Attachment 03 - Drawings MMAC HQB Lobby Remodel.pdf
PDF 9 MB Posted
- Solicitation number
- 6973GH-20-R-00140
About this file
This solicitation requests proposals for construction services for the Headquarters Building Lobby Remodel at the Mike Monroney Aeronautical Center in Oklahoma City, OK. The base bid includes replacing interior finishes in the 1st floor lobby and main corridor, and option 1 adds new flooring, seating and wall panels in the auditorium. Option 2 provides new finishes on the 1st through 3rd floors. The estimated price range is $1-4 million, with award as a firm-fixed price construction contract. The NAICS code is 236220 and it is 100% set aside for small businesses under $39.5 million. Proposals are due August 14, 2020. A pre-proposal teleconference will be held on July 28 and a mandatory site visit on July 30, with notice required by July 24 and 28 respectively. Questions are due by August 4.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGNED BY
DRAWN BY
WORK ORDER
CHECKED BY ISSUED BY
APPROVED BY
DRAWING NO.
DATE
DATE CHK'D APP'DDESCRIPTION
REV.
LTR.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
JOB # SHT. #
HQB REMODEL LOBBY
2012-009421
C .H G U
ER
N S
EY
C O M P
AN
Y
N G R
AN
D
B
LV
D
C .A
AR
C H
IT
EC
TU
R E
E X P
IR
E S
JU
N E
C .A
EN
G
IN
EE
R
IN
G
E X P
IR
ES
JU
N E
SEQUENCE #
SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY
INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY
BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15
AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION.
UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S.
GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR
PARTS 15 AND 1520.
MARY TSIEN
G-001
COVER SHEET
29 MAY 2020
J. GALLAS
J. LOPEZ
D. OMAN
MIKE MONRONEY AERONAUTICAL CENTER
CONTRACT NO. DTFAAC-16-D-00034
WORK ORDER NO. 2012-009421
DATED: MAY 29, 2020
IFC TYPE "B" DESIGN SUBMITTAL
ISSUED FOR CONSTRUCTION TYPE B DESIGN SUBMITTAL
HQB REMODEL LOBBY
FEDERAL
AVIATION
ADMINISTRATION
A S P H A L T
A S P H A L T
A S P H A L T
C O N C
S P R
IN
K
LER
M
ETER
S P R
IN
K
LER
S P R
IN
K
LER
S P R
IN
K
LER
M
ETER
T R
EE
G R O U N D C O
VER
G R
ASS
T R
EE
T R
EE
G R
ASS
NO
PA
RK
IN
G
D
IR
T
AC
M
AN
H O
LE
AC
P
IP
ES
L
IG
H T
P O
ST
AC
P O N D
P O N D
P O N D
A B A N D O N
ED
R A
ILR
O
AD
TR
AC
K S
A S D E
R A D A R
S U P P O R T
F A C
ILIT
Y G E N
C M U
A S R
S E C T
IO
N
C O R N
ER
N
,7 .5
E
,0 ,1 .4
BM1
BM2
BM3
BM4 BM8
BM7
BM6
BM5
BM9
BM10
BM11
BM12
BM15
BM16
BM14
BM13
BM18
BM19
BM20
BM21
BM17
T O W E R
R A D A R
W A T E R
T O W E R
T O W E R
R A D A R
R A D A R
A R S R
B A S E
E X
IS
T
IN
G
T O W E R
B A S E
W
IT
H
M E T A L
T O W E R
L E G S
'X 'X
T O W E R
B A S E
W
IT
H
M E T A L
T O W E R
L E G S
'X 'X
T O W E R
R A D A R
IR
O N
C O L U M N S
.5 X .5
A N G L E
O V E R H A N G
O V E R H A N G
.9
O V E R H A N G
O V E R H A N G
C O
NC
R
ETE
F O
UN
D
ATION
S F O R A
NTE
NN
A
A R
RA
Y
W A
NTE
NN
A A R
RA
Y C O
NC
R
ETE
P
AD
A C
'x
V A U
LT
C O N C P A D
F O R
D U M P S T E R
P A D
W C O
A C
A C
A C
O N
P
AD
A C
A C
A C
A C
A C
A C
A C
A C 's
C O N C P A D S
W T O W E R
A C
A C
A C
A C
G P 's
G P
G P 's
G P
S
TE
E L
P O
LE
S
P O
LE
TR
A N S O N
C O N C P A D
P O L E
P O
LE
P O
LE
V E N T
V E N T
V E N T S
C O N C .A C
A
CA
C
M E T A L
T R A
IL
E R
G U A R D
P O S T S
VENT
P
IP
E
V E N T
W A L L
G U A R D
P O S T S
G U A R D
P O S T S
P
IP
E
G U A R D
P O S T S
F L A G P O L E
F L A G P O L E
S
IG
N
P O
LE
G U A R D
P O S T
C H
IL
L E R
U N
IT
G U A R D
P O S T S
G U A R D
P O S T S
G U A R D
P O S T
G U A R D
P O S T S
F L A G P O L E
G U A R D
P O S T
G U A R D
P O S T
G U A R D
P O S T S
C O L U M N S
S U P P O R T
S T A
IR
S
S T A
IR
S
G U A R D
P O S T S
G U A R D
P O S T S
G U A R D
P O S T
P
IP
E
R A
IS
E D
P
AD
G U A R D
P O S T
D O C K
L O A D
IN
G
D O C K
R A M P
A
LU
M
P O
ST
R A M P
L O A D
IN
G
D O C K
W E A T H E R
T O W E R
A V
A V
G U A R D
P O S T S
T Y P
A V
A V
P
IP
E S
G U A R D
P O S T S
G U A R D
P O S T
G U A R D
P O S T S
P
IP
E
P O R C H
IN
S
ID
E
R E T W A L L
D
IE
S E L
F U E L
T A N K
D O W N S P O U T S
R O O F
D R A
IN
T Y P
A C 's
R A M P
G U A R D
P O S T
F E D E R A L
T R A N S F E R
C E N T E R
S
IG
N
S T E E L
P
IP
E
E W
CONC.
C
ON
C
CONC.
CONC.
A S PHALT
A S PHALT
CONC.
CONC.
A S PHALT
CONC.
V A ULT
V A ULT
S
IG
N
C O N C
F L U M E
C O N C
CONC.
STRIP
S
IG
N
H E A D W A L L
H E A D W A L L
H E A D W A L L
R A
M P
R
IP
R A
P
C O
N C
. F L
U M
E
C O
N C
. P A
D W
/C A
B L
E R
IS
E
R
.2 ' D
E E
P P
IT
G
U A
R D
R A
IL
A
R O
U N
D
C O
N C
. F L
U M
E
A C
A C
A C
C O N C R E T E
P A D
C O N C R E T E
P A D
C O N C R E T E
P A D
C O N C R E T E
P A D
C O N C R E T E
P A D
C O N C R E T E
P A D
F O R
P A R K
IN
G
C O N C
P A D
C O N C
P A D
C O N C
P A D
C O N C
P A D
C O N C
P A D
C O N C
P A D S
P A D
C O N C R E T E
C O N C R E T E
P A D
C O N C
F L U M E
C O N C
P A D
V A U L T
W E A T H E R
S T A T
IO
N
2x2 P A D
CONC.
IN
P
A D
" P
V C
'x
P A D
P A D
F O R
D I S H
C O N C P A D
F O R
D U M P S T E R
C O N C
S T R
IP
R A M P
C O N C
C O N C
V A U L T
C O
NC
CONC
WEATHER
STATION
B
AR
B
S E C U R
IT
Y
F E N C E
G A
T E
7' CH. LK. F ENCE W /3
B.W.
C H L K F E N C E
W
B .W
C H L K
F E N C E
W
B .W
G A T E
G A T E
G A T E
C H L K
F N E C E
C H L K F E N C E
W B .W
C H L K
F N E C E
C H L K
F E N C E
W
B .W
W E L L
N O T H
IN
G
V
IS
IB
L E
W
IT
H
IN
F E N C E D
A R E A
C H L K
F E N C E
W
B .W
7' C H . L K F
EN
C E
W B .W
C H L K F E N C E
W
B .W
C H L K
F E N C E
C H L K
F E N C
EG
A T E
G A T E
G A T E
C H L K
F E N C E
C H L K
F E N C E
W
B .W
C H L K
F E N C E
C H L K F E N C E
W
B .W .5 C H
LK
F E N C E
W
B .W
C H L K F E N C E
W
B .W
C H L K F E N C E
W
B .W
C H L K
F E N C E
W
B .W
G A T E
G A T E
C H L K
F E N C E
W
B .W
G A T E6 C H
LK
F E N C E
W
B .W
C H L K
F E N C E
W
B .W
G A T E
C H L K
F E N C E
G A T E
C H L K
F E N C E
G A T E
C H L K
F E N C E
G A T E
C H L K
F E N C E
C H L K
F E N C E
C H L K
F E N C E
4' CH. LK. FENCE
G A T E
G A T E
G A T E
G A T E x
C H L K
F E N C E
W
B .W
C H L K
F E N C E
G A T E
C H
L
IN
K
G A T E
C H L K
F E N C
EG
A T E
C H L K
F E N C E
C H L K F E N C E
G A T E
C H L K
F E N C E
G A T E
G A T E
G A T E
G A T E
6' CH. LK. FENCE W/3
B.W.
C H L K
F E N C E
C H L K
F E N C E
C H L K
G A T E
GATE
C H L K
F E N C E
C H L K
F E N C E
C H L K
F E N C E
C H L K
F E N C E
C H L K
F E N C E
AR
O U N D
O
IL
P U M P
J A C K
6' CH. L K.
FENCE4' CH. L K.
FENCE
G A T E
C H L K
F E N C E
C H L K
F E N C E
4' CH. L K.
FENCE
C H
LK
F E N C E
C H L K
F E N C E
G A T E
C H L K
F E N C E xx x x
G A
TE W
B .W
P O S T
G A T E
4' C H. LK.
FENCE
L O A D
IN
G
Z O N E
N O
P A R K
IN
G
N O
P A R K
IN
G
C O N C
ASPHALT
AS
P H A L T
C R O S S
W A L K
C R O S S
W A L K
N O
P A R K
PARK
ING
NO
N O
P A R K
IN
G
N O
P A R K
IN
G
N O
P A R K
IN
G
NO
PARKI NG
N O
P A R K
IN
G
NO
PARKI NG
NO
PARKI NG
NO
PARKI NG
NO
PARKI NG
N
OP
A R K
IN
G
N O
P A R K
N O
P A R K
N O
P A R K
IN
G
N
OP
A R K
IN
G
NO
PARKI NG
NO
PARKI NG
NO
PARKI NG
N O
P A R K
IN
G
N O
P A R K
IN
G
N O
P A R K
IN
G
N O
P A R K
IN
G
N O
P A R K
IN
G
P
ARK
ING
N O
PARKING
NO
N O
P A R K
IN
G
N O
P A R K
IN
G
NO
PARKI NG
P A R K
IN
G
G U A R D
S
TA
TIO
N
A
IR
N A V
IG
ATIO
N
H A N G A R
N O
B
LD
G
G U A R D
S H A C K
LIN
E
M A
IN
T.
B
LD
G
F
LIG
H T
B U
ILD
IN
G
M E
TA
L
H A N G A R
N O
C R E D
IT
U N
IO
N
W O O D
B
LD
G
S
TA
N D A R D S
W O O D
B
LD
G
O N E
S
TO
R Y
F
LIG
H T
IN
S P E C
TIO
N
H A N G A R
N O
BUILDING
BUILDING
METAL
BUILDING
R A D A R
A N
TEN
N A
LA
B
M E
TA
L
B U
ILD
IN
G
M E T A L
T R A
IL
E R
O N
P A D
C O N C
T Y P
F
IB
E R G L A S S
S H E D
F A C
ILITIE
S
N O
A C A D E M Y
H E A D Q U A R
TE
R S
A
IR
TR
A F F
IC
B U
ILD
IN
G
R A D A R
TR
A
IN
IN
G
F A C
ILITY
S P E C
IA
L P U R P O S E
B U
ILD
IN
G
S
TA
F F O R D
B U
ILD
IN
G
S
TA
F F O R D
B U
ILD
IN
G
B R
IC
K
B
LD
G O N E
S
TO
R Y
S Y S
TE
M S
TR
A
IN
IN
G
C O O L
IN
G
T O W E R
C O O L
IN
G
T O W E R
M E T
AL
B
LD
G
O N E
S T O R Y
C A F E
TE
R
IA
A V
IA
TIO
N R E C O R D S
A
IR
N A V
IG
A
TIO
N F A C
ILITIE
S
N O
A R S R
F P S
S Y S
TE
M S
B
LD
G
E N V
IR
O N M E N
TA
L
S U P P O R T
G N
AS
TR
AIN
IN
G
F A C
ILITY
B U
IL
D
IN
G
C O O L
IN
G
T O W E R
ONE STORY W OOD
BLDG.
E X
IS
IT
N G
P R
IM
AT
E
B
LD
G
E X
IS
T
IN
G
S T O R Y
M E
TA
L
B L D G
E X
IS
T
IN
G
P O S
IT
IO
N E R
E X
IS
T
IN
G
P O R T A B L E
S H E D
F
IB
E R G L A S S
E X
IS
IT
N G
P O R T A B L E
S H E D
C
IV
IL
A E R O S P A C E
M E D
IC
A L
IN
S
TITU
TE
I.L.S
TR
A
IN
IN
G
TRAILER
O N E
S
TO
R Y
.6 x
.4
FR
A M E
S H E D
ARSR-8
A S R
G E N E R A
TO
R
TR
A
ILE
RA
R S R
TR
A
IN
IN
G
M E
TA
L
B
LD
G
.9 x
.0
TR
A
ILE
R
O N C O N C
P A D
S
TO
R Y
.8 x
.8
M E
TA
L
B
LD
G . F
.F
.1
B
LD
G
M E
TA
L
B U
ILD
IN
G
B L D G B L D G .F
IB
E R G L A S S
F
IB
E R G L A S S
R E G
IS
TR
Y
B U
ILD
IN
G
SHE D
A
IR
C R A F T
T
IT
L E
IN
S U R E D
S E R V
IC
E
D W T
T.S .I.
LA
B
S H E D
B A S E
M A
IN
T E N A N C E
B L D G
C S F
B
LD
G
A O S
B
LD
G
T E M P
T R A
IL
E R
M E
TA
L
B L D G
S T O R Y
D A Y
C A R E
B
LD
G
V O R
D M E
TA
C A N
D I G
IT
A L
R E M O T E
S W I
TC
H
IN
G
C E N
TE
R
S T E E L
F R A M E
S H E D
A irp o rt
T ru s t
R A
TLIF
F
E X P
LO
R A
TIO
N C O
G R O U N D
M A
IN
TEN
A N C E
B
LD
G
P O W E R
S U B
S
TA
TIO
N
T.D .W .R
B U
ILD
IN
G
A R S R
S Y S T E M
S U P P O R T
F A C
IL
IT
Y P R O G R
AM
P P O R T
F A C
ILITY
T.D .W .R
TO
W E R
C E N
TE
R
M E
TA
L
B U
ILD
IN
G
M E
TAL
B U
ILD
IN
G
H A Z
AR
D
M A
TE
R
IA
LS
LIB
R A R Y
P O L E
G U A R D
P O S T
C O N C
F O S T E R
D R
IV
E
Q U E S A D A
D R
MIKE MONRONEY
BLVD
H A L A B Y
D RMcLUCAS
ST
HELMS
ST
Q U E S A D A
D R
S H A F F E R
S T
R O C K W E L L
A V E
S.W. 59TH
ST.
S.W. 74TH
ST.
S.W. 59TH
ST.
S.W. 74TH
ST.
E D D
IE
A V E
S.W. 66TH
ST.
E D D
IE
A V E
D E N N
IN
G
A V E
S M a c A R T H U R
B L V D
S.W. 61ST
ST.
S.W. 62ND
ST.
S.W. 63RD
ST.
S.W. 64TH
ST.
S.W. 66TH
ST.
C H R
IS
T
IA
N
A V E
Q U E S A D A
D R
S.W. 61ST
ST.
S D U K E
A V E
S.W. 63RD
ST.
S.W. 64TH
ST.
S.W. 68TH
ST.
S.W. 69TH
ST.
C O N C
D R
AIN
O P
EN
W
ALL
V
EN
T
C O
VER
D R
AIN
G
AS
P
IP
E
S
TA
IR
S
W
ATER
M
ETER
C O N C
S
ID
E W
ALK
R A M
PO
V E R
R A M P
RAMP
A C 's
A S P H A L T
S T A
IR
S
P A T C H
P O S T
RAMP
C O N C
R A M P S
C O N C
R A
IS
E D
P A D S
R A M P
R A M P
RAMP
A S P H A L T
C O N C
A C
A C U N
IT
S
C O N C
C O N C
D O C K
L O A D
IN
G
R A M P
A S P H A L T
P K
F N D
P K
F N D
R A M P
R A M P
A S P H A
LT
P L T
A C
L
S E T P K
N A
IL
C O N C
C O N C
C O N C
G R A V E L
D R
IV
E
G R A S S
F
IE
LD
G R A S S
F
IE
LD
.5 ' N E
C O R N E R N E
S E C T1 N R W
I.M
P K S H
IN
E R
A S P H A L T
C O N C
F L U M E
M E T A L
P O S T
P A D
M .L .S
C O N C
A S P H A L T
B R A S S
C A P
A S P H A L T
C O N C
M E D
IA
N
A S P H A L T
A S P H A L T
A S P H A L T
C O N C
H E A D W A L L
A S P H A L T
O N
C O N C
B A S E
G R A V E L
G R A V E L
G R A V E L
D R
IV
E
G R A S S
F
IE
LD
A S P H A
LT
P A R K
IN
G
C O N C C U R B
G U
TTE
R
A S P H A L T
R A M P S
F .F E L E V
.3
A S P H A L T
C O N C
A S P H A L T
F .F E L E V
.4
R A M P
T
IL
E
A S P H A L T5 X
G R A
TE
R A M P
M E T A L
P O L E
O N
C O N C P A D
IN
T E R S E C T
IO
N
E W
N S
D
IT
C H
L
IN
E
C O N C
P A V E M E N T
A S P H A
LT
P A R K
IN
G
A S P H A L T
S T A T
IO
N
O B S E R V A T
IO
N
P O S T
E N D
O F
C O N C
P A V E M E N T
C O N C
C O N C
F L U M E
C O N C
P
IP
E
D
IR
T
P
IP
E
C O N C
C O N C
A S P H A L T
C O N C
C O N C
A S P H A L T
C O N C
ASPHALT
A S P H A L T
C O N C
A S P H A L T
C A B L E
N S
C O N C
M A
IL
B O X
A S P H A L T
G R A V E L
D R
IV
E
G R A V E L
G R A V E L
C O N C
A S P H A L T
R A M P
C O N C
C O N C
R A M P
A S P H A L T
P
IT
C O N C
A S P H A L T
C O N C
B E R M
A S P H A L T
G R O U N D
A N C H O R
G R O U N D
A N C H O R
G R A V E L
G R O U N D
A N C H O R
A
IR
P O R T
T R U S T
D
J
M A R A T H O N
O
IL
G R O U N D
A N C H O R
G R A V E L
G R A V E L
B E R M
G R O U N D
A N C H
G
A V E L
B E R M
P A D
P
R E
IL
C H L K
F E N C E
V A U L T
P A D
D U C T
P C
C A B L E
P
IP
E
G R A V E L
C O N C
C O N C
G R A V E L
G R A V E L
A S P H A
LT
G R A V E L
A S P H A
LT
G R A V E L
G R A V E L
L A D D E R
S E T
I.P
G A T E
C O N C
A S P H A L T
C O N C
S T R
IP
G A T E
C O N C
G A T E
V E N T
A S P H A L T
A S P H A L T
A S P H A L T
A S P H A L T
A S P H A L T
C O N C
S
TO
R Y
M E T
AL
B
LD
G
T O W E R
C O O L
IN
G
C O N C
R A M P
R A M P
R A M P
C O N C
C O N C
R A M P
C O N C
R A M
PC
O N C
A S P H A L T
A S P H A L T
C O N C
C O N C
A S P H A L T
A S P H A L T
C O N C
C O N C
G R A V E L
2A C
C O N C
C O N C
A C
C O N C
R A M P
G R A V E L
C O N C
C O N C
W A L L
W G U A R D
R A
IL
D O W N
V E N T
P
IT
A S P H A L T
C O N C
P A D
O H
T A L L
G U A R D
R A
IL
C O N C
A S P H A L T
P O L E
C O N C
C O N C
A S P H A L T
R A M P
A S P H A L T
RAMP
R A M P
C O N C
R A M P
A S P H A
LT
R A M P
P
IT
C O N C
C O N C
.6 T O
B O T T O M
S A F E T Y
G R
IL
L
A S P H A L T
A C
A S P H A L
TC
O N C
RAMP
C O N C
C O N C
RAMP
A S P H A L T
A S P H A L T
A S P H A L T
A S P H A L T
C O N C
S T O R A G E
B L D G
G U A R D
P O S T
A S P H A L T
R A M P
A C
C O N C
C O N C
A C
G P
G A T E
A S P H A L T
W A L L
C O N C
P
IP
E
A C
C O V E R E D
P A R K
IN
G
W A L L
A S P H A L T
C O N C
A S P H A L T
C O N C
T A N K S
A S P H A L T
C O N C
A S P H A L T
A S P H A L T
C O N C
S T R
IP
S
G A T E
P O L E
R A M P
A S P H A L T
C O N C
A S P H A L T
J E T
W A S H
D E F L
EC
T O R
C O N C
A S P H A L T
C O N C
A S P H A L T
C O V E R E D
A
IR
P O R T
L
IG
H T
IN
G
S Y S T E M
A S P H A L T
A S P H A L T
A S P H A L T
GRAVEL
ROAD
G R A V E L
R O A D
M A R A T H O N
O
IL
C O
G R A V E L
A
IR
P O R T T R U S T
B
A S P H A L T
A S P H A L T
A S P H A L T
C O N C
C O N C .A S P H A L T
C O N C
C O N C
C O N C
C O N C
A S P H A L T
C O N C
C O N C
A S P H A L T
C O N C
C O N C
A S P H A L T
C O N C
C O N C
C O N C
R A M P
C O N C
D O C K
C H
L K
G A T E
A S P H A L T
C O N C
M A N H O L E
A S P H A L T
A S P H A L T
A S P H A L T
R A M P
R A M P
C O N C
A S P H A L T
A S P H A L T
M E M O R
IA
L
M O N U M E N T
A S P H A L T
R
AM
P
A S P H A
LT
R A M P
RAMP
A S P H A L T
RAMP
C O N C
RAMP
R A M P
RAMPC
O N C
RAMP
C O N C
A S P H A L T
A S P H A L
TC
O N C
A S P H A L T
A S P H A L T
R A M P
RAMP
R A M P
P O S T
P O S T
RAMP
C O N C
R A M P
A C
G A
TE
RAMP
C O N C
. RAMP
P A D S
F O R
T O W E R
R A M P
P O L E
A S P H A L T
R A M P S
S C S
M A C H
IN
E
A S P H A L T
R A M P
A S P H A L T
A S P H A L T
R A M P
W IND.
POST
A S P H A L T
R A M P
RAMP
A S P H A L T
G ATE
A S P H A L T
R A M P
C O N C
G A T E
S T A
IR
S
C O N C
S P
IG
O T
O V E R H A N
GRAMP
C O N C
S T A
IR
S
P A D
C O V E R E D
P A R K
IN
G
C O N C
P
IT
W
V A L V E S
W A L L
V A U L T
A S P H A L T
G L A S S E D
E N T R Y W A Y
A S P H A L T
C O N C
C O N C
C O N C
C O N C
G R A V E L
R O A D
P O S T
P A D
C O N C
A S P H A L T
G R A V E L
C O N C
G A T E
C O N C
W O O D
R A M P
C O N C
C O N C
C O N C
C O N C
A S P H A L T
C O N C
C O N C
C O N C
C O N C
P L T
C O N C
R
AM
P
C O N C
P L T
C O N C
R A M P
R A M P
A C
A C
C O N C
W A T E R
M A N H O L E
O N
C O N C P A D
T R .8
C O N C
A S P H A L T
C O N C
C O N C
C O N C
R A M P
C O N C
C O N C
A S P H A L T
C O N C
R A M P
A S P H A L T
R A M P
S T A
IR
S
D O W N
R A M P
E L E V A T O R
A G
GR
E
GA
TE
C O
NC
R E
TE
R A M P
C O N C
R A M P S
A S P H A L T
A S P H A L T
CONC.STRIP
A S P H A L T
C O N C
R A M P S
COL UM NS
RAMP
V A U L T
C O N C
W B E N C H
P
IP
E
A S P H A L T
A C A C
A C
P
IP
E
C O N C
C O N C
C O N C B L O C K
W A L L
C O N C
C O N C
C O N C
A S P H A L T
A S P H A L T
R A
MP
P A R K
IN
G
C O V E R E D
A C 's
R A M P
B U
IL
D
IN
G
S T O R A G E
A S P H A L T
C O N C
C O N C
C O N C
A S P H A L T
C O N C
R A M P
A S P H A L T
C O
NC
C O
NC
A C
C O N C
P A D
S T A
IR
S
C O
NC
A S P H A L T
C O N C
V A U L T
C O N C
D
IR
T G R A V E L
R O A D
G R A V E L
G R A V E L
D R
IV
E
C O N C
P O L E
W O O D
C O N C D O C K
W O V E R H A N G
C O N C
C O N C
A S P H A L T
R A M P
F
IB
E R G L A S S
S T O R A G E
T A N K
F
IL
L
D
IR
T
M O U N D
D
IR
T G R A V E L
R O A D
G R A V E L
G R A V E L
G R A V E L
A N C H O R
'x
C O N C
G R A V E L
G R A V E L
G R A S S
A S P H A L T
A S P H A L T C O N C
C O N C
C O N C
C O N C
C O N C
G R A S S
C O N C
C O N C
A S P H A L T
A S P H A L T
C O N C
C O N C
C O N C
A S P H A L T
C O N C W A L L
W G U A R D
R A
IL
R O C K
W A L L
C O N C
C O N C
C O N C
CONC.
R A M P
C O N C
A S P H A L T
A S P H A L T
B R
IC
K
W A L
LA
R O U N D
V E N T
A S P H A L T
C O N C
C O N C
R A M P
R A M P
LO
A D
IN
G
D O C K
C O N C
R A M P
W G U A R D
R A
IL
C O N C
RAMP
R
AMP
RAMP
C O N C
C O N C
A S P H A
LT
R A M P
C O N C
A S P H A L T
C O N C
RAMP
A S P H A L T
C O N C
C O N C
R A M P
R A M P
AS
P H
AL
T
A S P H A L T
C A T P
C O N C
A C
R A M P
R A M P
R A M P
U N
IT
C H
IL
L E R
R A M P
C O N C
C O N C . A S P H A L T
G R A V E L
W
IN
D
P O S T
A S P H A L T
C O N C
C O N C
G U A R D
R A
IL
S
R A M P
A S P H A L T
C O N C
C O N C
R A M P
A S P H A L T
A S P H A L T
R A M P
G A T E
A S P H A L T
R A M P
A S P H A L T
R A M P
C O N C
C O N C
D O C K
A S P H A L T
A S P H A L T
R A M P A S P H A L T
C O N C
F L U M E S
C O N C
S W
C O N C
R A M P
A S P H A L T
C O N C
S T E P S
D O W N
C O N C S W
E N D S
A S P H A L T
C O N C
C O N C
R A M P
C O N C
A S P H A L T
C O N C
C O N C
A S P H A L T
C O N C
C O N C
O V E R H E A D
P O R C H
C O L U M N S
S U P P O R T
A S P H A L T
A C
V A U L T
A S P H A L T
C O N C
C O N C
C O N C
P O S T
D
IR
T
D R
IV
E
D
IR
T G R A V E L
R O A D
T E M P O R A R Y
B E N C H M A R K X
P A
IN
T E D
O N
C O N C
D
IR
T G R A V E L
R O A D
A C
C O N C
A S P H A L T
A S P H A L T
A S P H A L T
A S P H A L T
C O N C
ASPHALT
PAVEM ENT
S H
ED
M E
TA
L
C O N C
C O N C
D
IR
T G R A V E L
D R
IV
E
G R A V E L
D
IR
T G R A V E L
R O A D
EDGE OF
PAVEMENT
C O N C
ASPHALT
PAVEM ENT
A S P H A L T
A S P H A L T
G R A V E L
D R
IV
E
C O N C
A S P H A L T
C O U R T
B A S K E T B A L L
G R A V E L
R A M P A S P H A L T
C O N C
C O N C .S
IG
N
A S P H A L T
C O N C
C O N C
A S P H A L T
A S P H A L T
A S P H A
LT
A S P H A L T
F L U M E
W M E T A L
C O V E R
A S P H A
LT
C O N C
A S P H A
LT
A S P H A
LT
A S P H A
LT
A S P H A L T
C O
NC
A S P H A L T
G R A V E L
A S P H A L T
A S P H A L T
C O N C
A S P H A
LT
C O N C
A S P H A L T
C O N C
R A
IL
A S P H A
LT
A S P H A L T
G R A V E L
A C
C O N C
G R A V E L
C O N C
G R A V E L
A S P H A L T
C O N C
C O N C
A S P H A L T
C O N C
A S P H A L T
C O N C
C O N C
A S P H A L T
M O N
IT
O R
IN
G
W E L L
C O N C
C O N C
A S P H A L T
A S P H A L T
P
IP
E
V A U L T
R A M P
C O N C
C O N C
A S P H A L T
C O N C
A S P H A L T
C O N C
V A U L T
C O N C
A S P H A L T
A S P H A L T
R
AM
P
C O N C
S T R
IP
A S P H A L T
A S P H A L T
A S P H A L T
A S P H A L T
C H E M
IC
A L
S T O R A G E
B L D G
A S P H A L T
C O N C
D U M P S T E R
P A D
G R A V E L
C O N C . P O S T
E D G E
O F
C O N C R E T E
R A
IS
E D
D O C K
C H L K F E N C E
W
B .W
C O N C
D
IR
T G R A V E L
R O A D
G E N E R A T O R
C O N C
A S P H A L T
C O N C
A S P H A L T
C O N C
C O N C
A S P H A L T
R A M P
G A T E
A S P H A L T
A S P H A L T
A C
G R A V E L
A C
P
IP
E
ASPHALT
G R A V E L
C A G E S
A S P H A L T
T O W E R
B A S E
C A B L E
J C T F O R
A N T E N N A
G R A T E D
P
IT
R A M P
A S P H A L T
A S P H A L T
A C
C O N C
C O N C
A S P H A L T
C O N C
R A M P
W A L L
C O N C
C O N C
C O N C
W A L L
C O N C
C O N C
C O N C
C O N C
V E N T S
M E T A L
P A D
F O R
E L E V A T O R
G U A R D
R A
IL
D O C K
G A T E
G U A R D
R A
IL
R A M P
G A T E
P O L E
A S P H A L T
G R A V E L
R O O F
D R A
IN
D O W N S P O U T S
T Y P
C O N C
C O N C
A S P H A L T
G A T E 1 C H L K F E N C E
W
B .W
A C C E S S
F O R
T R U C K
S C A L E S
G A T E
G A T E
G A T E
C O N C
G R A V E L
R O A D
W R O U G H
A S P H A L T
U N D E R N E A T H
A S P H A L T
C O N C
C O N C
C O N C
C O N C
C O N C
P O S T
P O L E
P O S T
U T
IL
IT
Y
U N K N O W N
U N D E R G R O U N D
U T
IL
IT
Y
D
IT
C H
C O N C
A S P H A L T
W A T E R
IN
D
P O S T
C O N C
G R A V E L
A S P H A L T
C O N C
A S P H A L T
C R A S H
S U R V
IV
A L
A R
EA
C O N C
A S P H A L T
C O N C P A D
S A Y S
W
D U C T
N S
A S P H A L T
A S P H A L T
C O N C
S T R
IP
A S P H A L T
G A T E
S P
IG
O T
G U A R D
P O S T S
A R V
S T E E L
I B E A M
C O L U M N S
S T E E L
C O L U M N
H A N G
C O N C
A S P H A L T
A S P H A L T
C O N C
R A
IL
G U A R D
P
IP
E
E D G E
O F
P
AV
EM
E N T
C H L K F E N C E
W
B .W
C O N C
C O N C R E T E
A C
C O N C R E T E
ONE STORY
WOOD BLDG.
C O N C R E T E
C O N C
S
IG
N
P V C
G A T E
C O N C R E T E
R A M P
M O T O R
D O C K
R A M P
A S P H A L T
G A T E
C O N C R E T E
A S P H A L T
RAMP
TO
W
ER
C U R B x
C S.W. 59th
STREET
L
G A
T E
R O C K W E
LL
A V E
L C S.W. 59th St
O
IL
F
IE
LD
P
IP
E
Y A R D
(N O T S U R V E Y E D
H A
LA
B Y
D R
C S.W. 59th STREET L
N E W P O R T H E
IG
H T S
A D D N W N E
V A C A T E D
O R D
IN
A N C E
B K P G A
LS
O
V A C A
TIO
N
O F
P
LA
T B K P G
D A
TE
D
G R AVEL
F O S
TE
R
R D
F O S
TE
R
D R
IV
E
S E
R V
IC
E
D R
IV
E
SECRUITY FENCE 7'-0"
S.W. 59th
STREET
S M a c A R
TH
U R
B
LV
D
S M a c A R
TH
U R
B
LV
D
S M a c A R
TH
U R
B
LV
D
S.W. 61st
ST.
S.W. 61st
STREET
S M a c A R
TH
U R
B
LV
D
R O C K W E
LL
A V E
'5 W
.2 N
S H A F F E R
S T
McLUCAS
ST.
HALABY
DR
H A
LA
B Y
D R
Q U E S A D A
H A
LA
B Y
D R
Helms Street
Q u e s a d a
D rive S.W. 66th
STREET
E D D
IE
A V E N U E
E D D
IE
A V E N U E
S D E N N
IN
G
A V E N U E
S.W. 66th
STREET
D E N N
IN
G
A V E N U E
E D D
IE
A V E
S.W. 65th
ST.
S.W. 64th
ST.
E D D
IE
A V E
E D D
IE
A V E
S.W. 62nd ST S.W. 62nd
ST
D E N N
IN
G
A V E
S.W. 64th
ST.
S M a c A R
TH
U R
B
LV
D
S.W. 66th
STREET
S M a c A R
TH
U R
B
LV
D
S D U K E
A V E
S D U K E
A V E N U E
S D U K E
A V E
S D U K E
A V E
S.W. 63rd
STREET
S.W. 64th
STREET
S.W. 64th
STREET
S M a c A R
TH
U R
B
LV
D
S.W. 62nd
ST.
S.W. 63rd
STREET
C H R
IS
TIA
N A V E
D E N N
IN
G
A V E N U E
S M a c A R
TH
U R
B
LV
D
L
Q u e s a d a
D rive
Q u e s a d a
D rive
S M a c A R
TH
U R
B
LV
D
G R
AV
E L
G R A V E L
SU
R F A C E
R O A D W A Y
C
R O C K W E
LL
A V E
L
C H R
IS
TIA
N A V E
Q u e s a d a
D rive
SW 74TH
ST.
SW 74TH
ST.
CL
CL
S.W. 68th
STREET
S.W. 69th
STREET
S.W. 59TH STREET
S.W. 74TH STREET
HEADQUARTERS
BUILDING
S . R
O C
K W
E
LL
A V
E N
U E
R E
G
IN
A A
V E
N U
E
S . M
A C
A R
U T
H E
R B
LV
D
DUKE AVE
D U
K E
A V
E
MIKE MONRONEY
BLVD
S . M
A C
A R
U T
H E
R B
LV
D
G R A V E L
R A M P
R A M P
STAIRS DOWN
R A M P
R A M P
R A M P
R A M P
ELEVATOR
C O N C
R A M P
R A M P
R A M P
R A M P
R A M P
R A M P
R A M P
R A M P
R A M P
PIT
R A M P
R A M P
R A M P
R A M P
R A M P
C O N C R E T E
C O N C R E T E
C O N C R E T E
C O N C R E T E
A S P H A L T
A S P H A L T
C O N C R E T E
A S P H A L T
A S P H A L T
C O N C R E T E
S T R
IP
A S P H A L T
A S P H A L T
A S P H A L T
A S P H A L T
A S P H A L T
A S P H A L T
A S P H A L T
CONCRETE STRIP
A S P H A L T
A S P H A L T
A S P H A L T
C O N C R E T E
C O N C R E
TE
C O N C R E T E
C O N C R E T E
S.W. 64th ST.
S.W. 63RD ST.
NORTH COURTYARD
SOUTH COURTYARD
HEADQUARTERS
BUILDING
TO DUKE AVENUE
BUILDING
ENTRANCE
DESIGNED BY
DRAWN BY
WORK ORDER
CHECKED BY ISSUED BY
APPROVED BY
DRAWING NO.
DATE
DATE CHK'D APP'DDESCRIPTION
REV.
LTR.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
JOB # SHT. #
HQB REMODEL LOBBY
2012-009421
C .H G U
ER
N S
EY
C O M P
AN
Y
N G R
AN
D
B
LV
D
C .A
AR
C H
IT
EC
TU
R E
E X P
IR
E S
JU
N E
C .A
EN
G
IN
EE
R
IN
G
E X P
IR
ES
JU
N E
SEQUENCE #
SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY
INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY
BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15
AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION.
UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S.
GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR
PARTS 15 AND 1520.
MARY TSIEN
G-002
PROJECT LOCATION MAP AND SITE PLAN
29 MAY 2020
J. GALLAS
J. LOPEZ
D. OMAN
NOT TO SCALE1
PROJECT LOCATION MAP
SHEET INDEX
SHEET NUMBER SHEET TITLE
01000 - GENERAL
G-001 COVER SHEET
G-002 PROJECT LOCATION MAP AND SITE PLAN
G-003 LIFE SAFETY PLAN
G-004 GENERAL NOTES
G-005 CONSTRUCTION PHASING PLAN
08000 - ARCHITECTURAL
A-001 ARCHITECTURAL ABBREVIATIONS, CONVENTIONS, AND NOTES
AD121 BASEMENT DEMOLITION PLAN OPTION #05 (PHASE 6)
AD122 FIRST FLOOR DEMOLITION PLAN
AD123 SECOND FLOOR DEMOLITION PLAN
AD124 THIRD-FOURTH FLOOR DEMOLITION PLAN
AD125 FIRST AND SECOND FLOOR ENLARGED DEMOLITION PLAN BASE BID
AD126 AUDITORIUM DEMOLITION FLOOR PLAN - OPTION #01 PHASE 2
A-121 BASEMENT FLOOR PLAN
A-122 FIRST FLOOR PLAN
A-123 SECOND FLOOR PLAN
A-124 THIRD-FOURTH FLOOR PLAN
A-125 ENLARGED FLOOR PLAN AT FIRST FLOOR AND
A-126 AUDITORIUM FLOOR PLAN - OPTION # 01 PHASE 2
A-141 BASEMENT REFLECTED CEILING PLAN
A-142 FIRST FLOOR REFLECTED CEILING PLAN
A-143 SECOND FLOOR REFLECTED CEILING PLAN
A-144 THIRD FLOOR AND ROOF STAIR REFLECTED CEILING PLAN
A-145 ENLARGED REFLECTED CEILING PLAN AT FIRST FLOOR
A-221 INTERIOR ELEVATIONS
A-222 INTERIOR ELEVATIONS
A-223 INTERIOR ELEVATIONS
A-301 PLAN AND VERTICAL DETAILS
A-501 GUARDRAIL ELEVATIONS
A-502 GUARDRAIL DETAILS
A-503 WOOD PANEL ELEVATIONS
A-504 WOOD PANEL DETAILS
14000 - MECHANICAL
M-001 HVAC LEGEND
M-101 FIRST FLOOR HVAC PLANS
M-102 FIRST FLOOR HVAC PLANS
M-103 SECOND FLOOR HVAC PLANS
M-104 SECOND FLOOR HVAC PLANS
M-105 THIRD FLOOR HVAC PLANS
M-106 THIRD FLOOR HVAC PLANS
M-107 BASEMENT HVAC PLANS
15000 - ELECTRICAL
E-001 ELECTRICAL LEGEND AND NOTES
E-101 ELECTRICAL PLANS
E-102 FIRST FLOOR ELECTRICAL PLANS
E-103 SECIOND FLOOR ELECTRICAL PLANS
E-104 SECOND FLOOR ELECTRICAL PLANS
E-105 THIRD FLOOR ELECTRICAL PLANS
E-106 THIRD FLOOR ELECTRICAL PLANS
E-107 BASEMENT ELECTRICAL PLANS
SCALE: 1" = 40'-0"2
SITE PLAN
NORTH
CONTRACTORS
STAGING AREA
CONTRACTOR HAUL ROUTE A. CONTRACTOR SHALL PROVIDE THE FAA WITH A WASTE
MANAGEMENT PLAN PREPARED IN ACCORDANCE WITH FAA
AMS GUIDELINES. THESE GUIDELINES INCLUDE FAA AMS
CLAUSE #3.6.3-22 CONSTRUCTION WASTE MANAGEMENT AND
MONTHLY CONSTRUCTION / DEMOLITION WASTE
MANAGEMENT INVENTORY REPORTS. CONTRACTOR SHALL
SUBMIT THIS PLAN NO LATER THAN 15 DAYS AFTER
RECEIVING THE NOTICE TO PROCEED.
B. CONTRACTOR MOBILIZATION AND STAGING AREA SHALL BE
LOCATED AT THE HQB’S NORTH COURTYARD. THIS AREA TO
BE KEPT IN A CLEAN AND ORDERLY MANNER THROUGHOUT
THE DURATION OF THE CONSTRUCTION PROJECT.
CONTRACTOR SHALL REPAIR OR REPLACE ANY DAMAGE TO
THE EXISTING BUILDING, BUILDING SYSTEMS, AND
PAYMENTS.
C. CONTRACTOR SHALL ONLY USE ELEVATOR E-1 (LOCATED IN
THE LOBBY) FOR CONSTRUCTION WASTE AND DEBRIS
REMOVAL.
D. CONTRACTOR SHALL ONLY USE ELEVATOR E-2 FOR
CONSTRUCTION AND WASTE DEBRIS FROM THE SOUTH
BASEMENT.
E. PERMISSION AND LOCATION OF DEBRIS CHUTES IS SHALL BE
COORDINATED WITH THE CONTRACTING OFFICER OF
RECORD.
CONSTRUCTION WASTE
AND HAUL ROUTE NOTES
80' 40' 0 80'
SCALE: 1" = 40'
CORRIDOR
B21
ELEV
E-3
STAIR
S-4B
CORRIDOR
B03
CORRIDOR
B10
CORRIDOR
B08
ELEV
E-4
CORRIDOR
B13
STAIR
S-4A
STAIR
S-3A
STAIR
S-3B
UP
EXIT
UP
EXIT
UP
UP
EXIT
EXITUP
VESTIBULE
V-A
C O
R R
ID
O
R
A
CORRIDOR
100B
VESTIBULE
V-B
VESTIBULE
V-E
ENTRY
100F
C O
R R
ID
O
R
E
LOBBY
100L
STAIR
S-3A
CORRIDOR
100G
STAIR
S-3B
CORRIDOR
100C
VESTIBULE
V-C
C O
R R
ID
O
R
D
VESTIBULE
V-D
ELEV
E-3
STAGE
100?
AUDITORIUM
100?
ELEV
E-1
STAIR
S-1A
STAIR
S-1B
ELEV
E-4
STAIR
S-4B
STAIR
S-4A
STAIR
S-2
UP
UP
UP
DN
DN
UP
UP
DN
UP
DN
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT EXIT
EXIT
EXIT
ELEV
E-1
CORRIDOR
200A
CORRIDOR
200B
CORRIDOR
200E
CORRIDOR
200F
LOBBY
200L
CORRIDOR
200C
CORRIDOR
200D
STAIR
S-1
STAIR
S-1A
STAIR
S-1B
ELEV
E-2
ELEV
E-3
ELEV
E-4
STAIR
S-4B
STAIR
S-4A
STAIR
S-2
UP
UP
UP
DN
UP
DN
UP
DNDN
DN
DN
UP
EXIT
EXIT
EXIT
EXIT
EXIT
CORRIDOR
300A
CORRIDOR
300B
CORRIDOR
300C
CORRIDOR
300D
CORRIDOR
300E
CORRIDOR
300F
ELEV
E-3
ELEV
E-1
STAIR
S-1
STAIR
S-1A
STAIR
S-1B
ELEV
E-2
ELEV
E-4
STAIR
S-4B
STAIR
S-2
STAIR
S-4A
DN
UP
DNDN
DN
DN
DN
EXIT
EXIT
EXIT
EXIT
ACCESS TO ROOF
BUILDING CODE INFORMATION
OKLAHOMA CITY MUNICIPAL CODECODE ACCEPTED BY
2015 IBC (INTERNATIONAL BUILDING CODE)
WITH AMENDMENTS
BUILDING CODE
2015 IMC (INTERNATIONAL MECHANICAL CODE)
WITH AMENDMENTS
MECHANICAL CODE
2015 IPC (INTERNATIONAL PLUMBING CODE)
WITH AMENDMENTS
PLUMBING CODE
2015 IFGC (INTERNATIONAL FUEL GAS CODE)
WITH AMENDMENTS
GAS CODE
2010 IECC (INTERNATIONAL ENERGY CONSERVATION CODE)
WITH AMENDMENTS
ENERGY CODE
2015 NEC (NATIONAL ELECTRICAL CODE), NFPA 70
WITH AMENDMENTS
ELETRICAL CODE
2015 IFC (INTERNATIONAL FIRE CODE)
WITH AMENDMENTS
FIRE CODE
ADA (AMERICANS WITH DISABILITY ACT)
2009 ANSI ICC A117.1 (AMERICAN NATIONAL STANDARDS
INSTITUTE, INTERNATIONAL CODE COUNCIL)
ACCESSIBILITY
BUILDING INFORMATION
BUSINESS GROUP B (PRIMARY)
ASSEMBLY: GROUP A-3 (ACCESSORY)
OCCUPANCY CLASSIFICATION
TYPE II-ACONSTRUCTION CLASSIFICATION
YES SEPARATEDMIXED-USE OCCUPANCY
40 FEET (65 FEET ALLOWED)BUILDING HEIGHT ABOVE GRADE
178,125 SF PER FLOOR WITH AREA
INCREASES
ALLOWABLE GROSS BUILDING AREA
HORIZONTAL EXITS
MINIMUM FIRE WALLS (B)
SHAFT ENCLOSURES:
FIRE PARTITIONS:
FIRE SEPARATION DISTANCE:
FIRE RESISTANCE RATINGS
YESSPRINKLED
3 ABOVE GRADE, 1 STORY BASEMENTBUILDING STORIES ABOVE GRADE
156,654 SF
52,218 SF (BUILDING DIVIDED INTO THREE
SEPARATE FIRE ARES)
163,062
TOTAL BUILDING AREA:
SEPARATED FIRE AREA
TOTAL AREA (WITH CANOPES)
2-HOUR
2-HOUR
1-HOUR
30 FEET
EGRESS INFORMATION
B WITH SPRINKLER SYSTEM = 300'EXIT ACCESS TRAVEL DISTANCE
ALLOWABLE DISTANCE = 50'DEAD ENDS
1,567 OCCUPANTSOCCUPANCY LOAD
6 EXITS (2 OUT OF EACH BUILDING SEPARATION)
9 EXITS
OTHERS COMPONENTS = 0.2" PER OCCUPANTEGRESS WIDTHS
(2015 IBC, 1005.3.1)
REFERENCE DRAWING ABOVE FOR INDIVIDUAL
EGRESS CAPACITY OF DOORS
(2015 IBC, 1020.4 EXCEPTION #2)
REQUIRED EXITS
PROVIDED EXITS
THIS PROJECT CONSISTS OF REPLACING THE EXISTING FINISHES AT THE
EXISTING FAA HEADQUARTERS BUILDING. THE WORK DESCRIBED IN THE
CONTRACT DOCUMENTS DOES NOT CHANGE OR IMPACT THE FOLLOWING
ITEMS: BUILDING CONSTRUCTION TYPE, OCCUPANCY TYPE, OCCUPANT
LOAD, EGRESS DISTANCES OR CONFIGURATIONS, AND ADA COMPLIANCE.
THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS IS LIMITED TO
THE CORRIDORS, ENTRANCE LOBBY, THE STAIRS AND ELEVATORS. THIS
WORK DOES NOT EXTEND INTO EXISTING OFFICES, RESTROOMS, OR
MECHANICAL SPACES.
FIRE SUPPRESSION HEADS MAY NEED TO BE ADJUSTED AT SOME
LOCATIONS TO COORDINATE WITH CEILING FURRING CONDITIONS
LOCATED AT THE FIRST FLOOR AND THE LOBBY CEILING AT THE SECOND
FLOOR LEVEL.
PROJECT DESCRIPTION
DESIGNED BY
DRAWN BY
WORK ORDER
CHECKED BY ISSUED BY
APPROVED BY
DRAWING NO.
DATE
DATE CHK'D APP'DDESCRIPTION
REV.
LTR.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
JOB # SHT. #
HQB REMODEL LOBBY
2012-009421
C .H G U
ER
N S
EY
C O M P
AN
Y
N G R
AN
D
B
LV
D
C .A
AR
C H
IT
EC
TU
R E
E X P
IR
E S
JU
N E
C .A
EN
G
IN
EE
R
IN
G
E X P
IR
ES
JU
N E
SEQUENCE #
SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY
INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY
BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15
AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION.
UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S.
GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR
PARTS 15 AND 1520.
MARY TSIEN
G-003
LIFE SAFETY PLAN
29 MAY 2020
J. GALLAS
J. LOPEZ
D. OMAN
SCALE: 1" = 30'-0"1
BASEMENT FLOOR PLAN
SCALE: 1" = 30'-0"2
FIRST FLOOR PLAN
SCALE: 1" = 30'-0"3
SECOND FLOOR PLAN
SCALE: 1" = 30'-0"4
THIRD FLOOR PLAN
NORTH
60' 30' 0 60'
SCALE: 1" = 30'
LIFE SAFETY NOTES:
A. CONTRACTOR SHALL MAINTAIN MEANS OF
EGRESS AND FIRE PROTECTION SYSTEM
DEVICES DURING NORMAL BUSINESS
HOURS.
B. THIS PROJECT CONSISTS OF PRIMARILY OF
INTERIOR FINISH REPLACEMENT AND
UPGRADES. OUTDATED MATERIALS WILL
BE REPLACED WITH NEW FINISHES OF
SIMILAR FUNCTION AND QUALITY.
C. WHERE A RATING HAS BEEN GIVEN TO AN
EXISTING WALL, ALL PENETRATIONS
(EXISTING OR NEW) MUST BE SEALED AND
PROPERLY FIRE PROOFED PER THAT
RATING.
D. THERE IS NO CHANGE OF OCCUPANCY,
HAZARDS OR EGRESS WITHIN THE HQB
BUILDING AS PART OF THIS WORK.
E. A LIFE SAFETY CODE ANALYSIS IS NOT
PERFORMED AS PART OF THIS INTERIOR
FINISHES REPAIR PROJECT.
A. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS AND MEASUREMENTS AS THEY RELATE TO NEW CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO
THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION.
B. EXISTING BUILDING WILL BE OCCUPIED DURING ALL PHASES OF CONSTRUCTION. AIR, WATER AND NOISE POLLUTION CONTROL SHALL BE CLOSELY MONITORED, CONTROLLED AND COORDINATED WITH THE COR.
C. THE MAJORITY OF THE WORK IS TO TAKE PLACE AFTER BUSINESS HOURS AND ON WEEKENDS UNLESS
COORDINATED WITH THE COR.
D. COORDINATE DEMOLITION OPERATIONS WITH REQUIREMENTS FOR PHASING OF DEMOLITION AND
CONSTRUCTION, INCLUDING TEMPORARY CONSTRUCTION.
E. REVIEW ALL DISCIPLINE CONSTRUCTION DOCUMENTS TO VERIFY EXTENTS OF DEMOLITION AND
CONSTRUCTION WITH RESPECT TO PHASING, BASE BID, AND OPTIONS.
F. CONTRACTOR TO PERFORM A PRE-DEMOLITION PHOTOGRAPHIC SURVEY OF AREAS TO BE DEMOLISHED.
G. CONTRACTOR SHALL SURVEY AND CATALOG ALL EXISTING CEILING-MOUNTED AND WALL-HUNG LIGHTS, DIFFUSERS, GRILLES, SIGNAGE, ALARMS, SENSORS, EXIT DEVICES, AND OTHER APPURTENANCES PRIOR TO COMMENCING DEMOLITION WORK FOR THIS PROJECT. THESE ITEMS ARE TO BE CATALOGED, WRAPPED, AND STORED FOR REINSTALLATION. IT IS THE EXPRESSED DESIGN INTENT FOR ALL EXISTING CEILING AND WALL MOUNTED DEVICES TO BE REINSTALLED IN PRECISELY THE SAME LOCATIONS UNLESS NOTED OTHERWISE.
H. CONTRACTOR TO ENSURE THAT ALL REINSTALLED (EXISTING) CEILING-MOUNTED AND WALL-HUNG ALARMS, SENSORS, EXIT DEVICES, AND OTHER APPURTENANCES ARE IN WORKING ORDER AFTER REINSTALLATION. THE CONTRACTOR SHOULD REQUEST A PRE-DEMOLITION WALKTHROUGH WITH FAA STAFF TO ENSURE DEVICES
ARE IN WORKING ORDER PRIOR TO THE START OF WORK.
I. PRIOR TO DISMANTLING EXISTING LAY-IN ACOUSTICAL CEILING GRIDS, CONTRACTOR IS TO VERIFY THAT ALL ABOVE CEILING ITEMS SUCH AS DUCTWORK, MECHANICAL EQUIPMENT, PIPING, CONDUITS, WIRING, CABLE TRAYS ETC. ARE SUPPORTED FROM THE STRUCTURE ABOVE AND NOT SUPPORTED BY THE GRID. ALL ITEMS
RESTING ON THE EXISTING CEILING GRID SHALL BE SUPPORTED PRIOR TO DEMOLITION.
J. WHERE FLOOR DEMOLITION IS REQUIRED TO INSTALL NEW WORK, CONTRACTOR SHALL PATCH AND REPAIR TO
A LEVEL AND EVEN SURFACE.
K. PATCH AND REPAIR ADJACENT SURFACES TO REMAIN AFTER DEMOLITION AND NEW CONSTRUCTION TO A LEVEL AND EVEN SURFACE TO MATCH EXISTING ADJACENT CONSTRUCTION TYPE, FINISH, COLOR AND TEXTURE. EXTENTS OF THIS REPAIR SHALL BE CARRIED TO A CONTROL JOINT OR CORNER OR APPROPRIATE
MATERIAL FINISH EDGE.
L. APPLY LEVELING COMPOUND AT FLOOR SLAB CONDITIONS AS REQUIRED FOR NEW OR REPAIRED FLOORING
MATERIALS.
M. ANY SALVAGED STONE / MARBLE VENEER NOT USED FOR REPAIRING EXISTING VENEER SHALL BE REMOVED AT
THE COMPLETION OF THE PROJECT.
N. FAA WILL RETAIN ALL SALVAGE THAT IS OF VALUE AS DESIGNATED BY THE COR. THE COR WILL DIRECT THE CONTRACTOR AS TO THE LOCATION OF STORAGE AREA FOR VARIOUS ITEMS. THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING FROM THE BUILDING AND CONSTRUCTION SITE ALL CONSTRUCTION DEBRIS
AND/OR ITEMS NOT RETAINED BY FAA.
O. ALL OPENINGS AND VOIDS LEFT BY THE REMOVAL OF EXISTING CONSTRUCTION, EQUIPMENT, PIPING, DUCTS, ETC. SHALL BE PROPERLY PATCHED AND CLOSED OFF TO MAINTAIN PROPER FIRE RATING IN EXISTING WALLS.
P. WHERE A RATING HAS BEEN GIVEN TO AN EXISTING WALL, ALL PENETRATIONS (EXISTING OR NEW) MUST BE
SEALED AND PROPERLY FIRE PROOFED PER THAT RATING REQUIREMENT.
Q. REMOVE ALL ABANDONED MECHANICAL, ELECTRICAL, PLUMBING, AND COMMUNICATION EQUIPMENT AT
INTERIOR AREAS OF THE WORK BACK TO ITS SOURCE.
PROJECT DEMOLITION NOTES:
A. CONSTRUCTION PHASING INFORMATION AND NOTES ARE INTENDED TO SHOW THE SEQUENCE IN WHICH THE DEMOLITION AND CONSTRUCTION OPERATIONS SHALL PROGRESS. REFER TO DEMOLITION AND CONSTRUCTION SHEETS FOR SPECIFIC WORK RELATED TO EACH AREA AND PHASE. DEMOLITION AND
CONSTRUCTION DOCUMENTS SUPERSEDE PHASING DRAWINGS.
B. WORK INDICATED IN EACH PHASE IS GENERALLY SHOWN IN THE ORDER ANTICIPATED FOR THE WORK TO BE COMPLETED. CONTRACTOR IS PERMITTED TO ADJUST SOME PORTIONS OF CONSTRUCTION PHASING PROVIDED THAT BUILDING FUNCTIONS, PROJECT SCHEDULE, AND OWNER / USER / OCCUPANT OPERATIONS ARE NOT NEGATIVELY IMPACTED. COORDINATE CONSTRUCTION SEQUENCE AND SCHEDULE WITH OWNER
AND ARCHITECT PRIOR TO IMPLEMENTATION.
C. CONSTRUCT FULL HEIGHT TEMPORARY WALLS TO SEPARATE THE WORK PERFORMED IN THE LOBBY FROM DEMOLITION AND CONSTRUCTION AREAS. TEMPORARY WALLS SHALL BE SEALED TO PREVENT TRANSFER OF DUST AND ODORS FROM CONSTRUCTION AREAS INTO OCCUPIED SPACES AND SHALL BE CONSTRUCTED TO PROTECT THE INTERIOR ENVIRONMENT AND MAINTAIN ENVIRONMENTAL CONTROLS UNTIL NEW WORK IS
SUBSTANTIALLY COMPLETED IN THE LOBBY.
D. FIELD VERIFY EXISTING BUILDING LAYOUT AND CONDITIONS TO DETERMINE THE EXTENT OF TEMPORARY CONSTRUCTION REQUIRED FOR CONSTRUCTION SEPARATION, AND BUILDING SECURITY AND ACCESS.
E. TEMPORARY CONSTRUCTION SHALL NOT BE PERMANENTLY ATTACHED TO EXISTING FINISHES AND EXISTING FINISHES SHALL BE PROTECTED FROM DAMAGE. REPAIR / REPLACE EXISTING MATERIALS
DAMAGED BY DEMOLITION OR CONSTRUCTION OPERATIONS.
F. INTERIOR TEMPORARY CONSTRUCTION WALLS SHALL BE DEFINED AS TEMPORARY WALLS WHICH ARE NOT EXPOSED TO WEATHER. INTERIOR TEMPORARY CONSTRUCTION WALLS SHALL BE CONSTRUCTED OF LIGHT GAUGE METAL FRAMING STUDS WITH ONE LAYER OF 5/8” GWB ON THE NON-CONSTRUCTION SIDE AND ONE LAYER OF 1/2” GWB ON THE CONSTRUCTION SIDE. METAL STUDS SHALL BE SIZED TO RESIST 5 PSF LATERAL LOADS FOR THE VERTICAL SPANS REQUIRED. ACOUSTICAL BATT INSULATION SHALL BE INSTALLED TO LIMIT CONSTRUCTION NOISE TRANSMISSION TO ADJACENT OCCUPIED SPACES. GWB SHALL BE TAPED AND BEDDED TO THE FULL HEIGHT OF THE WALL EXPOSED TO VIEW. THE TEMPORARY CONSTRUCTION WALL SHALL RECEIVE ONE COAT OF LATEX-BASED INTERIOR FLAT PAINT ON THE NON-
CONSTRUCTION SIDE TO THE FULL HEIGHT OF THE WALL EXPOSED TO VIEW.
G. TEMPORARY DOORS IN INTERIOR TEMPORARY CONSTRUCTION WALLS SHALL BE LOCATED, SIZED, AND IN QUANTITIES AS TO BE CONVENIENT FOR CONSTRUCTION AND COMPLIANT WITH BUILDING AND FIRE CODES.
TEMPORARY INTERIOR DOORS SHALL BE 1 3/4” HOLLOW METAL WITH HOLLOW METAL FRAMES. TEMPORARY INTERIOR DOORS AND FRAMES SHALL RECEIVE ONE COAT LATEX-BASED INTERIOR FLAT PAINT TO MATCH ADJACENT WALLS. TEMPORARY DOORS SHALL BE EQUIPPED WITH CYLINDRICAL LOCK SETS, DEAD BOLTS AND HINGES FOR BASIC OPERATION AND SECURITY. EGRESS DOORS IN TEMPORARY WALLS SHALL MEET LIFE SAFETY CODE REQUIREMENTS. LOCATION OF ALL TEMPORARY DOORS SHALL BE COORDINATED WITH
MMAC SECURITY.
H. TEMPORARY CONSTRUCTION IS THE RESPONSIBILITY OF THE CONTRACTOR TO DESIGN, ERECT, MAINTAIN, AND REMOVE.
I. HQB ACCESS ROUTES MUST BE KEPT CLEAN AT ALL TIMES FROM ANY CONSTRUCTION RELATED DEBRIS, DIRT OR OTHER MATERIALS.
J. MATERIALS AND EQUIPMENT SHALL BE STORED EITHER OFF-SITE OR WITHIN THE CONSTRUCTION STAGING
AREA UNTIL READY FOR USE.
CONSTRUCTION PHASING GENERAL NOTES:PROJECT GENERAL NOTES:
DESIGNED BY
DRAWN BY
WORK ORDER
CHECKED BY ISSUED BY
APPROVED BY
DRAWING NO.
DATE
DATE CHK'D APP'DDESCRIPTION
REV.
LTR.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
JOB # SHT. #
HQB REMODEL LOBBY
2012-009421
C .H G U
ER
N S
EY
C O M P
AN
Y
N G R
AN
D
B
LV
D
C .A
AR
C H
IT
EC
TU
R E
E X P
IR
E S
JU
N E
C .A
EN
G
IN
EE
R
IN
G
E X P
IR
ES
JU
N E
SEQUENCE #
SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY
INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY
BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15
AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION.
UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S.
GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR
PARTS 15 AND 1520.
MARY TSIEN
G-004
GENERAL NOTES
29 MAY 2020
J. GALLAS
J. LOPEZ
D. OMAN
A. CONTRACTOR WORK PRACTICES AND PROCEDURES SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL
ENVIRONMENTAL, HEALTH, AND SAFETY REQUIREMENTS.
B. HQB WILL BE FULLY OCCUPIED FOR THE DURATION OF DEMOLITION AND CONSTRUCTION WORK.
CONTRACTOR SHALL ISOLATE WORK AREAS FROM NORMAL DAY-TO-DAY FAA OCCUPANT TRAFFIC WITH DUST BARRIERS, TEMPORARY WALLS, CONSTRUCTION SIGNAGE, AND SAFETY CONES TO MINIMIZE OCCUPANT EXPOSURE TO DUST, NOISE, FUMES, ODORS, AND OTHER ENVIRONMENTAL HAZARDS RELATED
TO DEMOLITION AND CONSTRUCTION WORK.
C. ALL DEMOLITION AND CONSTRUCTION WORK ASSOCIATED WITH THIS PROJECT SHALL BE PERFORMED
AFTER NORMAL WORK HOURS OR ON WEEKENDS TO PREVENT THE DISRUPTION OF THE DAILY
OPERATIONS WITHIN THE HQB. ANY WORK PERFORMED DURING NORMAL WORK HOURS SHALL BE
APPROVED IN ADVANCE BY THE CONTRACTING OFFICER REPRESENTATIVE (COR).
D. ALL WORK AREAS WITHIN THE HQB SHALL BE RETURNED TO NORMAL WORKING CONDITIONS EACH DAY.
E. CONTRACTOR SHALL MAINTAIN MEANS OF EGRESS AND FIRE PROTECTION SYSTEM WITHIN THE HQB
DURING NORMAL BUSINESS HOURS.
F. CONTRACTOR SHALL MANAGE ALL MATERIALS, EQUIPMENT, AND CONSTRUCTION DEBRIS (BOTH INTERNAL
AND EXTERNAL) THROUGHOUT THE PROJECT.
G. CONTRACTOR SHALL PROTECT ALL EXISTING FINISHES, STRUCTURES, AND ENGINEERING SYSTEMS NOT
PART OF THIS WORK THROUGHOUT ALL DEMOLITION WORK AND CONSTRUCTION.
H. ASBESTOS CONTAINING MATERIALS (ACM) HAVE BEEN FOUND IN MASTIC AND FLOORING MATERIALS IN
SEVERAL HQB ROOMS INVOLVED IN THIS WORK. THIS MATERIAL WILL BE REMOVED BY OTHERS BEFORE THE START OF THIS PROJECT. CONTRACTOR IS TO NOTIFY THE COR IMMEDIATELY IF SUSPECTED ACM IS
DISCOVERED ELSEWHERE DURING THE COURSE OF DEMOLITION AND CONSTRUCTION WORK.
I. CONTRACTOR TO COORDINATE ALL POWER, COMMUNICATIONS, AND HVAC OUTAGES WITH THE COR.
OUTAGES AND SERVICE SWITCHOVERS SHALL BE MADE ON EVENINGS, WEEKENDS, AND HOLIDAYS TO
MINIMIZE DISRUPTION TO OCCUPIED WORK AREAS.
J. THESE DESIGN DOCUMENTS HAVE BEEN SUBMITTED FOR CONTRACTOR DEVELOPMENT OF THE
CONSTRUCTION WORK PLAN. COORDINATION BETWEEN THE CONTRACTOR AND SUBCONTRACTORS IS THE
RESPONSIBILITY OF THE CONTRACTOR. CHANGES TO THESE DRAWINGS AS A RESULT OF THE
CONSTRUCTION COORDINATION ARE THE RESPONSIBILITY OF THE CONTRACTOR.
CORRIDOR
B21
ELEV
E-3
CORRIDOR
B03
CORRIDOR
B10
CORRIDOR
B08
CORRIDOR
B13
STAIR
S-3A
STAIR
S-4B
ELEV
E-4
STAIR
S-4A
STAIR
S-3B
UP
UP
UP
UP
VESTIBULE
V-A
CORRIDOR
100A
VESTIBULE
V-B
VESTIBULE
V-E
ENTRY
100F
CORRIDOR
100E
LOBBY
100L STAIR
S-3A
CORRIDOR
100G
STAIR
S-3B
CORRIDOR
100D
VESTIBULE
V-D
ELEV
E-3
VESTIBULE
V-C
STAGE
100?
AUDITORIUM
100?
ELEV
E-1
STAIR
S-1A
STAIR
S-1B
ELEV
E-2
ELEV
E-4
STAIR
S-4B
STAIR
S-4A
STAIR
S-2
UP
UP
UP
DN
DN
UP
UP
DN
UP
DN
CORRIDOR
100B CORRIDOR
100C
3' -6
40'-0"
'-6
TEMPORARY CONSTRUCTION
WALL LOCATION
COORDINATE WITH COR
CORRIDOR
200A
CORRIDOR
200E
LOBBY
200L
CORRIDOR
200C
CORRIDOR
200D
ELEV
E-3
STAIR
S-1
ELEV
E-1
CORRIDOR
200F
STAIR
S-1A
STAIR
S-1B
ELEV
E-2
ELEV
E-4
STAIR
S-4B
STAIR
S-4A
STAIR
S-2
CORRIDOR
200B
UP
UP
UP
DN
UP
DN
UP
DNDN
DN
DN
UP
TEMPORARY CONSTRUCTION
WALL LOCATION
COORDINATE WITH COR
CORRIDOR
300B
CORRIDOR
300C
CORRIDOR
300D
CORRIDOR
300E
CORRIDOR
300F
ELEV
E-3
ELEV
E-1
STAIR
S-1
STAIR
S-1A
STAIR
S-1B
ELEV
E-2
ELEV
E-4
STAIR
S-4B
STAIR
S-2
STAIR
S-4A
DN
UP
DNDN
DN
DN
DN
CORRIDOR
300A
CONSTRUCTION
PHASING LEGEND
PHASE ONE - BASE BID
LOBBY AND MONUMENTAL STAIR ,
CORRIDORS 100E AND 100F,
ELEVATORS E-2 AND E-3,
STAIRS S-2 AND S-3A
PHASE TWO - OPTION 1
AUDITORIUM AND STAGE
PHASE THREE - OPTION 2
VESTIBULES V-A, V-B, V-C AND V-D,
CORRIDORS 100A, 100D AND 100G,
ELEVATORS E-1 AND E-4,
STAIRS S-1A, S-1B, S-3B, S-4A AND S-4B
PHASE FOUR - OPTION 2
CORRIDORS 200A, 200B, 200C AND 200D
PHASE FIVE - OPTION 2
CORRIDORS 300A, 300B, 300C AND 300D
PHASE SIX - OPTION 2
CORRIDOR B21
DESIGNED BY
DRAWN BY
WORK ORDER
CHECKED BY ISSUED BY
APPROVED BY
DRAWING NO.
DATE
DATE CHK'D APP'DDESCRIPTION
REV.
LTR.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
JOB # SHT. #
HQB REMODEL LOBBY
2012-009421
C .H G U
ER
N S
EY
C O M P
AN
Y
N G R
AN
D
B
LV
D
C .A
AR
C H
IT
EC
TU
R E
E X P
IR
E S
JU
N E
C .A
EN
G
IN
EE
R
IN
G
E X P
IR
ES
JU
N E
SEQUENCE #
SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY
INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY
BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15
AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION.
UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S.
GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR
PARTS 15 AND 1520.
MARY TSIEN
G-005
CONSTRUCTION PHASING PLAN
29 MAY 2020
J. GALLAS
J. LOPEZ
D. OMAN
SCALE: 1" = 30'-0"1
BASEMENT COMPOSITE PHASING FLOOR PLAN
SCALE: 1" = 30'-0"2
FIRST FLOOR COMPOSITE PHASING PLAN
SCALE: 1" = 30'-0"3
SECOND FLOOR COMPOSITE PHASING PLAN
SCALE: 1" = 30'-0"4
THIRD FLOOR COMPOSITE PHASING PLAN
NORTH
60' 30' 0 60'
SCALE: 1" = 30'
ARCHITECTURAL DRAFTING CONVENTIONS
Room name
150 SF
View Name
SCALE: 1/8" = 1'-0"
G012
A
DETAIL VIEW NUMBER
SHEET ON WHICH DETAIL
APPEARS
VIEW NUMBER
NUMBER
DESIGNATION
LETTER
DESIGNATION
NUMBER
DESIGNATIO
N
LETTER/NUMBER
DESIGNATION
LETTER
DESIGNATION
A
HEIGHT
DESIGNATION
10'-0"
NUMBER
DESIGNATION
HEIGHT DESIGNATION
LETTER/NUMBER
DESIGNATION
NAME DESIGNATION
ROOM NAME/NUMBER SYMBOL
WINDOW/STOREFRONT SYMBOL
EQUIPMENT/FURNITURE SYMBOL
PARTITION TYPE SYMBOL
TOILET ACCESSORY SYMBOL
SPOT/CEILING ELEVATION SYMBOL
DOOR SYMBOL
ELEVATION SYMBOL
GRID SYMBOL
VIEW TITLE
EXTERIOR ELEVATION MARKER
INTERIOR ELEVATION MARKER
BUILDING / WALL SECTION MARKER
DETAIL MARKER
A-101
SIM
PLAN NORTH
8' 4' 0 8'
SCALE: 1/8" = 1'-0"
LEVEL 30
24'-0"
MATCHLINE SYMBOL
1 / A-121
1 / A-122
LETTER/NUMBER
DESIGNATION OF
FLOOR PLAN(S)
DIRECTION OF ELEVATION VIEW
ELEVATION VIEW NUMBER
SHEET ON WHICH ELEVATION APPEARS
A101
SIM
SIMILAR (IF APPLICABLE)
CENTERLINE SYMBOL =
DIRECTION OF SECTION VIEW
SECTION VIEW NUMBER
SHEET ON WHICH SECTION APPEARS
A101
SIM
SIMILAR (IF APPLICABLE)
GRAPHIC SCALE SYMBOL
NORTH ARROW
SIMILAR (IF APPLICABLE)
PLAN NORTH
ARROW DIRECTION
TRUE NORTH
ARROW DIRECTION
REVISIONS SYMBOL
AREA / ITEM(S)
TO BE REVISED
1 REVISION NUMBER
EXISTING NEW
ABBREVIATIONS
DIRECTION OF VIEW FOR ELEVATION
ELEVATION VIEW NUMBER & SHEET
ON WHICH ELEVATION APPEARS
1/A-221
DESIGNED BY
DRAWN BY
WORK ORDER
CHECKED BY ISSUED BY
APPROVED BY
DRAWING NO.
DATE
DATE CHK'D APP'DDESCRIPTION
REV.
LTR.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
JOB # SHT. #
HQB REMODEL LOBBY
2012-009421
C .H G U
ER
N S
EY
C O M P
AN
Y
N G R
AN
D
B
LV
D
C .A
AR
C H
IT
EC
TU
R E
E X P
IR
E S
JU
N E
C .A
EN
G
IN
EE
R
IN
G
E X P
IR
ES
JU
N E
SEQUENCE #
SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY
INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY
BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15
AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION.
UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S.
GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR
PARTS 15 AND 1520.
MARY TSIEN
A-001
ARCHITECTURAL ABBREVIATIONS, CONVENTIONS, AND NOTES
29 MAY 2020
J. GALLAS
J. LOPEZ
D. OMAN
PREFIN PREFINISHED
PRJ PROJECTION
PROP PROPERTY
PSI POUNDS PER SQ IN
PT PAINT
PTD PAINTED
PTDD PAPER TOWEL DISPENSER / DISPOSAL
PTN PARTITION
PVC POLYVINYL CHLORIDE
Q
QT QUARRY TILE
QZ QUARTZ MATERIAL
RA RETURN AIR
RAF RAISED ACCESS FLOORING
RB RUBBER BASE
RD ROAD, ROOF DRAIN
RECT RECTANGULAR
REF, RE REFER, REFERENCE
REINF REINFORCE, REINFORCED
REP REPRESENTATIVE
REQD REQUIRED
RFG ROOFING
RFL RUBBER FLOORING
RH ROBE HOOK
RM ROOM
RND ROUND
RS ROLLER SHADES
RST RUBBER STAIR TREADS
SB SPLASH BLOCK
SC SEALED CONCRETE
SCHED SCHEDULE
SCN STAINED CONCRETE
SD SOAP DISPENSER
SECT SECTION
SEQ SEQUENCE
SHT SHEET
SIM SIMILAR
SJ STUCCO JOINT, SAWN JOINT
SMC SUSPENDED METAL CEILING
SND SANITARY NAPKIN DISPENSER
SPECS CONTRACT SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
SSM SOLID SURFACE MATERIAL
ST SOILED TOWEL RECEPTACLE
STD STANDARD
STL STEEL
STN NATURAL STONE
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SWC SUSPENDED WOOD CEILING
T
T TREAD
TC TOWEL DISPENSER
TFMR TRANSFORMER
THK THICK
THRU THROUGH
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TP TOILET PARTITION
TS FLOORING TRANSITION
TT TILE TRIM
TTD TOILET TISSUE DISPENSER
TYP TYPICAL
TZ TERRAZZO
UGND UNDERGROUND
UNO UNLESS NOTED OTHERWISE
UR URINAL
V
VB VINYL BASE, VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VF VINYL FLOORING
VP VENT PIPE
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W
W/ WITH (COMB. FORM)
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WIDTH, WINDOW DIMENSION, WOOD
WDW WINDOW
WF WOOD FLOORING
WH WATER HEATER
WM WALK-OFF MAT
WP WATERPROOF
WR WASTE RECEPTACLE
WS WEATHERSTRIPPING
WT WINDOW BLINDS
FTG FOOTING
FURR FURRED, FURRING
FWC FABRIC WALL COVERING
G
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED,
CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED,
GOVERNMENT INSTALLED
GL GLASS, GLAZING
GRT GROUT
GT GLASS TILE
GWB GYPSUM WALLBOARD
GYP GYPSUM
H
HB HOSE BIB
HC HANDICAPPED
HC HOLLOW CORE
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HPL HIGH PRESURE LAMINATE
HT HEIGHT
HTR HEATER
HVAC HEATING, VENTILATING, AND
AIR CONDITIONING
I
ID INSIDE DIAMETER
IN INCH
INSUL INSULATION
INT INTERIOR
J
JST JOIST
JT JOINT
L
LAM LAMINATE
LAV LAVATORY
LB POUND
LBL LABEL
LF LINEAL FEET
LN LINOLEUM
LVR LOUVER
LVT LUXURY VINYL TILE
LWT LIGHTWEIGHT
M
MACH MACHINE
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MBR MEMBER
MC MEDICINE CABINET
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURE, MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MK MARK
ML METAL LOCKER
MLDG MOLDING
MO MASONRY OPENING
MSNRY MASONRY
MSP METAL SPLASH PAN
MT METAL THRESHOLD
MTD MOUNTED
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WEATHERPROOFING
N
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NPRN NEOPRENE
NTS NOT TO SCALE
OA OVERALL, OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
OZ OUNCE
P
PART PARTIAL
PL PLATE, PLASTIC
PLAS PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL, PANELBOARD
PREFAB PREFABRICATED
SYMBOL
@ AT
A
A/C AIR CONDITIONING
AB ANCHOR BOLT
ABI ADDITIVE BID ITEM
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT, ADJUSTABLE
AFF ABOVE FINISH FLOOR
AFL ATHLETIC FLOORING
AGGR AGGREGATE
ALT ALTERNATE
ALUM, AL ALUMINUM
AP ACRYLIC PANEL
APPROX APPROXIMATE
APVD APPROVED
ARCH ARCHITECT, ARCHITECTURAL
ATTEN ATTENUATOR, ATTENUATION
AWP ACOUSTIC WALL PANEL
B
BB BASE BID
BD BOARD
BITUM BITUMINOUS
BLDG BUILDING
BLKG BLOCKING
BM BEAM, BENCH MARK
BOT, BTM BOTTOM
BRG BEARING
BRK BRICK
BSMT BASEMENT
C
C TO C CENTER TO CENTER
CAB CABINET
CBB CEMENTITIOUS BACKER BOARD
CC CONTRACTOR CONNECT
CF CONTRACTOR FURNISHED
CFCI CONTRACTOR FURNISHED,
CONTRACTOR INSTALLED
CFMF COLD-FORMED METAL FRAMING
CG CORNER GUARD
CI CONTRACTOR INSTALLED
CJ CONSTRUCTION CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CPT CARPET
CR CONTRACTOR ROUGH-IN
CT CERAMIC TILE
D
DB DOUBLE
DEMO DEMOLITION, DEMOLISH
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DN, DWN DOWN
DP DAMPPROOFING
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
DWP DECORATIVE WALL PANEL
DWR DRAWER
E
EA EACH
EF EXHAUST FAN
ELEC ELECTRICAL
ELEV ELEVATION
EPC EPOXY COATING
EQ EQUAL
EQPT EQUIPMENT
ES EMERGENCY SHOWER
EW EYE WASH
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXP EXPANSION, EXPOSED
EXP JT, EJ EXPANSION JOINT
EXT EXTERIOR
F
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FHS FIRE HOSE STATION
FIN FINISHED
FLR FLOOR
FPRF FIREPROOF
FRP FIBER-REINFORCED PLASTIC
FT FOOT, FEET
GENERAL ARCHITECTURAL NOTES:
A. DO NOT SCALE THE DRAWINGS. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCIES TO THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. COMMENCEMENT OF WORK SHALL CONSTITUTE ACCEPTANCE OF
CONDITIONS.
B. THE ARCHITECTURAL DRAWINGS ARE PART OF A LARGER SET OF DRAWINGS WHICH, CONSISTS OF ALL DRAWINGS LISTED BY THE INDEX OF DRAWINGS. THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY THE WORK DESCRIBED ON DRAWINGS OF ANOTHER DISCIPLINE AND MAY REQUIRE REFERENCE TO DRAWINGS OF ANOTHER DISCIPLINE. PARTIAL SETS OF DRAWINGS ARE INCOMPLETE AND SHALL NOT BE DISTRIBUTED AND UTILIZED BY THE CONTRACTOR. IT IS THE CONTRACTOR’S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH THE REQUIREMENTS OF THE CONTRACT BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE
REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS.
C. THE SPECIFICATIONS AND ALL CONSULTANT DRAWINGS ARE SUPPLEMENTAL TO THE ARCHITECTURAL DRAWINGS. IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO COORDINATE WITH THE ARCHITECTURAL DRAWINGS BEFORE THE INSTALLATION OF ANY OF THE CONSULTANT’S WORK AND TO BRING ANY DISCREPANCIES OR CONFLICTS TO THE ARCHITECTS ATTENTION FOR CLARIFICATION.
D. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF VARIOUS TRADE ITEMS WITHIN THE SPACE ABOVE THE CEILINGS (INCLUDING BUT NOT LIMITED TO: STRUCTURAL MEMBERS AND FIRE PROOFING, MECHANICAL UNITS, DUCTS AND INSULATION, CONDUITS, RACEWAYS, SPRINKLER SYSTEMS, LIGHT FIXTURES, CEILING SYSTEMS, AND ANY SPECIAL STRUCTURAL SUPPORTS REQUIRED) AND SHALL BE RESPONSIBLE FOR MAINTAINING THE FINISH CEILING HEIGHT ABOVE THE FINISH FLOOR INDICATED IN THE DRAWINGS.
E. ACCESS PANELS, WHERE REQUIRED BY BUILDING CODE OR FOR THE PROPER OPERATION OR MAINTENANCE OF MECHANICAL OR ELECTRICAL EQUIPMENT, SHALL BE PROVIDED AND INSTALLED. CONTRACTOR SHALL COORDINATE SIZE, LOCATION AND TYPE OF ACCESS PANEL WITH OTHER CONTRACTOR’S WORK AND RECEIVE APPROVAL OF THE ARCHITECT PRIOR TO INSTALLATION.
F. WHERE INSTALLATION OF ONE PART OF THE WORK IS DEPENDENT ON INSTALLATION OF OTHER COMPONENTS, EITHER BEFORE OR AFTER ITS OWN INSTALLATION, CONTRACTOR SHALL SCHEDULE CONSTRUCTION ACTIVITIES IN THE SEQUENCE REQUIRED TO GET THE BEST
RESULT.
G. WHERE AVAILABILITY OF SPACE IS LIMITED, COORDINATE INSTALLATION OF DIFFERENT COMPONENTS TO ASSURE MAXIMUM ACCESSIBILITY
FOR REQUIRED MAINTENANCE, SERVICE OR REPAIR.
H. COMPLY WITH MANUFACTURER’S INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS TO THE EXTENT THAT THOSE INSTRUCTIONS AND RECOMMENDATIONS ARE MORE EXPLICIT OR STRINGENT THAN REQUIREMENTS CONTAINED WITHIN THE CONTRACT DOCUMENTS.
I. INSPECT MATERIALS OR EQUIPMENT IMMEDIATELY UPON DELIVERY AND AGAIN PRIOR TO INSTALLATION. REJECT DAMAGED AND DEFECTIVE
ITEMS.
J. RE-CHECK AND VERIFY MEASUREMENTS AND DIMENSIONS BEFORE EACH INSTALLATION.
K. PROVIDE ATTACHMENT AND CONNECTION DEVICES AND METHODS NECESSARY FOR SECURING THE WORK. SECURE WORK TO TRUE LINE
LEVEL. ALLOW FOR EXPANSION AND BUILDING MOVEMENT.
L. DURING HANDLING AND INSTALLATION, CLEAN AND PROTECT CONSTRUCTION IN PROGRESS AND ADJOINING MATERIALS IN PLACE. APPLY
PROTECTIVE COVERING WHERE REQUIRED TO ENSURE PROTECTION FROM DAMAGE OR DETERIORATION AT SUBSTANTIAL COMPLETION.
M. CLEAN AND…