Attachment 05 - Drawings Part I.pdf
PDF 22 MB Posted
- Attached to
- Z1DA--590-802 | Construct SCI Reno/Addition | Hampton, VA | Federal contract opportunity
- Solicitation number
- 36C77625B0046
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Technical Questions Answered.docx | DOCX document | |
| VHA ICRA-1.2 Oct 1 2024.pdf | ||
| VAAR 852.219-75.docx | DOCX document | |
| Amendment 0002.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| Specs - Volume I 8-27-25.pdf | ||
| Amendment 0001.pdf | ||
| Attachment 09 - Drawings Part V.pdf | ||
| Attachment 08 - Drawings Part IV.pdf | ||
| Attachment 12 - Spec 01 31 00.01 Project Management and Coordination.pdf | ||
| Attachment 07 - Drawings Part III.pdf | ||
| Attachment 02 - Specs Volume I.pdf | ||
| Attachment 11 - Wage determination.pdf | ||
| Attachment 10 - VA Notice of Limitations on Subcontracting.docx | DOCX document | |
| Attachment 06 - Drawings Part II.pdf | ||
| Attachment 03 - Specs Volume II.pdf | ||
| Attachment 04 - Specs Volume III.pdf | ||
| Attachment 01 - Statement of Work.pdf | ||
| 36C77625B0046.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N N.T.S.Scale:
Property Map
INDEX OF DRAWINGS
CONTRACTOR'S MATERIAL
STAGING / LAYDOWN AREA
& PARKING
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
590-802
137C
2023-05-04 9541 Belfort Road, Croghan, NY 13327
(T) 315.834.2356 (F) 315.346.6672 www.adkops.com
5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764
(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
CONSULTANTS
Project Director
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
100% CONSTRUCTION
DOCUMENTS
ENGINEER OF RECORD
M-R PROJECT NO: 0500-0016
COVER SHEET & DRAWING LIST
GI001
ARFTH
Hampton, Virginia
CONTRACTOR
PHASE 2 ENTRANCE
MAINTAIN EGRESS.
SEE PHASING PLAN.
CRANE
LIFT
AREA
AREA OF WORK
REMOVE, STORE & REINSTALL
SMOKING SHELTER.
PROTECT SLAB TO REMAIN.
ENTRANCE TO REMAIN OPEN
CONTRACTOR
PHASE 1 ENTRANCE
STAGING / LAYDOWN
CONTRACTOR
PHASE 1 ENTRANCE
STAGING / LAYDOWN
ACCESS
ACCESS
CONTRACTOR
TRAILER
AREA
X
X
X
X
X
XX
XXX
X
X
X
X
X
X
X
X
X X
SALVAGE YARD
STORM WATER
POND
9 9
11 124
PARKING
STALLS
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
590-802
137C
2023-05-04 9541 Belfort Road, Croghan, NY 13327
(T) 315.834.2356 (F) 315.346.6672 www.adkops.com
5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764
(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
CONSULTANTS
Project Director
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
100% CONSTRUCTION
DOCUMENTS
ENGINEER OF RECORD
M-R PROJECT NO: 0500-0016
CONSTRUCTION & PRE-CONSTRUTION
NOTES AND INFORMATION
GI002
ARFTH
PROJECT CONSULTANTS
Architecture:
QPK DESIGN
450 SOUTH SALINA STREET, SUITE 500
PO BOX 29
SYRACUSE, NY 13201
315-472-7806
Civil Engineering:
MSA, P.C.
5032 ROUSE DRIVE, SUITE 100
VIRGINIA BEACH, VA 23462
757-490-9264
Environmental Services:
ADK OPS ENVIRONMENTAL CONSULTING
9541 BELFORT ROAD
CROGHAN, NY 13327
315-834-2356
CONTRACTORS SHALL USE THE ONLINE DOCUMENT EXCHANGE SYSTEM “SUBMITTAL EXCHANGE”
FOR ALL SUBMITTALS REQUIRED BY SPECIFICATIONS FOR THIS PROJECT.
CONTRACTOR IS RESPONSIBLE TO VIEW TUTORIALS AND LEARN SYSTEM.
CONTRACTOR IS RESPONSIBLE TO INCUR ALL COSTS REQUIRED TO ALLOW FULL ACCESS AND
USER CAPABILITY FOR ALL CONTRACTORS, THE AE TEAM, AND THE VA.
WEBSITE FOR PROGRAM IS:
HTTP://ORACLE.COM/INDUSTRIES/CONSTRUCTION-ENGINEERING/SUBMITTAL-EXCHANGE/
WEBSITE REPRESNTATIVE IS: ORACLE SALES, PHONE 1-800-633-0738
DN
R A
M P
R A
M P
R A
M P
UP
D
D D
D D
DEDUCT
ALTERNATE 1
O
P
WCWA.2
Q
W1
W2
R
W3
S
W4
T
W5
U
EA
W14
WC.2
EB EC ED
E8
E9
E1
E2
E3
E4
E5
E6
E7.5
E7
N
P
Q
R
S
T
U
EA EA.6 EB EC ED
E8
E9
E10
E11
E12
E13
E14
E15
E1
E2
E3
E4
E5
E6
E7.5
E7
V
W
X
14 15
P
Q
E19
E16
E17
E18
Y
Z
AA
BB
CC
WBWA
W5.9
W6
W9
W8
W7
W10
O
N
R E
F
REF.
W W
D D
PATIENT RM 1 BED
C144
PATIENT TLT
C144A
PATIENT TLT
C132A
PATIENT RM 1 BED
C132
PATIENT RM 1 BED
C42
PATIENT TLT
C42A
PATIENT TLT
C43A
PATIENT RM 1 BED
C43
PATIENT RM 1 BED
C45
TLT
C148 C146
CLERK
C151B
RESP. OFFICE
C140
PATIENT RM 1 BED
C118
PATIENT TLT
C118A
PATIENT RM 1 BED
C116
PATIENT TLT
C116A
CORRIDOR
C3
CORRIDOR
C2
PATIENT TLT
C115A
PATIENT RM 1 BED
C115
PATIENT RM 1 BED
C117PATIENT TLT
C117A
PATIENT TLT
C102A
PATIENT RM
C102
NOURISHMENT KITCHEN
C100
LAUNDRY
C155 PATIENT TLT
C153A
PATIENT RM 1 BED
C153
SOILED UTILITY
C142
PATIENT RM 1 BED
C159
PATIENT TLT
C159A
MED SUPLY 2X A
C143
PATIENT RM 1 BED
C163
EQUIPMENT STORAGE
C113
DATA
C135
MEDITATION
C130
NURSE SATELITE
C105
OXYGEN
C129
TLT
C120
SOILED LINEN
C131
NOURISHMENT KITCHEN
C126
TOILET
C105A
EXAM ROOM
C105
STUDENT OFICE
C108
TOILET
C107
HAC
C106
CONSULT
C103
CLEAN STORAGE
C101
CLEAN LINEN
C104
MED ROOM
C109
CORRIDOR
C1
CORRIDOR
C10
CORRIDOR
C11
PATIENT TLT
C123A
PATIENT RM 1 BED
C123
PATIENT RM 1 BED
C125
PATIENT TLT
C125A
PATIENT RM 1 BED
C124
PATIENT TLT
C124A
PATIENT RM 1 BED
C137
PATIENT RM 1 BED
C145
DATA
C141
PATIENT TLT
C137A
PATIENT TLT
C145A
PATIENT TLT
C163A
CORRIDOR
C10
CORRIDOR
C7
CORRIDOR
C2
ELECTRICAL
C134
CORRIDOR
C1
ELEC
C137
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
1C15
STAFF SHOWER
1C209
PATIENT TLT
1C221A
PATIENT TLT
1C222A
PATIENT TLT
1C224A
PATIENT TLT
1C225A
PATIENT TLT
1C228A
PATIENT RM 19 (1) BED
1C221
PATIENT RM 20 (1) BED
1C222
PATIENT RM 21 (1) BED
1C224
PATIENT RM 21 (1) BED
1C230
PATIENT TLT
1C230A
PATIENT RM 22 (1) BED
1C225
PATIENT TLT
1C229A
PATIENT RM 24 (1) BED
1C229
PATIENT RM 23 (1) BED
1C228
CLN LINEN
1C226
SPD
1C227
STAFF SHOWER
1C210
PATIENT TLT
1C218A
PATIENT TLT
C41A
PATIENT RM
C41
CORRIDOR
PATIENT RM
C39
PATIENT RM
E193
PATIENT RM
E195
PATIENT TLT
E196
PATIENT TLT
C39A
PATIENT TLT
E194
PATIENT RM
E189
PATIENT RM
E191
PATIENT TLT
E190
PATIENT TLT
PATIENT TLT
E192
PATIENT TLT
DAY RM UNIT C
C02
EXAM
C01
STAIR #2
1C219
CLST
222B
CLST
221B
NURSE SATALLITE
1C15A
CLST
230B
CLST
225B
CLST
224B
CLST
228B
CLST
229B
MEDS
C151A
NURSE SAT
C151
OFFICE
C184
DIET OFFICE
C182
NM
C180
NM
C179
NM
C177
PHARM
C173
CORRIDOR
C5
PATIENT RM 1 BED
C47
PATIENT RM 1 BED
C154
PATIENT TLT
C154A
PATIENT RM 1 BED
C152
PATIENT TLT
C152A
CORRIDOR
C4
PATIENT TLT
C47A
PATIENT TLT
C45A
PVA OFFICE
C150
STORAGE
CORRIDOR
C8
PATIENT RM 1 BED
C159
PATIENT TLT
C159A
PATIENT RM 1 BED
C163
CATV
C183A
STAFF LOCKERS
C181A
CORRIDOR
C6
INTERNET CAFE
C178
STAFF ROOM
C181
OFFICE
C175
PSYCH OFFICE
C174
NM
C171
CLEAN SUPPLY
C172
MED ROOM
C170
SOILED LINEN
C169
HAC
C167
ELEC
C158
NM
C160
DAY ROOM
C162
SOILED UTILITY
C183
CLEAN LINEN
C176
CORRIDOR
C7
CORRIDOR
C9
CORRIDOR
C5
CORRIDOR
C1
CORRIDOR
1C14
STAFF SHOWER
1C209
PATIENT TLT
1C215A
PATIENT TLT
1C2171
PATIENT TLT
1C214A
PATIENT TLT
1C213A
PATIENT RM 18 (1) BED
1C218
PATIENT RM 17 (1) BED
1C217
PATIENT RM 16 (1) BED
1C215
PATIENT RM 15 (1) BED
1C214
PATIENT RM 14 (1) BED
1C213
STAFF SHOWER
1C210
SCI CHIEF OFFICE
A147
DAY ROOM
A156
CLO
D100A
TOILET
D100B
DIETICIAN
D100C
ELECTRICAL
D100D
WARMING KITCHEN
D100E
DINING
D100
ELEC
1C216
CORRIDOR
1C14
DENTAL CLINIC
A143
CORRIDOR
CA25
CORRIDOR
CA24
CORRIDOR
CD1
CLST
218B
CLST
217B
CLST
215B
CLST
215B
CLST
213B
STAIR #2
1C219
COURTYARD D
COURTYARD C
COURTYARD B
COURTYARD A
7 7a 8 9 9a 10 11 12 13
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
590-802
137C
2023-05-04 9541 Belfort Road, Croghan, NY 13327
(T) 315.834.2356 (F) 315.346.6672 www.adkops.com
5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764
(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
CONSULTANTS
Project Director
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
100% CONSTRUCTION
DOCUMENTS
ENGINEER OF RECORD
M-R PROJECT NO: 0500-0016
DEDUCT ALTERNATES
GI003
ARFTH
N
O
P
Q
R
S
T
U
EA EA.6 EB EC ED
E8
E9
E1
E2
E3
E4
E5
E6
E7.5
E7
MATCH LINEMATCH LINE
P
Q
N
O
M
PHASE
LIMIT LINE
CORRRIDOR
C6
EQUIPMENT STORAGE
C131
UNOCCUPIED
C133
COMPUTER
C130
CLOSET
C9a
CORRIDOR
C7
CORRIDOR
C9
LAUNDRY
C138
DATA
C132
UNOCCUPIED
C134
SOILED UTILITY
C125
UNOCCUPIED
C136
UNOCCUPIED
C137
TLT.
C139
PATIENT TLT
C120a
C117
CLERK w/ MED.
C118b
PATIENT RM 4 BED
C120
PATIENT TLT
C115a
CORRIDOR
C5
PATIENT TLT
C122a
MED. SURG. 2X A DAY
C126
PATIENT RM 4 BED
C129
PATIENT RM 2 BED
C127
LINEN
C123
HAC
C124
PATIENT RM 4 BED
C122
PHARM.
C119
MEDICATION
C118a
CORRIDOR
STAFF SHOWER
E130
PATIENT TLT
E132
PATIENT TLT
E122
PATIENT TLT
E126
PATIENT TLT
E120
PATIENT TLT
E124
PATIENT RM 18 (1) BED
E127
PATIENT RM 17 (1) BED
E125
PATIENT RM 16 (1) BED
E121
PATIENT RM 15 (1) BED
E119
PATIENT RM 14 (1) BED
E123
STAFF SHOWER
E129
PATIENT TLT
E128
SCI CHIEF OFFICE
E117
CLO
E101
TOILET
E102
PVA
E103
ELECTRICAL
E104
WARMING KITCHEN
E105
DINING
E100
ELEC
E118
CORRIDOR
C4
NURSES SAT.
C118
CORRIDOR
C8
CORRIDOR
CORRIDOR
C5
EQUIPMENT STORAGE
C128
CORRIDOR
C7
DENTAL CLINIC
E112
NUTRITION
14 15 7 7a 8 9 9a 10 11 12 13
HAZARDOUS MATERIALS ABATEMENT
ABATEMENT PLAN
1ST FLOOR NORTH - PHASE 1
HA111.N
CMKMAK
KEYPLAN
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
590-802
137C
MATCH LINE
9541 Belfort Road, Croghan, NY 13327
(T) 315.834.2356 (F) 315.346.6672 www.adkops.com
5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764
(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
GENERAL NOTES:
1. CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE, STATE AND FEDERAL RULES, REGULATIONS, GUIDELINES, VARIANCES, AND THE CONTRACT DOCUMENTS
2. THE LOCATION OF ANY SITE STORAGE OF MATERIAL, EQUIPMENT, AND WASTE TRAILER/DUMPSTER SHALL BE COORDINATED WITH AND
APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA(S) IN A CLEAN AND SAFE CONDITION. CONTRACTOR SHALL ENSURE THAT
UNCERTIFIED PERSONNEL OR UNAUTHORIZED VISITORS DO NOT ENTER ACTIVE WORK AREAS AT ANY TIME.
4. CONTRACTOR SHALL PROTECT ALL FINISHES SCHEDULED TO REMAIN (I.E. FLOORS, WALLS, ETC.) CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL DAMAGE TO FINISHES SCHEDULED TO REMAIN.
5. CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION TO KEEP THE WORK AREAS IN A SECURE CONDITION AT ALL TIMES DURING THE
PERFORMANCE OF THE CONTRACT WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGED CAUSED TO ANY AREAS OF THE
BUILDING AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR SECURITY.
6. ALL HAZARDOUS WASTE/CONTAMINATED MATERIALS REMOVAL, CLEANING, AND PACKAGING SHALL BE PERFORMED BY PERSONS TRAINED IN
ACCORDANCE WITH 29CFR 1910.120 (OSHA) UNDER THE DIRERCT SUPERVISION OF AN OSHA QUALIFIED "COMPETENT PERSON". ALL
PERSONS SHALL BE TRAINED AND CERTIFIED FOR ASBESTOS IN ACCORDANCE WITH NYS ICR 56 AND HAZARDOUS MATERIALS ABATEMENT
AND REMEDIATION.
7. WORKERS SHALL BE REQUIRED TO FOLLOW ALL APPROVED HEALTH AND SAFETY PROCEDURES AND FOLLOW THE ACCEPTED PERSONAL
DECONTAMINATION SEQUENCE AS DESCRIBED IN THE CONTRACTOR'S HEALTH AND SAFETY PLAN (HASP) UPON EXIT FORM WORK AREAS.
8. CONTRACTING OFFICER'S REPRESENTATIVE SHALL SIGN ALL HAZARDOUS WASTE AND NON-HAZARDOUS WASTE MANIFESTS, SHIPPING
PAPERS, BILLS OF LADING AND OTHER WASTE SHIPMENT RECORDS. CONTRACTOR SHALL PROVIDE ALL COPIES WITH ALL SECTIONS
COMPLETELY FILLED IN AND READY TO BE SIGNED A MINIMUM OF 72 HOURS PRIOR TO SCHEDULED REMOVAL FROM THE SITE.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF ALL ITEMS INCLUDING: MOBILIZATION, TEMPORARY FACILITIES, UTILITY
CONNECTIONS, DEMOLITION, ABATEMENT, REMEDIATION, CLEANUP, SECURITY, STAGING, AND DISPOSAL.
10. CONTRACTOR SHALL PROVIDE ALL SCAFFOLDING, LIFTS, ETC. REQUIRED TO COMPLETE SCHEDULED REMOVALS.
11. ANY REMOVED COMPONENTS TO BE DISPOSED OF AS NON-ACM OR RECYCLED SHALL BE INSPECTED AND APPROVED FOR CLEANLINESS BY
THE CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO DISPOSAL OR RECYCLING.
12. ELECTRICAL POWER AND WATER NECESSARY TO PERFORM THE ABATEMENT WILL BE PROVIDED BY THE FACILITY AT A CONNECTION POINT
IDENTIFIED BY THE FACILITY. CONTRACTOR IS RESPONSIBLE FOR ALL CONNECTIONS AND DISCONNECTIONS.
13. CONTRACTOR SHALL PROVIDE ALL TEMPORARY RESTROOM FACILITIES REQUIRED BY WORKERS.
14. COORDINATE ALL HVAC, PLUMBING, AND ELECTRICAL, MECHANICAL, GAS AND OTHER SHUT DOWNS WITH THE OWNER PRIOR TO THE
COMMENCEMENT OF ABATEMENT WORK.
15. FIRE SAFETY SYSTEMS, ALARM AND PROTECTION SYSTEMS (SENSORS, SPRINKLERS, EMERGENCY LIGHTS AND ALARMS, CAMERAS, ETC..)
MUST BE MAINTAINED IN AN OPERATING CONDITION DURING THE WORK UNLESS SPECIFIC RELIEF IS GRANTED BY THE FACILITY.
16. DO NOT COMPROMISE STRUCTURAL INTEGRITY OF THE BUILDING.
17. ALL EMERGENCY EXISTS TO THE BUILDING AND WORK AREAS MUST BE MAINTAINED THROUGHOUT THE WORK. PROVIDE FIRE EVACUATION
PLAN FOR WORK AREAS - POST AT EACH DECONTAMINATION UNIT. PROVIDE ONE 2-A OR 40-B:C FIRE EXTINGUISHER AT EACH WORK AREA.
18. LEVELS ABOVE AND BENEATH ABATEMENT AREAS ARE FINISHED AND OCCUPIED SPACES, ABATEMENT CONTRACTOR SHALL TAKE ALL
NECESSARY MEASURES TO PROTECT THESE AREAS FROM CONTAMINATION OR DAMAGE INCLUDING SEALING ANY PENETRATIONS WITH
WATER PROOF SEAL PRIOR TO ABATEMENT.
19. THE FIGURES SHOWN ON THE DRAWINGS ARE INCLUDED HEREIN FOR INFORMATION PURPOSES ONLY. THE ABATEMENT DESIGNER IS NOT
STATING THAT THESE MEASUREMENTS AND QUANTITIES ARE COMPLETELY ACCURATE, BUT ARE BASED UPON THE AVAILABLE DATA.
20. ALL WASTE MUST BE REMOVED FROM THE SITE WITHIN 10 DAYS OF JOB COMPLETION. ALL WASTE MANIFESTS SHALL BE SIGNED BY THE
DISPOSAL FACILITY AND RETURNED TO THE OWNER WITHIN 30 DAYS. THE DISPOSAL FACILITY USED SHALL BE THE SAME DISPOSAL FACILITY
AS LISTED IN PROJECT NOTIFICATION. ANY DEVIATIONS FROM THE NOTIFICATION INFORMATION SHALL REQUIRE APPROVAL.
21. IN LIEU OF A SINGLE BACKUP UNIT, A FULLY REDUNDANT BANK OF NEGATIVE AIR MACHINES SHALL BE INSTALLED IN ANY LARGE ABATEMENT
WORK AREA.
22. CONTRACTOR SHALL HAVE STAFF AVAILABLE TO RESPOND TO THE SITE WITHIN ONE (1) HOUR SHOULD THE NEED ARISE WHILE WORK AREAS
ARE UNDER CONTAINMENT.
23. A DIGITAL MANOMETER SHALL BE UTILIZED ON ALL LARGE OR SMALL SIZED ABATEMENT WORK AREAS, MANOMETER LOCATION TO BE
COORDINATED WITH THE COR.
ASBESTOS ABATEMENT NOTES:
1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.
2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE
PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.
3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.
4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS
ARE ISOLATED AS REQUIRED.
AA-1 REMOVE AND DISPOSE OF 16,000 SF OF ASBESTOS-CONTAINING FLOOR TILE, FLOOR TILE, DOOR THRESHOLDS, DOOR
THRESHOLD MASTIC AND RELATED MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.
AA-2 REMOVE AND DISPOSE OF 3,000 SF OF ASBESTOS-CONTAINING FLOOR / WALL MASTIC AND RELATED MATERIALS FROM THE
AREAS INDICATED AND AS DESCRIBED ABOVE. THIS WILL REQUIRE THE ABATEMENT DEMOLITION OF CERAMIC TILE, PLASTIC
WALL VAPOR BARRIERS AND WALL STUDS.
AA-3 REMOVE AND DISPOSE OF FIVE (5) SF OF ASBESTOS-CONTAINING ROOF DRAIN DUCT INSULATION MASTIC AND RELATED
MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.
AA-4 REMOVE AND DISPOSE OF ASBESTOS-CONTAINING BLACK WINDOW SEALANT ON EIGHTY-EIGHT (88) WINDOWS, THIS WILL
REQUIRE ABATEMENT REMOVAL OF THE EXTERIOR WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS INDICATED
AND AS DESCRIBED ABOVE.
AA-5 REMOVE AND DISPOSE OF ASSUMED ASBESTOS-CONTAINING BLACK INTERIOR WINDOW SEALANT, FROM ELEVEN (11)
LOCATIONS, THIS WILL REQUIRE ABATEMENT REMOVAL OF WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS
INDICATED AND AS DESCRIBED ABOVE.
AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS
INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS.
LEAD AWARENESS NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:
INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR
UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE
PERMISSIBLE EXPOSURE LIMIT.
KEYNOTES:
1 SPECIAL COORDINATION REQUIRED TO ABATE FLOOR TILE/MASTIC BENEATH EQUIPMENT RACK
100% DESIGN SUBMISSION
NOT FOR CONSTRUCTION
M-R PROJECT NO: 0500-0016
2023-05-04
14 15 7 7a 8 9 9a 10 11 12 13
U
E8
E9
E10
E11
E12
E13
E14
E15
V
W
X
MATCH LINEMATCH LINE
PHASE
LIMIT LINE
PHASE
LIMIT LINE
PHASE
LIMIT LINE
PHASE
LIMIT LINE
COURTYARD D
E19
E16
E17
E18
Y
Z
AA
BB
CC
STAFF
C116
UNOCCUPIED
C137
TLT.
C139
PATIENT RM
C115
PATIENT TLT
C120a
C117
CLERK w/ MED.
C118b
PATIENT RM 4 BED
C120
PATIENT TLT
C115a
STAFF SHOWER
E130
PATIENT TLT
E132
PATIENT RM 19 (1) BED
E131
CORRIDOR
C5
CORRIDOR
C7
CORRIDOR
CORRIDOR CORRIDOR
CORRIDOR
CORRIDOR
PATIENT TLT
E134
PATIENT TLT
E138
PATIENT TLT
E140
PATIENT TLT
E144
PATIENT RM 19 (1) BED
E131
PATIENT RM 20 (1) BED
E133
PATIENT RM 21 (1) BED
E137
PATIENT RM 21 (1) BED
E135
PATIENT TLT
E136
PATIENT RM 22 (1) BED
E139
PATIENT TLT
E146
PATIENT RM 24 (1) BED
E145
PATIENT RM 23 (1) BED
E143
CLN LINEN
E141
SPD
E142
PATIENT TLT
C41A
PATIENT RM
C41
CORRIDOR
PATIENT RM
C39
PATIENT RM
E193
PATIENT RM
E195
PATIENT TLT
E196
PATIENT TLT
C39A
PATIENT TLT
E194
PATIENT RM
E189
PATIENT RM
E191
PATIENT TLT
E190
PATIENT TLT
PATIENT TLT
E192
PATIENT TLT DAY RM UNIT C EXAM
COURTYARD D
CORRIDOR
C2
PATIENT RM 2 BED
C108
PATIENT RM 2 BED
C109
PATIENT TLT
C101a
PATIENT TLT
C108a
SOILED UTILITY
C110
WOUND CARE
C102
NURSE MANG.
C104
PATIENT RM 4 BED
C112
UNOCCUPIED
C101
CORRIDOR
C3
SOILED LINEN
C114
PATIENT RM 2 BED
C107
PATIENT RM 2 BED
C106
PATIENT TLT
C106a
CORRIDOR
C2
CORRIDOR
C11
CORRIDOR
C1
CORRIDOR
C10
STUDENT OFFICE
C103c
TOILET
C103B
MED ROOM
C103d
NM
C152
NURSE SATELITE
C105
OXYGEN
C105a
SOILED LINEN
C146
CHARGING ROOM
C111
TLT
C147
BOWEL TRAINING
C113
DATA
C145
ELECTRICAL
C111a
UNOCCUPIED
C143
HAC
C148
UNOCCUPIED
C149
UNDER CONSTRUCTION
C151
UNDER CONSTRUCTION
C150
UNDER CONSTRUCTION
C150a
SHARED PSYCH OFF
C153
TOILET
C103a
UNDER CONSTRUCT
C100a
UNDER CONSTRUCTION
C100
UNDER CONSTRUCTION
C155
UNDER CONSTRUCTION
C154
CORRIDOR
C10
CL. STERILE
C142
NUTRITION
HAZARDOUS MATERIALS ABATEMENT
ABATEMENT PLAN
1ST FLOOR SOUTH - PHASE 1
HA111.S
CMKMAK
KEYPLAN
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
590-802
137C
MATCH LINE
9541 Belfort Road, Croghan, NY 13327
(T) 315.834.2356 (F) 315.346.6672 www.adkops.com
5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764
(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
GENERAL NOTES:
1. ALL GENERAL NOTES FROM DRAWING HA111.N SHALL APPLY TO THIS WORK.
LEAD AWARENESS NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:
INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR
UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE
PERMISSIBLE EXPOSURE LIMIT.
ASBESTOS ABATEMENT NOTES:
1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.
2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE
PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.
3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.
4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS
ARE ISOLATED AS REQUIRED.
AA-1 REMOVE AND DISPOSE OF 16,000 SF OF ASBESTOS-CONTAINING FLOOR TILE, FLOOR TILE, DOOR THRESHOLDS, DOOR
THRESHOLD MASTIC AND RELATED MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.
AA-2 REMOVE AND DISPOSE OF 3,000 SF OF ASBESTOS-CONTAINING FLOOR / WALL MASTIC AND RELATED MATERIALS FROM THE
AREAS INDICATED AND AS DESCRIBED ABOVE. THIS WILL REQUIRE THE ABATEMENT DEMOLITION OF CERAMIC TILE, PLASTIC
WALL VAPOR BARRIERS AND WALL STUDS.
AA-3 REMOVE AND DISPOSE OF FIVE (5) SF OF ASBESTOS-CONTAINING ROOF DRAIN DUCT INSULATION MASTIC AND RELATED
MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.
AA-4 REMOVE AND DISPOSE OF ASBESTOS-CONTAINING BLACK WINDOW SEALANT ON EIGHTY-EIGHT (88) WINDOWS, THIS WILL
REQUIRE ABATEMENT REMOVAL OF THE EXTERIOR WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS INDICATED
AND AS DESCRIBED ABOVE.
AA-5 REMOVE AND DISPOSE OF ASSUMED ASBESTOS-CONTAINING BLACK INTERIOR WINDOW SEALANT, FROM ELEVEN (11)
LOCATIONS, THIS WILL REQUIRE ABATEMENT REMOVAL OF WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS
INDICATED AND AS DESCRIBED ABOVE.
AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS
INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS.
100% DESIGN SUBMISSION
NOT FOR CONSTRUCTION
P
Q
R
S
T
U
EA EA.6 EB EC ED
E8
E9
E1
E2
E3
E4
E5
E6
E7.5
E7
MATCH LINEMATCH LINE
P
Q
N
O
M
CORRIDOR
STAFF SHOWER
E130
PATIENT TLT
E132
PATIENT TLT
E122
PATIENT TLT
E126
PATIENT TLT
E120
PATIENT TLT
E124
PATIENT RM 18 (1) BED
E127
PATIENT RM 17 (1) BED
E125
PATIENT RM 16 (1) BED
E121
PATIENT RM 15 (1) BED
E119
PATIENT RM 14 (1) BED
E123
STAFF SHOWER
E129
PATIENT TLT
E128
SCI CHIEF OFFICE
E117
CLO
E101
TOILET
E102
PVA
E103
ELECTRICAL
E104
WARMING KITCHEN
E105
DINING
E100
ELEC
E118
PATIENT RM 1 BED
C159
PATIENT TLT
C159A
PATIENT RM 1 BED
C163
CATV
C183A
STAFF LOCKERS
C181A
CORRIDOR
C6
INTERNET CAFE
C178
STAFF LOUNGE
C181
OFFICE
C175
PSYCH OFFICE
C174
NM
C171
CLEAN SUPPLY
C172
MED ROOM
C170
HAC
C169
SOILED LINEN
C167
CLOSET
C158
NM
C160
DAY ROOM
C162
SOILED UTILITY
C183
CLEAN LINEN
C176
CORRIDOR
C7
CORRIDOR
C9
PATIENT TLT
C163A
CORRIDOR
CORRIDOR
C7
PATIENT TLT
C120a
C117
CLERK w/ MED.
C118b
PATIENT RM 4 BED
C120
PATIENT TLT
C115a
CORRIDOR
C5
PATIENT TLT
C122a
MED. SURG. 2X A DAY
C126
PATIENT RM 4 BED
C129
PATIENT RM 2 BED
C127
LINEN
C123
HAC
C124
PATIENT RM 4 BED
C122
PHARM.
C119
MEDICATION
C118a
CORRIDOR
C4
NURSES SAT.
C118
CORRIDOR
C8
CORRIDOR
C5
DENTAL CLINIC
E112
PHASE
LIMIT LINE
PHASE
LIMIT LINE
NUTRITION
14 15 7 7a 8 9 9a 10 11 12 13
HAZARDOUS MATERIALS ABATEMENT
ABATEMENT PLAN
1ST FLOOR NORTH - PHASE 2
HA112.N
CMKMAK
KEYPLAN
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
590-802
137C
MATCH LINE
9541 Belfort Road, Croghan, NY 13327
(T) 315.834.2356 (F) 315.346.6672 www.adkops.com
5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764
(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
LEAD AWARENESS NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:
INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR
UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE
PERMISSIBLE EXPOSURE LIMIT.
ASBESTOS ABATEMENT NOTES:
1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.
2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE
PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.
3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.
4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS
ARE ISOLATED AS REQUIRED.
AA-1 REMOVE AND DISPOSE OF 16,000 SF OF ASBESTOS-CONTAINING FLOOR TILE, FLOOR TILE, DOOR THRESHOLDS, DOOR
THRESHOLD MASTIC AND RELATED MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.
AA-2 REMOVE AND DISPOSE OF 3,000 SF OF ASBESTOS-CONTAINING FLOOR / WALL MASTIC AND RELATED MATERIALS FROM THE
AREAS INDICATED AND AS DESCRIBED ABOVE. THIS WILL REQUIRE THE ABATEMENT DEMOLITION OF CERAMIC TILE, PLASTIC
WALL VAPOR BARRIERS AND WALL STUDS.
AA-3 REMOVE AND DISPOSE OF FIVE (5) SF OF ASBESTOS-CONTAINING ROOF DRAIN DUCT INSULATION MASTIC AND RELATED
MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.
AA-4 REMOVE AND DISPOSE OF ASBESTOS-CONTAINING BLACK WINDOW SEALANT ON EIGHTY-EIGHT (88) WINDOWS, THIS WILL
REQUIRE ABATEMENT REMOVAL OF THE EXTERIOR WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS INDICATED
AND AS DESCRIBED ABOVE.
AA-5 REMOVE AND DISPOSE OF ASSUMED ASBESTOS-CONTAINING BLACK INTERIOR WINDOW SEALANT, FROM ELEVEN (11)
LOCATIONS, THIS WILL REQUIRE ABATEMENT REMOVAL OF WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS
INDICATED AND AS DESCRIBED ABOVE.
AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS
INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS.
GENERAL NOTES:
1. ALL GENERAL NOTES FROM DRAWING HA111.N SHALL APPLY TO THIS WORK.
100% DESIGN SUBMISSION
NOT FOR CONSTRUCTION
U
E8
E9
E10
E11
E12
E13
E14
E15
V
W
X
MATCH LINEMATCH LINE
E19
E16
E17
E18
Y
Z
AA
BB
CC
STAFF SHOWER
E130
PATIENT TLT
E132
PATIENT RM 1 BED
C159
PATIENT TLT
C159A
PATIENT RM 1 BED
C163
PATIENT TLT
C163A
CORRIDOR
C7
PATIENT TLT
C120a
C117
CLERK w/ MED.
C118b
PATIENT RM 4 BED
C120
PATIENT TLT
C115a
CORRIDOR
C5
CORRIDOR
C2
PATIENT RM 2 BED
340 SF
PATIENT RM 2 BED
348 SF
PATIENT TLT
131 SF
PATIENT TLT
131 SF
SOILED UTILITY
112 SF
WOUND CARE
335 SF
NM
119 SF
PATIENT RM 4 BED
618 SF
UNOCCUPIED
224 SF
CORRIDOR
C3
PATIENT RM
205 SF
OFFICE
57 SF
PATIENT RM 2 BED
350 SF
PATIENT RM 2 BED
329 SF
PATIENT TLT
132 SF
CORRIDOR
C2
CORRIDOR
CORRIDOR
CORRIDOR
PATIENT TLT
E134
PATIENT TLT
E138
PATIENT TLT
E140
PATIENT TLT
E144
PATIENT RM 19 (1) BED
E131
PATIENT RM 20 (1) BED
E133
PATIENT RM 21 (1) BED
E137
PATIENT RM 21 (1) BED
E135
PATIENT TLT
E136
PATIENT RM 22 (1) BED
E139
PATIENT TLT
E146
PATIENT RM 24 (1) BED
E145
PATIENT RM 23 (1) BED
E143
CLN LINEN
E141
SPD
E142
PATIENT TLT
C41A
PATIENT RM
C41
CORRIDOR
PATIENT RM
C39
PATIENT RM
E193
PATIENT RM
E195
PATIENT TLT
E196
PATIENT TLT
C39A
PATIENT TLT
E194
PATIENT RM
E189
PATIENT RM
E191
PATIENT TLT
E190
PATIENT TLT
E192
SOILED UTILITY
C142
MED SUPLY 2X A
C143
EQUIPMENT STORAGE
C138
DATA
C135
MEDITATION
C130
NURSE SATELITE
C110
OXYGEN
C129
TLT
C120
SOILED LINEN
C131
NOURISHMENT KITCHEN
C126
TOILET
C105A
EXAM ROOM
C105
STUDENT OFICE
C108
TOILET
C107
HAC
C106
CONSULT
C103
CLEAN STORAGE
C101
CLEAN LINEN
C104
MED ROOM
C109
CORRIDOR
C1
CORRIDOR
C10
CORRIDOR
C11
PATIENT TLT
C123A
PATIENT RM 1 BED
C123
PATIENT RM 1 BED
C125
PATIENT TLT
C125A
PATIENT RM 1 BED
C124
PATIENT TLT
C124A
PATIENT RM 1 BED
C137
PATIENT RM 1 BED
C145
DATA
C141
PATIENT TLT
C137A
PATIENT TLT
C145A
CORRIDOR
C10
ELECTRICAL
C136
ELEC
C139
PHASE
LIMIT LINE
PHASE
LIMIT LINE
NUTRITION
HAZARDOUS MATERIALS ABATEMENT
ABATEMENT PLAN
1ST FLOOR SOUTH - PHASE 2
HA112.S
CMKMAK
KEYPLAN
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
590-802
137C
MATCH LINE
9541 Belfort Road, Croghan, NY 13327
(T) 315.834.2356 (F) 315.346.6672 www.adkops.com
5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764
(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
LEAD AWARENESS NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:
INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR
UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE
PERMISSIBLE EXPOSURE LIMIT.
GENERAL NOTES:
1. ALL GENERAL NOTES FROM DRAWING HA111.N SHALL APPLY TO THIS WORK.
ASBESTOS ABATEMENT NOTES:
1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.
2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE
PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.
3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.
4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS
ARE ISOLATED AS REQUIRED.
AA-1 REMOVE AND DISPOSE OF 16,000 SF OF ASBESTOS-CONTAINING FLOOR TILE, FLOOR TILE, DOOR THRESHOLDS, DOOR
THRESHOLD MASTIC AND RELATED MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.
AA-2 REMOVE AND DISPOSE OF 3,000 SF OF ASBESTOS-CONTAINING FLOOR / WALL MASTIC AND RELATED MATERIALS FROM THE
AREAS INDICATED AND AS DESCRIBED ABOVE. THIS WILL REQUIRE THE ABATEMENT DEMOLITION OF CERAMIC TILE, PLASTIC
WALL VAPOR BARRIERS AND WALL STUDS.
AA-3 REMOVE AND DISPOSE OF FIVE (5) SF OF ASBESTOS-CONTAINING ROOF DRAIN DUCT INSULATION MASTIC AND RELATED
MATERIALS FROM THE AREAS INDICATED AND AS DESCRIBED ABOVE.
AA-4 REMOVE AND DISPOSE OF ASBESTOS-CONTAINING BLACK WINDOW SEALANT ON EIGHTY-EIGHT (88) WINDOWS, THIS WILL
REQUIRE ABATEMENT REMOVAL OF THE EXTERIOR WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS INDICATED
AND AS DESCRIBED ABOVE.
AA-5 REMOVE AND DISPOSE OF ASSUMED ASBESTOS-CONTAINING BLACK INTERIOR WINDOW SEALANT, FROM ELEVEN (11)
LOCATIONS, THIS WILL REQUIRE ABATEMENT REMOVAL OF WINDOW SYSTEM AND RELATED MATERIALS FROM THE AREAS
INDICATED AND AS DESCRIBED ABOVE.
AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS
INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS.
100% DESIGN SUBMISSION
NOT FOR CONSTRUCTION
P
Q
R
S
T
U
EA EA.6 EB EC ED
E8
E9
E1
E2
E3
E4
E5
E6
E7.5
E7
MATCH LINEMATCH LINE
P
Q
N
O
M
PHASE
LIMIT LINE
CORRRIDOR
C6
EQUIPMENT STORAGE
C131
UNOCCUPIED
C133
COMPUTER
C130
CLOSET
C9a
CORRIDOR
C7
CORRIDOR
C9
LAUNDRY
C138
DATA
C132
UNOCCUPIED
C134
SOILED UTILITY
C125
UNOCCUPIED
C136
UNOCCUPIED
C137
TLT.
C139
PATIENT TLT
C120a
C117
CLERK w/ MED.
C118b
PATIENT RM 4 BED
C120
PATIENT TLT
C115a
CORRIDOR
C5
PATIENT TLT
C122a
MED. SURG. 2X A DAY
C126
PATIENT RM 4 BED
C129
PATIENT RM 2 BED
C127
LINEN
C123
HAC
C124
PATIENT RM 4 BED
C122
PHARM.
C119
MEDICATION
C118a
CORRIDOR
STAFF SHOWER
E130
PATIENT TLT
E132
PATIENT TLT
E122
PATIENT TLT
E126
PATIENT TLT
E120
PATIENT TLT
E124
PATIENT RM 18 (1) BED
E127
PATIENT RM 17 (1) BED
E125
PATIENT RM 16 (1) BED
E121
PATIENT RM 15 (1) BED
E119
PATIENT RM 14 (1) BED
E123
STAFF SHOWER
E129
PATIENT TLT
E128
SCI CHIEF OFFICE
E117
CLO
E101
TOILET
E102
PVA
E103
ELECTRICAL
E104
WARMING KITCHEN
E105
DINING
E100
ELEC
E118
CORRIDOR
C4
NURSES SAT.
C118
CORRIDOR
C8
CORRIDOR
CORRIDOR
C5
EQUIPMENT STORAGE
C128
CORRIDOR
C7
DENTAL CLINIC
E112
NUTRITION
14 15 7 7a 8 9 9a 10 11 12 13
HAZARDOUS MATERIALS ABATEMENT
DUCT ABATEMENT PLAN
1ST FLOOR NORTH - PHASE 1
HA113.N
CMKMAK
KEYPLAN
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
590-802
137C
MATCH LINE
9541 Belfort Road, Croghan, NY 13327
(T) 315.834.2356 (F) 315.346.6672 www.adkops.com
5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764
(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
GENERAL NOTES:
1. CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE, STATE AND FEDERAL RULES, REGULATIONS, GUIDELINES, VARIANCES, AND THE CONTRACT DOCUMENTS
2. THE LOCATION OF ANY SITE STORAGE OF MATERIAL, EQUIPMENT, AND WASTE TRAILER/DUMPSTER SHALL BE COORDINATED WITH AND
APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA(S) IN A CLEAN AND SAFE CONDITION. CONTRACTOR SHALL ENSURE THAT
UNCERTIFIED PERSONNEL OR UNAUTHORIZED VISITORS DO NOT ENTER ACTIVE WORK AREAS AT ANY TIME.
4. CONTRACTOR SHALL PROTECT ALL FINISHES SCHEDULED TO REMAIN (I.E. FLOORS, WALLS, ETC.) CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL DAMAGE TO FINISHES SCHEDULED TO REMAIN.
5. CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION TO KEEP THE WORK AREAS IN A SECURE CONDITION AT ALL TIMES DURING THE
PERFORMANCE OF THE CONTRACT WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGED CAUSED TO ANY AREAS OF THE
BUILDING AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR SECURITY.
6. ALL HAZARDOUS WASTE/CONTAMINATED MATERIALS REMOVAL, CLEANING, AND PACKAGING SHALL BE PERFORMED BY PERSONS TRAINED IN
ACCORDANCE WITH 29CFR 1910.120 (OSHA) UNDER THE DIRERCT SUPERVISION OF AN OSHA QUALIFIED "COMPETENT PERSON". ALL
PERSONS SHALL BE TRAINED AND CERTIFIED FOR ASBESTOS IN ACCORDANCE WITH NYS ICR 56 AND HAZARDOUS MATERIALS ABATEMENT
AND REMEDIATION.
7. WORKERS SHALL BE REQUIRED TO FOLLOW ALL APPROVED HEALTH AND SAFETY PROCEDURES AND FOLLOW THE ACCEPTED PERSONAL
DECONTAMINATION SEQUENCE AS DESCRIBED IN THE CONTRACTOR'S HEALTH AND SAFETY PLAN (HASP) UPON EXIT FORM WORK AREAS.
8. CONTRACTING OFFICER'S REPRESENTATIVE SHALL SIGN ALL HAZARDOUS WASTE AND NON-HAZARDOUS WASTE MANIFESTS, SHIPPING
PAPERS, BILLS OF LADING AND OTHER WASTE SHIPMENT RECORDS. CONTRACTOR SHALL PROVIDE ALL COPIES WITH ALL SECTIONS
COMPLETELY FILLED IN AND READY TO BE SIGNED A MINIMUM OF 72 HOURS PRIOR TO SCHEDULED REMOVAL FROM THE SITE.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF ALL ITEMS INCLUDING: MOBILIZATION, TEMPORARY FACILITIES, UTILITY
CONNECTIONS, DEMOLITION, ABATEMENT, REMEDIATION, CLEANUP, SECURITY, STAGING, AND DISPOSAL.
10. CONTRACTOR SHALL PROVIDE ALL SCAFFOLDING, LIFTS, ETC. REQUIRED TO COMPLETE SCHEDULED REMOVALS.
11. ANY REMOVED COMPONENTS TO BE DISPOSED OF AS NON-ACM OR RECYCLED SHALL BE INSPECTED AND APPROVED FOR CLEANLINESS BY
THE CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO DISPOSAL OR RECYCLING.
12. ELECTRICAL POWER AND WATER NECESSARY TO PERFORM THE ABATEMENT WILL BE PROVIDED BY THE FACILITY AT A CONNECTION POINT
IDENTIFIED BY THE FACILITY. CONTRACTOR IS RESPONSIBLE FOR ALL CONNECTIONS AND DISCONNECTIONS.
13. CONTRACTOR SHALL PROVIDE ALL TEMPORARY RESTROOM FACILITIES REQUIRED BY WORKERS.
14. COORDINATE ALL HVAC, PLUMBING, AND ELECTRICAL, MECHANICAL, GAS AND OTHER SHUT DOWNS WITH THE OWNER PRIOR TO THE
COMMENCEMENT OF ABATEMENT WORK.
15. FIRE SAFETY SYSTEMS, ALARM AND PROTECTION SYSTEMS (SENSORS, SPRINKLERS, EMERGENCY LIGHTS AND ALARMS, CAMERAS, ETC..)
MUST BE MAINTAINED IN AN OPERATING CONDITION DURING THE WORK UNLESS SPECIFIC RELIEF IS GRANTED BY THE FACILITY.
16. DO NOT COMPROMISE STRUCTURAL INTEGRITY OF THE BUILDING.
17. ALL EMERGENCY EXISTS TO THE BUILDING AND WORK AREAS MUST BE MAINTAINED THROUGHOUT THE WORK. PROVIDE FIRE EVACUATION
PLAN FOR WORK AREAS - POST AT EACH DECONTAMINATION UNIT. PROVIDE ONE 2-A OR 40-B:C FIRE EXTINGUISHER AT EACH WORK AREA.
18. LEVELS ABOVE AND BENEATH ABATEMENT AREAS ARE FINISHED AND OCCUPIED SPACES, ABATEMENT CONTRACTOR SHALL TAKE ALL
NECESSARY MEASURES TO PROTECT THESE AREAS FROM CONTAMINATION OR DAMAGE INCLUDING SEALING ANY PENETRATIONS WITH
WATER PROOF SEAL PRIOR TO ABATEMENT.
19. THE FIGURES SHOWN ON THE DRAWINGS ARE INCLUDED HEREIN FOR INFORMATION PURPOSES ONLY. THE ABATEMENT DESIGNER IS NOT
STATING THAT THESE MEASUREMENTS AND QUANTITIES ARE COMPLETELY ACCURATE, BUT ARE BASED UPON THE AVAILABLE DATA.
20. ALL WASTE MUST BE REMOVED FROM THE SITE WITHIN 10 DAYS OF JOB COMPLETION. ALL WASTE MANIFESTS SHALL BE SIGNED BY THE
DISPOSAL FACILITY AND RETURNED TO THE OWNER WITHIN 30 DAYS. THE DISPOSAL FACILITY USED SHALL BE THE SAME DISPOSAL FACILITY
AS LISTED IN PROJECT NOTIFICATION. ANY DEVIATIONS FROM THE NOTIFICATION INFORMATION SHALL REQUIRE APPROVAL.
21. IN LIEU OF A SINGLE BACKUP UNIT, A FULLY REDUNDANT BANK OF NEGATIVE AIR MACHINES SHALL BE INSTALLED IN ANY LARGE ABATEMENT
WORK AREA.
22. CONTRACTOR SHALL HAVE STAFF AVAILABLE TO RESPOND TO THE SITE WITHIN ONE (1) HOUR SHOULD THE NEED ARISE WHILE WORK AREAS
ARE UNDER CONTAINMENT.
23. A DIGITAL MANOMETER SHALL BE UTILIZED ON ALL LARGE OR SMALL SIZED ABATEMENT WORK AREAS, MANOMETER LOCATION TO BE
COORDINATED WITH THE COR.
ASBESTOS ABATEMENT NOTES:
1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.
2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE
PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.
3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.
4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS
ARE ISOLATED AS REQUIRED.
AA-1 NOT USED.
AA-2 NOT USED.
AA-3 NOT USED.
AA-4 NOT USED.
AA-5 NOT USED.
AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS
INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS. ABATEMENT CONTRACTOR IS
RESPONSIBLE FOR ALL REMOVALS NECESSARY TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.
LEAD AWARENESS NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:
INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR
UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE
PERMISSIBLE EXPOSURE LIMIT.
100% DESIGN SUBMISSION
NOT FOR CONSTRUCTION
U
E8
E9
E10
E11
E12
E13
E14
E15
V
W
X
MATCH LINEMATCH LINE
PHASE
LIMIT LINE
PHASE
LIMIT LINE
PHASE
LIMIT LINE
PHASE
LIMIT LINE
E19
E16
E17
E18
Y
Z
AA
BB
CC
STAFF
C116
UNOCCUPIED
C137
TLT.
C139
PATIENT RM
C115
PATIENT TLT
C120a
C117
CLERK w/ MED.
C118b
PATIENT RM 4 BED
C120
PATIENT TLT
C115a
STAFF SHOWER
E130
PATIENT TLT
E132
PATIENT RM 19 (1) BED
E131
CORRIDOR
C5
CORRIDOR
C7
CORRIDOR
CORRIDOR CORRIDOR
CORRIDOR
CORRIDOR
PATIENT TLT
E134
PATIENT TLT
E138
PATIENT TLT
E140
PATIENT TLT
E144
PATIENT RM 19 (1) BED
E131
PATIENT RM 20 (1) BED
E133
PATIENT RM 21 (1) BED
E137
PATIENT RM 21 (1) BED
E135
PATIENT TLT
E136
PATIENT RM 22 (1) BED
E139
PATIENT TLT
E146
PATIENT RM 24 (1) BED
E145
PATIENT RM 23 (1) BED
E143
CLN LINEN
E141
SPD
E142
PATIENT TLT
C41A
PATIENT RM
C41
CORRIDOR
PATIENT RM
C39
PATIENT RM
E193
PATIENT RM
E195
PATIENT TLT
E196
PATIENT TLT
C39A
PATIENT TLT
E194
PATIENT RM
E189
PATIENT RM
E191
PATIENT TLT
E190
PATIENT TLT
PATIENT TLT
E192
PATIENT TLT DAY RM UNIT C EXAM
CORRIDOR
C2
PATIENT RM 2 BED
C108
PATIENT RM 2 BED
C109
PATIENT TLT
C101a
PATIENT TLT
C108a
SOILED UTILITY
C110
WOUND CARE
C102
NURSE MANG.
C104
PATIENT RM 4 BED
C112
UNOCCUPIED
C101
CORRIDOR
C3
SOILED LINEN
C114
PATIENT RM 2 BED
C107
PATIENT RM 2 BED
C106
PATIENT TLT
C106a
CORRIDOR
C2
CORRIDOR
C11
CORRIDOR
C1
CORRIDOR
C10
STUDENT OFFICE
C103c
TOILET
C103B
MED ROOM
C103d
NM
C152
NURSE SATELITE
C105
OXYGEN
C105a
SOILED LINEN
C146
CHARGING ROOM
C111
TLT
C147
BOWEL TRAINING
C113
DATA
C145
ELECTRICAL
C111a
UNOCCUPIED
C143
HAC
C148
UNOCCUPIED
C149
UNDER CONSTRUCTION
C151
UNDER CONSTRUCTION
C150
UNDER CONSTRUCTION
C150a
SHARED PSYCH OFF
C153
TOILET
C103a
UNDER CONSTRUCT
C100a
UNDER CONSTRUCTION
C100
UNDER CONSTRUCTION
C155
UNDER CONSTRUCTION
C154
CORRIDOR
C10
CL. STERILE
C142
NUTRITION
HAZARDOUS MATERIALS ABATEMENT
DUCT ABATEMENT PLAN
1ST FLOOR SOUTH - PHASE 1
HA113.S
CMKMAK
KEYPLAN
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
590-802
137C
MATCH LINE
9541 Belfort Road, Croghan, NY 13327
(T) 315.834.2356 (F) 315.346.6672 www.adkops.com
5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764
(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
GENERAL NOTES:
1. ALL GENERAL NOTES FROM DRAWING HA111.N SHALL APPLY TO THIS WORK.
LEAD AWARENESS NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:
INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR
UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE
PERMISSIBLE EXPOSURE LIMIT.
ASBESTOS ABATEMENT NOTES:
1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.
2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE
PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.
3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.
4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS
ARE ISOLATED AS REQUIRED.
AA-1 NOT USED.
AA-2 NOT USED.
AA-3 NOT USED.
AA-4 NOT USED.
AA-5 NOT USED.
AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS
INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS. ABATEMENT CONTRACTOR IS
RESPONSIBLE FOR ALL REMOVALS NECESSARY TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.
100% DESIGN SUBMISSION
NOT FOR CONSTRUCTION
P
Q
R
S
T
U
EA EA.6 EB EC ED
E8
E9
E1
E2
E3
E4
E5
E6
E7.5
E7
MATCH LINEMATCH LINE
P
Q
N
O
M
CORRIDOR
STAFF SHOWER
E130
PATIENT TLT
E132
PATIENT TLT
E122
PATIENT TLT
E126
PATIENT TLT
E120
PATIENT TLT
E124
PATIENT RM 18 (1) BED
E127
PATIENT RM 17 (1) BED
E125
PATIENT RM 16 (1) BED
E121
PATIENT RM 15 (1) BED
E119
PATIENT RM 14 (1) BED
E123
STAFF SHOWER
E129
PATIENT TLT
E128
SCI CHIEF OFFICE
E117
CLO
E101
TOILET
E102
PVA
E103
ELECTRICAL
E104
WARMING KITCHEN
E105
DINING
E100
ELEC
E118
PATIENT RM 1 BED
C159
PATIENT TLT
C159A
PATIENT RM 1 BED
C163
CATV
C183A
STAFF LOCKERS
C181A
CORRIDOR
C6
INTERNET CAFE
C178
STAFF LOUNGE
C181
OFFICE
C175
PSYCH OFFICE
C174
NM
C171
CLEAN SUPPLY
C172
MED ROOM
C170
HAC
C169
SOILED LINEN
C167
CLOSET
C158
NM
C160
DAY ROOM
C162
SOILED UTILITY
C183
CLEAN LINEN
C176
CORRIDOR
C7
CORRIDOR
C9
PATIENT TLT
C163A
CORRIDOR
CORRIDOR
C7
PATIENT TLT
C120a
C117
CLERK w/ MED.
C118b
PATIENT RM 4 BED
C120
PATIENT TLT
C115a
CORRIDOR
C5
PATIENT TLT
C122a
MED. SURG. 2X A DAY
C126
PATIENT RM 4 BED
C129
PATIENT RM 2 BED
C127
LINEN
C123
HAC
C124
PATIENT RM 4 BED
C122
PHARM.
C119
MEDICATION
C118a
CORRIDOR
C4
NURSES SAT.
C118
CORRIDOR
C8
CORRIDOR
C5
DENTAL CLINIC
E112
PHASE
LIMIT LINE
PHASE
LIMIT LINE
NUTRITION
14 15 7 7a 8 9 9a 10 11 12 13
HAZARDOUS MATERIALS ABATEMENT
DUCT ABATEMENT PLAN
1ST FLOOR NORTH - PHASE 2
HA114.N
CMKMAK
KEYPLAN
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
590-802
137C
MATCH LINE
9541 Belfort Road, Croghan, NY 13327
(T) 315.834.2356 (F) 315.346.6672 www.adkops.com
5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764
(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
LEAD AWARENESS NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:
INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR
UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE
PERMISSIBLE EXPOSURE LIMIT.
GENERAL NOTES:
1. ALL GENERAL NOTES FROM DRAWING HA111.N SHALL APPLY TO THIS WORK.
ASBESTOS ABATEMENT NOTES:
1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.
2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE
PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.
3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.
4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS
ARE ISOLATED AS REQUIRED.
AA-1 NOT USED.
AA-2 NOT USED.
AA-3 NOT USED.
AA-4 NOT USED.
AA-5 NOT USED.
AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS
INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS. ABATEMENT CONTRACTOR IS
RESPONSIBLE FOR ALL REMOVALS NECESSARY TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.
100% DESIGN SUBMISSION
NOT FOR CONSTRUCTION
U
E8
E9
E10
E11
E12
E13
E14
E15
V
W
X
MATCH LINEMATCH LINE
E19
E16
E17
E18
Y
Z
AA
BB
CC
STAFF SHOWER
E130
PATIENT TLT
E132
PATIENT RM 1 BED
C159
PATIENT TLT
C159A
PATIENT RM 1 BED
C163
PATIENT TLT
C163A
CORRIDOR
C7
PATIENT TLT
C120a
C117
CLERK w/ MED.
C118b
PATIENT RM 4 BED
C120
PATIENT TLT
C115a
CORRIDOR
C5
CORRIDOR
C2
PATIENT RM 2 BED
340 SF
PATIENT RM 2 BED
348 SF
PATIENT TLT
131 SF
PATIENT TLT
131 SF
SOILED UTILITY
112 SF
WOUND CARE
335 SF
NM
119 SF
PATIENT RM 4 BED
618 SF
UNOCCUPIED
224 SF
CORRIDOR
C3
PATIENT RM
205 SF
OFFICE
57 SF
PATIENT RM 2 BED
350 SF
PATIENT RM 2 BED
329 SF
PATIENT TLT
132 SF
CORRIDOR
C2
CORRIDOR
CORRIDOR
CORRIDOR
PATIENT TLT
E134
PATIENT TLT
E138
PATIENT TLT
E140
PATIENT TLT
E144
PATIENT RM 19 (1) BED
E131
PATIENT RM 20 (1) BED
E133
PATIENT RM 21 (1) BED
E137
PATIENT RM 21 (1) BED
E135
PATIENT TLT
E136
PATIENT RM 22 (1) BED
E139
PATIENT TLT
E146
PATIENT RM 24 (1) BED
E145
PATIENT RM 23 (1) BED
E143
CLN LINEN
E141
SPD
E142
PATIENT TLT
C41A
PATIENT RM
C41
CORRIDOR
PATIENT RM
C39
PATIENT RM
E193
PATIENT RM
E195
PATIENT TLT
E196
PATIENT TLT
C39A
PATIENT TLT
E194
PATIENT RM
E189
PATIENT RM
E191
PATIENT TLT
E190
PATIENT TLT
E192
SOILED UTILITY
C142
MED SUPLY 2X A
C143
EQUIPMENT STORAGE
C138
DATA
C135
MEDITATION
C130
NURSE SATELITE
C110
OXYGEN
C129
TLT
C120
SOILED LINEN
C131
NOURISHMENT KITCHEN
C126
TOILET
C105A
EXAM ROOM
C105
STUDENT OFICE
C108
TOILET
C107
HAC
C106
CONSULT
C103
CLEAN STORAGE
C101
CLEAN LINEN
C104
MED ROOM
C109
CORRIDOR
C1
CORRIDOR
C10
CORRIDOR
C11
PATIENT TLT
C123A
PATIENT RM 1 BED
C123
PATIENT RM 1 BED
C125
PATIENT TLT
C125A
PATIENT RM 1 BED
C124
PATIENT TLT
C124A
PATIENT RM 1 BED
C137
PATIENT RM 1 BED
C145
DATA
C141
PATIENT TLT
C137A
PATIENT TLT
C145A
CORRIDOR
C10
ELECTRICAL
C136
ELEC
C139
PHASE
LIMIT LINE
PHASE
LIMIT LINE
NUTRITION
HAZARDOUS MATERIALS ABATEMENT
DUCT ABATEMENT PLAN
1ST FLOOR SOUTH - PHASE 2
HA114.S
CMKMAK
KEYPLAN
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
590-802
137C
MATCH LINE
9541 Belfort Road, Croghan, NY 13327
(T) 315.834.2356 (F) 315.346.6672 www.adkops.com
5032 Rouse Drive, Suite 100 Virginia Beach, VA 23462-3764
(T) 757.490.9264 MSAonline.comNO. DESCRIPTION DATE
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT
Project Director
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
LEAD AWARENESS NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION:
INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEES MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR
UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR EXPOSURE ABOVE THE
PERMISSIBLE EXPOSURE LIMIT.
GENERAL NOTES:
1. ALL GENERAL NOTES FROM DRAWING HA111.N SHALL APPLY TO THIS WORK.
ASBESTOS ABATEMENT NOTES:
1. SEE SPEC. SECTION 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT, FOR ADDITIONAL REQUIREMENTS.
2. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AREA PARTITIONING AND COORDINATION REQUIRED TO COMPLY WITH THE
PROJECT PHASING PLAN AND MAINTAIN EGRESS AS INDICATED IN THE PROJECT PHASING PLAN.
3. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.
4. CONTRACTOR SHALL INSTALL CRITICAL BARRIERS ON/WITHIN HVAC DUCT SYSTEMS SUCH THAT ABATEMENT WORK AREAS
ARE ISOLATED AS REQUIRED.
AA-1 NOT USED.
AA-2 NOT USED.
AA-3 NOT USED.
AA-4 NOT USED.
AA-5 NOT USED.
AA-6 REMOVE AND DISPOSE OF 4,000 SF OF DUCT, INSULATION, MASTICS, SEALERS AND RELATED MATERIALS FROM THE AREAS
INDICATED AND AS DESCRIBED ABOVE AND IN THE MECHANICAL DEMOLITION DRAWINGS. ABATEMENT CONTRACTOR IS
RESPONSIBLE FOR ALL REMOVALS NECESSARY TO ACCESS MATERIALS SCHEDULED FOR REMOVAL.
100% DESIGN SUBMISSION
NOT FOR CONSTRUCTION
C-001
DMW LEM
COVER SHEET
PROJECT SITE
ABBREVIATIONS SITE DATA
SHEET NO.
SHEET INDEX
TITLE
LOCATION MAP
CONTRACT DATA
HAMPTON, VIRGINIA
FOR
SITE PLAN
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER
SCI RENOVATION AND RESIDENCE ADDITION
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
A Se rv ic e
D i s ab led
Ve t eran Owned Sma l l Business
SDVOSB
CVE
MR PROJECT NO: 0500-0016
SCI RENOVATION
AND RESIDENCE ADDITION
HAMPTON, VIRGINIA
590-802
137C
NO. DESCRIPTION DATE
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6"
6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot 4 on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseENGINEER OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .