This document is a Cost/Price Proposal Worksheet for the Design, Development, Demonstration, and Integration II (D3I2) Domain 1 contract opportunity under solicitation number W9113M24R0070. The worksheet provides detailed instructions for offerors to submit their proposed pricing, including required tabs for labor category mapping, direct labor rates, indirect rates and fee, prime and subcontractor rate build-ups, contract rate tables, and a summary of the total proposed price. The worksheet requires offerors to provide their proposed fully burdened labor rates by labor category and calendar year for both CONUS and High-Cost CONUS areas, and for both government site and contractor site locations. Offerors must also distribute the government-provided estimated hours by labor category among the prime and any major subcontractors. The worksheet is a critical component of the cost/price proposal submission for this D3I2 Domain 1 opportunity.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| W9113M24R0070 Attachment 05 Cost/Price Proposal Worksheet |
| Design, Development, Demonstration, and Integration II (D3I2) Domain 1 |
| 02 APR 2024 (REV 00) |
On each TAB, enter the requested data in the yellow highlighted cells. The offeror may edit the worksheet to accommodate the offeror's normal accounting practices but the general format shall remain intact for evaluation and contract administration purposes. TABs have been pre-populated with formulas to aid the offeror in calculating the proposed price. The offeror is responsible for ensuring that all calculations within each TAB are accurate and reflective of the offeror's proposed price.
STEP 1 TAB Labor Category Mapping: The Labor Category Mapping TAB is intended to be used by offerors to show the calculation of composite base labor rates for each RFP Labor Category. The worksheet has been pre-populated with formulas to calculate the composite base labor rate for each RFP labor category based on the offeror's proposed Contractor Internal Labor Categories and assigned weightings. The resulting composite base rates for each RFP labor category as shown in Row 19 shall be used to populate TAB 1a. Direct Labor Rates. If the base direct labor rates detailed are not used for both the CONUS and High CONUS Government Site and Contractor Site locations, develop a separate mapping for the applicable site, ensuring the tables are appropriately labeled.
NOTE: Not all proposed team members (prime and major subcontractors) are required to propose a Fully Burdened Labor Rate (FBLR) for every RFP labor category. However, the prime offeror shall ensure that the Contract Rate Tables contain at least one prime FBLR or major subcontract FBLR for every RFP labor category by calendar year for both CONUS and High-Cost CONUS areas and for both Government Site and Contractor Site.
| Instructions: |
| 1. Provide the offeror's contractor fiscal year (CFY) from and to dates. |
| 2. Provide the proposed mapping of RFP labor categories to the offeror's contractor/corporate labor categories with minimum education, experience, and description of duties to demonstrate that the offeror is proposing qualified personnel for the effort in accordance with RFP Attachment 02. There are 110 rows available for detailing the offeror's contractor/corporate labor categories etc. If more than 110 rows are needed, insert additional rows ensuring the formulas for calculating the "Base Direct Labor Rates" are updated to include the added rows. Also, verify the added rows are included in the calculation of the total of the allocation percentages in the "Percentage Total" row at the bottom of the Labor Category Mapping Total. |
| 3. If a particular RFP labor category is a composite of more than one of the offeror’s contractor/corporate labor categories, the offeror shall provide the calculation of the composite with the assigned weightings, identifying percentages the contractor/corporate labor categories are anticipated to work in the RFP labor categories. If a proposed RFP labor category is comprised of only one contractor/corporate labor category, the offeror shall provide the crosswalk to the offeror’s single contractor/corporate labor category and assign a weighting of 100 percent. Ensure the "Percentage Total" equals 100%. If a "No" is identified in the "Percentage Total = 100" row, ensure: (i)the allocation percentages are correctly identified to contractor/corporate labor categories and (ii)the calculation of the allocation percentage, in the "Percentage Total" row, includes any added rows. |
| 4. For every proposed contractor/corporate labor category, input the proposed base labor rate for the offeror's contractor fiscal year identified in this worksheet. |
| 5. The labor rates, identified in the "Base Direct Labor Rates" row (Row 19) shall be used to populate TAB 1a. Direct Labor Rates. |
| STEP 1a | TAB Direct Labor Rates | The direct labor rates by calendar year proposed here shall be used to populate the Rate Build-up TABs. |
| A. Direct Labor Rate Table Instructions: | ||
| 1. Input the offeror's CFY from and to dates. | ||
| 2. Provide the offeror's direct labor rates by CFY, identifying the CFY (change the "X" in "CFY X" to the actual CFY year) in the Direct Labor Rates by CFY table. Input formulas to link the rates in Row 19 of TAB 1. Labor Category Mapping to the Direct Labor Rates by CFY table on this TAB. | ||
| 3. Identify the proposed escalation rate. Input formulas into the Direct Labor Rates by CFY table to apply escalation to the proposed direct labor rates by CFY. | ||
| 4. Provide rates by calendar year. When the offeror's CFY does not align with the calendar year, input formulas to show the conversion of CFY rates to calendar year rates. The resulting calendar year rates are the rates that shall be used in the Rate Build-up tabs. |
| STEP 2 | TAB Indirect Rates & Fee: | The indirect rates and fee proposed here shall be used to populate the Rate Build-up TABs. |
| A. Indirect Rate Table Instructions: | ||
| 1. Input the offeror's CFY from and to dates. | ||
| 2. Provide the offeror's proposed indirect rates by CFY, identifying the CFY (change the "X" in "CFY X" to the actual CFY year) in the INDIRECT RATE TABLE. The offeror shall ensure that its proposed indirect rates are proposed in accordance with the offeror's normal accounting practices. | ||
| 3. Provide rates by calendar year. When the offeror's CFY does not align with the calendar year, input formulas to show the conversion of CFY rates to calendar year rates. The resulting calendar year rates are the rates that shall be used in the Rate Build-up tabs. |
| B. Fee Table |
| 1. Input the offeror's proposed fee by calendar year. The calendar year fee rates are the rates that shall be used in the Rate Build-up tabs. |
| C. Indirect Rate Structure |
| 1. Detail the company's indirect rate structure. Identify the final indirect expense pool and the allocation base to which the expenses in the pool are allocated. |
| 2. Include a general description of the types of costs included in each indirect rate pool and a general description of the costs included in the allocation base. |
| D. Indirect Rate Proposal (Required when rates proposed are not based on a FPRA or FPRR) |
| 1. If the proposed rates are not based on a FPRA or FPRR, the offeror shall provide an indirect rate proposal for the budgeted/forecasted rates used in this proposal. The indirect rate proposal shall provide the total pool and base amounts for each indirect rate proposed. |
| E. Historical Indirect Rates (Required when rates proposed are not based on a FPRA or FPRR) |
| 1. Provide the actual indirect rate history for the prior three years for all proposed indirect rates not supported by an FPRA or FPRR, showing the historical total pool and base amounts. |
| 2. If a comparison of this procurement’s proposed rates to prior year rates is not applicable, so state and state the reason for differences. If the difference between the former year and current year rates may appear excessive, provide rationale and supporting documentation for the differences. The offeror may provide additional supporting worksheets as needed. |
STEPS 3 & 4 TAB Prime Rate Build-up-CONUS & TAB Prime Rate Build-up- High Cost CONUS: The prime offeror only completes these TABs.
The rates in these TABs will be used to populate the TAB Contract Rate Tables-Prime. The prime offeror shall use these tabs to propose prime FBLRs for the RFP labor categories by calendar year as identified for Government site and Contractor site locations for both CONUS and High-Cost CONUS areas. Not all proposed team members (prime and major subcontractors) are required to propose a FBLR for every RFP labor category. The offeror shall provide the details of the prime FBLRs and their build-ups to include the offeror’s base labor rates, any applicable indirect rate(s)/burden(s), and fee proposed in accordance with the offeror’s normal accounting practices.
| These TABs have been prepopulated with formulas to aid in providing the FBLR build-up. The offeror shall edit the formulas and worksheet format, if necessary, to ensure that the prime FBLRs are calculated in accordance with the offeror's normal accounting practices. |
| Instructions: |
| 1. Provide the proposed direct labor base rates by calendar year. Input/edit formulas in these worksheets to link the proposed rates by calendar year calculated in Tab "1a. Direct Labor Rates" to the Prime Rate Build-up. |
| 2. Input formulas into this worksheet to apply the offeror's proposed indirect rate(s)/burden(s) and fee by calendar year from TAB Indirect Rates & Fee to the offeror's proposed base labor rates by calendar year, providing the offeror's calculations for the prime FBLRs. Formulas shall link the TAB Indirect Rates & Fee to the Prime Rate Build-up TABs for CONUS and High Cost CONUS. |
| 3. Propose labor hours based on the planned level of support in accordance with TAB RFP Provided Hours. |
| 4. For each labor category, input/edit formulas to apply the prime total cost per hour and total fee per hour to the proposed hours to calculate the prime total proposed cost and total proposed fee. Then, calculate the total proposed price. |
STEPS 5 & 6 TAB(s) Major Sub X Rate Build-up-CONUS & TAB(s) Major Sub X Rate Build-up- High-Cost CONUS: The prime offeror shall propose fully burdened major subcontract labor rates for the RFP labor categories by calendar year, as identified for Government site and Contractor site locations for both CONUS and High-Cost CONUS areas. Not all proposed team members (prime and major subcontractors) are required to propose a FBLR for every RFP labor category.
The prime offeror shall provide the details of the major subcontract FBLRs and their build-ups. At a minimum, the prime's build-ups shall include the major subcontract labor rates, any applicable prime pass-through indirect rate(s)/burden(s), and fee proposed in accordance with the offeror’s normal accounting practices. The offeror shall complete a separate Major SubX Rate Build-up TAB for every major subcontractor proposed as part of the IDIQ CPFF effort. The D3I2 Cost/Price Proposal Worksheet contains TABs for inputting the build-up of FBLRs for three major subcontractors. Should the offeror propose more than three major subcontractors, the offeror shall add Major SubX Rate Build-up TABs and input/edit formulas throughout the D3I2 Cost/Price Proposal Worksheet to ensure that the proposed price reflects the offeror's proposed team structure.
Major subcontract offerors shall use this TAB to provide the details of the major subcontract FBLRs before prime pass-through and their build-ups to include the major subcontract base labor rates, any applicable indirect rate(s)/burden(s), and fee proposed in accordance with the subcontract offeror's normal accounting practices.
| This TAB has been prepopulated with formulas to aid in providing the FBLR build-up. The offeror shall edit the formulas and worksheet format, if necessary, to ensure that the major subcontract FBLRs are calculated in accordance with the offeror's normal accounting practices. |
| Instructions: |
| 1. Provide the major subcontract rates for each calendar year before prime pass-through indirect rate(s)/burden(s) and fee. |
| 2. Prime offerors shall input formulas into the worksheet to apply the prime offeror's proposed indirect rate(s)/burden(s) and fee (pass-through costs) by calendar year from TAB Indirect Rates to the major subcontract rates. Formulas shall link the TAB Indirect Rates & Fee to TAB Major Sub X Rate Build-up. |
| 3. Provide the build-up of the Major Subcontract FBLR before Prime Pass-through (build-up may be provided as part of the major subcontractor's unsanitized proposal submission)- |
(1) Provide the major subcontractor's direct labor base rates by calendar year. Input/edit formulas in these worksheets to link the major subcontractor's direct labor rates by calendar year calculated in Tab "1a. Direct Labor Rates" to the Major Subcontractor Rate Build-up.
(2) Input formulas to apply the major subcontract offeror's proposed indirect rate(s)/burden(s) and fee by calendar year from TAB Indirect Rates & Fee to the subcontract offeror's proposed base labor rates by calendar year.
Formulas shall link the TAB Indirect Rates & Fee to TAB(s) Major Sub X Rate Build-up.
4. Propose labor hours based on the planned level of support in accordance with TAB RFP Provided Hours.
STEPS 7 & 8 TABs Contract Rate Table-Prime & Contract Rate Table- Major Subcontractor The prime offeror only completes these TABs.
The rates in these tables shall be used when proposing on future CPFF orders issued under the D3I2 contract. The estimated cost per hour rates, fee per hour rates, and total FBLRs established in the Contract Rate Tables shall be used to calculate CPFF task orders' total cost, fixed fee, and total price.
NOTE: Not all proposed team members (prime and major subcontractors) are required to propose a FBLR for every RFP labor category. However, the prime offeror shall ensure that the Contract Rate Tables contain at least one prime FBLR or major subcontract FBLR for every RFP labor category by calendar year for both CONUS and High-Cost CONUS areas and for both Government Site and Contractor Site.
| Instructions: |
| 1. The TAB has been pre-populated to input into the Contract Rate Tables the FBLRs by RFP Labor Category and calendar year from the Prime Rate Build-up and Major Subcontract Rate Build-up worksheets. Input/edit the formulas in these worksheets to ensure that the offeror's proposed rates for the prime and major subcontractors are captured in the Contract Rate Table worksheets. |
| 2. The Contract Rate Tables' formulas allow for three major subcontractors' rates. However, should the offeror propose more than three major subcontractors, the offeror shall modify the Contract Rate Tables to reflect the offeror's proposed team. |
STEP 9 TAB Total Proposed This TAB shall show the Total Proposed Price for D3I2. The TAB has been pre-populated with formulas to calculate the Total Proposed Price for D3I2 from the supporting worksheets in the D3I2 Cost/Price Proposal Worksheet. Edit/input formulas so that this worksheet shows the offeror's total proposed price. The offeror is responsible for ensuring that all calculations are accurate and reflective of the offeror's proposed price.
| STEP 10 | TAB Total Compensation | Instructions: This worksheet shall be used to aid the offeror in providing the offeror's total compensation plan for the professional employees who will work the proposed effort. |
| 1. The offeror shall input the contractor/corporate labor categories for professional employees being proposed for the effort. | ||
| 2. The offeror shall identify the hourly fringe benefits by proposed labor category for each year. The fringe benefits identified in the tables are shown as examples of common types of fringe benefits. The offeror shall edit the tables, to identify the offeror's hourly fringe benefits proposed for each labor category in accordance with the offeror's normal accounting practices. Please identify other benefits in the columns shown as "Other". | ||
| 3. The offeror shall identify the hourly salary amount by labor category for all years proposed under this effort. | ||
| 4. The offeror shall identify the total hourly compensation amount by labor category for all years proposed under this effort. | ||
| 5. Provide a supporting narrative to explain how the total compensation amounts (salaries and fringe amounts) by labor category in the offeror's total compensation plan can be traced to the proposed base labor rates and fringe rates by labor category proposed in the offeror's Rate Build-Up worksheets. |
RFP Provided Hours
| Labor Category Mapping |
| D3I2 Domain 1 |
| Offeror Name: |
| Offeror CAGE: |
| This tab "RFP Provided Hours" requires no input by the offeror but contains the RFP hours by labor category for CONUS and High-Cost areas for both Government site and Contractor Site. The hours by labor category are estimates to be used for evaluation purposes only and do not obligate the Government to procure any number of hours. |
For each RFP labor category, the offeror is required to distribute the RFP provided hours by labor category among the prime offeror and all major subcontractors pursuant to the planned level of support. The proposed distribution of hours among the prime contractor and major subcontractors shall be provided in the Rate Build-up TABs.
For each labor category, the total number of proposed hours for the offeror and major subcontractors shall equal the RFP provided hours for the labor category, as identified in the tables below. For each labor category, the total number of proposed hours for the offeror and major subcontractors shall equal the RFP provided hours for the labor category, as identified in the Contract Rate Tables.
ANY DEVIATIONS FROM THE GOVERNMENT PRESCRIBED LABOR CATEGORIES WILL BE REJECTED AND NOT EVALUATED.
NOTE: The offeror shall ensure that all Fully Burdened Labor Rates (FBLRs) proposed in the "Contract Rate Tables- Prime" and in the "Contract Rate Tables-Major Subcontractor" have hours distributed to them. Not all proposed team members (prime and subcontractors) are required to propose a FBLR for every RFP labor category. However, the prime offferor shall ensure that the Contract Rate Tables contain at least one prime FBLR or major subcontract FBLR for every RFP labor category by calendar year for both CONUS and High-Cost CONUS areas and for both Government Site and Contractor Site.
| Labor Category | Calendar Year 2026 | Calendar Year 2027 | Calendar Year 2028 | Calendar Year 2029 | Calendar Year 2030 | Calendar Year 2031 | Calendar Year 2032 | Calendar Year 2033 | Calendar Year 2034 | Calendar Year 2035 | |||||||||||||||||||||||||||||||||||||||
| CONUS | HIGH-COST CONUS | TOTAL | CONUS | HIGH-COST CONUS | TOTAL | CONUS | HIGH-COST CONUS | TOTAL | CONUS | HIGH-COST CONUS | TOTAL | CONUS | HIGH-COST CONUS | TOTAL | CONUS | HIGH-COST CONUS | TOTAL | CONUS | HIGH-COST CONUS | TOTAL | CONUS | HIGH-COST CONUS | TOTAL | CONUS | HIGH-COST CONUS | TOTAL | CONUS | HIGH-COST CONUS | |||||||||||||||||||||
| Gov't Site | Ktr Site | Gov't Site | Ktr Site | HOURS | Gov't Site | Ktr Site | Gov't Site | Ktr Site | HOURS | Gov't Site | Ktr Site | Gov't Site | Ktr Site | HOURS | Gov't Site | Ktr Site | Gov't Site | Ktr Site | HOURS | Gov't Site | Ktr Site | Gov't Site | Ktr Site | HOURS | Gov't Site | Ktr Site | Gov't Site | Ktr Site | HOURS | Gov't Site | Ktr Site | Gov't Site | Ktr Site | HOURS | Gov't Site | Ktr Site | Gov't Site | Ktr Site | HOURS | Gov't Site | Ktr Site | Gov't Site | Ktr Site | HOURS | Gov't Site | Ktr Site | Gov't Site | Ktr Site | |
| 35.00% | 35.00% | 15.00% | 15.00% | 100.00% | 35.00% | 35.00% | 15.00% | 15.00% | 100.00% | 35.00% | 35.00% | 15.00% | 15.00% | 100.00% | 35.00% | 35.00% | 15.00% | 15.00% | 100.00% | 35.00% | 35.00% | 15.00% | 15.00% | 100.00% | 35.00% | 35.00% | 15.00% | 15.00% | 100.00% | 35.00% | 35.00% | 15.00% | 15.00% | 100.00% | 35.00% | 35.00% | 15.00% | 15.00% | 100.00% | 35.00% | 35.00% | 15.00% | 15.00% | 100.00% | 35.00% | 35.00% | 15.00% | 15.00% | |
| Analyst, Operations Research | 14,049 | 14,049 | 6,021 | 6,021 | 40,140 | 14,049 | 14,049 | 6,021 | 6,021 | 40,140 | 14,049 | 14,049 | 6,021 | 6,021 | 40,140 | 14,049 | 14,049 | 6,021 | 6,021 | 40,140 | 14,049 | 14,049 | 6,021 | 6,021 | 40,140 | 14,049 | 14,049 | 6,021 | 6,021 | 40,140 | 14,049 | 14,049 | 6,021 | 6,021 | 40,140 | 14,049 | 14,049 | 6,021 | 6,021 | 40,140 | 14,049 | 14,049 | 6,021 | 6,021 | 40,140 | 14,049 | 14,049 | 6,021 | 6,021 |
| Cyber Security Professional - Junior | 928 | 928 | 397 | 398 | 2,651 | 928 | 928 | 397 | 398 | 2,651 | 928 | 928 | 397 | 398 | 2,651 | 928 | 928 | 397 | 398 | 2,651 | 928 | 928 | 397 | 398 | 2,651 | 928 | 928 | 397 | 398 | 2,651 | 928 | 928 | 397 | 398 | 2,651 | 928 | 928 | 397 | 398 | 2,651 | 928 | 928 | 397 | 398 | 2,651 | 928 | 928 | 397 | 398 |
| Cyber Security Professional - Mid-Level | 1,096 | 1,096 | 469 | 469 | 3,130 | 1,096 | 1,096 | 469 | 469 | 3,130 | 1,096 | 1,096 | 469 | 469 | 3,130 | 1,096 | 1,096 | 469 | 469 | 3,130 | 1,096 | 1,096 | 469 | 469 | 3,130 | 1,096 | 1,096 | 469 | 469 | 3,130 | 1,096 | 1,096 | 469 | 469 | 3,130 | 1,096 | 1,096 | 469 | 469 | 3,130 | 1,096 | 1,096 | 469 | 469 | 3,130 | 1,096 | 1,096 | 469 | 469 |
| Cyber Security Professional - Senior | 1,855 | 1,855 | 795 | 795 | 5,300 | 1,855 | 1,855 | 795 | 795 | 5,300 | 1,855 | 1,855 | 795 | 795 | 5,300 | 1,855 | 1,855 | 795 | 795 | 5,300 | 1,855 | 1,855 | 795 | 795 | 5,300 | 1,855 | 1,855 | 795 | 795 | 5,300 | 1,855 | 1,855 | 795 | 795 | 5,300 | 1,855 | 1,855 | 795 | 795 | 5,300 | 1,855 | 1,855 | 795 | 795 | 5,300 | 1,855 | 1,855 | 795 | 795 |
| Database Management Specialist - Junior | 8,125 | 8,125 | 3,482 | 3,482 | 23,214 | 8,125 | 8,125 | 3,482 | 3,482 | 23,214 | 8,125 | 8,125 | 3,482 | 3,482 | 23,214 | 8,125 | 8,125 | 3,482 | 3,482 | 23,214 | 8,125 | 8,125 | 3,482 | 3,482 | 23,214 | 8,125 | 8,125 | 3,482 | 3,482 | 23,214 | 8,125 | 8,125 | 3,482 | 3,482 | 23,214 | 8,125 | 8,125 | 3,482 | 3,482 | 23,214 | 8,125 | 8,125 | 3,482 | 3,482 | 23,214 | 8,125 | 8,125 | 3,482 | 3,482 |
| Database Management Specialist - Senior | 6,473 | 6,473 | 2,774 | 2,775 | 18,495 | 6,473 | 6,473 | 2,774 | 2,775 | 18,495 | 6,473 | 6,473 | 2,774 | 2,775 | 18,495 | 6,473 | 6,473 | 2,774 | 2,775 | 18,495 | 6,473 | 6,473 | 2,774 | 2,775 | 18,495 | 6,473 | 6,473 | 2,774 | 2,775 | 18,495 | 6,473 | 6,473 | 2,774 | 2,775 | 18,495 | 6,473 | 6,473 | 2,774 | 2,775 | 18,495 | 6,473 | 6,473 | 2,774 | 2,775 | 18,495 | 6,473 | 6,473 | 2,774 | 2,775 |
| Draftsperson (CAD) | 1,277 | 1,277 | 548 | 547 | 3,649 | 1,277 | 1,277 | 548 | 547 | 3,649 | 1,277 | 1,277 | 548 | 547 | 3,649 | 1,277 | 1,277 | 548 | 547 | 3,649 | 1,277 | 1,277 | 548 | 547 | 3,649 | 1,277 | 1,277 | 548 | 547 | 3,649 | 1,277 | 1,277 | 548 | 547 | 3,649 | 1,277 | 1,277 | 548 | 547 | 3,649 | 1,277 | 1,277 | 548 | 547 | 3,649 | 1,277 | 1,277 | 548 | 547 |
| Electrical Assembler | 1,076 | 1,076 | 462 | 461 | 3,075 | 1,076 | 1,076 | 462 | 461 | 3,075 | 1,076 | 1,076 | 462 | 461 | 3,075 | 1,076 | 1,076 | 462 | 461 | 3,075 | 1,076 | 1,076 | 462 | 461 | 3,075 | 1,076 | 1,076 | 462 | 461 | 3,075 | 1,076 | 1,076 | 462 | 461 | 3,075 | 1,076 | 1,076 | 462 | 461 | 3,075 | 1,076 | 1,076 | 462 | 461 | 3,075 | 1,076 | 1,076 | 462 | 461 |
| Electrician | 1,573 | 1,573 | 675 | 674 | 4,495 | 1,573 | 1,573 | 675 | 674 | 4,495 | 1,573 | 1,573 | 675 | 674 | 4,495 | 1,573 | 1,573 | 675 | 674 | 4,495 | 1,573 | 1,573 | 675 | 674 | 4,495 | 1,573 | 1,573 | 675 | 674 | 4,495 | 1,573 | 1,573 | 675 | 674 | 4,495 | 1,573 | 1,573 | 675 | 674 | 4,495 | 1,573 | 1,573 | 675 | 674 | 4,495 | 1,573 | 1,573 | 675 | 674 |
| Electronics Technician I | 5,017 | 5,017 | 2,151 | 2,150 | 14,335 | 5,017 | 5,017 | 2,151 | 2,150 | 14,335 | 5,017 | 5,017 | 2,151 | 2,150 | 14,335 | 5,017 | 5,017 | 2,151 | 2,150 | 14,335 | 5,017 | 5,017 | 2,151 | 2,150 | 14,335 | 5,017 | 5,017 | 2,151 | 2,150 | 14,335 | 5,017 | 5,017 | 2,151 | 2,150 | 14,335 | 5,017 | 5,017 | 2,151 | 2,150 | 14,335 | 5,017 | 5,017 | 2,151 | 2,150 | 14,335 | 5,017 | 5,017 | 2,151 | 2,150 |
| Electronics Technician II | 4,484 | 4,484 | 1,921 | 1,922 | 12,811 | 4,484 | 4,484 | 1,921 | 1,922 | 12,811 | 4,484 | 4,484 | 1,921 | 1,922 | 12,811 | 4,484 | 4,484 | 1,921 | 1,922 | 12,811 | 4,484 | 4,484 | 1,921 | 1,922 | 12,811 | 4,484 | 4,484 | 1,921 | 1,922 | 12,811 | 4,484 | 4,484 | 1,921 | 1,922 | 12,811 | 4,484 | 4,484 | 1,921 | 1,922 | 12,811 | 4,484 | 4,484 | 1,921 | 1,922 | 12,811 | 4,484 | 4,484 | 1,921 | 1,922 |
| Electronics Technician III | 6,920 | 6,920 | 2,965 | 2,965 | 19,770 | 6,920 | 6,920 | 2,965 | 2,965 | 19,770 | 6,920 | 6,920 | 2,965 | 2,965 | 19,770 | 6,920 | 6,920 | 2,965 | 2,965 | 19,770 | 6,920 | 6,920 | 2,965 | 2,965 | 19,770 | 6,920 | 6,920 | 2,965 | 2,965 | 19,770 | 6,920 | 6,920 | 2,965 | 2,965 | 19,770 | 6,920 | 6,920 | 2,965 | 2,965 | 19,770 | 6,920 | 6,920 | 2,965 | 2,965 | 19,770 | 6,920 | 6,920 | 2,965 | 2,965 |
| Engineer or Scientist Analytical - Apprentice | 8,190 | 8,190 | 3,511 | 3,510 | 23,401 | 8,190 | 8,190 | 3,511 | 3,510 | 23,401 | 8,190 | 8,190 | 3,511 | 3,510 | 23,401 | 8,190 | 8,190 | 3,511 | 3,510 | 23,401 | 8,190 | 8,190 | 3,511 | 3,510 | 23,401 | 8,190 | 8,190 | 3,511 | 3,510 | 23,401 | 8,190 | 8,190 | 3,511 | 3,510 | 23,401 | 8,190 | 8,190 | 3,511 | 3,510 | 23,401 | 8,190 | 8,190 | 3,511 | 3,510 | 23,401 | 8,190 | 8,190 | 3,511 | 3,510 |
| Engineer or Scientist Analytical - Junior | 20,871 | 20,871 | 8,944 | 8,945 | 59,631 | 20,871 | 20,871 | 8,944 | 8,945 | 59,631 | 20,871 | 20,871 | 8,944 | 8,945 | 59,631 | 20,871 | 20,871 | 8,944 | 8,945 | 59,631 | 20,871 | 20,871 | 8,944 | 8,945 | 59,631 | 20,871 | 20,871 | 8,944 | 8,945 | 59,631 | 20,871 | 20,871 | 8,944 | 8,945 | 59,631 | 20,871 | 20,871 | 8,944 | 8,945 | 59,631 | 20,871 | 20,871 | 8,944 | 8,945 | 59,631 | 20,871 | 20,871 | 8,944 | 8,945 |
| Engineer or Scientist Analytical - Mid-Level | 24,252 | 24,252 | 10,393 | 10,393 | 69,290 | 24,252 | 24,252 | 10,393 | 10,393 | 69,290 | 24,252 | 24,252 | 10,393 | 10,393 | 69,290 | 24,252 | 24,252 | 10,393 | 10,393 | 69,290 | 24,252 | 24,252 | 10,393 | 10,393 | 69,290 | 24,252 | 24,252 | 10,393 | 10,393 | 69,290 | 24,252 | 24,252 | 10,393 | 10,393 | 69,290 | 24,252 | 24,252 | 10,393 | 10,393 | 69,290 | 24,252 | 24,252 | 10,393 | 10,393 | 69,290 | 24,252 | 24,252 | 10,393 | 10,393 |
| Engineer or Scientist Analytical - Senior | 46,984 | 46,984 | 20,136 | 20,136 | 134,240 | 46,984 | 46,984 | 20,136 | 20,136 | 134,240 | 46,984 | 46,984 | 20,136 | 20,136 | 134,240 | 46,984 | 46,984 | 20,136 | 20,136 | 134,240 | 46,984 | 46,984 | 20,136 | 20,136 | 134,240 | 46,984 | 46,984 | 20,136 | 20,136 | 134,240 | 46,984 | 46,984 | 20,136 | 20,136 | 134,240 | 46,984 | 46,984 | 20,136 | 20,136 | 134,240 | 46,984 | 46,984 | 20,136 | 20,136 | 134,240 | 46,984 | 46,984 | 20,136 | 20,136 |
| Engineering/Scientist Mfg - Apprentice | 112 | 112 | 48 | 48 | 320 | 112 | 112 | 48 | 48 | 320 | 112 | 112 | 48 | 48 | 320 | 112 | 112 | 48 | 48 | 320 | 112 | 112 | 48 | 48 | 320 | 112 | 112 | 48 | 48 | 320 | 112 | 112 | 48 | 48 | 320 | 112 | 112 | 48 | 48 | 320 | 112 | 112 | 48 | 48 | 320 | 112 | 112 | 48 | 48 |
| Engineering/Scientist Mfg - Mid-Level | 92 | 92 | 40 | 39 | 263 | 92 | 92 | 40 | 39 | 263 | 92 | 92 | 40 | 39 | 263 | 92 | 92 | 40 | 39 | 263 | 92 | 92 | 40 | 39 | 263 | 92 | 92 | 40 | 39 | 263 | 92 | 92 | 40 | 39 | 263 | 92 | 92 | 40 | 39 | 263 | 92 | 92 | 40 | 39 | 263 | 92 | 92 | 40 | 39 |
| Engineering/Scientist Mfg - Senior | 5,485 | 5,485 | 2,351 | 2,351 | 15,672 | 5,485 | 5,485 | 2,351 | 2,351 | 15,672 | 5,485 | 5,485 | 2,351 | 2,351 | 15,672 | 5,485 | 5,485 | 2,351 | 2,351 | 15,672 | 5,485 | 5,485 | 2,351 | 2,351 | 15,672 | 5,485 | 5,485 | 2,351 | 2,351 | 15,672 | 5,485 | 5,485 | 2,351 | 2,351 | 15,672 | 5,485 | 5,485 | 2,351 | 2,351 | 15,672 | 5,485 | 5,485 | 2,351 | 2,351 | 15,672 | 5,485 | 5,485 | 2,351 | 2,351 |
| Engineering/Scientist Mfg - Junior | 5,994 | 5,994 | 2,569 | 2,569 | 17,126 | 5,994 | 5,994 | 2,569 | 2,569 | 17,126 | 5,994 | 5,994 | 2,569 | 2,569 | 17,126 | 5,994 | 5,994 | 2,569 | 2,569 | 17,126 | 5,994 | 5,994 | 2,569 | 2,569 | 17,126 | 5,994 | 5,994 | 2,569 | 2,569 | 17,126 | 5,994 | 5,994 | 2,569 | 2,569 | 17,126 | 5,994 | 5,994 | 2,569 | 2,569 | 17,126 | 5,994 | 5,994 | 2,569 | 2,569 | 17,126 | 5,994 | 5,994 | 2,569 | 2,569 |
| Environmental Specialist | 14 | 14 | 6 | 6 | 40 | 14 | 14 | 6 | 6 | 40 | 14 | 14 | 6 | 6 | 40 | 14 | 14 | 6 | 6 | 40 | 14 | 14 | 6 | 6 | 40 | 14 | 14 | 6 | 6 | 40 | 14 | 14 | 6 | 6 | 40 | 14 | 14 | 6 | 6 | 40 | 14 | 14 | 6 | 6 | 40 | 14 | 14 | 6 | 6 |
| General Executive, Senior | 3,660 | 3,660 | 1,568 | 1,569 | 10,457 | 3,660 | 3,660 | 1,568 | 1,569 | 10,457 | 3,660 | 3,660 | 1,568 | 1,569 | 10,457 | 3,660 | 3,660 | 1,568 | 1,569 | 10,457 | 3,660 | 3,660 | 1,568 | 1,569 | 10,457 | 3,660 | 3,660 | 1,568 | 1,569 | 10,457 | 3,660 | 3,660 | 1,568 | 1,569 | 10,457 | 3,660 | 3,660 | 1,568 | 1,569 | 10,457 | 3,660 | 3,660 | 1,568 | 1,569 | 10,457 | 3,660 | 3,660 | 1,568 | 1,569 |
| Graphics Specialist | 340 | 340 | 145 | 145 | 970 | 340 | 340 | 145 | 145 | 970 | 340 | 340 | 145 | 145 | 970 | 340 | 340 | 145 | 145 | 970 | 340 | 340 | 145 | 145 | 970 | 340 | 340 | 145 | 145 | 970 | 340 | 340 | 145 | 145 | 970 | 340 | 340 | 145 | 145 | 970 | 340 | 340 | 145 | 145 | 970 | 340 | 340 | 145 | 145 |
| Heavy Equipment Mechanic | 1 | 1 | 1 | 1 | 4 | 1 | 1 | 1 | 1 | 4 | 1 | 1 | 1 | 1 | 4 | 1 | 1 | 1 | 1 | 4 | 1 | 1 | 1 | 1 | 4 | 1 | 1 | 1 | 1 | 4 | 1 | 1 | 1 | 1 | 4 | 1 | 1 | 1 | 1 | 4 | 1 | 1 | 1 | 1 | 4 | 1 | 1 | 1 | 1 |
| Information Systems Security Engineer - Apprentice | 2,108 | 2,108 | 903 | 903 | 6,022 | 2,108 | 2,108 | 903 | 903 | 6,022 | 2,108 | 2,108 | 903 | 903 | 6,022 | 2,108 | 2,108 | 903 | 903 | 6,022 | 2,108 | 2,108 | 903 | 903 | 6,022 | 2,108 | 2,108 | 903 | 903 | 6,022 | 2,108 | 2,108 | 903 | 903 | 6,022 | 2,108 | 2,108 | 903 | 903 | 6,022 | 2,108 | 2,108 | 903 | 903 | 6,022 | 2,108 | 2,108 | 903 | 903 |
| Information Systems Security Engineer - Junior | 3,697 | 3,697 | 1,584 | 1,584 | 10,562 | 3,697 | 3,697 | 1,584 | 1,584 | 10,562 | 3,697 | 3,697 | 1,584 | 1,584 | 10,562 | 3,697 | 3,697 | 1,584 | 1,584 | 10,562 | 3,697 | 3,697 | 1,584 | 1,584 | 10,562 | 3,697 | 3,697 | 1,584 | 1,584 | 10,562 | 3,697 | 3,697 | 1,584 | 1,584 | 10,562 | 3,697 | 3,697 | 1,584 | 1,584 | 10,562 | 3,697 | 3,697 | 1,584 | 1,584 | 10,562 | 3,697 | 3,697 | 1,584 | 1,584 |
| Information Systems Security Engineer - Mid-Level | 2,884 | 2,884 | 1,235 | 1,236 | 8,239 | 2,884 | 2,884 | 1,235 | 1,236 | 8,239 | 2,884 | 2,884 | 1,235 | 1,236 | 8,239 | 2,884 | 2,884 | 1,235 | 1,236 | 8,239 | 2,884 | 2,884 | 1,235 | 1,236 | 8,239 | 2,884 | 2,884 | 1,235 | 1,236 | 8,239 | 2,884 | 2,884 | 1,235 | 1,236 | 8,239 | 2,884 | 2,884 | 1,235 | 1,236 | 8,239 | 2,884 | 2,884 | 1,235 | 1,236 | 8,239 | 2,884 | 2,884 | 1,235 | 1,236 |
| Information Systems Security Engineer - Senior | 4,756 | 4,756 | 2,038 | 2,038 | 13,588 | 4,756 | 4,756 | 2,038 | 2,038 | 13,588 | 4,756 | 4,756 | 2,038 | 2,038 | 13,588 | 4,756 | 4,756 | 2,038 | 2,038 | 13,588 | 4,756 | 4,756 | 2,038 | 2,038 | 13,588 | 4,756 | 4,756 | 2,038 | 2,038 | 13,588 | 4,756 | 4,756 | 2,038 | 2,038 | 13,588 | 4,756 | 4,756 | 2,038 | 2,038 | 13,588 | 4,756 | 4,756 | 2,038 | 2,038 | 13,588 | 4,756 | 4,756 | 2,038 | 2,038 |
| Information Technology Specialist - Junior | 4,972 | 4,972 | 2,132 | 2,131 | 14,207 | 4,972 | 4,972 | 2,132 | 2,131 | 14,207 | 4,972 | 4,972 | 2,132 | 2,131 | 14,207 | 4,972 | 4,972 | 2,132 | 2,131 | 14,207 | 4,972 | 4,972 | 2,132 | 2,131 | 14,207 | 4,972 | 4,972 | 2,132 | 2,131 | 14,207 | 4,972 | 4,972 | 2,132 | 2,131 | 14,207 | 4,972 | 4,972 | 2,132 | 2,131 | 14,207 | 4,972 | 4,972 | 2,132 | 2,131 | 14,207 | 4,972 | 4,972 | 2,132 | 2,131 |
| Information Technology Specialist - Mid-Level | 3,094 | 3,094 | 1,327 | 1,326 | 8,841 | 3,094 | 3,094 | 1,327 | 1,326 | 8,841 | 3,094 | 3,094 | 1,327 | 1,326 | 8,841 | 3,094 | 3,094 | 1,327 | 1,326 | 8,841 | 3,094 | 3,094 | 1,327 | 1,326 | 8,841 | 3,094 | 3,094 | 1,327 | 1,326 | 8,841 | 3,094 | 3,094 | 1,327 | 1,326 | 8,841 | 3,094 | 3,094 | 1,327 | 1,326 | 8,841 | 3,094 | 3,094 | 1,327 | 1,326 | 8,841 | 3,094 | 3,094 | 1,327 | 1,326 |
| Information Technology Specialist - Senior | 6,101 | 6,101 | 2,615 | 2,615 | 17,432 | 6,101 | 6,101 | 2,615 | 2,615 | 17,432 | 6,101 | 6,101 | 2,615 | 2,615 | 17,432 | 6,101 | 6,101 | 2,615 | 2,615 | 17,432 | 6,101 | 6,101 | 2,615 | 2,615 | 17,432 | 6,101 | 6,101 | 2,615 | 2,615 | 17,432 | 6,101 | 6,101 | 2,615 | 2,615 | 17,432 | 6,101 | 6,101 | 2,615 | 2,615 | 17,432 | 6,101 | 6,101 | 2,615 | 2,615 | 17,432 | 6,101 | 6,101 | 2,615 | 2,615 |
| Intelligence Analyst - Junior | 4,963 | 4,963 | 2,126 | 2,127 | 14,179 | 4,963 | 4,963 | 2,126 | 2,127 | 14,179 | 4,963 | 4,963 | 2,126 | 2,127 | 14,179 | 4,963 | 4,963 | 2,126 | 2,127 | 14,179 | 4,963 | 4,963 | 2,126 | 2,127 | 14,179 | 4,963 | 4,963 | 2,126 | 2,127 | 14,179 | 4,963 | 4,963 | 2,126 | 2,127 | 14,179 | 4,963 | 4,963 | 2,126 | 2,127 | 14,179 | 4,963 | 4,963 | 2,126 | 2,127 | 14,179 | 4,963 | 4,963 | 2,126 | 2,127 |
| Intelligence Analyst - Senior | 3,489 | 3,489 | 1,495 | 1,495 | 9,968 | 3,489 | 3,489 | 1,495 | 1,495 | 9,968 | 3,489 | 3,489 | 1,495 | 1,495 | 9,968 | 3,489 | 3,489 | 1,495 | 1,495 | 9,968 | 3,489 | 3,489 | 1,495 | 1,495 | 9,968 | 3,489 | 3,489 | 1,495 | 1,495 | 9,968 | 3,489 | 3,489 | 1,495 | 1,495 | 9,968 | 3,489 | 3,489 | 1,495 | 1,495 | 9,968 | 3,489 | 3,489 | 1,495 | 1,495 | 9,968 | 3,489 | 3,489 | 1,495 | 1,495 |
| Logistician - Junior | 4,914 | 4,914 | 2,107 | 2,106 | 14,041 | 4,914 | 4,914 | 2,107 | 2,106 | 14,041 | 4,914 | 4,914 | 2,107 | 2,106 | 14,041 | 4,914 | 4,914 | 2,107 | 2,106 | 14,041 | 4,914 | 4,914 | 2,107 | 2,106 | 14,041 | 4,914 | 4,914 | 2,107 | 2,106 | 14,041 | 4,914 | 4,914 | 2,107 | 2,106 | 14,041 | 4,914 | 4,914 | 2,107 | 2,106 | 14,041 | 4,914 | 4,914 | 2,107 | 2,106 | 14,041 | 4,914 | 4,914 | 2,107 | 2,106 |
| Logistician - Senior | 3,320 | 3,320 | 1,422 | 1,423 | 9,485 | 3,320 | 3,320 | 1,422 | 1,423 | 9,485 | 3,320 | 3,320 | 1,422 | 1,423 | 9,485 | 3,320 | 3,320 | 1,422 | 1,423 | 9,485 | 3,320 | 3,320 | 1,422 | 1,423 | 9,485 | 3,320 | 3,320 | 1,422 | 1,423 | 9,485 | 3,320 | 3,320 | 1,422 | 1,423 | 9,485 | 3,320 | 3,320 | 1,422 | 1,423 | 9,485 | 3,320 | 3,320 | 1,422 | 1,423 | 9,485 | 3,320 | 3,320 | 1,422 | 1,423 |
| Machinist I | 1,010 | 1,010 | 433 | 433 | 2,886 | 1,010 | 1,010 | 433 | 433 | 2,886 | 1,010 | 1,010 | 433 | 433 | 2,886 | 1,010 | 1,010 | 433 | 433 | 2,886 | 1,010 | 1,010 | 433 | 433 | 2,886 | 1,010 | 1,010 | 433 | 433 | 2,886 | 1,010 | 1,010 | 433 | 433 | 2,886 | 1,010 | 1,010 | 433 | 433 | 2,886 | 1,010 | 1,010 | 433 | 433 | 2,886 | 1,010 | 1,010 | 433 | 433 |
| Machinist II | 1,319 | 1,319 | 566 | 565 | 3,769 | 1,319 | 1,319 | 566 | 565 | 3,769 | 1,319 | 1,319 | 566 | 565 | 3,769 | 1,319 | 1,319 | 566 | 565 | 3,769 | 1,319 | 1,319 | 566 | 565 | 3,769 | 1,319 | 1,319 | 566 | 565 | 3,769 | 1,319 | 1,319 | 566 | 565 | 3,769 | 1,319 | 1,319 | 566 | 565 | 3,769 | 1,319 | 1,319 | 566 | 565 | 3,769 | 1,319 | 1,319 | 566 | 565 |
| Manager, Quality Assurance | 292 | 292 | 126 | 125 | 835 | 292 | 292 | 126 | 125 | 835 | 292 | 292 | 126 | 125 | 835 | 292 | 292 | 126 | 125 | 835 | 292 | 292 | 126 | 125 | 835 | 292 | 292 | 126 | 125 | 835 | 292 | 292 | 126 | 125 | 835 | 292 | 292 | 126 | 125 | 835 | 292 | 292 | 126 | 125 | 835 | 292 | 292 | 126 | 125 |
| Mechanical Technician - Junior | 3,631 | 3,631 | 1,555 | 1,556 | 10,373 | 3,631 | 3,631 | 1,555 | 1,556 | 10,373 | 3,631 | 3,631 | 1,555 | 1,556 | 10,373 | 3,631 | 3,631 | 1,555 | 1,556 | 10,373 | 3,631 | 3,631 | 1,555 | 1,556 | 10,373 | 3,631 | 3,631 | 1,555 | 1,556 | 10,373 | 3,631 | 3,631 | 1,555 | 1,556 | 10,373 | 3,631 | 3,631 | 1,555 | 1,556 | 10,373 | 3,631 | 3,631 | 1,555 | 1,556 | 10,373 | 3,631 | 3,631 | 1,555 | 1,556 |
| Mechanical Technician - Senior | 9,874 | 9,874 | 4,232 | 4,232 | 28,212 | 9,874 | 9,874 | 4,232 | 4,232 | 28,212 | 9,874 | 9,874 | 4,232 | 4,232 | 28,212 | 9,874 | 9,874 | 4,232 | 4,232 | 28,212 | 9,874 | 9,874 | 4,232 | 4,232 | 28,212 | 9,874 | 9,874 | 4,232 | 4,232 | 28,212 | 9,874 | 9,874 | 4,232 | 4,232 | 28,212 | 9,874 | 9,874 | 4,232 | 4,232 | 28,212 | 9,874 | 9,874 | 4,232 | 4,232 | 28,212 | 9,874 | 9,874 | 4,232 | 4,232 |
| Military Operations Specialist | 7,427 | 7,427 | 3,184 | 3,183 | 21,221 | 7,427 | 7,427 | 3,184 | 3,183 | 21,221 | 7,427 | 7,427 | 3,184 | 3,183 | 21,221 | 7,427 | 7,427 | 3,184 | 3,183 | 21,221 | 7,427 | 7,427 | 3,184 | 3,183 | 21,221 | 7,427 | 7,427 | 3,184 | 3,183 | 21,221 | 7,427 | 7,427 | 3,184 | 3,183 | 21,221 | 7,427 | 7,427 | 3,184 | 3,183 | 21,221 | 7,427 | 7,427 | 3,184 | 3,183 | 21,221 | 7,427 | 7,427 | 3,184 | 3,183 |
| Program Analyst - Junior | 6,755 | 6,755 | 2,894 | 2,895 | 19,299 | 6,755 | 6,755 | 2,894 | 2,895 | 19,299 | 6,755 | 6,755 | 2,894 | 2,895 | 19,299 | 6,755 | 6,755 | 2,894 | 2,895 | 19,299 | 6,755 | 6,755 | 2,894 | 2,895 | 19,299 | 6,755 | 6,755 | 2,894 | 2,895 | 19,299 | 6,755 | 6,755 | 2,894 | 2,895 | 19,299 | 6,755 | 6,755 | 2,894 | 2,895 | 19,299 | 6,755 | 6,755 | 2,894 | 2,895 | 19,299 | 6,755 | 6,755 | 2,894 | 2,895 |
| Program Analyst - Senior | 8,678 | 8,678 | 3,718 | 3,719 | 24,793 | 8,678 | 8,678 | 3,718 | 3,719 | 24,793 | 8,678 | 8,678 | 3,718 | 3,719 | 24,793 | 8,678 | 8,678 | 3,718 | 3,719 | 24,793 | 8,678 | 8,678 | 3,718 | 3,719 | 24,793 | 8,678 | 8,678 | 3,718 | 3,719 | 24,793 | 8,678 | 8,678 | 3,718 | 3,719 | 24,793 | 8,678 | 8,678 | 3,718 | 3,719 | 24,793 | 8,678 | 8,678 | 3,718 | 3,719 | 24,793 | 8,678 | 8,678 | 3,718 | 3,719 |
| Program Manager | 3,941 | 3,941 | 1,690 | 1,689 | 11,261 | 3,941 | 3,941 | 1,690 | 1,689 | 11,261 | 3,941 | 3,941 | 1,690 | 1,689 | 11,261 | 3,941 | 3,941 | 1,690 | 1,689 | 11,261 | 3,941 | 3,941 | 1,690 | 1,689 | 11,261 | 3,941 | 3,941 | 1,690 | 1,689 | 11,261 | 3,941 | 3,941 | 1,690 | 1,689 | 11,261 | 3,941 | 3,941 | 1,690 | 1,689 | 11,261 | 3,941 | 3,941 | 1,690 | 1,689 | 11,261 | 3,941 | 3,941 | 1,690 | 1,689 |
| Quality Engineer - Apprentice | 24 | 24 | 10 | 10 | 68 | 24 | 24 | 10 | 10 | 68 | 24 | 24 | 10 | 10 | 68 | 24 | 24 | 10 | 10 | 68 | 24 | 24 | 10 | 10 | 68 | 24 | 24 | 10 | 10 | 68 | 24 | 24 | 10 | 10 | 68 | 24 | 24 | 10 | 10 | 68 | 24 | 24 | 10 | 10 | 68 | 24 | 24 | 10 | 10 |
| Quality Engineer - Junior | 1,933 | 1,933 | 829 | 829 | 5,524 | 1,933 | 1,933 | 829 | 829 | 5,524 | 1,933 | 1,933 | 829 | 829 | 5,524 | 1,933 | 1,933 | 829 | 829 | 5,524 | 1,933 | 1,933 | 829 | 829 | 5,524 | 1,933 | 1,933 | 829 | 829 | 5,524 | 1,933 | 1,933 | 829 | 829 | 5,524 | 1,933 | 1,933 | 829 | 829 | 5,524 | 1,933 | 1,933 | 829 | 829 | 5,524 | 1,933 | 1,933 | 829 | 829 |
| Quality Engineer - Mid-Level | 2,624 | 2,624 | 1,124 | 1,124 | 7,496 | 2,624 | 2,624 | 1,124 | 1,124 | 7,496 | 2,624 | 2,624 | 1,124 | 1,124 | 7,496 | 2,624 | 2,624 | 1,124 | 1,124 | 7,496 | 2,624 | 2,624 | 1,124 | 1,124 | 7,496 | 2,624 | 2,624 | 1,124 | 1,124 | 7,496 | 2,624 | 2,624 | 1,124 | 1,124 | 7,496 | 2,624 | 2,624 | 1,124 | 1,124 | 7,496 | 2,624 | 2,624 | 1,124 | 1,124 | 7,496 | 2,624 | 2,624 | 1,124 | 1,124 |
| Quality Engineer - Senior | 2,088 | 2,088 | 896 | 895 | 5,967 | 2,088 | 2,088 | 896 | 895 | 5,967 | 2,088 | 2,088 | 896 | 895 | 5,967 | 2,088 | 2,088 | 896 | 895 | 5,967 | 2,088 | 2,088 | 896 | 895 | 5,967 | 2,088 | 2,088 | 896 | 895 | 5,967 | 2,088 | 2,088 | 896 | 895 | 5,967 | 2,088 | 2,088 | 896 | 895 | 5,967 | 2,088 | 2,088 | 896 | 895 | 5,967 | 2,088 | 2,088 | 896 | 895 |
| Security Manager - Apprentice | 891 | 891 | 382 | 382 | 2,546 | 891 | 891 | 382 | 382 | 2,546 | 891 | 891 | 382 | 382 | 2,546 | 891 | 891 | 382 | 382 | 2,546 | 891 | 891 | 382 | 382 | 2,546 | 891 | 891 | 382 | 382 | 2,546 | 891 | 891 | 382 | 382 | 2,546 | 891 | 891 | 382 | 382 | 2,546 | 891 | 891 | 382 | 382 | 2,546 | 891 | 891 | 382 | 382 |
| Security Manager - Junior | 3,785 | 3,785 | 1,622 | 1,622 | 10,814 | 3,785 | 3,785 | 1,622 | 1,622 | 10,814 | 3,785 | 3,785 | 1,622 | 1,622 | 10,814 | 3,785 | 3,785 | 1,622 | 1,622 | 10,814 | 3,785 | 3,785 | 1,622 | 1,622 | 10,814 | 3,785 | 3,785 | 1,622 | 1,622 | 10,814 | 3,785 | 3,785 | 1,622 | 1,622 | 10,814 | 3,785 | 3,785 | 1,622 | 1,622 | 10,814 | 3,785 | 3,785 | 1,622 | 1,622 | 10,814 | 3,785 | 3,785 | 1,622 | 1,622 |
| Security Manager - Senior | 2,523 | 2,523 | 1,082 | 1,081 | 7,209 | 2,523 | 2,523 | 1,082 | 1,081 | 7,209 | 2,523 | 2,523 | 1,082 | 1,081 | 7,209 | 2,523 | 2,523 | 1,082 | 1,081 | 7,209 | 2,523 | 2,523 | 1,082 | 1,081 | 7,209 | 2,523 | 2,523 | 1,082 | 1,081 | 7,209 | 2,523 | 2,523 | 1,082 | 1,081 | 7,209 | 2,523 | 2,523 | 1,082 | 1,081 | 7,209 | 2,523 | 2,523 | 1,082 | 1,081 | 7,209 | 2,523 | 2,523 | 1,082 | 1,081 |
| Sheet Metal Mechanic - Junior | 1,336 | 1,336 | 572 | 573 | 3,817 | 1,336 | 1,336 | 572 | 573 | 3,817 | 1,336 | 1,336 | 572 | 573 | 3,817 | 1,336 | 1,336 | 572 | 573 | 3,817 | 1,336 | 1,336 | 572 | 573 | 3,817 | 1,336 | 1,336 | 572 | 573 | 3,817 | 1,336 | 1,336 | 572 | 573 | 3,817 | 1,336 | 1,336 | 572 | 573 | 3,817 | 1,336 | 1,336 | 572 | 573 | 3,817 | 1,336 | 1,336 | 572 | 573 |
| Sheet Metal Mechanic - Senior | 668 | 668 | 286 | 286 | 1,908 | 668 | 668 | 286 | 286 | 1,908 | 668 | 668 | 286 | 286 | 1,908 | 668 | 668 | 286 | 286 | 1,908 | 668 | 668 | 286 | 286 | 1,908 | 668 | 668 | 286 | 286 | 1,908 | 668 | 668 | 286 | 286 | 1,908 | 668 | 668 | 286 | 286 | 1,908 | 668 | 668 | 286 | 286 | 1,908 | 668 | 668 | 286 | 286 |
| Software Engineer - Apprentice | 1,950 | 1,950 | 836 | 836 | 5,572 | 1,950 | 1,950 | 836 | 836 | 5,572 | 1,950 | 1,950 | 836 | 836 | 5,572 | 1,950 | 1,950 | 836 | 836 | 5,572 | 1,950 | 1,950 | 836 | 836 | 5,572 | 1,950 | 1,950 | 836 | 836 | 5,572 | 1,950 | 1,950 | 836 | 836 | 5,572 | 1,950 | 1,950 | 836 | 836 | 5,572 | 1,950 | 1,950 | 836 | 836 | 5,572 | 1,950 | 1,950 | 836 | 836 |
| Software Engineer - Junior | 10,248 | 10,248 | 4,392 | 4,392 | 29,280 | 10,248 | 10,248 | 4,392 | 4,392 | 29,280 | 10,248 | 10,248 | 4,392 | 4,392 | 29,280 | 10,248 | 10,248 | 4,392 | 4,392 | 29,280 | 10,248 | 10,248 | 4,392 | 4,392 | 29,280 | 10,248 | 10,248 | 4,392 | 4,392 | 29,280 | 10,248 | 10,248 | 4,392 | 4,392 | 29,280 | 10,248 | 10,248 | 4,392 | 4,392 | 29,280 | 10,248 | 10,248 | 4,392 | 4,392 | 29,280 | 10,248 | 10,248 | 4,392 | 4,392 |
| Software Engineer - Mid-Level | 43,532 | 43,532 | 18,657 | 18,657 | 124,378 | 43,532 | 43,532 | 18,657 | 18,657 | 124,378 | 43,532 | 43,532 | 18,657 | 18,657 | 124,378 | 43,532 | 43,532 | 18,657 | 18,657 | 124,378 | 43,532 | 43,532 | 18,657 | 18,657 | 124,378 | 43,532 | 43,532 | 18,657 | 18,657 | 124,378 | 43,532 | 43,532 | 18,657 | 18,657 | 124,378 | 43,532 | 43,532 | 18,657 | 18,657 | 124,378 | 43,532 | 43,532 | 18,657 | 18,657 | 124,378 | 43,532 | 43,532 | 18,657 | 18,657 |
| Software Engineer - Senior | 17,222 | 17,222 | 7,381 | 7,381 | 49,206 | 17,222 | 17,222 | 7,381 | 7,381 | 49,206 | 17,222 | 17,222 | 7,381 | 7,381 | 49,206 | 17,222 | 17,222 | 7,381 | 7,381 | 49,206 | 17,222 | 17,222 | 7,381 | 7,381 | 49,206 | 17,222 | 17,222 | 7,381 | 7,381 | 49,206 | 17,222 | 17,222 | 7,381 | 7,381 | 49,206 | 17,222 | 17,222 | 7,381 | 7,381 | 49,206 | 17,222 | 17,222 | 7,381 | 7,381 | 49,206 | 17,222 | 17,222 | 7,381 | 7,381 |
| Subject Matter Expert | 36,611 | 36,611 | 15,690 | 15,690 | 104,602 | 36,611 | 36,611 | 15,690 | 15,690 | 104,602 | 36,611 | 36,611 | 15,690 | 15,690 | 104,602 | 36,611 | 36,611 | 15,690 | 15,690 | 104,602 | 36,611 | 36,611 | 15,690 | 15,690 | 104,602 | 36,611 | 36,611 | 15,690 | 15,690 | 104,602 | 36,611 | 36,611 | 15,690 | 15,690 | 104,602 | 36,611 | 36,611 | 15,690 | 15,690 | 104,602 | 36,611 | 36,611 | 15,690 | 15,690 | 104,602 | 36,611 | 36,611 | 15,690 | 15,690 |
| Systems Analyst or Integrator - Junior | 19,535 | 19,535 | 8,372 | 8,372 | 55,814 | 19,535 | 19,535 | 8,372 | 8,372 | 55,814 | 19,535 | 19,535 | 8,372 | 8,372 | 55,814 | 19,535 | 19,535 | 8,372 | 8,372 | 55,814 | 19,535 | 19,535 | 8,372 | 8,372 | 55,814 | 19,535 | 19,535 | 8,372 | 8,372 | 55,814 | 19,535 | 19,535 | 8,372 | 8,372 | 55,814 | 19,535 | 19,535 | 8,372 | 8,372 | 55,814 | 19,535 | 19,535 | 8,372 | 8,372 | 55,814 | 19,535 | 19,535 | 8,372 | 8,372 |
| Systems Analyst or Integrator - Senior | 16,256 | 16,256 | 6,966 | 6,967 | 46,445 | 16,256 | 16,256 | 6,966 | 6,967 | 46,445 | 16,256 | 16,256 | 6,966 | 6,967 | 46,445 | 16,256 | 16,256 | 6,966 | 6,967 | 46,445 | 16,256 | 16,256 | 6,966 | 6,967 | 46,445 | 16,256 | 16,256 | 6,966 | 6,967 | 46,445 | 16,256 | 16,256 | 6,966 | 6,967 | 46,445 | 16,256 | 16,256 | 6,966 | 6,967 | 46,445 | 16,256 | 16,256 | 6,966 | 6,967 | 46,445 | 16,256 | 16,256 | 6,966 | 6,967 |
| Systems Engineer - Apprentice | 7,377 | 7,377 | 3,162 | 3,162 | 21,078 | 7,377 | 7,377 | 3,162 | 3,162 | 21,078 | 7,377 | 7,377 | 3,162 | 3,162 | 21,078 | 7,377 | 7,377 | 3,162 | 3,162 | 21,078 | 7,377 | 7,377 | 3,162 | 3,162 | 21,078 | 7,377 | 7,377 | 3,162 | 3,162 | 21,078 | 7,377 | 7,377 | 3,162 | 3,162 | 21,078 | 7,377 | 7,377 | 3,162 | 3,162 | 21,078 | 7,377 | 7,377 | 3,162 | 3,162 | 21,078 | 7,377 | 7,377 | 3,162 | 3,162 |
| Systems Engineer - Junior | 5,783 | 5,783 | 2,479 | 2,479 | 16,524 | 5,783 | 5,783 | 2,479 | 2,479 | 16,524 | 5,783 | 5,783 | 2,479 | 2,479 | 16,524 | 5,783 | 5,783 | 2,479 | 2,479 | 16,524 | 5,783 | 5,783 | 2,479 | 2,479 | 16,524 | 5,783 | 5,783 | 2,479 | 2,479 | 16,524 | 5,783 | 5,783 | 2,479 | 2,479 | 16,524 | 5,783 | 5,783 | 2,479 | 2,479 | 16,524 | 5,783 | 5,783 | 2,479 | 2,479 | 16,524 | 5,783 | 5,783 | 2,479 | 2,479 |
| Systems Engineer - Mid-Level | 13,299 | 13,299 | 5,699 | 5,700 | 37,997 | 13,299 | 13,299 | 5,699 | 5,700 | 37,997 | 13,299 | 13,299 | 5,699 | 5,700 | 37,997 | 13,299 | 13,299 | 5,699 | 5,700 | 37,997 | 13,299 | 13,299 | 5,699 | 5,700 | 37,997 | 13,299 | 13,299 | 5,699 | 5,700 | 37,997 | 13,299 | 13,299 | 5,699 | 5,700 | 37,997 | 13,299 | 13,299 | 5,699 | 5,700 | 37,997 | 13,299 | 13,299 | 5,699 | 5,700 | 37,997 | 13,299 | 13,299 | 5,699 | 5,700 |
| Systems Engineer - Senior | 15,718 | 15,718 | 6,736 | 6,736 | 44,908 | 15,718 | 15,718 | 6,736 | 6,736 | 44,908 | 15,718 | 15,718 | 6,736 | 6,736 | 44,908 | 15,718 | 15,718 | 6,736 | 6,736 | 44,908 | 15,718 | 15,718 | 6,736 | 6,736 | 44,908 | 15,718 | 15,718 | 6,736 | 6,736 | 44,908 | 15,718 | 15,718 | 6,736 | 6,736 | 44,908 | 15,718 | 15,718 | 6,736 | 6,736 | 44,908 | 15,718 | 15,718 | 6,736 | 6,736 | 44,908 | 15,718 | 15,718 | 6,736 | 6,736 |
| Systems Operator | 4,899 | 4,899 | 2,099 | 2,099 | 13,996 | 4,899 | 4,899 | 2,099 | 2,099 | 13,996 | 4,899 | 4,899 | 2,099 | 2,099 | 13,996 | 4,899 | 4,899 | 2,099 | 2,099 | 13,996 | 4,899 | 4,899 | 2,099 | 2,099 | 13,996 | 4,899 | 4,899 | 2,099 | 2,099 | 13,996 | 4,899 | 4,899 | 2,099 | 2,099 | 13,996 | 4,899 | 4,899 | 2,099 | 2,099 | 13,996 | 4,899 | 4,899 | 2,099 | 2,099 | 13,996 | 4,899 | 4,899 | 2,099 | 2,099 |
| Task Order Manager | 6,984 | 6,984 | 2,992 | 2,993 | 19,953 | 6,984 | 6,984 | 2,992 | 2,993 | 19,953 | 6,984 | 6,984 | 2,992 | 2,993 | 19,953 | 6,984 | 6,984 | 2,992 | 2,993 | 19,953 | 6,984 | 6,984 | 2,992 | 2,993 | 19,953 | 6,984 | 6,984 | 2,992 | 2,993 | 19,953 | 6,984 | 6,984 | 2,992 | 2,993 | 19,953 | 6,984 | 6,984 | 2,992 | 2,993 | 19,953 | 6,984 | 6,984 | 2,992 | 2,993 | 19,953 | 6,984 | 6,984 | 2,992 | 2,993 |
| Technician, Network Support | 3,635 | 3,635 | 1,559 | 1,558 | 10,387 | 3,635 | 3,635 | 1,559 | 1,558 | 10,387 | 3,635 | 3,635 | 1,559 | 1,558 | 10,387 | 3,635 | 3,635 | 1,559 | 1,558 | 10,387 | 3,635 | 3,635 | 1,559 | 1,558 | 10,387 | 3,635 | 3,635 | 1,559 | 1,558 | 10,387 | 3,635 | 3,635 | 1,559 | 1,558 | 10,387 | 3,635 | 3,635 | 1,559 | 1,558 | 10,387 | 3,635 | 3,635 | 1,559 | 1,558 | 10,387 | 3,635 | 3,635 | 1,559 | 1,558 |
| Technician, Software | 960 | 960 | 412 | 412 | 2,744 | 960 | 960 | 412 | 412 | 2,744 | 960 | 960 | 412 | 412 | 2,744 | 960 | 960 | 412 | 412 | 2,744 | 960 | 960 | 412 | 412 | 2,744 | 960 | 960 | 412 | 412 | 2,744 | 960 | 960 | 412 | 412 | 2,744 | 960 | 960 | 412 | 412 | 2,744 | 960 | 960 | 412 | 412 | 2,744 | 960 | 960 | 412 | 412 |
| Training Specialist - Junior | 1,119 | 1,119 | 480 | 480 | 3,198 | 1,119 | 1,119 | 480 | 480 | 3,198 | 1,119 | 1,119 | 480 | 480 | 3,198 | 1,119 | 1,119 | 480 | 480 | 3,198 | 1,119 | 1,119 | 480 | 480 | 3,198 | 1,119 | 1,119 | 480 | 480 | 3,198 | 1,119 | 1,119 | 480 | 480 | 3,198 | 1,119 | 1,119 | 480 | 480 | 3,198 | 1,119 | 1,119 | 480 | 480 | 3,198 | 1,119 | 1,119 | 480 | 480 |
| Training Specialist - Senior | 833 | 833 | 357 | 357 | 2,380 | 833 | 833 | 357 | 357 | 2,380 | 833 | 833 | 357 | 357 | 2,380 | 833 | 833 | 357 | 357 | 2,380 | 833 | 833 | 357 | 357 | 2,380 | 833 | 833 | 357 | 357 | 2,380 | 833 | 833 | 357 | 357 | 2,380 | 833 | 833 | 357 | 357 | 2,380 | 833 | 833 | 357 | 357 | 2,380 | 833 | 833 | 357 | 357 |
| Welder | 763 | 763 | 328 | 327 | 2,181 | 763 | 763 | 328 | 327 | 2,181 | 763 | 763 | 328 | 327 | 2,181 | 763 | 763 | 328 | 327 | 2,181 | 763 | 763 | 328 | 327 | 2,181 | 763 | 763 | 328 | 327 | 2,181 | 763 | 763 | 328 | 327 | 2,181 | 763 | 763 | 328 | 327 | 2,181 | 763 | 763 | 328 | 327 | 2,181 | 763 | 763 | 328 | 327 |
| Woodcrafter | 119 | 119 | 51 | 52 | 341 | 119 | 119 | 51 | 52 | 341 | 119 | 119 | 51 | 52 | 341 | 119 | 119 | 51 | 52 | 341 | 119 | 119 | 51 | 52 | 341 | 119 | 119 | 51 | 52 | 341 | 119 | 119 | 51 | 52 | 341 | 119 | 119 | 51 | 52 | 341 | 119 | 119 | 51 | 52 | 341 | 119 | 119 | 51 | 52 |
| Writer, Technical - Junior | 5,495 | 5,495 | 2,355 | 2,355 | 15,700 | 5,495 | 5,495 | 2,355 | 2,355 | 15,700 | 5,495 | 5,495 | 2,355 | 2,355 | 15,700 | 5,495 | 5,495 | 2,355 | 2,355 | 15,700 | 5,495 | 5,495 | 2,355 | 2,355 | 15,700 | 5,495 | 5,495 | 2,355 | 2,355 | 15,700 | 5,495 | 5,495 | 2,355 | 2,355 | 15,700 | 5,495 | 5,495 | 2,355 | 2,355 | 15,700 | 5,495 | 5,495 | 2,355 | 2,355 | 15,700 | 5,495 | 5,495 | 2,355 | 2,355 |
| Writer, Technical - Senior | 4,101 | 4,101 | 1,757 | 1,757 | 11,716 | 4,101 | 4,101 | 1,757 | 1,757 | 11,716 | 4,101 | 4,101 | 1,757 | 1,757 | 11,716 | 4,101 | 4,101 | 1,757 | 1,757 | 11,716 | 4,101 | 4,101 | 1,757 | 1,757 | 11,716 | 4,101 | 4,101 | 1,757 | 1,757 | 11,716 | 4,101 | 4,101 | 1,757 | 1,757 | 11,716 | 4,101 | 4,101 | 1,757 | 1,757 | 11,716 | 4,101 | 4,101 | 1,757 | 1,757 | 11,716 | 4,101 | 4,101 | 1,757 | 1,757 |
| TOTAL HOURS | 488,404 | 488,404 | 209,317 | 209,316 | 1,395,441 | 488,404 | 488,404 | 209,317 | 209,316 | 1,395,441 | 488,404 | 488,404 | 209,317 | 209,316 | 1,395,441 | 488,404 | 488,404 | 209,317 | 209,316 | 1,395,441 | 488,404 | 488,404 | 209,317 | 209,316 | 1,395,441 | 488,404 | 488,404 | 209,317 | 209,316 | 1,395,441 | 488,404 | 488,404 | 209,317 | 209,316 | 1,395,441 | 488,404 | 488,404 | 209,317 | 209,316 | 1,395,441 | 488,404 | 488,404 | 209,317 | 209,316 | 1,395,441 | 488,404 | 488,404 | 209,317 | 209,316 |
| 1,395,441 | 1,395,441 | 1,395,441 | 1,395,441 | 1,395,441 | 1,395,441 | 1,395,441 | 1,395,441 | 1,395,441 | |||||||||||||||||||||||||||||||||||||||||
| Hours Distrubuted? | TRUE | Hours Distrubuted? | TRUE | Hours Distrubuted? | TRUE | Hours Distrubuted? | TRUE | Hours Distrubuted? | TRUE | Hours Distrubuted? | TRUE | Hours Distrubuted? | TRUE | Hours Distrubuted? | TRUE | Hours Distrubuted? | TRUE | Hours Distrubuted? | |||||||||||||||||||||||||||||||
| $995,466 |
D3I2 Domain X ATTACHMENT X - D3I2 Cost/Price Proposal Worksheet RFP No. X
&"Arial,Bold"&12&A
1. Labor Category Mapping
| Labor Category Mapping |
| D3I2 Domain 1 |
| Offeror Name: |
| Offeror CAGE: |
STEP 1: Labor Category Mapping
| The Labor Category Mapping TAB is intended to be used by Offerors to show the calculation of composite base labor rates for each RFP Labor Category. The worksheet has been pre-populated with formulas to calculate the composite base labor rate for each RFP labor category based on the Offeror's proposed Contractor Internal Labor Categories and assigned weightings. The resulting composite base rates for each RFP labor category as shown in Row 19 shall be used to populate the TAB 1a. Direct Labor Rates. If the base direct labor rates detailed are not used for both the CONUS and High CONUS Government Site and Contractor Site locations, develop a separate mapping for the applicable site, ensuring the tables are appropriately labeled. |
| NOTE: Not all proposed team members (prime and subcontractors) are required to propose a FBLR for every RFP labor category. However, the prime offeror shall ensure that the Contract Rate Tables contain at least one prime FBLR or major subcontract FBLR for every RFP labor category by calendar year for both CONUS and High-Cost CONUS areas and for both Government Site and Contractor Site. |
The offeror is responsible for ensuring that all calculations within this worksheet are accurate and reflective of the offeror's proposed price.
Red text is shown as an example only. The offeror shall ensure that red text amounts are not included in the offeror's proposed price.
| Contractor Fiscal Year (CFY) | |||||||||||||||||||||||||||||||||||||||||||||||||
| From: | 1 July 2025 | ||||||||||||||||||||||||||||||||||||||||||||||||
| To: | 30 June 2026 | Composite Direct Labor Base Rates = | |||||||||||||||||||||||||||||||||||||||||||||||
| Author: Rates in this Row 17 shall be used to populate the Rate Build-up TABs. | $ 12.50 | $ 15.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Proposed Contractor/Corporate Labor Category | Proposed Years of Experience | Proposed Education | Proposed Description of Duties | Proposed Labor Rate | RFP Lbr Categories | Example Category- Analyst II | Example Category- Engineer | Analyst, Operations Research | Cyber Security Professional - Junior | Cyber Security Professional - Mid-Level | Cyber Security Professional - Senior | Database Management Specialist - Junior | Database Management Specialist - Senior | Draftsperson (CAD) | Electrical Assembler | Electrician | Electronics Technician I | Electronics Technician II | Electronics Technician III | Engineer or Scientist Analytical - Apprentice | Engineer or Scientist Analytical - Junior | Engineer or Scientist Analytical - Mid-Level | Engineer or Scientist Analytical - Senior | Engineering/Scientist Mfg - Apprentice | Engineering/Scientist Mfg - Mid-Level | Engineering/Scientist Mfg - Senior | Engineering/Scientist Mfg - Junior | Environmental Specialist | General Executive, Senior | Graphics Specialist | Heavy Equipment Mechanic | Information Systems Security Engineer - Apprentice | Information Systems Security Engineer - Junior | Information Systems Security Engineer - Mid-Level | Information Systems Security Engineer - Senior | Information Technology Specialist - Junior | Information Technology Specialist - Mid-Level | Information Technology Specialist - Senior | Intelligence Analyst - Junior | Intelligence Analyst - Senior | Logistician - Junior | Logistician - Senior | Machinist I | Machinist II | Manager, Quality Assurance | Mechanical Technician - Junior | Mechanical Technician - Senior | Military Operations Specialist | |
| Example- Analyst Category 1 | 5 years in XYZ | Bachelor's | Example | $12.00 | 50% | ||||||||||||||||||||||||||||||||||||||||||||
| Example- Analyst Category 2 | 4 years in XYZ | Bachelor's | Example | $13.00 | 50% | ||||||||||||||||||||||||||||||||||||||||||||
| Example- Engineer 2 | 8 years in XYZ | Bachelor's | Example | $15.00 | 100% |
| Percentage Total | 100% | 100% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Percentage Total = 100% | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No |
D3I2 Attachment X – D3I2 Cost/Price Proposal Worksheet RFP Number X
1a. Direct Labor Rates
| Direct Labor Rates |
| D3I2 Domain 1 |
| Offeror Name: |
| Offeror CAGE: |
STEP 1a: Direct Labor Rates
The direct labor rates by calendar year proposed here shall be used to populate the Rate Build-up TABs. If the base direct labor rates by labor category are not used for both the CONUS and High-Cost CONUS Government Site and Contractor Site locations, develop a separate table for the applicable site, ensuring the tables are appropriately labeled.
The offeror is responsible for ensuring that all calculations within this worksheet are accurate and reflective of the offeror's proposed price.
Red text is shown as an example only. The offeror shall ensure that red text amounts are not included in the offeror's proposed price.
| A. EXAMPLE Direct Labor Rate Table: | ||||
| Contractor Fiscal Year (CFY) | ||||
| From: | 1 July 2025 | |||
| To: | 30 June 2026 | Proposed Escalation | 3.50% |
| Direct Labor Rates by CFY | Direct Labor Rates by Calendar Year | ||||||||||||||||||||||
| Labor Category | CFY 2026 | CFY 2027 | CFY 2028 | CFY 2029 | CFY 2030 | CFY 2031 | CFY 2032 | CFY 2033 | CFY 2034 | CFY 2035 | CFY 2036 | CFY 2037 | Labor Category | CY 2026 | CY 2027 | CY 2028 | CY 2029 | CY 2030 | CY 2031 | CY 2032 | CY 2033 | CY 2034 | CY 2035 |
| Example Category- Analyst II | $ 12.50 | $ 12.94 | $ 13.39 | $ 13.86 | $ 14.34 | $ 14.85 | $ 15.37 | $ 15.90 | $ 16.46 | $ 17.04 | $ 17.63 | $ 18.25 | Analyst, Operations Research | $ 12.72 | $ 13.16 | $ 13.62 | $ 14.10 | $ 14.60 | $ 15.11 | $ 15.63 | $ 16.18 | $ 16.75 | $ 17.33 |
| Example Category- Engineer | $ 15.00 | $ 15.52 | $ 16.07 | $ 16.63 | $ 17.21 | $ 17.82 | $ 18.44 | $ 19.08 | $ 19.75 | $ 20.44 | $ 21.16 | $ 21.90 | Cyber Security Professional - Junior | $ 15.26 | $ 15.80 | $ 16.35 | $ 16.92 | $ 17.51 | $ 18.13 | $ 18.76 | $ 19.42 | $ 20.10 | $ 20.80 |
| A. Direct Labor Rate Table: | ||||
| Contractor Fiscal Year (CFY) | ||||
| From: | Day Month | |||
| To: | Day Month | Proposed Escalation | 0.00% |
Author: Identify the proposed escalation. Input formulas in the table below to apply escalation to the proposed direct labor rates by CFY.
| Direct Labor Rates by CFY | Direct Labor Rates by Calendar Year | |
| Labor Category | CFY X |
Author: Input formulas to link the rates in this column to the composite direct labor rates calculated in Row 19 of TAB Labor Category Mapping.
Author: Identify the proposed escalation. Input formulas in the table below to apply escalation to the proposed direct labor rates by CFY.
| CFY X | CFY X | CFY X | CFY X | CFY X | CFY X | CFY X | CFY X | CFY X | CFY X | CFY X | Labor Category | CY 2026 | CY 2027 | CY 2028 | CY 2029 | CY 2030 | CY 2031 | CY 2032 | CY 2033 | CY 2034 | CY 2035 |
| Analyst, Operations Research | Analyst, Operations Research | ||||||||||||||||||||
| Cyber Security Professional - Junior | Cyber Security Professional - Junior | ||||||||||||||||||||
| Cyber Security Professional - Mid-Level | Cyber Security Professional - Mid-Level | ||||||||||||||||||||
| Cyber Security Professional - Senior | Cyber Security Professional - Senior | ||||||||||||||||||||
| Database Management Specialist - Junior | Database Management Specialist - Junior | ||||||||||||||||||||
| Database Management Specialist - Senior | Database Management Specialist - Senior | ||||||||||||||||||||
| Draftsperson (CAD) | Draftsperson (CAD) | ||||||||||||||||||||
| Electrical Assembler | Electrical Assembler | ||||||||||||||||||||
| Electrician | Electrician | ||||||||||||||||||||
| Electronics Technician I | Electronics Technician I | ||||||||||||||||||||
| Electronics Technician II | Electronics Technician II |
This is the start of the file's text. The full file is on GovTribe.