Attachment 03 Aviary TPO Spec.docx
DOCX document 42 KB Posted
- Attached to
- USDA Forest Service Puerto Rico- Aviary Roofing Replacement and Photovoltaic System Installation
- Solicitation number
- 12445221R0010
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation package outlines requirements for a roof replacement and photovoltaic system installation project at the USDA Forest Service Aviary in Puerto Rico. The contractor shall be responsible for providing all labor, materials, equipment, safety precautions and transportation to complete the work. A pre-bid meeting will be held on April 7th, 2021 at the Iguaca Aviary. Questions must be submitted to the contracting officer by April 20th. Responses are due by April 29th. This is a 100% small business set aside fixed price construction contract between $250,000-$500,000. Davis Bacon wage rates apply. The contractor must provide performance and payment bonds and a bid bond.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 02.pdf | ||
| SF 30 Amendment 01.pdf | ||
| 1Bldg3 Membrane reference.jpg | JPG image | |
| PV PREBID ATTENDEES 040721.xlsx | XLSX spreadsheet | |
| A_B2_Roof.zip | ZIP file | |
| Amendment 01 Updated Attachment 05 DBC AVIARY PV SYSTEM.docx | DOCX document | |
| 2Bldg3 Membrane reference.jpg | JPG image | |
| Amendment 01- SF 30.pdf | ||
| Attachment 04 PV BESS Technical Specifications PSL 05 22.docx | DOCX document | |
| Attachment 00- Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment 01 Davis Bacon Wages.docx | DOCX document | |
| Attachment 02 STATEMENT OF WORK ROOFS AND PV SYSTEM.docx | DOCX document | |
| SF -1442 12445221R0010.pdf | ||
| Attachment 06 Aviary Bid Set.pdf | ||
| Solicitation Body 12445221R0010.docx | DOCX document | |
| Attachment 08 Experience Questionnaire.docx | DOCX document | |
| Attachment 05 DBC AVIARY PV SYSTEM.docx | DOCX document | |
| Attachment 07 Proposed solar array1.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 03
THERMOPLASTIC POLYOLEFIN (TPO) MEMBRANE ROOFING
PART 1 - GENERAL
| 1.1 |
| SECTION INCLUDES |
| A. |
| Adhered TPO membrane roofing system. |
| B. |
| Roof insulation. |
1.2
RELATED SECTIONS
| A. |
| Division 06 Section "Miscellaneous Rough Carpentry" for wood nailers, cants, curbs, and blocking. |
| B. |
| Division 07 Section "Sheet Metal Flashing and Trim" for metal roof penetration flashings, flashings, and counter flashings. |
| C. |
| Division 22 Section "Storm Drainage Piping Specialties" for roof drains. |
1.3
REFERENCES
A. Roofing Terminology: Refer to the following publications for definitions of roofing work related terms in this Section:
1. ASTM D 1079 “Standard Terminology Relating to Roofing and Waterproofing.”
2. Glossary of NRCA’s “The NRCA Roofing and Waterproofing Manual.”
3. Roof Consultants Institute “Glossary of Building Envelope Terms.”
B. Sheet Metal Terminology and Techniques: SMACNA “Architectural Sheet Metal Manual.”
1.4 DESIGN CRITERIA
A. General: Installed roofing membrane system shall remain watertight; and resist specified wind uplift pressures, thermally induced movement, and exposure to weather without failure.
B. Material Compatibility: Roofing materials shall be compatible with one another under conditions of service and application required, as demonstrated by roofing system manufacturer based on testing and field experience.
C. Installer shall comply with current code requirements based on authority having jurisdiction.
D. Wind Uplift Performance: Roofing system shall be identical to systems that have been successfully tested by a qualified testing and inspecting agency to resist wind uplift pressure calculated in accordance with ASCE 7.
| 1. Field-of-Roof Uplift Pressure: | -60.49 psf |
| 2. Perimeter Uplift Pressure: | -101.49 psf |
| 3. Corner Uplift Pressure: | -152.76 psf |
4. Assembly Basis of Design: Miami-Dade NOA
a. Listing/Report: NOA No. 18-0501.02 – Page 18 of 28
b. Maximum Design Pressure: -277.5 psf
E. Fire-Test-Response Characteristics: Provide roofing materials with the fire-test-response characteristics indicated as determined by testing identical products per test method below by UL, FMG, or another testing and inspecting agency acceptable to authorities having jurisdiction. Materials shall be identified with appropriate markings of applicable testing and inspecting agency.
1. Exterior Fire-Test Exposure: Class A; ASTM E 108, for application and roof slopes indicated.
1.5 SUBMITTALS
A. Product Data: Manufacturer’s data sheets for each product to be provided.
B. Detail Drawings: Provide roofing system plans, elevations, sections, details, and details of attachment to other Work, including:
1. Base flashings and membrane terminations.
2. Tapered insulation, including slopes.
3. Crickets, saddles, and tapered edge strips, including slopes.
4. Insulation adhesive patterns.
C. Verification Samples: Provide for each product specified.
D. Installer Certificates: Signed by roofing system manufacturer certifying that Installer is approved, authorized, or licensed by manufacturer to install roofing system.
E. Maintenance Data: Refer to Johns Manville’s latest published documents on www.JM.com.
F. Guarantees: Provide manufacturer’s current guarantee specimen.
G. Prior to beginning the work of this section, roofing sub-contractor shall provide a copy of the final System Assembly Letter issued by Johns Manville Roofing Systems indicating that the products and system to be installed shall be eligible to receive the specified manufacturer's guarantee when installed by a certified JM contractor in accordance with our application requirements, inspected and approved by a JM Technical Representative.
H. Prior to roofing system installation, roofing sub-contractor shall provide a copy of the Guarantee Application Confirmation document issued by Johns Manville Roofing Systems indicating that the project has been reviewed for eligibility to receive the specified guarantee and registered.
1.6 QUALITY ASSURANCE
A. Installer Qualifications: Qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive the specified manufacturer's guarantee.
Manufacturer Qualifications: Qualified manufacturer that has UL listing and Miami-Dade NOA or roofing system identical to that used for this Project.
B. Source Limitations: Obtain all components from the single source roofing manufacturer guaranteeing the roofing system. All products used in the system shall be labeled by the single source roofing manufacturer issuing the guarantee.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Deliver roofing materials in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, and directions for storage.
B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer.
C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation.
D. Handle and store roofing materials and place equipment in a manner to avoid permanent deflection of deck.
1.8 PROJECT CONDITIONS
A. Weather Limitations: Proceed with installation only when current and forecasted weather conditions permit roofing system to be installed in accordance with manufacturer's written instructions and guarantee requirements.
1.9 GUARANTEE
A. Provide manufacturer's system guarantee equal to Johns Manville's Peak Advantage No Dollar Limit Roofing System Guarantee.
1. Single-Source special guarantee includes roofing membrane, base flashings, roofing membrane accessories, roof insulation, fasteners, walkway products, manufacturer’s edge metal products, and other single-source components of roofing system marketed by the manufacturer.
2. Guarantee Period: 20 years from date of Substantial Completion.
B. Installer’s Guarantee: Submit roofing Installer's guarantee, including all components of roofing system for the following guarantee period:
Guarantee Period: Two years from date of Substantial Completion.
C. Existing Guarantees: Guarantees on existing building elements should not be affected by scope of work.
1. Installer is responsible for coordinating with building owner’s representative to verify compliance.
PART 2 - PRODUCTS
2.1 THERMOPLASTIC POLYOLEFIN ROOFING MEMBRANE - TPO
A. Fabric-Reinforced Thermoplastic Polyolefin Sheet: ASTM D 6878, uniform, flexible sheet formed from a thermoplastic polyolefin, internally fabric or scrim reinforced. Basis of Design: JM TPO FB 135
1. Fabric Fleece Backed Membrane (TPO: 80 mil; Fleece back: 55 mil)
2. Exposed Face Color: White 12445221R0010 USDA FS Puerto Rico Aviary Roof Replacement and PV System Installation
2.2
2.3 AUXILIARY ROOFING MATERIALS – SINGLE PLY
A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with membrane roofing.
1. Liquid-type auxiliary materials shall meet VOC limits of authorities having jurisdiction.
B. Sheet Flashing: Manufacturer's internally reinforced or scrim reinforced, smooth backed membrane with same thickness and color as sheet membrane. Basis of Design: JM TPO
C. Bonding Adhesive: Manufacturer's standard water-based bonding adhesive for base flashings. Basis of Design: JM TPO Water Based Membrane Adhesive
D. Urethane Adhesive: Manufacturer’s self-contained two-part, low-rise foam adhesive formulated to adhere fleece- backed membranes to substrate. Basis of Design: JM Two-Part Urethane Insulation Adhesive Canister
E. Metal Termination Bars: Manufacturer's standard predrilled stainless-steel or aluminum bars, with anchors. Basis of Design: JM Termination Systems
F. Fasteners: Factory-coated steel fasteners and metal or plastic plates meeting corrosion-resistance provisions in FMG 4470, designed for fastening membrane to substrate, and acceptable to membrane roofing system manufacturer. Basis of Design: All Purpose Fasteners and High Load Plates
G. Miscellaneous Accessories: Provide pourable sealers, primers, preformed cone and vent sheet flashings, preformed inside and outside corner sheet flashings, T-joint covers, cover strips, and other accessories required for full installation. Basis of Design: JM TPO Pourable Sealer A & B, JM TPO Pipe Boots, JM TPO Universal Corners, JM TPO Edge Sealant, JM TPO T-Joint Patch, JM TPO Membrane Cleaner, JM TPO Membrane Primer, JM TPO Membrane Primer (Low VOC), JM TPO Sealing Mastic, JM TPO Cover Tape, JM TPO Detail Membrane, JM TPO Peel & Stick 10" RPS, JM TPO Peel & Stick 6" RTS, JM TPO-Coated Metal, JM TPO Curb Flashing and JM Single Ply Caulk
2.4 WALKWAYS
A. Flexible Walkways: Factory-formed, nonporous, heavy-duty, slip-resisting, surface-textured walkway pads sourced from membrane roofing system manufacturer. Basis of Design: JM TPO Walkpad
2.5 ROOF INSULATION
A. General: Preformed roof insulation boards that comply with requirements and referenced standards, selected from manufacturer's standard sizes and of thicknesses indicated.
B. Polyisocyanurate Board Insulation: ASTM C 1289, Type II, Class 1, Grade 2 (20 psi), Basis of Design: ENRGY 3 Provide insulation package with minimum R-15 Value. Minimum total insulation thickness 2.5".
1. Provide insulation package in multiple layers.
2. Minimum Long-Term Thermal Resistance (LTTR): 5.7 per inch.
a. Determined in accordance with CAN/ULC S770 at 75ºF (24ºC)
2.6 TAPERED INSULATION
A. Tapered Insulation: ASTM C 1289, Type II, Class 1, Grade 2 (20 psi), provide factory-tapered insulation boards fabricated to slope of 1/4 inch per 12 inches (1:48), unless otherwise indicated. Basis of Design: Tapered ENRGY 3
2.7 INSULATION ACCESSORIES
A. General: Roof insulation accessories recommended by insulation manufacturer for intended use and compatible with membrane roofing.
B. Provide factory preformed saddles, crickets, tapered edge strips, and other insulation shapes where indicated for sloping to drain. Fabricate to slopes indicated. Basis of Design: Diamondback Pre-Cut Cricket, Diamondback Pre- Cut Miter, Tapered Fesco Edge Strip
C. Urethane Adhesive: Manufacturer’s two component polyurethane adhesive formulated to adhere insulation to substrate. Basis of Design: JM Two-Part Urethane Insulation Adhesive (UIA)
D. Wood Nailer Strips: Comply with requirements in Division 06 Section "Miscellaneous Rough Carpentry."
2.8 EDGE METAL COMPONENTS
A. Metal Edge System: Manufacturer’s factory fabricated metal edge system used to terminate the roof at the perimeter of the structure. Provide product from single-source roofing system supplier that is included in the No Dollar Limit guarantee. Basis of Design: JM TPO-Coated Metal
Coping System: Manufacturer’s factory fabricated coping consisting of a base piece and a snap-on cap. Provide product from single-source roofing system supplier that is included in the No Dollar Limit guarantee. Basis of Design: Presto-Lock Coping on sloped parapet.
B. Metal Flashing Sheet: Metal flashing sheet is specified in Division 07 Section "Sheet Metal Flashing and Trim."
PART 3 – EXECUTION
EXAMINATION
A. Examine substrates, areas, and conditions for compliance with the requirements affecting performance of roofing system.
1. General:
a. Verify that roof openings and penetrations are in place and set and braced and that roof drains are securely clamped in place.
b. Verify that wood cants, blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations and that nailers match thicknesses of insulation.
2. Concrete Decks:
a. Verify that concrete curing compounds that will impair adhesion of roofing components to roof deck have been removed.
b. Verify that concrete substrate is visibly dry and free of moisture.
3. Ensure general rigidity and proper slope for drainage.
4. Verify that deck is securely fastened with no projecting fasteners and with no adjacent units more than 1/16 inch (1.6 mm) out of plane relative to adjoining deck.
B. Unacceptable panels should be brought to the attention of the General Contractor and Project Owner’s Representative and shall be corrected prior to installation of roofing system.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Clean and remove from substrate sharp projections, dust, debris, moisture, and other substances detrimental to roofing installation in accordance with roofing system manufacturer's written instructions.
B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction.
C. If applicable, prime surface of deck with asphalt primer at a rate recommended by roofing manufacturer and allow primer to dry.
D. Proceed with installation only after unsatisfactory conditions have been corrected. Re-roof Preparation
E. Remove all roofing membrane, surfacing, cover boards, insulation, fasteners, asphalt, pitch, adhesives, etc.
1. Remove an area no larger than can be re-roofed in one day.
F. Tear out all base flashings, counter flashings, pitch pans, pipe flashings, vents and like components necessary for application of new membrane.
G. Remove abandoned equipment curbs, skylights, smoke hatches, and penetrations.
1. Install decking to match existing as directed by Owner's Representative.
H. Raise (disconnect by licensed craftsmen, if necessary) all HVAC units and other equipment supported by curbs to conform with the following:
1. Modify curbs as required to provide a minimum 8" base flashing height measured from the surface of the new membrane to the top of the flashing membrane.
2. Secure of flashing and install new metal counterflashing prior to re-installation of unit.
3. Perimeter nailers shall be elevated to match elevation of new roof insulation.
I. Immediately remove all debris from roof surface. Demolished roof system may not be stored on the roof surface.
J. Proceed with installation only after unsatisfactory conditions have been corrected.
3.3 INSULATION INSTALLATION
A. Coordinate installation of roof system components so insulation and cover board are not exposed to precipitation or left exposed at the end of the workday.
B. Comply with roofing system manufacturer's written instructions for installation of roof insulation and cover board.
C. Install tapered insulation under area of roofing to conform to slopes indicated.
D. Install insulation boards with long joints in a continuous straight line. Joints should be staggered between rows, abutting edges and ends per manufacturer’s written instructions. Fill gaps exceeding 1/4 inch (6 mm) with like material.
E. Install 2 or more layers with joints of each succeeding layer staggered from joints of previous layer a minimum of 6 inches (150 mm) in each direction.
F. Trim surface of insulation boards where necessary at roof drains so completed surface is flush and does not restrict flow of water.
G. Install tapered edge strips at perimeter edges of roof that do not terminate at vertical surfaces.
H. Adhered Insulation: Adhere each layer of insulation to substrate as follows:
1. Install each layer in a two-part urethane adhesive according to roofing system manufacturer’s instruction. Install each layer to resist uplift pressure at corners, perimeter, and field of roof.
I. Proceed with installation only after unsatisfactory conditions have been corrected.
3.4 ROOFING MEMBRANE INSTALLATION, GENERAL
A. Install roofing membrane in accordance with roofing system manufacturer's written instructions, applicable recommendations of the roofing manufacturer and requirements in this Section.
B. Cooperate with testing and inspecting agencies engaged or required to perform services for installing roofing system.
C. Coordinate installing roofing system so insulation and other components of the roofing membrane system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is imminent.
1. Provide tie-offs at end of each day's work to cover exposed roofing membrane sheets and insulation.
2. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system.
3. Remove and discard temporary seals before beginning work on adjoining roofing.
D. Proceed with installation only after unsatisfactory conditions have been corrected.
3.5 ADHERED ROOFING MEMBRANE INSTALLATION
A. Install roofing membrane over area to receive roofing in accordance with membrane roofing system manufacturer's written instructions.
1. Unroll roofing membrane and allow to relax before installing.
2. Install sheet in accordance with roofing system manufacturer’s written instructions.
B. Accurately align roofing membrane and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps.
C. Urethane Membrane Adhesive for fleece backed membranes: Apply Urethane Adhesive to substrate at rate required by manufacturer and install fleece-backed roofing membrane. Do not apply bonding adhesive to splice area of roofing membrane.
D. Mechanically fasten roofing membrane securely at terminations, penetrations, and perimeter of roofing.
E. Apply roofing membrane with side laps shingled with roof slope, where possible.
F. Seams: Clean seam areas, overlap roofing membrane, and hot-air weld side and end laps of roofing membrane according to manufacturer's written instructions to ensure a watertight seam installation.
1. Test lap edges with probe to verify seam weld continuity. Apply lap sealant to seal cut edges of roofing membrane.
2. Verify field strength of seams a minimum of twice daily and repair seam sample areas.
a. Remove and repair any unsatisfactory sections before proceeding with installation.
Repair tears, voids, and incorrectly lapped seams in roofing membrane that do not meet requirements.
G. Spread sealant or mastic bed over deck drain flange at deck drains and securely seal roofing membrane in place with clamping ring.
H. Install roofing membrane and auxiliary materials to tie in to existing roofing.
I. Proceed with installation only after unsatisfactory conditions have been corrected.
3.6 BASE FLASHING INSTALLATION
A. Install sheet flashings and preformed flashing accessories and adhere to substrates per membrane roofing system manufacturer's written instructions.
B. Apply water-based bonding adhesive in two sided application, at required rate, and allow to partially dry. Do not apply bonding adhesive to seam area of flashing.
C. Flash penetrations and field-formed inside and outside corners per manufacturer’s installation instructions.
D. Clean seam areas and overlap and firmly roll sheet flashings into the adhesive. Weld side and end laps to ensure a watertight seam installation.
E. Terminate and seal top of sheet flashings and mechanically anchor to substrate through termination bars.
F. Proceed with installation only after unsatisfactory conditions have been corrected.
3.7 WALKWAY INSTALLATION
A. Flexible Walkways: Install walkway products in locations indicated. Heat weld and adhere walkway products to substrate according to roofing system manufacturer's written instructions.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.8 FIELD QUALITY CONTROL
A. Final Roof Inspection: Arrange for roofing system manufacturer's Registered Roof Observer (RRO) to inspect roofing installation on completion and submit report to Contracting Officer’s Representative.
1. Notify Contracting Officer’s Representative 7 days in advance of date and time of inspection.
B. Repair or remove and replace components of roofing system where test results or inspections indicate that they do not comply with specified requirements.
C. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.
3.9 PROTECTION AND CLEANING
A. Protect roofing system from damage and wear during remainder of construction period.
B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements.
C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.
END OF SECTION
File details come from the government source that posted it. Updated .