ATTACHMENT 06_ALL CLINs - Master Spreadsheet Nationwide Elevator Modernization_04222026.xlsx
XLSX spreadsheet 244 KB Posted
- Attached to
- J035--Proj #TBD | Elevator Modernization | Elias/Prather Federal contract opportunity
- Solicitation number
- 36c77626B0007_1
About this file
This is a Master Elevator Specifications Spreadsheet for a nationwide VA elevator modernization program that provides contractors with detailed information necessary to develop accurate bids across 101 Contract Line Item Numbers (CLINs) spanning multiple Veterans Integrated Service Networks (VISNs).
The workbook organizes elevator modernization requirements across two primary tabs: the CLIN Information tab identifies 101 separate CLINs by location, VISN assignment, period of performance (ranging from 286 to 1,825 days), and number of elevators per site (1 to 28 units); the Master Elevator List tab provides granular site-specific equipment details including elevator type (hydraulic or traction), capacity, speed, floor coverage, roping configuration, plunger size, building criticality ratings, seismic design categories, phasing restrictions, and comprehensive condition assessments. Key operational considerations documented include laydown space availability (200 square feet for hydraulic, 400 for traction), internal storage capabilities, contractor parking restrictions and availability, machine room drawing availability, electrical single-line drawing availability, hydraulic plunger assembly installation dates, and site-specific hazardous material impacts. The elevators represent diverse vintages and conditions—ranging from 1928 drum-driven units to 2012 modernized systems—with recommendations spanning from minor component repairs to complete system replacements. Contractors must cross-reference CLINs to specific elevators using site names and VISN numbers, with all data current as of the solicitation issuance date and subject to updates from the program team.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions for Use of Workbook |
| Purpose of This Workbook: |
This workbook provides contractors with the information necessary to develop accurate bids for the elevator modernization efforts within the program. The data is organized to allow clear navigation between CLIN-level requirements and detailed elevator specifications.
How to Use This Workbook:
1. Start with the CLIN Information (Tab: “CLIN Info”) Begin by reviewing the CLIN breakdown to understand which Contract Line Item Number (CLIN) you will be bidding on.
The CLIN Info tab provides:
-The CLIN number associated with each group of elevators.
-The site/city where the elevators are located.
-The VISN associated with each site.
-The Period of Performance (PoP) for each CLIN.
-The number of elevators included at each site under that CLIN.
Use this tab to identify the correct CLIN and associated site before reviewing detailed specifications.
2. Review Detailed Elevator Information (Tab: “Master Elevator List”) After determining the CLIN you will be pricing, refer to the Master Elevator List for detailed, site-specific equipment information.
This tab includes:
-Elevator type (hydraulic or traction) -Floors served -Platform size -Phasing requirements or restrictions -Condition assessment summaries -Additional operational or site-specific considerations Use this information to verify scope elements and ensure your proposal addresses each elevator’s unique requirements.
3. Cross-Referencing CLINs to Elevators -Each elevator in the Master Elevator List is associated with a specific site and VISN, which align with the sites listed in the CLIN Info tab.
-Use the site/city name and VISN number to cross-reference between the two tabs as needed.
4. General Notes -Ensure you review both tabs before finalizing your bid.
-All data is current as of the date of issuance; updates will be provided if required.
-If discrepancies or questions arise, contact the program team for clarification prior to submission.
CLIN Info
| CLIN | VISN | Location (City) | Period of Performance (Days) | Number of Elevators |
| 0001 | VISN 10 | Ann Arbor | 454 | 6 |
| 0002 | VISN 10 | Battle Creek | 336 | 2 |
| 0003 | VISN 15 | Marion | 370 | 2 |
| 0004 | VISN 20 | Portland | 1193 | 21 |
| 0005 | VISN 23 | St. Cloud | 403 | 7 |
| 0006 | VISN 6 | Richmond | 437 | 2 |
| 0007 | VISN 7 | Columbia | 319 | 2 |
| 0008 | VISN 7 | Dublin | 336 | 1 |
| 0009 | VISN 8 | Bay Pines | 941 | 19 |
| 0010 | VISN 8 | West Palm Beach | 538 | 16 |
| 0011 | VISN 8 | Lake City | 420 | 6 |
| 0012 | VISN 8 | Tampa | 462 | 13 |
| 0013 | VISN 8 | Orlando | 1540 | 28 |
| 0014 | VISN 1 | Bedford | 361 | 6 |
| 0015 | VISN 1 | West Roxbury | 588 | 11 |
| 0016 | VISN 1 | Brockton | 361 | 4 |
| 0017 | VISN 1 | Manchester | 638 | 5 |
| 0018 | VISN 1 | Leeds MA | 336 | 4 |
| 0019 | VISN 1 | West Haven | 1621 | 18 |
| 0020 | VISN 1 | Newington | 739 | 12 |
| 0021 | VISN 10 | Chillicothe | 286 | 1 |
| 0022 | VISN 10 | Cleveland | 815 | 8 |
| 0023 | VISN 10 | Indianapolis | 890 | 3 |
| 0024 | VISN 10 | Marion | 420 | 3 |
| 0025 | VISN 15 | Kansas City | 336 | 3 |
| 0026 | VISN 15 | Columbia | 882 | 6 |
| 0027 | VISN 15 | Topeka | 582 | 12 |
| 0028 | VISN 15 | Leavenworth | 412 | 7 |
| 0029 | VISN 15 | Wichita | 361 | 9 |
| 0030 | VISN 15 | St. Louis, MO (Jefferson Barracks) | 437 | 12 |
| 0031 | VISN 15 | Poplar Bluff | 437 | 2 |
| 0032 | VISN 16 | Houston | 1168 | 8 |
| 0033 | VISN 16 | Little Rock, AR | 386 | 2 |
| 0034 | VISN 16 | North Little Rock, AR | 689 | 16 |
| 0035 | VISN 16 | Shreveport | 874 | 8 |
| 0036 | VISN 17 | Amarillo | 353 | 1 |
| 0037 | VISN 17 | Big Spring | 336 | 1 |
| 0038 | VISN 17 | Dallas | 664 | 8 |
| 0039 | VISN 17 | Bonham | 386 | 6 |
| 0040 | VISN 17 | San Antonio | 412 | 6 |
| 0041 | VISN 17 | Temple | 386 | 2 |
| 0042 | VISN 17 | Waco | 336 | 1 |
| 0043 | VISN 19 | Fort Harrison, MT | 336 | 1 |
| 0044 | VISN 19 | Cheyenne | 437 | 6 |
| 0045 | VISN 19 | Grand Junction | 370 | 2 |
| 0046 | VISN 19 | Muskogee | 588 | 6 |
| 0047 | VISN 19 | Oklahoma City | 462 | 2 |
| 0048 | VISN 19 | Sheridan | 412 | 9 |
| 0049 | VISN 19 | Tulsa | 353 | 4 |
| 0050 | VISN 2 | Bronx | 1798 | 21 |
| 0051 | VISN 2 | Buffalo | 1540 | 18 |
| 0052 | VISN 2 | Batavia | 538 | 7 |
| 0053 | VISN 2 | Canandaigua | 361 | 8 |
| 0054 | VISN 2 | Bath NY | 370 | 10 |
| 0055 | VISN 2 | Syracuse | 1624 | 8 |
| 0056 | VISN 2 | Albany | 319 | 1 |
| 0057 | VISN 2 | Lyons | 538 | 21 |
| 0058 | VISN 2 | Montrose | 386 | 17 |
| 0059 | VISN 2 | Wappingers Falls | 386 | 5 |
| 0060 | VISN 2 | (NY) Margaret Cochran Corbin | 1825 | 14 |
| 0061 | VISN 2 | Brooklyn | 1470 | 16 |
| 0062 | VISN 2 | St Albans, Queens | 412 | 4 |
| 0063 | VISN 2 | Northport | 412 | 10 |
| 0064 | VISN 20 | Roseburg | 361 | 2 |
| 0065 | VISN 20 | Seattle | 1344 | 8 |
| 0066 | VISN 20 | American Lake/Tacoma | 386 | 7 |
| 0067 | VISN 21 | Las Vegas | 1806 | 22 |
| 0068 | VISN 21 | Reno | 689 | 6 |
| 0069 | VISN 21 | San Francisco | 412 | 2 |
| 0070 | VISN 22 | Albuquerque | 336 | 2 |
| 0071 | VISN 22 | Long Beach | 1750 | 12 |
| 0072 | VISN 22 | Loma Linda | 588 | 3 |
| 0073 | VISN 22 | Prescott | 815 | 11 |
| 0074 | VISN 22 | San Diego | 353 | 4 |
| 0075 | VISN 22 | Tucson | 454 | 7 |
| 0076 | VISN 22 | West Los Angeles | 454 | 21 |
| 0077 | VISN 22 | Sepulveda | 538 | 13 |
| 0078 | VISN 23 | Fort Meade | 437 | 4 |
| 0079 | VISN 23 | Hot Springs | 697 | 7 |
| 0080 | VISN 23 | Omaha | 361 | 1 |
| 0081 | VISN 23 | Des Moines | 336 | 1 |
| 0082 | VISN 4 | Coatesville, PA | 538 | 5 |
| 0083 | VISN 4 | Philadelphia | 1562 | 16 |
| 0084 | VISN 4 | Pittsburgh - UD | 1533 | 17 |
| 0085 | VISN 4 | Pittsburgh - Heinz | 403 | 8 |
| 0086 | VISN 4 | Wilkes Barre | 487 | 5 |
| 0087 | VISN 5 | Perry Point | 420 | 10 |
| 0088 | VISN 5 | Huntington WV | 1042 | 10 |
| 0089 | VISN 5 | Martinsburg | 613 | 2 |
| 0090 | VISN 5 | Washington | 336 | 2 |
| 0091 | VISN 6 | Durham | 336 | 2 |
| 0092 | VISN 6 | Hampton | 319 | 1 |
| 0093 | VISN 6 | Salisbury | 588 | 4 |
| 0094 | VISN 7 | Atlanta | 462 | 5 |
| 0095 | VISN 7 | Birmingham | 1294 | 4 |
| 0096 | VISN 7 | Charleston | 336 | 1 |
| 0097 | VISN 7 | Tuskegee | 538 | 3 |
| 0098 | VISN 7 | Tuscaloosa | 437 | 6 |
| 0099 | VISN 8 | San Juan Puerto Rico | 1394 | 14 |
| 0100 | VISN 9 | Memphis | 336 | 2 |
| 0101 | VISN 9 | Mountain Home, TN | 412 | 6 |
Master Elevator List
| Line Item Numbers | VISN | Station Number | State | Location (City) | Building Number | FCA Record # | Elevator Name & Number | Elevator Type | Elevator use | Overall Platform Size (inches) | Clear Inside Platform (inches) (Occupiable, inside cab) | Rated Load (lbs) | Contract Speed (FPM) | Total Travel (feet) | Floors Served | # of Openings or Landings | Entrance Type and Size (center opening, telescoping, automatic, etc.) | Type of Roping (configuration) | Plunger Size (diameter inches) N/A for traction | Building Criticality (FCD) | Seismic Design Category (SDC) | Hazardous Material Impact? | Phasing Restrictions | Notes | FCA Description | Can Site Meet Laydown Requirements - Hydro: 200 sq-ft; Traction: 400 sq-ft (Yes/No) | Location Description | Can Laydown Space be Provided within Building (Yes/No) | Internal Area Details | Does the Site have Contractor Parking Restrictions (Yes/No) | Number of Parking Spaces Available | Are Machine Room Drawings Available | Are Single Line Electrical Drawings Available | Can you Confirm Hydraulic Plunger Assembly is after Jan. 1 1995 | Notes |
| 0001 | VISN 10 | 506 | MI | Ann Arbor | 3 | 8219 | P1 | Hydraulic | Passenger | 4608 | 4080 | 2000 | 125 | 19 | 3 | 3 | 2 Speed Side Opening - Front Only | N/A | 4" | ancillary | B | N | Single elevator not in a bank | N/A | Elevator P1, Simplex operation. Schindler Haughton relay based controls installed in 1980 serving three total landings. Conventional inground hydraulic jack. #2000 capacity with 125 FPM rated car speed. Conventional tank over power unit . Door operation is poor. Complete modernization of elevator is recommended. | ||||||||||
| Yes | Lot H will be utilized for shipping containers. | Yes | Elevator machine room will be available as directed by COR. | N/A | N/A | N/A | Yes | No | Elevator machine room will be available as directed by COR. | ||||||||||||||||||||||||||
| 0001 | VISN 10 | 506 | MI | Ann Arbor | 30 | 8247 | WE1 | Hydraulic | Passenger | 7128 | 6132 | 3500 | 125 | 44 | 5 | 5 | 2 Speed Side Opening - Front Only | N/A | 6" | essential | B | N | 1 elevator under modernization at a time | N/A | Elevators WE1/WE2, Duplex operation service five landings. Schindler MPH-II controls installed in 1996 with conventional in ground hydraulic jack assemblies. #3500 capacity with 125 FPM rated car speed. Conventional tank over power units with Maxton valves. New solid state starer added to WE2. QKS door operators. Complete modernization is recommended for units, exceeds useful lifespan. | ||||||||||
| Yes | Lot H will be utilized for shipping containers. | Yes | Elevator machine room will be available as directed by COR. | N/A | N/A | N/A | Yes | No | Elevator machine room will be available as directed by COR. | ||||||||||||||||||||||||||
| 0001 | VISN 10 | 506 | MI | Ann Arbor | 30 | 8247 | WE2 | Hydraulic | Passenger | 7128 | 6132 | 3500 | 125 | 44 | 5 | 5 | 2 Speed Side Opening - Front Only | N/A | 6" | essential | B | N | 1 elevator under modernization at a time | N/A | Elevators WE1/WE2, Duplex operation service five landings. Schindler MPH-II controls installed in 1996 with conventional in ground hydraulic jack assemblies. #3500 capacity with 125 FPM rated car speed. Conventional tank over power units with Maxton valves. New solid state starer added to WE2. QKS door operators. Complete modernization is recommended for units, exceeds useful lifespan. | ||||||||||
| Yes | Lot H will be utilized for shipping containers. | Yes | Elevator machine room will be available as directed by COR. | N/A | N/A | N/A | Yes | No | Elevator machine room will be available as directed by COR. | ||||||||||||||||||||||||||
| 0001 | VISN 10 | 506 | MI | Ann Arbor | 31 | 8285 | S1 | Hydraulic | Service | 12321 | 11449 | 3500 | 125 | 36 | 5 | 5 | Front and Rear Opening | N/A | 5.5" | critical | B | N | 1 elevator under modernization at a time | N/A | Elevators S1/S2, Duplex operation. Conventional in ground hydraulic cylinders with #3500 capacity and 125 rated car speed. Schindler MPH-II controllers installed in 1995. Serves three landings. Machine room is shared for S1/S2/P1. Conventional tank over power units. Front and rear opening. QKS-14 door operators. | ||||||||||
| Yes | Lot H will be utilized for shipping containers. | Yes | Elevator machine room will be available as directed by COR. | N/A | N/A | N/A | Yes | No | Elevator machine room will be available as directed by COR. | ||||||||||||||||||||||||||
| 0001 | VISN 10 | 506 | MI | Ann Arbor | 31 | 8285 | S2 | Hydraulic | Service | 12321 | 11449 | 3500 | 125 | 36 | 4 | 4 | Front and Rear Opening | N/A | 5.5" | critical | B | N | 1 elevator under modernization at a time | N/A | Elevators S1/S2, Duplex operation. Conventional in ground hydraulic cylinders with #3500 capacity and 125 rated car speed. Schindler MPH-II controllers installed in 1995. Serves three landings. Machine room is shared for S1/S2/P1. Conventional tank over power units. Front and rear opening. QKS-14 door operators. | ||||||||||
| Yes | Lot H will be utilized for shipping containers. | Yes | Elevator machine room will be available as directed by COR. | N/A | N/A | N/A | Yes | No | Elevator machine room will be available as directed by COR. | ||||||||||||||||||||||||||
| 0001 | VISN 10 | 506 | MI | Ann Arbor | 31 | 219203 | P1 | Hydraulic | Service | 4608 | 4080 | 2000 | 125 | 106 | 2 | 2 | Front Only - 2 Speed Side Opening | N/A | 3.75" | critical | B | N | Single elevator not in a bank | N/A | "EQUIPMENT DATA FOR ELEVATOR P1 |
Type: Holed Hydraulic Passenger (Duplex) Controller Manufacturer: Schindler-Relay/PC board Controller installation Date: 1995 Capacity: 2000 lbs.
Number of floors: (2) front Rated Speed (ft/min): 100 Actual Speed (ft/min): UP 97, DN 102 Fire Service: PH 1 & PH 2 ADA Compliant: Yes
DESCRIPTION FOR ELEVATOR P1: The elevator systems appeared to be in fair condition with outstanding maintenance items in need of testing, adjustment or repair. Unit was installed in 1995 and planning for modernization based on the age and condition of the equipment should begin in 1 - 3 years See additional comments for current corrective action requirements.
| Additional Comments: (1) Perform and document past due CAT 1 testing. (2) Repair or replace door restrictor to ensure proper operation. (3) Repair or replace emergency phone to ensure proper operation. (4) Repair or replace position indicators to ensure proper operation. (5) Label machine room disconnect. (6) Provide and install car top handrails. " | Yes | Lot H will be utilized for shipping containers. | Yes | Elevator machine room will be available as directed by COR. | N/A | N/A | N/A | Yes | No | Elevator machine room will be available as directed by COR. | ||||||||||||||||||||||||||
| 0002 | VISN 10 | 515 | MI | Battle Creek | 5 | 9309 | N/A | Hydraulic | Freight | N/A | N/A | 2000 | 50 | 20 | 2 | 2 | Manual Bi-Parting Freight Door | N/A | N/A | essential | B | Y | Single elevator not in a bank | N/A | Simplex elevator installed in 1958. Two landings served, front only. #2000 capacity and 50 FPM rated car speed. Conventional tank over power unit with a retrofitted control valve. Conventional in ground jack. Manual bi-parting freight doors (no manufacturer data). Hydraulic jack age and type are not documented; potentially single bottom jack. | Yes | Just outside of the Building containing the elevator near the closest exterior door. | Yes | N/A | N/A | N/A | N/A | Yes | No | Building 5 elevator is older than 30 years and has not been modernized. |
Building 200 elevator was installed near this time but has not been modernized.
0002 VISN 10 515 MI Battle Creek 200 143282 N/A Hydraulic Passenger 72"x115" 68"x94" 4500 125 26 3 3 2 Speed Left Side Slide 48" N/A 5.44" ancillary B N 1 elevator under modernization at a time N/A Building 200- Simplex unit. #4500 capacity with 125 FPM rated car speed. Three landings served. Dover DMC 1-A controls installed in 1995. Conventional in ground hydraulic jack. Submersible pump power unit with Dover I-2 valve assembly. Impulse fixture type. Dover HD door operator. Yes Just outside of the Building containing the elevator near the closest exterior door. Yes N/A N/A N/A N/A Yes No Building 5 elevator is older than 30 years and has not been modernized.
Building 200 elevator was installed near this time but has not been modernized.
| 0003 | VISN 15 | 657A5 | IL | Marion | 38 | 79399 | 9 | Hydraulic | Passenger | 112.5x72 | 102x69 | 5000 | 100 | 12 | 2 | 2 | Telescoping 48x84" | Other | 6.59" | essential | D | N | Single elevator not in a bank | N/A | Tunnel Elevator #9, two stop conventional hydraulic elevator, front opening only. Montgomery Miprom controls installed in 1997. Conventional tank over power unit with Maxton control valve. Two speed side opening doors with MAC PMSSC door operator. #5000 capacity with 100 FPM rated car speed. Water accumulation in pit, no sump present. | Yes | The contractor lay down area is in the Southeast corner of our property. It is visible via satellite imagery on google maps. There are numerous 20' and 40' shipping containers along with contractor office trailers in that area already. There will be plenty of room for the needed container/containers for this project. | No | We do not have any spaces nearby that are permissible to store tools and equipment. There are mechanical rooms, but we are not allowed to store items not related to the mechanical equipment within that room in them. | Yes | We have plenty of parking for contractors in the southeast corner of the property. There is ample room for 4 vehicles in close proximity to the doors that will be used to perform this work. | No | Yes | Yes | N/A | |
| 0003 | VISN 15 | 657A5 | IL | Marion | 1 | 252449 | 10 | Hydraulic | Passenger | ??x?? | 94x69 | 4500 | 125 | N/A | 5 | 5 | Telescoping 48x84" | Other | N/A | essential | D | N | Single elevator not in a bank | N/A | Surgical #10, #4500 capacity with 125 FPM rated car speed. Conventional power unit and hydraulic jack. Key pad access on hall side. Dover DMC-1 controls installed 1999. Jack has been replaced in the last few years. | Yes | The contractor lay down area is in the Southeast corner of our property. It is visible via satellite imagery on google maps. There are numerous 20' and 40' shipping containers along with contractor office trailers in that area already. There will be plenty of room for the needed container/containers for this project. | No | We do not have any spaces nearby that are permissible to store tools and equipment. There are mechanical rooms, but we are not allowed to store items not related to the mechanical equipment within that room in them. | Yes | We have plenty of parking for contractors in the southeast corner of the property. There is ample room for 4 vehicles in close proximity to the doors that will be used to perform this work. | No | Yes | Yes | N/A | |
| 0004 | VISN 20 | 648 | OR | Portland | 16 | 72118 | E1 | Hydraulic | Passenger | 73 x 65 | 65 x 59 | 2500 | 125 | 32 | 4 | 4 | 42" 2-speed side opening | N/A for Hydraulic | 4.5 | Ancillary | D | Unknown | Single elevator not in a bank | N/A | P1: 2500 lbs. at 125 fpm. 1995 Montgomery Miprom. Direct plunger hydraulic. Recommend major modernization of system; Include new non-proprietary MCE microprocessor based controls. Replace Car and Hoistway Door equipment, new submersible power unit, new Car and Hall Pushbutton fixtures w/ LED illumination and electronic Chimes, and an Emergency Battery Lowering Device. | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |||||||||
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 103 | 68293 | P11 | Hydraulic | Passenger | 86 x 71 | 81 x 69 | 3500 | 100 | 19 | 2 | 2 | 42" center opening | N/A for Hydraulic | 4.25 | Critical | D | No | Single elevator not in a bank | N/A | P11: 3500 lbs. at 100 fpm. 1999 Dover dual plunger holeless hydraulic. Dover valve. Magnetek motor. 42"" center opening doors. Dover door operator. T.L. Jones microscan door reversal. Has Phase I and Phase II Fire Service. General A.D.A. compliance. Working in good condition. Recommend modernizing with non-proprietary microprocessor based controls, new closed loop GAL MOVFR door operator, submersible tank unit, Emergency Battery Lowering Device, new car LED lighting, car and hall pushbutton fixtures and cab interiors. | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 103 | 261282 | S13 | Hydraulic | Service | 72 x 100 | 69 x 94 | 4000 | 100 | 19 | 2 | 2 | 42" 2-speed side opening | N/A for Hydraulic | 4.25 | Critical | D | No | Single elevator not in a bank | N/A | S13: 4000 lbs. at 100 fpm. 1999 Dover dual plunger holeless hydraulic. Recommend: Installation of an Emergency Battery Lowering Device and modernizing with non-proprietary microprocessor based controls, new closed GAL MOVFR loop door operator, new car and hall pushbuttons, New cab interior, New landing and fire service fixtures, submersible tank unit. | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 101 | 261278 | S12 | Traction | Service | 63 x 99 | 61 x 93 | 4000 | 200 | 79 | 4 | 4 | 48" 2-speed side opening | 1:1 Single Wrap | N/A | Critical | D | No | Single elevator not in a bank | N/A | S12: 4000 lbs. at 200 fpm. Car and Hall fixtures do not meet ADA and Code requirements and roller guides cannot be adjusted for positive contact with rails and need replacement. Recommend: Installation of new Car and Hall Pushbutton fixtures. Replace car and counterweight roller guides with new spring type. | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 101 | 261277 | P7 | Traction | Passenger | 86 x 65 | 78 x 59 | 3000 | 350 | 79 | 6 | 6 | 42" center opening | 1:1 Single Wrap | N/A | Critical | D | No | 1 elevator under modernization at a time | N/A | P7 & P8: 3000 lbs. at 350 fpm. Car and Hall fixtures do not meet ADA and Code requirements and roller guides cannot be adjusted for positive contact with rails and need replacement. Recommend: Installation of new Car and Hall Pushbutton fixtures. Replace car and counterweight roller guides with new spring type. | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 101 | 261277 | P8 | Traction | Passenger | 86 x 65 | 78 x 59 | 3000 | 350 | 79 | 6 | 6 | 42" center opening | 1:1 Single Wrap | N/A | Critical | D | No | 1 elevator under modernization at a time | N/A | P7 & P8: 3000 lbs. at 350 fpm. Car and Hall fixtures do not meet ADA and Code requirements and roller guides cannot be adjusted for positive contact with rails and need replacement. Recommend: Installation of new Car and Hall Pushbutton fixtures. Replace car and counterweight roller guides with new spring type. | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 101 | 72016 | S11 | Traction | Service | 99 x 63 | 93 x 61 | 3500 | 350 | 79 | 6 | 6 | 42" 2-speed side opening | 1:1 Single Wrap | N/A | Critical | D | No | Single elevator not in a bank | N/A | S 11: 3500 lbs. at 350 fpm. Car and Hall fixtures do not meet ADA and Code requirements and roller guides cannot be adjusted for positive contact with rails and need replacement. Recommend: Installation of new Car and Hall Pushbutton fixtures. Replace car and counterweight roller guides with new spring type. | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 6 | 261255 | P1 | Hydraulic | Passenger | 72x88 | 68x82 | 4000 | 100 | 20 | 4 | 4 | 42" 2-speed side opening | N/A for Hydraulic | 3" | Critical | C | No | 1 elevator under modernization at a time | N/A | The 2002 installation did not include passenger rescue, new door operator or current code compliant car and hall station fixtures. Recommend the installation of an Emergency Battery Lowering Device, new door operator, car fixtures and hall station fixtures. | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 100 | 68587 | F10 | Hydraulic | Freight | 94x98 | 92x96 | 5000 | 100 | 16 | 2 | 2 | 92" vertical bi-parting doors | N/A for Hydraulic | 6.6" | Critical | D | No | 1 elevator under modernization at a time | N/A | One (1) Service Elevator F10: 5000 lbs. at 100 fpm. 1985 Montgomery Miprom. Direct plunger hydraulic freight elevator. Maxton valve. Imperial motor. 92 inches vertical bi-parting doors (front and rear). Power door operation. Peelle doors and door controls. Recommend: Elevator has exceeded life expectancy. Upgrade elevator controller and pump motor. Install an Emergency Battery Lowering Device. | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 100 | 68588 | F9 | Hydraulic | Freight | 94x98 | 92x96 | 5000 | 60 | 16 | 2 | 2 | 92" vertical bi-parting doors | N/A for Hydraulic | 6.6" | Critical | D | No | 1 elevator under modernization at a time | N/A | One (1) Service Elevator F9 (not used): 5000 lbs. at 60 fpm. 1985 Montgomery Miprom. Direct plunger hydraulic freight elevator. Maxton valve. Imperial motor. 92 inch vertical bi-parting doors (front and rear). Power door operation. Peelle doors and door controls. Service elevator F9 is operating beyond its original life expectancy. Recommend: Upgrade elevator controller and pump motor. Change usage from using Elevator F9 as a ""Storage Area"" and schedule modernization of Elevator F9 similarly to Elevator F10 (Record 68587). | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 100 | 68589 | S7 | Hydraulic | Service | 67x99 | 64x94 | 4000 | 125 | 35 | 2 | 2 | 48" 2-speed side opening | N/A for Hydraulic | 6.6" | Critical | D | No | Single elevator not in a bank | N/A | One (1) Service Elevator S7: 4000 lbs. at 125 fpm. 1985. Montgomery Miprom. Direct plunger hydraulic. Maxton valve. Imperial motor. 48 inch two-speed, side opening doors (front and rear). MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. Partial compliance with ADA. Recommend: Upgrade with new Elevator Control System, New Power/Pump Unit and tank, new Car and Hoist way Door equipment, new Car and Hall Pushbutton fixtures w/ LED illumination and electronic Chimes, and an Emergency Battery Lowering Device. New cab interiors | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 100 | 68585 | P1 | Traction | Passenger | 96 x 76 | 90 x 68 | 3500 | 500 | 151.5 | 9 | 9 | 48" center opening | 2:1 Double Wrap | N/A | Critical | D | No | 1 elevator under modernization at a time | N/A | Four (4) Passenger Elevators P1-P4: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($800,000). Six (6) Service Elevators S1-S6: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($1,300,000). | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 100 | 68585 | P2 | Traction | Passenger | 96 x 76 | 90 x 68 | 3500 | 500 | 151.5 | 9 | 9 | 48" center opening | 2:1 Double Wrap | N/A | Critical | D | No | 1 elevator under modernization at a time | N/A | Four (4) Passenger Elevators P1-P4: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($800,000). Six (6) Service Elevators S1-S6: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($1,300,000). | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 100 | 68585 | P3 | Traction | Passenger | 96 x 76 | 90 x 68 | 3500 | 500 | 151.5 | 9 | 9 | 48" center opening | 2:1 Double Wrap | N/A | Critical | D | No | 1 elevator under modernization at a time | N/A | Four (4) Passenger Elevators P1-P4: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($800,000). Six (6) Service Elevators S1-S6: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($1,300,000). | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 100 | 68585 | P4 | Traction | Passenger | 96 x 76 | 90 x 68 | 3500 | 500 | 151.5 | 9 | 9 | 48" center opening | 2:1 Double Wrap | N/A | Critical | D | No | 1 elevator under modernization at a time | N/A | Four (4) Passenger Elevators P1-P4: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($800,000). Six (6) Service Elevators S1-S6: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($1,300,000). | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 100 | 68585 | S1 | Traction | Service | 80 x 104 | 76 x 98 | 4000 | 500 | 184 | 11 | 11 | 48" center opening | 2:1 Double Wrap | N/A | Critical | D | No | 2 elevators per bank down simultaneously | N/A | Four (4) Passenger Elevators P1-P4: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($800,000). Six (6) Service Elevators S1-S6: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($1,300,000). | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 100 | 68585 | S2 | Traction | Service | 80 x 104 | 76 x 98 | 4000 | 500 | 184 | 11 | 11 | 48" center opening | 2:1 Double Wrap | N/A | Critical | D | No | 2 elevators per bank down simultaneously | N/A | Four (4) Passenger Elevators P1-P4: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($800,000). Six (6) Service Elevators S1-S6: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($1,300,000). | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 100 | 68585 | S3 | Traction | Service | 80 x 104 | 76 x 98 | 4000 | 500 | 184 | 11 | 11 | 48" center opening | 2:1 Double Wrap | N/A | Critical | D | No | 2 elevators per bank down simultaneously | N/A | Four (4) Passenger Elevators P1-P4: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($800,000). Six (6) Service Elevators S1-S6: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($1,300,000). | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing
| 0004 | VISN 20 | 648 | OR | Portland | 100 | 68585 | S4 | Traction | Service | 80 x 104 | 76 x 98 | 4000 | 500 | 184 | 11 | 11 | 48" center opening | 2:1 Double Wrap | N/A | Critical | D | No | 2 elevators per bank down simultaneously | N/A | Four (4) Passenger Elevators P1-P4: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($800,000). Six (6) Service Elevators S1-S6: 4000 lbs at 500 fpm. 1999 MCE controls. Montgomery gearless traction hoist machine. SCR drive. 48 inch center opening doors. MAC door operator. Janus Panaforty door reversal. Has Phase I and Phase II Fire Service. General compliance with ADA. Recommend: A complete Elevator Modernization with new AC Gearless Hoist Machines, New microprocessor Controls, new Car Door Operators and new Hoistway Door equipment. New Car Operating Panels, Hall Pushbutton fixtures, new Hall Lanterns and Position Indicators w/ LED illumination and electronic Chimes ($1,300,000). | Yes | can accommodate a maximum of 2 containers at once; area is located approximately 200 feet from the rear entry of building 100. the availability of offsite staging area is limited, as campus is located on the edge of a hill | |
| this lay down space is NOT equidistance from all the elevators that are involved in the project, but it is the only available laydown space. | No | will require close coordination, space may be made available with as close as possible to the elevators under active construction at a given time. | Yes | campus assigns parking spaces to contractors; will assign up to 5 spaces but they may not be contiguous | Yes | Yes | No | there are a total of 5 hydraulic elevators, will work on getting documentation. |
campus is very constrained, as it is located on the side of a hill, so will need to coordinate access and laydown, as well as phasing