Attachment 01 - Drawings Plumbing 672-CSI-124 - Part III of VI - 6 Pages.pdf

PDF 4 MB Posted

Attached to
Z2DA--Construct New Hybrid Operating Room
Solicitation number
36C24825R0026
Issued by

About this file

These are architectural and engineering plumbing drawings for a hybrid operating room renovation project at a VA healthcare facility. The six-page document includes detailed plans for plumbing demolition, renovation, and medical gas system modifications across the basement and first floor. Key elements include removing existing plumbing fixtures, medical gas outlets, and piping, and installing new plumbing connections, zone valves, and medical gas systems. The drawings specify precise technical details such as pipe sizing, support requirements, water hammer arrestor specifications, and medical gas outlet configurations. The project involves coordinating complex medical infrastructure upgrades while maintaining existing system integrity, with specific attention to VA design manuals, building codes, and healthcare facility standards.

View the file

Other files

File Type Posted
S06 - Amendment 0001 Attachment - Site Visit sign-in sheet 4-21-2025 - 36C24825R0026 BB 672-CSI-124 Hybrid OR.pdf PDF
36C24825R0026 0001 RFIs responses and Site Visit Roster.docx DOCX document
S06 - Amendment 0001 Attachment - 02 82 11 Abatement FINAL - 1 page.pdf PDF
S06 - Amendment 0001 Attachment - Specification 10 44 13 - 2 pages.pdf PDF
S06 - Amendment 0001 Attachment - Specification 01 42 19 - 9 pages.pdf PDF
S06 - Amendment 0001 Attachment - AQ-100 Arch PR VA Hybrid OR 100 Percent Final S-S - 1 page.pdf PDF
S06 - Amendment 0001 Attachment - Rigging Plan - 1 Page.pdf PDF
Attachment 01 - Drawings Fire Alarm 672-CSI-124 - Part VI of VI - 3 Pages.pdf PDF
Attachment 01 - Drawings General and Architectural 672-CSI-124 - Part I of VI - 23 Pages.pdf PDF
Attachment 02 - Specifications 672-CSI-124 - Part 2 of 2 - 1026 Pages.pdf PDF
Attachment 02 - Specifications 672-CSI-124 - Part 1 of 2 - 577 Pages.pdf PDF
Attachment 01 - Drawings Fire Protection 672-CSI-124 - Part II of VI - 3 Pages.pdf PDF
Attachment 06 - Letter of Commitment Key Subcontractors - 1 Page.pdf PDF
Attachment 08 - Subcontractor Past Performance Consent Form - 2 Pages.docx DOCX document
Attachment 03 - Contractor Safety and EMR - 2 Pages.docx DOCX document
Attachment 05 - Specialized Experience Form - 3 Pages.pdf PDF
Attachment 07 - Past Performance Questionnaire - 4 Pages.pdf PDF
Attachment 04 - Key Personnel Resume Form Sample - 1 Page.pdf PDF
Attachment 01 - Drawings Mechanical 672-CSI-124 - Part IV of VI - 4 Pages.pdf PDF
Attachment 01 - Drawings Electrical 672-CSI-124 - Part V of VI - 15 Pages.pdf PDF
36C24825R0026 - BB 672-CSI-124 Hybrid OR.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive

Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994

MES Group, Inc.

550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group

COA # 8304

PLUMBING NOTES AND

LEGEND

NS TH

FLOOR SINK

PIPE UP

PIPE DOWN

GCOOR

HOSE BIB

OR VTR VENT THRU ROOF

- EQUIPMENT MARK

POINT OF NEW CONNECTION

DRAWING KEYNOTEX

FLOOR DRAIN

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

GATE VALVE

PLUG VALVE

STRAINER

UNION

PRESSURE RELIEF VALVE

WCO WALL CLEAN OUT

FCO FLOOR CLEAN OUT (1-WAY OR 2-WAY)

WCO

OR

CW COLD WATER PIPING

HW HOT WATER PIPING

HWR HOT WATER RECIRCULATION PIPING

SAN SANITARY PIPING

(E)CW EXISTING COLD WATER

(E)HWR EXISTING HOT WATER RETURN

(E)HW EXISTING HOT WATER PIPING

EXISTING PIPING TO BE REMOVED

(E)SAN EXISTING SANITARY PIPING

V SANITARY VENT PIPING

INVERT ELEVATIONIE

PRV

BACKFLOW PREVENTER

LIMIT OF DEMOLITION

GRADE CLEAN OUT (1-WAY OR 2-WAY)

PLUMBING LEGEND

PLUMBING ABBREVIATIONS

(E) EXISTING

AFF ABOVE FINISHED FLOOR

BFF BELOW FINISHED FLOOR

CO PIPE CLEAN OUT

CTE CONNECT TO EXISTING

CP CIRCULATOR PUMP

CW COLD WATER

DEMO DEMOLISH OR DEMOLITION

DFU DRAINAGE FIXTURE UNITS

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXIST EXISTING

FBC FLORIDA BUILDING CODE

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FS FLOOR SINK

G GAS

GCO GRADE CLEAN OUT

GPM GALLONS PER MINUTE

GR GREASE

GWH GAS WATER HEATER

HB HOSE BIB

HD HUB DRAIN

HW HOT WATER

HWR HOT WATER RETURN

IB ICE MAKER OUTLET BOX

IBC INTERNATIONAL BUILDING CODE

IE INVERT ELEVATION

LAV LAVATORY

MS MOP SINK

NC NORMALLY CLOSED

NG NATURAL GAS

NO NORMALLY OPEN

OD OVERFLOW ROOF DRAIN

OSD OVERFLOW (SECONDARY) STORM WATER DRAIN

PSD PRIMARY STORM WATER DRAIN

RD ROOF DRAIN

S SINK

SAN SANITARY

SH SHOWER

SP SUMP PUMP

TWH TANKLESS WATER HEATER

UR URINAL

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEAN OUT

WH WALL HYDRANT

WSFU WATER SUPPLY FIXTURE UNITS

1. REVIEW PLANS OF ALL TRADES PRIOR TO BIDDING AND BEGINNING WORK. INSTALLATIONS ARE TO INCLUDE ALL

PLUMBING FOR COMPLETE SYSTEMS SHOWN ON THE PLANS AND AS REQUIRED.

2. COORDINATE WITH OTHER TRADES TO PREVENT INTERFERENCE WITH HVAC DUCTS, STRUCTURE, ELECTRICAL, LIGHTING, AND OTHER PIPING IN THE CEILING SPACE. VENT PIPING AND WATER PIPING SHALL BE HELD EITHER

ABOVE OR BELOW HVAC DUCTWORK, AS COORDINATED WITH THE HVAC CONTRACTOR.

3. ALL CHANGES SHALL BE REVIEWED BY THE ARCHITECT.

4. COORDINATE WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING-IN PLUMBING FIXTURES AND EQUIPMENT

SUPPLIES.

5. THE PLUMBING SUBCONTRACTOR SHALL FURNISH AND INSTALL ALL PLUMBING FIXTURES, UNLESS NOTED

OTHERWISE.

6. VERIFY MOUNTING HEIGHT AND WATER CONNECTION SIZES OF ALL PLUMBING FIXTURES PRIOR TO ROUGH-IN.

FURNISH CUT-OUT TEMPLATES, FOR PLUMBING FIXTURES TO BE INSTALLED IN MILLWORK, TO THE GENERAL

CONTRACTOR.

7. MAKE PROPER HOT AND COLD WATER, WASTE AND VENT PIPING CONNECTIONS TO ALL FIXTURES AND EQUIPMENT

EVEN THOUGH ALL FITTINGS AND CONNECTIONS ARE NOT SHOWN ON DRAWINGS.

8. VERIFY LOCATION OF EXISTING WATER SERVICE AND THE LOCATION/INVERTS OF SANITARY PIPING PRIOR TO

INSTALLATION.

9. CUT AND PATCH CONCRETE AS REQUIRED.

10. IT IS NOT THE INTENT OF THESE DRAWINGS TO COVER ALL WORK AND MATERIAL. ANY EQUIPMENT, PLUMBING FIXTURE, TRIM HARDWARE AND/OR DEVICES USUALLY UTILIZED IN THE CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THESE DRAWINGS, BUT WHICH MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK (AS DETERMINED BY THE ARCHITECT) SHALL BE FURNISHED AND

INSTALLED BY THE CONTRACTOR AS PART OF HIS TOTAL WORK.

11. THE EQUIPMENT ROUGH-IN ITEMS AND THEIR DIMENSIONED LOCATIONS FOR ALL CONNECTIONS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE. IN SOME INSTANCES THE OWNER OR SUPPLIER MAY MAKE SUBSTITUTIONS OR EQUIPMENT ITEMS MAY VARY FROM WHAT IS SHOWN. THEREFORE, THESE ITEMS AND DIMENSIONS SHALL BE VERIFIED WITH THE EQUIPMENT SUPPLIER, OWNER AND/OR EQUIPMENT ROUGH-IN DRAWING. FAILURE OF THE APPROPRIATE CONTRACTOR TO VERIFY ROUGH-INS OR THEIR LOCATIONS SHALL PLACE THE RESPONSIBILITY FOR ANY SUBSEQUENT RELOCATION AND/OR ADDITIONAL ROUGH-INS DIRECTLY UPON THAT CONTRACTOR.

12. CONTRACTOR SHALL SUPPLY TO THE ARCHITECT/ENGINEER THE REQUIRED COPIES OF SHOP DRAWINGS FOR APPROVAL SO THE QUALITY OF INTENDED MATERIALS OR EQUIPMENT CAN BE REVIEWED BEFORE INSTALLATION.

THERE WILL BE NO INSTALLATION UNTIL SHOP DRAWINGS HAVE BEEN SUBMITTED AND REVIEWED BY THE

ARCHITECT/ENGINEER.

13. DO NOT SCALE THIS DRAWING. REFER TO ARCHITECTURAL FLOOR PLAN FOR BUILDING DIMENSIONS.

14. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT NECESSARILY SHOW ALL ELBOWS, OFFSETS, UNIONS, VALVES, FITTINGS, ETC. REQUIRED TO COMPLETE THE INSTALLATION OF THE WORK. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE CONTRACTOR HAS FAMILIARIZED HIMSELF WITH THE PLANS AND BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF THEY COULD HAVE BEEN FORESEEN HAD PROPER

EXAMINATION BEEN MADE.

15. VERIFY SERVICE POINTS AND METERING LOCATIONS FOR PROJECTS WITH LOCAL UTILITIES AND/OR LANDLORD

(DOMESTIC WATER, SANITARY SEWER, GAS, ETC.).

16. THE CONTRACTOR SHALL COOPERATE FULLY AMONG ALL TRADES.

17. ALL ROOF PENETRATIONS FOR ROOF DRAINS AND PLUMBING, GAS, AND REFRIGERANT PIPING SHALL BE MADE IN ACCORDANCE WITH ROOF SYSTEM MANUFACTURER'S GUIDELINES. COORDINATE WITH ARCHITECTURAL DETAILS

AND/OR MANUFACTURER FOR ROOF SYSTEM USED.

18. ALL PLUMBING VENTS IN EXTERIOR WALLS SHALL BE OFFSET A MINIMUM OF 3'-0" BEFORE ROOF PENETRATION.

19. INSTALL 1" INSULATION WITH ALL-SERVICE JACKET ON ALL ROOF LEADERS ABOVE CEILING.

20. THE WATER PIPING SYSTEM SHALL BE FLUSHED AND STERILIZED IN ACCORDANCE WITH LOCAL REGULATIONS.

21. HOT AND COLD WATER SUPPLY BRANCHES FOR ALL SYSTEMS HAVING QUICK CLOSING VALVES OF ANY TYPE SHALL HAVE WATER HAMMER ARRESTORS INSTALLED AT THE HIGH POINT ON THE END OF EACH BRANCH AND AS

REQUIRED.

22. ALL PIPES HANGING FROM SINGLE VERTICAL RODS / HANGERS SHALL NOT MOVE OR SWAY DURING OPERATION.

SUITABLE LATERAL SUPPORTS OR BRACING SHALL BE USED TO PREVENT SWAY OR MOVEMENT.

23. PROVIDE SHUTOFF BALL VALVES AND DIELECTRIC UNIONS FOR ALL EQUIPMENT HOT AND COLD WATER LINES.

PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO EQUIPMENT. COORDINATE WITH EQUIPMENT

SUPPLIER FOR EXACT REQUIREMENTS.

24. VERIFY MOUNTING HEIGHTS OF ALL BARRIER FREE FIXTURES WITH ARCHITECTURAL PLANS.

25. PROVIDE COPPER INDIRECT WASTE PIPING REQUIRED FROM EQUIPMENT TO FLOOR DRAINS, OPEN RECEPTACLES, OR FLOOR SINKS. PIPING SHALL COMPLY WITH STATE AND LOCAL CODES. COORDINATE WITH ALL EQUIPMENT SUPPLIERS AND SIZES AS REQUIRED BY PIECE OF EQUIPMENT SERVED. HOLD PIPING TIGHT TO WALL WHERE APPLICABLE. PROPERLY SECURE AS REQUIRED. COORDINATE WITH CASEWORK SUPPLIER FOR MAXIMUM

CLEARANCE UNDER CABINETS.

26. PROVIDE CHROME PLATED ESCUTCHEONS AT ALL WALL PENETRATIONS.

27. INSTALL STORM AND CONDENSATE PIPING WITH MINIMUM SLOPE OF 1/8" PER FOOT. INSTALL SANITARY PIPING LESS THAN 3" AT 1/4" PER FOOT, 3" TO 6" AT 1/8" PER FOOT, AND 8" AND GREATER AT 1/16" PER FOOT. CONTRACTOR

IS RESPONSIBLE FOR PROPER DRAINAGE OF ALL SYSTEMS.

28. ALL FLOOR DRAINS ARE TO BE PROVIDED WITH MINIMUM 3" DRAIN LINES, DEEP SEAL TRAPS, AND AUTOMATIC TRAP PRIMERS. TRAP PRIMERS SHALL BE LOCATED IN A SERVICEABLE LOCATION AND INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. HOLD TOP OF FLOOR DRAINS FLUSH WITH FINISHED FLOOR; SEE

ARCHITECTURAL SHEETS FOR FLOOR SLOPES AND PROPER FINISHED FLOOR ELEVATION.

29. ALL VENT PIPE TO BE COMPATIBLE WITH STRUCTURE, MECHANICAL EQUIPMENT, DUCTWORK, ELECTRICAL EQUIPMENT, AND LIGHTING. ALL VTR'S SHALL BE EXTENDED TO A MINIMUM OF 2" ABOVE PARAPET HEIGHT AND

MAINTAINED 10'-0" MINIMUM FROM ALL OUTSIDE AIR INTAKES.

30. MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SHALL MEET ALL PERTINENT REQUIREMENTS OF NATIONALLY RECOGNIZED TESTING ORGANIZATIONS SUCH AS UL, ASTM, ASSE, AWWE, AGA AND NFPA AS WELL AS THE MOST

CURRENT ADOPTED VERSION OF THE STATE AND LOCAL CODES.

31. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE. REPLACE ANY AND ALL CONTRACTOR SUPPLIED DEFECTIVE DEVICES, ITEMS, OR SYSTEMS AT CONTRACTOR'S EXPENSE, BEFORE

COMPLETION OF PROJECT.

32. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO NOT CHANGE THE SCOPE OR NATURE OF WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE OWNER. NO OTHER CHANGES MAY BE MADE WITHOUT WRITTEN PERMISSION FROM THE ENGINEER.

33. ALL EQUIPMENT, FIXTURES AND MATERIALS SHALL BE NEW AND UNUSED, AND INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S RECOMMENDATIONS (UNLESS OTHERWISE NOTED). PROVIDE COMPLETE WITH ALL TRIM, STOPS, HANGERS, CARRIERS, SUPPORTS, ETC., INCLUDING PROVISIONS FOR BARRIER FREE USE, IF REQUIRED. WHERE FIXTURES ARE ACCESSIBLE THEY MUST COMPLY WITH ALL FEDERAL A.D.A. REGULATIONS.

34. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED, FIELD ERECTED, ALL FACTORY ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED, AND ALL WORK IN CONNECTION WITH INSTALLATION OF MANUFACTURER'S GUARANTEED EQUIPMENT.

THE CONTRACTOR'S GUARANTEE SHALL LAST ONE YEAR FROM THE FINAL OWNER ACCEPTANCE OF THE WORK

AND SHALL APPLY TO ALL DEFECTS IN MATERIALS AND WORKMANSHIP OF ANY KIND.

35. ALL FAUCET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND NOT REQUIRE TIGHTGRASPING.

36. ALL BARRIER FREE WATER CLOSET CONTROLS SHALL BE LOCATED ON UNIT TOWARDS WIDE SIDE OF STALL.

VERIFY IF RIGHT OR LEFT SIDE LOCATION.

PLUMBING NOTES GENERAL NOTES

1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE

PROVIDED (FURNISHED AND INSTALLED) UNDER THIS CONTRACT. DRAWINGS

SHOULD NOT BE SCALED.

2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING CONDITIONS UNDER

WHICH THEY SHALL OPERATE AND VERIFY THE EXTENT OF WORK REQUIRED TO

COMPLETE THE WORK UNDER THIS CONTRACT.

3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE RESPONSIBILITY

OF THE CONTRACTOR TO EXAMINE THE PHYSICAL CONDITIONS AT THE PROJECT

SITE AND VERIFY SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR

INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES, AND TO

DETERMINE ANY NECESSARY MODIFICATIONS.

4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND

LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY

HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE ENGINEERING

DOCUMENTS AND CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.

5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE

REQUIREMENTS:

· INTERNATIONAL BUILDING CODE (IBC) 2020

· INTERNATIONAL EXISTING BUILDING CODE 2020

· IBC MECHANICAL 2020

· IBC PLUMBING 2020

· IBC ENERGY CONSERVATION 2020

· NFPA 1-2018, THE UNIFORM FIRE CODE

· NFPA 101-2018, THE LIFE SAFETY CODE

· NFPA 51B-2014, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING

AND OTHER HOT WORK

· NFPA 13-2016, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

· NFPA 70-2017, NATIONAL ELECTRICAL CODE

· NFPA 90A-2018, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND

VENTING SYSTEMS.

· NFPA 99-2018, STANDARD FOR HEALTH CARE FACILITIES

· NFPA 241-2013, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION

AND DEMOLITION OPERATIONS.

· VA MECHANICAL DESIGN MANUAL, LATEST EDITION

· VA PLUMBING DESIGN MANUAL, LATEST EDITION

· VA FIRE PROTECTION DESIGN MANUAL, LATEST EDITION

· ALL OTHER APPLICABLE VA DESIGN MANUALS

6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND

CONSTRUCTION WORK.

7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR INSTALLATION OF

WORK UNDER THIS CONTRACT. DISMANTLE AND REASSEMBLE EQUIPMENT AS

NECESSARY FOR ENTRY INTO THE BUILDING AND THE LOCATION OF INSTALLATION.

8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL

UPDATE THIS SCHEDULE WEEKLY. ANY CHANGES SHALL BE NOTED AND AN

UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.

9. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS,

CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES

WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L. REQUIREMENTS TO MAINTAIN

THE ASSEMBLY RATING.

10. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE

AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND

SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL TIMES DURING

CONSTRUCTION.

11. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.

12. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT SUBMITTALS

FOR ALL PRODUCTS USED ON PROJECT.

13. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE

CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE REQUIREMENTS OF

CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED WRITTEN

APPROVAL FROM THE ENGINEER TO THE SPECIFIC DEVIATION. THE ENGINEER'S

APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF

RESPONSIBILITY FOR ERRORS OR OMISSIONS IN HIS OR HER SUBMITTAL DATA.

14. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS IN

THREE RING BINDERS AT SUBSTANTIAL COMPLETION. MANUALS SHALL INCLUDE

INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS,

CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS

DATA, ETC. PROVIDE AN INDEX AND ASSOCIATED DIVIDERS.

15. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF

CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT

CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE

ALL CONTRACT CHANGES, MODIFICATIONS, AND CLARIFICATIONS. THIS SET ALONG

WITH ALL SHOP DRAWINGS SHALL BE TURNED OVER TO THE ARCHITECT/ENGINEER

AFTER CONSTRUCTION COMPLETION.

16. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND

UNDERSTAND ALL CONSTRUCTION DOCUMENTS. THIS INCLUDES BUT IS NOT LIMITED

TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE SCHEMATIC

IN NATURE. THEREFORE BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL

REVIEW ALL OTHER CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND

SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE

OWNER. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE

ATTENTION OF THE ARCHITECT/ENGINEER. THE BASE BID SHALL REFLECT THE

TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT

AND MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED WITHOUT WRITTEN

CONSENT AND APPROVAL FROM ENGINEER AND ARCHITECT.

P000

PLUMBING FIXTURE SCHEDULE

FIXTURE

MARK FIXTURE DESCRIPTION

ROUGH-IN PIPE SIZES WATER FIXTURE UNITS

MAKE MODEL

COLD

WATER

SUPPLY

HOT

WATER

SUPPLY

FIXTURE

TRAP

FIXTURE

DRAIN

COLD

WATER

HOT

WATER DRAINAGE

P-519

DOUBLE SCRUB SINK - SENSOR

FAUCET, PROVIDE T&P

THERMOSTATIC MIXING VALVE

1/2" 1/2" 1 1/2" 2" 6 6 4 - -

23 JAN 2504/03/2024

CONTROL

ROOM CLOSET

FILES

CONTROL

CYSTOSCOPY ROOM

ROOM

A-164

STORAGE

TOILET

RADIOGRAPHIC

PROCEDURES

TECHNICAL

CLERICAL

AREA

STORAGE

A-168

TOILET

EXAM

ROOM

A-173

CARDIAC.

ROOM

CYSTOSCOPY

A-167

ROOM

A-168

SUPERVISOR

OFFICE

A-169 A-170

A-171

EXAM

ROOM

A-172

EXAM

ROOM

A-158a

STO.

ROOMROOM

EXAM EXAM

H.A.C.

A-171

A-172b

TOILET

A-

2a

LO

C

K R

M

B-117 B-115

B-114ELEC.

CLOS.

MALE LOCKERS

SIGNAL

CLOS. FEMALE LOCKERS

PHYSICIAN'S

LOCKERS

C O R R I D O R C1-8

1 1

(E)3" SAN. UP

(E)3" SAN.

UP

(E)3" SAN. UP

(E)4" SAN.

UP. & DN.

(E)3" SAN. DN

(E)3" SAN. UP

(E)2" V

(E)2" V

(E )2

" H W

(E )3

" C W

(E)3/4" HW

(E)2" CW

(E)3/4" HW

(E)2" CW

(E)3" CW

(E)2" HW

(E)3" CW.

DN

(E)2" HW.

DN

(E)3/4" HW.

UP

(E)2" CW.

UP

(E )6

"Ø

(E)5"Ø

(E )4

"Ø

(E )4

"Ø

(E )4

"Ø U

P C

.O

C .O

C .O

U P

C .O

(E)2"Ø

C .O

C.O.

C .O

(E)2"Ø

UP

3"Ø UP

(E)2"Ø UP

(E)3"Ø UP

(E)2"Ø UP

(E )2

"Ø U

P

(E)3"Ø UP

C .O

(E)3"Ø UP

(E )4

"Ø

(E)2"Ø UP

(E)2½"Ø

UP

(E )4

"Ø

(E)2½"Ø

UP

C.O.

(E)8"Ø DN.

(E )4

"Ø

(E)2½"Ø

UP

(E )3

/4 "Ø

(E)2"Ø UP

(E )4

"Ø

(E)3"Ø(E)3"Ø

(E)2"Ø UP

C.O.

(E)4"Ø

UP

(E)3"Ø

(E)3"Ø

(E )1

½ "Ø

UP

(E )4

"Ø (E

)3 "Ø

(E )2

"Ø

(E)10"Ø UP

(E )1

½ "Ø

(E )2

"Ø U

P

(E )2

½ "Ø

(E )2

"Ø U

P

C.O.

C .O

(E)2"Ø

(E )3

"Ø

U P

(E )2

"Ø U

P

(E )3

"Ø U

P

1½"Ø

(E)3"Ø

(E)3"Ø UP

(E)4"Ø(E)3"Ø

(E)2"Ø UP

(E)2"Ø

(E)1½"Ø

(E)5/8"Ø

(E )5

/8 "Ø

(E)1"Ø

U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive

Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994

MES Group, Inc.

550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group

COA # 8304

PLUMBING DEMOLITION PLAN

CB TH

KEYNOTES

1. REMOVE EXISTING PLUMBING FIXTURE AND ASSOCIATED CW, HW, SAN,

AND VENT PIPING. CAP SANITARY, DOMESTIC WATER, AND VENT PIPING

BACK TO MAIN AND CAP.

2. EXISTING PIPING IN CEILING TO REMAIN.

3. CAP EXISTING SANITARY PIPING FOR CONNECTION OF NEW FIXTURE.

X

PD100

GENERAL NOTES

A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A

MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE

REQUIREMENTS WITH THE COR.

B. EXISTING EQUIPMENT, PIPE ROUTING, AND ASSOCIATED COMPONENTS

SHOWN ON DRAWINGS ARE APPROXIMATE LOCATIONS BASED ON

RECORD DRAWINGS AND ARE PROVIDED FOR REFERENCE USE ONLY.

FIELD VERIFY AND COORDINATE WITH EXACT LOCATIONS, ELEVATIONS,

SIZES AND CONDITIONS OF EXISTING COMPONENTS.

C. ALL OPENINGS CREATED BY DEMOLITION OF EXISTING DUCTWORK OR

PIPING SHALL BE PATCHED WITH LIKE MATERIALS AND TO MAINTAIN

EXISTING FIRE RESISTIVE BARRIERS.

WAITING AREA

ROOM CLOSET

FILES

CONTROL

CYSTOSCOPY ROOM

ROOM

A-164

STORAGE

TOILET

RADIOGRAPHIC

PROCEDURES

TECHNICAL

CLERICAL

AREA

STORAGE

A-168

TOILET

EXAM

ROOM

A-173

C O R R I D O R

OFFICE

BUDGET

A-160

CARDIAC.

ROOM

A-158

OFFICE

A-159

PHYSICS

MEDICAL

A-158

ROOM

CONTROL

CYSTOSCOPY

A-167

ROOM

A-168

SUPERVISOR

OFFICE

A-169 A-170

A-171

EXAM

ROOM

A-172

EXAM

ROOM

A-158a

STO.

ROOMROOM

EXAM EXAM

H.A.C.

A-171

A-172b

TOILET

LOUNGE STAFF RM.

A-

2a

LO

C

K R

M

A-172 ECOCARDIO-

GRAPHY RM.

B-117 B-115

B-114

C O

R R

I D

O R

ELEC.

CLOS.

MALE LOCKERS

SIGNAL

CLOS. FEMALE LOCKERS

PHYSICIAN'S

LOCKERS

C O R R I D O R C1-8

(E)MEDICAL GAS

OUTLET BOX

(E)MEDICAL GAS

OUTLET BOX

(E)MEDICAL GAS

OUTLET BOX

(E)3/4" MA

(E)3/4" O (E)3/4" V

(E)3/4" MA

(E)1 1/4" O (E)1 1/4" V

(E)MEDICAL GAS

OUTLET BOX

MEDICAL GAS

OUTLET BOX

(E)OXYGEN

ZONE VALVE

(E)1/2" O (E)1" V

(E)3/4" O (E)1 1/2" V

(E)1/2" O (E)1" V

(E)3/4" V

(E)1/2" MA

(E)1/2" O

(E)1 3/8" V

(E)7/8" MA

(E)7/8" O

U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive

Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994

MES Group, Inc.

550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group

COA # 8304

MEDICAL GAS DEMOLITION

PLAN

CB TH

KEYNOTES

1. REMOVE EXISTING MEDICAL GAS OUTLET BOX AND MEDICAL GAS

PIPING AS INDICATED. CAP EXISTING PIPING AT MAIN.

2. REMOVE EXISTING ZONE VALVES. REMOVE EXISTING V AND O PIPING

BACK TO MAIN IN BASEMENT AND CAP.

3. EXISTING MEDICAL GAS PIPING TO REMAIN.

X

PD101

GENERAL NOTES

A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A

MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE

REQUIREMENTS WITH THE COR.

B. EXISTING EQUIPMENT, PIPE ROUTING, AND ASSOCIATED COMPONENTS

SHOWN ON DRAWINGS ARE APPROXIMATE LOCATIONS BASED ON

RECORD DRAWINGS AND ARE PROVIDED FOR REFERENCE USE ONLY.

FIELD VERIFY AND COORDINATE WITH EXACT LOCATIONS, ELEVATIONS,

SIZES AND CONDITIONS OF EXISTING COMPONENTS.

C. ALL OPENINGS CREATED BY DEMOLITION OF EXISTING DUCTWORK OR

PIPING SHALL BE PATCHED WITH LIKE MATERIALS AND TO MAINTAIN

ROOM

CLOSET

FILES

RADIOGRAPHIC

OFFICE

BUDGET

A-160

CARDIAC.

ROOM

A-158

A-

8a

ST

O

H.A.C.

A-171

A-172b

TOILET

A-172

B-117 B-115

B-114

LOUNGE STAFF RM.

A-172a

LOCK RM.

ELEC.

CLOS.

MALE LOCKERS

SIGNAL

CLOS. FEMALE LOCKERS

PHYSICIAN'S

LOCKERS

DN.DN.

C O R R I D O R C1-8

HYBRID

OPERATING

ROOM

CONTROL

ROOM

SCRUB STN.

IMAGING

COMPONENT

ROOM

STERILE

SUPPLY

GURNEY

8.8

9.8

CBA

NO WORK IN THIS ROOM

NO WORK IN

THIS ROOM

NO WORK

IN THIS

ROOM

P-519

(E)4" SAN.

UP.

(E)3" SAN. UP

(E )2

" H W

(E )3

" C W

(E)3/4" HW

(E)2" CW

(E)3" CW

(E)2" HW

(E)3" CW.

DN

(E)3/4" HW.

UP

(E)2" CW.

UP

(E)2" V

(E )C

.O

C .O

(E )C

.O

(E)C.O.

(E )4

"V

(E )4

"Ø (E

)3 "Ø

(E )3

"V

(E)C.O.

(E)3" SAN. UP

(E)3" SAN.

UP

(E)3" SAN.

UP

(E)2" HW.

DN

3" CW

2" HW

3" C

W

2" H

W

1/ 2"

C W

1/ 2"

H W

2" CW

2" HW

(E)2" HW.

UP

(E)2" CW.

UP

4" SAN.

DN. 4

U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive

Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994

MES Group, Inc.

550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group

COA # 8304

PLUMBING RENOVATION PLAN

NS TH

PL100

KEYNOTES

1. CONNECT NEW CW AND HW PIPING TO EXISTING PIPING ABOVE CEILING.

VERIFY SIZE AND LOCATION IN FIELD.

2. CONNECT TO CAPPED EXISTING 2" WASTE IN BASEMENT. VERIFY SIZE

AND LOCATION IN FIELD.

3. CONNECT TO EXISTING 2" V ABOVE CEILING. VERIFY SIZE AND LOCATION

IN FIELD.

4. REROUTE EXISTING SANITARY DOWN TO BASEMENT WITHIN CHASE.

VERIFY SIZE AND LOCATION IN FIELD.

X

GENERAL NOTES

A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A

MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE

REQUIREMENTS WITH THE COR.

B. EXISTING EQUIPMENT, PIPE ROUTING, AND ASSOCIATED COMPONENTS

SHOWN ON DRAWINGS ARE APPROXIMATE LOCATIONS BASED ON

RECORD DRAWINGS AND ARE PROVIDED FOR REFERENCE USE ONLY.

FIELD VERIFY AND COORDINATE WITH EXACT LOCATIONS, ELEVATIONS,

SIZES AND CONDITIONS OF EXISTING COMPONENTS.

C. ALL OPENINGS CREATED BY DEMOLITION OF EXISTING DUCTWORK OR

PIPING SHALL BE PATCHED WITH LIKE MATERIALS AND TO MAINTAIN

ROOM FILES

OFFICE

BUDGET

A-160

CARDIAC.

ROOM

A-158

A-

8a

ST

O

H.A.C.

A-171

A-172b

TOILET

B-117 B-115

B-114

LOUNGE STAFF RM.

A-172a

LOCK RM.

ELEC.

CLOS.

MALE LOCKERS CLOS. FEMALE LOCKERS

PHYSICIAN'S

LOCKERS

DN.DN.

C O R R I D O R C1-8

HYBRID

OPERATING

ROOM

CONTROL

ROOM

SCRUB STN.

IMAGING

COMPONENT

ROOM

STERILE

SUPPLY

GURNEY

8.8

9.8

CBA

NO WORK IN THIS ROOM

NO WORK IN

THIS ROOM

NO WORK

IN THIS

ROOM

(E)3/4" V

(E)1/2" MA

(E)1/2" O

(E)1 3/8" V

(E)7/8" MA

(E)7/8" O

1/2" N

1/2" NO

1/2" CO2

3/4" O

1/2" MA

1 1/2" V

P P P P P P

1/2" MA

3/4" O 1 1/2" V

1/2" NO

1/2" N

1/2"CO2

B-130

B-132d

B-129

C L

E A

N

S U

P L

Y

S

T A

F F

W

O

K

A

E A

385.47n.s.f.

410.47n.s.f.

OPERATING ROOM

GENERAL

CARDIC/NEUROLOGY

OPERATING ROOM

FACILITIES

SCRUB-UP

(E) N UP

(E) NO UP

(E) CO2 UP

(E) O UP

(E) MA UP

(E) V UP

1/2" N

1/2" NO

1/2" CO2

3/4" O

1/2" MA

1 1/2" V

(E) 1" MA

(E) 2" O

(E) 2" V

(E) 3/4" NO

(E) 1 1/2" N

(E) 1" CO2

(E) 1 1/2" O

U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive

Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994

MES Group, Inc.

550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group

COA # 8304

MEDICAL GAS RENOVATION

PLAN

NS TH

MG100

KEYNOTES

1. FURNISH AND INSTALL MEDICAL GAS ZONE VALVES. COORDINATE FINAL

LOCATION IN FIELD.

2. FURNISH AND INSTALL MEDICAL GAS ALARM PANEL. COORDINATE FINAL

LOCATION IN FIELD.

3. ROUTE A, V, O, N, NO, AND CO2 PIPING TO CEILING SYSTEM MANIFOLD

CONNECTION. THE CEILING SYSTEM IS COMPRISED OF PRE-PIPED

MEDICAL GAS TO ALL OF THE CEILING BOOMS. REFER TO SPECIFICATION

FOR ADDITIONAL INFORMATION.

4. EXISTING A, V, O, N, NO, CO2 PIPING LOCATED IN BASEMENT AT COLUMN

LINE 13. PROVIDE CONNECTIONS TO PIPING AS REQUIRED. VERIFY

LOCATION AND SIZES IN FIELD.

5. COORDINATE WAGD REQUIREMENTS WITH LOCAL STATION.

6. MEDICAL GAS OUTLETS. COORDINATE LOCATION AND QUANTITY WITH

END USER.

7. NEW O, V, MA, N, CO2, AND NO PIPES UP FROM BASEMENT TO ZONE

VALVES.

8. FURNISH AND INSTALL MEDICAL GAS GRADE FULL PORT BALL VALVES

LOCKED OPEN.

9. PROVIDE NEW PRESSURE SWITCHES ON A, V, O, N, NO, CO2 PIPING.

10. NEW O, V, MA, N, CO2, AND NO PIPES UP TO CEILING SPACE ABOVE.

X

GENERAL NOTES

A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A

MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE

REQUIREMENTS WITH THE COR.

B. EXISTING EQUIPMENT, PIPE ROUTING, AND ASSOCIATED COMPONENTS

SHOWN ON DRAWINGS ARE APPROXIMATE LOCATIONS BASED ON

RECORD DRAWINGS AND ARE PROVIDED FOR REFERENCE USE ONLY.

FIELD VERIFY AND COORDINATE WITH EXACT LOCATIONS, ELEVATIONS,

SIZES AND CONDITIONS OF EXISTING COMPONENTS.

C. ALL OPENINGS CREATED BY DEMOLITION OF EXISTING DUCTWORK OR

PIPING SHALL BE PATCHED WITH LIKE MATERIALS AND TO MAINTAIN

EXISTING FIRE RESISTIVE BARRIERS.

MEDICAL GAS PIPE SIZING

GAS TYPE NUMBER OF

CONNECTIONS

TOTAL FLOW

RATE PIPE SIZEFLOW RATE PER

CONNECTION

OXYGEN

NITROGEN

VACUUM

MEDICAL AIR

CARBON

DIOXIDE

NITROUS

OXIDE

6 SCFM

3.5 SCFM

3 SCFM

3.5 SCFM

3.5 SCFM

3.5 SCFM

12 SCFM

3.5 SCFM

21 SCFM

3.5 SCFM

3.5 SCFM

3.5 SCFM

3/4"

1/2"

1 1/2"

1/2"

1/2"

1/2"

NOTES:

1. REQUIRED FLOW RATE PER CONNECTION PER NFPA 99.

2. PIPE SIZING PER ASPE VOLUME 3.

3. NUMBER OF CONNECTIONS PER VA SURGICAL AND ENDOVASCULAR SERVICE

DESIGN GUIDE.

U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive

Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994

MES Group, Inc.

550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group

COA # 8304

PLUMBING DETAILS

NS TH

P500

- TYPE "L" COPPER PIPE 1-1/4" OR SMALLER

SUPPORT MAXIMUM EVERY 6 FT.

- SCHEDULE 40 BLACK STEEL PIPE SUPPORT

MAXIMUM EVERY 12 FT.

3/8" ALL THREAD HANGER

ROD CUT TO LENGTH

ADJUSTABLE SWIVEL

PIPE HANGER RING

11 1/2"

9 3/4"

4 1/2"

13/16"

1/4"-18 NPTF

(GAS SERVICE

CONNECTION

N.O.

N.C.

C

A

1 9/32"

2 9/16"

COMMON

B

3 1/4"

CLOSED-CIRCUIT ALARM SYSTEM USE

OPEN-CIRCUIT ALARM SYSTEM USE

CONTACTS A AND B

CONTACTS B AND C

1 5/16"

7/32"DIA.

MOUNTING

HOLE

(TYP.)

7/8"DIA.HOLE

(CONDUIT CONNECTION

1 3/8"

1/2"

JUNCTION BOX

4 5/8"

CONDUIT &

CONNECTORS MAXIMUM 12"

11/16"

13 1/2"

(343MM)

(114MM)

4 1/2"

9"

(229MM) 9/16"

(14MM) 1 5/8"

(41MM)

1/2" (13MM) MIN.TO

1" (25MM)MAX.

PLASTER

THICKNESS

ADJUSTMENT

3 7/16"

(87MM)

(114MM)

4 1/2"

(114MM)

3 7/16"

(87MM)

5 1/8"

(130MM)

21"(533MM)

G

APPROX

F

(INSET)

3 5/8" (92MM)FOR

1/2"THRU 11/2"VALVES

4 1/16"THRU 1 1/2"VALVES

4 9/16"(114MM)FOR 2"VALVE

CAP

DUST

(362MM)

14 1/4"

(248MM)

GAS SERVICE

LABEL

1 5/16"

(33MM)

DUST

CAP

(292MM) 7"

(178MM) 2 1/2"

(64MM)

7/16"

B

PLASTER FLANGE

5 1/4"

(133MM)

PLUG

BUTTON

1/2"

WIRE ANCHORS

(BY OTHERS)

2 7/16"

GAS SERVICE NIPPLE

ORIFICE

A

N.T.S.VALVE BOX DETAIL1

N.T.S.

N.T.S.VACUUM SWITCH3

N.T.S.

N.T.S.PIPE HANGER DETAIL6

MEDICAL AIR & OXYGEN HIGH & LOW

PRESSURE SWITCH

OXYGEN, VACUUM, AND MEDICAL AIR

OUTLET

WATER HAMMER ARRESTOR.

INSTALL PER MANUFACTURERS

RECOMMENDATIONS.

WATER SUPPLY

WATER SUPPLY TO

PLUMBING FIXTURE

WATER HAMMER ARRESTOR.

INSTALL PER MANUFACTURERS

RECOMMENDATIONS.

WATER SUPPLY

WATER SUPPLY TO

PLUMBING FIXTURES

WATER HAMMER

ARRESTOR SIZE

MODEL CONNECTION

DIA

FIXTURE

UNITS

CROSS

REFERENCE

PDI

LF15M2-A 1/2 1-11 A

LF15M2-B 3/4 12-32 B

LF15M2-C 1 33-60 C

LF15M2-D 1 61-113 D

LF15M2-E 1 114-154 E

LF15M2-F 1 155-330 F

SIZING BASED ON WATTS SERIES LF15M2

N.T.S.WATER HAMMER ARRESTOR DETAIL 5

P000 PLUMBING NOTES AND LEGEND
PD100 PLUMBING DEMOLITION PLAN
PD101 MEDICAL GAS DEMOLITION PLAN
PL100 PLUMBING RENOVATION PLAN
MG100 MEDICAL GAS RENOVATION PLAN
P500 PLUMBING DETAILS

File details come from the government source that posted it. Updated .