Attachment 01 - Drawings Plumbing 672-CSI-124 - Part III of VI - 6 Pages.pdf
PDF 4 MB Posted
- Attached to
- Z2DA--Construct New Hybrid Operating Room
- Solicitation number
- 36C24825R0026
About this file
These are architectural and engineering plumbing drawings for a hybrid operating room renovation project at a VA healthcare facility. The six-page document includes detailed plans for plumbing demolition, renovation, and medical gas system modifications across the basement and first floor. Key elements include removing existing plumbing fixtures, medical gas outlets, and piping, and installing new plumbing connections, zone valves, and medical gas systems. The drawings specify precise technical details such as pipe sizing, support requirements, water hammer arrestor specifications, and medical gas outlet configurations. The project involves coordinating complex medical infrastructure upgrades while maintaining existing system integrity, with specific attention to VA design manuals, building codes, and healthcare facility standards.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
MES Group, Inc.
550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group
COA # 8304
PLUMBING NOTES AND
LEGEND
NS TH
FLOOR SINK
PIPE UP
PIPE DOWN
GCOOR
HOSE BIB
OR VTR VENT THRU ROOF
- EQUIPMENT MARK
POINT OF NEW CONNECTION
DRAWING KEYNOTEX
FLOOR DRAIN
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
GATE VALVE
PLUG VALVE
STRAINER
UNION
PRESSURE RELIEF VALVE
WCO WALL CLEAN OUT
FCO FLOOR CLEAN OUT (1-WAY OR 2-WAY)
WCO
OR
CW COLD WATER PIPING
HW HOT WATER PIPING
HWR HOT WATER RECIRCULATION PIPING
SAN SANITARY PIPING
(E)CW EXISTING COLD WATER
(E)HWR EXISTING HOT WATER RETURN
(E)HW EXISTING HOT WATER PIPING
EXISTING PIPING TO BE REMOVED
(E)SAN EXISTING SANITARY PIPING
V SANITARY VENT PIPING
INVERT ELEVATIONIE
PRV
BACKFLOW PREVENTER
LIMIT OF DEMOLITION
GRADE CLEAN OUT (1-WAY OR 2-WAY)
PLUMBING LEGEND
PLUMBING ABBREVIATIONS
(E) EXISTING
AFF ABOVE FINISHED FLOOR
BFF BELOW FINISHED FLOOR
CO PIPE CLEAN OUT
CTE CONNECT TO EXISTING
CP CIRCULATOR PUMP
CW COLD WATER
DEMO DEMOLISH OR DEMOLITION
DFU DRAINAGE FIXTURE UNITS
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
FBC FLORIDA BUILDING CODE
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FS FLOOR SINK
G GAS
GCO GRADE CLEAN OUT
GPM GALLONS PER MINUTE
GR GREASE
GWH GAS WATER HEATER
HB HOSE BIB
HD HUB DRAIN
HW HOT WATER
HWR HOT WATER RETURN
IB ICE MAKER OUTLET BOX
IBC INTERNATIONAL BUILDING CODE
IE INVERT ELEVATION
LAV LAVATORY
MS MOP SINK
NC NORMALLY CLOSED
NG NATURAL GAS
NO NORMALLY OPEN
OD OVERFLOW ROOF DRAIN
OSD OVERFLOW (SECONDARY) STORM WATER DRAIN
PSD PRIMARY STORM WATER DRAIN
RD ROOF DRAIN
S SINK
SAN SANITARY
SH SHOWER
SP SUMP PUMP
TWH TANKLESS WATER HEATER
UR URINAL
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEAN OUT
WH WALL HYDRANT
WSFU WATER SUPPLY FIXTURE UNITS
1. REVIEW PLANS OF ALL TRADES PRIOR TO BIDDING AND BEGINNING WORK. INSTALLATIONS ARE TO INCLUDE ALL
PLUMBING FOR COMPLETE SYSTEMS SHOWN ON THE PLANS AND AS REQUIRED.
2. COORDINATE WITH OTHER TRADES TO PREVENT INTERFERENCE WITH HVAC DUCTS, STRUCTURE, ELECTRICAL, LIGHTING, AND OTHER PIPING IN THE CEILING SPACE. VENT PIPING AND WATER PIPING SHALL BE HELD EITHER
ABOVE OR BELOW HVAC DUCTWORK, AS COORDINATED WITH THE HVAC CONTRACTOR.
3. ALL CHANGES SHALL BE REVIEWED BY THE ARCHITECT.
4. COORDINATE WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING-IN PLUMBING FIXTURES AND EQUIPMENT
SUPPLIES.
5. THE PLUMBING SUBCONTRACTOR SHALL FURNISH AND INSTALL ALL PLUMBING FIXTURES, UNLESS NOTED
OTHERWISE.
6. VERIFY MOUNTING HEIGHT AND WATER CONNECTION SIZES OF ALL PLUMBING FIXTURES PRIOR TO ROUGH-IN.
FURNISH CUT-OUT TEMPLATES, FOR PLUMBING FIXTURES TO BE INSTALLED IN MILLWORK, TO THE GENERAL
CONTRACTOR.
7. MAKE PROPER HOT AND COLD WATER, WASTE AND VENT PIPING CONNECTIONS TO ALL FIXTURES AND EQUIPMENT
EVEN THOUGH ALL FITTINGS AND CONNECTIONS ARE NOT SHOWN ON DRAWINGS.
8. VERIFY LOCATION OF EXISTING WATER SERVICE AND THE LOCATION/INVERTS OF SANITARY PIPING PRIOR TO
INSTALLATION.
9. CUT AND PATCH CONCRETE AS REQUIRED.
10. IT IS NOT THE INTENT OF THESE DRAWINGS TO COVER ALL WORK AND MATERIAL. ANY EQUIPMENT, PLUMBING FIXTURE, TRIM HARDWARE AND/OR DEVICES USUALLY UTILIZED IN THE CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THESE DRAWINGS, BUT WHICH MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK (AS DETERMINED BY THE ARCHITECT) SHALL BE FURNISHED AND
INSTALLED BY THE CONTRACTOR AS PART OF HIS TOTAL WORK.
11. THE EQUIPMENT ROUGH-IN ITEMS AND THEIR DIMENSIONED LOCATIONS FOR ALL CONNECTIONS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE. IN SOME INSTANCES THE OWNER OR SUPPLIER MAY MAKE SUBSTITUTIONS OR EQUIPMENT ITEMS MAY VARY FROM WHAT IS SHOWN. THEREFORE, THESE ITEMS AND DIMENSIONS SHALL BE VERIFIED WITH THE EQUIPMENT SUPPLIER, OWNER AND/OR EQUIPMENT ROUGH-IN DRAWING. FAILURE OF THE APPROPRIATE CONTRACTOR TO VERIFY ROUGH-INS OR THEIR LOCATIONS SHALL PLACE THE RESPONSIBILITY FOR ANY SUBSEQUENT RELOCATION AND/OR ADDITIONAL ROUGH-INS DIRECTLY UPON THAT CONTRACTOR.
12. CONTRACTOR SHALL SUPPLY TO THE ARCHITECT/ENGINEER THE REQUIRED COPIES OF SHOP DRAWINGS FOR APPROVAL SO THE QUALITY OF INTENDED MATERIALS OR EQUIPMENT CAN BE REVIEWED BEFORE INSTALLATION.
THERE WILL BE NO INSTALLATION UNTIL SHOP DRAWINGS HAVE BEEN SUBMITTED AND REVIEWED BY THE
ARCHITECT/ENGINEER.
13. DO NOT SCALE THIS DRAWING. REFER TO ARCHITECTURAL FLOOR PLAN FOR BUILDING DIMENSIONS.
14. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT NECESSARILY SHOW ALL ELBOWS, OFFSETS, UNIONS, VALVES, FITTINGS, ETC. REQUIRED TO COMPLETE THE INSTALLATION OF THE WORK. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE CONTRACTOR HAS FAMILIARIZED HIMSELF WITH THE PLANS AND BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF THEY COULD HAVE BEEN FORESEEN HAD PROPER
EXAMINATION BEEN MADE.
15. VERIFY SERVICE POINTS AND METERING LOCATIONS FOR PROJECTS WITH LOCAL UTILITIES AND/OR LANDLORD
(DOMESTIC WATER, SANITARY SEWER, GAS, ETC.).
16. THE CONTRACTOR SHALL COOPERATE FULLY AMONG ALL TRADES.
17. ALL ROOF PENETRATIONS FOR ROOF DRAINS AND PLUMBING, GAS, AND REFRIGERANT PIPING SHALL BE MADE IN ACCORDANCE WITH ROOF SYSTEM MANUFACTURER'S GUIDELINES. COORDINATE WITH ARCHITECTURAL DETAILS
AND/OR MANUFACTURER FOR ROOF SYSTEM USED.
18. ALL PLUMBING VENTS IN EXTERIOR WALLS SHALL BE OFFSET A MINIMUM OF 3'-0" BEFORE ROOF PENETRATION.
19. INSTALL 1" INSULATION WITH ALL-SERVICE JACKET ON ALL ROOF LEADERS ABOVE CEILING.
20. THE WATER PIPING SYSTEM SHALL BE FLUSHED AND STERILIZED IN ACCORDANCE WITH LOCAL REGULATIONS.
21. HOT AND COLD WATER SUPPLY BRANCHES FOR ALL SYSTEMS HAVING QUICK CLOSING VALVES OF ANY TYPE SHALL HAVE WATER HAMMER ARRESTORS INSTALLED AT THE HIGH POINT ON THE END OF EACH BRANCH AND AS
REQUIRED.
22. ALL PIPES HANGING FROM SINGLE VERTICAL RODS / HANGERS SHALL NOT MOVE OR SWAY DURING OPERATION.
SUITABLE LATERAL SUPPORTS OR BRACING SHALL BE USED TO PREVENT SWAY OR MOVEMENT.
23. PROVIDE SHUTOFF BALL VALVES AND DIELECTRIC UNIONS FOR ALL EQUIPMENT HOT AND COLD WATER LINES.
PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO EQUIPMENT. COORDINATE WITH EQUIPMENT
SUPPLIER FOR EXACT REQUIREMENTS.
24. VERIFY MOUNTING HEIGHTS OF ALL BARRIER FREE FIXTURES WITH ARCHITECTURAL PLANS.
25. PROVIDE COPPER INDIRECT WASTE PIPING REQUIRED FROM EQUIPMENT TO FLOOR DRAINS, OPEN RECEPTACLES, OR FLOOR SINKS. PIPING SHALL COMPLY WITH STATE AND LOCAL CODES. COORDINATE WITH ALL EQUIPMENT SUPPLIERS AND SIZES AS REQUIRED BY PIECE OF EQUIPMENT SERVED. HOLD PIPING TIGHT TO WALL WHERE APPLICABLE. PROPERLY SECURE AS REQUIRED. COORDINATE WITH CASEWORK SUPPLIER FOR MAXIMUM
CLEARANCE UNDER CABINETS.
26. PROVIDE CHROME PLATED ESCUTCHEONS AT ALL WALL PENETRATIONS.
27. INSTALL STORM AND CONDENSATE PIPING WITH MINIMUM SLOPE OF 1/8" PER FOOT. INSTALL SANITARY PIPING LESS THAN 3" AT 1/4" PER FOOT, 3" TO 6" AT 1/8" PER FOOT, AND 8" AND GREATER AT 1/16" PER FOOT. CONTRACTOR
IS RESPONSIBLE FOR PROPER DRAINAGE OF ALL SYSTEMS.
28. ALL FLOOR DRAINS ARE TO BE PROVIDED WITH MINIMUM 3" DRAIN LINES, DEEP SEAL TRAPS, AND AUTOMATIC TRAP PRIMERS. TRAP PRIMERS SHALL BE LOCATED IN A SERVICEABLE LOCATION AND INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. HOLD TOP OF FLOOR DRAINS FLUSH WITH FINISHED FLOOR; SEE
ARCHITECTURAL SHEETS FOR FLOOR SLOPES AND PROPER FINISHED FLOOR ELEVATION.
29. ALL VENT PIPE TO BE COMPATIBLE WITH STRUCTURE, MECHANICAL EQUIPMENT, DUCTWORK, ELECTRICAL EQUIPMENT, AND LIGHTING. ALL VTR'S SHALL BE EXTENDED TO A MINIMUM OF 2" ABOVE PARAPET HEIGHT AND
MAINTAINED 10'-0" MINIMUM FROM ALL OUTSIDE AIR INTAKES.
30. MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SHALL MEET ALL PERTINENT REQUIREMENTS OF NATIONALLY RECOGNIZED TESTING ORGANIZATIONS SUCH AS UL, ASTM, ASSE, AWWE, AGA AND NFPA AS WELL AS THE MOST
CURRENT ADOPTED VERSION OF THE STATE AND LOCAL CODES.
31. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE. REPLACE ANY AND ALL CONTRACTOR SUPPLIED DEFECTIVE DEVICES, ITEMS, OR SYSTEMS AT CONTRACTOR'S EXPENSE, BEFORE
COMPLETION OF PROJECT.
32. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO NOT CHANGE THE SCOPE OR NATURE OF WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE OWNER. NO OTHER CHANGES MAY BE MADE WITHOUT WRITTEN PERMISSION FROM THE ENGINEER.
33. ALL EQUIPMENT, FIXTURES AND MATERIALS SHALL BE NEW AND UNUSED, AND INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S RECOMMENDATIONS (UNLESS OTHERWISE NOTED). PROVIDE COMPLETE WITH ALL TRIM, STOPS, HANGERS, CARRIERS, SUPPORTS, ETC., INCLUDING PROVISIONS FOR BARRIER FREE USE, IF REQUIRED. WHERE FIXTURES ARE ACCESSIBLE THEY MUST COMPLY WITH ALL FEDERAL A.D.A. REGULATIONS.
34. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED, FIELD ERECTED, ALL FACTORY ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED, AND ALL WORK IN CONNECTION WITH INSTALLATION OF MANUFACTURER'S GUARANTEED EQUIPMENT.
THE CONTRACTOR'S GUARANTEE SHALL LAST ONE YEAR FROM THE FINAL OWNER ACCEPTANCE OF THE WORK
AND SHALL APPLY TO ALL DEFECTS IN MATERIALS AND WORKMANSHIP OF ANY KIND.
35. ALL FAUCET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND NOT REQUIRE TIGHTGRASPING.
36. ALL BARRIER FREE WATER CLOSET CONTROLS SHALL BE LOCATED ON UNIT TOWARDS WIDE SIDE OF STALL.
VERIFY IF RIGHT OR LEFT SIDE LOCATION.
PLUMBING NOTES GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE
PROVIDED (FURNISHED AND INSTALLED) UNDER THIS CONTRACT. DRAWINGS
SHOULD NOT BE SCALED.
2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING CONDITIONS UNDER
WHICH THEY SHALL OPERATE AND VERIFY THE EXTENT OF WORK REQUIRED TO
COMPLETE THE WORK UNDER THIS CONTRACT.
3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE RESPONSIBILITY
OF THE CONTRACTOR TO EXAMINE THE PHYSICAL CONDITIONS AT THE PROJECT
SITE AND VERIFY SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR
INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES, AND TO
DETERMINE ANY NECESSARY MODIFICATIONS.
4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND
LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY
HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE ENGINEERING
DOCUMENTS AND CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.
5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE
REQUIREMENTS:
· INTERNATIONAL BUILDING CODE (IBC) 2020
· INTERNATIONAL EXISTING BUILDING CODE 2020
· IBC MECHANICAL 2020
· IBC PLUMBING 2020
· IBC ENERGY CONSERVATION 2020
· NFPA 1-2018, THE UNIFORM FIRE CODE
· NFPA 101-2018, THE LIFE SAFETY CODE
· NFPA 51B-2014, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING
AND OTHER HOT WORK
· NFPA 13-2016, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
· NFPA 70-2017, NATIONAL ELECTRICAL CODE
· NFPA 90A-2018, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND
VENTING SYSTEMS.
· NFPA 99-2018, STANDARD FOR HEALTH CARE FACILITIES
· NFPA 241-2013, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION
AND DEMOLITION OPERATIONS.
· VA MECHANICAL DESIGN MANUAL, LATEST EDITION
· VA PLUMBING DESIGN MANUAL, LATEST EDITION
· VA FIRE PROTECTION DESIGN MANUAL, LATEST EDITION
· ALL OTHER APPLICABLE VA DESIGN MANUALS
6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND
CONSTRUCTION WORK.
7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR INSTALLATION OF
WORK UNDER THIS CONTRACT. DISMANTLE AND REASSEMBLE EQUIPMENT AS
NECESSARY FOR ENTRY INTO THE BUILDING AND THE LOCATION OF INSTALLATION.
8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL
UPDATE THIS SCHEDULE WEEKLY. ANY CHANGES SHALL BE NOTED AND AN
UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.
9. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS,
CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES
WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L. REQUIREMENTS TO MAINTAIN
THE ASSEMBLY RATING.
10. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE
AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND
SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL TIMES DURING
CONSTRUCTION.
11. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.
12. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT SUBMITTALS
FOR ALL PRODUCTS USED ON PROJECT.
13. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE
CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE REQUIREMENTS OF
CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED WRITTEN
APPROVAL FROM THE ENGINEER TO THE SPECIFIC DEVIATION. THE ENGINEER'S
APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF
RESPONSIBILITY FOR ERRORS OR OMISSIONS IN HIS OR HER SUBMITTAL DATA.
14. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS IN
THREE RING BINDERS AT SUBSTANTIAL COMPLETION. MANUALS SHALL INCLUDE
INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS,
CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS
DATA, ETC. PROVIDE AN INDEX AND ASSOCIATED DIVIDERS.
15. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF
CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT
CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE
ALL CONTRACT CHANGES, MODIFICATIONS, AND CLARIFICATIONS. THIS SET ALONG
WITH ALL SHOP DRAWINGS SHALL BE TURNED OVER TO THE ARCHITECT/ENGINEER
AFTER CONSTRUCTION COMPLETION.
16. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND
UNDERSTAND ALL CONSTRUCTION DOCUMENTS. THIS INCLUDES BUT IS NOT LIMITED
TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE SCHEMATIC
IN NATURE. THEREFORE BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL
REVIEW ALL OTHER CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND
SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE
OWNER. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT/ENGINEER. THE BASE BID SHALL REFLECT THE
TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT
AND MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED WITHOUT WRITTEN
CONSENT AND APPROVAL FROM ENGINEER AND ARCHITECT.
P000
PLUMBING FIXTURE SCHEDULE
FIXTURE
MARK FIXTURE DESCRIPTION
ROUGH-IN PIPE SIZES WATER FIXTURE UNITS
MAKE MODEL
COLD
WATER
SUPPLY
HOT
WATER
SUPPLY
FIXTURE
TRAP
FIXTURE
DRAIN
COLD
WATER
HOT
WATER DRAINAGE
P-519
DOUBLE SCRUB SINK - SENSOR
FAUCET, PROVIDE T&P
THERMOSTATIC MIXING VALVE
1/2" 1/2" 1 1/2" 2" 6 6 4 - -
23 JAN 2504/03/2024
CONTROL
ROOM CLOSET
FILES
CONTROL
CYSTOSCOPY ROOM
ROOM
A-164
STORAGE
TOILET
RADIOGRAPHIC
PROCEDURES
TECHNICAL
CLERICAL
AREA
STORAGE
A-168
TOILET
EXAM
ROOM
A-173
CARDIAC.
ROOM
CYSTOSCOPY
A-167
ROOM
A-168
SUPERVISOR
OFFICE
A-169 A-170
A-171
EXAM
ROOM
A-172
EXAM
ROOM
A-158a
STO.
ROOMROOM
EXAM EXAM
H.A.C.
A-171
A-172b
TOILET
A-
2a
LO
C
K R
M
B-117 B-115
B-114ELEC.
CLOS.
MALE LOCKERS
SIGNAL
CLOS. FEMALE LOCKERS
PHYSICIAN'S
LOCKERS
C O R R I D O R C1-8
1 1
(E)3" SAN. UP
(E)3" SAN.
UP
(E)3" SAN. UP
(E)4" SAN.
UP. & DN.
(E)3" SAN. DN
(E)3" SAN. UP
(E)2" V
(E)2" V
(E )2
" H W
(E )3
" C W
(E)3/4" HW
(E)2" CW
(E)3/4" HW
(E)2" CW
(E)3" CW
(E)2" HW
(E)3" CW.
DN
(E)2" HW.
DN
(E)3/4" HW.
UP
(E)2" CW.
UP
(E )6
"Ø
(E)5"Ø
(E )4
"Ø
(E )4
"Ø
(E )4
"Ø U
P C
.O
C .O
C .O
U P
C .O
(E)2"Ø
C .O
C.O.
C .O
(E)2"Ø
UP
3"Ø UP
(E)2"Ø UP
(E)3"Ø UP
(E)2"Ø UP
(E )2
"Ø U
P
(E)3"Ø UP
C .O
(E)3"Ø UP
(E )4
"Ø
(E)2"Ø UP
(E)2½"Ø
UP
(E )4
"Ø
(E)2½"Ø
UP
C.O.
(E)8"Ø DN.
(E )4
"Ø
(E)2½"Ø
UP
(E )3
/4 "Ø
(E)2"Ø UP
(E )4
"Ø
(E)3"Ø(E)3"Ø
(E)2"Ø UP
C.O.
(E)4"Ø
UP
(E)3"Ø
(E)3"Ø
(E )1
½ "Ø
UP
(E )4
"Ø (E
)3 "Ø
(E )2
"Ø
(E)10"Ø UP
(E )1
½ "Ø
(E )2
"Ø U
P
(E )2
½ "Ø
(E )2
"Ø U
P
C.O.
C .O
(E)2"Ø
(E )3
"Ø
U P
(E )2
"Ø U
P
(E )3
"Ø U
P
1½"Ø
(E)3"Ø
(E)3"Ø UP
(E)4"Ø(E)3"Ø
(E)2"Ø UP
(E)2"Ø
(E)1½"Ø
(E)5/8"Ø
(E )5
/8 "Ø
(E)1"Ø
U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
MES Group, Inc.
550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group
COA # 8304
PLUMBING DEMOLITION PLAN
CB TH
KEYNOTES
1. REMOVE EXISTING PLUMBING FIXTURE AND ASSOCIATED CW, HW, SAN,
AND VENT PIPING. CAP SANITARY, DOMESTIC WATER, AND VENT PIPING
BACK TO MAIN AND CAP.
2. EXISTING PIPING IN CEILING TO REMAIN.
3. CAP EXISTING SANITARY PIPING FOR CONNECTION OF NEW FIXTURE.
X
PD100
GENERAL NOTES
A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE
SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A
MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE
REQUIREMENTS WITH THE COR.
B. EXISTING EQUIPMENT, PIPE ROUTING, AND ASSOCIATED COMPONENTS
SHOWN ON DRAWINGS ARE APPROXIMATE LOCATIONS BASED ON
RECORD DRAWINGS AND ARE PROVIDED FOR REFERENCE USE ONLY.
FIELD VERIFY AND COORDINATE WITH EXACT LOCATIONS, ELEVATIONS,
SIZES AND CONDITIONS OF EXISTING COMPONENTS.
C. ALL OPENINGS CREATED BY DEMOLITION OF EXISTING DUCTWORK OR
PIPING SHALL BE PATCHED WITH LIKE MATERIALS AND TO MAINTAIN
EXISTING FIRE RESISTIVE BARRIERS.
WAITING AREA
ROOM CLOSET
FILES
CONTROL
CYSTOSCOPY ROOM
ROOM
A-164
STORAGE
TOILET
RADIOGRAPHIC
PROCEDURES
TECHNICAL
CLERICAL
AREA
STORAGE
A-168
TOILET
EXAM
ROOM
A-173
C O R R I D O R
OFFICE
BUDGET
A-160
CARDIAC.
ROOM
A-158
OFFICE
A-159
PHYSICS
MEDICAL
A-158
ROOM
CONTROL
CYSTOSCOPY
A-167
ROOM
A-168
SUPERVISOR
OFFICE
A-169 A-170
A-171
EXAM
ROOM
A-172
EXAM
ROOM
A-158a
STO.
ROOMROOM
EXAM EXAM
H.A.C.
A-171
A-172b
TOILET
LOUNGE STAFF RM.
A-
2a
LO
C
K R
M
A-172 ECOCARDIO-
GRAPHY RM.
B-117 B-115
B-114
C O
R R
I D
O R
ELEC.
CLOS.
MALE LOCKERS
SIGNAL
CLOS. FEMALE LOCKERS
PHYSICIAN'S
LOCKERS
C O R R I D O R C1-8
(E)MEDICAL GAS
OUTLET BOX
(E)MEDICAL GAS
OUTLET BOX
(E)MEDICAL GAS
OUTLET BOX
(E)3/4" MA
(E)3/4" O (E)3/4" V
(E)3/4" MA
(E)1 1/4" O (E)1 1/4" V
(E)MEDICAL GAS
OUTLET BOX
MEDICAL GAS
OUTLET BOX
(E)OXYGEN
ZONE VALVE
(E)1/2" O (E)1" V
(E)3/4" O (E)1 1/2" V
(E)1/2" O (E)1" V
(E)3/4" V
(E)1/2" MA
(E)1/2" O
(E)1 3/8" V
(E)7/8" MA
(E)7/8" O
U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
MES Group, Inc.
550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group
COA # 8304
MEDICAL GAS DEMOLITION
PLAN
CB TH
KEYNOTES
1. REMOVE EXISTING MEDICAL GAS OUTLET BOX AND MEDICAL GAS
PIPING AS INDICATED. CAP EXISTING PIPING AT MAIN.
2. REMOVE EXISTING ZONE VALVES. REMOVE EXISTING V AND O PIPING
BACK TO MAIN IN BASEMENT AND CAP.
3. EXISTING MEDICAL GAS PIPING TO REMAIN.
X
PD101
GENERAL NOTES
A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE
SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A
MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE
REQUIREMENTS WITH THE COR.
B. EXISTING EQUIPMENT, PIPE ROUTING, AND ASSOCIATED COMPONENTS
SHOWN ON DRAWINGS ARE APPROXIMATE LOCATIONS BASED ON
RECORD DRAWINGS AND ARE PROVIDED FOR REFERENCE USE ONLY.
FIELD VERIFY AND COORDINATE WITH EXACT LOCATIONS, ELEVATIONS,
SIZES AND CONDITIONS OF EXISTING COMPONENTS.
C. ALL OPENINGS CREATED BY DEMOLITION OF EXISTING DUCTWORK OR
PIPING SHALL BE PATCHED WITH LIKE MATERIALS AND TO MAINTAIN
ROOM
CLOSET
FILES
RADIOGRAPHIC
OFFICE
BUDGET
A-160
CARDIAC.
ROOM
A-158
A-
8a
ST
O
H.A.C.
A-171
A-172b
TOILET
A-172
B-117 B-115
B-114
LOUNGE STAFF RM.
A-172a
LOCK RM.
ELEC.
CLOS.
MALE LOCKERS
SIGNAL
CLOS. FEMALE LOCKERS
PHYSICIAN'S
LOCKERS
DN.DN.
C O R R I D O R C1-8
HYBRID
OPERATING
ROOM
CONTROL
ROOM
SCRUB STN.
IMAGING
COMPONENT
ROOM
STERILE
SUPPLY
GURNEY
8.8
9.8
CBA
NO WORK IN THIS ROOM
NO WORK IN
THIS ROOM
NO WORK
IN THIS
ROOM
P-519
(E)4" SAN.
UP.
(E)3" SAN. UP
(E )2
" H W
(E )3
" C W
(E)3/4" HW
(E)2" CW
(E)3" CW
(E)2" HW
(E)3" CW.
DN
(E)3/4" HW.
UP
(E)2" CW.
UP
(E)2" V
(E )C
.O
C .O
(E )C
.O
(E)C.O.
(E )4
"V
(E )4
"Ø (E
)3 "Ø
(E )3
"V
(E)C.O.
(E)3" SAN. UP
(E)3" SAN.
UP
(E)3" SAN.
UP
(E)2" HW.
DN
3" CW
2" HW
3" C
W
2" H
W
1/ 2"
C W
1/ 2"
H W
2" CW
2" HW
(E)2" HW.
UP
(E)2" CW.
UP
4" SAN.
DN. 4
U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
MES Group, Inc.
550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group
COA # 8304
PLUMBING RENOVATION PLAN
NS TH
PL100
KEYNOTES
1. CONNECT NEW CW AND HW PIPING TO EXISTING PIPING ABOVE CEILING.
VERIFY SIZE AND LOCATION IN FIELD.
2. CONNECT TO CAPPED EXISTING 2" WASTE IN BASEMENT. VERIFY SIZE
AND LOCATION IN FIELD.
3. CONNECT TO EXISTING 2" V ABOVE CEILING. VERIFY SIZE AND LOCATION
IN FIELD.
4. REROUTE EXISTING SANITARY DOWN TO BASEMENT WITHIN CHASE.
VERIFY SIZE AND LOCATION IN FIELD.
X
GENERAL NOTES
A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE
SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A
MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE
REQUIREMENTS WITH THE COR.
B. EXISTING EQUIPMENT, PIPE ROUTING, AND ASSOCIATED COMPONENTS
SHOWN ON DRAWINGS ARE APPROXIMATE LOCATIONS BASED ON
RECORD DRAWINGS AND ARE PROVIDED FOR REFERENCE USE ONLY.
FIELD VERIFY AND COORDINATE WITH EXACT LOCATIONS, ELEVATIONS,
SIZES AND CONDITIONS OF EXISTING COMPONENTS.
C. ALL OPENINGS CREATED BY DEMOLITION OF EXISTING DUCTWORK OR
PIPING SHALL BE PATCHED WITH LIKE MATERIALS AND TO MAINTAIN
ROOM FILES
OFFICE
BUDGET
A-160
CARDIAC.
ROOM
A-158
A-
8a
ST
O
H.A.C.
A-171
A-172b
TOILET
B-117 B-115
B-114
LOUNGE STAFF RM.
A-172a
LOCK RM.
ELEC.
CLOS.
MALE LOCKERS CLOS. FEMALE LOCKERS
PHYSICIAN'S
LOCKERS
DN.DN.
C O R R I D O R C1-8
HYBRID
OPERATING
ROOM
CONTROL
ROOM
SCRUB STN.
IMAGING
COMPONENT
ROOM
STERILE
SUPPLY
GURNEY
8.8
9.8
CBA
NO WORK IN THIS ROOM
NO WORK IN
THIS ROOM
NO WORK
IN THIS
ROOM
(E)3/4" V
(E)1/2" MA
(E)1/2" O
(E)1 3/8" V
(E)7/8" MA
(E)7/8" O
1/2" N
1/2" NO
1/2" CO2
3/4" O
1/2" MA
1 1/2" V
P P P P P P
1/2" MA
3/4" O 1 1/2" V
1/2" NO
1/2" N
1/2"CO2
B-130
B-132d
B-129
C L
E A
N
S U
P L
Y
S
T A
F F
W
O
K
A
E A
385.47n.s.f.
410.47n.s.f.
OPERATING ROOM
GENERAL
CARDIC/NEUROLOGY
OPERATING ROOM
FACILITIES
SCRUB-UP
(E) N UP
(E) NO UP
(E) CO2 UP
(E) O UP
(E) MA UP
(E) V UP
1/2" N
1/2" NO
1/2" CO2
3/4" O
1/2" MA
1 1/2" V
(E) 1" MA
(E) 2" O
(E) 2" V
(E) 3/4" NO
(E) 1 1/2" N
(E) 1" CO2
(E) 1 1/2" O
U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
MES Group, Inc.
550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group
COA # 8304
MEDICAL GAS RENOVATION
PLAN
NS TH
MG100
KEYNOTES
1. FURNISH AND INSTALL MEDICAL GAS ZONE VALVES. COORDINATE FINAL
LOCATION IN FIELD.
2. FURNISH AND INSTALL MEDICAL GAS ALARM PANEL. COORDINATE FINAL
LOCATION IN FIELD.
3. ROUTE A, V, O, N, NO, AND CO2 PIPING TO CEILING SYSTEM MANIFOLD
CONNECTION. THE CEILING SYSTEM IS COMPRISED OF PRE-PIPED
MEDICAL GAS TO ALL OF THE CEILING BOOMS. REFER TO SPECIFICATION
FOR ADDITIONAL INFORMATION.
4. EXISTING A, V, O, N, NO, CO2 PIPING LOCATED IN BASEMENT AT COLUMN
LINE 13. PROVIDE CONNECTIONS TO PIPING AS REQUIRED. VERIFY
LOCATION AND SIZES IN FIELD.
5. COORDINATE WAGD REQUIREMENTS WITH LOCAL STATION.
6. MEDICAL GAS OUTLETS. COORDINATE LOCATION AND QUANTITY WITH
END USER.
7. NEW O, V, MA, N, CO2, AND NO PIPES UP FROM BASEMENT TO ZONE
VALVES.
8. FURNISH AND INSTALL MEDICAL GAS GRADE FULL PORT BALL VALVES
LOCKED OPEN.
9. PROVIDE NEW PRESSURE SWITCHES ON A, V, O, N, NO, CO2 PIPING.
10. NEW O, V, MA, N, CO2, AND NO PIPES UP TO CEILING SPACE ABOVE.
X
GENERAL NOTES
A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE
SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A
MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE
REQUIREMENTS WITH THE COR.
B. EXISTING EQUIPMENT, PIPE ROUTING, AND ASSOCIATED COMPONENTS
SHOWN ON DRAWINGS ARE APPROXIMATE LOCATIONS BASED ON
RECORD DRAWINGS AND ARE PROVIDED FOR REFERENCE USE ONLY.
FIELD VERIFY AND COORDINATE WITH EXACT LOCATIONS, ELEVATIONS,
SIZES AND CONDITIONS OF EXISTING COMPONENTS.
C. ALL OPENINGS CREATED BY DEMOLITION OF EXISTING DUCTWORK OR
PIPING SHALL BE PATCHED WITH LIKE MATERIALS AND TO MAINTAIN
EXISTING FIRE RESISTIVE BARRIERS.
MEDICAL GAS PIPE SIZING
GAS TYPE NUMBER OF
CONNECTIONS
TOTAL FLOW
RATE PIPE SIZEFLOW RATE PER
CONNECTION
OXYGEN
NITROGEN
VACUUM
MEDICAL AIR
CARBON
DIOXIDE
NITROUS
OXIDE
6 SCFM
3.5 SCFM
3 SCFM
3.5 SCFM
3.5 SCFM
3.5 SCFM
12 SCFM
3.5 SCFM
21 SCFM
3.5 SCFM
3.5 SCFM
3.5 SCFM
3/4"
1/2"
1 1/2"
1/2"
1/2"
1/2"
NOTES:
1. REQUIRED FLOW RATE PER CONNECTION PER NFPA 99.
2. PIPE SIZING PER ASPE VOLUME 3.
3. NUMBER OF CONNECTIONS PER VA SURGICAL AND ENDOVASCULAR SERVICE
DESIGN GUIDE.
U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
MES Group, Inc.
550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group
COA # 8304
PLUMBING DETAILS
NS TH
P500
- TYPE "L" COPPER PIPE 1-1/4" OR SMALLER
SUPPORT MAXIMUM EVERY 6 FT.
- SCHEDULE 40 BLACK STEEL PIPE SUPPORT
MAXIMUM EVERY 12 FT.
3/8" ALL THREAD HANGER
ROD CUT TO LENGTH
ADJUSTABLE SWIVEL
PIPE HANGER RING
11 1/2"
9 3/4"
4 1/2"
13/16"
1/4"-18 NPTF
(GAS SERVICE
CONNECTION
N.O.
N.C.
C
A
1 9/32"
2 9/16"
COMMON
B
3 1/4"
CLOSED-CIRCUIT ALARM SYSTEM USE
OPEN-CIRCUIT ALARM SYSTEM USE
CONTACTS A AND B
CONTACTS B AND C
1 5/16"
7/32"DIA.
MOUNTING
HOLE
(TYP.)
7/8"DIA.HOLE
(CONDUIT CONNECTION
1 3/8"
1/2"
JUNCTION BOX
4 5/8"
CONDUIT &
CONNECTORS MAXIMUM 12"
11/16"
13 1/2"
(343MM)
(114MM)
4 1/2"
9"
(229MM) 9/16"
(14MM) 1 5/8"
(41MM)
1/2" (13MM) MIN.TO
1" (25MM)MAX.
PLASTER
THICKNESS
ADJUSTMENT
3 7/16"
(87MM)
(114MM)
4 1/2"
(114MM)
3 7/16"
(87MM)
5 1/8"
(130MM)
21"(533MM)
G
APPROX
F
(INSET)
3 5/8" (92MM)FOR
1/2"THRU 11/2"VALVES
4 1/16"THRU 1 1/2"VALVES
4 9/16"(114MM)FOR 2"VALVE
CAP
DUST
(362MM)
14 1/4"
(248MM)
GAS SERVICE
LABEL
1 5/16"
(33MM)
DUST
CAP
(292MM) 7"
(178MM) 2 1/2"
(64MM)
7/16"
B
PLASTER FLANGE
5 1/4"
(133MM)
PLUG
BUTTON
1/2"
WIRE ANCHORS
(BY OTHERS)
2 7/16"
GAS SERVICE NIPPLE
ORIFICE
A
N.T.S.VALVE BOX DETAIL1
N.T.S.
N.T.S.VACUUM SWITCH3
N.T.S.
N.T.S.PIPE HANGER DETAIL6
MEDICAL AIR & OXYGEN HIGH & LOW
PRESSURE SWITCH
OXYGEN, VACUUM, AND MEDICAL AIR
OUTLET
WATER HAMMER ARRESTOR.
INSTALL PER MANUFACTURERS
RECOMMENDATIONS.
WATER SUPPLY
WATER SUPPLY TO
PLUMBING FIXTURE
WATER HAMMER ARRESTOR.
INSTALL PER MANUFACTURERS
RECOMMENDATIONS.
WATER SUPPLY
WATER SUPPLY TO
PLUMBING FIXTURES
WATER HAMMER
ARRESTOR SIZE
MODEL CONNECTION
DIA
FIXTURE
UNITS
CROSS
REFERENCE
PDI
LF15M2-A 1/2 1-11 A
LF15M2-B 3/4 12-32 B
LF15M2-C 1 33-60 C
LF15M2-D 1 61-113 D
LF15M2-E 1 114-154 E
LF15M2-F 1 155-330 F
SIZING BASED ON WATTS SERIES LF15M2
N.T.S.WATER HAMMER ARRESTOR DETAIL 5
| P000 PLUMBING NOTES AND LEGEND |
| PD100 PLUMBING DEMOLITION PLAN |
| PD101 MEDICAL GAS DEMOLITION PLAN |
| PL100 PLUMBING RENOVATION PLAN |
| MG100 MEDICAL GAS RENOVATION PLAN |
| P500 PLUMBING DETAILS |
File details come from the government source that posted it. Updated .