Attachment_0014_-_Conant_Bid_Schedule.pdf
PDF 101 KB Posted
- Attached to
- CONANT BANK STABILIZATION
- Solicitation number
- 140L0626R0011
About this file
This is a bid schedule for a construction project titled "Conant Bank Stabilization & Parking Area Expansion" located at the Upper Snake Field Office in Bonneville County. The project is structured with a base schedule and one optional schedule.
The base schedule includes three pay items: (01) Mobilization, (02) Bank Stabilization Design, and (03) Bank Stabilization Construction, each measured as one lump sum (LS) unit. The optional schedule (Option 1) comprises two additional pay items: (04) Parking Area Expansion Design and (05) Parking Area Expansion Construction, also measured as one lump sum unit each. Bidders are required to provide unit costs and total costs for each pay item, with separate subtotals for the base schedule items, the option 1 schedule item, and a combined total for base plus option 1 schedule items. All pricing fields are blank in this template version, indicating this is the form contractors will complete with their cost proposals.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01 Mobilization 1 LS $ $
02 Bank Stabilization Design 1 LS $ $
03 Bank Stabilization Construction 1 LS $ $
04 Parking Area Expansion Design 1 LS $ $
05 Parking Area Expansion Construction 1 LS $ $
BID SCHEDULE
Conant Bank Stabilization & Parking Area Expansion
Pay Item No. Description Quantity Unit Unit Cost Total Cost
Upper Snake Field Office Bonneville County
Base Schedule - Bank Stabilization and Raft Launch
TOTAL BASE SCHEDULE ITEMS
TOTAL OPTION 1 SCHEDULE ITEM
Option 1 Schedule - Parking Area Expansion
Total CostPay Item No. Description Quantity Unit Unit Cost
TOTAL BASE + OPTION 1 SCHEDULE ITEMS
Bid Schedule
File details come from the government source that posted it. Updated .