Cross-Reference Matrix
| Requirement | Doc / Page | Proposal Section and Page Number | ||
| Section L, Sub-factor 1 (SF-1) Management and Engineering Approach | Section L, page 8 | |||
| SF-1 (1) | Offeror's Program Management Approach to include: | Section L | ||
| 1 - Approach to meeting the technical performance requirements in the AIE-Next Performance Specifications (P-Spec) | Section L | |||
| P-Spec - Section 3 REQUIREMENTS | P-Spec, page 5 | |||
| P-Spec - Section 3.1 REGISTRATION | P-Spec, page 5 | |||
| P-Spec - Section 3.1.2 Visitor Control Center (VCC) Registration | P-Spec, page 8 | |||
| P-Spec - Section 3.1.3 Kiosk | P-Spec, page 8 | |||
| P-Spec - Section 3.1.4 Online | P-Spec, page 10 | |||
| P-Spec - Section 3.2 ACCESS CONTROL POINT (ACP) | P-Spec, page 12 | |||
| P-Spec - Section 3.2.1 Vehicle Lane Operations | P-Spec, page 12 | |||
| P-Spec - Section 3.2.2 Tier 1 | P-Spec, page 13 | |||
| P-Spec - Section 3.2.3 Tier 2 | P-Spec, page 14 | |||
| P-Spec - Section 3.2.4 Cellular Wireless | P-Spec, page 15 | |||
| P-Spec - Section 3.2.5 Automatic and Visitor In Lane Registration | P-Spec, page 15 | |||
| P-Spec - Section 3.3 SERVER OPERATIONS | P-Spec, page 16 | |||
| P-Spec - Section 3.3.1 Cloud Server | P-Spec, page 16 | |||
| P-Spec - Section 3.3.2 Local | P-Spec, page 16 | |||
| P-Spec - Section 3.4 COMMUNICATION | P-Spec, page 16 | |||
| P-Spec - Section 3.4.1 Interfaces | P-Spec, page 17 | |||
| P-Spec - Section 3.4.2 Infrastructure | P-Spec, page 17 | |||
| P-Spec - Section 3.5 CYBERSECURITY | P-Spec, page 17 | |||
| P-Spec - Section 3.6 SUSTAINMENT | P-Spec, page 20 | |||
| P-Spec - Section 3.6.1 Reliability, Availability, Maintainability (RAM) | P-Spec, page 21 | |||
| P-Spec - Section 3.6.2 Health and Status | P-Spec, page 22 | |||
| P-Spec - Section 3.7 CONTROL AND MONITORING | P-Spec, page 23 | |||
| P-Spec - Section 3.7.1 Dashboard | P-Spec, page 23 | |||
| P-Spec - Section 3.7.2 Reporting | P-Spec, page 24 | |||
| P-Spec - Section 3.7.3 Video Management | P-Spec, page 25 | |||
| P-Spec - Section 3.7.4 Data Mining | P-Spec, page 26 | |||
| P-Spec - Section 3.7.5 Data Analytics | P-Spec, page 26 | |||
| P-Spec - Section 3.7.6 Artificial Intelligence | P-Spec, page 26 | |||
| P-Spec - Section 3.8 SYSTEM CHARACTERISTICS | P-Spec, page 27 | |||
| P-Spec - Section 3.8.1 Safety | P-Spec, page 27 | |||
| P-Spec - Section 3.8.2 Physical | P-Spec, page 27 | |||
| P-Spec - Section 3.8.3 System Design | P-Spec, page 27 | |||
| P-Spec - Section 3.8.4 Environmental | P-Spec, page 29 | |||
| P-Spec - Section 4 REQUIREMENTS VERIFICATION MATRIX | P-Spec, page 30 | |||
| 2 - Scheduling/Fielding Strategy demonstrating their ability to meet all requirements within the six-year period of performance | Section L | |||
| 3 - Resource Allocation during surge activities related to multiple, simultaneous site installations | Section L | |||
| SF-1 (2) | Systems Engineering, Risk and Configuration Management processes and approach for establishing, utilizing, and integrating the existing AIE-3.4 baseline configuration hardware and software; to include proven organizational and Agile processes addressing change management and capability enhancements | Section L | ||
| SF-1 (3) | Cybersecurity approach to executing and maintaining the Networthiness requirements of the contract Statement of Work (SOW), specifically sections regarding RMF, ATO, and STIG activities | Section L | ||
| SF-1 (4) | How the proposed system design accommodates open architecture and future performance upgrades (with minimal impact to the overall system design), page 9 | Section L | ||
| SF-1 (5) | Approach to simultaneously address the CLS and sustainment requirements of multiple installations, page 9 | Section L | ||
| Section L, Sub-factor 2 (SF-2) Sample Task - System Fielding | Section L, page 9 | |||
| SF-2 | Offerors shall describe their proposed approach for executing four simultaneously awarded fielding Delivery Orders that direct the installation of the AIE system at two small Army installations, one medium Army Installation, and one large Army Installation (four Installations total) IAW the Statement of Work (SOW). Offerors shall include the following in their approach to executing this sample task: | Section L, page 9 | ||
| Approach to procurement, storage, and transportation of system components | Section L, page 9 | |||
| Resources (material), labor categories and hours, schedule, and infrastructure/bandwidth challenges | Section L, page 9 | |||
| Program Management and Qualification processes | Section L, page 9 | |||
| Cybersecurity compliance process | Section L, page 9 | |||
| Methods of improving efficiencies | Section L, page 9 | |||
| Section L, Sub-factor 3 (SF-3) Sample Task - Engineering Change Proposal | Section L, page 9 | |||
| SF-3 | Offerors shall describe their proposed approach to meeting the requirements of a Delivery Order RFP that requires the insertion of new vehicle lane cameras (to capture the front and back of the vehicle) that will result in an ECP to the current AIE baseline. The technical solution shall integrate with AIE to provide forensic evidence to support law enforcement activities and conform to the requirements described in the System Performance Specification, Section 3.7.3. For purposes of this sample task, the Contractor shall include the following in their proposal: | Section L, page 9 | ||
| Program Management and SE processes (to include prototype, test, qualification of a design suitable for ECP approval) | Section L, page 10 | |||
| Resources (material), labor hours/categories | Section L, page 10 | |||
| Proposed baseline changes (HW/SW) and cybersecurity impacts | Section L, page 10 | |||
| Methods of improving efficiencies | Section L, page 10 | |||
| Proposals shall address the requirements described in section three (3) of the Statement of Work (SOW) | Section L, page 8 | |||
| SOW - Section 3.2.1 Enterprise Capabilities | SOW, page 7 | |||
| SOW - Section 3.2.2 Cybersecurity | SOW, page 7 | |||
| SOW - Section 3.2.2.1 Risk Management Framework (RMF) | SOW, page 8 | |||
| SOW - Section 3.2.2.2 Defense Information System Agency (DISA) Security Technical Implementation Guides (STIGs) | SOW, page 8 | |||
| SOW - Section 3.2.2.3 Information System Enclave Accreditation Security Posture | SOW, page 9 | |||
| SOW - Section 3.2.2.4 Authority To Operate (ATO) | SOW, page 10 | |||
| SOW - Section 3.2.2.5 System Security Plan (SSP) | SOW, page 10 | |||
| SOW - Section 3.2.2.6 Cybersecurity Vulnerability Management (IAVM) | SOW, page 11 | |||
| SOW - Section 3.2.2.7 Vulnerability Assessments | SOW, page 11 | |||
| SOW - Section 3.2.2.8 Privacy Impact Assessment (PIA) | SOW, page 11 | |||
| SOW - Section 3.2.2.9 Information System Security Engineering (ISSE) | SOW, page 11 | |||
| SOW - Section 3.2.2.9.1 Endpoint Security (ENS) / Host Based Security System (HBSS) | SOW, page 11 | |||
| SOW - Section 3.2.2.9.2 Enterprise SPLUNK / Solar Winds | SOW, page 12 | |||
| SOW - Section 3.2.2.9.3 Security Test and Evaluations (ST&E) | SOW, page 13 | |||
| SOW - Section 3.2.3 AIE System Government Laboratory | SOW, page 13 | |||
| SOW - Section 3.2.3.1 Functional Configuration Audit | SOW, page 14 | |||
| SOW - Section 3.2.4 Systems and Technology Deployment | SOW, page 14 | |||
| SOW - Section 3.2.4.1 New Sites | SOW, page 14 | |||
| SOW - Section 3.2.4.3 Technology Refresh | SOW, page 14 | |||
| SOW - Section 3.2.4.2 COTS Technology Insertions | SOW, page 14 | |||
| SOW - Section 3.2.4.4 Site Deployment Operations | SOW, page 15 | |||
| SOW - Section 3.2.4.4.1 Site Survey | SOW, page 15 | |||
| SOW - Section 3.2.4.4.2.1 National Law Enforcement Telecommunication System (NLETS) | SOW, page 15 | |||
| SOW - Section 3.2.4.4.2.2 Initial Design Review (IDR) | SOW, page 15 | |||
| SOW - Section 3.2.4.4.2.3 Final Design Review (FDR) | SOW, page 16 | |||
| SOW - Section 3.2.4.4.3 Site Installation | SOW, page 16 | |||
| SOW - Section 3.2.4.4.3.1 Operational Testing | SOW, page 16 | |||
| SOW - Section 3.2.4.4.3.2 Physical Configuration Audit (PCA) | SOW, page 16 | |||
| SOW - Section 3.2.4.4.3.3 Site Technical Data Package (TDP) | SOW, page 16 | |||
| SOW - Section 3.2.5 Program Management | SOW, page 16 | |||
| SOW - Section 3.2.5.1 Contractor’s Management Plan | SOW, page 16 | |||
| SOW - Section 3.2.5.2 Integrated Master Schedule (IMS) | SOW, page 17 | |||
| SOW - Section 3.2.5.3 Bi-Weekly Schedule Report | SOW, page 17 | |||
| SOW - Section 3.2.5.4 Integrated Program Review (IPR) | SOW, page 17 | |||
| SOW - Section 3.2.5.5 Contractor Manpower Reporting | SOW, page 17 | |||
| SOW - Section 3.2.5.6 Data Repository | SOW, page 18 | |||
| SOW - Section 3.2.5.7 Meetings and Briefings | SOW, page 18 | |||
| SOW - Section 3.2.6 Systems Engineering | SOW, page 18 | |||
| SOW - Section 3.2.6.1 Software Quality Assurance Plan | SOW, page 18 | |||
| SOW - Section 3.2.6.2 System Description and Architecture | SOW, page 19 | |||
| SOW - Section 3.2.6.2.1 Interface Requirements Specification (IRS) | SOW, page 19 | |||
| SOW - Section 3.2.6.2.2 Software Design Description (SDD) | SOW, page 19 | |||
| SOW - Section 3.2.6.2.3 Interface Design Description (IDD) | SOW, page 19 | |||
| SOW - Section 3.2.6.3 System Update and Implementation Plan | SOW, page 19 | |||
| SOW - Section 3.2.6.4 Engineering Change Proposals (ECP) | SOW, page 19 | |||
| SOW - Section 3.2.6.5 Requirements Traceability Matrix (RTM) | SOW, page 20 | |||
| SOW - Section 3.2.6.6 Technology Research and Evaluation (RDT&E) | SOW, page 20 | |||
| SOW - Section 3.2.6.7 Test and Evaluation | SOW, page 20 | |||
| SOW - Section 3.2.6.7.1 Test Readiness Review (TRR) | SOW, page 20 | |||
| SOW - Section 3.2.6.7.2 Production Qualification Test (PQT): AIE System Laboratory Testing | SOW, page 20 | |||
| SOW - Section 3.2.6.7.3 Performance Verification Test (PVT): Government Acceptance Testing | SOW, page 20 | |||
| SOW - Section 3.2.6.7.4 Test Failures | SOW, page 21 | |||
| SOW - Section 3.2.6.7.5 Failure Analysis and Corrective Action Report (FACAR) | SOW, page 21 | |||
| SOW - Section 3.2.6.8 Configuration Control Board (CCB) | SOW, page 21 | |||
| SOW - Section 3.2.6.8.1 Configuration Management Plan | SOW, page 21 | |||
| SOW - Section 3.2.7 Logistics Planning | SOW, page 21 | |||
| SOW - Section 3.2.7.1 Total Package Fielding (TPF) | SOW, page 22 | |||
| SOW - Section 3.2.7.2 Contractor Logistics Support (CLS) | SOW, page 22 | |||
| SOW - Section 3.2.7.2.1 Sustainment Transition Plan | SOW, page 22 | |||
| SOW - Section 3.2.7.2.2 Integrated Logistics Support Plan (ILSP) | SOW, page 22 | |||
| SOW - Section 3.2.7.2.3 Level of Repair Analysis (LORA) | SOW, page 22 | |||
| SOW - Section 3.2.7.2.4 Maintenance Management | SOW, page 22 | |||
| SOW - Section 3.2.7.2.5 Manpower and Personnel | SOW, page 22 | |||
| SOW - Section 3.2.7.2.6 Item Unique Identification (IUID) Plan | SOW, page 22 | |||
| SOW - Section 3.2.7.2.7 Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan | SOW, page 23 | |||
| SOW - Section 3.2.7.2.8 Support Equipment | SOW, page 23 | |||
| SOW - Section 3.2.7.2.9 Help Desk | SOW, page 23 | |||
| SOW - Section 3.2.7.2.10 Technical Data and Software Rights | SOW, page 24 | |||
| SOW - Section 3.2.7.2.11 Packaging, Handling, Storage and Transportation (PHS&T) | SOW, page 24 | |||
| SOW - Section 3.2.7.2.12 Repair Return Merchandise Authorization (RMA) | SOW, page 24 | |||
| SOW - Section 3.2.7.3 Training | SOW, page 24 | |||
| SOW - Section 3.2.7.3.1 Depot Level Training (DLT) | SOW, page 24 | |||
| SOW - Section 3.2.7.4 Inventory Management | SOW, page 24 | |||
| SOW - Section 3.2.7.5 Supply Chain Risk Management (SCRM) | SOW, page 25 | |||
| SOW - Section 3.2.8 Sustainment Option | SOW, page 25 | |||
| SOW - Section 3.2.9 Security | SOW, page 26 | |||
| SOW - Section 3.2.9.1 Clearances | SOW, page 27 | |||
| SOW - Section 3.2.9.2 DoD Common Access Cards (CAC) | SOW, page 27 | |||
| SOW - Section 3.2.9.3 Cybersecurity / Information Technology (IT) Training | SOW, page 27 | |||
| SOW - Section 3.2.9.4 Anti-Terrorism (AT) Training | SOW, page 27 | |||
| SOW - Section 3.2.9.5 iWatch Training | SOW, page 27 | |||
| SOW - Section 3.2.9.6 Army Training Certification Tracking System (ATCTS) Registration | SOW, page 27 | |||
| SOW - Section 3.2.9.7 Operations Security (OPSEC) Plan | SOW, page 28 | |||
| SOW - Section 3.2.9.8 OPSEC Training | SOW, page 28 | |||
| SOW - Section 3.2.9.9 Threat Awareness Reporting Program | SOW, page 28 | |||
| SOW - Section 3.2.9.10 Access and General Protection/Security Policy and Procedures | SOW, page 28 | |||
| SOW - Section 3.2.10 Health and Safety | SOW, page 28 |
File details come from the government source that posted it. Updated .