ATTACHMENT 9D - CLINs 0054-0075 Wage Determinations.zip

ZIP file 8 MB Posted

Attached to
J035--Proj #TBD | Elevator Modernization | Elias/Prather Federal contract opportunity
Solicitation number
36c77626B0007_1
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This file is a Wage Determinations attachment containing prevailing wage requirements for CLINs (Contract Line Items) 0054 through 0075 related to an elevator modernization project. The document establishes mandatory wage rates that contractors and subcontractors must pay workers performing services under the specified contract line items. Wage determinations are typically issued by the Department of Labor and are required for federal construction and service contracts to ensure workers receive prevailing wages consistent with local market rates. The attachment applies to the Department of Veterans Affairs Technology Acquisition Center Austin solicitation for elevator modernization at the Elias/Prather location. Contractors bidding on CLINs 0054-0075 must comply with all wage rates, fringe benefits, and classifications specified in this determination document.

The zip file format indicates this contains detailed wage schedules, likely organized by trade classification (such as elevator mechanics, electricians, laborers, etc.) and specific geographic location(s) where the work will be performed. Contractors must incorporate these prevailing wage rates into their labor cost estimates and proposals. Failure to meet prevailing wage requirements can result in contract violations and penalties. All subcontractors and lower-tier suppliers must also be bound by these same wage determinations for applicable work classifications.

Other files for this federal contract opportunity

Other files attached to J035--Proj #TBD | Elevator Modernization | Elias/Prather, newest first.
File Type Posted
36C77626B0007 0004.pdf PDF
ATTACHMENT 06_ALL CLINs - Master Spreadsheet Nationwide Elevator Modernization_05282026.xlsx XLSX spreadsheet
36C77626B0007 0003.pdf PDF
Attachment 10 - ALL CLINs - Step 1 Tech Questions Tracker 05192026.pdf PDF
Attachment 01_ALL CLINs - SCOPE Nationwide Elevator Modernization_05192026.pdf PDF
36C77626B0007 0002.pdf PDF
Attachment 10 - ALL CLINs - Step 1 Tech Questions Tracker.pdf PDF
36C77626B0007 0001.pdf PDF
Attachment 01_ALL CLINs - Scope Nationwide Elevator Modernization_04162026.pdf PDF
ATTACHMENT 9A - CLINs 0001-0013 Wage Determinations.zip ZIP file
ATTACHMENT 06_ALL CLINs - Master Spreadsheet Nationwide Elevator Modernization_04222026.xlsx XLSX spreadsheet
Attachment 07_ALL CLINs - Past Performance Questionnaire.pdf PDF
Attachment 08_CLINS 0001-0013 ONLY - Limitations on Subcontracting.pdf PDF
ATTACHMENT 9B - CLINs 0014-0034 Wage Determinations.zip ZIP file
36C77626B0007_1_Final.pdf PDF
Attachment 03_ALL CLINs - Drawing 1 of 1_VHA Elevator Finish Standards_03242026.pdf PDF
Attachment 05_ALL CLINs Milestone Payment Schedule_0403.pdf PDF
ATTACHMENT 9E - CLINs 0076-0101 Wage Determinations.zip ZIP file
Attachment 02_ALL CLINs - Specifications Nationwide Elevator Modernization_05062026.pdf PDF
Attachment 04_ALL CLINs - H18-8 Seismic Design Requirements.pdf PDF
ATTACHMENT 9C - CLINs 0035-0053 Wage Determinations.zip ZIP file
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .