This document is an attachment (J-1800000-05) for a Proposed Sewer Treatment Plant Testing document. The attachment contains multiple detailed tables (Tables III-A-1 through III-A-5) that appear to be comprehensive monitoring and reporting requirements for Surface Water DMR (Discharge Monitoring Report) testing. The tables include various parameters such as surface water testing, pH levels, nutrient measurements, and other environmental monitoring metrics. The tables specify detailed monitoring frequencies (ranging from 1/Day to 6 Hour Composite), reporting requirements, and specific measurement units and limits for different environmental parameters across multiple testing phases. The documentation seems to be part of a naval weapons station's environmental compliance reporting process, with all tables dated in January and covering a monitoring period beginning from the effective date of a permit (EDP).
View the file
Other files for this federal contract opportunity
Other files attached to Naval Weapons Station Earle Environmental Laboratory Services, newest first.