Attachment 006 1800000 FAP Envirionmental.pdf

PDF 273 KB Posted

Attached to
Naval Weapons Station Earle Environmental Laboratory Services Federal contract opportunity
Solicitation number
N4008526R0013
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This Functional Assessment Plan (FAP) outlines environmental services for a federal contract with the identifier 1800000. The document specifies performance objectives, standards, and assessment methods for various environmental management tasks, primarily focusing on sampling, field testing, and laboratory services. Key performance areas include:

The primary assessment involves periodic sampling (PS) with monthly frequency and a 10% normal sample size (5% reduced). Performance is evaluated across three assessment levels (AL1, AL2, AL3), with escalating scrutiny if contractor performance is unsatisfactory. Specific requirements include timely sample collection and submission within seven days, field testing compliance, laboratory analysis within 14 days, and adherence to Department of Defense (DoD), Environmental Protection Agency (EPA), and state environmental policies and regulations. The contract also allows for Indefinite Delivery/Indefinite Quantity (IDIQ) work, with performance standards matching those outlined in the main specification items.

View the file

Other files for this federal contract opportunity

Other files attached to Naval Weapons Station Earle Environmental Laboratory Services, newest first.
File Type Posted
N4008526R0013 Questions and Answers.pdf PDF
Attachment 003 1800000 C Environmental.pdf PDF
Att J-1800000-06 Non-Recurring Steam Condensate Testing.pdf PDF
Att J-0200000-07 ELINs Environmental.xlsx XLSX spreadsheet
Attachment 001 0100000 C General Information.pdf PDF
Attachment 004 0200000 F Management and Administration.pdf PDF
Attachment 007 1800000 WBS Environmmental.pdf PDF
Att J-1800000-03 Current Sludge Testing.pdf PDF
Att J-1800000-04 Current Sewer Treatment Plant Testing.pdf PDF
Att J-1800000-05 Proposed Sewer Treatment Plant Testing.pdf PDF
Att J-1800000-09 Waste Water Testing Requirements.pdf PDF
Att J-1800000-10 Potable Water Testing Requirements.pdf PDF
Att J-0200000-05 NAVFAC CSIR FORM W.pdf PDF
Solicitation - N4008526R0013.pdf PDF
Attachment 005 1800000 F Environmental.pdf PDF
Att J-1800000-07-08 Historical Data Sampling and Potential Rqrmts.pdf PDF
Att J-1800000-11 Per- and Polyfluorinated Alkyl Substances (PFAS) Sampling.pdf PDF
Att J-0200000 J Management and Administration.pdf PDF
Att J-0200000-05 RA Badge.pdf PDF
Attachment 002 0200000 C Management and Administration.pdf PDF
Attachment 008 1800000 M Envirionmental.pdf PDF
Att J-1800000-01-02 Environmental.pdf PDF
Att J-0200000-05 5512 7-31-2027.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FUNCTIONAL ASSESSMENT PLAN (FAP)

ENVIRONMENTAL

1800000

ENVIRONMENTAL FAP

Assessment Levels (AL) Assessment Frequency (Freq)

A – Annually

Q – Quarterly

M – Once per month

BW – Once every 13-16 days

W – Once per week

R – As required

Method of Assessment (MOA)

PS – Periodic Sampling

VCC – Validated Customer Complaints

UV – Unscheduled Visits

CE – Customer’s Evaluation

AL1

Start assessment at this Level

AL2

Add this Level if Contractor performance for AL1 is Unsatisfactory

AL3

Add this Level if Contractor performance at AL1 or AL2 is Unsatisfactory

Note: Return to appropriate Assessment Level when performance improves.

Note: The first method listed in the MOA column below is the primary assessment method.

Spec Item

Performance Objective Performance Standard MOA

Assessment Level

Sample Size

Freq

AL1 AL2 AL3

UOM

(total)

Normal Reduced

3.1 Sampling, Field Testing and

Laboratory Services The Contractor shall provide environmental sampling, field testing, laboratory services to ensure compliance oversight at the installation.

Sample collection, field testing and laboratory services comply with DoD, EPA, and state policies, instructions, and guidance such as:

(1) OPNAVINST

5090.1

(2) EPA SW-846

(3) EPA PB83-124503

(4) EPA/600/4-85/013

(5) NAVSEA T0300-AZ-PRO-010

PS

N/A

10%

5%

M

3.1.1 Sampling

The Contractor shall conduct timely sample collection to ensure the installation complies with sampling plan.

Sample collection complies with the approved sampling plan.

Item

Performance Objective Performance Standard MOA

Assessment Level

Sample Size

Freq

AL1 AL2 AL3

UOM

(total)

Normal Reduced

Samples are collected and copies of sample collection logs are submitted within seven days of notification or in accordance with the schedule included in the sampling plan.

3.1.2 Field Testing

The Contractor shall conduct timely field testing to ensure the installation complies with the

Field testing complies with the

Copies of field tests results are submitted within seven days after testing has been completed.

3.1.3 Laboratory Services

The Contractor shall provide laboratory services to ensure the installation complies with the

Laboratory services comply with the

Samples are analyzed and results are reported within 14 days of receipt of sample.

3.2 Used Oil Management Services

3.2.1 Used Oil Accumulation and

Collection

3.2.2 Used Oil Recycling and

Disposal

3.3 Discarded Hazardous Material/

Hazardous Waste/Other Regulated Waste (HM/ HW/ORW) Management The Contractor shall manage discarded HM/HW/ORW to ensure the installation complies with Federal, state and local

HM/HW/ORW management complies with Federal, state and local statutes and regulations, and with DoD and Navy policies, instructions guidance, and permits.

5%

Item

Performance Objective Performance Standard MOA

Assessment Level

Sample Size

Freq

AL1 AL2 AL3

UOM

(total)

Normal Reduced statutes and regulations, and with DoD and Navy policies, instructions and guidance.

No release of HM/HW/ORW to the environment due to Contractor’s non-performance, mismanagement or negligence.

No documented citations such as NOV, warning letters or citizen suits due to Contractor’s non-performance, mismanagement or negligence.

3.3.1 Discarded HM/HW/ORW

Accumulation Areas and Storage Facilities Operations

3.3.2 Collection of Discarded

HM/HW/ORW

3.3.3 Transportation of HM/HW/ORW

3.3.4 Hazardous Waste/Other

Regulated Waste Disposal

3.4 Oil and Hazardous Substance

Spill Response and Cleanup Ashore

3.4.1 Oil and Hazardous Substance

Spill Containment

3.4.2 Oil and Hazardous Substance

Spill Cleanup and Disposal

3.4.3 Oil and Hazardous Substance

Spill Reporting and Documentation

Item

Performance Objective Performance Standard MOA

Assessment Level

Sample Size

Freq

AL1 AL2 AL3

UOM

(total)

Normal Reduced

3.5 Groundwater Monitoring

3.6 Storm Water Monitoring N/A

4 IDIQ Work IDIQ work may be ordered on a task order in accordance with the

PROCEDURES FOR ISSUING

ORDERS clause in Section G.

The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

All periods of performance are measured from issue date of order to acceptance of the work. Performance standards for IDIQ work will be the same as those in Spec Item 3 where applicable.

As

Required

R

MONTHLY PERFORMANCE ASSESSMENT SUMMARY

Contract #: N40085-21-D-XXXX Installation/Site:

Annex/sub-annex: 1800000 Environmental Month/Year:

Title

AL1 Rating AL2/AL3 Rating Safety

Item E VG S M U # Samples A U # Samples VCC Issues # Samples

3.1 Sampling, Field Testing and

Laboratory Services

3.1.1 Sampling

3.1.2 Field Testing

3.1.3 Laboratory Services

3.2 N/A

3.2.1 N/A

3.2.2. N/A

3.3 Discarded Hazardous

Material/Hazardous

Waste/Other Regulated Waste

(HM/HW/ORW) Management

3.3.1 N/A

3.3.2 N/A

3.3.3 N/A

3.4 N/A

3.4.1 N/A

3.4.2 N/A

3.4.3 N/A

3.5 N/A

3.6 N/A

4 IDIQ

Comments:

Recommended Actions:

Technical Ratings (mark using "X")

E VG S M U

Overall Technical Rating for FFP Work

Overall Technical Rating for IDIQ Work

SPAR Signature: Date:

File details come from the government source that posted it. Updated .