Attachment 01 - Drawings Fire Alarm 672-CSI-124 - Part VI of VI - 3 Pages.pdf

PDF 2 MB Posted

Attached to
Z2DA--Construct New Hybrid Operating Room
Solicitation number
36C24825R0026
Issued by

About this file

These documents are fire alarm system drawings for a new hybrid operating room project at the VA Caribbean Healthcare System in San Juan, Puerto Rico. The drawings include fire alarm plans for multiple floors (main floor and penthouse) and provide detailed technical specifications for the fire alarm system installation. Key requirements include:

The fire alarm system must comply with NFPA 72 (2022 edition), NFPA 70, NFPA 101, and local VA codes. The system requires digital addressable devices compatible with the existing campus fire alarm standards, with specific installation notes mandating that all new devices tie into the closest existing notification appliance circuit panel. The contractor must provide complete shop drawings, perform functional testing, and coordinate with the VA's fire alarm maintenance contractor for device terminations and programming. Additional specifications cover device placement, wiring methods, conduit requirements (to be painted red and labeled), and system response protocols, including shutting down air handling units and opening locked egress doors upon fire alarm activation.

View the file

Other files

File Type Posted
S06 - Amendment 0001 Attachment - Site Visit sign-in sheet 4-21-2025 - 36C24825R0026 BB 672-CSI-124 Hybrid OR.pdf PDF
36C24825R0026 0001 RFIs responses and Site Visit Roster.docx DOCX document
S06 - Amendment 0001 Attachment - 02 82 11 Abatement FINAL - 1 page.pdf PDF
S06 - Amendment 0001 Attachment - Specification 10 44 13 - 2 pages.pdf PDF
S06 - Amendment 0001 Attachment - Specification 01 42 19 - 9 pages.pdf PDF
S06 - Amendment 0001 Attachment - AQ-100 Arch PR VA Hybrid OR 100 Percent Final S-S - 1 page.pdf PDF
S06 - Amendment 0001 Attachment - Rigging Plan - 1 Page.pdf PDF
Attachment 01 - Drawings General and Architectural 672-CSI-124 - Part I of VI - 23 Pages.pdf PDF
Attachment 02 - Specifications 672-CSI-124 - Part 2 of 2 - 1026 Pages.pdf PDF
Attachment 02 - Specifications 672-CSI-124 - Part 1 of 2 - 577 Pages.pdf PDF
Attachment 01 - Drawings Fire Protection 672-CSI-124 - Part II of VI - 3 Pages.pdf PDF
Attachment 06 - Letter of Commitment Key Subcontractors - 1 Page.pdf PDF
Attachment 08 - Subcontractor Past Performance Consent Form - 2 Pages.docx DOCX document
Attachment 03 - Contractor Safety and EMR - 2 Pages.docx DOCX document
Attachment 05 - Specialized Experience Form - 3 Pages.pdf PDF
Attachment 07 - Past Performance Questionnaire - 4 Pages.pdf PDF
Attachment 04 - Key Personnel Resume Form Sample - 1 Page.pdf PDF
Attachment 01 - Drawings Plumbing 672-CSI-124 - Part III of VI - 6 Pages.pdf PDF
Attachment 01 - Drawings Mechanical 672-CSI-124 - Part IV of VI - 4 Pages.pdf PDF
Attachment 01 - Drawings Electrical 672-CSI-124 - Part V of VI - 15 Pages.pdf PDF
36C24825R0026 - BB 672-CSI-124 Hybrid OR.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

F

FR

FIRE ALARM SYSTEM RISER KEYNOTES

1. SEE FLOOR PLANS FOR QUANTITIES OF NEW DEVICES AND APPLIANCES, TYPICAL.

2. NEW SUPERVISION CIRCUIT [(2)CLASS B WIRING, TSP-#14 AWG, 3/4" C].

3. NEW SIGNALING LINE CIRCUIT [(2)CLASS B WIRING, TSP-#14 AWG, 3/4" C].

4. EXISTING POWER CIRCUIT (CLASS B WIRING, TSP-#14, 3/4" C).

5. EXISTING FIRE ALARM TERMINAL CABINET.6.

FIRE ALARM RELAY FOR HYBRID OR DOOR.

FIRE ALARM GENERAL NOTES

A. THIS BUILDING REQUIRES A FIRE ALARM SYSTEM THAT COMPLIES WITH NFPA 72 2022

EDITION, NFPA 70 ARTICLE 760, NFPA 101 AND LOCAL VA CODES AND ORDINANCES.

B. FIRE ALARM DOCUMENTS SHALL BE PROVIDED BY OTHERS UNDER SEPARATE

CONTRACT AND SHALL BE USED FOR IFC. THE DOCUMENTS SHALL INCLUDE COMPLETE

DRAWINGS SHOWING ALL EQUIPMENT, DEVICES LOCATIONS, BATTERY

CALCULATIONS, SEQUENCE OF OPERATIONS, POINT TO POINT WIRING, WIRING

LEGEND, FA RISER DIAGRAM, NON-LATCHING FIRE ALARM SYSTEM AND FIRE ALARM

MONITORING SHALL BE CONTACT ID POINT ADDRESSABLE TO THE REMOTE

SUPERVISING STATION VIA THE DIGITAL ALARM COMMUNICATOR BUILT-IN THE FACP

AND ALL OTHER DOCUMENTS REQUIRED BY THE VA.

REFER TO FINAL APPROVED MECHANICAL PLANS AND FIRE PROTECTION

SYSTEM PLANS FOR OTHER LOCATIONS OF FIRE ALARM EQUIPMENT AND/OR DEVICES

REQUIREMENTS AND ADDITIONAL INFORMATION.

C. THE FIRE ALARM CONTRACTOR SHALL BE AN AUTHORIZED

REPRESENTATIVE/DISTRIBUTOR BY THE MANUFACTURER. ACCEPTABLE DIGITAL

ADDRESSABLE SYSTEMS TO MATCH STATION'S STANDARDS.

D. THE EQUIPMENT AND DEVICES SHOWN ON THESE ELECTRICAL DRAWINGS

REPRESENTS A BASIS FOR DESIGN ONLY. THE SELECTED FIRE ALARM SYSTEM

CONTRACTOR IS EXPECTED TO BE FAMILIAR WITH THE ACCEPTED PRACTICES OF THE

VA AND SHALL INCLUDE ALL EQUIPMENT, MATERIALS AND LABOR TO MEET

ALL APPLICABLE CODES AND VA REQUIREMENTS AND SPECIFICATIONS.

E. IT IS THE SOLE RESPONSIBILITY OF THE FIRE ALARM SUBCONTRACTOR TO PROVIDE

A COMPLETE SET OF SHOP DRAWINGS REFLECTING A FULLY-FUNCTIONAL,

CODE-COMPLIANT INSTALLATION AS PER NFPA 72 2022, NFPA 70 ARTICLE 760,

NFPA 101 AND LOCAL VA CODES AND ORDINANCES. BIDS SHALL BE BASED UPON SUCH

A SYSTEM. CHANGE ORDERS FOR ADDITIONAL REQUIRED SYSTEM COMPONENTS

AND WIRING NOT SHOWN ON THE FIRE ALARM PLANS WILL NOT BE APPROVED.

THE FIRE ALARM SYSTEM SUBCONTRACTOR SHALL SUBMIT A SEPARATE FIRE ALARM

SYSTEM DESIGN TO THE VA PER THE REQUIREMENTS OF THE LOCAL CODE AND

ORDINANCES TO HAVE A FULLY FUNCTIONAL FIRE ALARM SYSTEM.

F. THE BUILDING SHALL BE TESTED BY A PRIVATE COMPANY HIRED BY THE CONTRACTOR

TO COMPLY WITH ALL OF THE VA REQUIREMENTS.

G. SHOP DRAWINGS ARE REQUIRED BY A LICENSED AND CERTIFIED CONTRACTOR.

ALL SHOP DRAWINGS MUST BE REVIEWED BY THE ORIGINAL ENGINEER OF RECORD

FOR THE PROJECT FOR COMPLIANCE TO DESIGN. ENGINEER OF RECORD MUST

PROVIDE A SIGNED LETTER WITH THE SHOP DRAWING SUBMITTAL STATING THE

PROJECT IS REVIEWED AND APPROVED.

H. THIS CAMPUS HAS STANDARDIZED EXISTING FIRE ALARM SYSTEM AND

RESPONSIBLE FOR ALL INSPECTION, TESTING AND MAINTENANCE.

THE GENERAL CONTRACTOR SHALL DIRECTLY HIRE EXISTING CAMPUS PROVIDER

AND COORDINATE ALL WORK WITH EXISTING FIRE ALARM MANUFACTURER.

I. THE DESIGN INTENT IS TO TIE THE NEW FIRE ALARM DEVICES TO THE EXISTING FIRE

ALARM TERMINAL CABINET CLOSEST TO SCOPE OF WORK.

FIRE ALARM DEVICES SHALL WORK IN COLLABORATION WITH THE EXISTING FACP.

UPON OPERATION OF A FIRE ALARM INITIATING DEVICE WITHIN THAT ZONE, A TEMPORAL

THREE ALARM SIGNAL AND VISIBLE APPLIANCES SHALL ONLY ACTIVATE WITHIN THAT

ZONE WHILE SENDING A VOICE MESSAGE THROUGHOUT THE BUILDING TO PROVIDE

STAFF RESPONSE IN A TIMELY MANNER AS DESCRIBED IN THE VA FIRE PROTECTION

DESIGN MANUAL SECTION 7.3.F.2.

FF FR

EXISTING

TERMINAL

CABINET

EXISTING

CIRCUIT

EXISTING

FARA

EXISTING

FACP

7.

EXISTING FIRE ALARM ANNUNCIATOR PANEL.

1P 1 POLE (2P, 3P, 4P, ETC.)

A AMPERE

AC ABOVE COUNTER

ACLG ABOVE CEILING

ADO AUTOMATIC DOOR OPENER

AF AMP FRAME

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFI ARC FAULT CIRCUIT

INTERRUPTER

AHU AIR HANDLING UNIT

AL ALUMINUM

ALT ALTERNATE

AMP AMPERE

AMPL AMPLIFIER

ANNUN ANNUNCIATOR

APPROX APPROXIMATELY

AQ-STAT AQUASTAT

ARCH ARCHITECT, ARCHITECTURAL

AS AMP SWITCH

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AWG AMERICAN WIRE GAUGE

BATT BATTERY

BD BOARD

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM

C CONDUIT

CAB CABINET

CAT CATALOG

CATV CABLE TELEVISION

CB CIRCUIT BREAKER

CCTV CLOSED CIRCUIT TELEVISION

CKT CIRCUIT

CLG CEILING

COMB COMBINATION

CMPR COMPRESSOR

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUATION OR CONTINUOUS

CONTR CONTRACTOR

CONV CONVECTOR

CP CIRCULATING PUMP

CRT CATHODE-RAY TUBE

CT CURRENT TRANSFORMER

CTR CENTER

CU COPPER

DCP DOMESTIC WATER CIRCULATING PUMP

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DISC DISCONNECT

DIST DISTRIBUTION

DN DOWN

DPR DAMPER

DS SAFETY DISCONNECT SWITCH

DT DOUBLE THROW

DWG DRAWING

EC ELECTRICAL CONTRACTOR

ELEC ELECTRIC, ELECTRICAL

ELEV ELEVATOR

ELU EMERGENCY LIGHTING UNIT

EM EMERGENCY

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

EP ELECTRIC PNEUMATIC

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXH EXHAUST

EXP EXPLOSION PROOF

FA FIRE ALARM

FABP FIRE ALARM BOOSTER POWER

SUPPLY PANEL

FACP FIRE ALARM CONTROL PANEL

FARA FIRE ALARM ANNUNCIATOR PANEL

FIXT FIXTURE

FLR FLOOR

FLUOR FLUORESCENT

FU FUSE

FUDS FUSED SAFETY DISCONNECT SWITCH

GA GAUGE

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR

GFI GROUND FAULT CIRCUIT INTERRUPTER

GFP GROUND FAULT PROTECTOR

GND GROUND

GRS GALVANIZED RIGID STEEL (CONDUIT)

GYP BD GYPSUM BOARD

HOA HANDS-OFF-AUTOMATIC SWITCH

HORIZ HORIZONTAL

HP HORSEPOWER

HPF HIGH POWER FACTOR

HT HEIGHT

HTG HEATING

HTR HEATER

HV HIGH VOLTAGE

HVAC HEATING, VENTILATING AND AIR

CONDITIONING

IC INTERRUPTING CAPACITY

IG ISOLATED GROUND

IMC INTERMEDIATE METAL CONDUIT

INCAND INCANDESCENT

IR INFRARED

I/W INTERLOCK WITH

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT-AMPERE

KVAR KILOVOLT-AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

LOC LOCATE OR LOCATION

LT LIGHT

LTG LIGHTING

LTNG LIGHTNING

LV LOW VOLTAGE

MAX MAXIMUM

MAG.S MAGNETIC STARTER

M/C MOMENTARY CONTACT

MC MECHANICAL CONTRACTOR

ELECTRICAL ABBREVIATIONS LIST

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDC MAIN DISTRIBUTION CENTER

MDP MAIN DISTRIBUTION PANEL

MFR MANUFACTURER

MFS MAIN FUSED DISCONNECT SW

MH MANHOLE

MIC MICROPHONE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MMS MANUAL MOTOR STARTER

MOA MULTIOUTLET ASSEMBLY

MSP MOTOR STARTER PANELBOARD

MSBD MAIN SWITCHBOARD

MT MOUNT

MT.C EMPTY CONDUIT

MTS MANUAL TRANSFER SWITCH

MTR MOTOR, MOTORIZED

N.C. NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION

NFDS NON-FUSED SAFETY DISCONNECT

SWITCH

NIC NOT IN CONTRACT

NL NIGHT LIGHT

N.O. NORMALLY OPEN

NPF NORMAL POWER FACTOR

NTS NOT TO SCALE

OH OVERHEAD

OL OVERLOADS

PA PUBLIC ADDRESS

PB PULL BOX OR PUSHBUTTON

PE PNEUMATIC ELECTRIC

PED PEDESTAL

PF POWER FACTOR

PH PHASE

PIV POST INDICATING VALVE

PNL PANEL

PP POWER POLE

PR PAIR

PRI PRIMARY

PROJ PROJECTION

PRV POWER ROOF VENTILATOR

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE (CONDUIT)

PWR POWER

QUAN QUANTITY

RCPT RECEPTACLE

REQD REQUIRED

RM ROOM

RSC RIGID STEEL CONDUIT

RTU ROOF TOP UNIT

SC SURFACE CONDUIT

SEC SECONDARY

SHT SHEET

SIM SIMILAR

S/N SOLID NEUTRAL

SPEC SPECIFICATION

SPKR SPEAKER

SP SPARE

SPD SURGE PROTECTION DEVICE

SS STAINLESS STEEL

SSW SELECTOR SWITCH

S/S STOP/START PUSHBUTTONS

STA STATION

STD STANDARD

SURF SURFACE MOUNTED

SW SWITCH

SWBD SWITCHBOARD

SYM SYMMETRICAL

SYS SYSTEM

TEL TELEPHONE

TEL/DATA TELEPHONE/DATA

TERM TERMINAL

TL TWIST LOCK

TR TAMPER RESISTANT

T-STAT THERMOSTAT

TTC TELEPHONE TERMINAL CABINET

TV TELEVISION

TVTC TELEVISION TERMINAL CABINET

TYP TYPICAL

UC UNDER COUNTER

UE UNDERGROUND ELECTRICAL

UG UNDERGROUND

UH UNIT HEATER

UT UNDERGROUND TELEPHONE

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VA VOLT-AMPERES

VDT VIDEO DISPLAY TERMINAL

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W WATT

W/ WITH

WG WIRE GUARD

WH WATER HEATER

W/O WITHOUT

WP WEATHERPROOF

XFMR TRANSFORMER

XFR TRANSFER

∠ ANGLE

@ AT

▲ DELTA

' FEET

" INCHES

# NUMBER

Ø PHASE

C CENTER LINE

P PLATE

FIRE ALARM NOTES, LEGEND

& ABBREVIATIONS

FA001

PROJECT GENERAL NOTES

1. THIS IS A LIST OF FIRE ALARM SYMBOLS AND ABBREVIATIONS FOR REFERENCE ONLY.

SYMBOLS AND ABBREVIATIONS SHOWN ON THIS DRAWING MAY NOT APPEAR ON THE

FOLLOWING DRAWINGS.

2. THE CONTRACTOR SHALL COORDINATE ALL REQUIRED SHUTDOWNS ON EXISTING

UTILITIES WITH COR DURING ALL CONSTRUCTION PHASES IN ORDER TO MINIMIZE IMPACT

TO OTHER AREAS. ENSURE ALL OTHER AREAS OUTSIDE PHARMACY SOW IS TO REMAIN

ACTIVE AND NOT DISTURBED.

3. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL

CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY HAVING

JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE ENGINEERING DOCUMENTS AND

CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.

4. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING

CODE REQUIREMENTS:

- NFPA 101-2021, THE LIFE SAFETY CODE

- NFPA 70-2023, NATIONAL ELECTRICAL CODE

- NFPA 72-2022, NATIONAL FIRE ALARM CODE

5. THE FIRE ALARM DRAWINGS ARE SCHEMATIC IN NATURE. BEFORE STARTING THE WORK

THE CONTRACTOR SHALL REVIEW ALL OTHER DISCIPLINE DRAWINGS AND VERIFY FIELD

CONDITIONS AND SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA

COST TO THE VA. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE

ATTENTION OF THE ARCHITECT/ENGINEER.

6. ALL DEVICES, EQUIPMENT MATERIAL AND LABOR SHALL BE PROVIDED BY THE

CONTRACTOR UNLESS NOTED OTHERWISE.

7. ALL ELECTRICAL EQUIPMENT AND DEVICES SHALL BE MOUNTED AS PER EQUIPMENT AND

DEVICE MANUFACTURER RECOMMENDATIONS.

8. CONTRACTOR SHALL PROVIDE SUBMITTALS TO VA COR FOR REVIEW AND APPROVAL OF

ALL ELECTRICAL EQUIPMENT AND DEVICES DESCRIBED IN THE SUBMITTAL REGISTER.

SUBMITTALS SHALL INCLUDE CUT SHEETS, DIMENSIONS, WIRING DIAGRAMS,

ACCESSORIES, OPERATION MANUALS, AND ALL NECESSARY INFORMATION FOR

REVIEWER TO MAKE A SOUND EVALUATION.

9. PROVIDE STARTUP OF ALL FIRE ALARM SYSTEMS AND ENSURE THE VA COR IS IN

ATTENDANCE TO WITNESS THE STARTUP.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A COMPLETE SET OF RECORD

DRAWINGS TO THE VA AT THE END OF THE CONSTRUCTION.

11. ALL MATERIALS AND EQUIPMENT TO BE INSTALLED SHALL BE NEW AND FREE OF DEFECTS.

ALL ELECTRICAL EQUIPMENT SHALL COMPLY WITH NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION (NEMA) STANDARDS AND SHALL BE UL LABELED. ALL

ELECTRICAL EQUIPMENT AND MATERIALS SHALL BE INSTALLED IN A WORKMANLIKE

MANNER.

12. WHERE JOB CONDITIONS REQUIRE CHANGE FROM THE CONTRACT DOCUMENTS THAT DO

NOT CHANGE THE SCOPE OR NATURE OF WORK REQUIRED, THE CONTRACTOR SHALL

MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE VA. NO OTHER CHANGES MAY

BE MADE WITHOUT WRITTEN PERMISSION FROM THE ENGINEER.

13. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF CONSTRUCTION

DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT CONDITIONS DURING

CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE ALL CONTRACT CHANGES,

MODIFICATIONS AND CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL

BE TURNED OVER TO THE ARCHITECT/ENGINEER AFTER CONSTRUCTION COMPLETION.

14. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE AND

SMOKE RATED ASSEMBLY PENETRATIONS BY DUCTS, PIPES, OR CONDUITS, AND SHALL

DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL TIMES DURING CONSTRUCTION.

FIRE ALARM SYMBOLS

(MOUNTING HEIGHT TO CENTER LINE OF BOX UNLESS NOTED OTHERWISE)

FIRE ALARM STROBE LIGHT (80" AFF) (SAME AS MANUFACTURER AND MODEL

AS EXISTING DEVICES) (75 CANDELA)

FIRE ALARM SPEAKER/STROBE COMBINATION (80" AFF) (SAME AS

MANUFACTURER AND MODEL AS EXISTING DEVICES) (75 CANDELA)

FIRE DAMPER

FIRE ALARM RELAY

SMOKE DETECTOR

DUCT DETECTOR

U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive

Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994

MES Group, Inc.

550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group

COA # 8304

SD

Fire Alarm System Input Output Matrix

*While NFPA 101 does not require some detectors to notify building occupants, VA requires all smoke detectors, other than duct smoke detectors, to notify building occupants. Only install smoke detectors when required by NFPA 101 or its references.

** Those doors that are required to be tied to the fire alarm system such as delayed egress electrical locking systems and sensor release electrical locking systems.

*** This applies to Ambulatory Health Care Occupancies that require smoke barriers per NFPA 101 or are designed with multiple smoke zones.

OUTPUT →

INPUT DEVICE

Duct Smoke Detector*

Area Smoke Detector*

XB

X

XB

X

XB

X

XB

A – Do not provide duct detectors in dedicated (100%) exhaust fans, they should continue to run. Unless otherwise noted.

B – The facility is permitted to sound the general alarm/notify necessary staff or initiate a supervisory signal to be consistent with the operation of existing systems/fire plan.

X XA

X

1.

So un d ge ne ra l b ui ld in g al ar m fo r O th er a nd N on -H ig h

R is e (n on -H ea lth

C ar

e) . S ee S ec tio n 7.

2.

2.

N ot ify n ec es sa ry s ta ff fo r re sp on se fo r H ea lth

C ar e, Am bu la to ry

H ea lth C ar e* an d

H ig h R is e bu ild in gs o nl y (a la rm s ig na l m ay b e di ffe re nt on d iff er en t f lo or s)

3.

N ot ify

F ire

D ep ar tm en t.

4.

In iti at e su pe rv is or y si gn al to a

-h ou r m an ne d po in t f or im m ed ia te re sp on se

5.

C lo se d am pe rs o n fa n pr ox im at e to d et ec to r.

6.

S hu t d ow n ai r h an dl er s er ve d by th e de te ct or

7.

O pe n lo ck ed e gr es s do or s on fl oo r o f f ire o rig in

N.T.S.D4 FIRE ALARM SYSTEM RISER

N.T.S.E4 FIRE ALARM SYSTEM INPUT AND OUTPUT MATRIX

DD

Sheet List Table Sheet Number Sheet Title

FA001 FIRE ALARM NOTES, LEGEND & ABBREVIATIONS

FA100 FIRE ALARM PLAN

FA200 FIRE ALARM PENTHOUSE PLAN

04/03/2024

WAITING AREA

CONTROL

ROOM

CLOSET

FILES

RADIOGRAPHIC

C O R R I D O R

109.86n.s.f.

100.92n.s.f.

OFFICE

BUDGET

A-160

500 n.s.f.

CARDIAC.

ROOM

A-158

OFFICE

A-159

PHYSICS

MEDICAL

163.62n.s.f.

A-158

ROOM

CONTROL

A-

8a

ST

O

31.41n.s.f.

H.A.C.

A-171

149.64n.s.f.

A-172b

TOILET

A-172 ECOCARDIO-

GRAPHY RM.

B-117 B-115

B-114

LOUNGE STAFF RM.

A-172a

LOCK RM.

ELEC.

CLOS.

MALE LOCKERS

SIGNAL

SHOWER

CLOS. FEMALE LOCKERS

PHYSICIAN'S

LOCKERS

C O

R R

I D

O R

25.58n.s.f.

25.75n.s.f.

152.44n.s.f.122.11n.s.f.

194.94n.s.f.

DN.DN.

C O R R I D O R C1-8

NO WORK IN THIS ROOM

NO WORK IN

THIS ROOM

NO WORK

IN THIS

ROOM

PANEL

1LA1C

(E)

HYBRID

OPERATING

ROOM

CONTROL

ROOM

SCRUB STN.

IMAGING

COMPONENT

ROOM

STERILE

SUPPLY

GURNEY

1 (TYP)

F

F

75cd

75cd

F 75cd

75cd

F 75cd

F75cd

F 75cd

F 75cd

F

FR

B-117a

ELECTRICAL CLOSET

U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive

Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994

MES Group, Inc.

550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group

COA # 8304

FIRE ALARM PLAN

1/4" = 1'-0"

FA100

FIRE ALARM PLAN

FA100

KEYNOTES

1. REFER TO SHEET E501 AND E502 FOR DETAILS AND LEGEND OF

EQUIPMENT.

2. FIRE ALARM ANSUL NOTIFICATION APPLIANCE MODULE.

8.8

9.8

CBA

GENERAL NOTES

A. CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFICATION OF ALL

RATED WALLS, CEILINGS, AND SLAB AND THEIR SPECIFIED RATING ON

THE ARCHITECTURAL DRAWINGS. ALL DEVICES AND MATERIAL SHALL

MEET THE UL RATING OF THE RATED WALL ASSEMBLY. CONTRACTOR

SHALL PROVIDE AN ASSEMBLY INSTALLED IN ACCORDANCE WITH UL FOR

THE RATED APPLICATION.

B. EXISTING CONDITIONS ARE BASED ON RECORD DOCUMENTS AND FIELD

OBSERVATION. ELECTRICAL CONTRACTOR SHALL REPORT

DISCREPANCIES TO ENGINEER PRIOR TO DISTURBING EXISTING

INSTALLATION.

C. ENSURE EXISTING FIRE ALARM RESPONSE IS COMPATIBLE WITH THE

EXISTING FIRE ALARM SYSTEM FOR ALL NEW FIRE ALARM DEVICES TO

TIE INTO CLOSEST EXISTING NOTIFICATION APPLIANCE CIRCUIT PANEL.

D. CONTRACTOR SHALL PROVIDE ALL NEW FIRE ALARM DEVICES, WIRING,

CONDUIT, ETC. FROM POINT OF CONNECTION OF NEW DEVICES TO

EXISTING NOTIFICATION APPLIANCE CIRCUIT (NAC PANEL). FIRE ALARM

CONTRACTOR SHALL PERFORM FUNCTIONAL TESTING, PROGRAMMING

AND CONNECTION OF THE NEW FIRE ALARM DEVICES AND COMPONENTS

WITHIN THE AREA OF SCOPE. ALL NEW DEVICES SHALL BE UNDER

WARRANTY SEPARATE FROM THE ORIGINAL SYSTEM.

E. PROVIDE JUNCTION BOXES, WIRE, CABLING, CONDUIT, ETC, AS

REQUIRED TO MAINTAIN CONTINUITY TO EXISTING TO REMAIN DEVICES,

FIXTURES, EQUIPMENT, ETC.

F. MAGNETIC LOCKS SHALL BE CONNECTED TO THE FIRE ALARM SYSTEM

THROUGH A SET OF NORMALLY CLOSED, DRY CONTACTS SUPPLIED BY

FIRE ALARM CONTRACTOR.

G. DOOR HARDWARE SHALL BE COORDINATED WITH FIRE ALARM SYSTEM

TO DISENGAGE UPON FIRE ALARM SYSTEM ACTIVATION. COORDINATE

FINAL LOCATION OF CONDUIT AND JUNCTION BOXES WITH SUCCESSFUL

DOOR SECURITY HARDWARE PROVIDER PRIOR TO CONSTRUCTION.

H. GC TO ENGAGE SERVICES OF VA'S FIRE ALARM MAINTENANCE

CONTRACTOR TO PERFORM DEVICE TERMINATIONS, PROGRAMMING

CHANGES AND TESTING. IF THE VA DOES NOT HAVE A CURRENT SERVICE

CONTRACTOR, GC SHALL ENGAGE SERVICES FROM ENTITY CERTIFIED

BY MANUFACTURER AND ACCEPTABLE TO THE VA.

I. ENSURE ALL FIRE ALARM CONDUIT, JUNCTION BOXES, ETC. ARE PAINTED

RED. ALL CONDUIT IS TO BE LABELED EVERY 10 FEET POINTING

TOWARDS THE FACP. ALL JUNCTION BOXES ARE TO BE LABELED TO

THEIR CONTENTS (SLC OR NAC, ETC.).

F G H J K

P-2

P-1

10.1

STAIR # 1

UP. DN.

P-3

P-4

9.4

8.9

S-5 S-6 S-7

NL M

DN.

5.9

STAIR # 2

SERV. ELEV.

LOBBY

ROOM

A-309-X

ROOM

B-340-X

F G H J K NL MFE

DD DD

COORDINATION NOTE:

PENTHOUSE IS AN ENCLOSED

AREA FROM ELEMENTS.

U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive

Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994

MES Group, Inc.

550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group

COA # 8304

FIRE ALARM PENTHOUSE PLAN

1/8" = 1'-0"

FA200

FIRE ALARM PENTHOUSE

PLAN

FA200

KEYNOTES

1. CONTRACTOR SHALL COORDINATE ALL CONDUIT RUNS IN FIELD. ALL

CONDUIT SHALL BE CEILING SUSPENDED OR WALL MOUNTED. NO

CONDUIT SHALL RUN ALONG THE FLOOR.

2. FIRE ALARM CONTRACTOR SHALL COORDINATE WITH HVAC CONTROLS

CONTRACTOR TO ENSURE THAT AIR MOVING DEVICES SHUT DOWN IN

THE EVENT OF ACTIVATION OF INITIATION DEVICES. GENERAL

CONTRACTOR SHALL INCLUDE IN BID ALL PROGRAMMING, TESTING,

HARDWARE AND DEVICES NEEDED TO ACHIEVE A FULLY FUNCTIONAL

SYSTEM.

GENERAL NOTES

A. CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFICATION OF ALL

RATED WALLS, CEILINGS, AND SLAB AND THEIR SPECIFIED RATING ON

THE ARCHITECTURAL DRAWINGS. ALL DEVICES AND MATERIAL SHALL

MEET THE UL RATING OF THE RATED WALL ASSEMBLY. CONTRACTOR

SHALL PROVIDE AN ASSEMBLY INSTALLED IN ACCORDANCE WITH UL FOR

THE RATED APPLICATION.

B. EXISTING CONDITIONS ARE BASED ON RECORD DOCUMENTS AND FIELD

OBSERVATION. ELECTRICAL CONTRACTOR SHALL REPORT

DISCREPANCIES TO ENGINEER PRIOR TO DISTURBING EXISTING

INSTALLATION.

C. ENSURE EXISTING FIRE ALARM RESPONSE IS COMPATIBLE WITH THE

EXISTING FIRE ALARM SYSTEM FOR ALL NEW FIRE ALARM DEVICES TO

TIE INTO CLOSEST EXISTING NOTIFICATION APPLIANCE CIRCUIT PANEL.

D. CONTRACTOR SHALL PROVIDE ALL NEW FIRE ALARM DEVICES, WIRING,

CONDUIT, ETC. FROM POINT OF CONNECTION OF NEW DEVICES TO

EXISTING NOTIFICATION APPLIANCE CIRCUIT (NAC PANEL). FIRE ALARM

CONTRACTOR SHALL PERFORM FUNCTIONAL TESTING, PROGRAMMING

AND CONNECTION OF THE NEW FIRE ALARM DEVICES AND COMPONENTS

WITHIN THE AREA OF SCOPE. ALL NEW DEVICES SHALL BE UNDER

WARRANTY SEPARATE FROM THE ORIGINAL SYSTEM.

E. PROVIDE JUNCTION BOXES, WIRE, CABLING, CONDUIT, ETC, AS

REQUIRED TO MAINTAIN CONTINUITY TO EXISTING TO REMAIN DEVICES,

FIXTURES, EQUIPMENT, ETC.

F. GC TO ENGAGE SERVICES OF VA'S FIRE ALARM MAINTENANCE

CONTRACTOR TO PERFORM DEVICE TERMINATIONS, PROGRAMMING

CHANGES AND TESTING. IF THE VA DOES NOT HAVE A CURRENT SERVICE

CONTRACTOR, GC SHALL ENGAGE SERVICES FROM ENTITY CERTIFIED

BY MANUFACTURER AND ACCEPTABLE TO THE VA.

G. ENSURE ALL FIRE ALARM CONDUIT, JUNCTION BOXES, ETC. ARE PAINTED

RED. ALL CONDUIT IS TO BE LABELED EVERY 10 FEET POINTING

TOWARDS THE FACP. ALL JUNCTION BOXES ARE TO BE LABELED TO

THEIR CONTENTS (SLC OR NAC, ETC.).

File details come from the government source that posted it. Updated .