Attachment 06a__D3I2_D1_Pre_award_Survey_of_Prosp_Ktr_Acct_Sys_Checklist02_APR_2024.pdf
PDF 1 MB Posted
- Solicitation number
- W9113M24R0070
About this file
This document is a Pre-Award Survey of Prospective Contractor Accounting System Checklist related to a federal contract opportunity. The checklist contains detailed questions about the contractor's accounting system, including whether it has been audited by DCAA, whether it complies with Cost Accounting Standards (CAS), and whether it provides the necessary financial information and controls required for government contracting. The contractor must provide detailed explanations to each question, indicating the capabilities and status of their accounting system. This checklist is required to be submitted as part of the response to the related federal contract opportunity, Solicitation Number W9113M24R0070 for the United States Army Space and Missile Defense Command's (USASMDC) Design, Development, Demonstration, and Integration II (D3I2) Domain 1 (D1) contract. The formal RFP solicitation for this opportunity has not yet been released, but a draft request for proposals (DRFP) and associated exhibits/attachments have been posted for review and comment.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM CHECKLIST
PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM
Date: I�----�
Company Name, Contract Number, and Full Address:
Commercial and Government Agency (CAGE) Code Number: (Found at http://www.dlis.dla.mil/ cage_welcome.asp)
Cognizant Defense Contract Audit Agency (DCAA) office info (Address/phone number/E-mail) - (Found at http://dcaa.mil/office_locator.html)
Company Point of Contact:
(Name, Title, Phone Number, and E-mail address
Name, Title, and signature of Company Principal (PresidenWP/Controller, etc) responsible for the design of the Accounting System.
NAME
TITLE
E-MAIL ADDRESS
SIGNATURE DATE
PLEASE ANSWER THE QUESTIONS BELOW:
HAVE YOU READ THE REQUIREMENTS IN THE SF1408? (YES/NO) ___ _
HAVE YOU READ THE DCAA PUBLICATION DCAAM 7641.90- "Information for Contractors" ON
DCAA'S WEBSITE at http:www.dcaa.mil/? (YES/NO) ___ _
For each question, check only one box. ALL questions must have explanatory narrative text entered in the boxes. Please provide sufficient detail to describe the process (Including Account Numbers/Process Flow etc.) Each Question must be complete. Do NOT refer to previous answers, (i.e. "See Question 3 Above").
W9113M24R0070 Attachment 06a Pre-award Survey of Prospective Contractor Accounting System Checklist Design, Development, Demonstration, And Integration II (D3I2) Domain 1
02 APR 2024 (REV 00)
Pre-award Survey of Prospective Contractor Accounting System Checklist
1. Has your organization"s Accounting System ever been audited by DCAA?
D YES (if Yes, the Offeror should attach a copy of their most recent DCAA audit report to this Modified Pre-Award Survey) or provide the DCAA Report number or DCAA POC info.
D NO (if NO, answer N/A to Questions 1.A., 1.B., and 1.C. below)
1.A. If the answer is ""Yes"" to Question 1 above, when was the audit performed?
D Within the past Year
D Within the past 3 Years
0 Greater than 3 Years (PROVIDE THE YEAR THE AUDIT WAS PERFORMED HERE -
D N/A (Answer to Question 1 is NO)
1.B. If the answer is ""Yes"" to Question 1 above, did DCAA determine the Accounting System acceptable for award of prospective contracts?
0 YES
D NO (If NO provide an explanation in the box below)
D N/A (Answer to Question 1 is NO)
1.C. If the answer is ""Yes"" to Question 1 above, have there been any changes to the Accounting System since the DCAA audit?
D YES (If YES, describe the changes in the box below
0 NO
D N/A (Answer to Question 1 is NO)
W9113M24R0070 Attachment 06a Pre-award Survey of Prospective Contractor Accounting System Checklist Design, Development, Demonstration, And Integration II (D3I2) Domain 1
2. Is your organization subject to CAS (48 CFR Chapter 99)?
0 YES (If YES, is it FULL or MODIFIED CAS?) 0 FULL O MODIFIED
(If YES (FULL or MODIFIED), the Offeror MUST attach a copy of their most recent audit reports/documentation regarding all CAS compliance or non-compliance issues to this Modified Pre-Award Survey)
D NO (If NO provide an explanation in the box below why your organization is exempt and answer N/A to Questions 2.A., 2.B., and 2.C. below)
2.A. Has your organization submitted a CASB disclosure statement (CASB DS-1) to DCAA and has it been determined adequate?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (Answer to Question 2 is NO)
2.8. Has your organization been notified by DCAA that it is (or may be in) non-compliance with its disclosure statement or CAS?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, if the answer to Question 2 is NO)
W9113M24R0070 Attachment 06a Pre-award Survey of Prospective Contractor Accounting System Checklist Design, Development, Demonstration, And Integration II (D3I2) Domain 1
2.c. Is any aspect of this proposal inconsistent with your orgnaization's disclosed practices or applicable CAS?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, if the answer to Question 2 is NO or if you have no current, active proposal being considered)
Instruction: If the Contractor is planning on bidding on Cost Type Contracts, the contractor MUST provide explanatory narrative for all of the following questions:
3. Has your organization's Accounting System been audited by an outside Certified Public Accountant/Consultant or other Cognizant Federal Agency other than DCAA?
□ YES (If YES, the Offerer MUST attach a copy of their most recent audit report to this Modified Pre-Award Survey) NOTE: Do not submit your Annual Financial Audit.
4. Is your organization's Accounting System currently in full operation?
D YES (If YES, provide an explanation that validates your answer in the box below).
□ NO (If NO, provide an explanation in the box below which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) non-existent)
D N/A (If N/A, provide an explanation in the box below)
W9113M24R0070 Attachment 06a Pre-award Survey of Prospective Contractor Accounting System Checklist Design, Development, Demonstration, And Integration II (D3I2) Domain 1
5. Is your organization's Accounting System in accord with Generally Accepted Accounting Principles (GAAP) Applicable in the Circumstances?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
6. Is your organization's Accounting System ready for a DCAA audit?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below as to when you will be ready for an audit)
D N/A (N/A, provide an explanation in the box below)
7. Are the loaded hourly labor rates proposed consistent with your established estimating and accounting principles and procedures and FAR Part 31, Cost Principles? (Answer this Questions "N/A" if you do not have an active proposal)
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
W9113M24R0070 Attachment 06a Pre-award Survey of Prospective Contractor Accounting System Checklist Design, Development, Demonstration, And Integration II (D3I2) Domain 1
8. Does the Accounting System provide for the proper segregation of Direct Costs from Indirect Costs?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
9. Does the Accounting System provide for the identification and accumulation of Direct Costs by contract?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
10. Does the Accounting System provide for a logical and consistent method for the allocation of Indirect Costs to intermediate and final cost objectives? (A contract is a final cost objective.)
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
W9113M24R0070 Attachment 06a Pre-award Survey of Prospective Contractor Accounting System Checklist Design, Development, Demonstration, And Integration II (D3I2) Domain 1
11. Does the Accounting System Provide for the accumulation of costs under general ledger control?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
12. Does the Accounting System provide for a timekeeping system that identifies employees' labor by intermediate or final cost objectives?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
13. Does the Accounting System provide for a labor distribution system that charges Direct and Indirect labor to the appropriate cost objectives?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
W9113M24R0070 Attachment 06a Pre-award Survey of Prospective Contractor Accounting System Checklist Design, Development, Demonstration, And Integration II (D3I2) Domain 1
14. Does the Accounting System provide for an interim (at least monthly) determination of costs charged to a contract through routine posting of books of account?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
15. Does the Accounting System provide for an exclusion of costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
Pre-award Survey of Prospective Contractor Accounting System Checklist
16. Does the Accounting System provide for the identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
W9113M24R0070 Attachment 06a Pre-award Survey of Prospective Contractor Accounting System Checklist Design, Development, Demonstration, And Integration II (D3I2) Domain 1
17. Does the Accounting System provide for the segregation of preproduction costs from production costs?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
18. Does the Accounting System provide financial information required by contract clauses concerning limitation of cost (FAR 52.232.20) or limitation on payments (FAR 52.216-16)?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
19. Does the Accounting System provide financial information required to support requests for Progress Payments?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
W9113M24R0070 Attachment 06a Pre-award Survey of Prospective Contractor Accounting System Checklist Design, Development, Demonstration, And Integration II (D3I2) Domain 1
20. Is the Accounting System designed, and are the records maintained, in such manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?
D YES (If YES, provide an explanation that validates your answer in the box below)
D NO (If NO provide an explanation in the box below)
D N/A (N/A, provide an explanation in the box below)
21. Is your organization planning on submitting proposals on Cost-Type (FAR 16.3) contracts/task orders?
0 YES
D NO (If NO provide an explanation in the box below)
D NIA (NIA, provide an explanation in the box below)
22. Is your organization currently performing on Cost-Type (FAR 16.3) contracts/task orders?
0 YES
0 NO
0 N/A
W9113M24R0070 Attachment 06a Pre-award Survey of Prospective Contractor Accounting System Checklist Design, Development, Demonstration, And Integration II (D3I2) Domain 1
| Date I: |
| HAVE YOU READ THE REQUIREMENTS IN THE SF1408 YESNO: |
| DCAAS WEBSITE at httpwwwdcaamil YESNO: |
| Text1: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text10: |
| Text11: |
| Text12: |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Text19: |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Text23: |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Text27: |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Text32: |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Text36: |
| Check Box37: Off |
| Check Box38: Off |
| Check Box39: Off |
| Text40: |
| Check Box41: Off |
| Check Box42: Off |
| Check Box43: Off |
| Text44: |
| Check Box45: Off |
| Check Box46: Off |
| Text47: |
| Check Box48: Off |
| Check Box49: Off |
| Check Box50: Off |
| Text51: |
| Check Box52: Off |
| Check Box53: Off |
| Check Box54: Off |
| Text55: |
| Check Box56: Off |
| Check Box57: Off |
| Check Box58: Off |
| Text59: |
| Check Box60: Off |
| Check Box61: Off |
| Check Box62: Off |
| Text63: |
| Check Box64: Off |
| Check Box65: Off |
| Check Box66: Off |
| Text67: |
| Check Box68: Off |
| Check Box69: Off |
| Check Box70: Off |
| Text71: |
| Check Box72: Off |
| Check Box73: Off |
| Check Box74: Off |
| Text75: |
| Check Box76: Off |
| Check Box77: Off |
| Check Box78: Off |
| Text79: |
| Check Box80: Off |
| Check Box81: Off |
| Check Box82: Off |
| Text83: |
| Check Box84: Off |
| Check Box85: Off |
| Check Box86: Off |
| Text87: |
| Check Box88: Off |
| Check Box89: Off |
| Check Box90: Off |
| Text91: |
| Check Box92: Off |
| Check Box93: Off |
| Check Box94: Off |
| Text95: |
| Text96: |
| Check Box97: Off |
| Check Box98: Off |
| Check Box99: Off |
| Check Box100: Off |
| Check Box101: Off |
| Check Box102: Off |
| Text103: |
| Check Box104: Off |
| Check Box105: Off |
| Check Box106: Off |
| Text107: |
| Check Box108: Off |
| Check Box109: Off |
| Check Box110: Off |
| Text111: |
| Check Box112: Off |
| Check Box113: Off |
| Check Box114: Off |
| Text115: |
| Check Box116: Off |
| Check Box117: Off |
| Check Box118: Off |
| Text119: |
| Check Box120: Off |
| Check Box121: Off |
| Check Box122: Off |
| Text123: |
File details come from the government source that posted it. Updated .