Attachment 0010 - Section L Cross-Reference Matrix v2.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
AIE NEXT
Solicitation number
W909MY-23-R-0002
Issued by

View the file

Other files

File Type Posted
W909MY23R0002-0005.pdf PDF
W909MY23R0002-0004.pdf PDF
AMD 0004 Attachment 0006 - PRICING MODEL.xlsx XLSX spreadsheet
W909MY23R0002-0003.pdf PDF
AMD 0002 Attachment 0011 - PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
AMD 0002 Exhibit A CDRLs v2.pdf PDF
AMD 0002 Attachment 0001 - STATEMENT OF WORK v2.pdf PDF
AMD 0002 Attachment 0002 - AIE-NEXT PERFORMANCE SPECIFICATION v3.pdf PDF
AMD 0002 AIE-NEXT_Industry Questions.xlsx XLSX spreadsheet
AMD 0002 Attachment 0006 -PRICING MODEL.xlsx XLSX spreadsheet
W909MY23R0002-0002.pdf PDF
Attachment 0006 - PRICING MODEL.xlsx XLSX spreadsheet
Attachment 0006 - PRICING MODEL.xlsx XLSX spreadsheet
W909MY23R0002-0001.pdf PDF
Attachment 0008 - AIE 3.4 HW SW LIST.xlsx XLSX spreadsheet
Attachment 0007 - SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT.pdf PDF
Attachment 0006 - PRICING MODEL.xlsx XLSX spreadsheet
Attachment 0003 - AIE-NEXT CONCEPT OF OPERATIONS.pdf PDF
Attachment 0002 - AIE-NEXT PERFORMANCE SPECIFICATION.pdf PDF
Attachment 0001 - STATEMENT OF WORK.pdf PDF
W909MY23R0002.pdf PDF
Format_AIE-NEXT_Questions.xlsx XLSX spreadsheet
Exhibit A CDRLs.pdf PDF
Attachment 0005 - QUALITY ASSURANCE SURVEILLANCE PLAN.pdf PDF
Attachment 0004 - AIE-3.4 SYSTEM DESCRIPTION AND ARCHITECTURE.pdf PDF
Attachment 0009 - AIE NEXT SUPPORTING DATA.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cross-Reference Matrix

RequirementDoc / PageProposal Section and Page Number
Section L, Sub-factor 1 (SF-1) Management and Engineering ApproachSection L, page 8
SF-1 (1)Offeror's Program Management Approach to include:Section L
1 - Approach to meeting the technical performance requirements in the AIE-Next Performance Specifications (P-Spec)Section L
P-Spec - Section 3 REQUIREMENTSP-Spec, page 5
P-Spec - Section 3.1 REGISTRATIONP-Spec, page 5
P-Spec - Section 3.1.2 Visitor Control Center (VCC) RegistrationP-Spec, page 8
P-Spec - Section 3.1.3 KioskP-Spec, page 8
P-Spec - Section 3.1.4 OnlineP-Spec, page 10
P-Spec - Section 3.2 ACCESS CONTROL POINT (ACP)P-Spec, page 12
P-Spec - Section 3.2.1 Vehicle Lane OperationsP-Spec, page 12
P-Spec - Section 3.2.2 Tier 1P-Spec, page 13
P-Spec - Section 3.2.3 Tier 2P-Spec, page 14
P-Spec - Section 3.2.4 Cellular WirelessP-Spec, page 15
P-Spec - Section 3.2.5 Automatic and Visitor In Lane RegistrationP-Spec, page 15
P-Spec - Section 3.3 SERVER OPERATIONSP-Spec, page 16
P-Spec - Section 3.3.1 Cloud ServerP-Spec, page 16
P-Spec - Section 3.3.2 LocalP-Spec, page 16
P-Spec - Section 3.4 COMMUNICATIONP-Spec, page 16
P-Spec - Section 3.4.1 InterfacesP-Spec, page 17
P-Spec - Section 3.4.2 InfrastructureP-Spec, page 17
P-Spec - Section 3.5 CYBERSECURITYP-Spec, page 17
P-Spec - Section 3.6 SUSTAINMENTP-Spec, page 20
P-Spec - Section 3.6.1 Reliability, Availability, Maintainability (RAM)P-Spec, page 21
P-Spec - Section 3.6.2 Health and StatusP-Spec, page 22
P-Spec - Section 3.7 CONTROL AND MONITORINGP-Spec, page 23
P-Spec - Section 3.7.1 DashboardP-Spec, page 23
P-Spec - Section 3.7.2 ReportingP-Spec, page 24
P-Spec - Section 3.7.3 Video ManagementP-Spec, page 25
P-Spec - Section 3.7.4 Data MiningP-Spec, page 26
P-Spec - Section 3.7.5 Data AnalyticsP-Spec, page 26
P-Spec - Section 3.7.6 Artificial IntelligenceP-Spec, page 26
P-Spec - Section 3.8 SYSTEM CHARACTERISTICSP-Spec, page 27
P-Spec - Section 3.8.1 SafetyP-Spec, page 27
P-Spec - Section 3.8.2 PhysicalP-Spec, page 27
P-Spec - Section 3.8.3 System DesignP-Spec, page 27
P-Spec - Section 3.8.4 EnvironmentalP-Spec, page 29
P-Spec - Section 4 REQUIREMENTS VERIFICATION MATRIXP-Spec, page 30
2 - Scheduling/Fielding Strategy demonstrating their ability to meet all requirements within the six-year period of performanceSection L
3 - Resource Allocation during surge activities related to multiple, simultaneous site installationsSection L
SF-1 (2)Systems Engineering, Risk and Configuration Management processes and approach for establishing, utilizing, and integrating the existing AIE-3.4 baseline configuration hardware and software; to include proven organizational and Agile processes addressing change management and capability enhancementsSection L
SF-1 (3)Cybersecurity approach to executing and maintaining the Networthiness requirements of the contract Statement of Work (SOW), specifically sections regarding RMF, ATO, and STIG activitiesSection L
SF-1 (4)How the proposed system design accommodates open architecture and future performance upgrades (with minimal impact to the overall system design), page 9Section L
SF-1 (5)Approach to simultaneously address the CLS and sustainment requirements of multiple installations, page 9Section L
Section L, Sub-factor 2 (SF-2) Sample Task - System FieldingSection L, page 9
SF-2Offerors shall describe their proposed approach for executing four simultaneously awarded fielding Delivery Orders that direct the installation of the AIE system at two small Army installations, one medium Army Installation, and one large Army Installation (four Installations total) IAW the Statement of Work (SOW). Offerors shall include the following in their approach to executing this sample task:Section L, page 9
Approach to procurement, storage, and transportation of system componentsSection L, page 9
Resources (material), labor categories and hours, schedule, and infrastructure/bandwidth challengesSection L, page 9
Program Management and Qualification processesSection L, page 9
Cybersecurity compliance processSection L, page 9
Methods of improving efficienciesSection L, page 9
Section L, Sub-factor 3 (SF-3) Sample Task - Engineering Change ProposalSection L, page 9
SF-3Offerors shall describe their proposed approach to meeting the requirements of a Delivery Order RFP that requires the insertion of new vehicle lane cameras (to capture the front and back of the vehicle) that will result in an ECP to the current AIE baseline. The technical solution shall integrate with AIE to provide forensic evidence to support law enforcement activities and conform to the requirements described in the System Performance Specification, Section 3.7.3. For purposes of this sample task, the Contractor shall include the following in their proposal:Section L, page 9
Program Management and SE processes (to include prototype, test, qualification of a design suitable for ECP approval)Section L, page 10
Resources (material), labor hours/categoriesSection L, page 10
Proposed baseline changes (HW/SW) and cybersecurity impactsSection L, page 10
Methods of improving efficienciesSection L, page 10
Proposals shall address the requirements described in section three (3) of the Statement of Work (SOW)Section L, page 8
SOW - Section 3.2.1 Enterprise CapabilitiesSOW, page 7
SOW - Section 3.2.2 CybersecuritySOW, page 7
SOW - Section 3.2.2.1 Risk Management Framework (RMF)SOW, page 8
SOW - Section 3.2.2.2 Defense Information System Agency (DISA) Security Technical Implementation Guides (STIGs)SOW, page 8
SOW - Section 3.2.2.3 Information System Enclave Accreditation Security PostureSOW, page 9
SOW - Section 3.2.2.4 Authority To Operate (ATO)SOW, page 10
SOW - Section 3.2.2.5 System Security Plan (SSP)SOW, page 10
SOW - Section 3.2.2.6 Cybersecurity Vulnerability Management (IAVM)SOW, page 11
SOW - Section 3.2.2.7 Vulnerability AssessmentsSOW, page 11
SOW - Section 3.2.2.8 Privacy Impact Assessment (PIA)SOW, page 11
SOW - Section 3.2.2.9 Information System Security Engineering (ISSE)SOW, page 11
SOW - Section 3.2.2.9.1 Endpoint Security (ENS) / Host Based Security System (HBSS)SOW, page 11
SOW - Section 3.2.2.9.2 Enterprise SPLUNK / Solar WindsSOW, page 12
SOW - Section 3.2.2.9.3 Security Test and Evaluations (ST&E)SOW, page 13
SOW - Section 3.2.3 AIE System Government LaboratorySOW, page 13
SOW - Section 3.2.3.1 Functional Configuration AuditSOW, page 14
SOW - Section 3.2.4 Systems and Technology DeploymentSOW, page 14
SOW - Section 3.2.4.1 New SitesSOW, page 14
SOW - Section 3.2.4.3 Technology RefreshSOW, page 14
SOW - Section 3.2.4.2 COTS Technology InsertionsSOW, page 14
SOW - Section 3.2.4.4 Site Deployment OperationsSOW, page 15
SOW - Section 3.2.4.4.1 Site SurveySOW, page 15
SOW - Section 3.2.4.4.2.1 National Law Enforcement Telecommunication System (NLETS)SOW, page 15
SOW - Section 3.2.4.4.2.2 Initial Design Review (IDR)SOW, page 15
SOW - Section 3.2.4.4.2.3 Final Design Review (FDR)SOW, page 16
SOW - Section 3.2.4.4.3 Site InstallationSOW, page 16
SOW - Section 3.2.4.4.3.1 Operational TestingSOW, page 16
SOW - Section 3.2.4.4.3.2 Physical Configuration Audit (PCA)SOW, page 16
SOW - Section 3.2.4.4.3.3 Site Technical Data Package (TDP)SOW, page 16
SOW - Section 3.2.5 Program ManagementSOW, page 16
SOW - Section 3.2.5.1 Contractor’s Management PlanSOW, page 16
SOW - Section 3.2.5.2 Integrated Master Schedule (IMS)SOW, page 17
SOW - Section 3.2.5.3 Bi-Weekly Schedule ReportSOW, page 17
SOW - Section 3.2.5.4 Integrated Program Review (IPR)SOW, page 17
SOW - Section 3.2.5.5 Contractor Manpower ReportingSOW, page 17
SOW - Section 3.2.5.6 Data RepositorySOW, page 18
SOW - Section 3.2.5.7 Meetings and BriefingsSOW, page 18
SOW - Section 3.2.6 Systems EngineeringSOW, page 18
SOW - Section 3.2.6.1 Software Quality Assurance PlanSOW, page 18
SOW - Section 3.2.6.2 System Description and ArchitectureSOW, page 19
SOW - Section 3.2.6.2.1 Interface Requirements Specification (IRS)SOW, page 19
SOW - Section 3.2.6.2.2 Software Design Description (SDD)SOW, page 19
SOW - Section 3.2.6.2.3 Interface Design Description (IDD)SOW, page 19
SOW - Section 3.2.6.3 System Update and Implementation PlanSOW, page 19
SOW - Section 3.2.6.4 Engineering Change Proposals (ECP)SOW, page 19
SOW - Section 3.2.6.5 Requirements Traceability Matrix (RTM)SOW, page 20
SOW - Section 3.2.6.6 Technology Research and Evaluation (RDT&E)SOW, page 20
SOW - Section 3.2.6.7 Test and EvaluationSOW, page 20
SOW - Section 3.2.6.7.1 Test Readiness Review (TRR)SOW, page 20
SOW - Section 3.2.6.7.2 Production Qualification Test (PQT): AIE System Laboratory TestingSOW, page 20
SOW - Section 3.2.6.7.3 Performance Verification Test (PVT): Government Acceptance TestingSOW, page 20
SOW - Section 3.2.6.7.4 Test FailuresSOW, page 21
SOW - Section 3.2.6.7.5 Failure Analysis and Corrective Action Report (FACAR)SOW, page 21
SOW - Section 3.2.6.8 Configuration Control Board (CCB)SOW, page 21
SOW - Section 3.2.6.8.1 Configuration Management PlanSOW, page 21
SOW - Section 3.2.7 Logistics PlanningSOW, page 21
SOW - Section 3.2.7.1 Total Package Fielding (TPF)SOW, page 22
SOW - Section 3.2.7.2 Contractor Logistics Support (CLS)SOW, page 22
SOW - Section 3.2.7.2.1 Sustainment Transition PlanSOW, page 22
SOW - Section 3.2.7.2.2 Integrated Logistics Support Plan (ILSP)SOW, page 22
SOW - Section 3.2.7.2.3 Level of Repair Analysis (LORA)SOW, page 22
SOW - Section 3.2.7.2.4 Maintenance ManagementSOW, page 22
SOW - Section 3.2.7.2.5 Manpower and PersonnelSOW, page 22
SOW - Section 3.2.7.2.6 Item Unique Identification (IUID) PlanSOW, page 22
SOW - Section 3.2.7.2.7 Diminishing Manufacturing Sources and Material Shortages (DMSMS) PlanSOW, page 23
SOW - Section 3.2.7.2.8 Support EquipmentSOW, page 23
SOW - Section 3.2.7.2.9 Help DeskSOW, page 23
SOW - Section 3.2.7.2.10 Technical Data and Software RightsSOW, page 24
SOW - Section 3.2.7.2.11 Packaging, Handling, Storage and Transportation (PHS&T)SOW, page 24
SOW - Section 3.2.7.2.12 Repair Return Merchandise Authorization (RMA)SOW, page 24
SOW - Section 3.2.7.3 TrainingSOW, page 24
SOW - Section 3.2.7.3.1 Depot Level Training (DLT)SOW, page 24
SOW - Section 3.2.7.4 Inventory ManagementSOW, page 24
SOW - Section 3.2.7.5 Supply Chain Risk Management (SCRM)SOW, page 25
SOW - Section 3.2.8 Sustainment OptionSOW, page 25
SOW - Section 3.2.9 SecuritySOW, page 26
SOW - Section 3.2.9.1 ClearancesSOW, page 27
SOW - Section 3.2.9.2 DoD Common Access Cards (CAC)SOW, page 27
SOW - Section 3.2.9.3 Cybersecurity / Information Technology (IT) TrainingSOW, page 27
SOW - Section 3.2.9.4 Anti-Terrorism (AT) TrainingSOW, page 27
SOW - Section 3.2.9.5 iWatch TrainingSOW, page 27
SOW - Section 3.2.9.6 Army Training Certification Tracking System (ATCTS) RegistrationSOW, page 27
SOW - Section 3.2.9.7 Operations Security (OPSEC) PlanSOW, page 28
SOW - Section 3.2.9.8 OPSEC TrainingSOW, page 28
SOW - Section 3.2.9.9 Threat Awareness Reporting ProgramSOW, page 28
SOW - Section 3.2.9.10 Access and General Protection/Security Policy and ProceduresSOW, page 28
SOW - Section 3.2.10 Health and SafetySOW, page 28

File details come from the government source that posted it. Updated .