Attachment 03 - Drawings MMAC HQB Lobby Remodel.pdf

PDF 9 MB Posted

Attached to
CONSTRUCTION: Headquarters Building Lobby Remodel at the Mike Monroney Aeronautical Center, Oklahoma City, OK
Solicitation number
6973GH-20-R-00140
Issued by

About this file

This solicitation requests proposals for construction services for the Headquarters Building Lobby Remodel at the Mike Monroney Aeronautical Center in Oklahoma City, OK. The base bid includes replacing interior finishes in the 1st floor lobby and main corridor, and option 1 adds new flooring, seating and wall panels in the auditorium. Option 2 provides new finishes on the 1st through 3rd floors. The estimated price range is $1-4 million, with award as a firm-fixed price construction contract. The NAICS code is 236220 and it is 100% set aside for small businesses under $39.5 million. Proposals are due August 14, 2020. A pre-proposal teleconference will be held on July 28 and a mandatory site visit on July 30, with notice required by July 24 and 28 respectively. Questions are due by August 4.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGNED BY

DRAWN BY

WORK ORDER

CHECKED BY ISSUED BY

APPROVED BY

DRAWING NO.

DATE

DATE CHK'D APP'DDESCRIPTION

REV.

LTR.

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA

JOB # SHT. #

HQB REMODEL LOBBY

2012-009421

C .H G U

ER

N S

EY

C O M P

AN

Y

N G R

AN

D

B

LV

D

C .A

AR

C H

IT

EC

TU

R E

E X P

IR

E S

JU

N E

C .A

EN

G

IN

EE

R

IN

G

E X P

IR

ES

JU

N E

SEQUENCE #

SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY

INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY

BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15

AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION.

UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S.

GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR

PARTS 15 AND 1520.

MARY TSIEN

G-001

COVER SHEET

29 MAY 2020

J. GALLAS

J. LOPEZ

D. OMAN

MIKE MONRONEY AERONAUTICAL CENTER

CONTRACT NO. DTFAAC-16-D-00034

WORK ORDER NO. 2012-009421

DATED: MAY 29, 2020

IFC TYPE "B" DESIGN SUBMITTAL

ISSUED FOR CONSTRUCTION TYPE B DESIGN SUBMITTAL

HQB REMODEL LOBBY

FEDERAL

AVIATION

ADMINISTRATION

A S P H A L T

A S P H A L T

A S P H A L T

C O N C

S P R

IN

K

LER

M

ETER

S P R

IN

K

LER

S P R

IN

K

LER

S P R

IN

K

LER

M

ETER

T R

EE

G R O U N D C O

VER

G R

ASS

T R

EE

T R

EE

G R

ASS

NO

PA

RK

IN

G

D

IR

T

AC

M

AN

H O

LE

AC

P

IP

ES

L

IG

H T

P O

ST

AC

P O N D

P O N D

P O N D

A B A N D O N

ED

R A

ILR

O

AD

TR

AC

K S

A S D E

R A D A R

S U P P O R T

F A C

ILIT

Y G E N

C M U

A S R

S E C T

IO

N

C O R N

ER

N

,7 .5

E

,0 ,1 .4

BM1

BM2

BM3

BM4 BM8

BM7

BM6

BM5

BM9

BM10

BM11

BM12

BM15

BM16

BM14

BM13

BM18

BM19

BM20

BM21

BM17

T O W E R

R A D A R

W A T E R

T O W E R

T O W E R

R A D A R

R A D A R

A R S R

B A S E

E X

IS

T

IN

G

T O W E R

B A S E

W

IT

H

M E T A L

T O W E R

L E G S

'X 'X

T O W E R

B A S E

W

IT

H

M E T A L

T O W E R

L E G S

'X 'X

T O W E R

R A D A R

IR

O N

C O L U M N S

.5 X .5

A N G L E

O V E R H A N G

O V E R H A N G

.9

O V E R H A N G

O V E R H A N G

C O

NC

R

ETE

F O

UN

D

ATION

S F O R A

NTE

NN

A

A R

RA

Y

W A

NTE

NN

A A R

RA

Y C O

NC

R

ETE

P

AD

A C

'x

V A U

LT

C O N C P A D

F O R

D U M P S T E R

P A D

W C O

A C

A C

A C

O N

P

AD

A C

A C

A C

A C

A C

A C

A C

A C 's

C O N C P A D S

W T O W E R

A C

A C

A C

A C

G P 's

G P

G P 's

G P

S

TE

E L

P O

LE

S

P O

LE

TR

A N S O N

C O N C P A D

P O L E

P O

LE

P O

LE

V E N T

V E N T

V E N T S

C O N C .A C

A

CA

C

M E T A L

T R A

IL

E R

G U A R D

P O S T S

VENT

P

IP

E

V E N T

W A L L

G U A R D

P O S T S

G U A R D

P O S T S

P

IP

E

G U A R D

P O S T S

F L A G P O L E

F L A G P O L E

S

IG

N

P O

LE

G U A R D

P O S T

C H

IL

L E R

U N

IT

G U A R D

P O S T S

G U A R D

P O S T S

G U A R D

P O S T

G U A R D

P O S T S

F L A G P O L E

G U A R D

P O S T

G U A R D

P O S T

G U A R D

P O S T S

C O L U M N S

S U P P O R T

S T A

IR

S

S T A

IR

S

G U A R D

P O S T S

G U A R D

P O S T S

G U A R D

P O S T

P

IP

E

R A

IS

E D

P

AD

G U A R D

P O S T

D O C K

L O A D

IN

G

D O C K

R A M P

A

LU

M

P O

ST

R A M P

L O A D

IN

G

D O C K

W E A T H E R

T O W E R

A V

A V

G U A R D

P O S T S

T Y P

A V

A V

P

IP

E S

G U A R D

P O S T S

G U A R D

P O S T

G U A R D

P O S T S

P

IP

E

P O R C H

IN

S

ID

E

R E T W A L L

D

IE

S E L

F U E L

T A N K

D O W N S P O U T S

R O O F

D R A

IN

T Y P

A C 's

R A M P

G U A R D

P O S T

F E D E R A L

T R A N S F E R

C E N T E R

S

IG

N

S T E E L

P

IP

E

E W

CONC.

C

ON

C

CONC.

CONC.

A S PHALT

A S PHALT

CONC.

CONC.

A S PHALT

CONC.

V A ULT

V A ULT

S

IG

N

C O N C

F L U M E

C O N C

CONC.

STRIP

S

IG

N

H E A D W A L L

H E A D W A L L

H E A D W A L L

R A

M P

R

IP

R A

P

C O

N C

. F L

U M

E

C O

N C

. P A

D W

/C A

B L

E R

IS

E

R

.2 ' D

E E

P P

IT

G

U A

R D

R A

IL

A

R O

U N

D

C O

N C

. F L

U M

E

A C

A C

A C

C O N C R E T E

P A D

C O N C R E T E

P A D

C O N C R E T E

P A D

C O N C R E T E

P A D

C O N C R E T E

P A D

C O N C R E T E

P A D

F O R

P A R K

IN

G

C O N C

P A D

C O N C

P A D

C O N C

P A D

C O N C

P A D

C O N C

P A D

C O N C

P A D S

P A D

C O N C R E T E

C O N C R E T E

P A D

C O N C

F L U M E

C O N C

P A D

V A U L T

W E A T H E R

S T A T

IO

N

2x2 P A D

CONC.

IN

P

A D

" P

V C

'x

P A D

P A D

F O R

D I S H

C O N C P A D

F O R

D U M P S T E R

C O N C

S T R

IP

R A M P

C O N C

C O N C

V A U L T

C O

NC

CONC

WEATHER

STATION

B

AR

B

S E C U R

IT

Y

F E N C E

G A

T E

7' CH. LK. F ENCE W /3

B.W.

C H L K F E N C E

W

B .W

C H L K

F E N C E

W

B .W

G A T E

G A T E

G A T E

C H L K

F N E C E

C H L K F E N C E

W B .W

C H L K

F N E C E

C H L K

F E N C E

W

B .W

W E L L

N O T H

IN

G

V

IS

IB

L E

W

IT

H

IN

F E N C E D

A R E A

C H L K

F E N C E

W

B .W

7' C H . L K F

EN

C E

W B .W

C H L K F E N C E

W

B .W

C H L K

F E N C E

C H L K

F E N C

EG

A T E

G A T E

G A T E

C H L K

F E N C E

C H L K

F E N C E

W

B .W

C H L K

F E N C E

C H L K F E N C E

W

B .W .5 C H

LK

F E N C E

W

B .W

C H L K F E N C E

W

B .W

C H L K F E N C E

W

B .W

C H L K

F E N C E

W

B .W

G A T E

G A T E

C H L K

F E N C E

W

B .W

G A T E6 C H

LK

F E N C E

W

B .W

C H L K

F E N C E

W

B .W

G A T E

C H L K

F E N C E

G A T E

C H L K

F E N C E

G A T E

C H L K

F E N C E

G A T E

C H L K

F E N C E

C H L K

F E N C E

C H L K

F E N C E

4' CH. LK. FENCE

G A T E

G A T E

G A T E

G A T E x

C H L K

F E N C E

W

B .W

C H L K

F E N C E

G A T E

C H

L

IN

K

G A T E

C H L K

F E N C

EG

A T E

C H L K

F E N C E

C H L K F E N C E

G A T E

C H L K

F E N C E

G A T E

G A T E

G A T E

G A T E

6' CH. LK. FENCE W/3

B.W.

C H L K

F E N C E

C H L K

F E N C E

C H L K

G A T E

GATE

C H L K

F E N C E

C H L K

F E N C E

C H L K

F E N C E

C H L K

F E N C E

C H L K

F E N C E

AR

O U N D

O

IL

P U M P

J A C K

6' CH. L K.

FENCE4' CH. L K.

FENCE

G A T E

C H L K

F E N C E

C H L K

F E N C E

4' CH. L K.

FENCE

C H

LK

F E N C E

C H L K

F E N C E

G A T E

C H L K

F E N C E xx x x

G A

TE W

B .W

P O S T

G A T E

4' C H. LK.

FENCE

L O A D

IN

G

Z O N E

N O

P A R K

IN

G

N O

P A R K

IN

G

C O N C

ASPHALT

AS

P H A L T

C R O S S

W A L K

C R O S S

W A L K

N O

P A R K

PARK

ING

NO

N O

P A R K

IN

G

N O

P A R K

IN

G

N O

P A R K

IN

G

NO

PARKI NG

N O

P A R K

IN

G

NO

PARKI NG

NO

PARKI NG

NO

PARKI NG

NO

PARKI NG

N

OP

A R K

IN

G

N O

P A R K

N O

P A R K

N O

P A R K

IN

G

N

OP

A R K

IN

G

NO

PARKI NG

NO

PARKI NG

NO

PARKI NG

N O

P A R K

IN

G

N O

P A R K

IN

G

N O

P A R K

IN

G

N O

P A R K

IN

G

N O

P A R K

IN

G

P

ARK

ING

N O

PARKING

NO

N O

P A R K

IN

G

N O

P A R K

IN

G

NO

PARKI NG

P A R K

IN

G

G U A R D

S

TA

TIO

N

A

IR

N A V

IG

ATIO

N

H A N G A R

N O

B

LD

G

G U A R D

S H A C K

LIN

E

M A

IN

T.

B

LD

G

F

LIG

H T

B U

ILD

IN

G

M E

TA

L

H A N G A R

N O

C R E D

IT

U N

IO

N

W O O D

B

LD

G

S

TA

N D A R D S

W O O D

B

LD

G

O N E

S

TO

R Y

F

LIG

H T

IN

S P E C

TIO

N

H A N G A R

N O

BUILDING

BUILDING

METAL

BUILDING

R A D A R

A N

TEN

N A

LA

B

M E

TA

L

B U

ILD

IN

G

M E T A L

T R A

IL

E R

O N

P A D

C O N C

T Y P

F

IB

E R G L A S S

S H E D

F A C

ILITIE

S

N O

A C A D E M Y

H E A D Q U A R

TE

R S

A

IR

TR

A F F

IC

B U

ILD

IN

G

R A D A R

TR

A

IN

IN

G

F A C

ILITY

S P E C

IA

L P U R P O S E

B U

ILD

IN

G

S

TA

F F O R D

B U

ILD

IN

G

S

TA

F F O R D

B U

ILD

IN

G

B R

IC

K

B

LD

G O N E

S

TO

R Y

S Y S

TE

M S

TR

A

IN

IN

G

C O O L

IN

G

T O W E R

C O O L

IN

G

T O W E R

M E T

AL

B

LD

G

O N E

S T O R Y

C A F E

TE

R

IA

A V

IA

TIO

N R E C O R D S

A

IR

N A V

IG

A

TIO

N F A C

ILITIE

S

N O

A R S R

F P S

S Y S

TE

M S

B

LD

G

E N V

IR

O N M E N

TA

L

S U P P O R T

G N

AS

TR

AIN

IN

G

F A C

ILITY

B U

IL

D

IN

G

C O O L

IN

G

T O W E R

ONE STORY W OOD

BLDG.

E X

IS

IT

N G

P R

IM

AT

E

B

LD

G

E X

IS

T

IN

G

S T O R Y

M E

TA

L

B L D G

E X

IS

T

IN

G

P O S

IT

IO

N E R

E X

IS

T

IN

G

P O R T A B L E

S H E D

F

IB

E R G L A S S

E X

IS

IT

N G

P O R T A B L E

S H E D

C

IV

IL

A E R O S P A C E

M E D

IC

A L

IN

S

TITU

TE

I.L.S

TR

A

IN

IN

G

TRAILER

O N E

S

TO

R Y

.6 x

.4

FR

A M E

S H E D

ARSR-8

A S R

G E N E R A

TO

R

TR

A

ILE

RA

R S R

TR

A

IN

IN

G

M E

TA

L

B

LD

G

.9 x

.0

TR

A

ILE

R

O N C O N C

P A D

S

TO

R Y

.8 x

.8

M E

TA

L

B

LD

G . F

.F

.1

B

LD

G

M E

TA

L

B U

ILD

IN

G

B L D G B L D G .F

IB

E R G L A S S

F

IB

E R G L A S S

R E G

IS

TR

Y

B U

ILD

IN

G

SHE D

A

IR

C R A F T

T

IT

L E

IN

S U R E D

S E R V

IC

E

D W T

T.S .I.

LA

B

S H E D

B A S E

M A

IN

T E N A N C E

B L D G

C S F

B

LD

G

A O S

B

LD

G

T E M P

T R A

IL

E R

M E

TA

L

B L D G

S T O R Y

D A Y

C A R E

B

LD

G

V O R

D M E

TA

C A N

D I G

IT

A L

R E M O T E

S W I

TC

H

IN

G

C E N

TE

R

S T E E L

F R A M E

S H E D

A irp o rt

T ru s t

R A

TLIF

F

E X P

LO

R A

TIO

N C O

G R O U N D

M A

IN

TEN

A N C E

B

LD

G

P O W E R

S U B

S

TA

TIO

N

T.D .W .R

B U

ILD

IN

G

A R S R

S Y S T E M

S U P P O R T

F A C

IL

IT

Y P R O G R

AM

P P O R T

F A C

ILITY

T.D .W .R

TO

W E R

C E N

TE

R

M E

TA

L

B U

ILD

IN

G

M E

TAL

B U

ILD

IN

G

H A Z

AR

D

M A

TE

R

IA

LS

LIB

R A R Y

P O L E

G U A R D

P O S T

C O N C

F O S T E R

D R

IV

E

Q U E S A D A

D R

MIKE MONRONEY

BLVD

H A L A B Y

D RMcLUCAS

ST

HELMS

ST

Q U E S A D A

D R

S H A F F E R

S T

R O C K W E L L

A V E

S.W. 59TH

ST.

S.W. 74TH

ST.

S.W. 59TH

ST.

S.W. 74TH

ST.

E D D

IE

A V E

S.W. 66TH

ST.

E D D

IE

A V E

D E N N

IN

G

A V E

S M a c A R T H U R

B L V D

S.W. 61ST

ST.

S.W. 62ND

ST.

S.W. 63RD

ST.

S.W. 64TH

ST.

S.W. 66TH

ST.

C H R

IS

T

IA

N

A V E

Q U E S A D A

D R

S.W. 61ST

ST.

S D U K E

A V E

S.W. 63RD

ST.

S.W. 64TH

ST.

S.W. 68TH

ST.

S.W. 69TH

ST.

C O N C

D R

AIN

O P

EN

W

ALL

V

EN

T

C O

VER

D R

AIN

G

AS

P

IP

E

S

TA

IR

S

W

ATER

M

ETER

C O N C

S

ID

E W

ALK

R A M

PO

V E R

R A M P

RAMP

A C 's

A S P H A L T

S T A

IR

S

P A T C H

P O S T

RAMP

C O N C

R A M P S

C O N C

R A

IS

E D

P A D S

R A M P

R A M P

RAMP

A S P H A L T

C O N C

A C

A C U N

IT

S

C O N C

C O N C

D O C K

L O A D

IN

G

R A M P

A S P H A L T

P K

F N D

P K

F N D

R A M P

R A M P

A S P H A

LT

P L T

A C

L

S E T P K

N A

IL

C O N C

C O N C

C O N C

G R A V E L

D R

IV

E

G R A S S

F

IE

LD

G R A S S

F

IE

LD

.5 ' N E

C O R N E R N E

S E C T1 N R W

I.M

P K S H

IN

E R

A S P H A L T

C O N C

F L U M E

M E T A L

P O S T

P A D

M .L .S

C O N C

A S P H A L T

B R A S S

C A P

A S P H A L T

C O N C

M E D

IA

N

A S P H A L T

A S P H A L T

A S P H A L T

C O N C

H E A D W A L L

A S P H A L T

O N

C O N C

B A S E

G R A V E L

G R A V E L

G R A V E L

D R

IV

E

G R A S S

F

IE

LD

A S P H A

LT

P A R K

IN

G

C O N C C U R B

G U

TTE

R

A S P H A L T

R A M P S

F .F E L E V

.3

A S P H A L T

C O N C

A S P H A L T

F .F E L E V

.4

R A M P

T

IL

E

A S P H A L T5 X

G R A

TE

R A M P

M E T A L

P O L E

O N

C O N C P A D

IN

T E R S E C T

IO

N

E W

N S

D

IT

C H

L

IN

E

C O N C

P A V E M E N T

A S P H A

LT

P A R K

IN

G

A S P H A L T

S T A T

IO

N

O B S E R V A T

IO

N

P O S T

E N D

O F

C O N C

P A V E M E N T

C O N C

C O N C

F L U M E

C O N C

P

IP

E

D

IR

T

P

IP

E

C O N C

C O N C

A S P H A L T

C O N C

C O N C

A S P H A L T

C O N C

ASPHALT

A S P H A L T

C O N C

A S P H A L T

C A B L E

N S

C O N C

M A

IL

B O X

A S P H A L T

G R A V E L

D R

IV

E

G R A V E L

G R A V E L

C O N C

A S P H A L T

R A M P

C O N C

C O N C

R A M P

A S P H A L T

P

IT

C O N C

A S P H A L T

C O N C

B E R M

A S P H A L T

G R O U N D

A N C H O R

G R O U N D

A N C H O R

G R A V E L

G R O U N D

A N C H O R

A

IR

P O R T

T R U S T

D

J

M A R A T H O N

O

IL

G R O U N D

A N C H O R

G R A V E L

G R A V E L

B E R M

G R O U N D

A N C H

G

A V E L

B E R M

P A D

P

R E

IL

C H L K

F E N C E

V A U L T

P A D

D U C T

P C

C A B L E

P

IP

E

G R A V E L

C O N C

C O N C

G R A V E L

G R A V E L

A S P H A

LT

G R A V E L

A S P H A

LT

G R A V E L

G R A V E L

L A D D E R

S E T

I.P

G A T E

C O N C

A S P H A L T

C O N C

S T R

IP

G A T E

C O N C

G A T E

V E N T

A S P H A L T

A S P H A L T

A S P H A L T

A S P H A L T

A S P H A L T

C O N C

S

TO

R Y

M E T

AL

B

LD

G

T O W E R

C O O L

IN

G

C O N C

R A M P

R A M P

R A M P

C O N C

C O N C

R A M P

C O N C

R A M

PC

O N C

A S P H A L T

A S P H A L T

C O N C

C O N C

A S P H A L T

A S P H A L T

C O N C

C O N C

G R A V E L

2A C

C O N C

C O N C

A C

C O N C

R A M P

G R A V E L

C O N C

C O N C

W A L L

W G U A R D

R A

IL

D O W N

V E N T

P

IT

A S P H A L T

C O N C

P A D

O H

T A L L

G U A R D

R A

IL

C O N C

A S P H A L T

P O L E

C O N C

C O N C

A S P H A L T

R A M P

A S P H A L T

RAMP

R A M P

C O N C

R A M P

A S P H A

LT

R A M P

P

IT

C O N C

C O N C

.6 T O

B O T T O M

S A F E T Y

G R

IL

L

A S P H A L T

A C

A S P H A L

TC

O N C

RAMP

C O N C

C O N C

RAMP

A S P H A L T

A S P H A L T

A S P H A L T

A S P H A L T

C O N C

S T O R A G E

B L D G

G U A R D

P O S T

A S P H A L T

R A M P

A C

C O N C

C O N C

A C

G P

G A T E

A S P H A L T

W A L L

C O N C

P

IP

E

A C

C O V E R E D

P A R K

IN

G

W A L L

A S P H A L T

C O N C

A S P H A L T

C O N C

T A N K S

A S P H A L T

C O N C

A S P H A L T

A S P H A L T

C O N C

S T R

IP

S

G A T E

P O L E

R A M P

A S P H A L T

C O N C

A S P H A L T

J E T

W A S H

D E F L

EC

T O R

C O N C

A S P H A L T

C O N C

A S P H A L T

C O V E R E D

A

IR

P O R T

L

IG

H T

IN

G

S Y S T E M

A S P H A L T

A S P H A L T

A S P H A L T

GRAVEL

ROAD

G R A V E L

R O A D

M A R A T H O N

O

IL

C O

G R A V E L

A

IR

P O R T T R U S T

B

A S P H A L T

A S P H A L T

A S P H A L T

C O N C

C O N C .A S P H A L T

C O N C

C O N C

C O N C

C O N C

A S P H A L T

C O N C

C O N C

A S P H A L T

C O N C

C O N C

A S P H A L T

C O N C

C O N C

C O N C

R A M P

C O N C

D O C K

C H

L K

G A T E

A S P H A L T

C O N C

M A N H O L E

A S P H A L T

A S P H A L T

A S P H A L T

R A M P

R A M P

C O N C

A S P H A L T

A S P H A L T

M E M O R

IA

L

M O N U M E N T

A S P H A L T

R

AM

P

A S P H A

LT

R A M P

RAMP

A S P H A L T

RAMP

C O N C

RAMP

R A M P

RAMPC

O N C

RAMP

C O N C

A S P H A L T

A S P H A L

TC

O N C

A S P H A L T

A S P H A L T

R A M P

RAMP

R A M P

P O S T

P O S T

RAMP

C O N C

R A M P

A C

G A

TE

RAMP

C O N C

. RAMP

P A D S

F O R

T O W E R

R A M P

P O L E

A S P H A L T

R A M P S

S C S

M A C H

IN

E

A S P H A L T

R A M P

A S P H A L T

A S P H A L T

R A M P

W IND.

POST

A S P H A L T

R A M P

RAMP

A S P H A L T

G ATE

A S P H A L T

R A M P

C O N C

G A T E

S T A

IR

S

C O N C

S P

IG

O T

O V E R H A N

GRAMP

C O N C

S T A

IR

S

P A D

C O V E R E D

P A R K

IN

G

C O N C

P

IT

W

V A L V E S

W A L L

V A U L T

A S P H A L T

G L A S S E D

E N T R Y W A Y

A S P H A L T

C O N C

C O N C

C O N C

C O N C

G R A V E L

R O A D

P O S T

P A D

C O N C

A S P H A L T

G R A V E L

C O N C

G A T E

C O N C

W O O D

R A M P

C O N C

C O N C

C O N C

C O N C

A S P H A L T

C O N C

C O N C

C O N C

C O N C

P L T

C O N C

R

AM

P

C O N C

P L T

C O N C

R A M P

R A M P

A C

A C

C O N C

W A T E R

M A N H O L E

O N

C O N C P A D

T R .8

C O N C

A S P H A L T

C O N C

C O N C

C O N C

R A M P

C O N C

C O N C

A S P H A L T

C O N C

R A M P

A S P H A L T

R A M P

S T A

IR

S

D O W N

R A M P

E L E V A T O R

A G

GR

E

GA

TE

C O

NC

R E

TE

R A M P

C O N C

R A M P S

A S P H A L T

A S P H A L T

CONC.STRIP

A S P H A L T

C O N C

R A M P S

COL UM NS

RAMP

V A U L T

C O N C

W B E N C H

P

IP

E

A S P H A L T

A C A C

A C

P

IP

E

C O N C

C O N C

C O N C B L O C K

W A L L

C O N C

C O N C

C O N C

A S P H A L T

A S P H A L T

R A

MP

P A R K

IN

G

C O V E R E D

A C 's

R A M P

B U

IL

D

IN

G

S T O R A G E

A S P H A L T

C O N C

C O N C

C O N C

A S P H A L T

C O N C

R A M P

A S P H A L T

C O

NC

C O

NC

A C

C O N C

P A D

S T A

IR

S

C O

NC

A S P H A L T

C O N C

V A U L T

C O N C

D

IR

T G R A V E L

R O A D

G R A V E L

G R A V E L

D R

IV

E

C O N C

P O L E

W O O D

C O N C D O C K

W O V E R H A N G

C O N C

C O N C

A S P H A L T

R A M P

F

IB

E R G L A S S

S T O R A G E

T A N K

F

IL

L

D

IR

T

M O U N D

D

IR

T G R A V E L

R O A D

G R A V E L

G R A V E L

G R A V E L

A N C H O R

'x

C O N C

G R A V E L

G R A V E L

G R A S S

A S P H A L T

A S P H A L T C O N C

C O N C

C O N C

C O N C

C O N C

G R A S S

C O N C

C O N C

A S P H A L T

A S P H A L T

C O N C

C O N C

C O N C

A S P H A L T

C O N C W A L L

W G U A R D

R A

IL

R O C K

W A L L

C O N C

C O N C

C O N C

CONC.

R A M P

C O N C

A S P H A L T

A S P H A L T

B R

IC

K

W A L

LA

R O U N D

V E N T

A S P H A L T

C O N C

C O N C

R A M P

R A M P

LO

A D

IN

G

D O C K

C O N C

R A M P

W G U A R D

R A

IL

C O N C

RAMP

R

AMP

RAMP

C O N C

C O N C

A S P H A

LT

R A M P

C O N C

A S P H A L T

C O N C

RAMP

A S P H A L T

C O N C

C O N C

R A M P

R A M P

AS

P H

AL

T

A S P H A L T

C A T P

C O N C

A C

R A M P

R A M P

R A M P

U N

IT

C H

IL

L E R

R A M P

C O N C

C O N C . A S P H A L T

G R A V E L

W

IN

D

P O S T

A S P H A L T

C O N C

C O N C

G U A R D

R A

IL

S

R A M P

A S P H A L T

C O N C

C O N C

R A M P

A S P H A L T

A S P H A L T

R A M P

G A T E

A S P H A L T

R A M P

A S P H A L T

R A M P

C O N C

C O N C

D O C K

A S P H A L T

A S P H A L T

R A M P A S P H A L T

C O N C

F L U M E S

C O N C

S W

C O N C

R A M P

A S P H A L T

C O N C

S T E P S

D O W N

C O N C S W

E N D S

A S P H A L T

C O N C

C O N C

R A M P

C O N C

A S P H A L T

C O N C

C O N C

A S P H A L T

C O N C

C O N C

O V E R H E A D

P O R C H

C O L U M N S

S U P P O R T

A S P H A L T

A C

V A U L T

A S P H A L T

C O N C

C O N C

C O N C

P O S T

D

IR

T

D R

IV

E

D

IR

T G R A V E L

R O A D

T E M P O R A R Y

B E N C H M A R K X

P A

IN

T E D

O N

C O N C

D

IR

T G R A V E L

R O A D

A C

C O N C

A S P H A L T

A S P H A L T

A S P H A L T

A S P H A L T

C O N C

ASPHALT

PAVEM ENT

S H

ED

M E

TA

L

C O N C

C O N C

D

IR

T G R A V E L

D R

IV

E

G R A V E L

D

IR

T G R A V E L

R O A D

EDGE OF

PAVEMENT

C O N C

ASPHALT

PAVEM ENT

A S P H A L T

A S P H A L T

G R A V E L

D R

IV

E

C O N C

A S P H A L T

C O U R T

B A S K E T B A L L

G R A V E L

R A M P A S P H A L T

C O N C

C O N C .S

IG

N

A S P H A L T

C O N C

C O N C

A S P H A L T

A S P H A L T

A S P H A

LT

A S P H A L T

F L U M E

W M E T A L

C O V E R

A S P H A

LT

C O N C

A S P H A

LT

A S P H A

LT

A S P H A

LT

A S P H A L T

C O

NC

A S P H A L T

G R A V E L

A S P H A L T

A S P H A L T

C O N C

A S P H A

LT

C O N C

A S P H A L T

C O N C

R A

IL

A S P H A

LT

A S P H A L T

G R A V E L

A C

C O N C

G R A V E L

C O N C

G R A V E L

A S P H A L T

C O N C

C O N C

A S P H A L T

C O N C

A S P H A L T

C O N C

C O N C

A S P H A L T

M O N

IT

O R

IN

G

W E L L

C O N C

C O N C

A S P H A L T

A S P H A L T

P

IP

E

V A U L T

R A M P

C O N C

C O N C

A S P H A L T

C O N C

A S P H A L T

C O N C

V A U L T

C O N C

A S P H A L T

A S P H A L T

R

AM

P

C O N C

S T R

IP

A S P H A L T

A S P H A L T

A S P H A L T

A S P H A L T

C H E M

IC

A L

S T O R A G E

B L D G

A S P H A L T

C O N C

D U M P S T E R

P A D

G R A V E L

C O N C . P O S T

E D G E

O F

C O N C R E T E

R A

IS

E D

D O C K

C H L K F E N C E

W

B .W

C O N C

D

IR

T G R A V E L

R O A D

G E N E R A T O R

C O N C

A S P H A L T

C O N C

A S P H A L T

C O N C

C O N C

A S P H A L T

R A M P

G A T E

A S P H A L T

A S P H A L T

A C

G R A V E L

A C

P

IP

E

ASPHALT

G R A V E L

C A G E S

A S P H A L T

T O W E R

B A S E

C A B L E

J C T F O R

A N T E N N A

G R A T E D

P

IT

R A M P

A S P H A L T

A S P H A L T

A C

C O N C

C O N C

A S P H A L T

C O N C

R A M P

W A L L

C O N C

C O N C

C O N C

W A L L

C O N C

C O N C

C O N C

C O N C

V E N T S

M E T A L

P A D

F O R

E L E V A T O R

G U A R D

R A

IL

D O C K

G A T E

G U A R D

R A

IL

R A M P

G A T E

P O L E

A S P H A L T

G R A V E L

R O O F

D R A

IN

D O W N S P O U T S

T Y P

C O N C

C O N C

A S P H A L T

G A T E 1 C H L K F E N C E

W

B .W

A C C E S S

F O R

T R U C K

S C A L E S

G A T E

G A T E

G A T E

C O N C

G R A V E L

R O A D

W R O U G H

A S P H A L T

U N D E R N E A T H

A S P H A L T

C O N C

C O N C

C O N C

C O N C

C O N C

P O S T

P O L E

P O S T

U T

IL

IT

Y

U N K N O W N

U N D E R G R O U N D

U T

IL

IT

Y

D

IT

C H

C O N C

A S P H A L T

W A T E R

IN

D

P O S T

C O N C

G R A V E L

A S P H A L T

C O N C

A S P H A L T

C R A S H

S U R V

IV

A L

A R

EA

C O N C

A S P H A L T

C O N C P A D

S A Y S

W

D U C T

N S

A S P H A L T

A S P H A L T

C O N C

S T R

IP

A S P H A L T

G A T E

S P

IG

O T

G U A R D

P O S T S

A R V

S T E E L

I B E A M

C O L U M N S

S T E E L

C O L U M N

H A N G

C O N C

A S P H A L T

A S P H A L T

C O N C

R A

IL

G U A R D

P

IP

E

E D G E

O F

P

AV

EM

E N T

C H L K F E N C E

W

B .W

C O N C

C O N C R E T E

A C

C O N C R E T E

ONE STORY

WOOD BLDG.

C O N C R E T E

C O N C

S

IG

N

P V C

G A T E

C O N C R E T E

R A M P

M O T O R

D O C K

R A M P

A S P H A L T

G A T E

C O N C R E T E

A S P H A L T

RAMP

TO

W

ER

C U R B x

C S.W. 59th

STREET

L

G A

T E

R O C K W E

LL

A V E

L C S.W. 59th St

O

IL

F

IE

LD

P

IP

E

Y A R D

(N O T S U R V E Y E D

H A

LA

B Y

D R

C S.W. 59th STREET L

N E W P O R T H E

IG

H T S

A D D N W N E

V A C A T E D

O R D

IN

A N C E

B K P G A

LS

O

V A C A

TIO

N

O F

P

LA

T B K P G

D A

TE

D

G R AVEL

F O S

TE

R

R D

F O S

TE

R

D R

IV

E

S E

R V

IC

E

D R

IV

E

SECRUITY FENCE 7'-0"

S.W. 59th

STREET

S M a c A R

TH

U R

B

LV

D

S M a c A R

TH

U R

B

LV

D

S M a c A R

TH

U R

B

LV

D

S.W. 61st

ST.

S.W. 61st

STREET

S M a c A R

TH

U R

B

LV

D

R O C K W E

LL

A V E

'5 W

.2 N

S H A F F E R

S T

McLUCAS

ST.

HALABY

DR

H A

LA

B Y

D R

Q U E S A D A

H A

LA

B Y

D R

Helms Street

Q u e s a d a

D rive S.W. 66th

STREET

E D D

IE

A V E N U E

E D D

IE

A V E N U E

S D E N N

IN

G

A V E N U E

S.W. 66th

STREET

D E N N

IN

G

A V E N U E

E D D

IE

A V E

S.W. 65th

ST.

S.W. 64th

ST.

E D D

IE

A V E

E D D

IE

A V E

S.W. 62nd ST S.W. 62nd

ST

D E N N

IN

G

A V E

S.W. 64th

ST.

S M a c A R

TH

U R

B

LV

D

S.W. 66th

STREET

S M a c A R

TH

U R

B

LV

D

S D U K E

A V E

S D U K E

A V E N U E

S D U K E

A V E

S D U K E

A V E

S.W. 63rd

STREET

S.W. 64th

STREET

S.W. 64th

STREET

S M a c A R

TH

U R

B

LV

D

S.W. 62nd

ST.

S.W. 63rd

STREET

C H R

IS

TIA

N A V E

D E N N

IN

G

A V E N U E

S M a c A R

TH

U R

B

LV

D

L

Q u e s a d a

D rive

Q u e s a d a

D rive

S M a c A R

TH

U R

B

LV

D

G R

AV

E L

G R A V E L

SU

R F A C E

R O A D W A Y

C

R O C K W E

LL

A V E

L

C H R

IS

TIA

N A V E

Q u e s a d a

D rive

SW 74TH

ST.

SW 74TH

ST.

CL

CL

S.W. 68th

STREET

S.W. 69th

STREET

S.W. 59TH STREET

S.W. 74TH STREET

HEADQUARTERS

BUILDING

S . R

O C

K W

E

LL

A V

E N

U E

R E

G

IN

A A

V E

N U

E

S . M

A C

A R

U T

H E

R B

LV

D

DUKE AVE

D U

K E

A V

E

MIKE MONRONEY

BLVD

S . M

A C

A R

U T

H E

R B

LV

D

G R A V E L

R A M P

R A M P

STAIRS DOWN

R A M P

R A M P

R A M P

R A M P

ELEVATOR

C O N C

R A M P

R A M P

R A M P

R A M P

R A M P

R A M P

R A M P

R A M P

R A M P

PIT

R A M P

R A M P

R A M P

R A M P

R A M P

C O N C R E T E

C O N C R E T E

C O N C R E T E

C O N C R E T E

A S P H A L T

A S P H A L T

C O N C R E T E

A S P H A L T

A S P H A L T

C O N C R E T E

S T R

IP

A S P H A L T

A S P H A L T

A S P H A L T

A S P H A L T

A S P H A L T

A S P H A L T

A S P H A L T

CONCRETE STRIP

A S P H A L T

A S P H A L T

A S P H A L T

C O N C R E T E

C O N C R E

TE

C O N C R E T E

C O N C R E T E

S.W. 64th ST.

S.W. 63RD ST.

NORTH COURTYARD

SOUTH COURTYARD

HEADQUARTERS

BUILDING

TO DUKE AVENUE

BUILDING

ENTRANCE

DESIGNED BY

DRAWN BY

WORK ORDER

CHECKED BY ISSUED BY

APPROVED BY

DRAWING NO.

DATE

DATE CHK'D APP'DDESCRIPTION

REV.

LTR.

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA

JOB # SHT. #

HQB REMODEL LOBBY

2012-009421

C .H G U

ER

N S

EY

C O M P

AN

Y

N G R

AN

D

B

LV

D

C .A

AR

C H

IT

EC

TU

R E

E X P

IR

E S

JU

N E

C .A

EN

G

IN

EE

R

IN

G

E X P

IR

ES

JU

N E

SEQUENCE #

SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY

INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY

BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15

AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION.

UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S.

GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR

PARTS 15 AND 1520.

MARY TSIEN

G-002

PROJECT LOCATION MAP AND SITE PLAN

29 MAY 2020

J. GALLAS

J. LOPEZ

D. OMAN

NOT TO SCALE1

PROJECT LOCATION MAP

SHEET INDEX

SHEET NUMBER SHEET TITLE

01000 - GENERAL

G-001 COVER SHEET

G-002 PROJECT LOCATION MAP AND SITE PLAN

G-003 LIFE SAFETY PLAN

G-004 GENERAL NOTES

G-005 CONSTRUCTION PHASING PLAN

08000 - ARCHITECTURAL

A-001 ARCHITECTURAL ABBREVIATIONS, CONVENTIONS, AND NOTES

AD121 BASEMENT DEMOLITION PLAN OPTION #05 (PHASE 6)

AD122 FIRST FLOOR DEMOLITION PLAN

AD123 SECOND FLOOR DEMOLITION PLAN

AD124 THIRD-FOURTH FLOOR DEMOLITION PLAN

AD125 FIRST AND SECOND FLOOR ENLARGED DEMOLITION PLAN BASE BID

AD126 AUDITORIUM DEMOLITION FLOOR PLAN - OPTION #01 PHASE 2

A-121 BASEMENT FLOOR PLAN

A-122 FIRST FLOOR PLAN

A-123 SECOND FLOOR PLAN

A-124 THIRD-FOURTH FLOOR PLAN

A-125 ENLARGED FLOOR PLAN AT FIRST FLOOR AND

A-126 AUDITORIUM FLOOR PLAN - OPTION # 01 PHASE 2

A-141 BASEMENT REFLECTED CEILING PLAN

A-142 FIRST FLOOR REFLECTED CEILING PLAN

A-143 SECOND FLOOR REFLECTED CEILING PLAN

A-144 THIRD FLOOR AND ROOF STAIR REFLECTED CEILING PLAN

A-145 ENLARGED REFLECTED CEILING PLAN AT FIRST FLOOR

A-221 INTERIOR ELEVATIONS

A-222 INTERIOR ELEVATIONS

A-223 INTERIOR ELEVATIONS

A-301 PLAN AND VERTICAL DETAILS

A-501 GUARDRAIL ELEVATIONS

A-502 GUARDRAIL DETAILS

A-503 WOOD PANEL ELEVATIONS

A-504 WOOD PANEL DETAILS

14000 - MECHANICAL

M-001 HVAC LEGEND

M-101 FIRST FLOOR HVAC PLANS

M-102 FIRST FLOOR HVAC PLANS

M-103 SECOND FLOOR HVAC PLANS

M-104 SECOND FLOOR HVAC PLANS

M-105 THIRD FLOOR HVAC PLANS

M-106 THIRD FLOOR HVAC PLANS

M-107 BASEMENT HVAC PLANS

15000 - ELECTRICAL

E-001 ELECTRICAL LEGEND AND NOTES

E-101 ELECTRICAL PLANS

E-102 FIRST FLOOR ELECTRICAL PLANS

E-103 SECIOND FLOOR ELECTRICAL PLANS

E-104 SECOND FLOOR ELECTRICAL PLANS

E-105 THIRD FLOOR ELECTRICAL PLANS

E-106 THIRD FLOOR ELECTRICAL PLANS

E-107 BASEMENT ELECTRICAL PLANS

SCALE: 1" = 40'-0"2

SITE PLAN

NORTH

CONTRACTORS

STAGING AREA

CONTRACTOR HAUL ROUTE A. CONTRACTOR SHALL PROVIDE THE FAA WITH A WASTE

MANAGEMENT PLAN PREPARED IN ACCORDANCE WITH FAA

AMS GUIDELINES. THESE GUIDELINES INCLUDE FAA AMS

CLAUSE #3.6.3-22 CONSTRUCTION WASTE MANAGEMENT AND

MONTHLY CONSTRUCTION / DEMOLITION WASTE

MANAGEMENT INVENTORY REPORTS. CONTRACTOR SHALL

SUBMIT THIS PLAN NO LATER THAN 15 DAYS AFTER

RECEIVING THE NOTICE TO PROCEED.

B. CONTRACTOR MOBILIZATION AND STAGING AREA SHALL BE

LOCATED AT THE HQB’S NORTH COURTYARD. THIS AREA TO

BE KEPT IN A CLEAN AND ORDERLY MANNER THROUGHOUT

THE DURATION OF THE CONSTRUCTION PROJECT.

CONTRACTOR SHALL REPAIR OR REPLACE ANY DAMAGE TO

THE EXISTING BUILDING, BUILDING SYSTEMS, AND

PAYMENTS.

C. CONTRACTOR SHALL ONLY USE ELEVATOR E-1 (LOCATED IN

THE LOBBY) FOR CONSTRUCTION WASTE AND DEBRIS

REMOVAL.

D. CONTRACTOR SHALL ONLY USE ELEVATOR E-2 FOR

CONSTRUCTION AND WASTE DEBRIS FROM THE SOUTH

BASEMENT.

E. PERMISSION AND LOCATION OF DEBRIS CHUTES IS SHALL BE

COORDINATED WITH THE CONTRACTING OFFICER OF

RECORD.

CONSTRUCTION WASTE

AND HAUL ROUTE NOTES

80' 40' 0 80'

SCALE: 1" = 40'

CORRIDOR

B21

ELEV

E-3

STAIR

S-4B

CORRIDOR

B03

CORRIDOR

B10

CORRIDOR

B08

ELEV

E-4

CORRIDOR

B13

STAIR

S-4A

STAIR

S-3A

STAIR

S-3B

UP

EXIT

UP

EXIT

UP

UP

EXIT

EXITUP

VESTIBULE

V-A

C O

R R

ID

O

R

A

CORRIDOR

100B

VESTIBULE

V-B

VESTIBULE

V-E

ENTRY

100F

C O

R R

ID

O

R

E

LOBBY

100L

STAIR

S-3A

CORRIDOR

100G

STAIR

S-3B

CORRIDOR

100C

VESTIBULE

V-C

C O

R R

ID

O

R

D

VESTIBULE

V-D

ELEV

E-3

STAGE

100?

AUDITORIUM

100?

ELEV

E-1

STAIR

S-1A

STAIR

S-1B

ELEV

E-4

STAIR

S-4B

STAIR

S-4A

STAIR

S-2

UP

UP

UP

DN

DN

UP

UP

DN

UP

DN

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT EXIT

EXIT

EXIT

ELEV

E-1

CORRIDOR

200A

CORRIDOR

200B

CORRIDOR

200E

CORRIDOR

200F

LOBBY

200L

CORRIDOR

200C

CORRIDOR

200D

STAIR

S-1

STAIR

S-1A

STAIR

S-1B

ELEV

E-2

ELEV

E-3

ELEV

E-4

STAIR

S-4B

STAIR

S-4A

STAIR

S-2

UP

UP

UP

DN

UP

DN

UP

DNDN

DN

DN

UP

EXIT

EXIT

EXIT

EXIT

EXIT

CORRIDOR

300A

CORRIDOR

300B

CORRIDOR

300C

CORRIDOR

300D

CORRIDOR

300E

CORRIDOR

300F

ELEV

E-3

ELEV

E-1

STAIR

S-1

STAIR

S-1A

STAIR

S-1B

ELEV

E-2

ELEV

E-4

STAIR

S-4B

STAIR

S-2

STAIR

S-4A

DN

UP

DNDN

DN

DN

DN

EXIT

EXIT

EXIT

EXIT

ACCESS TO ROOF

BUILDING CODE INFORMATION

OKLAHOMA CITY MUNICIPAL CODECODE ACCEPTED BY

2015 IBC (INTERNATIONAL BUILDING CODE)

WITH AMENDMENTS

BUILDING CODE

2015 IMC (INTERNATIONAL MECHANICAL CODE)

WITH AMENDMENTS

MECHANICAL CODE

2015 IPC (INTERNATIONAL PLUMBING CODE)

WITH AMENDMENTS

PLUMBING CODE

2015 IFGC (INTERNATIONAL FUEL GAS CODE)

WITH AMENDMENTS

GAS CODE

2010 IECC (INTERNATIONAL ENERGY CONSERVATION CODE)

WITH AMENDMENTS

ENERGY CODE

2015 NEC (NATIONAL ELECTRICAL CODE), NFPA 70

WITH AMENDMENTS

ELETRICAL CODE

2015 IFC (INTERNATIONAL FIRE CODE)

WITH AMENDMENTS

FIRE CODE

ADA (AMERICANS WITH DISABILITY ACT)

2009 ANSI ICC A117.1 (AMERICAN NATIONAL STANDARDS

INSTITUTE, INTERNATIONAL CODE COUNCIL)

ACCESSIBILITY

BUILDING INFORMATION

BUSINESS GROUP B (PRIMARY)

ASSEMBLY: GROUP A-3 (ACCESSORY)

OCCUPANCY CLASSIFICATION

TYPE II-ACONSTRUCTION CLASSIFICATION

YES SEPARATEDMIXED-USE OCCUPANCY

40 FEET (65 FEET ALLOWED)BUILDING HEIGHT ABOVE GRADE

178,125 SF PER FLOOR WITH AREA

INCREASES

ALLOWABLE GROSS BUILDING AREA

HORIZONTAL EXITS

MINIMUM FIRE WALLS (B)

SHAFT ENCLOSURES:

FIRE PARTITIONS:

FIRE SEPARATION DISTANCE:

FIRE RESISTANCE RATINGS

YESSPRINKLED

3 ABOVE GRADE, 1 STORY BASEMENTBUILDING STORIES ABOVE GRADE

156,654 SF

52,218 SF (BUILDING DIVIDED INTO THREE

SEPARATE FIRE ARES)

163,062

TOTAL BUILDING AREA:

SEPARATED FIRE AREA

TOTAL AREA (WITH CANOPES)

2-HOUR

2-HOUR

1-HOUR

30 FEET

EGRESS INFORMATION

B WITH SPRINKLER SYSTEM = 300'EXIT ACCESS TRAVEL DISTANCE

ALLOWABLE DISTANCE = 50'DEAD ENDS

1,567 OCCUPANTSOCCUPANCY LOAD

6 EXITS (2 OUT OF EACH BUILDING SEPARATION)

9 EXITS

OTHERS COMPONENTS = 0.2" PER OCCUPANTEGRESS WIDTHS

(2015 IBC, 1005.3.1)

REFERENCE DRAWING ABOVE FOR INDIVIDUAL

EGRESS CAPACITY OF DOORS

(2015 IBC, 1020.4 EXCEPTION #2)

REQUIRED EXITS

PROVIDED EXITS

THIS PROJECT CONSISTS OF REPLACING THE EXISTING FINISHES AT THE

EXISTING FAA HEADQUARTERS BUILDING. THE WORK DESCRIBED IN THE

CONTRACT DOCUMENTS DOES NOT CHANGE OR IMPACT THE FOLLOWING

ITEMS: BUILDING CONSTRUCTION TYPE, OCCUPANCY TYPE, OCCUPANT

LOAD, EGRESS DISTANCES OR CONFIGURATIONS, AND ADA COMPLIANCE.

THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS IS LIMITED TO

THE CORRIDORS, ENTRANCE LOBBY, THE STAIRS AND ELEVATORS. THIS

WORK DOES NOT EXTEND INTO EXISTING OFFICES, RESTROOMS, OR

MECHANICAL SPACES.

FIRE SUPPRESSION HEADS MAY NEED TO BE ADJUSTED AT SOME

LOCATIONS TO COORDINATE WITH CEILING FURRING CONDITIONS

LOCATED AT THE FIRST FLOOR AND THE LOBBY CEILING AT THE SECOND

FLOOR LEVEL.

PROJECT DESCRIPTION

DESIGNED BY

DRAWN BY

WORK ORDER

CHECKED BY ISSUED BY

APPROVED BY

DRAWING NO.

DATE

DATE CHK'D APP'DDESCRIPTION

REV.

LTR.

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA

JOB # SHT. #

HQB REMODEL LOBBY

2012-009421

C .H G U

ER

N S

EY

C O M P

AN

Y

N G R

AN

D

B

LV

D

C .A

AR

C H

IT

EC

TU

R E

E X P

IR

E S

JU

N E

C .A

EN

G

IN

EE

R

IN

G

E X P

IR

ES

JU

N E

SEQUENCE #

SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY

INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY

BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15

AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION.

UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S.

GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR

PARTS 15 AND 1520.

MARY TSIEN

G-003

LIFE SAFETY PLAN

29 MAY 2020

J. GALLAS

J. LOPEZ

D. OMAN

SCALE: 1" = 30'-0"1

BASEMENT FLOOR PLAN

SCALE: 1" = 30'-0"2

FIRST FLOOR PLAN

SCALE: 1" = 30'-0"3

SECOND FLOOR PLAN

SCALE: 1" = 30'-0"4

THIRD FLOOR PLAN

NORTH

60' 30' 0 60'

SCALE: 1" = 30'

LIFE SAFETY NOTES:

A. CONTRACTOR SHALL MAINTAIN MEANS OF

EGRESS AND FIRE PROTECTION SYSTEM

DEVICES DURING NORMAL BUSINESS

HOURS.

B. THIS PROJECT CONSISTS OF PRIMARILY OF

INTERIOR FINISH REPLACEMENT AND

UPGRADES. OUTDATED MATERIALS WILL

BE REPLACED WITH NEW FINISHES OF

SIMILAR FUNCTION AND QUALITY.

C. WHERE A RATING HAS BEEN GIVEN TO AN

EXISTING WALL, ALL PENETRATIONS

(EXISTING OR NEW) MUST BE SEALED AND

PROPERLY FIRE PROOFED PER THAT

RATING.

D. THERE IS NO CHANGE OF OCCUPANCY,

HAZARDS OR EGRESS WITHIN THE HQB

BUILDING AS PART OF THIS WORK.

E. A LIFE SAFETY CODE ANALYSIS IS NOT

PERFORMED AS PART OF THIS INTERIOR

FINISHES REPAIR PROJECT.

A. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS AND MEASUREMENTS AS THEY RELATE TO NEW CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO

THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION.

B. EXISTING BUILDING WILL BE OCCUPIED DURING ALL PHASES OF CONSTRUCTION. AIR, WATER AND NOISE POLLUTION CONTROL SHALL BE CLOSELY MONITORED, CONTROLLED AND COORDINATED WITH THE COR.

C. THE MAJORITY OF THE WORK IS TO TAKE PLACE AFTER BUSINESS HOURS AND ON WEEKENDS UNLESS

COORDINATED WITH THE COR.

D. COORDINATE DEMOLITION OPERATIONS WITH REQUIREMENTS FOR PHASING OF DEMOLITION AND

CONSTRUCTION, INCLUDING TEMPORARY CONSTRUCTION.

E. REVIEW ALL DISCIPLINE CONSTRUCTION DOCUMENTS TO VERIFY EXTENTS OF DEMOLITION AND

CONSTRUCTION WITH RESPECT TO PHASING, BASE BID, AND OPTIONS.

F. CONTRACTOR TO PERFORM A PRE-DEMOLITION PHOTOGRAPHIC SURVEY OF AREAS TO BE DEMOLISHED.

G. CONTRACTOR SHALL SURVEY AND CATALOG ALL EXISTING CEILING-MOUNTED AND WALL-HUNG LIGHTS, DIFFUSERS, GRILLES, SIGNAGE, ALARMS, SENSORS, EXIT DEVICES, AND OTHER APPURTENANCES PRIOR TO COMMENCING DEMOLITION WORK FOR THIS PROJECT. THESE ITEMS ARE TO BE CATALOGED, WRAPPED, AND STORED FOR REINSTALLATION. IT IS THE EXPRESSED DESIGN INTENT FOR ALL EXISTING CEILING AND WALL MOUNTED DEVICES TO BE REINSTALLED IN PRECISELY THE SAME LOCATIONS UNLESS NOTED OTHERWISE.

H. CONTRACTOR TO ENSURE THAT ALL REINSTALLED (EXISTING) CEILING-MOUNTED AND WALL-HUNG ALARMS, SENSORS, EXIT DEVICES, AND OTHER APPURTENANCES ARE IN WORKING ORDER AFTER REINSTALLATION. THE CONTRACTOR SHOULD REQUEST A PRE-DEMOLITION WALKTHROUGH WITH FAA STAFF TO ENSURE DEVICES

ARE IN WORKING ORDER PRIOR TO THE START OF WORK.

I. PRIOR TO DISMANTLING EXISTING LAY-IN ACOUSTICAL CEILING GRIDS, CONTRACTOR IS TO VERIFY THAT ALL ABOVE CEILING ITEMS SUCH AS DUCTWORK, MECHANICAL EQUIPMENT, PIPING, CONDUITS, WIRING, CABLE TRAYS ETC. ARE SUPPORTED FROM THE STRUCTURE ABOVE AND NOT SUPPORTED BY THE GRID. ALL ITEMS

RESTING ON THE EXISTING CEILING GRID SHALL BE SUPPORTED PRIOR TO DEMOLITION.

J. WHERE FLOOR DEMOLITION IS REQUIRED TO INSTALL NEW WORK, CONTRACTOR SHALL PATCH AND REPAIR TO

A LEVEL AND EVEN SURFACE.

K. PATCH AND REPAIR ADJACENT SURFACES TO REMAIN AFTER DEMOLITION AND NEW CONSTRUCTION TO A LEVEL AND EVEN SURFACE TO MATCH EXISTING ADJACENT CONSTRUCTION TYPE, FINISH, COLOR AND TEXTURE. EXTENTS OF THIS REPAIR SHALL BE CARRIED TO A CONTROL JOINT OR CORNER OR APPROPRIATE

MATERIAL FINISH EDGE.

L. APPLY LEVELING COMPOUND AT FLOOR SLAB CONDITIONS AS REQUIRED FOR NEW OR REPAIRED FLOORING

MATERIALS.

M. ANY SALVAGED STONE / MARBLE VENEER NOT USED FOR REPAIRING EXISTING VENEER SHALL BE REMOVED AT

THE COMPLETION OF THE PROJECT.

N. FAA WILL RETAIN ALL SALVAGE THAT IS OF VALUE AS DESIGNATED BY THE COR. THE COR WILL DIRECT THE CONTRACTOR AS TO THE LOCATION OF STORAGE AREA FOR VARIOUS ITEMS. THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING FROM THE BUILDING AND CONSTRUCTION SITE ALL CONSTRUCTION DEBRIS

AND/OR ITEMS NOT RETAINED BY FAA.

O. ALL OPENINGS AND VOIDS LEFT BY THE REMOVAL OF EXISTING CONSTRUCTION, EQUIPMENT, PIPING, DUCTS, ETC. SHALL BE PROPERLY PATCHED AND CLOSED OFF TO MAINTAIN PROPER FIRE RATING IN EXISTING WALLS.

P. WHERE A RATING HAS BEEN GIVEN TO AN EXISTING WALL, ALL PENETRATIONS (EXISTING OR NEW) MUST BE

SEALED AND PROPERLY FIRE PROOFED PER THAT RATING REQUIREMENT.

Q. REMOVE ALL ABANDONED MECHANICAL, ELECTRICAL, PLUMBING, AND COMMUNICATION EQUIPMENT AT

INTERIOR AREAS OF THE WORK BACK TO ITS SOURCE.

PROJECT DEMOLITION NOTES:

A. CONSTRUCTION PHASING INFORMATION AND NOTES ARE INTENDED TO SHOW THE SEQUENCE IN WHICH THE DEMOLITION AND CONSTRUCTION OPERATIONS SHALL PROGRESS. REFER TO DEMOLITION AND CONSTRUCTION SHEETS FOR SPECIFIC WORK RELATED TO EACH AREA AND PHASE. DEMOLITION AND

CONSTRUCTION DOCUMENTS SUPERSEDE PHASING DRAWINGS.

B. WORK INDICATED IN EACH PHASE IS GENERALLY SHOWN IN THE ORDER ANTICIPATED FOR THE WORK TO BE COMPLETED. CONTRACTOR IS PERMITTED TO ADJUST SOME PORTIONS OF CONSTRUCTION PHASING PROVIDED THAT BUILDING FUNCTIONS, PROJECT SCHEDULE, AND OWNER / USER / OCCUPANT OPERATIONS ARE NOT NEGATIVELY IMPACTED. COORDINATE CONSTRUCTION SEQUENCE AND SCHEDULE WITH OWNER

AND ARCHITECT PRIOR TO IMPLEMENTATION.

C. CONSTRUCT FULL HEIGHT TEMPORARY WALLS TO SEPARATE THE WORK PERFORMED IN THE LOBBY FROM DEMOLITION AND CONSTRUCTION AREAS. TEMPORARY WALLS SHALL BE SEALED TO PREVENT TRANSFER OF DUST AND ODORS FROM CONSTRUCTION AREAS INTO OCCUPIED SPACES AND SHALL BE CONSTRUCTED TO PROTECT THE INTERIOR ENVIRONMENT AND MAINTAIN ENVIRONMENTAL CONTROLS UNTIL NEW WORK IS

SUBSTANTIALLY COMPLETED IN THE LOBBY.

D. FIELD VERIFY EXISTING BUILDING LAYOUT AND CONDITIONS TO DETERMINE THE EXTENT OF TEMPORARY CONSTRUCTION REQUIRED FOR CONSTRUCTION SEPARATION, AND BUILDING SECURITY AND ACCESS.

E. TEMPORARY CONSTRUCTION SHALL NOT BE PERMANENTLY ATTACHED TO EXISTING FINISHES AND EXISTING FINISHES SHALL BE PROTECTED FROM DAMAGE. REPAIR / REPLACE EXISTING MATERIALS

DAMAGED BY DEMOLITION OR CONSTRUCTION OPERATIONS.

F. INTERIOR TEMPORARY CONSTRUCTION WALLS SHALL BE DEFINED AS TEMPORARY WALLS WHICH ARE NOT EXPOSED TO WEATHER. INTERIOR TEMPORARY CONSTRUCTION WALLS SHALL BE CONSTRUCTED OF LIGHT GAUGE METAL FRAMING STUDS WITH ONE LAYER OF 5/8” GWB ON THE NON-CONSTRUCTION SIDE AND ONE LAYER OF 1/2” GWB ON THE CONSTRUCTION SIDE. METAL STUDS SHALL BE SIZED TO RESIST 5 PSF LATERAL LOADS FOR THE VERTICAL SPANS REQUIRED. ACOUSTICAL BATT INSULATION SHALL BE INSTALLED TO LIMIT CONSTRUCTION NOISE TRANSMISSION TO ADJACENT OCCUPIED SPACES. GWB SHALL BE TAPED AND BEDDED TO THE FULL HEIGHT OF THE WALL EXPOSED TO VIEW. THE TEMPORARY CONSTRUCTION WALL SHALL RECEIVE ONE COAT OF LATEX-BASED INTERIOR FLAT PAINT ON THE NON-

CONSTRUCTION SIDE TO THE FULL HEIGHT OF THE WALL EXPOSED TO VIEW.

G. TEMPORARY DOORS IN INTERIOR TEMPORARY CONSTRUCTION WALLS SHALL BE LOCATED, SIZED, AND IN QUANTITIES AS TO BE CONVENIENT FOR CONSTRUCTION AND COMPLIANT WITH BUILDING AND FIRE CODES.

TEMPORARY INTERIOR DOORS SHALL BE 1 3/4” HOLLOW METAL WITH HOLLOW METAL FRAMES. TEMPORARY INTERIOR DOORS AND FRAMES SHALL RECEIVE ONE COAT LATEX-BASED INTERIOR FLAT PAINT TO MATCH ADJACENT WALLS. TEMPORARY DOORS SHALL BE EQUIPPED WITH CYLINDRICAL LOCK SETS, DEAD BOLTS AND HINGES FOR BASIC OPERATION AND SECURITY. EGRESS DOORS IN TEMPORARY WALLS SHALL MEET LIFE SAFETY CODE REQUIREMENTS. LOCATION OF ALL TEMPORARY DOORS SHALL BE COORDINATED WITH

MMAC SECURITY.

H. TEMPORARY CONSTRUCTION IS THE RESPONSIBILITY OF THE CONTRACTOR TO DESIGN, ERECT, MAINTAIN, AND REMOVE.

I. HQB ACCESS ROUTES MUST BE KEPT CLEAN AT ALL TIMES FROM ANY CONSTRUCTION RELATED DEBRIS, DIRT OR OTHER MATERIALS.

J. MATERIALS AND EQUIPMENT SHALL BE STORED EITHER OFF-SITE OR WITHIN THE CONSTRUCTION STAGING

AREA UNTIL READY FOR USE.

CONSTRUCTION PHASING GENERAL NOTES:PROJECT GENERAL NOTES:

DESIGNED BY

DRAWN BY

WORK ORDER

CHECKED BY ISSUED BY

APPROVED BY

DRAWING NO.

DATE

DATE CHK'D APP'DDESCRIPTION

REV.

LTR.

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA

JOB # SHT. #

HQB REMODEL LOBBY

2012-009421

C .H G U

ER

N S

EY

C O M P

AN

Y

N G R

AN

D

B

LV

D

C .A

AR

C H

IT

EC

TU

R E

E X P

IR

E S

JU

N E

C .A

EN

G

IN

EE

R

IN

G

E X P

IR

ES

JU

N E

SEQUENCE #

SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY

INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY

BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15

AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION.

UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S.

GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR

PARTS 15 AND 1520.

MARY TSIEN

G-004

GENERAL NOTES

29 MAY 2020

J. GALLAS

J. LOPEZ

D. OMAN

A. CONTRACTOR WORK PRACTICES AND PROCEDURES SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL

ENVIRONMENTAL, HEALTH, AND SAFETY REQUIREMENTS.

B. HQB WILL BE FULLY OCCUPIED FOR THE DURATION OF DEMOLITION AND CONSTRUCTION WORK.

CONTRACTOR SHALL ISOLATE WORK AREAS FROM NORMAL DAY-TO-DAY FAA OCCUPANT TRAFFIC WITH DUST BARRIERS, TEMPORARY WALLS, CONSTRUCTION SIGNAGE, AND SAFETY CONES TO MINIMIZE OCCUPANT EXPOSURE TO DUST, NOISE, FUMES, ODORS, AND OTHER ENVIRONMENTAL HAZARDS RELATED

TO DEMOLITION AND CONSTRUCTION WORK.

C. ALL DEMOLITION AND CONSTRUCTION WORK ASSOCIATED WITH THIS PROJECT SHALL BE PERFORMED

AFTER NORMAL WORK HOURS OR ON WEEKENDS TO PREVENT THE DISRUPTION OF THE DAILY

OPERATIONS WITHIN THE HQB. ANY WORK PERFORMED DURING NORMAL WORK HOURS SHALL BE

APPROVED IN ADVANCE BY THE CONTRACTING OFFICER REPRESENTATIVE (COR).

D. ALL WORK AREAS WITHIN THE HQB SHALL BE RETURNED TO NORMAL WORKING CONDITIONS EACH DAY.

E. CONTRACTOR SHALL MAINTAIN MEANS OF EGRESS AND FIRE PROTECTION SYSTEM WITHIN THE HQB

DURING NORMAL BUSINESS HOURS.

F. CONTRACTOR SHALL MANAGE ALL MATERIALS, EQUIPMENT, AND CONSTRUCTION DEBRIS (BOTH INTERNAL

AND EXTERNAL) THROUGHOUT THE PROJECT.

G. CONTRACTOR SHALL PROTECT ALL EXISTING FINISHES, STRUCTURES, AND ENGINEERING SYSTEMS NOT

PART OF THIS WORK THROUGHOUT ALL DEMOLITION WORK AND CONSTRUCTION.

H. ASBESTOS CONTAINING MATERIALS (ACM) HAVE BEEN FOUND IN MASTIC AND FLOORING MATERIALS IN

SEVERAL HQB ROOMS INVOLVED IN THIS WORK. THIS MATERIAL WILL BE REMOVED BY OTHERS BEFORE THE START OF THIS PROJECT. CONTRACTOR IS TO NOTIFY THE COR IMMEDIATELY IF SUSPECTED ACM IS

DISCOVERED ELSEWHERE DURING THE COURSE OF DEMOLITION AND CONSTRUCTION WORK.

I. CONTRACTOR TO COORDINATE ALL POWER, COMMUNICATIONS, AND HVAC OUTAGES WITH THE COR.

OUTAGES AND SERVICE SWITCHOVERS SHALL BE MADE ON EVENINGS, WEEKENDS, AND HOLIDAYS TO

MINIMIZE DISRUPTION TO OCCUPIED WORK AREAS.

J. THESE DESIGN DOCUMENTS HAVE BEEN SUBMITTED FOR CONTRACTOR DEVELOPMENT OF THE

CONSTRUCTION WORK PLAN. COORDINATION BETWEEN THE CONTRACTOR AND SUBCONTRACTORS IS THE

RESPONSIBILITY OF THE CONTRACTOR. CHANGES TO THESE DRAWINGS AS A RESULT OF THE

CONSTRUCTION COORDINATION ARE THE RESPONSIBILITY OF THE CONTRACTOR.

CORRIDOR

B21

ELEV

E-3

CORRIDOR

B03

CORRIDOR

B10

CORRIDOR

B08

CORRIDOR

B13

STAIR

S-3A

STAIR

S-4B

ELEV

E-4

STAIR

S-4A

STAIR

S-3B

UP

UP

UP

UP

VESTIBULE

V-A

CORRIDOR

100A

VESTIBULE

V-B

VESTIBULE

V-E

ENTRY

100F

CORRIDOR

100E

LOBBY

100L STAIR

S-3A

CORRIDOR

100G

STAIR

S-3B

CORRIDOR

100D

VESTIBULE

V-D

ELEV

E-3

VESTIBULE

V-C

STAGE

100?

AUDITORIUM

100?

ELEV

E-1

STAIR

S-1A

STAIR

S-1B

ELEV

E-2

ELEV

E-4

STAIR

S-4B

STAIR

S-4A

STAIR

S-2

UP

UP

UP

DN

DN

UP

UP

DN

UP

DN

CORRIDOR

100B CORRIDOR

100C

3' -6

40'-0"

'-6

TEMPORARY CONSTRUCTION

WALL LOCATION

COORDINATE WITH COR

CORRIDOR

200A

CORRIDOR

200E

LOBBY

200L

CORRIDOR

200C

CORRIDOR

200D

ELEV

E-3

STAIR

S-1

ELEV

E-1

CORRIDOR

200F

STAIR

S-1A

STAIR

S-1B

ELEV

E-2

ELEV

E-4

STAIR

S-4B

STAIR

S-4A

STAIR

S-2

CORRIDOR

200B

UP

UP

UP

DN

UP

DN

UP

DNDN

DN

DN

UP

TEMPORARY CONSTRUCTION

WALL LOCATION

COORDINATE WITH COR

CORRIDOR

300B

CORRIDOR

300C

CORRIDOR

300D

CORRIDOR

300E

CORRIDOR

300F

ELEV

E-3

ELEV

E-1

STAIR

S-1

STAIR

S-1A

STAIR

S-1B

ELEV

E-2

ELEV

E-4

STAIR

S-4B

STAIR

S-2

STAIR

S-4A

DN

UP

DNDN

DN

DN

DN

CORRIDOR

300A

CONSTRUCTION

PHASING LEGEND

PHASE ONE - BASE BID

LOBBY AND MONUMENTAL STAIR ,

CORRIDORS 100E AND 100F,

ELEVATORS E-2 AND E-3,

STAIRS S-2 AND S-3A

PHASE TWO - OPTION 1

AUDITORIUM AND STAGE

PHASE THREE - OPTION 2

VESTIBULES V-A, V-B, V-C AND V-D,

CORRIDORS 100A, 100D AND 100G,

ELEVATORS E-1 AND E-4,

STAIRS S-1A, S-1B, S-3B, S-4A AND S-4B

PHASE FOUR - OPTION 2

CORRIDORS 200A, 200B, 200C AND 200D

PHASE FIVE - OPTION 2

CORRIDORS 300A, 300B, 300C AND 300D

PHASE SIX - OPTION 2

CORRIDOR B21

DESIGNED BY

DRAWN BY

WORK ORDER

CHECKED BY ISSUED BY

APPROVED BY

DRAWING NO.

DATE

DATE CHK'D APP'DDESCRIPTION

REV.

LTR.

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA

JOB # SHT. #

HQB REMODEL LOBBY

2012-009421

C .H G U

ER

N S

EY

C O M P

AN

Y

N G R

AN

D

B

LV

D

C .A

AR

C H

IT

EC

TU

R E

E X P

IR

E S

JU

N E

C .A

EN

G

IN

EE

R

IN

G

E X P

IR

ES

JU

N E

SEQUENCE #

SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY

INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY

BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15

AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION.

UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S.

GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR

PARTS 15 AND 1520.

MARY TSIEN

G-005

CONSTRUCTION PHASING PLAN

29 MAY 2020

J. GALLAS

J. LOPEZ

D. OMAN

SCALE: 1" = 30'-0"1

BASEMENT COMPOSITE PHASING FLOOR PLAN

SCALE: 1" = 30'-0"2

FIRST FLOOR COMPOSITE PHASING PLAN

SCALE: 1" = 30'-0"3

SECOND FLOOR COMPOSITE PHASING PLAN

SCALE: 1" = 30'-0"4

THIRD FLOOR COMPOSITE PHASING PLAN

NORTH

60' 30' 0 60'

SCALE: 1" = 30'

ARCHITECTURAL DRAFTING CONVENTIONS

Room name

150 SF

View Name

SCALE: 1/8" = 1'-0"

G012

A

DETAIL VIEW NUMBER

SHEET ON WHICH DETAIL

APPEARS

VIEW NUMBER

NUMBER

DESIGNATION

LETTER

DESIGNATION

NUMBER

DESIGNATIO

N

LETTER/NUMBER

DESIGNATION

LETTER

DESIGNATION

A

HEIGHT

DESIGNATION

10'-0"

NUMBER

DESIGNATION

HEIGHT DESIGNATION

LETTER/NUMBER

DESIGNATION

NAME DESIGNATION

ROOM NAME/NUMBER SYMBOL

WINDOW/STOREFRONT SYMBOL

EQUIPMENT/FURNITURE SYMBOL

PARTITION TYPE SYMBOL

TOILET ACCESSORY SYMBOL

SPOT/CEILING ELEVATION SYMBOL

DOOR SYMBOL

ELEVATION SYMBOL

GRID SYMBOL

VIEW TITLE

EXTERIOR ELEVATION MARKER

INTERIOR ELEVATION MARKER

BUILDING / WALL SECTION MARKER

DETAIL MARKER

A-101

SIM

PLAN NORTH

8' 4' 0 8'

SCALE: 1/8" = 1'-0"

LEVEL 30

24'-0"

MATCHLINE SYMBOL

1 / A-121

1 / A-122

LETTER/NUMBER

DESIGNATION OF

FLOOR PLAN(S)

DIRECTION OF ELEVATION VIEW

ELEVATION VIEW NUMBER

SHEET ON WHICH ELEVATION APPEARS

A101

SIM

SIMILAR (IF APPLICABLE)

CENTERLINE SYMBOL =

DIRECTION OF SECTION VIEW

SECTION VIEW NUMBER

SHEET ON WHICH SECTION APPEARS

A101

SIM

SIMILAR (IF APPLICABLE)

GRAPHIC SCALE SYMBOL

NORTH ARROW

SIMILAR (IF APPLICABLE)

PLAN NORTH

ARROW DIRECTION

TRUE NORTH

ARROW DIRECTION

REVISIONS SYMBOL

AREA / ITEM(S)

TO BE REVISED

1 REVISION NUMBER

EXISTING NEW

ABBREVIATIONS

DIRECTION OF VIEW FOR ELEVATION

ELEVATION VIEW NUMBER & SHEET

ON WHICH ELEVATION APPEARS

1/A-221

DESIGNED BY

DRAWN BY

WORK ORDER

CHECKED BY ISSUED BY

APPROVED BY

DRAWING NO.

DATE

DATE CHK'D APP'DDESCRIPTION

REV.

LTR.

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA

JOB # SHT. #

HQB REMODEL LOBBY

2012-009421

C .H G U

ER

N S

EY

C O M P

AN

Y

N G R

AN

D

B

LV

D

C .A

AR

C H

IT

EC

TU

R E

E X P

IR

E S

JU

N E

C .A

EN

G

IN

EE

R

IN

G

E X P

IR

ES

JU

N E

SEQUENCE #

SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY

INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY

BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15

AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION.

UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S.

GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR

PARTS 15 AND 1520.

MARY TSIEN

A-001

ARCHITECTURAL ABBREVIATIONS, CONVENTIONS, AND NOTES

29 MAY 2020

J. GALLAS

J. LOPEZ

D. OMAN

PREFIN PREFINISHED

PRJ PROJECTION

PROP PROPERTY

PSI POUNDS PER SQ IN

PT PAINT

PTD PAINTED

PTDD PAPER TOWEL DISPENSER / DISPOSAL

PTN PARTITION

PVC POLYVINYL CHLORIDE

Q

QT QUARRY TILE

QZ QUARTZ MATERIAL

RA RETURN AIR

RAF RAISED ACCESS FLOORING

RB RUBBER BASE

RD ROAD, ROOF DRAIN

RECT RECTANGULAR

REF, RE REFER, REFERENCE

REINF REINFORCE, REINFORCED

REP REPRESENTATIVE

REQD REQUIRED

RFG ROOFING

RFL RUBBER FLOORING

RH ROBE HOOK

RM ROOM

RND ROUND

RS ROLLER SHADES

RST RUBBER STAIR TREADS

SB SPLASH BLOCK

SC SEALED CONCRETE

SCHED SCHEDULE

SCN STAINED CONCRETE

SD SOAP DISPENSER

SECT SECTION

SEQ SEQUENCE

SHT SHEET

SIM SIMILAR

SJ STUCCO JOINT, SAWN JOINT

SMC SUSPENDED METAL CEILING

SND SANITARY NAPKIN DISPENSER

SPECS CONTRACT SPECIFICATIONS

SQ SQUARE

SS STAINLESS STEEL

SSM SOLID SURFACE MATERIAL

ST SOILED TOWEL RECEPTACLE

STD STANDARD

STL STEEL

STN NATURAL STONE

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SWC SUSPENDED WOOD CEILING

T

T TREAD

TC TOWEL DISPENSER

TFMR TRANSFORMER

THK THICK

THRU THROUGH

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOS TOP OF STEEL

TOW TOP OF WALL

TP TOILET PARTITION

TS FLOORING TRANSITION

TT TILE TRIM

TTD TOILET TISSUE DISPENSER

TYP TYPICAL

TZ TERRAZZO

UGND UNDERGROUND

UNO UNLESS NOTED OTHERWISE

UR URINAL

V

VB VINYL BASE, VAPOR BARRIER

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VF VINYL FLOORING

VP VENT PIPE

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W

W/ WITH (COMB. FORM)

W/O WITHOUT

WB WOOD BASE

WC WATER CLOSET

WD WIDTH, WINDOW DIMENSION, WOOD

WDW WINDOW

WF WOOD FLOORING

WH WATER HEATER

WM WALK-OFF MAT

WP WATERPROOF

WR WASTE RECEPTACLE

WS WEATHERSTRIPPING

WT WINDOW BLINDS

FTG FOOTING

FURR FURRED, FURRING

FWC FABRIC WALL COVERING

G

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GFCI GOVERNMENT FURNISHED,

CONTRACTOR INSTALLED

GFGI GOVERNMENT FURNISHED,

GOVERNMENT INSTALLED

GL GLASS, GLAZING

GRT GROUT

GT GLASS TILE

GWB GYPSUM WALLBOARD

GYP GYPSUM

H

HB HOSE BIB

HC HANDICAPPED

HC HOLLOW CORE

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HORIZ HORIZONTAL

HPL HIGH PRESURE LAMINATE

HT HEIGHT

HTR HEATER

HVAC HEATING, VENTILATING, AND

AIR CONDITIONING

I

ID INSIDE DIAMETER

IN INCH

INSUL INSULATION

INT INTERIOR

J

JST JOIST

JT JOINT

L

LAM LAMINATE

LAV LAVATORY

LB POUND

LBL LABEL

LF LINEAL FEET

LN LINOLEUM

LVR LOUVER

LVT LUXURY VINYL TILE

LWT LIGHTWEIGHT

M

MACH MACHINE

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MBR MEMBER

MC MEDICINE CABINET

MECH MECHANICAL

MEZZ MEZZANINE

MFR MANUFACTURE, MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MK MARK

ML METAL LOCKER

MLDG MOLDING

MO MASONRY OPENING

MSNRY MASONRY

MSP METAL SPLASH PAN

MT METAL THRESHOLD

MTD MOUNTED

MTL METAL

MVBL MOVABLE

MWP MEMBRANE WEATHERPROOFING

N

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NPRN NEOPRENE

NTS NOT TO SCALE

OA OVERALL, OUTSIDE AIR

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

OZ OUNCE

P

PART PARTIAL

PL PLATE, PLASTIC

PLAS PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PNL PANEL, PANELBOARD

PREFAB PREFABRICATED

SYMBOL

@ AT

A

A/C AIR CONDITIONING

AB ANCHOR BOLT

ABI ADDITIVE BID ITEM

ACT ACOUSTICAL CEILING TILE

ADJ ADJACENT, ADJUSTABLE

AFF ABOVE FINISH FLOOR

AFL ATHLETIC FLOORING

AGGR AGGREGATE

ALT ALTERNATE

ALUM, AL ALUMINUM

AP ACRYLIC PANEL

APPROX APPROXIMATE

APVD APPROVED

ARCH ARCHITECT, ARCHITECTURAL

ATTEN ATTENUATOR, ATTENUATION

AWP ACOUSTIC WALL PANEL

B

BB BASE BID

BD BOARD

BITUM BITUMINOUS

BLDG BUILDING

BLKG BLOCKING

BM BEAM, BENCH MARK

BOT, BTM BOTTOM

BRG BEARING

BRK BRICK

BSMT BASEMENT

C

C TO C CENTER TO CENTER

CAB CABINET

CBB CEMENTITIOUS BACKER BOARD

CC CONTRACTOR CONNECT

CF CONTRACTOR FURNISHED

CFCI CONTRACTOR FURNISHED,

CONTRACTOR INSTALLED

CFMF COLD-FORMED METAL FRAMING

CG CORNER GUARD

CI CONTRACTOR INSTALLED

CJ CONSTRUCTION CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

CPT CARPET

CR CONTRACTOR ROUGH-IN

CT CERAMIC TILE

D

DB DOUBLE

DEMO DEMOLITION, DEMOLISH

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DN, DWN DOWN

DP DAMPPROOFING

DR DOOR

DS DOWNSPOUT

DTL DETAIL

DWG DRAWING

DWP DECORATIVE WALL PANEL

DWR DRAWER

E

EA EACH

EF EXHAUST FAN

ELEC ELECTRICAL

ELEV ELEVATION

EPC EPOXY COATING

EQ EQUAL

EQPT EQUIPMENT

ES EMERGENCY SHOWER

EW EYE WASH

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPANSION, EXPOSED

EXP JT, EJ EXPANSION JOINT

EXT EXTERIOR

F

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FHS FIRE HOSE STATION

FIN FINISHED

FLR FLOOR

FPRF FIREPROOF

FRP FIBER-REINFORCED PLASTIC

FT FOOT, FEET

GENERAL ARCHITECTURAL NOTES:

A. DO NOT SCALE THE DRAWINGS. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCIES TO THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. COMMENCEMENT OF WORK SHALL CONSTITUTE ACCEPTANCE OF

CONDITIONS.

B. THE ARCHITECTURAL DRAWINGS ARE PART OF A LARGER SET OF DRAWINGS WHICH, CONSISTS OF ALL DRAWINGS LISTED BY THE INDEX OF DRAWINGS. THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY THE WORK DESCRIBED ON DRAWINGS OF ANOTHER DISCIPLINE AND MAY REQUIRE REFERENCE TO DRAWINGS OF ANOTHER DISCIPLINE. PARTIAL SETS OF DRAWINGS ARE INCOMPLETE AND SHALL NOT BE DISTRIBUTED AND UTILIZED BY THE CONTRACTOR. IT IS THE CONTRACTOR’S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH THE REQUIREMENTS OF THE CONTRACT BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE

REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS.

C. THE SPECIFICATIONS AND ALL CONSULTANT DRAWINGS ARE SUPPLEMENTAL TO THE ARCHITECTURAL DRAWINGS. IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO COORDINATE WITH THE ARCHITECTURAL DRAWINGS BEFORE THE INSTALLATION OF ANY OF THE CONSULTANT’S WORK AND TO BRING ANY DISCREPANCIES OR CONFLICTS TO THE ARCHITECTS ATTENTION FOR CLARIFICATION.

D. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF VARIOUS TRADE ITEMS WITHIN THE SPACE ABOVE THE CEILINGS (INCLUDING BUT NOT LIMITED TO: STRUCTURAL MEMBERS AND FIRE PROOFING, MECHANICAL UNITS, DUCTS AND INSULATION, CONDUITS, RACEWAYS, SPRINKLER SYSTEMS, LIGHT FIXTURES, CEILING SYSTEMS, AND ANY SPECIAL STRUCTURAL SUPPORTS REQUIRED) AND SHALL BE RESPONSIBLE FOR MAINTAINING THE FINISH CEILING HEIGHT ABOVE THE FINISH FLOOR INDICATED IN THE DRAWINGS.

E. ACCESS PANELS, WHERE REQUIRED BY BUILDING CODE OR FOR THE PROPER OPERATION OR MAINTENANCE OF MECHANICAL OR ELECTRICAL EQUIPMENT, SHALL BE PROVIDED AND INSTALLED. CONTRACTOR SHALL COORDINATE SIZE, LOCATION AND TYPE OF ACCESS PANEL WITH OTHER CONTRACTOR’S WORK AND RECEIVE APPROVAL OF THE ARCHITECT PRIOR TO INSTALLATION.

F. WHERE INSTALLATION OF ONE PART OF THE WORK IS DEPENDENT ON INSTALLATION OF OTHER COMPONENTS, EITHER BEFORE OR AFTER ITS OWN INSTALLATION, CONTRACTOR SHALL SCHEDULE CONSTRUCTION ACTIVITIES IN THE SEQUENCE REQUIRED TO GET THE BEST

RESULT.

G. WHERE AVAILABILITY OF SPACE IS LIMITED, COORDINATE INSTALLATION OF DIFFERENT COMPONENTS TO ASSURE MAXIMUM ACCESSIBILITY

FOR REQUIRED MAINTENANCE, SERVICE OR REPAIR.

H. COMPLY WITH MANUFACTURER’S INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS TO THE EXTENT THAT THOSE INSTRUCTIONS AND RECOMMENDATIONS ARE MORE EXPLICIT OR STRINGENT THAN REQUIREMENTS CONTAINED WITHIN THE CONTRACT DOCUMENTS.

I. INSPECT MATERIALS OR EQUIPMENT IMMEDIATELY UPON DELIVERY AND AGAIN PRIOR TO INSTALLATION. REJECT DAMAGED AND DEFECTIVE

ITEMS.

J. RE-CHECK AND VERIFY MEASUREMENTS AND DIMENSIONS BEFORE EACH INSTALLATION.

K. PROVIDE ATTACHMENT AND CONNECTION DEVICES AND METHODS NECESSARY FOR SECURING THE WORK. SECURE WORK TO TRUE LINE

LEVEL. ALLOW FOR EXPANSION AND BUILDING MOVEMENT.

L. DURING HANDLING AND INSTALLATION, CLEAN AND PROTECT CONSTRUCTION IN PROGRESS AND ADJOINING MATERIALS IN PLACE. APPLY

PROTECTIVE COVERING WHERE REQUIRED TO ENSURE PROTECTION FROM DAMAGE OR DETERIORATION AT SUBSTANTIAL COMPLETION.

M. CLEAN AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .