Attachment 05 - Drawings Part I.pdf

PDF 22 MB Posted

Attached to
Z1DA--590-802 | Construct SCI Reno/Addition | Hampton, VA | Federal contract opportunity
Solicitation number
36C77625B0046
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--590-802 | Construct SCI Reno/Addition | Hampton, VA |, newest first.
File Type Posted
Technical Questions Answered.docx DOCX document
VHA ICRA-1.2 Oct 1 2024.pdf PDF
VAAR 852.219-75.docx DOCX document
Amendment 0002.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
Specs - Volume I 8-27-25.pdf PDF
Amendment 0001.pdf PDF
Attachment 09 - Drawings Part V.pdf PDF
Attachment 08 - Drawings Part IV.pdf PDF
Attachment 12 - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
Attachment 07 - Drawings Part III.pdf PDF
Attachment 02 - Specs Volume I.pdf PDF
Attachment 11 - Wage determination.pdf PDF
Attachment 10 - VA Notice of Limitations on Subcontracting.docx DOCX document
Attachment 06 - Drawings Part II.pdf PDF
Attachment 03 - Specs Volume II.pdf PDF
Attachment 04 - Specs Volume III.pdf PDF
Attachment 01 - Statement of Work.pdf PDF
36C77625B0046.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N N.T.S.Scale:

Property Map

INDEX OF DRAWINGS

CONTRACTOR'S MATERIAL

STAGING / LAYDOWN AREA

& PARKING

SCI RENOVATION

AND RESIDENCE ADDITION

HAMPTON, VIRGINIA

590-802

137C

2023-05-04 9541 Belfort Road, Croghan, NY 13327

(T) 315.834.2356 (F) 315.346.6672 www.adkops.com

5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764

(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

CONSULTANTS

Project Director

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

100% CONSTRUCTION

DOCUMENTS

ENGINEER OF RECORD

M-R PROJECT NO: 0500-0016

COVER SHEET & DRAWING LIST

GI001

ARFTH

Hampton, Virginia

CONTRACTOR

PHASE 2 ENTRANCE

MAINTAIN EGRESS.

SEE PHASING PLAN.

CRANE

LIFT

AREA

AREA OF WORK

REMOVE, STORE & REINSTALL

SMOKING SHELTER.

PROTECT SLAB TO REMAIN.

ENTRANCE TO REMAIN OPEN

CONTRACTOR

PHASE 1 ENTRANCE

STAGING / LAYDOWN

CONTRACTOR

PHASE 1 ENTRANCE

STAGING / LAYDOWN

ACCESS

ACCESS

CONTRACTOR

TRAILER

AREA

X

X

X

X

X

XX

XXX

X

X

X

X

X

X

X

X

X X

SALVAGE YARD

STORM WATER

POND

9 9

11 124

PARKING

STALLS

SCI RENOVATION

AND RESIDENCE ADDITION

HAMPTON, VIRGINIA

590-802

137C

2023-05-04 9541 Belfort Road, Croghan, NY 13327

(T) 315.834.2356 (F) 315.346.6672 www.adkops.com

5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764

(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

CONSULTANTS

Project Director

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

100% CONSTRUCTION

DOCUMENTS

ENGINEER OF RECORD

M-R PROJECT NO: 0500-0016

CONSTRUCTION & PRE-CONSTRUTION

NOTES AND INFORMATION

GI002

ARFTH

PROJECT CONSULTANTS

Architecture:

QPK DESIGN

450 SOUTH SALINA STREET, SUITE 500

PO BOX 29

SYRACUSE, NY 13201

315-472-7806

Civil Engineering:

MSA, P.C.

5032 ROUSE DRIVE, SUITE 100

VIRGINIA BEACH, VA 23462

757-490-9264

Environmental Services:

ADK OPS ENVIRONMENTAL CONSULTING

9541 BELFORT ROAD

CROGHAN, NY 13327

315-834-2356

CONTRACTORS SHALL USE THE ONLINE DOCUMENT EXCHANGE SYSTEM “SUBMITTAL EXCHANGE”

FOR ALL SUBMITTALS REQUIRED BY SPECIFICATIONS FOR THIS PROJECT.

CONTRACTOR IS RESPONSIBLE TO VIEW TUTORIALS AND LEARN SYSTEM.

CONTRACTOR IS RESPONSIBLE TO INCUR ALL COSTS REQUIRED TO ALLOW FULL ACCESS AND

USER CAPABILITY FOR ALL CONTRACTORS, THE AE TEAM, AND THE VA.

WEBSITE FOR PROGRAM IS:

HTTP://ORACLE.COM/INDUSTRIES/CONSTRUCTION-ENGINEERING/SUBMITTAL-EXCHANGE/

WEBSITE REPRESNTATIVE IS: ORACLE SALES, PHONE 1-800-633-0738

DN

R A

M P

R A

M P

R A

M P

UP

D

D D

D D

DEDUCT

ALTERNATE 1

O

P

WCWA.2

Q

W1

W2

R

W3

S

W4

T

W5

U

EA

W14

WC.2

EB EC ED

E8

E9

E1

E2

E3

E4

E5

E6

E7.5

E7

N

P

Q

R

S

T

U

EA EA.6 EB EC ED

E8

E9

E10

E11

E12

E13

E14

E15

E1

E2

E3

E4

E5

E6

E7.5

E7

V

W

X

14 15

P

Q

E19

E16

E17

E18

Y

Z

AA

BB

CC

WBWA

W5.9

W6

W9

W8

W7

W10

O

N

R E

F

REF.

W W

D D

PATIENT RM 1 BED

C144

PATIENT TLT

C144A

PATIENT TLT

C132A

PATIENT RM 1 BED

C132

PATIENT RM 1 BED

C42

PATIENT TLT

C42A

PATIENT TLT

C43A

PATIENT RM 1 BED

C43

PATIENT RM 1 BED

C45

TLT

C148 C146

CLERK

C151B

RESP. OFFICE

C140

PATIENT RM 1 BED

C118

PATIENT TLT

C118A

PATIENT RM 1 BED

C116

PATIENT TLT

C116A

CORRIDOR

C3

CORRIDOR

C2

PATIENT TLT

C115A

PATIENT RM 1 BED

C115

PATIENT RM 1 BED

C117PATIENT TLT

C117A

PATIENT TLT

C102A

PATIENT RM

C102

NOURISHMENT KITCHEN

C100

LAUNDRY

C155 PATIENT TLT

C153A

PATIENT RM 1 BED

C153

SOILED UTILITY

C142

PATIENT RM 1 BED

C159

PATIENT TLT

C159A

MED SUPLY 2X A

C143

PATIENT RM 1 BED

C163

EQUIPMENT STORAGE

C113

DATA

C135

MEDITATION

C130

NURSE SATELITE

C105

OXYGEN

C129

TLT

C120

SOILED LINEN

C131

NOURISHMENT KITCHEN

C126

TOILET

C105A

EXAM ROOM

C105

STUDENT OFICE

C108

TOILET

C107

HAC

C106

CONSULT

C103

CLEAN STORAGE

C101

CLEAN LINEN

C104

MED ROOM

C109

CORRIDOR

C1

CORRIDOR

C10

CORRIDOR

C11

PATIENT TLT

C123A

PATIENT RM 1 BED

C123

PATIENT RM 1 BED

C125

PATIENT TLT

C125A

PATIENT RM 1 BED

C124

PATIENT TLT

C124A

PATIENT RM 1 BED

C137

PATIENT RM 1 BED

C145

DATA

C141

PATIENT TLT

C137A

PATIENT TLT

C145A

PATIENT TLT

C163A

CORRIDOR

C10

CORRIDOR

C7

CORRIDOR

C2

ELECTRICAL

C134

CORRIDOR

C1

ELEC

C137

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

1C15

STAFF SHOWER

1C209

PATIENT TLT

1C221A

PATIENT TLT

1C222A

PATIENT TLT

1C224A

PATIENT TLT

1C225A

PATIENT TLT

1C228A

PATIENT RM 19 (1) BED

1C221

PATIENT RM 20 (1) BED

1C222

PATIENT RM 21 (1) BED

1C224

PATIENT RM 21 (1) BED

1C230

PATIENT TLT

1C230A

PATIENT RM 22 (1) BED

1C225

PATIENT TLT

1C229A

PATIENT RM 24 (1) BED

1C229

PATIENT RM 23 (1) BED

1C228

CLN LINEN

1C226

SPD

1C227

STAFF SHOWER

1C210

PATIENT TLT

1C218A

PATIENT TLT

C41A

PATIENT RM

C41

CORRIDOR

PATIENT RM

C39

PATIENT RM

E193

PATIENT RM

E195

PATIENT TLT

E196

PATIENT TLT

C39A

PATIENT TLT

E194

PATIENT RM

E189

PATIENT RM

E191

PATIENT TLT

E190

PATIENT TLT

PATIENT TLT

E192

PATIENT TLT

DAY RM UNIT C

C02

EXAM

C01

STAIR #2

1C219

CLST

222B

CLST

221B

NURSE SATALLITE

1C15A

CLST

230B

CLST

225B

CLST

224B

CLST

228B

CLST

229B

MEDS

C151A

NURSE SAT

C151

OFFICE

C184

DIET OFFICE

C182

NM

C180

NM

C179

NM

C177

PHARM

C173

CORRIDOR

C5

PATIENT RM 1 BED

C47

PATIENT RM 1 BED

C154

PATIENT TLT

C154A

PATIENT RM 1 BED

C152

PATIENT TLT

C152A

CORRIDOR

C4

PATIENT TLT

C47A

PATIENT TLT

C45A

PVA OFFICE

C150

STORAGE

CORRIDOR

C8

PATIENT RM 1 BED

C159

PATIENT TLT

C159A

PATIENT RM 1 BED

C163

CATV

C183A

STAFF LOCKERS

C181A

CORRIDOR

C6

INTERNET CAFE

C178

STAFF ROOM

C181

OFFICE

C175

PSYCH OFFICE

C174

NM

C171

CLEAN SUPPLY

C172

MED ROOM

C170

SOILED LINEN

C169

HAC

C167

ELEC

C158

NM

C160

DAY ROOM

C162

SOILED UTILITY

C183

CLEAN LINEN

C176

CORRIDOR

C7

CORRIDOR

C9

CORRIDOR

C5

CORRIDOR

C1

CORRIDOR

1C14

STAFF SHOWER

1C209

PATIENT TLT

1C215A

PATIENT TLT

1C2171

PATIENT TLT

1C214A

PATIENT TLT

1C213A

PATIENT RM 18 (1) BED

1C218

PATIENT RM 17 (1) BED

1C217

PATIENT RM 16 (1) BED

1C215

PATIENT RM 15 (1) BED

1C214

PATIENT RM 14 (1) BED

1C213

STAFF SHOWER

1C210

SCI CHIEF OFFICE

A147

DAY ROOM

A156

CLO

D100A

TOILET

D100B

DIETICIAN

D100C

ELECTRICAL

D100D

WARMING KITCHEN

D100E

DINING

D100

ELEC

1C216

CORRIDOR

1C14

DENTAL CLINIC

A143

CORRIDOR

CA25

CORRIDOR

CA24

CORRIDOR

CD1

CLST

218B

CLST

217B

CLST

215B

CLST

215B

CLST

213B

STAIR #2

1C219

COURTYARD D

COURTYARD C

COURTYARD B

COURTYARD A

7 7a 8 9 9a 10 11 12 13

SCI RENOVATION

AND RESIDENCE ADDITION

HAMPTON, VIRGINIA

590-802

137C

2023-05-04 9541 Belfort Road, Croghan, NY 13327

(T) 315.834.2356 (F) 315.346.6672 www.adkops.com

5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764

(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE

PLAN

NORTH

ACTUAL

NORTH

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

CONSULTANTS

Project Director

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

100% CONSTRUCTION

DOCUMENTS

ENGINEER OF RECORD

M-R PROJECT NO: 0500-0016

DEDUCT ALTERNATES

GI003

ARFTH

N

O

P

Q

R

S

T

U

EA EA.6 EB EC ED

E8

E9

E1

E2

E3

E4

E5

E6

E7.5

E7

MATCH LINEMATCH LINE

P

Q

N

O

M

PHASE

LIMIT LINE

CORRRIDOR

C6

EQUIPMENT STORAGE

C131

UNOCCUPIED

C133

COMPUTER

C130

CLOSET

C9a

CORRIDOR

C7

CORRIDOR

C9

LAUNDRY

C138

DATA

C132

UNOCCUPIED

C134

SOILED UTILITY

C125

UNOCCUPIED

C136

UNOCCUPIED

C137

TLT.

C139

PATIENT TLT

C120a

C117

CLERK w/ MED.

C118b

PATIENT RM 4 BED

C120

PATIENT TLT

C115a

CORRIDOR

C5

PATIENT TLT

C122a

MED. SURG. 2X A DAY

C126

PATIENT RM 4 BED

C129

PATIENT RM 2 BED

C127

LINEN

C123

HAC

C124

PATIENT RM 4 BED

C122

PHARM.

C119

MEDICATION

C118a

CORRIDOR

STAFF SHOWER

E130

PATIENT TLT

E132

PATIENT TLT

E122

PATIENT TLT

E126

PATIENT TLT

E120

PATIENT TLT

E124

PATIENT RM 18 (1) BED

E127

PATIENT RM 17 (1) BED

E125

PATIENT RM 16 (1) BED

E121

PATIENT RM 15 (1) BED

E119

PATIENT RM 14 (1) BED

E123

STAFF SHOWER

E129

PATIENT TLT

E128

SCI CHIEF OFFICE

E117

CLO

E101

TOILET

E102

PVA

E103

ELECTRICAL

E104

WARMING KITCHEN

E105

DINING

E100

ELEC

E118

CORRIDOR

C4

NURSES SAT.

C118

CORRIDOR

C8

CORRIDOR

CORRIDOR

C5

EQUIPMENT STORAGE

C128

CORRIDOR

C7

DENTAL CLINIC

E112

NUTRITION

14 15 7 7a 8 9 9a 10 11 12 13

HAZARDOUS MATERIALS ABATEMENT

ABATEMENT PLAN

1ST FLOOR NORTH - PHASE 1

HA111.N

CMKMAK

KEYPLAN

SCI RENOVATION

AND RESIDENCE ADDITION

HAMPTON, VIRGINIA

590-802

137C

MATCH LINE

9541 Belfort Road, Croghan, NY 13327

(T) 315.834.2356 (F) 315.346.6672 www.adkops.com

5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764

(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE

PLAN

NORTH

ACTUAL

NORTH

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

GENERAL NOTES:

1. CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE, STATE AND FEDERAL RULES, REGULATIONS, GUIDELINES, VARIANCES, AND THE CONTRACT DOCUMENTS

2. THE LOCATION OF ANY SITE STORAGE OF MATERIAL, EQUIPMENT, AND WASTE TRAILER/DUMPSTER SHALL BE COORDINATED WITH AND

APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.

3. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA(S) IN A CLEAN AND SAFE CONDITION. CONTRACTOR SHALL ENSURE THAT

UNCERTIFIED PERSONNEL OR UNAUTHORIZED VISITORS DO NOT ENTER ACTIVE WORK AREAS AT ANY TIME.

4. CONTRACTOR SHALL PROTECT ALL FINISHES SCHEDULED TO REMAIN (I.E. FLOORS, WALLS, ETC.) CONTRACTOR SHALL BE RESPONSIBLE FOR

ALL DAMAGE TO FINISHES SCHEDULED TO REMAIN.

5. CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION TO KEEP THE WORK AREAS IN A SECURE CONDITION AT ALL TIMES DURING THE

PERFORMANCE OF THE CONTRACT WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGED CAUSED TO ANY AREAS OF THE

BUILDING AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR SECURITY.

6. ALL HAZARDOUS WASTE/CONTAMINATED MATERIALS REMOVAL, CLEANING, AND PACKAGING SHALL BE PERFORMED BY PERSONS TRAINED IN

ACCORDANCE WITH 29CFR 1910.120 (OSHA) UNDER THE DIRERCT SUPERVISION OF AN OSHA QUALIFIED "COMPETENT PERSON". ALL

PERSONS SHALL BE TRAINED AND CERTIFIED FOR ASBESTOS IN ACCORDANCE WITH NYS ICR 56 AND HAZARDOUS MATERIALS ABATEMENT

AND REMEDIATION.

7. WORKERS SHALL BE REQUIRED TO FOLLOW ALL APPROVED HEALTH AND SAFETY PROCEDURES AND FOLLOW THE ACCEPTED PERSONAL

DECONTAMINATION SEQUENCE AS DESCRIBED IN THE CONTRACTOR'S HEALTH AND SAFETY PLAN (HASP) UPON EXIT FORM WORK AREAS.

8. CONTRACTING OFFICER'S REPRESENTATIVE SHALL SIGN ALL HAZARDOUS WASTE AND NON-HAZARDOUS WASTE MANIFESTS, SHIPPING

PAPERS, BILLS OF LADING AND OTHER WASTE SHIPMENT RECORDS. CONTRACTOR SHALL PROVIDE ALL COPIES WITH ALL SECTIONS

COMPLETELY FILLED IN AND READY TO BE SIGNED A MINIMUM OF 72 HOURS PRIOR TO SCHEDULED REMOVAL FROM THE SITE.

9. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF ALL ITEMS INCLUDING: MOBILIZATION, TEMPORARY FACILITIES, UTILITY

CONNECTIONS, DEMOLITION, ABATEMENT, REMEDIATION, CLEANUP, SECURITY, STAGING, AND DISPOSAL.

10. CONTRACTOR SHALL PROVIDE ALL SCAFFOLDING, LIFTS, ETC. REQUIRED TO COMPLETE SCHEDULED REMOVALS.

11. ANY REMOVED COMPONENTS TO BE DISPOSED OF AS NON-ACM OR RECYCLED SHALL BE INSPECTED AND APPROVED FOR CLEANLINESS BY

THE CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO DISPOSAL OR RECYCLING.

12. ELECTRICAL POWER AND WATER NECESSARY TO PERFORM THE ABATEMENT WILL BE PROVIDED BY THE FACILITY AT A CONNECTION POINT

IDENTIFIED BY THE FACILITY. CONTRACTOR IS RESPONSIBLE FOR ALL CONNECTIONS AND DISCONNECTIONS.

13. CONTRACTOR SHALL PROVIDE ALL TEMPORARY RESTROOM FACILITIES REQUIRED BY WORKERS.

14. COORDINATE ALL HVAC, PLUMBING, AND ELECTRICAL, MECHANICAL, GAS AND OTHER SHUT DOWNS WITH THE OWNER PRIOR TO THE

COMMENCEMENT OF ABATEMENT WORK.

15. FIRE SAFETY SYSTEMS, ALARM AND PROTECTION SYSTEMS (SENSORS, SPRINKLERS, EMERGENCY LIGHTS AND ALARMS, CAMERAS, ETC..)

MUST BE MAINTAINED IN AN OPERATING CONDITION DURING THE WORK UNLESS SPECIFIC RELIEF IS GRANTED BY THE FACILITY.

16. DO NOT COMPROMISE STRUCTURAL INTEGRITY OF THE BUILDING.

17. ALL EMERGENCY EXISTS TO THE BUILDING AND WORK AREAS MUST BE MAINTAINED THROUGHOUT THE WORK. PROVIDE FIRE EVACUATION

PLAN FOR WORK AREAS - POST AT EACH DECONTAMINATION UNIT. PROVIDE ONE 2-A OR 40-B:C FIRE EXTINGUISHER AT EACH WORK AREA.

18. LEVELS ABOVE AND BENEATH ABATEMENT AREAS ARE FINISHED AND OCCUPIED SPACES, ABATEMENT CONTRACTOR SHALL TAKE ALL

NECESSARY MEASURES TO PROTECT THESE AREAS FROM CONTAMINATION OR DAMAGE INCLUDING SEALING ANY PENETRATIONS WITH

WATER PROOF SEAL PRIOR TO ABATEMENT.

19. THE FIGURES SHOWN ON THE DRAWINGS ARE INCLUDED HEREIN FOR INFORMATION PURPOSES ONLY. THE ABATEMENT DESIGNER IS NOT

STATING THAT THESE MEASUREMENTS AND QUANTITIES ARE COMPLETELY ACCURATE, BUT ARE BASED UPON THE AVAILABLE DATA.

20. ALL WASTE MUST BE REMOVED FROM THE SITE WITHIN 10 DAYS OF JOB COMPLETION. ALL WASTE MANIFESTS SHALL BE SIGNED BY THE

DISPOSAL FACILITY AND RETURNED TO THE OWNER WITHIN 30 DAYS. THE DISPOSAL FACILITY USED SHALL BE THE SAME DISPOSAL FACILITY

AS LISTED IN PROJECT NOTIFICATION. ANY DEVIATIONS FROM THE NOTIFICATION INFORMATION SHALL REQUIRE APPROVAL.

21. IN LIEU OF A SINGLE BACKUP UNIT, A FULLY REDUNDANT BANK OF NEGATIVE AIR MACHINES SHALL BE INSTALLED IN ANY LARGE ABATEMENT

WORK AREA.

22. CONTRACTOR SHALL HAVE STAFF AVAILABLE TO RESPOND TO THE SITE WITHIN ONE (1) HOUR SHOULD THE NEED ARISE WHILE WORK AREAS

ARE UNDER CONTAINMENT.

23. A DIGITAL MANOMETER SHALL BE UTILIZED ON ALL LARGE OR SMALL SIZED ABATEMENT WORK AREAS, MANOMETER LOCATION TO BE

COORDINATED WITH THE COR.

ASBESTOS ABATEMENT NOTES:

1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.

2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE

PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.

3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.

4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS

ARE ISOLATED AS REQUIRED.

AA-1 REMOVE AND DISPOSE OF 16,000 SF OF ASBESTOS-CONTAINING FLOOR TILE, FLOOR TILE, DOOR THRESHOLDS, DOOR

THRESHOLD MASTIC AND RELATED MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.

AA-2 REMOVE AND DISPOSE OF 3,000 SF OF ASBESTOS-CONTAINING FLOOR / WALL MASTIC AND RELATED MATERIALS FROM THE

AREAS INDICATED AND AS DESCRIBED ABOVE. THIS WILL REQUIRE THE ABATEMENT DEMOLITION OF CERAMIC TILE, PLASTIC

WALL VAPOR BARRIERS AND WALL STUDS.

AA-3 REMOVE AND DISPOSE OF FIVE (5) SF OF ASBESTOS-CONTAINING ROOF DRAIN DUCT INSULATION MASTIC AND RELATED

MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.

AA-4 REMOVE AND DISPOSE OF ASBESTOS-CONTAINING BLACK WINDOW SEALANT ON EIGHTY-EIGHT (88) WINDOWS, THIS WILL

REQUIRE ABATEMENT REMOVAL OF THE EXTERIOR WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS INDICATED

AND AS DESCRIBED ABOVE.

AA-5 REMOVE AND DISPOSE OF ASSUMED ASBESTOS-CONTAINING BLACK INTERIOR WINDOW SEALANT, FROM ELEVEN (11)

LOCATIONS, THIS WILL REQUIRE ABATEMENT REMOVAL OF WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS

INDICATED AND AS DESCRIBED ABOVE.

AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS

INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS.

LEAD AWARENESS NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:

INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.

2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR

UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE

PERMISSIBLE EXPOSURE LIMIT.

KEYNOTES:

1 SPECIAL COORDINATION REQUIRED TO ABATE FLOOR TILE/MASTIC BENEATH EQUIPMENT RACK

100% DESIGN SUBMISSION

NOT FOR CONSTRUCTION

M-R PROJECT NO: 0500-0016

2023-05-04

14 15 7 7a 8 9 9a 10 11 12 13

U

E8

E9

E10

E11

E12

E13

E14

E15

V

W

X

MATCH LINEMATCH LINE

PHASE

LIMIT LINE

PHASE

LIMIT LINE

PHASE

LIMIT LINE

PHASE

LIMIT LINE

COURTYARD D

E19

E16

E17

E18

Y

Z

AA

BB

CC

STAFF

C116

UNOCCUPIED

C137

TLT.

C139

PATIENT RM

C115

PATIENT TLT

C120a

C117

CLERK w/ MED.

C118b

PATIENT RM 4 BED

C120

PATIENT TLT

C115a

STAFF SHOWER

E130

PATIENT TLT

E132

PATIENT RM 19 (1) BED

E131

CORRIDOR

C5

CORRIDOR

C7

CORRIDOR

CORRIDOR CORRIDOR

CORRIDOR

CORRIDOR

PATIENT TLT

E134

PATIENT TLT

E138

PATIENT TLT

E140

PATIENT TLT

E144

PATIENT RM 19 (1) BED

E131

PATIENT RM 20 (1) BED

E133

PATIENT RM 21 (1) BED

E137

PATIENT RM 21 (1) BED

E135

PATIENT TLT

E136

PATIENT RM 22 (1) BED

E139

PATIENT TLT

E146

PATIENT RM 24 (1) BED

E145

PATIENT RM 23 (1) BED

E143

CLN LINEN

E141

SPD

E142

PATIENT TLT

C41A

PATIENT RM

C41

CORRIDOR

PATIENT RM

C39

PATIENT RM

E193

PATIENT RM

E195

PATIENT TLT

E196

PATIENT TLT

C39A

PATIENT TLT

E194

PATIENT RM

E189

PATIENT RM

E191

PATIENT TLT

E190

PATIENT TLT

PATIENT TLT

E192

PATIENT TLT DAY RM UNIT C EXAM

COURTYARD D

CORRIDOR

C2

PATIENT RM 2 BED

C108

PATIENT RM 2 BED

C109

PATIENT TLT

C101a

PATIENT TLT

C108a

SOILED UTILITY

C110

WOUND CARE

C102

NURSE MANG.

C104

PATIENT RM 4 BED

C112

UNOCCUPIED

C101

CORRIDOR

C3

SOILED LINEN

C114

PATIENT RM 2 BED

C107

PATIENT RM 2 BED

C106

PATIENT TLT

C106a

CORRIDOR

C2

CORRIDOR

C11

CORRIDOR

C1

CORRIDOR

C10

STUDENT OFFICE

C103c

TOILET

C103B

MED ROOM

C103d

NM

C152

NURSE SATELITE

C105

OXYGEN

C105a

SOILED LINEN

C146

CHARGING ROOM

C111

TLT

C147

BOWEL TRAINING

C113

DATA

C145

ELECTRICAL

C111a

UNOCCUPIED

C143

HAC

C148

UNOCCUPIED

C149

UNDER CONSTRUCTION

C151

UNDER CONSTRUCTION

C150

UNDER CONSTRUCTION

C150a

SHARED PSYCH OFF

C153

TOILET

C103a

UNDER CONSTRUCT

C100a

UNDER CONSTRUCTION

C100

UNDER CONSTRUCTION

C155

UNDER CONSTRUCTION

C154

CORRIDOR

C10

CL. STERILE

C142

NUTRITION

HAZARDOUS MATERIALS ABATEMENT

ABATEMENT PLAN

1ST FLOOR SOUTH - PHASE 1

HA111.S

CMKMAK

KEYPLAN

SCI RENOVATION

AND RESIDENCE ADDITION

HAMPTON, VIRGINIA

590-802

137C

MATCH LINE

9541 Belfort Road, Croghan, NY 13327

(T) 315.834.2356 (F) 315.346.6672 www.adkops.com

5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764

(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE

PLAN

NORTH

ACTUAL

NORTH

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

GENERAL NOTES:

1. ALL GENERAL NOTES FROM DRAWING HA111.N SHALL APPLY TO THIS WORK.

LEAD AWARENESS NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:

INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.

2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR

UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE

PERMISSIBLE EXPOSURE LIMIT.

ASBESTOS ABATEMENT NOTES:

1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.

2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE

PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.

3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.

4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS

ARE ISOLATED AS REQUIRED.

AA-1 REMOVE AND DISPOSE OF 16,000 SF OF ASBESTOS-CONTAINING FLOOR TILE, FLOOR TILE, DOOR THRESHOLDS, DOOR

THRESHOLD MASTIC AND RELATED MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.

AA-2 REMOVE AND DISPOSE OF 3,000 SF OF ASBESTOS-CONTAINING FLOOR / WALL MASTIC AND RELATED MATERIALS FROM THE

AREAS INDICATED AND AS DESCRIBED ABOVE. THIS WILL REQUIRE THE ABATEMENT DEMOLITION OF CERAMIC TILE, PLASTIC

WALL VAPOR BARRIERS AND WALL STUDS.

AA-3 REMOVE AND DISPOSE OF FIVE (5) SF OF ASBESTOS-CONTAINING ROOF DRAIN DUCT INSULATION MASTIC AND RELATED

MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.

AA-4 REMOVE AND DISPOSE OF ASBESTOS-CONTAINING BLACK WINDOW SEALANT ON EIGHTY-EIGHT (88) WINDOWS, THIS WILL

REQUIRE ABATEMENT REMOVAL OF THE EXTERIOR WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS INDICATED

AND AS DESCRIBED ABOVE.

AA-5 REMOVE AND DISPOSE OF ASSUMED ASBESTOS-CONTAINING BLACK INTERIOR WINDOW SEALANT, FROM ELEVEN (11)

LOCATIONS, THIS WILL REQUIRE ABATEMENT REMOVAL OF WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS

INDICATED AND AS DESCRIBED ABOVE.

AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS

INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS.

100% DESIGN SUBMISSION

NOT FOR CONSTRUCTION

P

Q

R

S

T

U

EA EA.6 EB EC ED

E8

E9

E1

E2

E3

E4

E5

E6

E7.5

E7

MATCH LINEMATCH LINE

P

Q

N

O

M

CORRIDOR

STAFF SHOWER

E130

PATIENT TLT

E132

PATIENT TLT

E122

PATIENT TLT

E126

PATIENT TLT

E120

PATIENT TLT

E124

PATIENT RM 18 (1) BED

E127

PATIENT RM 17 (1) BED

E125

PATIENT RM 16 (1) BED

E121

PATIENT RM 15 (1) BED

E119

PATIENT RM 14 (1) BED

E123

STAFF SHOWER

E129

PATIENT TLT

E128

SCI CHIEF OFFICE

E117

CLO

E101

TOILET

E102

PVA

E103

ELECTRICAL

E104

WARMING KITCHEN

E105

DINING

E100

ELEC

E118

PATIENT RM 1 BED

C159

PATIENT TLT

C159A

PATIENT RM 1 BED

C163

CATV

C183A

STAFF LOCKERS

C181A

CORRIDOR

C6

INTERNET CAFE

C178

STAFF LOUNGE

C181

OFFICE

C175

PSYCH OFFICE

C174

NM

C171

CLEAN SUPPLY

C172

MED ROOM

C170

HAC

C169

SOILED LINEN

C167

CLOSET

C158

NM

C160

DAY ROOM

C162

SOILED UTILITY

C183

CLEAN LINEN

C176

CORRIDOR

C7

CORRIDOR

C9

PATIENT TLT

C163A

CORRIDOR

CORRIDOR

C7

PATIENT TLT

C120a

C117

CLERK w/ MED.

C118b

PATIENT RM 4 BED

C120

PATIENT TLT

C115a

CORRIDOR

C5

PATIENT TLT

C122a

MED. SURG. 2X A DAY

C126

PATIENT RM 4 BED

C129

PATIENT RM 2 BED

C127

LINEN

C123

HAC

C124

PATIENT RM 4 BED

C122

PHARM.

C119

MEDICATION

C118a

CORRIDOR

C4

NURSES SAT.

C118

CORRIDOR

C8

CORRIDOR

C5

DENTAL CLINIC

E112

PHASE

LIMIT LINE

PHASE

LIMIT LINE

NUTRITION

14 15 7 7a 8 9 9a 10 11 12 13

HAZARDOUS MATERIALS ABATEMENT

ABATEMENT PLAN

1ST FLOOR NORTH - PHASE 2

HA112.N

CMKMAK

KEYPLAN

SCI RENOVATION

AND RESIDENCE ADDITION

HAMPTON, VIRGINIA

590-802

137C

MATCH LINE

9541 Belfort Road, Croghan, NY 13327

(T) 315.834.2356 (F) 315.346.6672 www.adkops.com

5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764

(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE

PLAN

NORTH

ACTUAL

NORTH

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

LEAD AWARENESS NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:

INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.

2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR

UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE

PERMISSIBLE EXPOSURE LIMIT.

ASBESTOS ABATEMENT NOTES:

1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.

2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE

PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.

3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.

4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS

ARE ISOLATED AS REQUIRED.

AA-1 REMOVE AND DISPOSE OF 16,000 SF OF ASBESTOS-CONTAINING FLOOR TILE, FLOOR TILE, DOOR THRESHOLDS, DOOR

THRESHOLD MASTIC AND RELATED MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.

AA-2 REMOVE AND DISPOSE OF 3,000 SF OF ASBESTOS-CONTAINING FLOOR / WALL MASTIC AND RELATED MATERIALS FROM THE

AREAS INDICATED AND AS DESCRIBED ABOVE. THIS WILL REQUIRE THE ABATEMENT DEMOLITION OF CERAMIC TILE, PLASTIC

WALL VAPOR BARRIERS AND WALL STUDS.

AA-3 REMOVE AND DISPOSE OF FIVE (5) SF OF ASBESTOS-CONTAINING ROOF DRAIN DUCT INSULATION MASTIC AND RELATED

MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.

AA-4 REMOVE AND DISPOSE OF ASBESTOS-CONTAINING BLACK WINDOW SEALANT ON EIGHTY-EIGHT (88) WINDOWS, THIS WILL

REQUIRE ABATEMENT REMOVAL OF THE EXTERIOR WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS INDICATED

AND AS DESCRIBED ABOVE.

AA-5 REMOVE AND DISPOSE OF ASSUMED ASBESTOS-CONTAINING BLACK INTERIOR WINDOW SEALANT, FROM ELEVEN (11)

LOCATIONS, THIS WILL REQUIRE ABATEMENT REMOVAL OF WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS

INDICATED AND AS DESCRIBED ABOVE.

AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS

INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS.

GENERAL NOTES:

1. ALL GENERAL NOTES FROM DRAWING HA111.N SHALL APPLY TO THIS WORK.

100% DESIGN SUBMISSION

NOT FOR CONSTRUCTION

U

E8

E9

E10

E11

E12

E13

E14

E15

V

W

X

MATCH LINEMATCH LINE

E19

E16

E17

E18

Y

Z

AA

BB

CC

STAFF SHOWER

E130

PATIENT TLT

E132

PATIENT RM 1 BED

C159

PATIENT TLT

C159A

PATIENT RM 1 BED

C163

PATIENT TLT

C163A

CORRIDOR

C7

PATIENT TLT

C120a

C117

CLERK w/ MED.

C118b

PATIENT RM 4 BED

C120

PATIENT TLT

C115a

CORRIDOR

C5

CORRIDOR

C2

PATIENT RM 2 BED

340 SF

PATIENT RM 2 BED

348 SF

PATIENT TLT

131 SF

PATIENT TLT

131 SF

SOILED UTILITY

112 SF

WOUND CARE

335 SF

NM

119 SF

PATIENT RM 4 BED

618 SF

UNOCCUPIED

224 SF

CORRIDOR

C3

PATIENT RM

205 SF

OFFICE

57 SF

PATIENT RM 2 BED

350 SF

PATIENT RM 2 BED

329 SF

PATIENT TLT

132 SF

CORRIDOR

C2

CORRIDOR

CORRIDOR

CORRIDOR

PATIENT TLT

E134

PATIENT TLT

E138

PATIENT TLT

E140

PATIENT TLT

E144

PATIENT RM 19 (1) BED

E131

PATIENT RM 20 (1) BED

E133

PATIENT RM 21 (1) BED

E137

PATIENT RM 21 (1) BED

E135

PATIENT TLT

E136

PATIENT RM 22 (1) BED

E139

PATIENT TLT

E146

PATIENT RM 24 (1) BED

E145

PATIENT RM 23 (1) BED

E143

CLN LINEN

E141

SPD

E142

PATIENT TLT

C41A

PATIENT RM

C41

CORRIDOR

PATIENT RM

C39

PATIENT RM

E193

PATIENT RM

E195

PATIENT TLT

E196

PATIENT TLT

C39A

PATIENT TLT

E194

PATIENT RM

E189

PATIENT RM

E191

PATIENT TLT

E190

PATIENT TLT

E192

SOILED UTILITY

C142

MED SUPLY 2X A

C143

EQUIPMENT STORAGE

C138

DATA

C135

MEDITATION

C130

NURSE SATELITE

C110

OXYGEN

C129

TLT

C120

SOILED LINEN

C131

NOURISHMENT KITCHEN

C126

TOILET

C105A

EXAM ROOM

C105

STUDENT OFICE

C108

TOILET

C107

HAC

C106

CONSULT

C103

CLEAN STORAGE

C101

CLEAN LINEN

C104

MED ROOM

C109

CORRIDOR

C1

CORRIDOR

C10

CORRIDOR

C11

PATIENT TLT

C123A

PATIENT RM 1 BED

C123

PATIENT RM 1 BED

C125

PATIENT TLT

C125A

PATIENT RM 1 BED

C124

PATIENT TLT

C124A

PATIENT RM 1 BED

C137

PATIENT RM 1 BED

C145

DATA

C141

PATIENT TLT

C137A

PATIENT TLT

C145A

CORRIDOR

C10

ELECTRICAL

C136

ELEC

C139

PHASE

LIMIT LINE

PHASE

LIMIT LINE

NUTRITION

HAZARDOUS MATERIALS ABATEMENT

ABATEMENT PLAN

1ST FLOOR SOUTH - PHASE 2

HA112.S

CMKMAK

KEYPLAN

SCI RENOVATION

AND RESIDENCE ADDITION

HAMPTON, VIRGINIA

590-802

137C

MATCH LINE

9541 Belfort Road, Croghan, NY 13327

(T) 315.834.2356 (F) 315.346.6672 www.adkops.com

5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764

(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE

PLAN

NORTH

ACTUAL

NORTH

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

LEAD AWARENESS NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:

INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.

2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR

UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE

PERMISSIBLE EXPOSURE LIMIT.

GENERAL NOTES:

1. ALL GENERAL NOTES FROM DRAWING HA111.N SHALL APPLY TO THIS WORK.

ASBESTOS ABATEMENT NOTES:

1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.

2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE

PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.

3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.

4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS

ARE ISOLATED AS REQUIRED.

AA-1 REMOVE AND DISPOSE OF 16,000 SF OF ASBESTOS-CONTAINING FLOOR TILE, FLOOR TILE, DOOR THRESHOLDS, DOOR

THRESHOLD MASTIC AND RELATED MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.

AA-2 REMOVE AND DISPOSE OF 3,000 SF OF ASBESTOS-CONTAINING FLOOR / WALL MASTIC AND RELATED MATERIALS FROM THE

AREAS INDICATED AND AS DESCRIBED ABOVE. THIS WILL REQUIRE THE ABATEMENT DEMOLITION OF CERAMIC TILE, PLASTIC

WALL VAPOR BARRIERS AND WALL STUDS.

AA-3 REMOVE AND DISPOSE OF FIVE (5) SF OF ASBESTOS-CONTAINING ROOF DRAIN DUCT INSULATION MASTIC AND RELATED

MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.

AA-4 REMOVE AND DISPOSE OF ASBESTOS-CONTAINING BLACK WINDOW SEALANT ON EIGHTY-EIGHT (88) WINDOWS, THIS WILL

REQUIRE ABATEMENT REMOVAL OF THE EXTERIOR WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS INDICATED

AND AS DESCRIBED ABOVE.

AA-5 REMOVE AND DISPOSE OF ASSUMED ASBESTOS-CONTAINING BLACK INTERIOR WINDOW SEALANT, FROM ELEVEN (11)

LOCATIONS, THIS WILL REQUIRE ABATEMENT REMOVAL OF WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS

INDICATED AND AS DESCRIBED ABOVE.

AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS

INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS.

100% DESIGN SUBMISSION

NOT FOR CONSTRUCTION

P

Q

R

S

T

U

EA EA.6 EB EC ED

E8

E9

E1

E2

E3

E4

E5

E6

E7.5

E7

MATCH LINEMATCH LINE

P

Q

N

O

M

PHASE

LIMIT LINE

CORRRIDOR

C6

EQUIPMENT STORAGE

C131

UNOCCUPIED

C133

COMPUTER

C130

CLOSET

C9a

CORRIDOR

C7

CORRIDOR

C9

LAUNDRY

C138

DATA

C132

UNOCCUPIED

C134

SOILED UTILITY

C125

UNOCCUPIED

C136

UNOCCUPIED

C137

TLT.

C139

PATIENT TLT

C120a

C117

CLERK w/ MED.

C118b

PATIENT RM 4 BED

C120

PATIENT TLT

C115a

CORRIDOR

C5

PATIENT TLT

C122a

MED. SURG. 2X A DAY

C126

PATIENT RM 4 BED

C129

PATIENT RM 2 BED

C127

LINEN

C123

HAC

C124

PATIENT RM 4 BED

C122

PHARM.

C119

MEDICATION

C118a

CORRIDOR

STAFF SHOWER

E130

PATIENT TLT

E132

PATIENT TLT

E122

PATIENT TLT

E126

PATIENT TLT

E120

PATIENT TLT

E124

PATIENT RM 18 (1) BED

E127

PATIENT RM 17 (1) BED

E125

PATIENT RM 16 (1) BED

E121

PATIENT RM 15 (1) BED

E119

PATIENT RM 14 (1) BED

E123

STAFF SHOWER

E129

PATIENT TLT

E128

SCI CHIEF OFFICE

E117

CLO

E101

TOILET

E102

PVA

E103

ELECTRICAL

E104

WARMING KITCHEN

E105

DINING

E100

ELEC

E118

CORRIDOR

C4

NURSES SAT.

C118

CORRIDOR

C8

CORRIDOR

CORRIDOR

C5

EQUIPMENT STORAGE

C128

CORRIDOR

C7

DENTAL CLINIC

E112

NUTRITION

14 15 7 7a 8 9 9a 10 11 12 13

HAZARDOUS MATERIALS ABATEMENT

DUCT ABATEMENT PLAN

1ST FLOOR NORTH - PHASE 1

HA113.N

CMKMAK

KEYPLAN

SCI RENOVATION

AND RESIDENCE ADDITION

HAMPTON, VIRGINIA

590-802

137C

MATCH LINE

9541 Belfort Road, Croghan, NY 13327

(T) 315.834.2356 (F) 315.346.6672 www.adkops.com

5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764

(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE

PLAN

NORTH

ACTUAL

NORTH

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

GENERAL NOTES:

1. CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE, STATE AND FEDERAL RULES, REGULATIONS, GUIDELINES, VARIANCES, AND THE CONTRACT DOCUMENTS

2. THE LOCATION OF ANY SITE STORAGE OF MATERIAL, EQUIPMENT, AND WASTE TRAILER/DUMPSTER SHALL BE COORDINATED WITH AND

APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.

3. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA(S) IN A CLEAN AND SAFE CONDITION. CONTRACTOR SHALL ENSURE THAT

UNCERTIFIED PERSONNEL OR UNAUTHORIZED VISITORS DO NOT ENTER ACTIVE WORK AREAS AT ANY TIME.

4. CONTRACTOR SHALL PROTECT ALL FINISHES SCHEDULED TO REMAIN (I.E. FLOORS, WALLS, ETC.) CONTRACTOR SHALL BE RESPONSIBLE FOR

ALL DAMAGE TO FINISHES SCHEDULED TO REMAIN.

5. CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION TO KEEP THE WORK AREAS IN A SECURE CONDITION AT ALL TIMES DURING THE

PERFORMANCE OF THE CONTRACT WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGED CAUSED TO ANY AREAS OF THE

BUILDING AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR SECURITY.

6. ALL HAZARDOUS WASTE/CONTAMINATED MATERIALS REMOVAL, CLEANING, AND PACKAGING SHALL BE PERFORMED BY PERSONS TRAINED IN

ACCORDANCE WITH 29CFR 1910.120 (OSHA) UNDER THE DIRERCT SUPERVISION OF AN OSHA QUALIFIED "COMPETENT PERSON". ALL

PERSONS SHALL BE TRAINED AND CERTIFIED FOR ASBESTOS IN ACCORDANCE WITH NYS ICR 56 AND HAZARDOUS MATERIALS ABATEMENT

AND REMEDIATION.

7. WORKERS SHALL BE REQUIRED TO FOLLOW ALL APPROVED HEALTH AND SAFETY PROCEDURES AND FOLLOW THE ACCEPTED PERSONAL

DECONTAMINATION SEQUENCE AS DESCRIBED IN THE CONTRACTOR'S HEALTH AND SAFETY PLAN (HASP) UPON EXIT FORM WORK AREAS.

8. CONTRACTING OFFICER'S REPRESENTATIVE SHALL SIGN ALL HAZARDOUS WASTE AND NON-HAZARDOUS WASTE MANIFESTS, SHIPPING

PAPERS, BILLS OF LADING AND OTHER WASTE SHIPMENT RECORDS. CONTRACTOR SHALL PROVIDE ALL COPIES WITH ALL SECTIONS

COMPLETELY FILLED IN AND READY TO BE SIGNED A MINIMUM OF 72 HOURS PRIOR TO SCHEDULED REMOVAL FROM THE SITE.

9. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF ALL ITEMS INCLUDING: MOBILIZATION, TEMPORARY FACILITIES, UTILITY

CONNECTIONS, DEMOLITION, ABATEMENT, REMEDIATION, CLEANUP, SECURITY, STAGING, AND DISPOSAL.

10. CONTRACTOR SHALL PROVIDE ALL SCAFFOLDING, LIFTS, ETC. REQUIRED TO COMPLETE SCHEDULED REMOVALS.

11. ANY REMOVED COMPONENTS TO BE DISPOSED OF AS NON-ACM OR RECYCLED SHALL BE INSPECTED AND APPROVED FOR CLEANLINESS BY

THE CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO DISPOSAL OR RECYCLING.

12. ELECTRICAL POWER AND WATER NECESSARY TO PERFORM THE ABATEMENT WILL BE PROVIDED BY THE FACILITY AT A CONNECTION POINT

IDENTIFIED BY THE FACILITY. CONTRACTOR IS RESPONSIBLE FOR ALL CONNECTIONS AND DISCONNECTIONS.

13. CONTRACTOR SHALL PROVIDE ALL TEMPORARY RESTROOM FACILITIES REQUIRED BY WORKERS.

14. COORDINATE ALL HVAC, PLUMBING, AND ELECTRICAL, MECHANICAL, GAS AND OTHER SHUT DOWNS WITH THE OWNER PRIOR TO THE

COMMENCEMENT OF ABATEMENT WORK.

15. FIRE SAFETY SYSTEMS, ALARM AND PROTECTION SYSTEMS (SENSORS, SPRINKLERS, EMERGENCY LIGHTS AND ALARMS, CAMERAS, ETC..)

MUST BE MAINTAINED IN AN OPERATING CONDITION DURING THE WORK UNLESS SPECIFIC RELIEF IS GRANTED BY THE FACILITY.

16. DO NOT COMPROMISE STRUCTURAL INTEGRITY OF THE BUILDING.

17. ALL EMERGENCY EXISTS TO THE BUILDING AND WORK AREAS MUST BE MAINTAINED THROUGHOUT THE WORK. PROVIDE FIRE EVACUATION

PLAN FOR WORK AREAS - POST AT EACH DECONTAMINATION UNIT. PROVIDE ONE 2-A OR 40-B:C FIRE EXTINGUISHER AT EACH WORK AREA.

18. LEVELS ABOVE AND BENEATH ABATEMENT AREAS ARE FINISHED AND OCCUPIED SPACES, ABATEMENT CONTRACTOR SHALL TAKE ALL

NECESSARY MEASURES TO PROTECT THESE AREAS FROM CONTAMINATION OR DAMAGE INCLUDING SEALING ANY PENETRATIONS WITH

WATER PROOF SEAL PRIOR TO ABATEMENT.

19. THE FIGURES SHOWN ON THE DRAWINGS ARE INCLUDED HEREIN FOR INFORMATION PURPOSES ONLY. THE ABATEMENT DESIGNER IS NOT

STATING THAT THESE MEASUREMENTS AND QUANTITIES ARE COMPLETELY ACCURATE, BUT ARE BASED UPON THE AVAILABLE DATA.

20. ALL WASTE MUST BE REMOVED FROM THE SITE WITHIN 10 DAYS OF JOB COMPLETION. ALL WASTE MANIFESTS SHALL BE SIGNED BY THE

DISPOSAL FACILITY AND RETURNED TO THE OWNER WITHIN 30 DAYS. THE DISPOSAL FACILITY USED SHALL BE THE SAME DISPOSAL FACILITY

AS LISTED IN PROJECT NOTIFICATION. ANY DEVIATIONS FROM THE NOTIFICATION INFORMATION SHALL REQUIRE APPROVAL.

21. IN LIEU OF A SINGLE BACKUP UNIT, A FULLY REDUNDANT BANK OF NEGATIVE AIR MACHINES SHALL BE INSTALLED IN ANY LARGE ABATEMENT

WORK AREA.

22. CONTRACTOR SHALL HAVE STAFF AVAILABLE TO RESPOND TO THE SITE WITHIN ONE (1) HOUR SHOULD THE NEED ARISE WHILE WORK AREAS

ARE UNDER CONTAINMENT.

23. A DIGITAL MANOMETER SHALL BE UTILIZED ON ALL LARGE OR SMALL SIZED ABATEMENT WORK AREAS, MANOMETER LOCATION TO BE

COORDINATED WITH THE COR.

ASBESTOS ABATEMENT NOTES:

1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.

2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE

PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.

3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.

4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS

ARE ISOLATED AS REQUIRED.

AA-1 NOT USED.

AA-2 NOT USED.

AA-3 NOT USED.

AA-4 NOT USED.

AA-5 NOT USED.

AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS

INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS. ABATEMENT CONTRACTOR IS

RESPONSIBLE FOR ALL REMOVALS NECESSARY TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.

LEAD AWARENESS NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:

INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.

2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR

UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE

PERMISSIBLE EXPOSURE LIMIT.

100% DESIGN SUBMISSION

NOT FOR CONSTRUCTION

U

E8

E9

E10

E11

E12

E13

E14

E15

V

W

X

MATCH LINEMATCH LINE

PHASE

LIMIT LINE

PHASE

LIMIT LINE

PHASE

LIMIT LINE

PHASE

LIMIT LINE

E19

E16

E17

E18

Y

Z

AA

BB

CC

STAFF

C116

UNOCCUPIED

C137

TLT.

C139

PATIENT RM

C115

PATIENT TLT

C120a

C117

CLERK w/ MED.

C118b

PATIENT RM 4 BED

C120

PATIENT TLT

C115a

STAFF SHOWER

E130

PATIENT TLT

E132

PATIENT RM 19 (1) BED

E131

CORRIDOR

C5

CORRIDOR

C7

CORRIDOR

CORRIDOR CORRIDOR

CORRIDOR

CORRIDOR

PATIENT TLT

E134

PATIENT TLT

E138

PATIENT TLT

E140

PATIENT TLT

E144

PATIENT RM 19 (1) BED

E131

PATIENT RM 20 (1) BED

E133

PATIENT RM 21 (1) BED

E137

PATIENT RM 21 (1) BED

E135

PATIENT TLT

E136

PATIENT RM 22 (1) BED

E139

PATIENT TLT

E146

PATIENT RM 24 (1) BED

E145

PATIENT RM 23 (1) BED

E143

CLN LINEN

E141

SPD

E142

PATIENT TLT

C41A

PATIENT RM

C41

CORRIDOR

PATIENT RM

C39

PATIENT RM

E193

PATIENT RM

E195

PATIENT TLT

E196

PATIENT TLT

C39A

PATIENT TLT

E194

PATIENT RM

E189

PATIENT RM

E191

PATIENT TLT

E190

PATIENT TLT

PATIENT TLT

E192

PATIENT TLT DAY RM UNIT C EXAM

CORRIDOR

C2

PATIENT RM 2 BED

C108

PATIENT RM 2 BED

C109

PATIENT TLT

C101a

PATIENT TLT

C108a

SOILED UTILITY

C110

WOUND CARE

C102

NURSE MANG.

C104

PATIENT RM 4 BED

C112

UNOCCUPIED

C101

CORRIDOR

C3

SOILED LINEN

C114

PATIENT RM 2 BED

C107

PATIENT RM 2 BED

C106

PATIENT TLT

C106a

CORRIDOR

C2

CORRIDOR

C11

CORRIDOR

C1

CORRIDOR

C10

STUDENT OFFICE

C103c

TOILET

C103B

MED ROOM

C103d

NM

C152

NURSE SATELITE

C105

OXYGEN

C105a

SOILED LINEN

C146

CHARGING ROOM

C111

TLT

C147

BOWEL TRAINING

C113

DATA

C145

ELECTRICAL

C111a

UNOCCUPIED

C143

HAC

C148

UNOCCUPIED

C149

UNDER CONSTRUCTION

C151

UNDER CONSTRUCTION

C150

UNDER CONSTRUCTION

C150a

SHARED PSYCH OFF

C153

TOILET

C103a

UNDER CONSTRUCT

C100a

UNDER CONSTRUCTION

C100

UNDER CONSTRUCTION

C155

UNDER CONSTRUCTION

C154

CORRIDOR

C10

CL. STERILE

C142

NUTRITION

HAZARDOUS MATERIALS ABATEMENT

DUCT ABATEMENT PLAN

1ST FLOOR SOUTH - PHASE 1

HA113.S

CMKMAK

KEYPLAN

SCI RENOVATION

AND RESIDENCE ADDITION

HAMPTON, VIRGINIA

590-802

137C

MATCH LINE

9541 Belfort Road, Croghan, NY 13327

(T) 315.834.2356 (F) 315.346.6672 www.adkops.com

5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764

(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE

PLAN

NORTH

ACTUAL

NORTH

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

GENERAL NOTES:

1. ALL GENERAL NOTES FROM DRAWING HA111.N SHALL APPLY TO THIS WORK.

LEAD AWARENESS NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:

INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.

2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR

UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE

PERMISSIBLE EXPOSURE LIMIT.

ASBESTOS ABATEMENT NOTES:

1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.

2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE

PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.

3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.

4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS

ARE ISOLATED AS REQUIRED.

AA-1 NOT USED.

AA-2 NOT USED.

AA-3 NOT USED.

AA-4 NOT USED.

AA-5 NOT USED.

AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS

INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS. ABATEMENT CONTRACTOR IS

RESPONSIBLE FOR ALL REMOVALS NECESSARY TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.

100% DESIGN SUBMISSION

NOT FOR CONSTRUCTION

P

Q

R

S

T

U

EA EA.6 EB EC ED

E8

E9

E1

E2

E3

E4

E5

E6

E7.5

E7

MATCH LINEMATCH LINE

P

Q

N

O

M

CORRIDOR

STAFF SHOWER

E130

PATIENT TLT

E132

PATIENT TLT

E122

PATIENT TLT

E126

PATIENT TLT

E120

PATIENT TLT

E124

PATIENT RM 18 (1) BED

E127

PATIENT RM 17 (1) BED

E125

PATIENT RM 16 (1) BED

E121

PATIENT RM 15 (1) BED

E119

PATIENT RM 14 (1) BED

E123

STAFF SHOWER

E129

PATIENT TLT

E128

SCI CHIEF OFFICE

E117

CLO

E101

TOILET

E102

PVA

E103

ELECTRICAL

E104

WARMING KITCHEN

E105

DINING

E100

ELEC

E118

PATIENT RM 1 BED

C159

PATIENT TLT

C159A

PATIENT RM 1 BED

C163

CATV

C183A

STAFF LOCKERS

C181A

CORRIDOR

C6

INTERNET CAFE

C178

STAFF LOUNGE

C181

OFFICE

C175

PSYCH OFFICE

C174

NM

C171

CLEAN SUPPLY

C172

MED ROOM

C170

HAC

C169

SOILED LINEN

C167

CLOSET

C158

NM

C160

DAY ROOM

C162

SOILED UTILITY

C183

CLEAN LINEN

C176

CORRIDOR

C7

CORRIDOR

C9

PATIENT TLT

C163A

CORRIDOR

CORRIDOR

C7

PATIENT TLT

C120a

C117

CLERK w/ MED.

C118b

PATIENT RM 4 BED

C120

PATIENT TLT

C115a

CORRIDOR

C5

PATIENT TLT

C122a

MED. SURG. 2X A DAY

C126

PATIENT RM 4 BED

C129

PATIENT RM 2 BED

C127

LINEN

C123

HAC

C124

PATIENT RM 4 BED

C122

PHARM.

C119

MEDICATION

C118a

CORRIDOR

C4

NURSES SAT.

C118

CORRIDOR

C8

CORRIDOR

C5

DENTAL CLINIC

E112

PHASE

LIMIT LINE

PHASE

LIMIT LINE

NUTRITION

14 15 7 7a 8 9 9a 10 11 12 13

HAZARDOUS MATERIALS ABATEMENT

DUCT ABATEMENT PLAN

1ST FLOOR NORTH - PHASE 2

HA114.N

CMKMAK

KEYPLAN

SCI RENOVATION

AND RESIDENCE ADDITION

HAMPTON, VIRGINIA

590-802

137C

MATCH LINE

9541 Belfort Road, Croghan, NY 13327

(T) 315.834.2356 (F) 315.346.6672 www.adkops.com

5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764

(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE

PLAN

NORTH

ACTUAL

NORTH

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

LEAD AWARENESS NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:

INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.

2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR

UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE

PERMISSIBLE EXPOSURE LIMIT.

GENERAL NOTES:

1. ALL GENERAL NOTES FROM DRAWING HA111.N SHALL APPLY TO THIS WORK.

ASBESTOS ABATEMENT NOTES:

1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.

2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE

PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.

3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.

4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS

ARE ISOLATED AS REQUIRED.

AA-1 NOT USED.

AA-2 NOT USED.

AA-3 NOT USED.

AA-4 NOT USED.

AA-5 NOT USED.

AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS

INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS. ABATEMENT CONTRACTOR IS

RESPONSIBLE FOR ALL REMOVALS NECESSARY TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.

100% DESIGN SUBMISSION

NOT FOR CONSTRUCTION

U

E8

E9

E10

E11

E12

E13

E14

E15

V

W

X

MATCH LINEMATCH LINE

E19

E16

E17

E18

Y

Z

AA

BB

CC

STAFF SHOWER

E130

PATIENT TLT

E132

PATIENT RM 1 BED

C159

PATIENT TLT

C159A

PATIENT RM 1 BED

C163

PATIENT TLT

C163A

CORRIDOR

C7

PATIENT TLT

C120a

C117

CLERK w/ MED.

C118b

PATIENT RM 4 BED

C120

PATIENT TLT

C115a

CORRIDOR

C5

CORRIDOR

C2

PATIENT RM 2 BED

340 SF

PATIENT RM 2 BED

348 SF

PATIENT TLT

131 SF

PATIENT TLT

131 SF

SOILED UTILITY

112 SF

WOUND CARE

335 SF

NM

119 SF

PATIENT RM 4 BED

618 SF

UNOCCUPIED

224 SF

CORRIDOR

C3

PATIENT RM

205 SF

OFFICE

57 SF

PATIENT RM 2 BED

350 SF

PATIENT RM 2 BED

329 SF

PATIENT TLT

132 SF

CORRIDOR

C2

CORRIDOR

CORRIDOR

CORRIDOR

PATIENT TLT

E134

PATIENT TLT

E138

PATIENT TLT

E140

PATIENT TLT

E144

PATIENT RM 19 (1) BED

E131

PATIENT RM 20 (1) BED

E133

PATIENT RM 21 (1) BED

E137

PATIENT RM 21 (1) BED

E135

PATIENT TLT

E136

PATIENT RM 22 (1) BED

E139

PATIENT TLT

E146

PATIENT RM 24 (1) BED

E145

PATIENT RM 23 (1) BED

E143

CLN LINEN

E141

SPD

E142

PATIENT TLT

C41A

PATIENT RM

C41

CORRIDOR

PATIENT RM

C39

PATIENT RM

E193

PATIENT RM

E195

PATIENT TLT

E196

PATIENT TLT

C39A

PATIENT TLT

E194

PATIENT RM

E189

PATIENT RM

E191

PATIENT TLT

E190

PATIENT TLT

E192

SOILED UTILITY

C142

MED SUPLY 2X A

C143

EQUIPMENT STORAGE

C138

DATA

C135

MEDITATION

C130

NURSE SATELITE

C110

OXYGEN

C129

TLT

C120

SOILED LINEN

C131

NOURISHMENT KITCHEN

C126

TOILET

C105A

EXAM ROOM

C105

STUDENT OFICE

C108

TOILET

C107

HAC

C106

CONSULT

C103

CLEAN STORAGE

C101

CLEAN LINEN

C104

MED ROOM

C109

CORRIDOR

C1

CORRIDOR

C10

CORRIDOR

C11

PATIENT TLT

C123A

PATIENT RM 1 BED

C123

PATIENT RM 1 BED

C125

PATIENT TLT

C125A

PATIENT RM 1 BED

C124

PATIENT TLT

C124A

PATIENT RM 1 BED

C137

PATIENT RM 1 BED

C145

DATA

C141

PATIENT TLT

C137A

PATIENT TLT

C145A

CORRIDOR

C10

ELECTRICAL

C136

ELEC

C139

PHASE

LIMIT LINE

PHASE

LIMIT LINE

NUTRITION

HAZARDOUS MATERIALS ABATEMENT

DUCT ABATEMENT PLAN

1ST FLOOR SOUTH - PHASE 2

HA114.S

CMKMAK

KEYPLAN

SCI RENOVATION

AND RESIDENCE ADDITION

HAMPTON, VIRGINIA

590-802

137C

MATCH LINE

9541 Belfort Road, Croghan, NY 13327

(T) 315.834.2356 (F) 315.346.6672 www.adkops.com

5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764

(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE

PLAN

NORTH

ACTUAL

NORTH

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT

Project Director

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

LEAD AWARENESS NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:

INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.

2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR

UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE

PERMISSIBLE EXPOSURE LIMIT.

GENERAL NOTES:

1. ALL GENERAL NOTES FROM DRAWING HA111.N SHALL APPLY TO THIS WORK.

ASBESTOS ABATEMENT NOTES:

1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.

2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE

PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.

3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.

4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS

ARE ISOLATED AS REQUIRED.

AA-1 NOT USED.

AA-2 NOT USED.

AA-3 NOT USED.

AA-4 NOT USED.

AA-5 NOT USED.

AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS

INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS. ABATEMENT CONTRACTOR IS

RESPONSIBLE FOR ALL REMOVALS NECESSARY TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.

100% DESIGN SUBMISSION

NOT FOR CONSTRUCTION

C-001

DMW LEM

COVER SHEET

PROJECT SITE

ABBREVIATIONS SITE DATA

SHEET NO.

SHEET INDEX

TITLE

LOCATION MAP

CONTRACT DATA

HAMPTON, VIRGINIA

FOR

SITE PLAN

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER

SCI RENOVATION AND RESIDENCE ADDITION

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business

A Se rv ic e

D i s ab led

Ve t eran Owned Sma l l Business

SDVOSB

CVE

MR PROJECT NO: 0500-0016

SCI RENOVATION

AND RESIDENCE ADDITION

HAMPTON, VIRGINIA

590-802

137C

NO. DESCRIPTION DATE

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6"

6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot 4 on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseENGINEER OF…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .