Attachment 07 Technical_Experience_Project_Worksheet (Factor-1).docx

DOCX document 93 KB Posted

Attached to
Army Ground Aerial Target Control System (AGATCS) Support, Development, and Production (SDP) Federal contract opportunity
Solicitation number
W900KK-20-R-0020
Issued by
Department of the Army Materiel Command Contracting Command Orlando Contracting Center

About this file

This document contains a technical experience project worksheet template and information on an Army Ground Aerial Target Control System (AGATCS) Support, Development, and Production solicitation. The technical experience project worksheet is to be completed by offerors to demonstrate relevant past performance on contracts from January 2016 to January 2021 involving unmanned systems control, cybersecurity, and engineering development resulting in production. It requests details on prime and subcontractors, period of performance, references, and substantiating documentation. The AGATCS SDP solicitation will result in a single-award IDIQ contract to provide target control systems capabilities for aerial, maritime, and ground targets over a five-year base period and two optional one-year ordering periods. The pre-solicitation was released to obtain industry feedback on draft documents by July 14, 2020. A virtual industry day will be held on July 21, 2020, with registration by July 15. Anticipated award is third quarter 2021. The Department of the Army is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Army Ground Aerial Target Control System (AGATCS) Support, Development, and Production (SDP), newest first.
File Type Posted
Attachment 13 Cost-Price Workbook Example_Draft.xlsx XLSX spreadsheet
W900KK-20-R-0020 AGATCS SDP RFP DRAFT-V2.pdf PDF
Attachment 03 SAMPLE Order Draft.pdf PDF
Attachment 02 Delivery Order 0001 Draft.pdf PDF
W900KK-20-R-0020 AGATCS SDP RFP DRAFT.pdf PDF
Attachment 15 Government Furnished Property (GFP-GFE) 659.xlsx XLSX spreadsheet
Attachment 03 Sample Orders 0001_RevB_16Jun2020.docx DOCX document
Attachment 02A Delivery Order 0001 CDRLs_23Jun2020.docx DOCX document
Attachment 13 Cost-Price Workbook Example_18Jun2020.xlsx XLSX spreadsheet
Attachment 10 DCAA Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist.pdf PDF
Attachment 18 -Contract Labor Rates (FFP and CPFF Rates)_02Jun2020.docx DOCX document
Attachment 04 Contract Datat Requirements List.pdf PDF
Attachment 19 DATA Rights CDRLs Workbook_23Jun2020.xlsx XLSX spreadsheet
Attachment 09 SF1408 Preaward_Survey_of_Prospective_Contractor_Accounting_System.pdf PDF
Attachment 14_Cross_Reference_Matrix_03Jun2020.xlsx XLSX spreadsheet
Attachment 04 Contract Datat Requirements List-CDRLs-AGATCS SDP 24Jun2020.pdf PDF
Distribution Agreement AGATCS SDP.docx DOCX document
Attachment 11 Quality Assurance Surveillance Plan (QASP)_Final_v.1.0_20Apr2020.pdf PDF
Attachment 08_Clarification_Form (Industry Questions).doc DOC document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXPERIENCE PROJECT WORKSHEETAttachment (07)

W900KK-20-R-0020

ARMY GROUND AERIAL TARGET CONTROL SYSTEM (AGATCS)

SUPPORT DEVELOPMENT & PRODUCTION (SDP)

Company Name:
Click here to enter text.

GENERAL INSTRUCTIONS:

1. Reference Sections L.4 for additional instructions.

2. A project may be based on any of the following:

1. A single contract, task order with a period of performance within the 02 January 2016 through 01 January 2021.

2. A collection of contracts and or task orders performed by the same firm or offered teaming arrangement / joint venture within a 12 month time period that also has all 12 months of performance within the 02 January 2016 through 01 January 2021 time restrictions.

3. There is no requirement or benefit to completing multiple project worksheets if your experience can be fully described in fewer.

4. Documented experience as a Prime Contractor or Subcontractor is acceptable. Experience must reflect that of the offeror; if experience was derived from a previous teaming or subcontracting arrangement, then only the portion provided by the Offeror as described in the proposal may be submitted.

5. If experience provided is from a member of your teaming arrangement in response to this solicitation then this experience may be included in one project worksheet or in more than one, at the decision of the offeror. A binding Teaming Agreement, Partnership or Joint Venture must be included in Volume 5 - Contract Information for any subcontractor experience incorporated on a project worksheet.

6. Offerors shall respond to all applicable questions in this worksheet.

7. All proposal documentation associated with this worksheet shall be scanned documents in PDF format.

8. All requested information shall be highlighted/identified within the scanned documents. It is recommended that the highlighted/identified items are identified by the Question and project worksheet number (Q.1 - P.1 for Question #1 on Project #1).

9. All file documentation shall be included in Volume 1 of the Offeror’s proposal submission. See Proposal Format Table in Section L

10. The Technical Experience shall address the following (3) key points:

Key Point #1. Successful performance of all three (3) Core Technical Experience areas as described in AGATCS SDP SOW paragraphs 3.3 through 3.8. The Core Task areas are:

1) Experience with unmanned systems control related to

a. Hardware development, integration, and test;

b. Software development, integration, and test;

c. Operations; and

d. Production.

2) Experience with cybersecurity under Risk Management Framework (RMF) as described in the AGATCS SDP SOW paragraphs 6.0 through 6.3.

3) Experience with engineering development that has resulted in production capabilities as described in the AGATCS SDP SOW paragraphs 3.4 and 3.5.

Key Point #2. Technical Experience shall be between 02 January 2016 and 01 January 2021.

Key Point #3. The combined value of the Technical Experience must be equal to or greater than $5 million.

PROJECT Number (1-3): # of 3.

TECHNICAL EXPERIENCE - BACKGROUND INFORMATION:

1. Who is/are the PRIME CONTRACTOR(s) and what is the CONTRACT OR TASK ORDER NUMBER(s) of the project (add rows as necessary)?

Prime Contractor Name:
Click here to enter text.
Contract or Task Order Number:
Click here to enter text.

Note: In order to substantiate the Prime Contractor Name, the Offeror shall provide a scan of the award page of the Contract or Task Order in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).

2. Indicate here if performance is as a SUBCONTRACTOR.

Subcontractor Name:
Click here to enter text.

If Subcontract, Briefly explain scope and duties relative to the AGATCS Core Technical Experience Tasks.

Click here to enter text.

Note: In order to substantiate the Subcontract, the Offeror shall provide a scan of the award page and substantiating section(s) of the award document in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).

3. What is the VEHICLE TYPE? (Check only one):

|_| CONTRACT or TASK ORDER

|_| COLLECTION OF CONTRACTS AND/OR TASK ORDERS

|_| VEHICLE OR COMBINATION OF VEHICLES NOT DESCRIBED ABOVE

Fully describe the vehicle type here.

Click here to enter text.

4. Provide a PRIMARY Reference: (Person who can verify all the Contract or Task Order data - Government Contracting Officer, Project/Program Manager, or Contracting Officer Representative) (add rows as necessary)

Name:
Click here to enter text.
Title:
Click here to enter text.
Agency or Customer:
Click here to enter text.
Phone:
Click here to enter text.
E-Mail:
Click here to enter text.

5. Provide an ALTERNATE Reference: (Person who can verify all the Contract or Task Order data - Government Contracting Officer, Project/Program Manager, or Contracting Officer Representative) (add rows as necessary)

Name:
Click here to enter text.
Title:
Click here to enter text.
Agency or Customer:
Click here to enter text.
Phone:
Click here to enter text.
E-Mail:
Click here to enter text.

6. Does the project meet the minimum PERIOD OF PERFORMANCE requirement (Ongoing or Completed) between 02 January 2016 and 01 January 2021?

|_| Yes |_| No

If Yes, what is/was the actual completed PERIOD OF PERFORMANCE?

Period of Performance, including Options
Click here to enter text.

Note: The Offeror shall provide excerpt(s) from verifiable documentation to substantiate the Period of Performance in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).

7. Does the project meet the minimum requirement for the combined value of the Technical Experience to be at least $5 million?

|_| Yes |_| No *Provide rational and calculations (rounding to $100,000 is authorized, for example $1.1 M). The sum of all Project Worksheets must be equal to or greater than $5 million. Delete these notes and input your information in this box. Adjust the box size if necessary to provide adequate information.

Note: The Offeror shall provide excerpt(s) from verifiable documentation to substantiate the Combined Project Value in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).

8. Which CORE TASK AREAS were performed on the project?

(Mark all that apply)

A. Unmanned systems control related to:

|_| Hardware development, integration and test;
|_| Software development, integration and test;
|_| Operations; and
|_| Production.

B. |_| Cybersecurity under Risk Management Framework C. |_| Engineering development that has resulted in production capabilities

9. Does the project have SUBSTANTIATING DOCUMENTATION for each of the core task areas performed on the project?

|_| Yes |_| No The intent of this question is to allow the contractor to determine which CORE Task Area(s) the project will cover and identify the verifiable documentation. All verifiable documentation to substantiate the identified Task Area should reference question #9 not #8. Delete these notes and input your information in this box. Adjust the text box size if necessary to provide adequate information.

Note: The Offeror shall provide excerpt(s) from verifiable documentation to substantiate the identified Task Area (s) in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).

AN EVALUATION OF THE SUBMITTED DOCUMENTATION WILL DETERMINE IF THE PROVIDED TECHNICAL EXPERIENCE IS ACCEPTABLE.

END OF PROJECT

* This is to certify that, to the best of my knowledge and belief, that the submitted Technical Experience information is accurate, complete and that the substantiating documents are contained in Factor 1 - Volume I. If the submitted material does not meet the stated criteria the proposal will be considered unacceptable.

_________________________
(Name and Company Title)

SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104

File details come from the government source that posted it. Updated .