This document provides an amendment to a solicitation for roof replacement and photovoltaic system installation services. The USDA Forest Service is seeking to replace roofs and install a 26kW photovoltaic system and 24kW battery energy storage system at the Jimenez Aviary in Puerto Rico. The amendment provides clarification on bonding requirements, attendance at a pre-bid meeting, existing engineering studies, certification requirements, the facility's power system, on-site generators, and the application of Buy American policies. Questions and answers are also included to address these project details. The response deadline remains April 29, 2021, with responses to be submitted electronically and hard copy bonding due prior to award. Davis-Bacon prevailing wage rates apply, and the opportunity is a 100% small business set-aside with an estimated value between $250,000 to $500,000.

View the file

Other files

File Type Posted
Amendment 02.pdf PDF
1Bldg3 Membrane reference.jpg JPG image
PV PREBID ATTENDEES 040721.xlsx XLSX spreadsheet
A_B2_Roof.zip ZIP file
Amendment 01 Updated Attachment 05 DBC AVIARY PV SYSTEM.docx DOCX document
2Bldg3 Membrane reference.jpg JPG image
Amendment 01- SF 30.pdf PDF
Attachment 04 PV BESS Technical Specifications PSL 05 22.docx DOCX document
Attachment 00- Schedule of Items.xlsx XLSX spreadsheet
Attachment 01 Davis Bacon Wages.docx DOCX document
Attachment 02 STATEMENT OF WORK ROOFS AND PV SYSTEM.docx DOCX document
SF -1442 12445221R0010.pdf PDF
Attachment 03 Aviary TPO Spec.docx DOCX document
Attachment 06 Aviary Bid Set.pdf PDF
Solicitation Body 12445221R0010.docx DOCX document
Attachment 08 Experience Questionnaire.docx DOCX document
Attachment 05 DBC AVIARY PV SYSTEM.docx DOCX document
Attachment 07 Proposed solar array1.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12445221R0010 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ATLANTA GA 30309-2449

STE 876S

1720 PEACHTREE ST NW

USDA-FS CSA EAST 12

04/09/20210001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/30/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Aviary Replace Roofs and Install Photovoltaic (PV) System on Jimenez, Rio Grande

Amendment 01 Incorporates the following in text below or included as attachment. Potential offerors are required to confirm receipt by submitting the SF-30 along with the proposal.

The response date has not been extended. All other solicitation terms and conditions remain unchanged.

1. Clarifications: Bid Bond is required at 100% of proposal response.

2. Attachment 05- Clarification of Magnitude: $250000 and $500000 is accurate.

3. Roof Photos have been uploaded to BETA-Sam. As a reference two additional photos labeled "Roof Membrane Reference" have been uploaded to BETA-Sam

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

TAKELE WOLDU

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12445221R0010/0001

4. A list of attendees present at the Pre-Bid

Meeting have been uploaded to the solicitation in the solicitation announcement in BETA-Sam.

Questions and Answers:

Question 1: Do you want a 26kW or 24kW system?

Answer 2: Per Attachment 04 PHOTO VOLTAIC AND

BATTERY ENERGY STORAGE SYSTEM

(PV + BESS) DESIGN SPECIFICATIONS, Page 6 Design and build a minimum 26 kW roof mounted photovoltaic system and 24 kW, 100 kWh

Lithium-ion Battery Energy Storage Systems (PV +

BESS).

Provide a 26 kW system, with a 24kW battery.

Question 2: What wind load should the system be designed to?

Answer 2: Per Attachment 04 PHOTO VOLTAIC AND

BATTERY ENERGY STORAGE SYSTEM

(PV + BESS) DESIGN SPECIFICATIONS, Page 6: The PV system shall be designed to withstand category 5 hurricane winds.

The structure and BESS will survive up to a Cat 5 hurricane, but the panels will be expected to be a loss.

Question 3: During a power grid outage, what is the order of powering up the facility?

Answer 3: Per Attachment 04 PHOTO VOLTAIC AND

BATTERY ENERGY STORAGE SYSTEM

(PV + BESS) DESIGN SPECIFICATIONS, Page 6:

Grid outage scenario: Integrate the PV + BESS with the existing 60 kW Generac emergency generator and automatic transfer switch (ATS).

Install a microgrid control system and modify the existing ATS as necessary to provide electricity to the building upon grid failure as follows:

Provide electricity from the PV + BESS until the

BESS is drained to 20% (20 kWh) remaining.

When the BESS is at 20% start the emergency generator to power the building and recharge the

BESS. When the BESS is 80% charged turn off the emergency generator and power building with the

PV + BESS until BESS is at 20%, then start the emergency generator again. Repeat this cycle

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12445221R0010/0001 until grid power is returned.

Question 4: Has the designer completed a solar study of the roof? If so, does the Contractor need to do one?

Answer 4: Per Attachment 04 PHOTO VOLTAIC AND

BATTERY ENERGY STORAGE SYSTEM

(PV + BESS) DESIGN SPECIFICATIONS, Page 6, Existing Feasibility Studies and Engineering

Studies Done by Others¿

The Contractor is responsible for ascertaining relevant site conditions to determine project feasibility and final PV + BESS design and installation according to the terms of this solicitation. If any existing engineering studies or facility conditions reports are provided through this solicitation from the site information package or agency representative, the bidder and Contractor shall independently verify all information provided.

Question 5: Attachment 04 PHOTO VOLTAIC AND

BATTERY ENERGY STORAGE SYSTEM (PV + BESS) DESIGN

SPECIFICATIONS, Page 9 requires one person be

NABCEP certified. Puerto Rico doesn't typically require this certification. Do you want to keep this requirement?

Answer 5: Yes.

Question 6: Is the complex power system entirely

120/240V, single phase power?

Answer 6 Yes.

Question 7: How many emergency generators (and what size) are on site?

Answer 7: There are two generators on site. Each was originally rated at 100 kW. Both have been modified to provide 120/240 V power and now each is capable of 60 kW. There is a manual switch to operate one at a time, to provide a rest period for each generator.

Question 8: Is there an existing underground conduit from the emergency generators to Building

1 and 2 that this project can use?

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12445221R0010/0001

Answer 8: An existing underground conduit is in place; however, it is full. This project should not require a new conduit from the emergency generator building to the BESS in Bldg 2.

Question 9: Can we climb up the ladders to inspect the existing roof conditions?

Answer 9: Unfortunately, it was raining during the pre-bid conference. The government determined the ladders were too slick to allow contractors to safely climb at that time. The government will provide photographs showing the existing Building 1 and 2 roofs. In addition, the government will provide photographs of the

Bldg 3 roof. Although Building 3 is not in the project scope, it has the specified roof in place. (PICTURES HAVE BEEN UPLOADED AS ATTACHMENTS

Question 10: Can we provide foreign manufactured components to reduce the project cost?

Answer 10: No. The Buy American Act will be strictly enforced.

End.