Attachment 0014 - Economic Price Adjustment (EPA) Tables.xlsx

XLSX spreadsheet 825 KB Posted

Attached to
Caterpillar Earthmoving Equipment Service Life Extension Program (SLEP)
Solicitation number
W56HZV-22-R-0103
Issued by

About this file

This document provides notice of the Army's intent to award a new ten-year requirements contract to Caterpillar Inc. for a Service Life Extension Program. The contract will extend the service life of approximately 240 government-furnished construction vehicles and material handling equipment, including vibratory rollers, high speed compactors, dozers, graders, loaders, and scrapers. Work will include core maintenance tasks common to all vehicles, along with additional repairs unique to each vehicle's condition. The contract will also include technology insertions, modifications to accommodate new equipment, and provisions for future maintenance work orders and engineering changes over the ten-year period from May 2024 to May 2033. Pricing will consist of both fixed-price and firm-fixed-price CLINs. The notice states that Caterpillar is the only company able to provide the required SLEP services and supplies without unacceptable delay, and that the proposed sole-source award is in accordance with FAR 6.302-1(a)(2)(ii). Interested parties may submit capability statements for consideration, but the agency retains discretion over competition. The point of contact is provided for any questions.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover

CUI

ATTENTION

Use this space to indicate categories, limited dissemination controls, special instructions, points of contact, etc., if needed.

Controlled by: PEO CS&CSS JPO JLTV Controlled by: PEO CS&CSS Classification Guide and JPO JLTV Classification Guide CUI Category(ies): Procure Limited Dissemination Control: DIST C POC: JPO JLTV Project Security Manager; (586) 239-3491

ATTENTION
All individuals handling this information are required to protect it from unauthorized disclosure.

Handling, storage, reproduction, and disposition of the attached document(s) must be in accordance with 32 CFR Part 2002 and applicable agency policy.

Access to and dissemination of Controlled Unclassified Information shall be allowed as necessary and permissible to any individual(s), organization(s), or grouping(s) of users, provided such access or dissemination is consistent with or in furtherance of a Lawful Government Purpose and in a manner consistent with applicable law, regulations, and Government-wide policies.

Standard Form 901 (11-18) Prescribed by GSA/ISOO | 32 CFR 2002

CUI

Controlled by: DOA Controlled by: PEO CS&CSS, PM FP, PdM EMSE CUI Categories: CONTRACT, PROPIN Limited Distribution Control: FEDCON

POC:

Title

CUI

Attachment 0014
Economic Price Adjustment (EPA) Tables

October 2023

CUI

Instructions

Contract W56HZV-XX-D-XXXX
Attachment 0014 Economic Price Adjustment (EPA) Tables
1All input cells are highlighted in yellow.
2The Contractor shall not manipulate or alter any cells that are not highlghted in yellow in the attachment.
3For the applicable ordering year, enter the most current index value (may be preliminary) as of the Effective Index Observation Date.
4The attachment automatically calculates the adjustment amount, if any, according to the parameters of the clause in Section H.2.

Order Year 2 (Base)

CUI
Contract W56HZV-XX-D-XXXX
Attachment 0014 Economic Price Adjustment (EPA) Tables
Field
1Applicable Contract Year:Order Year 2 (Base)
2Start of Ordering Period:Mar/2024
3Effective Index Observation Date:Dec/2023
4Index Risk Area:Commercial Machinery Repair and Maintenance
5Index Identifier:PCU811310811310
6Baseline Index Value:
7Measurement Index Value:
8Index Percent Change:ERROR:#DIV/0!
LOW UNIT PRICE
CLIN:0201020302050207020902110213021502170219022102230225022702290231023302350237023902410243
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
MEDIUM UNIT PRICE
CLIN:0201020302050207020902110213021502170219022102230225022702290231023302350237023902410243
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
HIGH UNIT PRICE
CLIN:0201020302050207020902110213021502170219022102230225022702290231023302350237023902410243
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
CUI

Order Year 3 (Base)

CUI
Contract W56HZV-XX-D-XXXX
Attachment 0014 Economic Price Adjustment (EPA) Tables
Field
1Applicable Contract Year:Order Year 3 (Base)
2Start of Ordering Period:Mar/2025
3Effective Index Observation Date:Dec/2024
4Index Risk Area:Commercial Machinery Repair and Maintenance
5Index Identifier:PCU811310811310
6Baseline Index Value:0.000
7Measurement Index Value:
8Index Percent Change:ERROR:#DIV/0!
LOW UNIT PRICE
CLIN:0301030303050307030903110313031503170319032103230325032703290331033303350337033903410343
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
MEDIUM UNIT PRICE
CLIN:0301030303050307030903110313031503170319032103230325032703290331033303350337033903410343
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
HIGH UNIT PRICE
CLIN:0301030303050307030903110313031503170319032103230325032703290331033303350337033903410343
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

CUI

Order Year 4 (Base)

CUI
Contract W56HZV-XX-D-XXXX
Attachment 0014 Economic Price Adjustment (EPA) Tables
Field
1Applicable Contract Year:Order Year 4 (Base)
2Start of Ordering Period:Mar/2026
3Effective Index Observation Date:Dec/2025
4Index Risk Area:Commercial Machinery Repair and Maintenance
5Index Identifier:PCU811310811310
6Baseline Index Value:0.000
7Measurement Index Value:
8Index Percent Change:ERROR:#DIV/0!
LOW UNIT PRICE
CLIN:0401040304050407040904110413041504170419042104230425042704290431043304350437043904410443
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
MEDIUM UNIT PRICE
CLIN:0401040304050407040904110413041504170419042104230425042704290431043304350437043904410443
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
HIGH UNIT PRICE
CLIN:0401040304050407040904110413041504170419042104230425042704290431043304350437043904410443
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

CUI

Order Year 5 (Base)

CUI
Contract W56HZV-XX-D-XXXX
Attachment 0014 Economic Price Adjustment (EPA) Tables
Field
1Applicable Contract Year:Order Year 5 (Base)
2Start of Ordering Period:Mar/2027
3Effective Index Observation Date:Dec/2026
4Index Risk Area:Commercial Machinery Repair and Maintenance
5Index Identifier:PCU811310811310
6Baseline Index Value:0.000
7Measurement Index Value:
8Index Percent Change:ERROR:#DIV/0!
LOW UNIT PRICE
CLIN:0501050305050507050905110513051505170519052105230525052705290531053305350537053905410543
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
MEDIUM UNIT PRICE
CLIN:0501050305050507050905110513051505170519052105230525052705290531053305350537053905410543
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
HIGH UNIT PRICE
CLIN:0501050305050507050905110513051505170519052105230525052705290531053305350537053905410543
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

CUI

Order Year 6 (Option)

CUI
Contract W56HZV-XX-D-XXXX
Attachment 0014 Economic Price Adjustment (EPA) Tables
Field
1Applicable Contract Year:Order Year 6 (Option)
2Start of Ordering Period:Feb/2028
3Effective Index Observation Date:Dec/2027
4Index Risk Area:Commercial Machinery Repair and Maintenance
5Index Identifier:PCU811310811310
6Baseline Index Value:0.000
7Measurement Index Value:
8Index Percent Change:ERROR:#DIV/0!
LOW UNIT PRICE
CLIN:0601060306050607060906110613061506170619062106230625062706290631063306350637063906410643
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
MEDIUM UNIT PRICE
CLIN:0601060306050607060906110613061506170619062106230625062706290631063306350637063906410643
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
HIGH UNIT PRICE
CLIN:0601060306050607060906110613061506170619062106230625062706290631063306350637063906410643
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

CUI

Order Year 7 (Option)

CUI
Contract W56HZV-XX-D-XXXX
Attachment 0014 Economic Price Adjustment (EPA) Tables
Field
1Applicable Contract Year:Order Year 7 (Option)
2Start of Ordering Period:Feb/2029
3Effective Index Observation Date:Nov/2028
4Index Risk Area:Commercial Machinery Repair and Maintenance
5Index Identifier:PCU811310811310
6Baseline Index Value:0.000
7Measurement Index Value:
8Index Percent Change:ERROR:#DIV/0!
LOW UNIT PRICE
CLIN:0701070307050707070907110713071507170719072107230725072707290731073307350737073907410743
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
MEDIUM UNIT PRICE
CLIN:0701070307050707070907110713071507170719072107230725072707290731073307350737073907410743
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
HIGH UNIT PRICE
CLIN:0701070307050707070907110713071507170719072107230725072707290731073307350737073907410743
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

CUI

Order Year 8 (Option)

CUI
Contract W56HZV-XX-D-XXXX
Attachment 0014 Economic Price Adjustment (EPA) Tables
Field
1Applicable Contract Year:Order Year 8 (Option)
2Start of Ordering Period:Feb/2030
3Effective Index Observation Date:Nov/2029
4Index Risk Area:Commercial Machinery Repair and Maintenance
5Index Identifier:PCU811310811310
6Baseline Index Value:0.000
7Measurement Index Value:
8Index Percent Change:ERROR:#DIV/0!
LOW UNIT PRICE
CLIN:0801080308050807080908110813081508170819082108230825082708290831083308350837083908410843
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
17EPA Adjusted Unit PriceERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
MEDIUM UNIT PRICE
CLIN:0801080308050807080908110813081508170819082108230825082708290831083308350837083908410843
FieldDescriptionRateD7G Dozer w/Winch ID7G Dozer w/Ripper II613C Scraper621B Scraper621G ScraperCS433C Vibe Rollers I & IIICS563C Vibe Roller II815HSC High Speed CompactorDual Steel Wheel Rollers (DSWR)613C Water Distributor130G Grader120M Type I Grader120M Type IA (Air Drop)M966H Type I LoaderM966H Type II LoaderD7R Dozer w/WinchD7R Dozer w/RipperD6K Type I w/WinchD6K Type II w/Ripper924G Loaders924H LoadersDozer E / H Conversion
9Original Contract Unit Price
10Upward Adjustment Threshold3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
11Downward Adjustment Threshold-3%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
12Maximum Upward Adjustment Minus Adjustment Threshold10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
13Maximum Downward Adjustment Minus Adjustment Threshold-10%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
14Unit Price Subject to Adjustment77%$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
15Index % Change Applied to Unit Price Subject to AdjustmentERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
16Final Adjustment AmountERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .