This document is an architectural drawing set titled "Attachment 06 - Drawings Part II" for a Veterans Affairs SCI (Spinal Cord Injury) Renovation and Residence Addition project located at the Hampton, Virginia Medical Center. The comprehensive drawing set includes detailed plans for a phased renovation and addition, covering architectural, structural, electrical, and finish specifications across multiple sheets.
The project involves a two-phase renovation of an existing healthcare facility, with specific focus on patient rooms, corridors, medical support spaces, and an addition. Key architectural elements include wall and floor finish schedules, furniture and equipment placement plans, life safety considerations, and detailed room-by-room specifications. The drawings indicate the project will be fully sprinklered, follows VA fire protection guidelines, and is designed to maintain continuous hospital operations during construction through carefully planned phasing. The renovation encompasses approximately 28,780 square feet, with patient rooms, medical support areas, staff spaces, and infrastructure upgrades being primary components of the project scope.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| VAAR 852.219-75.docx | DOCX document | |
| VHA ICRA-1.2 Oct 1 2024.pdf | ||
| Technical Questions Answered.docx | DOCX document | |
| Specs - Volume I 8-27-25.pdf | ||
| Amendment 0001.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| Attachment 04 - Specs Volume III.pdf | ||
| Attachment 01 - Statement of Work.pdf | ||
| 36C77625B0046.pdf | ||
| Attachment 11 - Wage determination.pdf | ||
| Attachment 10 - VA Notice of Limitations on Subcontracting.docx | DOCX document | |
| Attachment 05 - Drawings Part I.pdf | ||
| Attachment 03 - Specs Volume II.pdf | ||
| Attachment 12 - Spec 01 31 00.01 Project Management and Coordination.pdf | ||
| Attachment 07 - Drawings Part III.pdf | ||
| Attachment 02 - Specs Volume I.pdf | ||
| Attachment 09 - Drawings Part V.pdf | ||
| Attachment 08 - Drawings Part IV.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N A
ROOM NAME DESIGNATION
ROOM NUMBER DESIGNATION (IF PRESENT)
ROOM AREA DESIGNATION (IF PRESENT)
PARTITION TYPE DESIGNATION. SEE
PARTITION LEGEND
DOOR NUMBER DESIGNATION
SPECIAL NOTATION (e.g. DEMO NOTE)
W1 WINDOW TYPE DESIGNATION
1T ACCESSORY ITEM- SEE ACCESSORY
SCHEDULE
DATUM POINT OR WORK POINT
BUILDING SECTION
WALL SECTION
DETAIL NUMBER
SHEET NUMBER WHERE
DETAIL IS LOCATED
DETAIL NUMBER
SHEET NUMBER WHERE
DETAIL IS LOCATED
EXTENT OF SECTION
A-XXX
A1
A2 B1
DETAIL NUMBERS
SHEET NUMBER WHERE
DETAIL IS LOCATED
ELEVATIONS
REVISION NOTE
REVISION NUMBER
EXTENT OF REVISION
1F 2F 3F 4F 5F 6F 7F
1E 2E 3E 4E 5E 6E 7E
1D 2D 3D 4D 5D 6D 7D
1C 2C 3C 4C 5C 6C 7C
1B 2B 3B 4B 5B 6B 7B
1A 2A 3A 4A 5A 6A 7A
DETAIL NUMBER DETAIL SCALE
DETAIL NAME
DETAIL NUMBER
SCALE: 1/8" = 1'-0"
AXX
View Name
ROOM NAME
00000
1500 SF
DETAIL SECTION
DETAIL NUMBER
SHEET NUMBER WHERE
DETAIL IS LOCATED
PLAN DETAIL
EXTENT
OF DETAIL
R1
NNNL
A-XXX
A-XXX
A-XXX
NEW DOOR IN NEW OR
EXISTING PARTITION,
SEE DOOR SCHEDULE
EXISTING DOOR IN NEW OR
EXISTING PARTITION, WITH
MODIFICATION. SEE DOOR
SCHEDULE
EXISTING DOOR TO
BE REMOVED, SEE
REMOVAL PLAN
EXISTING DOOR TO
REMAIN, IN EXISTING
PARTITION
E-###
FINISHED SURFACES-NEW
REMOVAL OF EXISTING
EXISTING SURFACES
A-XXX
A-XXX
EXTENT OF SECTION
DETAIL NUMBER
SHEET NUMBER WHERE
DETAIL IS LOCATED
GRAVEL / STONE
CONCRETE - CAST
IN PLACE
CONCRETE
MASONRY UNIT
BRICK
CONCRETE -
PRECAST
STONE
SAND / MORTAR
GYPSUM
WALLBOARD
ALUMINUM
STEEL
RIGID INSULATION
QUARRY TILE
P LAM OVER
SUBSTRATE
WOOD - FINISHED
PLYWOOD
ACOUSTIC TILE
CARPET
EARTH
BATT INSULATION WOOD
BLOCKING
REINFORCING -
WWF
EXTEND ALL MATERIALS
TO UNDERSIDE OF
DECK/SLAB
_A
EXTEND GB MATERIAL
ABOVE CLG & BRACE
STUDS AT STRUCT ABOVE,
AS REQD.
AT INSULATED WALLS
PROVIDE 2-1/2" BATT
INSULATION MIN 24" TO EA
SIDE OF WALL.
_B
CLG
24" MIN 24" MIN
CLG 6"
EXTEND GB MATERIAL
ABOVE CLG & BRACE
STUDS AT STRUCT ABOVE,
AS REQD TO PROVIDE
STABILITY
_C
CLG 6" STOP GB ABOVE CLG ONE
SIDE; EXTEND ALL OTHER
MATERIALS TO UNDERSIDE
OF DECK / SLAB
_D
CLG 6"
LOW WALL, SEE
DWGS FOR HT
_E
CLG
VA
R
IE
S
BULKHEAD
CONDITIONS VARY-
SEE DWGS FOR
DETAILS. BRACE
STUDS AT STRUCT
ABOVE, AS REQD TO
PROVIDE STABILITY
_F
CLG 6"
VA
R
IE
S
BULKHEAD
CONDITIONS VARY-
SEE DWGS FOR
DETAILS. BRACE
STUDS AT STRUCT
ABOVE, AS REQD TO
PROVIDE STABILITY
_G
CLG 6"
VA
R
IE
S
CLG
1A
CONSTRUCTION TYPES :
HEIGHT TYPES :
ADDITIONAL RELATED NOTES: SEE "GENERAL NOTES"
SEE SPECIFIC NOTES ON PLANS AND
DETAILS; SEE SPECIFICATIONS
TEST DESIGNATIONS : UL= UNDERWRITERS LABORATORIES
OSU= OHIO STATE UNIVERSITY
UC= UNIVERSITY OF CALIFORNIA
ALPHABET SUFFIX DESIGNATES
PARTITION HEIGHT NOTED BELOW
NUMERAL PREFIX
DESIGNATES PARTITION
CONSTRUCTION NOTED
ABOVE
EXTEND EXISTING
WALL TO UNDERSIDE
OF STRUCTURAL DECK
ABOVE
_H
CLG
AB
O
VE
TO
S
TR
U C T.
B
4" 1"
5/ 8"
1/ 2"
5/ 8"
SE
E
PL
AN
2"
33 ACTUAL FACE
OF MASONRY
NOMINAL
DIMENSION
FROM PLAN
1/2" JT WIDTH
FACE OF
FINISHED
SURFACE
FROM PLAN
NOMINAL DIM
FROM PLAN
NOMINAL OPENING
1' -4
ELEV SECTION
8" 1' -4
2' -0
TOP OF MASONRY
UNIT BEYOND
ACTUAL FACE
OF MASONRY
F R O M E
LE
V A T
IO
N
1' A B
FOR DOOR OPENING
INFORMATION SEE
DOOR SCHEDULE
WP
A-101
2"
7'-4" 4'-8"
3' -0
WP
2'-2"
FINISHED
FACE OF
NON-
MASONRY
WALL
NOMINAL
FACE OF
MASONRY
WALL
3 B
6 A
6 A
1 A
B6
A-001
4 7/8"
3-5/8" METAL STUDS - 20 GAUGE
AT 24" O.C.
1 LAYER 5/8" GWB - TYPE X
TYPE 1
RATING = ---
TEST = ---
STC = ---
1 LAYER 5/8" TILE BACKER BOARD
AT ALL TOILET/SHOWER ROOMS
2 1/2" MINERAL WOOL INSULATION
TYPE 5
2 1/2" MTL STUDS - 20 GA
@ 16" OC
1 LAYER 5/8" GWB
7 3/4"
TYPE 6
RATING = 1 HR
TEST = UL-U419
STC = 56
6" METAL STUDS - 20 GA
AT 16" OC
2 1/2" MINERAL WOOL INSULATION
1 LAYER 5/8" SOUND
DEADENING TYPE X GWB
1/2" RC-1 CHANNELS 25 GA
AT 24" O.C.
1 LAYER 5/8" GWB - TYPE X
RATING = ---
TEST = ---
STC = ---
TYPE 2
RATING = ---
TEST = ---
STC = ---
3 5/8" METAL STUDS - 20 GA AT 16"
OC. BRACE STUDS TO MASONRY
@ 48" OC.
1 LAYER 5/8" GWB - TYPE X
EXG. EXTERIOR WALL
TYPE 3
RATING = ---
TEST = ---
STC = ---
2 1/2" METAL STUDS -
20GA 2 ROWS - AT 16" OC
1 LAYER 5/8" GWB - TYPE X
PATIENT ROOM SIDE. TILE
BACKER BOARD ON TOILET
ROOM SIDE. BRACE EACH PAIR
STUDS AT 48" OC VERTICAL.
PROVIDE 2 LAYERS 2 1/2" MINERAL
WOOL INSULATION.
SEE PLAN.
5 3/8"
RATING = 1 HR
TEST = UL-U419
STC = 56
3 5/8" METAL STUDS - 20
GA AT 16" OC
2 1/2" MINERAL WOOL INSULATION
1 LAYER 5/8" SOUND
DEADENING TYPE X GWB
1/2" RC-1 CHANNELS 25 GA
AT 24" O.C.
1 LAYER 5/8" GWB - TYPE X
TYPE 4
4 1/4"
3 1/8"
7 1/4"
6" METAL STUDS- 20 GAUGE AT
24" O.C.
TYPE 7
RATING = ---
TEST = ---
STC = ---
1 LAYER 5/8" GWB - TYPE X
1 LAYER 5/8" GWB - TYPE X
Location
Issue Date
2023-05-04 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
NO. DESCRIPTION DATE
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
Project Director
MILLER-REMICK LLCPROFESSIONAL ENGINEERPRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
AJE
590-802
137C
FULLY SPRINKLERED
AMW
GI-100
GENERAL INFORMATION
LEGEND-(LIST)-ABBREVIATIONS
PT PRESSURE TREATED
PTD PAPER TOWER DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
Q
QT QUARRY TILE
QTY QUANTITY
R
R RADIUS/RISER
R RESILIENT
RB RESILIENT BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF REFRIDGERATOR
REINF REINFORCE(D)
REQ'D REQUIRED
RESIL C RESILIENT CHANNEL
RET RETURN
REV REVISION
RM ROOM
RO ROUGH OPENING
S
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FEET
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SLNT SEALANT
SND SANITARY NAPKIN DISPENSER
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ SQUARE
SSM SOLID SURFACE MATERIAL
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PLATE STEEL PLATE
STRUCT STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SVT SHEET VINYL FLOORING
SYMM SYMMETRICAL
T
T TREAD
T&G TONGUE AND GROOVE
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
TERM TERMINAL
THK THICKNESS
THRES THRESHOLD
TK BD TACKBOARD
TMPD TEMPERED
TO TOP OF
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TOW TOP OF WALL
TRANS TRANSOM, TRANSPARENT
TYP TYPICAL
U
UC UNDERCUT
UL UNDERWRITER'S LABATORY (TEST)
UNO UNLESS NOTED OTHERWISE
UR URINAL
V
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VNR VENEER
VP VENEER PLASTER
VR VAPOR RETARDER
VT VINYL TILE
VWC VINYL WALLCOVERING
W
W WIDE
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WDW WINDOW
WGL WIRED GLASS
WP WATERPROOFING
WPT WORKPOINT
WS WEATHERSTRIP
WWF WELDED WIRE FABRIC
PROJECT SPECIFIC ABBREVIATIONS
COR VA CONTRACTING OFFICER'S
REPRESENTATIVE
TIC TAPERED INSULATION CRICKET
LEGEND-(LIST)-ABBREVIATIONS
FOF FACE OF FINISH
FOS FACE OF STUD
FP FIREPROOFING
FR FRAME
FRMG FRAMING
FRP FIBERGLASS REINFORCED
PLASTIC/PANEL
FRTW FIRE RETARDANT TREATED WOOD
FT FOOT/FEET
FTG FOOTING
FURG FURRING
FURN FURNISHED/FURNITURE
FWC FABRIC WALL COVERING
G
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GCT GLAZED CERAMIC TILE
GL GLASS/GLAZING
GWB GYPSUM WALLBOARD
GYP GYPSUM
H
HC HOLLOW CORE
HCP HANDICAPPED
HDBD HARDBOARD
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HVAC HEATING/VENTILATING/AIR
CONDITIONING
I
ICRA INFECTION CONTROL RISK
ASSESSMENT
ID INSIDE DIAMETER
INCL INCLUDE(D)(-ING)
INSUL INSULATE(D)(-ION)(-ING)
INT INTERIOR
INV INVERT
J
JAN JANITOR
JT JOINT
L
LAM LAMINATE(D)
LAV LAVATORY
LF LINEAR FEET
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LT GA LIGHT GAUGE
LTG LIGHTING
LVR LOUVER
M
MACH MACHINE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MKR BD MARKER BOARD
MLDG MOULDING
MO MASONRY OPENING
MR MOISTURE RESISTANT
MTL METAL
MULL MULLION
N
NA NOT APPLICABLE
NAT NATURAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
P
PBD PARTICLE BOARD
PCT PORCELAIN CERAMIC TILE
PERIM PERIMETER
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
PNTD PAINTED
PR PAIR
PREFAB PREFABRICAT(D)
LEGEND-(LIST)-ABBREVIATIONS
A
A/C AIR CONDITIONING
AB ANCHOR BOLT
ACC ACCESIBLE
ACS PNL ACCESS PANEL
ADDM ADDENDUM
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AHR ANCHOR(AGE)
ALT ALTERNATE
ALUM ALUMINUM
ANN PNL ANNUNCIATOR PANEL
ANOD ANODIZED
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASB ASBESTOS
ASPH ASPHALT
ATC ACOUSTICAL TILE CEILING
B
BD BOARD
BEV BEVELED
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BM BEAM, BENCHMARK
BOT OF BOTTOM OF
BRG BEARING
BSMT BASEMENT
BUR BUILT-UP ROOF
C
CAB CABINET
CEM CEMENT
CH BD CHALKBOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CLG CEILING
CLL CONTRACT LIMIT LINE
CLO CLOSET
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMPST COMPOSITE
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPRS FL COMPRESSIBLE FILLER
CPT CARPET
CR CARD READER
CRS COLD ROLLED STEEL
CT CERAMIC TILE
D
D DEPTH
DET DETAIL
DF DRINKING FOUNTAIN
DFLCT DEFLECTION
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DL DEAD LOAD
DMPF DAMPPROOFING
DR DOOR
DWG DRAWING
E
EA EACH
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMHO ELECTROMAGNETIC HOLD OPEN
ENTR ENTRANCE
EP ELECTRIC PANEL
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATE
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPOSED, EXPANSION
EXT EXTERIOR
F
FAAP FIRE ALARM ANNUNCIATOR PANEL
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FH FIRE HYDRANT
FIN FINISH(ED)
FIXT FIXTURE
FLASH FLASHING
FLG FLOORING
FLR FLOOR
FM FACTORY MUTUAL
FO FACE OF
SCALE: NO SCALE
E1
ABBREVIATIONS
SCALE: NO SCALE
E3
MATERIALS LEGEND
SCALE: NO SCALE
D3
GRAPHIC KEY
SCALE: NO SCALE
F6
PARTITION & CONSTRUCTION TYPES
SCALE: NO SCALE
A8
GENERAL NOTES
SCALE: NO SCALE
F9
DIMENSIONING GUIDE ELEV/SECTION
SCALE: NO SCALE
D9
DIMENSIONING GUIDE PLAN
SCALE: NO SCALE
E9
DIMENSIONING GUIDE DETAIL
DIMENSIONING LEGEND NOTES
Key Name DIM LEGEND NOTE
1 MASONRY PLAN DIMENSIONS AT SCALES NOT SHOWING INDIVIDUAL MODULES ARE TO NOMINAL FACE OF MASONRY
2 NON MASONRY DIMENSIONS ARE TO FINISHED FACE OF MATERIAL UNLESS NOTED OTHERWISE
3 MASONRY ON DRAWINGS SHOWN WITH INDIVIDUAL MODULAR UNITS ARE DIMENSIONED TO ACUTAL SIZE, AND WHERE SHOWN INCLUDE
REFERENCES TO MODULAR DIMESIONS.
4 MASONRY COURSING LINES IN ELEVATON REPRESENT NOMINAL DIMENSIONS. VERTICAL JOINTS ARE DIMENSIONSED TO CENTERLINE OF JOINT. HORIZONTAL JOINTS ARE DIMENSIONSED TO TOP OF MASONRY IN ELEVATION AND IN SECTION.
5 DIMENSIONS ARE FROM STRUCTURAL COLUMN CENTERLINES, UNO.
6 AT INTERSECTION OF DIFFERENT PARTITION TYPES, CONTINUE PARTITION OF GREATER FIRE RATING THROUGH INTERSECTION UNO.
7 REFER TO PARTITION SCHEDULE FOR PARTITION THICKNESS AND HEIGHT.
8 NON-ARCHITECTURAL DISCIPLINE INFORMATION IF SHOWN IS FOR REFERENCE ONLY. OBJECTS AND INFORMATION SHOWN MAY NOT BE
ALL INCLUSIVE. REFER TO APPROPRIATE DISCIPLINE FOR INFORMATION.
9 REFER TO WORKPOINTS WHERE SHOWN FOR ELEMENTS PLACED ON NON-PARALLEL OR NON-PARALLEL RELATIONSHIPS. WORKPOINTS MAY ALSO BE SHOWN AS LAYOUT STARTING POINTS IN ORDER TO MAINTAIN CORRECT RELATIONSHIPS BETWEEN ELEMENTS.
GENERAL NOTES-ARCHITECTURE
Key Name GENERAL NOTES
1 SEE STRUCTURAL DRAWINGS FOR WIND, SNOW, SEISMIC AND OTHER STRUCTURAL LOAD INFORMATION
2 SEE "REGULATORY PLAN" FOR REGULATORY INFORMATION AND UL ASSEMBLY DESIGNATIONS FOR FIRE RATED STEEL STRUCTURE AND
FLOOR ASSEMBLIES.
3 BUILDING DIRECTORY SIGNAGE AT ELEVATORS, SUITE ENTRY SIGNAGE AND DOOR SIGNAGE SHOWN FOR LOCATION PURPOSES ONLY.
SIGNAGE PROVIDED AND INSTALLED BY OTHERS, PROVIDE BLOCKING AT BUILDING MOUNTED SIGNAGE.
4 CONTRACTOR TO REMOVE AND RID OF EXISTING FURNITURE ITEMS. CONTACT C.O.R. FOR MORE INFORMATION.
NON-RATED
1 HR FIRE BARRIER
2 HR FIRE BARRIER
SMOKE BARRIER
1 - 1
TRAVEL DISTANCE
LINE TO EXIT
TRAVEL DISTANCE
PATH-SEE SCHEDULE
FOR DISTANCE
FEFE
FE
FEFE
FE
FE
COURTYARD
COURTYARD
COURTYARD
COURTYARD
1HR
1HR
1HR
1HR
1HR
2HRS
SMOKE COMPARTMENT: 16,723 s.f.
SMOKE COMPARTMENT: 17,600 s.f.
SMOKE COMPARTMENT: 20,566 S.F.
1HRS
1HRS
1HR
1HR
1HR
EXISTING BUILDING
STAFF LOCKERS
C181A
CORRIDOR
C6
SOILED UTILITY
C183
STAFF LOUNGE
C181
INTERNET CAFE
C178
OFFICE
C175
CLEAN LINEN
C176
CLEAN SUPPLY
C172
MED ROOM
C170
PSYCH OFFICE
C174
NM
C171
TRASH
C169
HAC
C167
ELEC.
C158
NM
C160
DAY ROOM
C162
CORRIDOR
CORRIDOR
CORRIDOR
C9
CORRIDOR
C8
CORRIDOR
C1
CORRIDOR
C4
CORRIDOR
C11
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
C3
C O R R
ID
O R
C
CORRIDOR
C12
PATIENT RM 1 BED
C154
PATIENT RM 1 BED
C153
PATIENT RM 1 BED
C152
PATIENT RM 1 BED
C144
PATIENT RM 1 BED
C132
PATIENT RM 1 BED
C118
PATIENT RM 1 BED
C116
PATIENT RM 1 BED
C117
PATIENT RM 1 BED
C115
PATIENT RM
C102
PATIENT RM 1 BED
C123
PATIENT RM 1 BED
C125
PATIENT TLT
C144A
PATIENT TLT
C154A
PATIENT TLT
C152A
PATIENT TLT
C153A
PATIENT TLT
C132A
HAC
C106
PATIENT TLT
C118A
PATIENT TLT
C116A
PATIENT TLT
C117A
PATIENT TLT
C102A
PATIENT TLT
C115A
STUDENT OFFICE
C108
TOILET
C107
NOURISHMENT KITCHEN
C100
MED ROOM
C109
CLEAN STORAGE
C101
CLEAN LINEN
C104
PATIENT TLT
C125A
PATIENT TLT
C123A
NM
C180
NM
C179
NM
C177
PHARM
C173
EXISTING BUILDING
EXISTING BUILDING
LAUNDRY
C155
PVA OFFICE
C150
TLT
C148
MED ROOM
C151A
ACCESS STAIR
C149 CLERK
C151B
MED SUPPLY
C143
SOILED UTILITY
C142
PATIENT TLT
C159A
PATIENT TLT
C163A
PATIENT RM 1 BED
C159
PATIENT RM 1 BED
C163
RESP. OFFICE
C140
DATA
C141
EQUIPMENT STORAGE
C138
DATA
C135
ELECTRIC
C134
PATIENT TLT
C137A
PATIENT TLT
C145A
PATIENT RM 1 BED
C145
PATIENT RM 1 BED
C137
NURSE SATELITE
C110
OXYGEN
C129
PATIENT RM 1 BED
C124
PATIENT TLT
C124A
NOURISHMENT KITCHEN
C126
SOILED LINEN
C131
TOILET
C105A
EXAM ROOM
C105
CONSULT
C103
MEDITATION
C130
TLT
C122
PATIENT RM 1 BED
C47
PATIENT RM 1 BED
C45
PATIENT RM 1 BED
C43
PATIENT RM 1 BED
C42
PATIENT TLT
C47A
PATIENT TLT
C45A
PATIENT TLT
C43A
PATIENT TLT
C42A
NURSE SAT
C151
CATV
C183A
OFFICE
C184
CORRIDOR
ELECTRIC
C139
EXTEND EXISTING
WALLS FROM 9'-0" (+/-)
TO STRUCTURAL DECK
AT 12'-0" (+/-) SEE
PARTITION 1H ON
FLOOR PLANS.
EXTEND EXISTING
WALLS FROM 9'-0" (+/-)
TO STRUCTURAL DECK
AT 12'-0" (+/-) SEE
PARTITION 1H ON
FLOOR PLANS.
EXTEND EXISTING WALLS FROM
9'-0" (+/-) TO STRUCTURAL DECK
AT 12'-0" (+/-) SEE PARTITION 1H
ON FLOOR PLANS.
EXTEND EXISTING WALLS FROM
9'-0" (+/-) TO STRUCTURAL DECK
AT 12'-0" (+/-) SEE PARTITION 1H
ON FLOOR PLANS.
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
E - 1
1 HR BLDG SUBDIVISION.
E - 3
E - 4
E - 5
HORIZ
EXIT
HORIZ
EXIT
2 HR
2 HR
2 HR
HORIZ
EXIT
HORIZ
EXIT
2 HR
DIET OFFICE
C182
CORRIDOR
C10
HORIZ
EXIT
1HR
= NOT IN CONTRACT
= AREA OF WORK
CODE SYNOPSIS
PROJECT OVERVIEW:
SCI RENOVATION AND RESIDENCE ADDITION, HAMPTON VA MEDICAL CENTER
APPLICABLE CODES:
• NFPA 13-2019 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
• NFPA 72-2019 NATIONAL FIRE ALARM CODE
• NFPA 90A-2018 STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS
• NFPA 99-2018 STANDARD FOR HEALTH CARE FACILITIES
• NFPA 101-2018 LIFE SAFETY CODE
• NFPA 220-2018 STANDARD ON TYPES OF BUILDING CONSTRUCTION
• NFPA 291-2019 RECOMMENDED PRACTICE FOR FIRE FLOW TESTING AND MARKING OF HYRDRANTS
• NFPA 5000 BUILDING SAFETY AND CONSTRUCTION
• VIRGINIA/CMS LONG TERM CARE PHYSICAL ENVIRONMENT
• VA FIRE PROTECTION MANUAL
EXISTING BUILDING USE CLASSIFICATION:
NFPA 101 – CHAPTER 18 (Healthcare) and VA Fire Protection Manual
EXISTING BULDING CONSTRUCTION:
BULDING STRUCTURE: STEEL COLUMNS/BEAMS, UNPROTECTED
NUMBER OF STORIES: ONE STORY RENOVATION AND ADDITION
CONSTRUCTION TYPE: TYPE II (000) NFPA-101
SPRINKLER: FULLY SPRINKLERED IN ACCORDANCE WITH “NFPA 13-INSTALLATION OF SPRINKLER SYSTEMS.
FIRE EXTINGUISHERS: PROVIDE IN ACCORDANCE WITH “NFPA-10-PORTABLE FIRE EXTINGUISTHERS” WITH
TRAVEL DISTANCE OF 75 FT.
HEIGHT AND AREA ALLOWED
AREA:UNLIMITED
CONTIGIOUS SPACE OCCUPANCY
Healthcare (CHAPTER 18/19)-Hospital
RENOVATION USE CLASSIFCATION:
Healthcare (CHAPTER 18-per VA Fire Protection Manual)
EXITS:
Not less than two exits shall be accessible from every floor.
200 FT (18.2.6.2.1)
30 FT (18.2.5.2)
EXCEPT CROSS CORRIDOR DOORS IN BUILDING SUBDIVISION WALLS
OCCUPANT LOAD 28,780 / 120 SF PER PERSON = 240
KEY PLAN
Location
Issue Date
2023-05-04 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
NO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
Project Director
MILLER-REMICK LLCPROFESSIONAL ENGINEERPRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
AJE
590-802
137C
FULLY SPRINKLERED
AMW
AE-100
LIFE SAFETY PLAN
SCALE: NO SCALE
F3
GRAPHIC KEY
SCALE: 1" = 20'-0"
F1
LIFE SAFETY PLAN
SCHEDULE-TRAVEL DISTANCE PATHS
SCHEDULE
FILTER TYPE PATH LENGTH COMMENTS
E 1 128'-8"
E 2 91'-0" 200' MAX TO BUILDING SUBDIVISION
E 3 114'-10" 200' MAX TRAVEL TO EXIT
E 4 198'-11" 200' MAX TRAVEL TO EXIT
E 5 191'-9" 200' MAX TRAVEL TO EXIT
D D
D D
= NO WORK, NOT IN CONTRACT
= PHASE 1
= PHASE 2
= PHASE 1&2
B O O K C A S E
B O O K C A S E
S T R E T C H E R
S T R E T C H E R
S T R E T C H E R
LINEN
CRASH
CART
CPR CART
N U R S E S A T
CRASH
CART
COURTYARD CCOURTYARD B
C O U R T Y A R D A
COURTYARD D
CORRIDOR
PATIENT RM 2 BED
340 SF
PATIENT RM 2 BED
348 SF
PATIENT TLT
131 SF
PATIENT TLT
131 SF
SOILED UTILITY
112 SF
WOUND CARE
335 SF
NM
119 SF
PATIENT RM 4 BED
618 SF
UNDER CONSTRUCTION
224 SF
CORRIDOR
PATIENT RM
205 SF
PATIENT TLT
122 SF
DATA
72 SF
CLERK w/ MED
151 SF
PATIENT RM 4 BED
643 SF
PATIENT TLT
81 SF
OFFICE
57 SF
PATIENT RM 2 BED
350 SF
PATIENT RM 2 BED
329 SF
PATIENT TLT
132 SF
CORRIDOR
CORRIDOR
PATIENT TLT
121 SF
MED SURG 2X A DAY
94 SF
PATIENT RM 4 BED
646 SF
PATIENT RM 2 BED
408 SF
LINEN
53 SF
HAC
42 SF
PATIENT RM 4 BED
638 SF
PHARM
127 SF
MED
49 SF
CORRIDOR
NURSE SAT
175 SF
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
STAFF SHOWER
E130
PATIENT TLT
E132
PATIENT TLT
E134
PATIENT TLT
E138
PATIENT TLT
E140
PATIENT TLT
E144
PATIENT RM 19 (1) BED
E131
PATIENT RM 20 (1) BED
E133
PATIENT RM 21 (1) BED
E137
PATIENT RM 21 (1) BED
E135
PATIENT TLT
E136
PATIENT RM 22 (1) BED
E139
PATIENT TLT
E146
PATIENT RM 24 (1) BED
E145
PATIENT RM 23 (1) BED
E143
CLN LINEN
E141
SPD
E142
PATIENT TLT
E122
PATIENT TLT
E126
PATIENT TLT
E120
PATIENT TLT
E124
PATIENT RM 18 (1) BED
E127
PATIENT RM 17 (1) BED
E125
PATIENT RM 16 (1) BED
E121
PATIENT RM 15 (1) BED
E119
PATIENT RM 14 (1) BED
E123
STAFF SHOWER
E129
PATIENT TLT
E128
SCI CHIEF OFFICE
E117
DAY ROOM
E115
DENTAL
E112
CLO
E101
TOILET
E102
PVA
E103
ELECTRICAL
E104
WARMING KITCHEN
E105
DINING
E100
PATIENT TLT
C41A
PATIENT RM
C41
CORRIDOR
13PATIENT RM
C39
PATIENT RM
E193
PATIENT RM
E195
PATIENT TLT
E196
PATIENT TLT
C39A
PATIENT TLT
E194
PATIENT RM
E189
PATIENT RM
E191
PATIENT TLT
E190
PATIENT TLT
E186
PATIENT TLT
E192
PATIENT TLT
E188
PATIENT RM
E185
PATIENT RM
E187
PATIENT RM
E181
PATIENT RM
E183
PATIENT TLT
E184
PATIENT TLT
E166
CLOSET
E167
PATIENT RM
E165
PATIENT TLT
E182
PATIENT TLT
E180
STAIR
E??
CORRIDOR
PATIENT RM
E161
PATIENT RM
E179
PATIENT RM
E178
PATIENT RM
E176
PATIENT RM
E174
PATIENT RM
E172
PATIENT RM
E168
PATIENT RM
E163
PATIENT RM
E159
PATIENT TLT
E162
PATIENT TLT
E160
PATIENT TLT
E164
PATIENT TLT
E169
DATA CLOSET
E170
STORAGE
E171
PATIENT TLT
E177
PATIENT TLT
E179
PATIENT TLT
E173
PATIENT TLT
E175
PATIENT TLT
E158
PATIENT RM
E157
NURSE
C10
MEDS
C10A
VEST
V1
PATIENT RM
E159
ELECTRICAL
C03
TOILET
C01A
CLO
E150
DAY RM UNIT C
C02
EXAM
C01
ELEC
E118
CORRIDOR
CORRIDOR
CORRIDOR
EQUIPMENT STORAGE
301 SF
UNDER CONSTRUCTION
646 SF
COMPUTER
331 SF
SOILED UTILITY
160 SF
CLOSET
33 SF
CORRIDOR
CORRIDOR
STAFF
316 SF
LAUNDRY
114 SF
DATA
44 SF
UNDER CONSTRUCTION
572 SF
EQUIPMENT STORAGE
301 SF
UNDER CONSTRUCTION
753 SF
UNDER CONSTRUCTION
763 SF
TLT
61 SF
CORRIDOR
CORRIDOR
CORRIDOR
STUDENT OFFICE
96 SF
TOILET
43 SF
MED ROOM
120 SF
NM
74 SF
NURSE SATELITE
332 SF
OXYGEN
55 SF
SOILED LINEN
104 SF
CHARGING ROOM
332 SF
TLT
44 SF
BOWEL TRAINING
487 SF
DATA
43 SF
ELECTRICAL
55 SF
UNDER CONSTRUCTION
862 SF
HAC
40 SF
UNDER CONSTRUCTION
754 SF
UNDER CONSTRUCTION
331 SF
UNDER CONSTRUCTION
333 SF
UNDER CONSTRUCTION
134 SF
SHARED PSYCH OFF
86 SF
TOILET
52 SF
UNDER CONSTRUCT
88 SF
UNDER CONSTRUCTION
416 SF
UNDER CONSTRUCTION
331 SF
UNDER CONSTRUCTION
332 SF
CORRIDOR
KINESIOTHERAPY
E106
PT OFFICE
E107
SOC OFFICE
E109
PHY OFFICE
E110 PSYCH OFFICE
E111
AO OFFICE
E118
CORR
CORR
CORR
SOC OFFICE
E108
NORTH UNIT
SOUTH UNIT
EAST
UNIT
* SEE MECHANICAL
DRAWINGS FOR WORK IN
EAST UNIT PENTHOUSE
LIMIT OF SUBSTANTIAL
CONSTRUCTION
N
O
P
7 9 10 11 13 14 15
WCWBWA.2WA
K
L
M
Q
W1
W2
R
W3
SW4
T
W5
U
W5.9
W6
W9
W8
W7
EA
W14WC.2
EB EC ED
E8
E9
E10
E19
E12
E13
E14
E15
E16
E17
E18
E1
E2
E3
E4
E5
E6
E7
V
W
X
Y
Z
AA
BBBB
CCCC
COURTYARD C
COURTYARD B
C O U R T Y A R D A
COURTYARD D
CORRIDOR
PATIENT RM 1 BED
289 SF
PATIENT RM 1 BED
303 SF
PATIENT TLT
129 SF
PATIENT TLT
130 SF
PATIENT RM 1 BED
288 SF
CORRIDOR
PATIENT TLT
131 SF
ACCESS STAIR
68 SF
CLERK
93 SF
TLT
70 SF
RESP OFFICE
55 SF
PATIENT RM 1 BED
295 SF
PATIENT TLT
138 SF
CORRIDOR
CORRIDOR
PATIENT TLT
130 SF
PVA OFFICE
112 SF
MED
102 SF
CORRIDOR
NURSE SAT
175 SF
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
STAFF SHOWER
E130
PATIENT TLT
E132
PATIENT TLT
E134
PATIENT TLT
E138
PATIENT TLT
E140
PATIENT TLT
E144
PATIENT RM 19 (1) BED
E131
PATIENT RM 20 (1) BED
E133
PATIENT RM 21 (1) BED
E137
PATIENT RM 21 (1) BED
E135
PATIENT TLT
E136
PATIENT RM 22 (1) BED
E139
PATIENT TLT
E146
PATIENT RM 24 (1) BED
E145
PATIENT RM 23 (1) BED
E143
CLN LINEN
E141
SPD
E142
PATIENT TLT
E122
PATIENT TLT
E126
PATIENT TLT
E120
PATIENT TLT
E124
PATIENT RM 18 (1) BED
E127
PATIENT RM 17 (1) BED
E125
PATIENT RM 16 (1) BED
E121
PATIENT RM 15 (1) BED
E119
PATIENT RM 14 (1) BED
E123
STAFF SHOWER
E129
PATIENT TLT
E128
SCI CHIEF OFFICE
E117
DAY ROOM
E115
DENTAL
E112
CLO
E101
TOILET
E102
PVA
E103
ELECTRICAL
E104
WARMING KITCHEN
E105
DINING
E100
PATIENT TLT
C41A
PATIENT RM
C41
CORRIDOR
13PATIENT RM
C39
PATIENT RM
E193
PATIENT RM
E195
PATIENT TLT
130 SF
PATIENT TLT
C39A
PATIENT TLT
E194
PATIENT RM
E189
PATIENT RM
E191
PATIENT TLT
E190
PATIENT TLT
E186
PATIENT TLT
E192
PATIENT TLT
E188
PATIENT RM
E185
PATIENT RM
E187
PATIENT RM
E181
PATIENT RM
E183
PATIENT TLT
E184
PATIENT TLT
E166
CLOSET
E167
PATIENT RM
E165
PATIENT TLT
E182
PATIENT TLT
E180
STAIR
E??
CORRIDOR
PATIENT RM
E161
PATIENT RM
E179
PATIENT RM
E178
PATIENT RM
E176
PATIENT RM
E174
PATIENT RM
E172
PATIENT RM
E168
PATIENT RM
E163
PATIENT RM
E159
PATIENT TLT
E162
PATIENT TLT
E160
PATIENT TLT
E164
PATIENT TLT
E169
DATA CLOSET
E170
STORAGE
E171
PATIENT TLT
E177
PATIENT TLT
E179
PATIENT TLT
E173
PATIENT TLT
E175
PATIENT TLT
E158
PATIENT RM
E157
NURSE
C10
MEDS
C10A
VEST
V1
PATIENT RM
E159
ELECTRICAL
C03
TOILET
C01A
CLO
E150
DAY RM UNIT C
C02
EXAM
C01
ELEC
E118
CORRIDOR
CORRIDOR
CORRIDOR
SOILED UTILITY
291 SF
STAFF LOCKERS
200 SF
INTERNET CAFE
332 SF
MED RM
203 SF
SOILED LINEN
82 SF
CORRIDOR
CORRIDOR
MED SUPPLY
175 SF
DATA
45 SF
OFFICE
170 SF
CLEAN LINEN
202 SF
DAY ROOM
597 SF
PATIENT TLT
127 SF
CORRIDOR
CORRIDOR
CORRIDOR
STUDENT OFFICE
77 SF
TOILET
60 SF
MED ROOM
210 SF
NURSE SATELITE
324 SF
OXYGEN
54 SF
SOILED LINEN
104 SF
MEDITATION
332 SF
TLT
44 SF
EQUIPMENT STORAGE
526 SF
DATA
43 SF
ELECTRICAL
56 SF
HAC
40 SF
HAC
43 SF
CLEAN LINEN
181 SF
CLEAN STORAGE
250 SF
CORRIDOR
W10
STAFF LOUNGE
363 SF
CLEAN SUPPLY
333 SF
PSYCH OFFICE
151 SF
NM
146 SF
HAC
69 SF
ELEC
46 SF
NM
145 SF
PATIENT RM 1 BED
305 SF
PATIENT TLT
127 SF
PATIENT RM 1 BED
307 SF
PATIENT RM 1 BED
293 SF
PATIENT TLT
111 SF
PATIENT TLT
111 SF
PATIENT RM 1 BED
293 SF
PATIENT RM 1 BED
335 SF
PATIENT TLT
144 SF
NOUR. KITCHEN
240 SF
SOILED UTILITY
126 SF
DATA
64 SF
PATIENT TLT
134 SF
PATIENT TLT
130 SF
PATIENT RM 1 BED
300 SF
PATIENT RM 1 BED
308 SF
TLT
109 SF
EXAM ROOM
327 SF
CONSULT
210 SF
OFFICE
149 SF
NM
148 SF
NM
148 SF
NM
148 SF
DIET OFFICE
148 SF
PHARM
279 SF
PATIENT TLT
128 SF
PATIENT RM 1 BED
300 SF
PATIENT RM 1 BED
306 SF
PATIENT RM 1 BED
308 SF
LAUNDRY
275 SF
PATIENT RM 1 BED
288 SF
PATIENT TLT
111 SF
PATIENT TLT
111 SF
PATIENT RM 1 BED
307 SF
PATIENT TLT
118 SF
PATIENT TLT
118 SF
PATIENT TLT
117 SF
PATIENT RM 1 BED
307 SF
PATIENT RM 1 BED
308 SF
PATIENT RM 1 BED
309 SF
PATIENT TLT
119 SF
PATIENT TLT
131 SF
PATIENT RM 1 BED
307 SF
PATIENT TLT
E196
PATIENT RM 1 BED
308 SF
NOUR. KITCHEN
174 SF
KINESIOTHERAPY
E106
PT OFFICE
E107
SOC OFFICE
E109
PHY OFFICE
E110 PSYCH OFFICE
E111
AO OFFICE
E118
CORR
CORR
CORR
SOC OFFICE
E108
NO CONTRACTOR ACCESS.
DO NOT BLOCK ENTRANCE
OR WALK.
ELECTRICAL
33 SF
WEST ADDITION (DEDUCT
ALTERNATES #1 & 2)
P1
P1
P1
P1
EXIT
EXIT
MAINTAIN EXITS
DURING ADDITION
CONSTRUCTION
DOOR TO BE USED BY OCCUPANTS DURING
PHASE 1 WHILE CORRIDOR IS MAINTAINED
DOOR TO BE USED BY OCCUPANTS DURING
PHASE 1 WHILE CORRIDOR IS MAINTAINED
CONTRACTOR ACCESS.
SEE SHEET GI-001.
TLT
109 SF
W5.5
NORTH UNIT
SOUTH UNIT
EAST
UNIT
PHASING NOTES:
1 ACCESS TO EXISTING OCCUPIED PHASE 2 AREA FROM OCCUPIED EAST UNIT MUST BE
MAINTAINED THROUGHOUT PHASE 1 THROUGH EITHER CORRIDOR 8 OR CORRIDOR 11.
2 EXISTING SHELTER-REMOVE AT BEGINNING OF CONSTRUCTION, STORE, AND
REINSTALL WHEN PHASE 1 & COURTYARD ARE COMPLETED. PROTECT EXISTING SLABS
TO REMAIN DURING PHASE 1. SEE SITE FOR ADDITIONAL DESCRIPTION.
3 PROVIDE TEMPORARY LAUNDRY ROOM FROM BEGINNING OF CONSTRUCTION
THROUGH PHASE 1.
AT THE END OF PHASE 1:
DISCONNECT & MOVE LAUNDRY EQUIPMENT TO PHASE 2 TEMPORARY LOCATION
& RECONNECT. COMPLETE CONSTRUCTION OF NOURISHMENT KITCHEN AS LAST
STEP OF PHASE 1.
4 PROVIDE TEMPORARY LAUNDRY ROOM FROM END OF PHASE 1 TO COMPLETION OF
PHASE 2.
AT THE END OF PHASE 2:
DISCONNECT LAUNDRY EQUIP., MOVE TO FINAL LOCATION & RECONNECT.
RESTORE FINISHES & REINSTALL GLASS AT TEMP GLASS PRIOR TO TURNING
OVER CONSULT ROOM.
5 ALL WORK IN THE AREA MUST BE COMPLETED IN PHASE 1 & MAINTAINED AS EGRESS
FOR SOUTH UNIT OCCUPANTS THROUGHOUT DURATION OF PHASE 2.
6 ADDITION PHASING:
PHASE 1 - ADDITION FOUNDATIONS, STRUCTURE, ROOF, EXTERIOR WALLS, INCL -
BELOW GRADE WORK IN COURTYARD B, & M/E/P ROUGH-INS ARE TO BE
COMPLETED FOR A WEATHER TIGHT ENCLOSURE. PROVIDE CONDITIONING TO
ENSURE PROTECTION OF MATERIALS IN PLACE. COMPLETE AREA IDENTIFIED IN
PHASING NOTE 5.
PHASE 2 - COMPLETE INTERIOR AND ANY REMAINING MINOR EXTERIOR
CONSTRUCTION ACTIVITIES.
P1 CONTRACTOR CONSTRUCTION ACCESS AT EXISTING WINDOW TO BE REMOVED.
PROVIDE WEATHERTIGHT CLOSURE & TEMP. DOOR FOR DURATION OF PHASE 1.
INSTALL NEW WINDOWS & ENCLOSURE AT END OF PHASE 1.
FOR DISRUPTIVE CONSTRUCTION ACTIVITIES:
A) NO 2ND OR 3RD SHIFT WORK. WEEKEND WORK IS ACCEPTABLE ONLY DURING THE DAY.
B) COORDINATE ALL WORK AND WORK REQUIRED AT OTHER WITH C.O.R.
C) AREAS REQUIRING ANY WORK IN SPACES BELOW (ALL ASPECTS TO INCLUDE
ELECTRICAL, PLUMBING, CONCRETE WORK TO ROOF BELOW OR PENETRATIONS BELOW)
MUST BE COORDINATED WITH THE PHASING OF THE REST OF THE PROJECT.
D) FIRE ALARM OR SPRINKLER REMOVAL/MODIFICATION THAT REQUIRE OUTAGES MUST BE
KEPT TO A MINIMUM. ANY OUTAGE LASTING MORE THAN 8 HOURS REQUIRES A
TEMPORARY SYSTEM TO BE INSTALLED BEFORE DISRUPTION TO THE EXISTING SYSTEM.
DEDUCT ALTERNATE NOTES:
A) BID ITEM 1 (BASE BID): CONTRACTOR SHALL PERFORM ALL WORK AS INDICATED IN THE
CONTRACT DOCUMENTS, INCLUDING GENERAL CONSTRUCTION, ALTERATIONS, ROADS,
WALKS, GRADING DRAINAGE, MECHANICAL AND ELECTRICAL WORK, UTILITY SYSTEMS,
NECESSARY REMOVAL OF EXISTING STRUCTURES AND CONSTRUCTION, AND CERTAIN
OTHER ITEMS.
1) DEDUCT ALTERNATE No. 1: CONTRACTOR SHALL PERFORM ALL WORK AS DESCRIBED IN
'BID ITEM 1 (BASE BID)' EXCEPT DEDUCT THE INTERIOR ARCHITECTURAL FINISHED, AND
PLUMBING, MECHANICAL AND ELECTRICAL WORK ASSOCIATED WITH THE FIVE BED (WEST)
ADDITION, AS INDICATED IN THE CONTRACT DOCUMENTS.
2) DEDUCT ALTERNATE No. 2: CONTRACTOR SHALL PERFORM ALL WORK AS DESCRIBED IN 'BID ITEM 1 (BASE BID)' EXCEPT DEDUCT ALTERNATE No. 1 AND DEDUCT THE CIVIL, ARCHITECTURAL, STRUCTURAL, PLUMBING, MECHANICAL, ELECTRICAL AND FIRE
PROTECTION WORK ASSOCIATED WITH THE FOUR BED (WEST) ADDITION AS INDICATED IN
THE CONTRACT DOCUMENTS.
Location
Issue Date
2023-05-04 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
NO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
Project Director
MILLER-REMICK LLCPROFESSIONAL ENGINEERPRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
AJE
590-802
137C
FULLY SPRINKLERED
AMW
GC-100
FLOOR PLAN - EXISTING &
OVERALL PHASING PLANS
SCALE: 1" = 20'-0"
F1
FIRST FLOOR - EXISTING PLAN
SCALE: 1" = 20'-0"
F4
FIRST FLOOR- OVERALL PHASING PLAN
SCALE: NO SCALE
F9
DRAWING KEY
N
O
P
7 7a 8 9 10 11 13 14 15
L
M
Q
W1
W2
R
W3
S
W4
T
W5
U
W5.9
W6
EA EA.6 EB EC ED
E8
E9
E1
E2
E3
E4
E5
E6
E7.5
E7
COURTYARD
COURTYARD
COURTYARD
EXISTING BUILDING
EXISTING 2 HR PARTITION FROM
FLOOR TO STRUCTURE ABOVE
TEMPORARILY
SECURE DOOR
CONTRACTOR
EGRESS ONLY
CONTRACTOR
ACCESS / EGRESS
PATIENT RM
205 SF
PATIENT TLT
122 SF
NUTRITION
72 SF
CLERK w/ MED
151 SF
PATIENT RM 4 BED
643 SF
PATIENT TLT
81 SF
CORRIDOR
PATIENT TLT
121 SF
MED SURG 2X A DAY
94 SF
PATIENT RM 4 BED
646 SF
PATIENT RM 2 BED
408 SF
LINEN
53 SF
HAC
42 SF
PATIENT RM 4 BED
638 SF
PHARM
127 SF
MED
49 SF
CORRIDOR
NURSE SAT
175 SF
CORRIDOR
CORRIDOR
CORRIDOR
STAFF SHOWER
E130
PATIENT TLT
E132
PATIENT RM 19 (1) BED
E131
PATIENT TLT
E122
PATIENT TLT
E126
PATIENT TLT
E120
PATIENT TLT
E124
PATIENT RM 18 (1) BED
E127
PATIENT RM 17 (1) BED
E125
PATIENT RM 16 (1) BED
E121
PATIENT RM 15 (1) BED
E119
PATIENT RM 14 (1) BED
E123
STAFF SHOWER
E129
PATIENT TLT
E128
SCI CHIEF OFFICE
E117
DAY ROOM
E115
DENTAL
E112
CLO
E101
TOILET
E102
PVA
E103
ELECTRICAL
E104
WARMING KITCHEN
E105
DINING
E100
ELEC
E118
CORRIDOR
CORRIDOR
EQUIPMENT STORAGE
301 SF
UNDER CONSTRUCTION
646 SF
COMPUTER
331 SF
SOILED UTILITY
160 SF
CLOSET
33 SF
CORRIDOR
CORRIDOR
STAFF
316 SF
LAUNDRY
114 SF
DATA
44 SF
UNDER CONSTRUCTION
572 SF
EQUIPMENT STORAGE
301 SF
UNDER CONSTRUCTION
753 SF
UNDER CONSTRUCTION
763 SF
TLT
61 SF
KINESIOTHERAPY
E106
PT OFFICE
E107
SOC OFFICE
E109
PHY OFFICE
E110
PSYCH OFFICE
E111
AO OFFICE
E118
SOC OFFICE
E108
TEMPORARY PARTITIONS REQUIRED
WHILE CORRIDORS 8 & 3 ARE
MAINTAINED FOR OCCUPANT USE.
NURSING PHASE 1
CONTRACTOR
ACCESS / EGRESS
EXISTING
RAMP UP
EXISTING
RAMP UP
R A M P
R A M P
W5.5
TEMP PARTITION
WHILE PHASE 1
ADDITION WORK
IS DONE
WALK-OFF MAT
PROVIDE TEMP PARTITION (1 HR RATED)
EXTEND EXISTING PARTITION FROM ABOVE CEILING TO
STRUCTURAL DECK. SEE DTL F6/GC-102.
TEMPORARY DOOR (3/4 HR RATED)
CONTRACTOR CONSTRUCTION ACCESS. PROVIDE WEATHER
TIGHT ENCLOSURE AND TEMPORARY HM DOOR & FRAME. SEE
NOTE D1/GC-100
CONTRACTOR EGRESS ONLY
PROVIDE TEMPORARY FIRE RETARDANT / REINFORCED
PLASTIC CLOSURE TO MAINTAIN AIR PRESSURE &
PREVENT DUST IN OCCUPIED AREAS
1. REFER TO ABATEMENT DRAWINGS FOR FURTHER INFORMATION.
2. CONTRACTOR IS TO FOLLOW ALL REQUIREMENTS AS DEFINED BY ICRA
PROCEDURES DEFINED IN PROJECT MANUAL.
3. REFER TO M/E/P DRAWINGS FOR WORK SCOPES REQUIRED TO BE
PERFORMED BY THOSE TRADES.
4. SPRINKLER HEADS TO BE MAINTAINED IN CONSTRUCTION AREA AND
ARE TO BE REPOSITIONED FOR HEAD TO SPRAY UPWARD WITHIN 24
HOURS AFTER CEILING IS REMOVED. SEE FP DWGS FOR FURTHER
INFORMATION.
MATCH LINE
KEY PLAN
= NOT IN CONTRACT
= PHASE LIMIT LINE
Location
Issue Date
2023-05-04 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
NO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
Project Director
MILLER-REMICK LLCPROFESSIONAL ENGINEERPRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
AJE
590-802
137C
FULLY SPRINKLERED
AMW
GC-101
ICRA PLAN - PHASE 1 NORTH
SCALE: 1/8" = 1'-0"
F1
ICRA PLAN - PHASE 1 NORTH
SCALE: NO SCALE
A9
ICRA PLAN DRAWING KEY
SCALE: NO SCALE
B9
GENERAL ICRA PLAN NOTES
D D
7a 8 9 10 11 13 14
WCWBWA.2WA
W5
U
W5.9
W6
W9
W8
W7
EA
EA
EA.6
EA.6
W14WC.2 EB
EB
EC
EC
ED
ED
E8
E9
E10
E19
E11
E12
E13
E14
E15
E16
E17
E18
E7.5
V
W
X
Y
Z
AA
BB
CC
W10
EXISTING BUILDING
CORRIDOR
PATIENT RM 2 BED
340 SF
PATIENT RM 2 BED
348 SF
PATIENT TLT
131 SF
PATIENT TLT
131 SF
SOILED UTILITY
112 SF
WOUND CARE
335 SF
NM
119 SF
PATIENT RM 4 BED
618 SF
TEMPORARY LAUNDRY
224 SF
CORRIDOR
PATIENT RM
205 SF
PATIENT TLT
122 SF
NUTRITION
72 SF
CLERK w/ MED
151 SF
PATIENT RM 4 BED
643 SF
PATIENT TLT
81 SF
OFFICE
57 SF
PATIENT RM 2 BED
350 SF
PATIENT RM 2 BED
329 SF
PATIENT TLT
132 SF
CORRIDOR
PHARM
127 SF
MED
49 SF
NURSE SAT
175 SF
CORRIDOR
CORRIDOR
CORRIDOR
STAFF SHOWER
E130
PATIENT TLT
E132
PATIENT TLT
E134
PATIENT TLT
E138
PATIENT TLT
E140
PATIENT TLT
E144
PATIENT RM 19 (1) BED
E131
PATIENT RM 20 (1) BED
E133
PATIENT RM 21 (1) BED
E137
PATIENT RM 21 (1) BED
E135
PATIENT TLT
E136
PATIENT RM 22 (1) BED
E139
PATIENT TLT
E146
PATIENT RM 24 (1) BED
E145
PATIENT RM 23 (1) BED
E143
CLN LINEN
E141
SPD
E142
STAFF SHOWER
E129
PATIENT TLT
E128
PATIENT TLT
C41A
PATIENT RM
C41
CORRIDOR
PATIENT RM
C39
PATIENT RM
E193
PATIENT RM
E195
PATIENT TLT
E196
PATIENT TLT
C39A
PATIENT TLT
E194
PATIENT RM
E189
PATIENT RM
E191
PATIENT TLT
E190
PATIENT TLT
E186
PATIENT TLT
E192
PATIENT TLT
E188
CORRIDOR
STAFF
316 SF
LAUNDRY
114 SF
UNDER CONSTRUCTION
763 SF
TLT
61 SF
CORRIDOR
CORRIDOR
CORRIDOR
STUDENT OFFICE
96 SF
TOILET
43 SF
MED ROOM
120 SF
NM
74 SF
NURSE SATELITE
332 SF
OXYGEN
55 SF
SOILED LINEN
104 SF
CHARGING ROOM
332 SF
TLT
44 SF
BOWEL TRAINING
487 SF
DATA
43 SF
ELECTRICAL
55 SF
UNDER CONSTRUCTION
862 SF
HAC
40 SF
UNDER CONSTRUCTION
754 SF
UNDER CONSTRUCTION
331 SF
UNDER CONSTRUCTION
333 SF
UNDER CONSTRUCTION
134 SF
SHARED PSYCH OFF
86 SF
TOILET
52 SF
UNDER CONSTRUCT
88 SF
UNDER CONSTRUCTION
416 SF
UNDER CONSTRUCTION
331 SF
UNDER CONSTRUCTION
332 SF
CORRIDOR
CONTRACTOR
ACCESS / EGRESS
CONTRACTOR
EGRESS ONLY
TEMPORARY PARTITION
REQUIRED WHILE CORRIDOR 11 IS
MAINTAINED FOR OCCUPANT USE
NURSING PHASE 1
NURSING
PHASE 1
NURSING
PHASE 1 & 2
PROVIDE TEMPORARY
INSULATION PANEL
WITH DRYER VENTS IN
ALUMINUM FRAMING
CONTRACTOR
ACCESS / EGRESS
CONTRACTOR
ACCESS / EGRESS
W5.5
WALK-OFF MAT
PROVIDE TEMP PARTITION (1 HR RATED)
EXTEND EXISTING PARTITION FROM ABOVE CEILING TO
STRUCTURAL DECK. SEE DTL F6/GC-102.
TEMPORARY DOOR (3/4 HR RATED)
CONTRACTOR CONSTRUCTION ACCESS. PROVIDE WEATHER
TIGHT ENCLOSURE AND TEMPORARY HM DOOR & FRAME. SEE
NOTE D1/GC-100
CONTRACTOR EGRESS ONLY
PROVIDE TEMPORARY FIRE RETARDANT / REINFORCED
PLASTIC CLOSURE TO MAINTAIN AIR PRESSURE &
PREVENT DUST IN OCCUPIED AREAS
1. REFER TO ABATEMENT DRAWINGS FOR FURTHER INFORMATION.
2. CONTRACTOR IS TO FOLLOW ALL REQUIREMENTS AS DEFINED BY ICRA
PROCEDURES DEFINED IN PROJECT MANUAL.
3. REFER TO M/E/P DRAWINGS FOR WORK SCOPES REQUIRED TO BE
PERFORMED BY THOSE TRADES.
4. SPRINKLER HEADS TO BE MAINTAINED IN CONSTRUCTION AREA AND
ARE TO BE REPOSITIONED FOR HEAD TO SPRAY UPWARD WITHIN 24
HOURS AFTER CEILING IS REMOVED. SEE FP DWGS FOR FURTHER
INFORMATION.
TO SLAB
0"
TO ROOF
15'-4"
TO ROOF
15'-4"
DEFLECTION TRACK
SEALANT - TYP EACH SIDE
FINISH FLOOR
EXISTING PARTITION
EXIST ROOF ASSEMBLY
EXIST STRUCTURE - SEAL ALL
PENETRATIONS THROUGH NEW
PARTITION EXTENSIONS
NEW PARTITION EXTENSION :
ONE LAYER 5/8" TYPE "X" GWB EA SIDE,
3 5/8"- 20 GA. METAL STUDS @ 16"0.C.
TOP OF EXIST PARTITION
EXIST DUCTS AND PIPES - SEAL
ALL PENETRATIONS THROUGH
NEW PARTITION EXTENSIONS
CEILING SYSTEM - AS SPECIFIED
NOTE:
INSTALL METAL STUDS AND ONE LAYER OF
GWB ONLY, ON CONSTRUCTION SIDE OF AND
DURING PHASE 1. INSTALL SECOND LAYER
OF GWB ON OPPOSITE SIDE DURING
CONSTRUCTION OF PHASE 2
TO EXISTING ROOF PLANK
12'-4"
TO NEW STEEL - DUNNAGE
15'-4"
MATCH LINE
KEY PLAN
= NOT IN CONTRACT
= PHASE LIMIT LINE
Location
Issue Date
2023-05-04 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
NO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
Project Director
MILLER-REMICK LLCPROFESSIONAL ENGINEERPRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
AJE
590-802
137C
FULLY SPRINKLERED
AMW
GC-102
ICRA PLAN - PHASE 1 SOUTH
SCALE: 1/8" = 1'-0"
F1
ICRA PLAN - PHASE 1 SOUTH
SCALE: 3/4" = 1'-0"
F6
SECTION DTL - PHASE WALL EXTENSION
SCALE: NO SCALE
A9
ICRA DRAWING KEY
SCALE: NO SCALE
GENERAL ICRA NOTES
P
7 7a 8 9 10 11 13 14 15
WCWBWA.2WA
L
M
Q
W1
W2
R
W3
S
W4
T
W5
U
W5.9
W6
EA EA.6
WC.2
EB EC ED
E8
E9
E1
E2
E3
E4
E5
E6
E7.5
E7
EXISTING BUILDING
STAFF LOCKERS
C181A
CORRIDOR
SOILED UTILITY
C183
STAFF LOUNGE
C181
INTERNET CAFE
C176
OFFICE
C177
CLEAN LINEN
C175
CLEAN SUPPLY
C170
MED ROOM
C170A
PSYCH OFFICE
C173
NM
C171
HAC
C169
SOILED LINEN
C167
CLOSET
C158
NM
C160
DAY ROOM
C162
CORRIDOR
CORRIDOR
CORRIDOR
MEDS
C151A
NUTRITION
C146
CLERK
C151B
MED SUPPLY
C143
SOILED UTILITY
C142
PATIENT TLT
C159A
PATIENT TLT
C163A
PATIENT RM 1 BED
C159
PATIENT RM 1 BED
C163
PATIENT RM 1 BED
C145
NURSE SAT
C151
DATA
C183A
CORRIDOR
CORRIDOR
PATIENT TLT
122 SF
PATIENT RM 4 BED
643 SF
PATIENT TLT
81 SF
PATIENT TLT
121 SF
MED SURG 2X A DAY
94 SF
PATIENT RM 4 BED
646 SF
PATIENT RM 2 BED
408 SF
LINEN
53 SF
HAC
42 SF
PATIENT RM 4 BED
638 SF
PHARM
127 SF
CORRIDOR
DENTAL
E112
CLO
E101
TOILET
E102
PVA
E103
ELECTRICAL
E104
WARMING KITCHEN
E105
DINING
E100
PT OFFICE
E107
SOC OFFICE
E109
PHY OFFICE
E110
PSYCH OFFICE
E111
CORR
SOC OFFICE
E108
EXISTING 2 HR PARTITION FROM
FLOOR TO STRUCTURE ABOVE
CONTRACTOR
EGRESS ONLY
CONTRACTOR
EGRESS
EXISTING
RAMP UP
EXISTING
RAMP UP
R A M P
R A M P
Dn
W5.5
C1
AS-403
WALK-OFF MAT
PROVIDE TEMP PARTITION (1 HR RATED)
EXTEND EXISTING PARTITION FROM ABOVE CEILING TO
STRUCTURAL DECK. SEE DTL F6/GC-102.
TEMPORARY DOOR (3/4 HR RATED)
CONTRACTOR CONSTRUCTION ACCESS. PROVIDE WEATHER
TIGHT ENCLOSURE AND TEMPORARY HM DOOR & FRAME. SEE
NOTE D1/GC-100
CONTRACTOR EGRESS ONLY
PROVIDE TEMPORARY FIRE RETARDANT / REINFORCED
PLASTIC CLOSURE TO MAINTAIN AIR PRESSURE &
PREVENT DUST IN OCCUPIED AREAS
1. REFER TO ABATEMENT DRAWINGS FOR FURTHER INFORMATION.
2. CONTRACTOR IS TO FOLLOW ALL REQUIREMENTS AS DEFINED BY ICRA
PROCEDURES DEFINED IN PROJECT MANUAL.
3. REFER TO M/E/P DRAWINGS FOR WORK SCOPES REQUIRED TO BE
PERFORMED BY THOSE TRADES.
4. SPRINKLER HEADS TO BE MAINTAINED IN CONSTRUCTION AREA AND
ARE TO BE REPOSITIONED FOR HEAD TO SPRAY UPWARD WITHIN 24
HOURS AFTER CEILING IS REMOVED. SEE FP DWGS FOR FURTHER
INFORMATION.
CORRIDOR
C1
PATIENT RM 1 BED
C47
PATIENT TLT
C47A
PATIENT TLT
C45A
PATIENT RM 1 BED
C45
CORRIDOR
C1
MATCH LINE
KEY PLAN
= NOT IN CONTRACT
= PHASE LIMIT LINE
Location
Issue Date
2023-05-04 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
NO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
Project Director
MILLER-REMICK LLCPROFESSIONAL ENGINEERPRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
AJE
590-802
137C
FULLY SPRINKLERED
AMW
GC-103
ICRA PLAN - PHASE 2 NORTH
SCALE: 1/8" = 1'-0"
F1
ICRA PLAN - PHASE 2 NORTH
SCALE: NO SCALE
A9
ICRA DRAWING KEY
SCALE: NO SCALE
D D
7 7a 8 9 10 11 13 14 15WCWBWA.2WA
W5
U
W5.9
W6
W9
W8
W7
EA EA.6W14 EB EC ED
E8
E9
E10
E19
E11
E12
E13
E14
E15
E16
E17
E18
E7.5
V
W
X
Y
Z
AA
BB
CC
W10
COURTYARD
CORRIDOR
CORRIDOR
C O R R
ID
O R
CORRIDOR
CORRIDOR
PATIENT RM 1 BED
C123
PATIENT RM 1 BED
C125
HAC
C107
STUDENT OFFICE
C108
TOILET
C106
MED ROOM
C109
CLEAN STORAGE
C101
CLEAN LINEN
C104
PATIENT TLT
C125A
PATIENT TLT
C123A
MEDS
C151A
MED SUPPLY
C143
SOILED UTILITY
C142
PATIENT TLT
C159A
PATIENT TLT
C163A
PATIENT RM 1 BED
C159
PATIENT RM 1 BED
C163
DATA
C141
EQUIPMENT STORAGE
C138
DATA
C135
ELECTRIC
C134
PATIENT TLT
C137A
PATIENT TLT
C145A
PATIENT RM 1 BED
C145
PATIENT RM 1 BED
C137
NURSE SATELITE
C110
OXYGEN
C129
PATIENT RM 1 BED
C124
PATIENT TLT
C124A
NOURISHMENT KITCHEN
C126
SOILED LINEN
C131
TOILET
C105A
EXAM ROOM
C105
CONSULT
C103
MEDITATION
C130
TLT
C120
CORRIDOR
CORRIDOR
ELECTRIC
C139
CORRIDOR
C2
PATIENT RM 2 BED
C108
PATIENT RM 2 BED
C109
PATIENT TLT
C102a
PATIENT TLT
C108a
SOILED UTILITY
C110
WOUND CARE
C102
NM
C104
PATIENT RM 4 BED
C112
CORRIDOR
C3
PATIENT RM
C115
PATIENT TLT
C120a
NUTRITION
C117
CLERK w/ MED
C141
PATIENT RM 4 BED
C120
PATIENT TLT
C115a
OFFICE
C114
PATIENT RM 2 BED
C107
PATIENT RM 2 BED
C106
PATIENT TLT
C106a
CORRIDOR
CORRIDOR
CORRIDOR
STAFF SHOWER
E130
PATIENT TLT
E132
PATIENT TLT
E134
PATIENT TLT
E138
PATIENT TLT
E140
PATIENT TLT
E144
PATIENT RM 19 (1) BED
E131
PATIENT RM 20 (1) BED
E133
PATIENT RM 21 (1) BED
E137
PATIENT RM 21 (1) BED
E135
PATIENT TLT
E136
PATIENT RM 22 (1) BED
E139
PATIENT TLT
E146
PATIENT RM 24 (1) BED
E145
PATIENT RM 23 (1) BED
E143
CLN LINEN
E141
SPD
E142
PATIENT TLT
C41A
PATIENT RM
C41
PATIENT RM
C39
PATIENT RM
E193
PATIENT RM
E195
PATIENT TLT
E196
PATIENT TLT
C39A
PATIENT TLT
E194
PATIENT RM
E189
PATIENT RM
E191
PATIENT TLT
E190
PATIENT TLT
E192
CORRIDOR
C5
CORRIDOR
C2
EGRESS TO EXISTING
CONTRACTOR
AND/OR TEMP
EGRESS
MAINTAIN EGRESS DURING
ADDITION CONSTRUCTION.
PROVIDE TEMP BARRIER
DURING RENOVATION.
CORRIDOR
MAINTAIN EGRESS
DURING SOUTH
RENOVATION.
PROVIDE
TEMPORARY
BARRIER DURING
ADDITION
CONSTRUCTION.
CONTRACTOR
ACCESS / EGRESS
AREA 2A
PHASE 1 & 2
NURSING
PHASE 2
NURSING
PROVIDE TEMPORARY
INSULATION PANEL
WITH DRYER VENTS IN
ALUMINUM FRAMING
W5.5
C1
AS-403
WALK-OFF MAT
PROVIDE TEMP PARTITION (1 HR RATED)
EXTEND EXISTING PARTITION FROM ABOVE CEILING TO
STRUCTURAL DECK. SEE DTL F6/GC-102.
TEMPORARY DOOR (3/4 HR RATED)
CONTRACTOR CONSTRUCTION ACCESS. PROVIDE WEATHER
TIGHT ENCLOSURE AND TEMPORARY HM DOOR & FRAME. SEE
NOTE D1/GC-100
CONTRACTOR EGRESS ONLY
PROVIDE TEMPORARY FIRE RETARDANT / REINFORCED
PLASTIC CLOSURE TO MAINTAIN AIR PRESSURE &
PREVENT DUST IN OCCUPIED AREAS
1. REFER TO ABATEMENT DRAWINGS FOR FURTHER INFORMATION.
2. CONTRACTOR IS TO FOLLOW ALL REQUIREMENTS AS DEFINED BY ICRA
PROCEDURES DEFINED IN PROJECT MANUAL.
3. REFER TO M/E/P DRAWINGS FOR WORK SCOPES REQUIRED TO BE
PERFORMED BY THOSE TRADES.
4. SPRINKLER HEADS TO BE MAINTAINED IN CONSTRUCTION AREA AND
ARE TO BE REPOSITIONED FOR HEAD TO SPRAY UPWARD WITHIN 24
HOURS AFTER CEILING IS REMOVED. SEE FP DWGS FOR FURTHER
INFORMATION.
PATIENT RM 1 BED
C45
PATIENT RM 1 BED
C43
PATIENT TLT
C43A
PATIENT RM 1 BED
C42
PATIENT TLT
C42A
CORRIDOR
C1
Up
MATCH LINE
KEY PLAN
= NOT IN CONTRACT
= PHASE LIMIT LINE
Location
Issue Date
2023-05-04 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
NO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
Project Director
MILLER-REMICK LLCPROFESSIONAL ENGINEERPRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
AJE
590-802
137C
FULLY SPRINKLERED
AMW
GC-104
ICRA PLAN - PHASE 2 SOUTH
SCALE: 1/8" = 1'-0"
F1
ICRA PLAN - PHASE 2 SOUTH
SCALE: NO SCALE
A9
ICRA DRAWING KEY
SCALE: NO SCALE
P
7 9 10 11 13
14 15
L
M
Q
R
S
T
U
EA EB EC ED
E8
E9
E1
E2
E3
E4
E5
E6
E7
R1
R1
R3
R3
R3 R3
R3
R4
R5
R2
R6
R6R6
R6
R6
R6 R6
R6
R1
R1
R6
R9
R16
R1
R1
R6
R6
R2
PHASE
LIMIT LINE
R2
R6 R6
R11
R11
R11
PHASE
LIMIT LINE
R11 R11
R11 R11
CORRRIDOR
C6
EQUIPMENT STORAGE
C131
UNOCCUPIED
C133
COMPUTER
C130
CLOSET
C9a
CORRIDOR
C7
CORRIDOR
C9
STAFF
C116
LAUNDRY
C138
DATA
C132
UNOCCUPIED
C134
SOILED UTILITY
C125
UNOCCUPIED
C136
UNOCCUPIED
C137
TLT.
C139
PATIENT RM
C115
PATIENT TLT
C120b
NUTRITION
C117
CLERK w/ MED.
C141
PATIENT RM 4 BED
C120
PATIENT TLT
C115a
CORRIDOR
C5
PATIENT TLT
C122b
MED. SURG. 2X A DAY
C126
PATIENT RM 4 BED
C129
PATIENT RM 2 BED
C127
LINEN
C123
HAC
C124
PATIENT RM 4 BED
C122
PHARM.
C119 MEDICATION
C118a
CORRIDOR
1C14
STAFF SHOWER
1C209
PATIENT TLT
1C221A
PATIENT RM 19 (1) BED
1C221
PATIENT TLT
1C215A
PATIENT TLT
1C2171
PATIENT TLT
1C214A
PATIENT TLT
1C213A
PATIENT RM 18 (1) BED
1C218
PATIENT RM 17 (1) BED
1C217
PATIENT RM 16 (1) BED
1C215
PATIENT RM 15 (1) BED
1C214
PATIENT RM 14 (1) BED
1C213
STAFF SHOWER
1C210
PATIENT TLT
1C218A
SCI CHIEF OFFICE
A147
DAY ROOM
A156
CLO
D100A
TOILET
D100B
DIETICIAN
D100C
ELECTRICAL
D100D
WARMING KITCHEN
D100E
DINING
D100
ELEC
1C216
CORRIDOR
C4
NURSES SAT.
C118
CORRIDOR
C8
CORRIDOR
1C14
CORRIDOR
C5
COURTYARD A
R13
R13
R13
R13
R13
R13
R13 R13
R13
R13 R13
R13
R13
R13
R14
R14
R14
R1
EQUIPMENT STORAGE
C128
CORRIDOR
C7
SITEWORK IN COURTYARD A
IS INCLUDED IN PHASE 1 -
SEE CIVIL DWGS FOR WORK
REQUIRED IN THE AREA
R1
R2 R2 R2
R2
MATCH LINEMATCH LINE
DENTAL CLINIC
A143
PT THERAPY
A131A
KINESIOTHERAPY
A131
SOC OFFICE
A133
SOC OFFICE
A135
PHY OFFICE
A137
PSYCH OFFICE
A139
AO OFFICE
A145
CORRIDOR
CA25
R15
R15
R15
R15
R15
R15
R15
R15
R15
R15
R16 R16
EXISTING
RAMP UP
R17
R17
R17
R18
R18
R17
R21
R2R2
R2
R13
R6
EXISTING
RAMP UP
SEE PHASING &
ICRA PLANS FOR
TEMP BARRIER IN
THIS LOCATION.
CORRIDOR
CA24
BREAK ROOM
A142
CORRIDOR
CA23
CORRIDOR
CD1
PHY. OFFICE
A132
ROOM
A128
ROOM
A126
HAC
A140
MIO
A118
ROOM
A116
ROOM
A114
CLST
218B
CLST
217B
CLST
215B
CLST
215B
CLST
213B
STAIR #2
1C219
CLST
221B
R A M P
R A M P
SEE SHEET AD-102SEE SHEET AD-102
R22
R22
R22
R23
R22
R22
R22
R23
R22 R22 R22
R23
R22 R22
R23
R22
R13R25 R25 R25
R25 R25 R25
R25
R25
R25
R25
R25
R25
R25
R25
R25
R25
R26
R26
R26
R2R2
R2R2
= NOT IN CONTRACT
= PHASE LIMIT LINE
MATCH LINE
KEY PLAN
REMOVE PIPE, SEE PLUMBING DWGS
16 GA POUR STOP
FLR TOPPING
FLR FINISH
Location
Issue Date
2023-05-04 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
NO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
Project Director
MILLER-REMICK LLCPROFESSIONAL ENGINEERPRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
AJE
590-802
137C
FULLY SPRINKLERED
AMW
AD-101
REMOVALS PLAN- PHASE 1
NORTH
SCALE: 1/8" = 1'-0"
F1
REMOVALS PLAN- PHASE 1 NORTH
KEYED NOTES-REMOVALS
NUMBER COMMENT
R1 REMOVE PARTITION WALL AND ANY ASSOCIATED MECH & ELECT ITEMS. SEE M/E/P REMOVAL
DRAWINGS.
R2 REMOVE AND SALVAGE DOOR, FRAME AND HARDWARE. TURN OVER TO C.O.R.
R3 REMOVE TOILET FIXTURE, PATCH AND PREP FLOOR FOR SCHEDULED WORK. COORDINATE
LOCATIONS REQUIRING CAPING OR RELOCATING SANITARY PIPING WITH PROPOSED WORK.
SEE PLUMBING DRAWINGS.
R4 REMOVE STAINLESS STEEL COUNTER, SINK & GRAB BARS. SEE PLUMBING DRAWINGS.
R5 REMOVE COUNTER TOP AND CABINETRY. COORDINATE EXTENT OF REMOVAL WITH
PROPOSED WORK. SEE PLUMBING DRAWINGS.
R6 REMOVE SECTION OF PARTITION WALL AS REQUIRED TO INSTALL NEW DOOR & FRAME. PATCH
AND PREP AREA AS REQUIRED FOR LIKE NEW INSTALLATION & FINISH.
R7 REMOVE EXISTING SIDELITE AND TRANSOM GLASS PANEL PORTIONS OF STOREFRONT
ASSEMBLY TO ACCOMMODATE PROPOSED PARTITION WALL INFILL - EXISTING DOUBLE DOOR
TO REMAIN.
R8 REMOVE COUNTER TOP, BASE AND WALL CABINETS.
R9 REMOVE CORRIDOR FINISH FLOORING, BASE, WAINSCOT AND CEILING. PATCH AND PREP
FLOOR AND WALL. SEE ABATEMENT DWGS.
R10 REMOVE EXISTING EXTERIOR WALL ASSEMBLY FROM T.O. FOUNDATION UP TO ROOF DECK
(SEE STRUCT DWGS). SAWCUT TOP OF FOUNDATION AS REQUIRED TO CREATE CONC SLAB
CONNECTION.
R11 REMOVE WINDOW ASSEMBLY IN PREPARATION FOR INSTALLATION OF NEW. (SEE DETAILS F4
& F6 ON AS-301).
R12 REMOVE HEADWALL COLUMN UNIT AFTER GAS PIPING AND ELECTRICAL HAS BEEN
DISCONNECTED.
R13 REMOVE SURFACE MOUNTED HEADWALL COLUMN UNIT, AND REMOVE ANY ASSOCIATED
ELECTRICAL OUTLETS BACK TO THE WIRING BACK.
R14 HATCHED AREA INDICATES - REMOVAL OF CERAMIC FLOOR TILE AND SETTING MATERIAL.
INSTALL 1 1/2" CONCRETE TOPPING AND PREPARE SUBFLOOR FOR NEW SCHEDULED FINISH.
R15 REMOVE ACOUSTICAL CEILING TILE, ASSOCIATED GRID, GWB SOFFITS, AND SUPPORT
HANGERS. PATCH AND REPAIR ANY DAMAGE ASSOCIATED WITH REMOVALS AT EXISTING
WALLS TO REMAIN. PREPARE WALLS TO RECEIVE NEW FINISH WORK AT EXISTING WALLS TO
REMAIN. REMOVE CURTAINS & CURTAIN TRACK.
R16 REMOVE TILE AND 6" CMU PARTITION FROM FLOOR TO 9'-0" AFF.
R17 REMOVE HANDRAIL, CRASHRAIL & FASTENING SYSTEMS FROM BOTH SIDES/FULL LENGTH OF
CORRIDOR INDICATED.
R18 REMOVE EXIST 1 1/2" CONC TOPPING IN PREPARATION FOR NEW SLOPED CT PATIENT TOILET
FLOOR.
R20 REMOVE METAL GRATE AT PIPE BASEMENT ACCESS.
R21 REMOVE DRINKING FOUNTAIN. COORDINATE EXTENT OF REMOVAL WITH PROPOSED WORK
AND PLUMBING DRAWINGS.
R22 REMOVE CLG MOUNT TV & MOUNTING HARDWARE. SALVAGE FOR REINSTALLATION.
R23 REMOVE PATIENT LIFT TRACK & LIFT. SALVAGE AND INCORPORATE INTO NEW WORK.
R24 REMOVE SLIDING ALUM. DOOR AND SURFACE MOUNTED FRAME.
R25 REMOVE AUTONOME, EGS, WALL MOUNTED MONITOR ARM & MONITOR. SALVAGE & TURN
OVER TO VA C.O.R.
R26 SHADED WALLS INDICATE TEMPORARY PARTITION WALL(S) TO BE BUILT PRIOR TO BEGINING
PHASED AREA REMOVALS CONTRACTOR TO PROVIDE MINIMUM 48" CLEAR PASSAGE DOOR
WITH LOCKING LATCH SET. ALL TEMPORARY WALLS TO EXTEND TO UNDERSIDE OF EXISTING
CEILINGS / SOFFITS.
GENERAL REMOVAL NOTES:
1. PROTECT ALL MATERIALS AND FINISHES TO REMAIN AS REQUIRED TO FACILITATE REUSE AT
END OF CONSTRUCTION.
2. AT EXIST FLOORS, PARTITIONS AND CEILING SURFACES TO REMAIN, PATCH, REPAIR AND INFILL
FOR LIKE NEW SURFACE READY TO RECEIVE NEW FINISHES.
3. FILL FLOOR SLAB AT REMOVED FLOOR DRAINS. SEE DETAIL B7/AD-101 AND PLUMBING DWGS.
4. AT ALL DOORS TO REMAIN - REPAIR & RESTORE DOOR FINISH TO LIKE NEW CONDITION.
REPLACE LATCHSET WITH LATCHSET AS SCHEDULED IN PROJECT MANUAL. PAINT FRAME TO
MATCH WALL COLOR. (902)
SCALE: 1 1/2" = 1'-0"
B7
FLOOR PIPE PENETRATION INFILL
D D
7 9 10 11 13 14 15
U
EA EB EC ED
E8
E9
E10
E19
E12
E13
E14
E15
E16
E17
E18
V
W
X
Y
Z
AA
BB
CC
R1
R1
R6
R6 R6
R3
R4
R3R4
R2
R2R2
R2
R2
R2
R1
R1
R1R1
R1
R6
R16
R6
R8 R6
PHASE
LIMIT LINE
R1
R2
R6
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .