Attachment_03__PRCING_SHEET.xlsx

XLSX spreadsheet 2 MB Posted

Attached to
LYJO RE-ROOF HISTORIC STRUCTURES Federal contract opportunity
Solicitation number
140PS126Q0036
Issued by
Department of the Interior National Park Service

About this file

This is a Pricing Sheet template for a federal construction contract related to historic structure renovation at Lyndon B. Johnson National Historic Park. The pricing structure includes eight base contract line items and two optional bid items covering roofing and lightning protection work at multiple locations: Bruckner Barn, Cooler Building, Boyhood Home Barn, Boyhood Home Smokehouse, and Settlement Cabin.

The base contract (CLINs 0010–0080) comprises four roofing projects involving selective demolition, removal of existing wood shingles, structural repairs to wood joists and purlins, installation of synthetic cedar shake/shingles, vapor barriers, and weather barriers, with unit prices based on CSI codes and bare material, labor, and equipment costs. Four additional base items cover lightning protection system removal, refurbishment, and reinstallation (including copper cable, air terminals, arresters, and surge suppressors) at the four historic structures. Optional bid items include reroof work at Settlement Cabin (CLIN 100) and lightning protection installation there (CLIN 110). The pricing template requires offerors to provide bare unit prices, installer pricing with compounding factors (reflecting 60% labor/40% materials per DSC handbook guidance), and extended total prices on a lump-sum basis. The template incorporates general conditions percentages for permits, insurance, cleanup, and worker's compensation; mobilization and demobilization costs; and contingency, overhead, profit, bonding, inflation, and TERO fee markups. Currently, the spreadsheet shows multiple "#REF!" errors indicating incomplete formula references and missing cost data that contractors must populate with their pricing.

View the file

Other files for this federal contract opportunity

Other files attached to LYJO RE-ROOF HISTORIC STRUCTURES, newest first.
File Type Posted
Sol_140PS126Q0036_Amd_0002.pdf PDF
Attachment_05__Request_for_Information_0002.xlsx XLSX spreadsheet
Sol_140PS126Q0036_Amd_0001.pdf PDF
Sol_140PS126Q0036.pdf PDF
Attachment_05__Request_for_Information.xlsx XLSX spreadsheet
Attachment_02__Drawings.pdf PDF
Attachment_04__Wage_Determination_TX20260193.pdf PDF
Attachment_01__Project_Specifications.docx DOCX document
Attachment_06__Site_Visit_-_Construction.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Conditions

ERROR:#REF!
Settlement Reroof Rehab stoneBARE UNIT PRICES
PMISERROR:#REF!
ItemCSI NumberDescriptionQtyUnitBare Material Unit PriceBare Labor (Base+Fringe) Unit PriceBare Equipment Unit PriceBare Unit PriceNotes
General Conditions
14126500020Permits rule of thumb, most cities, minimum%
13113300020Insurance, standard builders risk, minimum%
17413200020Cleaning up, clean up after job completion, allow, min%
13223300850Worker's compensation and liabilty insurance%
%
Sum of % Factors0.0%
014523501500Concrete testing, cement, physical tests, ASTM C 150EA$ - 0$ - 0$ - 0$ - 0
015213201250Storage boxes, rent per month, 20' x 8'Month$ - 0$ - 0
015409500030Respirator mask only, half face, siliconeEA$ - 0$ - 0
015409500040Respirator cartridges, dust or asbestos, 2 req'd per maskEA$ - 0$ - 0
015409500060Respirator cartridges, combination vapor and dust, 2 req'd per maskEA$ - 0$ - 0
015416500100Forklift crew, all-terrain forklift, 45' lift, 35' reach, 9000 lb. capacity, weekly useWeek$ - 0$ - 0
015423700090Scaffolding, steel tubular, regular, labor only to erect & dismantle, building exterior, wall face, 6'-4" x 5' frames, 1 to 5 stories, excludes planksEA$ - 0$ - 0
015423700965Scaffolding, steel tubular, heavy duty shoring, accessory, leveling jack, buyEA$ - 0$ - 0
015423701500Scaffolding, steel tubular, regular, accessory, cross brace, buyEA$ - 0$ - 0
015423701550Scaffolding, steel tubular, regular, accessory, guardrail post, buyEA$ - 0$ - 0
015423701650Scaffolding, steel tubular, regular, accessory, screw jack & plate, buyEA$ - 0$ - 0
015423701700Scaffolding, steel tubular, regular, accessory, sidearm bracket, buyEA$ - 0$ - 0
015423701800Scaffolding, steel tubular, regular, accessory, plank, buy, 2" x 10" x 16' longEA$ - 0$ - 0
015433402100Rent electric generator gas engine 1.5 kW to 3 kW, Incl. Hourly Oper. Cost.Month$ - 0$ - 0
015433405450Pressure Washer 5 gpm, 3000 psi, Incl. Hourly Oper. Cost.Month$ - 0$ - 0
015433406000Rent masonry saw 14" diameter 5 HP, Incl. Hourly Oper. Cost.Month$ - 0$ - 0
015433406410Rent toilet portable chemical, Incl. Hourly Oper. Cost.Month$ - 0$ - 0
015436501200Mobilization or demobilization, delivery charge for small equipment, placed in rear of, or towed by pickup truckEA$ - 0$ - 0
015436501200Mobilization or demobilization, each additional 5 miles haul distance, addMiles$ - 0$ - 0
015436501300Mobilization or demobilization, delivery charge for equipment, hauled on 3-ton capacity towed trailerEA$ - 0$ - 0
015436501300Mobilization or demobilization, each additional 5 miles haul distance, addMiles$ - 0$ - 0
015623101300Barricades, barricade tape, polyethylene, 7 mils thick, 3" wide x 300' long rollEA$ - 0$ - 0
015626500200Temporary fencing, chain link, rented up to 12 months, 6' high, 11 ga, to 1000'LF$ - 0$ - 0
$ - 0$ - 0

Subtotal $ - 0

Total GC Percentage ERROR:#REF!

Unit Costs - A

ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!COMPOUNDING FACTORS
PMISERROR:#REF!ERROR:#REF!

Item CSI Number Description Qty Unit Bare Unit Price Installer Price nbuikema: nbuikema:

If no subcontractor for project (only a prime), change to 0% on cover page. Write comment that explains the installer price is based on having a prime do all of the work

60% Labor/40% M&E per DSC Handbook. RS Means indicates 70% Labor/30% M%E. Demo projects this should be evaluated for Park specific need. Change in cell as neededDirect Unit PriceTotal Direct PricePrice ScheduleNotes
1Bruckner Barn Reroof with Synthetic Cedar Shingles
024119190164Selective demolition, rubbish handling, dust control device for dumpsters, cost to be added to demolition costEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
024119190725Selective demolition, rubbish handling, dumpster, 20 C.Y., 5 ton capacity, weekly rental, includes one dump per week, cost to be added to demolition costWeekERROR:#REF!ERROR:#REF!ERROR:#REF!
024119190950Selective demolition, rubbish handling, dumpster, alternate pricing method, disposal fee per ton, average for all sizes, cost to be added to demolition costTonERROR:#REF!ERROR:#REF!ERROR:#REF!
024119192000Selective demolition, rubbish handling, 0'-50' haul, load, haul, dump and return, hand carried, cost to be added to demolition costC.Y.ERROR:#REF!ERROR:#REF!ERROR:#REF!
024119192045Selective demolition, rubbish handling, 0'-100' haul, load, haul, dump and return, wheeled, cost to be added to demolition costC.Y.ERROR:#REF!ERROR:#REF!ERROR:#REF!
024119195100Selective demolition, rubbish handling, over 8 C.Y. truck, loading & trucking, haul, per mile, includes 2 mile haul, cost to be added to demolition costC.Y.ERROR:#REF!ERROR:#REF!ERROR:#REF!
024119200200Selective demolition, dump charges, typical urban city, trees, brush, lumber, includes tipping fees onlyTonERROR:#REF!ERROR:#REF!ERROR:#REF!
024119200300Selective demolition, dump charges, typical urban city, rubbish only, includes tipping fees onlyTonERROR:#REF!ERROR:#REF!ERROR:#REF!
060505103440Selective demolition, wood framing, fascia boards, 1" x 8"L.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
060505103490Selective demolition, wood framing, decking boards, 2" x 6"L.F.ERROR:#REF!$ - 0
061110029000Miscellaneous wood blocking, minimum labor/equipment chargeJobERROR:#REF!$ - 0
061323102302Wood framing, heavy mill timber, roof purlins, structural grade, 4"B.F.ERROR:#REF!$ - 0
070505102220Selective demolition, thermal and moisture protection, roof edge, drip edgeL.F.ERROR:#REF!$ - 0
070505104670Selective demolition, thermal and moisture protection, roofing, wood shinglesS.F.ERROR:#REF!$ - 0
072510109960Weather barriers, minimum labor and equipment chargeJobERROR:#REF!ERROR:#REF!ERROR:#REF!
072613100900Vapor retarders, building paper, polyethylene vapor barrier, standard, 6 mil (.006" thick), 9' x 400' rollSq.ERROR:#REF!ERROR:#REF!ERROR:#REF!
073129161200Wood shakes, red cedar, 1/2" thick x 18" long, 8-1/2" exposure on roofSq.ERROR:#REF!ERROR:#REF!ERROR:#REF!
077126101300Reglet, counter flashing for galvanized steel, 26 ga., 12 wideL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
$ - 0ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
2Cooler Building Reroof with Synthetic Cedar Shingles$ - 0
024119190164Selective demolition, rubbish handling, dust control device for dumpsters, cost to be added to demolition costEa.ERROR:#REF!$ - 0
024119190725Selective demolition, rubbish handling, dumpster, 20 C.Y., 5 ton capacity, weekly rental, includes one dump per week, cost to be added to demolition costWeekERROR:#REF!$ - 0
024119190950Selective demolition, rubbish handling, dumpster, alternate pricing method, disposal fee per ton, average for all sizes, cost to be added to demolition costTonERROR:#REF!$ - 0
024119192000Selective demolition, rubbish handling, 0'-50' haul, load, haul, dump and return, hand carried, cost to be added to demolition costC.Y.ERROR:#REF!$ - 0
024119192045Selective demolition, rubbish handling, 0'-100' haul, load, haul, dump and return, wheeled, cost to be added to demolition costC.Y.ERROR:#REF!$ - 0
024119195100Selective demolition, rubbish handling, over 8 C.Y. truck, loading & trucking, haul, per mile, includes 2 mile haul, cost to be added to demolition costC.Y.ERROR:#REF!$ - 0
024119200200Selective demolition, dump charges, typical urban city, trees, brush, lumber, includes tipping fees onlyTonERROR:#REF!$ - 0
024119200300Selective demolition, dump charges, typical urban city, rubbish only, includes tipping fees onlyTonERROR:#REF!$ - 0
060505103440Selective demolition, wood framing, fascia boards, 1" x 8"L.F.ERROR:#REF!$ - 0
060505103490Selective demolition, wood framing, decking boards, 2" x 6"L.F.ERROR:#REF!$ - 0
061110029000Miscellaneous wood blocking, minimum labor/equipment chargeJobERROR:#REF!$ - 0
061323102302Wood framing, heavy mill timber, roof purlins, structural grade, 4"B.F.ERROR:#REF!$ - 0
070505102220Selective demolition, thermal and moisture protection, roof edge, drip edgeL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
070505104670Selective demolition, thermal and moisture protection, roofing, wood shinglesS.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
072510109960Weather barriers, minimum labor and equipment chargeJobERROR:#REF!ERROR:#REF!ERROR:#REF!
072613100900Vapor retarders, building paper, polyethylene vapor barrier, standard, 6 mil (.006" thick), 9' x 400' rollSq.ERROR:#REF!ERROR:#REF!ERROR:#REF!
073129161200Wood shakes, red cedar, 1/2" thick x 18" long, 8-1/2" exposure on roofSq.ERROR:#REF!ERROR:#REF!ERROR:#REF!
077126101300Reglet, counter flashing for galvanized steel, 26 ga., 12 wideL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
3Boyhood Home - Barn Reroof with Synthetic Cedar Shingles$ - 0
024119190164Selective demolition, rubbish handling, dust control device for dumpsters, cost to be added to demolition costEa.ERROR:#REF!$ - 0
024119190725Selective demolition, rubbish handling, dumpster, 20 C.Y., 5 ton capacity, weekly rental, includes one dump per week, cost to be added to demolition costWeekERROR:#REF!$ - 0
024119190950Selective demolition, rubbish handling, dumpster, alternate pricing method, disposal fee per ton, average for all sizes, cost to be added to demolition costTonERROR:#REF!$ - 0
024119192000Selective demolition, rubbish handling, 0'-50' haul, load, haul, dump and return, hand carried, cost to be added to demolition costC.Y.ERROR:#REF!$ - 0
024119192045Selective demolition, rubbish handling, 0'-100' haul, load, haul, dump and return, wheeled, cost to be added to demolition costC.Y.ERROR:#REF!$ - 0
024119195100Selective demolition, rubbish handling, over 8 C.Y. truck, loading & trucking, haul, per mile, includes 2 mile haul, cost to be added to demolition costC.Y.ERROR:#REF!$ - 0
024119200200Selective demolition, dump charges, typical urban city, trees, brush, lumber, includes tipping fees onlyTonERROR:#REF!$ - 0
024119200300Selective demolition, dump charges, typical urban city, rubbish only, includes tipping fees onlyTonERROR:#REF!$ - 0
060505103440Selective demolition, wood framing, fascia boards, 1" x 8"L.F.ERROR:#REF!$ - 0
060505103490Selective demolition, wood framing, decking boards, 2" x 6"L.F.ERROR:#REF!$ - 0
061110029000Miscellaneous wood blocking, minimum labor/equipment chargeJobERROR:#REF!$ - 0
061323102302Wood framing, heavy mill timber, roof purlins, structural grade, 4"B.F.ERROR:#REF!$ - 0
070505100420Selective demolition, thermal and moisture protection, gutters, mettal, edge hungL.F.ERROR:#REF!$ - 0
070505102220Selective demolition, thermal and moisture protection, roof edge, drip edgeL.F.ERROR:#REF!$ - 0
070505104670Selective demolition, thermal and moisture protection, roofing, wood shinglesS.F.ERROR:#REF!$ - 0
070505105880Selective demolition, thermal and moistrue protection, roofing, steel corrugated/ribbedS.F.ERROR:#REF!$ - 0
072510109960Weather barriers, minimum labor and equipment chargeJobERROR:#REF!$ - 0
072613100900Vapor retarders, building paper, polyethylene vapor barrier, standard, 6 mil (.006" thick), 9' x 400' rollSq.ERROR:#REF!$ - 0
073129161200Wood shakes, red cedar, 1/2" thick x 18" long, 8-1/2" exposure on roofSq.ERROR:#REF!$ - 0
074113200400Steel roofing panels, on wood frame, corrugated or ribbed, galvanized 24 gaugeS.F.ERROR:#REF!$ - 0
077123104000Lead coated copper downspout, round, stock, 5" diaL.F.ERROR:#REF!$ - 0
077123200800Elbows, copper round, 16 oz, 4" diaEa.ERROR:#REF!$ - 0
077123300700Copper Gutters, half round, 16 oz., stock units, 4" wideL.F.ERROR:#REF!$ - 0
077123305290Gutter outlets, lead coated copper, 2-3/8" roundEa.ERROR:#REF!$ - 0
077126101300Reglet, counter flashing for galvanized steel, 26 ga., 12 wideL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
$ - 0ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
4Boyhood Home - Reroof Smokehouse with Synthetic Cedar Shingles$ - 0
024119190164Selective demolition, rubbish handling, dust control device for dumpsters, cost to be added to demolition costEa.ERROR:#REF!$ - 0
024119190725Selective demolition, rubbish handling, dumpster, 20 C.Y., 5 ton capacity, weekly rental, includes one dump per week, cost to be added to demolition costWeekERROR:#REF!$ - 0
024119190950Selective demolition, rubbish handling, dumpster, alternate pricing method, disposal fee per ton, average for all sizes, cost to be added to demolition costTonERROR:#REF!$ - 0
024119192000Selective demolition, rubbish handling, 0'-50' haul, load, haul, dump and return, hand carried, cost to be added to demolition costC.Y.ERROR:#REF!$ - 0
024119192045Selective demolition, rubbish handling, 0'-100' haul, load, haul, dump and return, wheeled, cost to be added to demolition costC.Y.ERROR:#REF!$ - 0
024119195100Selective demolition, rubbish handling, over 8 C.Y. truck, loading & trucking, haul, per mile, includes 2 mile haul, cost to be added to demolition costC.Y.ERROR:#REF!$ - 0
024119200200Selective demolition, dump charges, typical urban city, trees, brush, lumber, includes tipping fees onlyTonERROR:#REF!$ - 0
024119200300Selective demolition, dump charges, typical urban city, rubbish only, includes tipping fees onlyTonERROR:#REF!$ - 0
060505103440Selective demolition, wood framing, fascia boards, 1" x 8"L.F.ERROR:#REF!$ - 0
060505103490Selective demolition, wood framing, decking boards, 2" x 6"L.F.ERROR:#REF!$ - 0
061110029000Miscellaneous wood blocking, minimum labor/equipment chargeJobERROR:#REF!$ - 0
061323102302Wood framing, heavy mill timber, roof purlins, structural grade, 4"B.F.ERROR:#REF!$ - 0
070505102220Selective demolition, thermal and moisture protection, roof edge, drip edgeL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
070505104670Selective demolition, thermal and moisture protection, roofing, wood shinglesS.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
072510109960Weather barriers, minimum labor and equipment chargeJobERROR:#REF!ERROR:#REF!ERROR:#REF!
072613100900Vapor retarders, building paper, polyethylene vapor barrier, standard, 6 mil (.006" thick), 9' x 400' rollSq.ERROR:#REF!ERROR:#REF!ERROR:#REF!
073129161200Wood shakes, red cedar, 1/2" thick x 18" long, 8-1/2" exposure on roofSq.ERROR:#REF!ERROR:#REF!ERROR:#REF!
077126101300Reglet, counter flashing for galvanized steel, 26 ga., 12 wideL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
$ - 0ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
5Bruckner Barn Lightning Protection$ - 0
130505450030Air terminal & base, copper, 1/2" dia x 12", to 75' high, selective demolitionEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
130505450070cable, copper, 220 lb per thousand feet, to 75' high, selective demolitionL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
130505450110Arrester, to ground, 175 V AC, selective demolitionEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
260590101800Lightning surge supperssorEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
260505109000Minimal labor/equipment chargeEa.ERROR:#REF!$ - 0
264113132000Lightning protection cable, copper, 220 lb per thousand feet, to 75' highL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113133000Lightning arrester, 175 V AC to groundEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134020Air terminal, copper, 1/2" x 12"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134220Copper air terminal base, bolted base for copper terminal, 1/2"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134270Copper air terminal base, tee connector for copper terminal, 1/2"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134700cable support, copper, loop fastenerEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
$ - 0ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
6Cooler Building Lightning Protection$ - 0
130505450030Air terminal & base, copper, 1/2" dia x 12", to 75' high, selective demolitionEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
130505450070cable, copper, 220 lb per thousand feet, to 75' high, selective demolitionL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
130505450110Arrester, to ground, 175 V AC, selective demolitionEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
260590101800Lightning surge supperssorEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
260505109000Minimal labor/equipment chargeEa.ERROR:#REF!$ - 0
264113132000Lightning protection cable, copper, 220 lb per thousand feet, to 75' highL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113133000Lightning arrester, 175 V AC to groundEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134020Air terminal, copper, 1/2" x 12"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134220Copper air terminal base, bolted base for copper terminal, 1/2"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134270Copper air terminal base, tee connector for copper terminal, 1/2"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134700cable support, copper, loop fastenerEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
$ - 0ERROR:#REF!ERROR:#REF!ERROR:#REF!
$ - 0ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
7Boyhood House - Barn Lightning Protection$ - 0
130505450030Air terminal & base, copper, 1/2" dia x 12", to 75' high, selective demolitionEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
130505450070cable, copper, 220 lb per thousand feet, to 75' high, selective demolitionL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
130505450110Arrester, to ground, 175 V AC, selective demolitionEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
260590101800Lightning surge supperssorEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
260505109000Minimal labor/equipment chargeEa.ERROR:#REF!$ - 0
264113132000Lightning protection cable, copper, 220 lb per thousand feet, to 75' highL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113133000Lightning arrester, 175 V AC to groundEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134020Air terminal, copper, 1/2" x 12"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134220Copper air terminal base, bolted base for copper terminal, 1/2"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134270Copper air terminal base, tee connector for copper terminal, 1/2"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134700cable support, copper, loop fastenerEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
$ - 0ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
8Boyhood House - Smokehouse Lightning Protection$ - 0
130505450030Air terminal & base, copper, 1/2" dia x 12", to 75' high, selective demolitionEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
130505450070cable, copper, 220 lb per thousand feet, to 75' high, selective demolitionL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
130505450110Arrester, to ground, 175 V AC, selective demolitionEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
260590101800Lightning surge supperssorEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
260505109000Minimal labor/equipment chargeEa.ERROR:#REF!$ - 0
264113132000Lightning protection cable, copper, 220 lb per thousand feet, to 75' highL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113133000Lightning arrester, 175 V AC to groundEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134020Air terminal, copper, 1/2" x 12"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134220Copper air terminal base, bolted base for copper terminal, 1/2"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134270Copper air terminal base, tee connector for copper terminal, 1/2"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134700cable support, copper, loop fastenerEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
$ - 0ERROR:#REF!ERROR:#REF!ERROR:#REF!
$ - 0ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ABid Option No. 01 Reroof Settlement Cabin with Synthetic Cedar Shingles$ - 0
024119190164Selective demolition, rubbish handling, dust control device for dumpsters, cost to be added to demolition costEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
024119190725Selective demolition, rubbish handling, dumpster, 20 C.Y., 5 ton capacity, weekly rental, includes one dump per week, cost to be added to demolition costWeekERROR:#REF!ERROR:#REF!ERROR:#REF!
024119190950Selective demolition, rubbish handling, dumpster, alternate pricing method, disposal fee per ton, average for all sizes, cost to be added to demolition costTonERROR:#REF!ERROR:#REF!ERROR:#REF!
024119192000Selective demolition, rubbish handling, 0'-50' haul, load, haul, dump and return, hand carried, cost to be added to demolition costC.Y.ERROR:#REF!ERROR:#REF!ERROR:#REF!
024119192045Selective demolition, rubbish handling, 0'-100' haul, load, haul, dump and return, wheeled, cost to be added to demolition costC.Y.ERROR:#REF!ERROR:#REF!ERROR:#REF!
024119195100Selective demolition, rubbish handling, over 8 C.Y. truck, loading & trucking, haul, per mile, includes 2 mile haul, cost to be added to demolition costC.Y.ERROR:#REF!ERROR:#REF!ERROR:#REF!
024119200200Selective demolition, dump charges, typical urban city, trees, brush, lumber, includes tipping fees onlyTonERROR:#REF!ERROR:#REF!ERROR:#REF!
024119200300Selective demolition, dump charges, typical urban city, rubbish only, includes tipping fees onlyTonERROR:#REF!ERROR:#REF!ERROR:#REF!
060505103440Selective demolition, wood framing, fascia boards, 1" x 8"L.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
060505103490Selective demolition, wood framing, decking boards, 2" x 6"L.F.ERROR:#REF!$ - 0
061110029000Miscellaneous wood blocking, minimum labor/equipment chargeJobERROR:#REF!ERROR:#REF!ERROR:#REF!
061323102302Wood framing, heavy mill timber, roof purlins, structural grade, 4"B.F.ERROR:#REF!$ - 0
070505102220Selective demolition, thermal and moisture protection, roof edge, drip edgeL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
070505104670Selective demolition, thermal and moisture protection, roofing, wood shinglesS.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
072510109960Weather barriers, minimum labor and equipment chargeJobERROR:#REF!ERROR:#REF!ERROR:#REF!
072613100900Vapor retarders, building paper, polyethylene vapor barrier, standard, 6 mil (.006" thick), 9' x 400' rollSq.ERROR:#REF!ERROR:#REF!ERROR:#REF!
073129161200Wood shakes, red cedar, 1/2" thick x 18" long, 8-1/2" exposure on roofSq.ERROR:#REF!ERROR:#REF!ERROR:#REF!
077126101300Reglet, counter flashing for galvanized steel, 26 ga., 12 wideL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
$ - 0ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
BBid Option No. 02 Settlement Cabin Lightning Protection
130505450030Air terminal & base, copper, 1/2" dia x 12", to 75' high, selective demolitionEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
130505450070cable, copper, 220 lb per thousand feet, to 75' high, selective demolitionL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
130505450110Arrester, to ground, 175 V AC, selective demolitionEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
260590101800Lightning surge supperssorEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
260505109000Minimal labor/equipment chargeEa.ERROR:#REF!$ - 0
264113132000Lightning protection cable, copper, 220 lb per thousand feet, to 75' highL.F.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113133000Lightning arrester, 175 V AC to groundEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134020Air terminal, copper, 1/2" x 12"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134220Copper air terminal base, bolted base for copper terminal, 1/2"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134270Copper air terminal base, tee connector for copper terminal, 1/2"Ea.ERROR:#REF!ERROR:#REF!ERROR:#REF!
264113134700cable support, copper, loop fastenerEa.ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
SubtotalERROR:#REF!Compounded %
Design ContingencyERROR:#REF!ERROR:#REF!ERROR:#REF!
Government and General GC, Historic PreservationERROR:#REF!ERROR:#REF!ERROR:#REF!
Overhead and ProfitERROR:#REF!ERROR:#REF!ERROR:#REF!
Bond, Inflation, Contract TypeERROR:#REF!ERROR:#REF!ERROR:#REF!
TERO FeeERROR:#REF!

nbuikema: nbuikema:

Value will be standalone, individual CLIN on Price Schedule nbuikema: nbuikema:

If no subcontractor for project (only a prime), change to 0% on cover page. Write comment that explains the installer price is based on having a prime do all of the work

60% Labor/40% M&E per DSC Handbook. RS Means indicates 70% Labor/30% M%E. Demo projects this should be evaluated for Park specific need. Change in cell as needed TOTAL ERROR:#REF!

Contract Price Schedule

Contract Price Schedule
National Park Service (NPS) - Denver Service Center (DSC) | 4/25-18
Solicitation Number: 140PS126Q0036
PARK - PMIS (Project Management Information System):LYNDON B JOHNSON, PMIS: 241282, 241283, 250239
Developed Area:
Project Title:REROOF HISTORIC BARNS & SETTLEMENT CABIN WITH STONE REPOINTING AND STRUCTUARL REPAIRS AND BOYHOOD BARN AND SMOKEHOUSE
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars. Refer to solicitation section “H” for additional information regarding contract options
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
0010Bruckner Barn Reroof with Synthetic Cedar Shingles1LS
0020Cooler Building Reroof with Synthetic Cedar Shingles1LS
0030Boyhood Home - Barn Reroof with Synthetic Cedar Shingles1LS
0040Boyhood Home - Reroof Smokehouse with Synthetic Cedar Shingles1LS
0050Bruckner Barn Lightning Protection1LS
0060Cooler Building Lightning Protection1LS
0070Boyhood House - Barn Lightning Protection1LS
0080Boyhood House - Smokehouse Lightning Protection1LS
0090INTENTIONALLY BLANK
TOTAL BASE PRICE (Contract Line Item Number 0010 through 0080)
100BID OPTION NO. 01 REROOF SETTLEMENT CABIN WITH SYNTHETIC CEDAR SHINGLES1LS
110BID OPTION NO 02 SETTLEMENT CABIN LIGHTNING PROTECTION1LS
120INTENTIONALLY BLANK
130INTENTIONALLY BLANK
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 100 through 110)
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 0010 through 110)
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

Units Abbreviations image1.jpg image2.jpg image3.jpg image4.jpg

File details come from the government source that posted it. Updated .