i.e. PhD, Master’s, Bachelors) |
| Example: Masters |
| Years Attended: 2002 - 2004 |
| Program |
| Major(s) area of study: |
Intelligence Security Year Graduated 2004
| University/College |
| (include address) Example: Central MI University, Mt. Pleasant, MI |
TRAINING – Provide any relevant technical or professional training related to the role resource will be providing on this project.
Technical or Professional Training
Course Name
| Topic |
| (include credit hours if applicable) |
Date taken
Certifications/Affiliations
Name
Topic/Description
Date completed