Attachment 0014 - Economic Price Adjustment (EPA) Tables.xlsx
XLSX spreadsheet 825 KB Posted
- Solicitation number
- W56HZV-22-R-0103
About this file
This document provides notice of the Army's intent to award a new ten-year requirements contract to Caterpillar Inc. for a Service Life Extension Program. The contract will extend the service life of approximately 240 government-furnished construction vehicles and material handling equipment, including vibratory rollers, high speed compactors, dozers, graders, loaders, and scrapers. Work will include core maintenance tasks common to all vehicles, along with additional repairs unique to each vehicle's condition. The contract will also include technology insertions, modifications to accommodate new equipment, and provisions for future maintenance work orders and engineering changes over the ten-year period from May 2024 to May 2033. Pricing will consist of both fixed-price and firm-fixed-price CLINs. The notice states that Caterpillar is the only company able to provide the required SLEP services and supplies without unacceptable delay, and that the proposed sole-source award is in accordance with FAR 6.302-1(a)(2)(ii). Interested parties may submit capability statements for consideration, but the agency retains discretion over competition. The point of contact is provided for any questions.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover
CUI
ATTENTION
Use this space to indicate categories, limited dissemination controls, special instructions, points of contact, etc., if needed.
Controlled by: PEO CS&CSS JPO JLTV Controlled by: PEO CS&CSS Classification Guide and JPO JLTV Classification Guide CUI Category(ies): Procure Limited Dissemination Control: DIST C POC: JPO JLTV Project Security Manager; (586) 239-3491
| ATTENTION | |
| All individuals handling this information are required to protect it from unauthorized disclosure. |
Handling, storage, reproduction, and disposition of the attached document(s) must be in accordance with 32 CFR Part 2002 and applicable agency policy.
Access to and dissemination of Controlled Unclassified Information shall be allowed as necessary and permissible to any individual(s), organization(s), or grouping(s) of users, provided such access or dissemination is consistent with or in furtherance of a Lawful Government Purpose and in a manner consistent with applicable law, regulations, and Government-wide policies.
Standard Form 901 (11-18) Prescribed by GSA/ISOO | 32 CFR 2002
CUI
Controlled by: DOA Controlled by: PEO CS&CSS, PM FP, PdM EMSE CUI Categories: CONTRACT, PROPIN Limited Distribution Control: FEDCON
POC:
Title
CUI
| Attachment 0014 |
| Economic Price Adjustment (EPA) Tables |
October 2023
CUI
Instructions
| Contract W56HZV-XX-D-XXXX | |
| Attachment 0014 Economic Price Adjustment (EPA) Tables | |
| 1 | All input cells are highlighted in yellow. |
| 2 | The Contractor shall not manipulate or alter any cells that are not highlghted in yellow in the attachment. |
| 3 | For the applicable ordering year, enter the most current index value (may be preliminary) as of the Effective Index Observation Date. |
| 4 | The attachment automatically calculates the adjustment amount, if any, according to the parameters of the clause in Section H.2. |
Order Year 2 (Base)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 2 (Base) |
| 2 | Start of Ordering Period: | Mar/2024 |
| 3 | Effective Index Observation Date: | Dec/2023 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0201 | 0203 | 0205 | 0207 | 0209 | 0211 | 0213 | 0215 | 0217 | 0219 | 0221 | 0223 | 0225 | 0227 | 0229 | 0231 | 0233 | 0235 | 0237 | 0239 | 0241 | 0243 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0201 | 0203 | 0205 | 0207 | 0209 | 0211 | 0213 | 0215 | 0217 | 0219 | 0221 | 0223 | 0225 | 0227 | 0229 | 0231 | 0233 | 0235 | 0237 | 0239 | 0241 | 0243 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0201 | 0203 | 0205 | 0207 | 0209 | 0211 | 0213 | 0215 | 0217 | 0219 | 0221 | 0223 | 0225 | 0227 | 0229 | 0231 | 0233 | 0235 | 0237 | 0239 | 0241 | 0243 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| CUI |
Order Year 3 (Base)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 3 (Base) |
| 2 | Start of Ordering Period: | Mar/2025 |
| 3 | Effective Index Observation Date: | Dec/2024 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0301 | 0303 | 0305 | 0307 | 0309 | 0311 | 0313 | 0315 | 0317 | 0319 | 0321 | 0323 | 0325 | 0327 | 0329 | 0331 | 0333 | 0335 | 0337 | 0339 | 0341 | 0343 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0301 | 0303 | 0305 | 0307 | 0309 | 0311 | 0313 | 0315 | 0317 | 0319 | 0321 | 0323 | 0325 | 0327 | 0329 | 0331 | 0333 | 0335 | 0337 | 0339 | 0341 | 0343 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0301 | 0303 | 0305 | 0307 | 0309 | 0311 | 0313 | 0315 | 0317 | 0319 | 0321 | 0323 | 0325 | 0327 | 0329 | 0331 | 0333 | 0335 | 0337 | 0339 | 0341 | 0343 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
CUI
Order Year 4 (Base)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 4 (Base) |
| 2 | Start of Ordering Period: | Mar/2026 |
| 3 | Effective Index Observation Date: | Dec/2025 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0401 | 0403 | 0405 | 0407 | 0409 | 0411 | 0413 | 0415 | 0417 | 0419 | 0421 | 0423 | 0425 | 0427 | 0429 | 0431 | 0433 | 0435 | 0437 | 0439 | 0441 | 0443 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0401 | 0403 | 0405 | 0407 | 0409 | 0411 | 0413 | 0415 | 0417 | 0419 | 0421 | 0423 | 0425 | 0427 | 0429 | 0431 | 0433 | 0435 | 0437 | 0439 | 0441 | 0443 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0401 | 0403 | 0405 | 0407 | 0409 | 0411 | 0413 | 0415 | 0417 | 0419 | 0421 | 0423 | 0425 | 0427 | 0429 | 0431 | 0433 | 0435 | 0437 | 0439 | 0441 | 0443 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
CUI
Order Year 5 (Base)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 5 (Base) |
| 2 | Start of Ordering Period: | Mar/2027 |
| 3 | Effective Index Observation Date: | Dec/2026 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0501 | 0503 | 0505 | 0507 | 0509 | 0511 | 0513 | 0515 | 0517 | 0519 | 0521 | 0523 | 0525 | 0527 | 0529 | 0531 | 0533 | 0535 | 0537 | 0539 | 0541 | 0543 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0501 | 0503 | 0505 | 0507 | 0509 | 0511 | 0513 | 0515 | 0517 | 0519 | 0521 | 0523 | 0525 | 0527 | 0529 | 0531 | 0533 | 0535 | 0537 | 0539 | 0541 | 0543 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0501 | 0503 | 0505 | 0507 | 0509 | 0511 | 0513 | 0515 | 0517 | 0519 | 0521 | 0523 | 0525 | 0527 | 0529 | 0531 | 0533 | 0535 | 0537 | 0539 | 0541 | 0543 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
CUI
Order Year 6 (Option)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 6 (Option) |
| 2 | Start of Ordering Period: | Feb/2028 |
| 3 | Effective Index Observation Date: | Dec/2027 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0601 | 0603 | 0605 | 0607 | 0609 | 0611 | 0613 | 0615 | 0617 | 0619 | 0621 | 0623 | 0625 | 0627 | 0629 | 0631 | 0633 | 0635 | 0637 | 0639 | 0641 | 0643 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0601 | 0603 | 0605 | 0607 | 0609 | 0611 | 0613 | 0615 | 0617 | 0619 | 0621 | 0623 | 0625 | 0627 | 0629 | 0631 | 0633 | 0635 | 0637 | 0639 | 0641 | 0643 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0601 | 0603 | 0605 | 0607 | 0609 | 0611 | 0613 | 0615 | 0617 | 0619 | 0621 | 0623 | 0625 | 0627 | 0629 | 0631 | 0633 | 0635 | 0637 | 0639 | 0641 | 0643 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
CUI
Order Year 7 (Option)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 7 (Option) |
| 2 | Start of Ordering Period: | Feb/2029 |
| 3 | Effective Index Observation Date: | Nov/2028 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0701 | 0703 | 0705 | 0707 | 0709 | 0711 | 0713 | 0715 | 0717 | 0719 | 0721 | 0723 | 0725 | 0727 | 0729 | 0731 | 0733 | 0735 | 0737 | 0739 | 0741 | 0743 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0701 | 0703 | 0705 | 0707 | 0709 | 0711 | 0713 | 0715 | 0717 | 0719 | 0721 | 0723 | 0725 | 0727 | 0729 | 0731 | 0733 | 0735 | 0737 | 0739 | 0741 | 0743 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0701 | 0703 | 0705 | 0707 | 0709 | 0711 | 0713 | 0715 | 0717 | 0719 | 0721 | 0723 | 0725 | 0727 | 0729 | 0731 | 0733 | 0735 | 0737 | 0739 | 0741 | 0743 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
CUI
Order Year 8 (Option)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 8 (Option) |
| 2 | Start of Ordering Period: | Feb/2030 |
| 3 | Effective Index Observation Date: | Nov/2029 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0801 | 0803 | 0805 | 0807 | 0809 | 0811 | 0813 | 0815 | 0817 | 0819 | 0821 | 0823 | 0825 | 0827 | 0829 | 0831 | 0833 | 0835 | 0837 | 0839 | 0841 | 0843 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0801 | 0803 | 0805 | 0807 | 0809 | 0811 | 0813 | 0815 | 0817 | 0819 | 0821 | 0823 | 0825 | 0827 | 0829 | 0831 | 0833 | 0835 | 0837 | 0839 | 0841 | 0843 | ||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | 621G Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .