This document is a Performance Work Statement (PWS) for the Federal Aviation Administration's (FAA) requirement for aircraft maintenance services for their fleet of Bombardier Challenger 600 series aircraft.

The PWS outlines the scope of work, which includes scheduled and unscheduled maintenance, Aircraft on Ground (AOG) response, technical services, engineering support, and parts/tools rental for the airframe, engines, Auxiliary Power Unit (APU), and avionics. The Contractor must have a 14 CFR Part 145 Repair Station Certificate and access to OEM engineering support. The PWS details the program management requirements, quality control plan, phase-in/phase-out activities, and maintenance processes. It also specifies the maintenance induction, completion, and documentation requirements, as well as the airframe, engine, avionics, and engineering support needs. The Contractor must provide a monthly status report and invoice for services rendered.

View the file

Other files for this federal contract opportunity

Other files attached to Screening Information Request (SIR)/Request for Proposal (RFP): Challenger 600 Series Aircraft Maintenance Program, newest first.
File Type Posted
Questions and Answers - 01.28.2025.pdf PDF
6973GH-24-R-00226-0006.pdf PDF
Attachment 02 - PWS CL600 1-8-2025.pdf PDF
Attachment 01 - SCHEDULE B (CL600 MX) 1-13-2025.xlsx XLSX spreadsheet
6973GH-24-R-00226-0005.pdf PDF
Questions and Answers - 1.15.2025.pdf PDF
6973GH-24-R-00226-0004.pdf PDF
6973GH-24-R-00226-0003.pdf PDF
6973GH-24-R-00226-0002.pdf PDF
6973GH-24-R-00226-0001.pdf PDF
Attachment 01 SCHEDULE B (CL600 MX).xlsx XLSX spreadsheet
6973GH-24-R-00226.pdf PDF
Attachment 03 - CDRLs (CL600 MX).pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Flight Program Operations (AJF)

Bombardier Challenger 600 Series Aircraft Maintenance Programs

Performance Work Statement (PWS)

AUG 2024

FAA Flight Program Operations – CL600 Maintenance Page 2 of 10

TABLE OF CONTENTS

1. INTRODUCTION

2. SCOPE OF WORK

3. PROGRAM MANAGEMENT SUPPORT

3.1 Program Management

3.2 Quality Control Plan (QCP)

3.3 Phase In/Phase Out

4. General Contract Maintenance Processes

4.1 Scheduled Maintenance

4.2 Unscheduled Maintenance

4.3 Aircraft on Ground (AOG)

4.4 Over and Above (O&A)

5. Maintenance Induction, Completion Processes AND Documentation

5.1 Aircraft Induction

5.2 Aircraft Replacement Components and Documentation

5.3 Aircraft Maintenance Completion Events

5.4 Aircraft Inspection and Maintenance Documents

6. Airframe Maintenance Requirements

7. Engine Maintenance Requirements

7.1 General Engine Maintenance

7.2 Engine Overhaul

7.3 Engine Documentation

7.4 Auxiliary Power Units

8. Avionics

9. Engineering Support

10. Invoicing AND MONTHLY STATUS REPORT

11. Acronyms

12. Appendices

FAA Flight Program Operations – CL600 Maintenance Page 3 of 10

1. INTRODUCTION

The Federal Aviation Administration (FAA) Flight Program Operations (AJF) owns and operates a fleet of nine (9) Bombardier Challenger aircraft (three CL601 and six CL605) that are powered by General Electric (GE) CF34‐3A1 and CF34‐3B engines. The FAA plans to remove Challenger 601 aircraft from the fleet by the end of 2025, but may require full support for CL601 aircraft pending mission requirements.

The FAA requires contract aircraft maintenance services to support the FAA Challenger fleet. The Contractor must meet all applicable regulations to provide maintenance services in accordance with (IAW) Title 14 of the Code of Federal Regulations (14 CFR) Part 135. The Contractor must perform all covered work by following Flight Program Operations’ FAA approved General Maintenance Manual (GMM) and FAA approved Continuous Airworthiness Maintenance Program (CAMP). The goal of this effort is to provide the FAA with streamlined ordering procedures for future requirements. Thereby, improving maintenance support response times.

The FAA Challenger aircraft are primarily based out of FAA Mike Monroney Aeronautical Center (MMAC) located at Will Rogers World International Airport in Oklahoma City Airport (KOKC). However, these aircraft operate worldwide and require domestic and international maintenance support.

2. SCOPE OF WORK

FAA Flight Program Operations requires a single contract for Bombardier Challenger 600 series for aircraft maintenance services. The requirements include scheduled maintenance, unscheduled maintenance, Aircraft on Ground (AOG) response, technical services, engineering support, and parts/tools rental. These services are required to address airframe, CF34‐3A1 engines, CF34‐3B engines, Auxiliary Power Unit (APU), and avionics.

Requirements include options to lease or purchase engines and APUs as required. The response time for services is critical to return FAA owned aircraft to airworthy and mission capable condition in a timely manner. The availability of aircraft is critical to meet the mission requirements. All maintenance requested under this contract must be supported by the Contractor.

The Contractor or any subcontractor performing work under this section must possess a 14 CFR Part 145 Repair Station Certificate and associated Operations Specifications listing the appropriate ratings and limitations and have access to the original equipment manufacturer (OEM) engineering support or an OEM approved repair facility.

3. PROGRAM MANAGEMENT SUPPORT

3.1 Program Management

The Contractor must provide program management direction to ensure task(s) are performed efficiently, accurately, on time, and in compliance with the requirements. The Contractor must assign a Program Manager (PM) to serve as the primary contact for the Contracting Officer (CO) and Contracting Officer’s Representative (COR) and must participate as a member of a government-led team in scheduling and planning efforts for the FAA Challenger 600 Series fleet.

The PM must conduct a post award conference (CDRL A001) with the FAA, to review the Performance Work Statement (PWS) requirements to ensure a successful transition for full performance.

The FAA will conduct meetings with the Contractor representatives to coordinate maintenance, overhaul efforts, and other reviews as needed to resolve issues for regular planning and scheduling efforts intervals. The Contractor must provide support meeting minutes (CDRL A002) to document technical agreements and issues.

The Contractor will hold an annual program management review (PMR) meeting (CDRL A003) with Contractor representatives to review the previous year’s efforts and coordinate upcoming maintenance, planning, and program management efforts. The PMR location will be at MMAC or by video conference as determined by the FAA.

Contractor program management travel to support program meetings and routine site visits shall be included in the program management contract line-item number (CLIN). Additional travel costs may be requested for program management support whereby the CO determines that the travel was not anticipated at award. When unanticipated travel is granted, program management travel costs will be IAW FAA Acquisition Management System (AMS) policies.

FAA Flight Program Operations – CL600 Maintenance Page 4 of 10

3.2 Quality Control Plan (QCP)

The Contractor must provide Quality Control Plan (CDRL A004) for program management and the performance of all maintenance on the FAA Flight Program aircraft, and other requirements detailed in this PWS at proposal. The QCP must identify and describe how the Contractor intends to maintain full compliance with all requirements of this contract. The negotiated QCP will become an attachment to the PWS and will be used to evaluate performance.

Personnel must possess the required qualifications under 14 CFR, as well as the necessary skills and training to effectively accomplish the requirements. The skills must include technical support for all applicable aircraft maintenance tasks, engine and airframe troubleshooting, parts support required for airframe and engine maintenance/inspection, field support for airframe and engine repairs, engine change, and accounting support for invoicing. Personnel must maintain a current FAA Airframe and Powerplant Certificate 14 CFR part 145 and proof of the OEM aircraft familiarization (FAM) certified training throughout the life of the contract.

Continuous monitoring of technicians and work in progress to ensure technical data is being followed, and ensuring all work is completed in accordance with the Flight Program Operations’ 14 CFR Part 135 FAA approved CAMP, applicable 14 CFR parts, and in a safe and thorough manner.

Competently performing complete records research of Airworthiness Directives (AD) and Service Bulletins (SB), and Maintenance Alert Directives (MAD) as well as preparing proper documentation of compliance in permanent aircraft logbook.

Ensuring each Contractor employee working on this contract is drug and alcohol free as set forth in Title 14

CFR Part 120. The FAA Guidance for random drug and alcohol testing that implements this CFR is IAW the Department of Transportation (DOT) Office of Drug & Alcohol Policy & Compliance that requires mandatory drug testing of each employee who performs a safety-sensitive function.

Continuously maintaining a 14 CFR Part 145 Repair Station Certificate and associated Operations

Specifications listing the appropriate ratings and limitations with access to OEM engineering support. This applies to all subcontractors utilized in maintenance activities.

Establishing and maintaining agreements, throughout the life of the contract, with the OEMs and subcontractors that allow the Contractor to obtain the approved data and technical support necessary to maintain the Challenger 600 series aircraft airframes, engines, accessories, and systems to ensure the FAA airworthiness certification is not compromised. The Contractor must ensure mission capability and departure reliability requirements are not impacted as a result of the inability to obtain data or support from the OEMs. The Contractor must ensure subcontractors comply with all FAA, quality assurance, safety, and contractual requirements.

3.3 Phase In/Phase Out

3.3.1 Phase-In Transition Plan and Execution

The Contractor must provide a Phase-In Transition Plan to coordinate with the government. The Contractor must provide a draft Phase-In Transition Plan with the proposal and a final Phase-In Transition Plan no later than five (5) business days after contract award. The final Phase-In Transition Plan must be approved by the CO and incorporated into the contract. All transition activities must be completed no later than thirty (30) calendar days after contract award. A successful and orderly phase-in will be documented in Contractor Performance Assessment Reporting System (CPARS).

3.3.2 Phase-Out Transition Plan

The Contractor must provide a Phase-Out Transition Plan within ninety (90) calendar days after contract award. The Contractor must not disrupt or adversely impact the provision of services and must achieve a smooth and orderly transfer of responsibility to the successor. The Contractor must execute the phase-out activities in accordance with the Phase-Out Transition Plan.

FAA Flight Program Operations – CL600 Maintenance Page 5 of 10

4. GENERAL CONTRACT MAINTENANCE PROCESSES

4.1 Scheduled Maintenance

Scheduled maintenance is repetitively performed in intervals in accordance with the maintenance program as described in the remainder of this section of this document.

The Contractor must have approved tooling, equipment, parts, and material to perform scheduled maintenance inspections in accordance with FAA approved CAMP.

The Contractor must provide available dates and manpower, to include technicians, for requested scheduled maintenance inspections within seven (7) calendar days of the request. The FAA will submit a request for scheduled maintenance within at least sixty (60) calendar days prior to the required induction date.

All maintenance inspections, repairs or alterations must be documented IAW Flight Program Operations FAA approved CAMP.

All scheduled maintenance inspection down times will be agreed upon by the Contractor and FAA, based on the work scope requirements prior to the induction date of the scheduled inspection. Inspections will be performed as required by scheduled periodicity of Time Limited Work (TLW) for the Challenger aircraft maintenance checks. Up to fifteen (15) calendar days is the standard performance period unless a discrepancy is found that drives a longer return to service date. Additional unscheduled maintenance or over and above may cause this schedule to be extended. The Contractor must provide this information to the COR and CO to negotiate a longer period of performance.

At the completion of each maintenance event, the Contractor must clean the inside and outside of the aircraft. This includes washing the aircraft to maintain appearance and condition equal to the condition of the aircraft when first delivered to the Contractor for services.

4.2 Unscheduled Maintenance

Unscheduled Maintenance is non-routine maintenance requirements that are not in OEM directed intervals, as described in section 4.1. Unscheduled maintenance, for the purposes of this contract, is any maintenance that is not described in section 4.1 Scheduled Maintenance, 4.3 Aircraft on the Ground (AOG) or 4.4 Over and Above Support (O&A) of this document. Unscheduled maintenance must be fixed priced prior to induction, unless approved by the Contracting Officer. When possible, the FAA will combine as many scheduled and unscheduled maintenance efforts to reduce aircraft downtime.

Unscheduled maintenance includes, but is not limited to, service bulletins, Air Worthiness Directives, and modifications to the aircraft. When practical, the FAA will submit requests for unscheduled maintenance within sixty

(60) days of the required induction date. If unscheduled maintenance is not combined with a scheduled maintenance event, then the Contractor must provide available options for induction dates and locations for requested unscheduled maintenance inspections within seven (7) calendar days of the request. Additional unscheduled maintenance events may be added at any time before induction with CO approval or while the aircraft is in maintenance if practical and may decrease aircraft downtime.

As required, the Contractor must support service bulletins issued by the aircraft manufacturer while the FAA operates the aircraft.

4.3 Aircraft on Ground (AOG)

AOG items cover pilot in-flight, pre and post flight discrepancies. These activities are not a part of the scheduled maintenance. The Contractor must provide AOG maintenance, logistical, troubleshooting and parts sourcing support 24 hours/day, 7 days/week, including holidays. The Contractor will be responsible for performing aircraft repairs remotely or at their facility as required. Contractor must have the ability to provide AOG support throughout the United States and worldwide. Due to the AOG nature, the Contractor must complete all repairs within 48 hours of notice to proceed, or within 24 hours of a negotiated return to service (RTS).

FAA Flight Program Operations – CL600 Maintenance Page 6 of 10

The Contractor must provide Mobile Repair Team (MRT) services when aircraft cannot be relocated and if local support services are not available. When required the aircraft may be flown to the Contractor’s facility under Minimum Equipment List (MEL) or a Special Flight Permit for repair. Repair service shall commence within 24 hours of aircraft arrival/delivery.

The CO will request a proposal, based on AOG work, to include a fixed price and induction schedule. When possible, the FAA will combine as many scheduled and unscheduled maintenance efforts to reduce aircraft downtime. AOG work will not commence until the work package has been approved in writing by the CO or the COR, as the designated representative of the CO.

The Contractor will be required to perform a return to service release in accordance with FAA Flight Program Operations FAA approved CAMP.

4.4 Over and Above (O&A)

O&A support is any non-routine discrepancy that is found during a maintenance event on the aircraft other than AOG. The Contractor is required to provide maintenance services, parts, and support tasks associated with O&A.

Either the FAA or the Contractor may initiate an O&A action depending on the circumstances. All non-routine discrepancies that need to be corrected must be submitted promptly to the COR for approval prior to commencement of work. Any pilot reported discrepancy upon induction of a scheduled maintenance event would be considered non-routine and should be treated as O&A.

When it is determined that O&A work is required, the Contractor must provide a proposal with a detailed estimated cost immediately, but no later than 24 hours after identified. The estimated cost must include labor hours, labor hour rates, materials, fees, and any other identified costs. All O&A work requests must identify all pertinent information (e.g., aircraft system, engine serial number, part numbers, tool, rental fee). Support documentation must include how the Contractor calculated materials or other rates, not documented in the contract to justify proposed cost as fair and reasonable. Documented catalog pricing or competitive pricing are generally considered acceptable means to find pricing reasonable. The Contractor must coordinate the materials, labor hours, and scope of work with the FAA Quality Assurance Representative (QAR). Once the QAR agrees with the proposed O&A requirement, the CO and/or COR will ensure sufficient funding is available on the O&A CLIN and the proposed pricing is fair and reasonable. When this process has been followed, the CO may provide approval to the Contractor by issuing a Notice to Proceed (NTP). Billing for O&A must match actual work performed which must be in compliance with the NTP.

5. MAINTENANCE INDUCTION, COMPLETION PROCESSES AND DOCUMENTATION

5.1 Aircraft Induction

The FAA will provide a work order for each requirement prior to scheduled and unscheduled inductions. Upon the arrival of the aircraft, before any work commences, the Contractor and the FAA QAR must inspect the aircraft exterior and interior to confirm the configuration and condition of the aircraft. However, a FAA QAR may not be available for an initial AOG inspection. All irregularities should be documented, and a copy must be provided to the COR. When aircraft maintenance is to be performed, an inventory of loose equipment must be completed and the property must be stored in a secure location as Government Property (GP). All GP must be returned with the aircraft upon completion of the repair work.

Any repair or non-routine discrepancy tasks shall be completed prior to release of the aircraft for flight. A post-maintenance inspection will be performed by the QAR for all scheduled and unscheduled maintenance to ensure airworthiness, inspect for damage, and verify completeness.

All maintenance inspections, repairs or alterations must be documented in accordance with FAA approved CAMP.

5.2 Aircraft Replacement Components and Documentation

The Contractor must provide a written statement of warranty for the work performed for the FAA. The warranty statement must identify what components are covered under warranty and the warranty duration.

Time controlled parts are parts where time has expired and must be replaced with new or overhauled parts. When time controlled parts have failed, but time has not expired, they may be repaired and used on FAA aircraft provided the part(s) have sufficient life to achieve its next major scheduled event where access to such part(s) is permitted.

FAA Flight Program Operations – CL600 Maintenance Page 7 of 10

Replacement component(s) must meet the following requirements unless approved by the Maintenance Director:

Components offered as “New” must:

Have zero (0) hours and zero (0) cycles in service since time of manufacture, and the internal components must have (0) hours and zero (0) cycles in service since time of manufacture.

Have documentation that provides full traceability of parts and assemblies, along with documentation to establish proper certification for type design in accordance with the Challenger 600 series illustrated parts catalog or FAA approved CAMP.

Have documentation that identifies major sub-components that are required to be tracked in accordance with the OEM manuals. Documentation must identify part number and serial number.

Components offered as “Repaired/Overhauled/Serviceable” must:

Be restored by an FAA-approved 14 CFR Part 145 repair station in accordance with the OEM manual requirements.

Be restored in the last five (5) years and have zero (0) time and zero (0) cycles in service since time of restoration.

Have FAA form 8130-3, Airworthiness Approval Form.

Documentation for all life-limited subassemblies must include part number and serial number.

Consumable components must:

Have proper acceptable documentation in accordance with the FAA approved CAMP.

5.3 Aircraft Maintenance Completion Events

At the completion of each work order, the Contractor must ensure the aircraft maintenance logs (AML) are properly completed in accordance with FAA approved CAMP. The QAR will coordinate with the Contractor to close out work orders to complete maintenance events and will confirm AMLs are properly completed.

At the completion of each scheduled or other FAA requested maintenance event, the Contractor must clean the inside and outside of the aircraft. This includes washing the aircraft to maintain appearance and condition equal to the condition of the aircraft when first delivered to the Contractor for services.

The Contractor must provide a Final Work Order Completion Report (CDRL A005), and the return to service must be in accordance with FAA approved CAMP.

5.4 Aircraft Inspection and Maintenance Documents

The FAA will conduct a receiving inspection on all aircraft after maintenance IAW FAA approved CAMP. Any parts received in a damaged condition or without proper certification documentation will be recorded and identified to the Contractor for resolution and mitigation from future occurrences.

6. AIRFRAME MAINTENANCE REQUIREMENTS

The Contractor will be responsible for performing aircraft scheduled maintenance inspections at Contractor facilities, as required. Scheduled maintenance and inspections on the Challenger 600 Series will include preventive maintenance, hourly inspections, and special inspections required by the manufacturer, corrosion control, overhaul and/or replacement of components, and modifications to aircraft systems. Historically, the aircraft has flown an average of 580 hours/yr.

FAA Flight Program Operations – CL600 Maintenance Page 8 of 10

7. ENGINE MAINTENANCE REQUIREMENTS

7.1 General Engine Maintenance

The Contractor will be required to perform inspections, maintenance, hot section inspections, engine trend monitoring (CDRL A007) and overhauls on approximately eight (8) GE CF-34-3A1 and twelve (12) CF-34-3B engines and must use OEM authorized facilities. The Contractor may be required to provide spare engines for rent and/or option for purchase to minimize aircraft downtime. The Contractor will be required to perform TLW Scheduled Engine Maintenance Checks as applicable. The FAA will provide engine configuration and maintenance data upon the Contractor’s request. The data provided will be from the FAA tracking system and/or from the engine logbooks.

Maintenance and inspections on the Challenger 600 series engine will include but are not limited to the following:

Preventive maintenance Hourly inspections Special inspections required by the manufacturer Corrosion control Overhaul and/or replacement of components Modifications to aircraft system

Each engine part removed by the Contractor not reinstalled, replaced, or exchanged by the Contractor is property of the FAA. These parts must be labeled “FAA Property,” with the part number, component serial number, cause for removal, and serviceability. These parts must be returned to the FAA with a shipping document that lists each part and quantity. Parts may be disposed in place if consumable or otherwise directed for Contractor disposal.

7.2 Engine Overhaul

The Contractor must provide GE CF-34-3A1, and CF34-3B engine overhaul maintenances services consisting of teardowns, evaluations, and inspections. Engine overhaul services must provide coverage for the cost of all maintenance including parts, labor, engine removal and install, and other tasks as described in this PWS. The Contractor must also provide for the removal, packing, transportation (e.g., shipping), and re-installation of the engine(s) to include engine approved shipping containers.

The Contractor must provide an engine teardown and evaluation report (CDRL A006) prior to an engine overhaul.

After receipt of the teardown and evaluation report, the price of the overhaul will be negotiated and finalized with the CO. Engine overhaul must not begin until authorized by the CO.

A copy of the maintenance service report must be a part of the recertification documents (8130-3) packet and provided to the FAA QAR when the overhaul is complete.

7.3 Engine Documentation

Upon completion of engine inspection, maintenance and repair, the Contractor must provide all certification documentation and a final work order completion report (CDRL A005) which must include details of inspections performed, maintenance performed, components repaired or replaced, and problem areas corrected. The Contractor must enter in the engine logbooks all FAA airworthiness directives, manufacturers’ service bulletins or other modifications, and all other significant maintenance actions accomplished. The Contractor must indicate in the engine logbooks the nomenclature, part number, location, total time, and total cycles, accumulated for all replacement life limited parts (LLP) installed. Any LLP parts that are repaired, reworked, or modified that extend or reduce life will be identified with new limits in the historical records.

7.4 Auxiliary Power Units

The Contractor will be responsible for periodic Inspections, maintenance, and overhaul on GTCP36-150RJ and GTCP36-150CL APUs to include parts and labor (eg.: Hot Section Inspections (HSI)). APU maintenance must be accomplished by an approved Service Center and includes gaining access to removal and replacement of APUs and Line Replaceable Units (LRUs). A spare APU may be requested for lease and/or purchase to minimize aircraft downtime.

APUs are an on-condition removal item and are only removed due to failure or when the performance deteriorates below an acceptable limit. The Contractor will provide insurance, transportation and repair logistic expenses related to on-site maintenance activities, such as mobile repair units, personnel and equipment charges, and all expenses related thereto, incident to the repair, exchange, or loan of APU.

FAA Flight Program Operations – CL600 Maintenance Page 9 of 10

As required, the Contractor will be responsible for APU Alert and Recommended Service Bulletins. All parts and labor for APU Alert and Recommended Service Bulletins will be accomplished in conjunction with other covered maintenance and in accordance with the instructions of the Service Bulletin.

8. AVIONICS

The Contractor must provide OEM Authorized Service Facility or contractually approved vendor support for aircraft avionics preventative maintenance, modifications, repairs and troubleshooting support during maintenance events.

This includes access to approved tooling, equipment, parts, material, and experienced technicians required for the repair of avionics systems on the Challenger 600 series aircraft.

9. ENGINEERING SUPPORT

The Contractor is responsible to provide engineering support for maintenance discrepancies to include aircraft, engine, and avionics support. Engineering support responsibilities includes technical support for modifications, structural and electrical repairs.

10. INVOICING AND MONTHLY STATUS REPORT

The Contractor must submit an invoice for the services and approved O&A actions within thirty (30) calendars days of any maintenance activities being completed along with a Monthly Status Report (MSR). Each invoice must be numbered in Contractor format and include the contract and task order number. The invoice must detail the work being billed for each CLIN. The invoice must be accompanied by the MSR (CDRL A008) with appropriate supporting documentation and financial information to match the invoice. The CO or COR may request additional supporting information as required.

FAA Flight Program Operations – CL600 Maintenance Page 10 of 10

11. ACRONYMS

AJF Flight Program Operations AML Aircraft Maintenance Logs AMS Acquisition Management System AOG Aircraft on Ground CAMP Continuous Airworthiness Maintenance Program CFR Code of Federal Regulations CLIN Contract Line-Item Number CO Contracting Officer COR Contracting Officer’s Representative CPARS Contractor Performance Assessment Reporting System DOT Department of Transportation FAA Federal Aviation Administration FAM Familiarization GP Government Property IAW In accordance with KOKC Will Roger World International Airport in Oklahoma City Airport LLP Life Limited Part MEL Minimum Equipment MRL Material Requirement Listing MRT Mobile Repair Time MSP Maintenance Service Plan MSR Monthly Status Report NTE Not to Exceed NTP Notice to Proceed O&A Over and Above OEM Original Equipment Manufacturer PM Program Manager PMR Program Management Review PWS Performance Work Statement QAR FAA Quality Assurance Representative QCP Quality Control Plan RTS Return to Service SB Service Bulletins TLW Time Limited Work

12. APPENDICES

Appendix A – Contractor Negotiated QCP (to be added at award)

1. INTRODUCTION
2. SCOPE OF WORK
3. PROGRAM MANAGEMENT SUPPORT
3.1 Program Management
3.2 Quality Control Plan (QCP)
3.3 Phase In/Phase Out
3.3.1 Phase-In Transition Plan and Execution
3.3.2 Phase-Out Transition Plan
4. General Contract Maintenance Processes
4.1 Scheduled Maintenance
4.2 Unscheduled Maintenance
4.3 Aircraft on Ground (AOG)
4.4 Over and Above (O&A)
5. Maintenance Induction, Completion Processes AND Documentation
5.1 Aircraft Induction
5.2 Aircraft Replacement Components and Documentation
5.3 Aircraft Maintenance Completion Events
5.4 Aircraft Inspection and Maintenance Documents
6. Airframe Maintenance Requirements
7. Engine Maintenance Requirements
7.1 General Engine Maintenance
7.2 Engine Overhaul
7.3 Engine Documentation
7.4 Auxiliary Power Units
8. Avionics
9. Engineering Support
10. Invoicing AND MONTHLY STATUS REPORT
11. Acronyms
12. Appendices

File details come from the government source that posted it. Updated .