Attachment 0006 - PRICING MODEL.xlsx
XLSX spreadsheet 170 KB Posted
- Attached to
- AIE NEXT
- Solicitation number
- W909MY-23-R-0002
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instruction Sheet AIE Next Price Model Instruction Sheet
| 1.) Vendors are directed to data enter firm fixed price estimates in yellow cells (column G) for all CLINS as well as a percent for the CLS cost calculation (cell F131) |
| 2.) Pricing Model is locked, except the YELLOW cells requiring vendor input. |
| 3.) CLIN descriptions are provided in the CLIN Descriptions Tab |
| 4.) CDRL descriptions are provided in the CDRL Descriptions Tab |
Summary Summary of AIE Extended Price for Base Year 1 through Option Year 4
| Contract Year | COST | TRAVEL BOE | |||||
| BY1 | $6,814,000.00 | ||||||
| BY2 | $6,532,500.00 | 8 | 750000 | ||||
| OY1 | $6,535,750.00 | 28 | 350% | 2625000 | |||
| OY2 | $6,817,750.00 | 27 | 338% | 2531250 | |||
| OY3 | $5,594,750.00 | 27 | 338% | 2531250 | |||
| OY4 | $5,387,750.00 | 27 | 338% | 2531250 | |||
| TOTAL | $37,682,500.00 | 25 | 313% | 1593750 | |||
| CLINS | Extended Price Summary | CDRLS | Extended Price Summary | ||||
| XX01 | $0.00 | A001 | $0.00 | ||||
| XX02 | $0.00 | A002 | $0.00 | ||||
| XX03 | $0.00 | A003 | $0.00 | ||||
| XX04 | $0.00 | Negotiated at Delivery Order | A004 | $0.00 | |||
| XX05 | $0.00 | A005 | $0.00 | ||||
| XX06 | $0.00 | A007 | $0.00 | ||||
| XX07 | $0.00 | A010 | $0.00 | ||||
| XX08 | $0.00 | A011 | $0.00 | ||||
| XX09 | $0.00 | A012 | $0.00 | ||||
| XX10 | $0.00 | A013 | $0.00 | ||||
| XX11 | $0.00 | A014 | $0.00 | ||||
| XX12 | $0.00 | A017 | $0.00 | ||||
| XX13 | $0.00 | A019 | $0.00 | ||||
| XX14 | $0.00 | A022 | $0.00 | ||||
| XX15 | $0.00 | A024 | $0.00 | ||||
| XX16 | $0.00 | A025 | $0.00 | ||||
| XX17 | $0.00 | A030 | $0.00 | ||||
| XX18 | $0.00 | A032 | $0.00 | ||||
| XX19 | $0.00 | A035 | $0.00 | ||||
| XX20 | $0.00 | A036 | $0.00 | ||||
| XX21 | $0.00 | A037 | $0.00 | ||||
| XX22 | $0.00 | A038 | $0.00 | ||||
| XX23 | $0.00 | A041 | $0.00 | ||||
| XX24 | $0.00 | A042 | $0.00 | ||||
| XX25 | $0.00 | A043 | $0.00 | ||||
| XX26 | $0.00 | A044 | $0.00 | ||||
| XX27 | $0.00 | A045 | $0.00 | ||||
| XX28 | $0.00 | A046 | $0.00 | ||||
| XX29 | $0.00 | Total | $0.00 | ||||
| XX30 | $0.00 | ||||||
| XX31 | $0.00 | ||||||
| XX32 | $0.00 | ||||||
| XX33 | $0.00 | ||||||
| XX34 | $0.00 | ||||||
| XX35 | $0.00 | ||||||
| XX36 | $0.00 | ||||||
| XX37 | $28,870,000.00 | Negotiated at Delivery Order | |||||
| XX38 | $0.00 | Negotiated at Delivery Order | |||||
| XX39 | $8,812,500.00 | ||||||
| XX40 | $0.00 | ||||||
| XX41 | $0.00 | ||||||
| XX42 | $0.00 | ||||||
| XX43 | $0.00 | ||||||
| XX44 | $0.00 | Negotiated at Delivery Order | |||||
| XX45 | $0.00 | Negotiated at Delivery Order | |||||
| XX46 | $0.00 | Negotiated at Delivery Order | |||||
| XX47 | $0.00 | Negotiated at Delivery Order | |||||
| XX48 | $0.00 | ||||||
| Total | $37,682,500.00 |
Base Year 1 Base Year 1
| Only yellow highlighted boxes can be filled in | ||||||||||
| CLIN | CLIN Type | CLIN Description | Quantity Type | QTY (Estimated) | Lot Price | Extended Price | Description | |||
| 0001 | FFP | Site Survey / Design - Small Site | EA | 3.0 | $0.00 | 8.0 | ||||
| A008 – Site Survey Report (SSR) | NSP | |||||||||
| A009 – Installation Engineering Plan (IEP) | ||||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 161 to 206 | |||||||||
| Quantity Type | ||||||||||
| 0002 | FFP | Site Survey / Design - Medium Site | EA | 3.0 | $0.00 | |||||
| A008 – Site Survey Report (SSR) | NSP | |||||||||
| A009 – Installation Engineering Plan (IEP) | ||||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 161 to 206 | |||||||||
| Quantity Type | ||||||||||
| 0003 | FFP | Site Survey / Design - Large Site | EA | 2.0 | $0.00 | |||||
| A008 – Site Survey Report (SSR) | NSP | |||||||||
| A009 – Installation Engineering Plan (IEP) | ||||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 161 to 206 | |||||||||
| Quantity Type | ||||||||||
| 0004 | FFP | Site Survey / Design - XLarge Site | EA | Negotiated at Delivery Order Level | ||||||
| A008 – Site Survey Report (SSR) | ||||||||||
| A009 – Installation Engineering Plan (IEP) | ||||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 161 to 206 | |||||||||
| Quantity Type | ||||||||||
| 0005 | FFP | Lane Install - Tier 1 | EA | 16.0 | $0.00 | 16 | 10 lanes per site, assumes 20% Tier 1 | Current 98 sites | ||
| A012 – Physical Configuration Audit Report | Priced below in CDRL section in rows 161 to 206 | Total ACPs - 359 = 3.66 ACPs per site. Note: 84 of the current 98 sites have 5 or less ACPs. | ||||||||
| A013 – Site Technical Data Package | Total Lanes - 820 (POV, IB COM, IB PED) = 2.28 lanes per ACP / 8.37 lanes per site | |||||||||
| A022 – Test Procedures | POV lanes = 716 | |||||||||
| A024 – Failure Analysis and Corrective Action Report (FACAR) | ||||||||||
| Quantity Type | Small Sites (64 of the 98) | |||||||||
| 0006 | FFP | Lane Install - Tier 2 | EA | 64.0 | $0.00 | 64 | 10 lanes per site, assumes 80% Tier 2 | Medium Sites (24 of the 98) | ||
| A012 – Physical Configuration Audit Report | Priced below in CDRL section in rows 161 to 206 | Large Sites (5 of the 98) | ||||||||
| A013 – Site Technical Data Package | Xlarge Sites (5 of the 98) | |||||||||
| A022 – Test Procedures | ||||||||||
| A024 – Failure Analysis and Corrective Action Report (FACAR) | ||||||||||
| Quantity Type | ||||||||||
| 0007 | FFP | Handheld Scanner | EA | 160.0 | $0.00 | 160 | total year lanes x 2 per lane | |||
| Quantity Type | ||||||||||
| 0008 | FFP | Access Control Point (ACP) Install - Tier 1 | EA | 8.0 | $0.00 | 8 | total year sites * 5 ACPs per site, assumes 20% Tier 1 | |||
| Quantity Type | ||||||||||
| 0009 | FFP | Access Control Point (ACP) Install - Tier 2 | EA | 32.0 | $0.00 | 32 | total year sites * 5 ACPs per site, assumes 80% Tier 2 | |||
| Quantity Type | ||||||||||
| 0010 | FFP | Large Server Set | EA | 3.0 | $0.00 | 1 per tier 1 site | ||||
| Quantity Type | ||||||||||
| 0011 | FFP | Cache Box | EA | 6.0 | $0.00 | 1 per small and medium site | ||||
| Quantity Type | ||||||||||
| 0012 | FFP | Cloud Service | EA | 6.0 | $0.00 | 1 per small and medium site | ||||
| Quantity Type | ||||||||||
| 0013 | FFP | Kiosk | EA | 4.0 | $0.00 | 4 | total year sites * 2 Kiosks per site * 25% sites | |||
| Quantity Type | 10 | |||||||||
| 0014 | FFP | Web Registration | EA | 8.0 | $0.00 | 8.0 | total year sites * 1 per site | 6 | ||
| Quantity Type | ||||||||||
| 0015 | FFP | Portable Registration Station | EA | 8.0 | $0.00 | 8.0 | total year sites * 1 per site | |||
| Quantity Type | 14 sites per year, 2 per small/medium site, 4 per large | |||||||||
| 0016 | FFP | Visitor Control Center (VCC) Registration Workstation | EA | 20.0 | $0.00 | 20 | (total small/med year sites * 2 per site) + (total large sites * 4 per site) | |||
| Quantity Type | ||||||||||
| 0017 | FFP | Central Monitoring Workstation (CMWS) | EA | 3.0 | $0.00 | |||||
| Quantity Type | ||||||||||
| 0018 | FFP | Cellular ACP - Fixed | EA | 3.0 | $0.00 | As needed ~10% of total ACP per year | ||||
| Quantity Type | ||||||||||
| 0019 | FFP | Cellular ACP - Deployable | EA | 3.0 | $0.00 | As needed ~10% of total ACP per year | ||||
| Quantity Type | ||||||||||
| 0020 | FFP | Cybersecurity | LO (6 months) | 2.0 | $0.00 | |||||
| A002 – Information Systems Accreditation Documentation | Priced below in CDRL section in rows 161 to 206 | |||||||||
| A003 – Vulnerability Scan Compliance Report | ||||||||||
| A004 – Privacy Impact Assessment (PIA) | ||||||||||
| Quantity Type | ||||||||||
| 0021 | FFP | Site Registration System | EA | 3.0 | $0.00 | As needed | ||||
| Quantity Type | ||||||||||
| 0022 | FFP | Program Management | LO (year) | 1.0 | $0.00 | |||||
| A014 – Contractor’s Management Plan | Priced below in CDRL section in rows 161 to 206 | |||||||||
| A015 – Integrated Master Schedule (IMS) | NSP | |||||||||
| A016 – Bi-Weekly Schedule Report | ||||||||||
| A018 – Meetings & Briefings | ||||||||||
| A036 – Safety Assessment Report | Priced below in CDRL section in rows 161 to 206 | |||||||||
| A037 – Training Conduct Support Document Package | ||||||||||
| A038 – Training Program Development and Management Plan | ||||||||||
| Quantity Type | ||||||||||
| 0023 | FFP | Systems Engineering | EA | 1.0 | $0.00 | |||||
| A001 – System Description and Architecture | Priced below in CDRL section in rows 161 to 206 | |||||||||
| A005 – Failure Modes and Effects Criticality Analysis (FMECA) Report | ||||||||||
| A007 – Software Quality Assurance Plan | ||||||||||
| A011 – Physical Configuration Audit (PCA) Plan | ||||||||||
| A019 – Systems Engineering Management Plan (SEMP) | ||||||||||
| A025 – Configuration Management Plan (CMP) | ||||||||||
| A041 – Functional Configuration Audit (FCA) Plan | ||||||||||
| A043 – Interface Requirements Specification | ||||||||||
| A044 – Software Design Description | ||||||||||
| A045 – Interface Design Description | ||||||||||
| A046 – Database Design Description (DBDD) | ||||||||||
| Quantity Type | ||||||||||
| 0024 | FFP | System Verification Documentation | EA | 13.0 | $0.00 | total year sites + 5 | ||||
| A020 – System Installation and Checkout Test Report | NSP | |||||||||
| A021 – Test Plan | ||||||||||
| A023 – Test Inspection Report | ||||||||||
| A012 – Physical Configuration Audit (PCA) Report | Priced below in CDRL section in rows 161 to 206 | |||||||||
| A022 – Test Procedures | ||||||||||
| A024 – Failure Analysis and Corrective Action Report (FACAR) priced provided below | ||||||||||
| A042 – Functional Configuration Audit (FCA) Report | ||||||||||
| Quantity Type | ||||||||||
| 0025 | FFP | Logistics Management | EA | 1.0 | $0.00 | |||||
| A026 – Sustainment Transition Plan | NSP | |||||||||
| A027 – Integrated Logistics Support Plan (ILSP) | ||||||||||
| A028 – Level of Repair Analysis (LORA) | ||||||||||
| A029 – Maintenance Support Plan | ||||||||||
| A030 – Maintenance Service Report | Priced below in CDRL section in rows 161 to 206 | |||||||||
| A031 – Logistics Management Information Summaries | NSP | |||||||||
| A032 – Logistics Management Information Data Products | Priced below in CDRL section in rows 161 to 206 | |||||||||
| A033 – Item Unique Identification (IUID) Plan | NSP | |||||||||
| A034 – Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan | ||||||||||
| Quantity Type | ||||||||||
| 0026 | FFP | Migration of User Data (L) | EA | 2.0 | $0.00 | 1 per associated site | ||||
| Quantity Type | ||||||||||
| 0027 | FFP | Migration of User Data (M) | EA | 3.0 | $0.00 | 1 per associated site | ||||
| Quantity Type | ||||||||||
| 0028 | FFP | Migration of User Data (S) | EA | 3.0 | $0.00 | 1 per associated site | ||||
| Quantity Type | ||||||||||
| 0029 | FFP | Post-Government Site Acceptance User Support | EA | 8.0 | $0.00 | 1 per associated site | ||||
| Quantity Type | ||||||||||
| 0030 | FFP | Nlets Support License | EA | 8.0 | $0.00 | 1 per associated site | ||||
| Quantity Type | ||||||||||
| 0031 | FFP | Operator Training Course | EA | 8.0 | $0.00 | 1 per associated site | ||||
| Quantity Type | ||||||||||
| 0032 | FFP | Admin Training Course | EA | 8.0 | $0.00 | 1 per associated site | ||||
| Quantity Type | ||||||||||
| 0033 | FFP | Registrar Training Course | EA | 8.0 | $0.00 | 1 per associated site | ||||
| Quantity Type | ||||||||||
| 0034 | FFP | Maintainer Training Course | EA | 8.0 | $0.00 | 1 per associated site | ||||
| Quantity Type | ||||||||||
| 0035 | FFP | Depot Level Training Course | EA | 2.0 | $0.00 | *QTY of 2 per year starting in yr 2 | ||||
| Quantity Type | ||||||||||
| 0036 | FFP | Contractor Logistics Support (CLS cost is a percentage CLINS 0005-0017 and 0021) | LO (year) | 0.0% | $0.00 | 1 per associated site | ||||
| A024 – Failure Analysis and Corrective Action Report (FACAR) | Priced below in CDRL section in rows 161 to 206 | |||||||||
| A035 – CLS Help Desk Ticket Report | ||||||||||
| Quantity Type | ||||||||||
| 0037 | FFP | Engineering Change Proposals | EA | $6,064,000.00 | ||||||
| A006 – Engineering Change Proposal | Negotiated at Delivery Order Level | |||||||||
| Quantity Type | ||||||||||
| 0038 | FFP | Changes | EA | Negotiated at Delivery Order Level | ||||||
| Quantity Type | ||||||||||
| 0039 | CR | Travel | EA | $750,000.00 | ||||||
| Quantity Type | ||||||||||
| 0040 | FFP | Sustainment Support - Small Site | EA | 1.0 | $0.00 | |||||
| Quantity Type | ||||||||||
| 0041 | FFP | Sustainment Support - Medium Site | EA | 1.0 | $0.00 | |||||
| Quantity Type | ||||||||||
| 0042 | FFP | Sustainment Support - Large Site | EA | 1.0 | $0.00 | |||||
| Quantity Type | ||||||||||
| 0043 | FFP | Sustainment Support - Xlarge Site | EA | 1.0 | $0.00 | |||||
| Quantity Type | ||||||||||
| 0044 | FFP | Technology Research and Evaluation | EA | Negotiated at Delivery Order Level |
0045 FFP Software License Renewal EA Negotiated at Delivery Order Level
0046 FFP Return for Maintenance Authorization EA Negotiated at Delivery Order Level
0047 FFP Individually Pre-Priced CDRL(s) EA Negotiated at Delivery Order Level
| 0048 | FFP | Contractor Manpower Reporting | LO (year) | 1.0 | $0.00 | |||
| A017 – Contractor’s Progress, Status & Management Report | Priced below in CDRL section in rows 161 to 206 | |||||||
| TOTAL CLIN COST | $6,814,000.00 | Sum of Extended Prices for CLINS only | Sum of Extended Prices for CLINS only | |||||
| CDRL # | CDRL Description | Quantity Type | QTY (Estimated) | Lot Price | Extended Price | |||
| A001 | System Description and Architecture | Each | 1.0 | $0.00 | ||||
| A002 | Information Systems Accreditation Documentation | Each | 2.0 | $0.00 | ||||
| A003 | Vulnerability Scan Compliance Report | Each | 2.0 | $0.00 | ||||
| A004 | Privacy Impact Assessment (PIA) | Each | 2.0 | $0.00 | ||||
| A005 | Failure Modes and Effects Criticality Analysis (FMECA) Report | Each | 2.0 | $0.00 | ||||
| A006 | Engineering Change Proposals (ECP) | Negotiated at the Delivery Order level | ||||||
| A007 | Software Quality Assurance Plan | Each | 1.0 | $0.00 | ||||
| A008 | Site Survey Report (SSR) | Included in FFP CLINs 0001, 0002, 0003, and 0004 | ||||||
| A009 | Installation Engineering Plan (IEP) | Included in FFP CLINs 0001, 0002, 0003, and 0004 | ||||||
| A010 | Criminal Justice Information Services (CJIS) Security Plan | Each | 8.0 | $0.00 | ||||
| A011 | Physical Configuration Audit (PCA) Plan | Each | 1.0 | $0.00 | ||||
| A012 | Physical Configuration Audit (PCA) Report | Each | 8.0 | $0.00 | ||||
| A013 | Site Technical Data Package | Each | 8.0 | $0.00 | ||||
| A014 | Contractor’s Management Plan | Each | 1.0 | $0.00 | ||||
| A015 | Integrated Master Schedule (IMS) | Included in FFP CLIN 0022 | ||||||
| A016 | Bi-Weekly Schedule Report | Included in FFP CLIN 0022 | ||||||
| A017 | Contractor’s Progress, Status & Management Report | Each | 1.0 | $0.00 | ||||
| A018 | Meetings & Briefings | Included in FFP CLIN 0022 | ||||||
| A019 | Systems Engineering Management Plan (SEMP) | Each | 1.0 | $0.00 | ||||
| A020 | System Installation and Checkout Test Report | Included in FFP CLIN 0024 | ||||||
| A021 | Test Plan | Included in FFP CLIN 0024 | ||||||
| A022 | Test Procedures | Each | 8.0 | $0.00 | ||||
| A023 | Test Inspection Report | Included in FFP CLIN 0024 | ||||||
| A024 | Failure Analysis and Corrective Action Report (FACAR) | Each | 1.0 | $0.00 | ||||
| A025 | Configuration Management Plan (CMP) | Each | 1.0 | $0.00 | ||||
| A026 | Sustainment Transition Plan | Included in FFP CLIN 0025 | ||||||
| A027 | Integrated Logistics Support Plan (ILSP) | Included in FFP CLIN 0025 | ||||||
| A028 | Level of Repair Analysis (LORA) | Included in FFP CLIN 0025 | ||||||
| A029 | Maintenance Support Plan | Included in FFP CLIN 0025 | ||||||
| A030 | Maintenance Service Report | Each | 1.0 | $0.00 | ||||
| A031 | Logistics Management Information Summaries | Included in FFP CLIN 0025 | ||||||
| A032 | Logistics Management Information Data Products | Each | 1.0 | $0.00 | ||||
| A033 | Item Unique Identification (IUID) Plan | Included in FFP CLIN 0025 | ||||||
| A034 | Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan | Included in FFP CLIN 0025 | ||||||
| A035 | CLS Help Desk Ticket Report | Each | 20.0 | $0.00 | ||||
| A036 | Safety Assessment Report | Each | 1.0 | $0.00 | ||||
| A037 | Training Program Development and Management Plan | Each | 1.0 | $0.00 | ||||
| A038 | Training Conduct Support Document Package | Each | 1.0 | $0.00 | ||||
| A039 | Software License Renewal | Negotiated at the Delivery Order level | ||||||
| A040 | Return for Maintenance Authorization | Negotiated at the Delivery Order level | ||||||
| A041 | Functional Configuration Audit (FCA) Plan | Each | 1.0 | $0.00 | ||||
| A042 | Functional Configuration Audit (FCA) Report | Each | 1.0 | $0.00 | ||||
| A043 | Interface Requirements Specification | Each | 1.0 | $0.00 | ||||
| A044 | Software Design Description | Each | 1.0 | $0.00 | ||||
| A045 | Interface Design Description | Each | 1.0 | $0.00 | ||||
| A046 | Database Design Description (DBDD) | Each | 1.0 | $0.00 | ||||
| TOTAL CDRL COST | $0.00 | Sum of Extended Price for CDRLS only | Sum of Extended Price for CDRLS only | |||||
| $6,814,000.00 | Total Extended Price for CDRLS and CLINS | Total Extended Price for CDRLS and CLINS |
Base Year 2 Base Year 2
| Only yellow highlighted boxes can be filled in | |||||||||
| CLIN | CLIN Type | CLIN Description | Quantity Type | QTY (Estimated) | Lot Price | Extended Price | Description | ||
| 1001 | FFP | Site Survey / Design - Small Site | EA | 12.0 | $0.00 | 28.0 | |||
| A008 – Site Survey Report (SSR) | NSP | ||||||||
| A009 – Installation Engineering Plan (IEP) | |||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 161 to 206 | ||||||||
| Quantity Type | |||||||||
| 1002 | FFP | Site Survey / Design - Medium Site | EA | 11.0 | $0.00 | ||||
| A008 – Site Survey Report (SSR) | NSP | ||||||||
| A009 – Installation Engineering Plan (IEP) | |||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 161 to 206 | ||||||||
| Quantity Type | |||||||||
| 1003 | FFP | Site Survey / Design - Large Site | EA | 5.0 | $0.00 | ||||
| A008 – Site Survey Report (SSR) | NSP | ||||||||
| A009 – Installation Engineering Plan (IEP) | |||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 161 to 206 | ||||||||
| Quantity Type | |||||||||
| 1004 | FFP | Site Survey / Design - XLarge Site | EA | Negotiated at Delivery Order Level | |||||
| A008 – Site Survey Report (SSR) | |||||||||
| A009 – Installation Engineering Plan (IEP) | |||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 161 to 206 | ||||||||
| Quantity Type | |||||||||
| 1005 | FFP | Lane Install - Tier 1 | EA | 56.0 | $0.00 | 56 | 10 lanes per site, assumes 20% Tier 1 | Current 98 sites | |
| A012 – Physical Configuration Audit Report | Priced below in CDRL section in rows 161 to 206 | Total ACPs - 359 = 3.66 ACPs per site. Note: 84 of the current 98 sites have 5 or less ACPs. | |||||||
| A013 – Site Technical Data Package | Total Lanes - 820 (POV, IB COM, IB PED) = 2.28 lanes per ACP / 8.37 lanes per site | ||||||||
| A022 – Test Procedures | POV lanes = 716 | ||||||||
| A024 – Failure Analysis and Corrective Action Report (FACAR) | |||||||||
| Quantity Type | Small Sites (64 of the 98) | ||||||||
| 1006 | FFP | Lane Install - Tier 2 | EA | 224.0 | $0.00 | 224 | 10 lanes per site, assumes 80% Tier 2 | Medium Sites (24 of the 98) | |
| A012 – Physical Configuration Audit Report | Priced below in CDRL section in rows 161 to 206 | Large Sites (5 of the 98) | |||||||
| A013 – Site Technical Data Package | Xlarge Sites (5 of the 98) | ||||||||
| A022 – Test Procedures | |||||||||
| A024 – Failure Analysis and Corrective Action Report (FACAR) | |||||||||
| Quantity Type | |||||||||
| 1007 | FFP | Handheld Scanner | EA | 560.0 | $0.00 | 560 | total year lanes x 2 per lane | ||
| Quantity Type | |||||||||
| 1008 | FFP | Access Control Point (ACP) Install - Tier 1 | EA | 28.0 | $0.00 | 28 | total year sites * 5 ACPs per site, assumes 20% Tier 1 | ||
| Quantity Type | |||||||||
| 1009 | FFP | Access Control Point (ACP) Install - Tier 2 | EA | 112.0 | $0.00 | 112 | total year sites * 5 ACPs per site, assumes 80% Tier 2 | ||
| Quantity Type | |||||||||
| 1010 | FFP | Large Server Set | EA | 3.0 | $0.00 | 1 per tier 1 site | |||
| Quantity Type | |||||||||
| 1011 | FFP | Cache Box | EA | 23.0 | $0.00 | 1 per small and medium site | |||
| Quantity Type | |||||||||
| 1012 | FFP | Cloud Service | EA | 23.0 | $0.00 | 1 per small and medium site | |||
| Quantity Type | |||||||||
| 1013 | FFP | Kiosk | EA | 14.0 | $0.00 | 14 | total year sites * 2 Kiosks per site * 25% sites | ||
| Quantity Type | |||||||||
| 1014 | FFP | Web Registration | EA | 28.0 | $0.00 | 28.0 | total year sites * 1 per site | ||
| Quantity Type | |||||||||
| 1015 | FFP | Portable Registration Station | EA | 28.0 | $0.00 | 28.0 | total year sites * 1 per site | ||
| Quantity Type | 14 sites per year, 2 per small/medium site, 4 per large | ||||||||
| 1016 | FFP | Visitor Control Center (VCC) Registration Workstation | EA | 66.0 | $0.00 | 66 | (total small/med year sites * 2 per site) + (total large sites * 4 per site) | ||
| Quantity Type | |||||||||
| 1017 | FFP | Central Monitoring Workstation (CMWS) | EA | 3.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 1018 | FFP | Cellular ACP - Fixed | EA | 3.0 | $0.00 | As needed ~10% of total ACP per year | |||
| Quantity Type | |||||||||
| 1019 | FFP | Cellular ACP - Deployable | EA | 3.0 | $0.00 | As needed ~10% of total ACP per year | |||
| Quantity Type | |||||||||
| 1020 | FFP | Cybersecurity | LO (6 months) | 2.0 | $0.00 | ||||
| A002 – Information Systems Accreditation Documentation | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A003 – Vulnerability Scan Compliance Report | |||||||||
| A004 – Privacy Impact Assessment (PIA) | |||||||||
| Quantity Type | |||||||||
| 1021 | FFP | Site Registration System | EA | 3.0 | $0.00 | As needed | |||
| Quantity Type | |||||||||
| 1022 | FFP | Program Management | LO (year) | 1.0 | $0.00 | ||||
| A014 – Contractor’s Management Plan | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A015 – Integrated Master Schedule (IMS) | NSP | ||||||||
| A016 – Bi-Weekly Schedule Report | |||||||||
| A018 – Meetings & Briefings | |||||||||
| A036 – Safety Assessment Report | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A037 – Training Conduct Support Document Package | |||||||||
| A038 – Training Program Development and Management Plan | |||||||||
| Quantity Type | |||||||||
| 1023 | FFP | Systems Engineering | EA | 1.0 | $0.00 | ||||
| A001 – System Description and Architecture | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A005 – Failure Modes and Effects Criticality Analysis (FMECA) Report | |||||||||
| A007 – Software Quality Assurance Plan | |||||||||
| A011 – Physical Configuration Audit (PCA) Plan | |||||||||
| A019 – Systems Engineering Management Plan (SEMP) | |||||||||
| A025 – Configuration Management Plan (CMP) | |||||||||
| A041 – Functional Configuration Audit (FCA) Plan | |||||||||
| A043 – Interface Requirements Specification | |||||||||
| A044 – Software Design Description | |||||||||
| A045 – Interface Design Description | |||||||||
| A046 – Database Design Description (DBDD) | |||||||||
| Quantity Type | |||||||||
| 1024 | FFP | System Verification Documentation | EA | 33.0 | $0.00 | total year sites + 5 | |||
| A020 – System Installation and Checkout Test Report | NSP | ||||||||
| A021 – Test Plan | |||||||||
| A023 – Test Inspection Report | |||||||||
| A012 – Physical Configuration Audit (PCA) Report | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A022 – Test Procedures | |||||||||
| A024 – Failure Analysis and Corrective Action Report (FACAR) priced provided below | |||||||||
| A042 – Functional Configuration Audit (FCA) Report | |||||||||
| Quantity Type | |||||||||
| 1025 | FFP | Logistics Management | EA | 1.0 | $0.00 | ||||
| A026 – Sustainment Transition Plan | NSP | ||||||||
| A027 – Integrated Logistics Support Plan (ILSP) | |||||||||
| A028 – Level of Repair Analysis (LORA) | |||||||||
| A029 – Maintenance Support Plan | |||||||||
| A030 – Maintenance Service Report | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A031 – Logistics Management Information Summaries | NSP | ||||||||
| A032 – Logistics Management Information Data Products | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A033 – Item Unique Identification (IUID) Plan | NSP | ||||||||
| A034 – Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan | |||||||||
| Quantity Type | |||||||||
| 1026 | FFP | Migration of User Data (L) | EA | 5.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 1027 | FFP | Migration of User Data (M) | EA | 11.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 1028 | FFP | Migration of User Data (S) | EA | 12.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 1029 | FFP | Post-Government Site Acceptance User Support | EA | 28.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 1030 | FFP | Nlets Support License | EA | 18.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 1031 | FFP | Operator Training Course | EA | 18.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 1032 | FFP | Admin Training Course | EA | 18.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 1033 | FFP | Registrar Training Course | EA | 18.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 1034 | FFP | Maintainer Training Course | EA | 18.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 1035 | FFP | Depot Level Training Course | EA | 2.0 | $0.00 | *QTY of 2 per year starting in yr 2 | |||
| Quantity Type | |||||||||
| 1036 | FFP | Contractor Logistics Support (CLS cost is a percentage CLINS 0005-0017 and 0021) | LO (year) | 0.0% | $0.00 | 1 per associated site | |||
| A024 – Failure Analysis and Corrective Action Report (FACAR) | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A035 – CLS Help Desk Ticket Report | |||||||||
| Quantity Type | |||||||||
| 1037 | FFP | Engineering Change Proposals | EA | $4,845,000.00 | |||||
| A006 – Engineering Change Proposal | Negotiated at Delivery Order Level | ||||||||
| Quantity Type | |||||||||
| 1038 | FFP | Changes | EA | Negotiated at Delivery Order Level | |||||
| Quantity Type | |||||||||
| 1039 | CR | Travel | EA | $1,687,500.00 | |||||
| Quantity Type | |||||||||
| 1040 | FFP | Sustainment Support - Small Site | EA | 67.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 1041 | FFP | Sustainment Support - Medium Site | EA | 27.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 1042 | FFP | Sustainment Support - Large Site | EA | 7.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 1043 | FFP | Sustainment Support - Xlarge Site | EA | 5.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 1044 | FFP | Technology Research and Evaluation | EA | Negotiated at Delivery Order Level |
1045 FFP Software License Renewal EA Negotiated at Delivery Order Level
1046 FFP Return for Maintenance Authorization EA Negotiated at Delivery Order Level
1047 FFP Individually Pre-Priced CDRL(s) EA Negotiated at Delivery Order Level
| 0048 | FFP | Contractor Manpower Reporting | LO (year) | 1.0 | $0.00 | |||||
| A017 – Contractor’s Progress, Status & Management Report | Priced below in CDRL section in rows 161 to 206 | |||||||||
| TOTAL CLIN COST | $6,532,500.00 | Sum of Extended Prices for CLINS only | Sum of Extended Prices for CLINS only | |||||||
| CDRL # | CDRL Description | Quantity Type | QTY (Estimated) | Lot Price | Extended Price | |||||
| A001 | System Description and Architecture | Each | 1.0 | $0.00 | ||||||
| A002 | Information Systems Accreditation Documentation | Each | 2.0 | $0.00 | ||||||
| A003 | Vulnerability Scan Compliance Report | Each | 2.0 | $0.00 | ||||||
| A004 | Privacy Impact Assessment (PIA) | Each | 2.0 | $0.00 | ||||||
| A005 | Failure Modes and Effects Criticality Analysis (FMECA) Report | Each | 2.0 | $0.00 | ||||||
| A006 | Engineering Change Proposals (ECP) | Negotiated at the Delivery Order level | ||||||||
| A007 | Software Quality Assurance Plan | Each | 1.0 | $0.00 | ||||||
| A008 | Site Survey Report (SSR) | Included in FFP CLINs 0001, 0002, 0003, and 0004 | ||||||||
| A009 | Installation Engineering Plan (IEP) | Included in FFP CLINs 0001, 0002, 0003, and 0004 | ||||||||
| A010 | Criminal Justice Information Services (CJIS) Security Plan | Each | 18.0 | $0.00 | ||||||
| A011 | Physical Configuration Audit (PCA) Plan | Each | 1.0 | $0.00 | ||||||
| A012 | Physical Configuration Audit (PCA) Report | Each | 28.0 | $0.00 | ||||||
| A013 | Site Technical Data Package | Each | 28.0 | $0.00 | ||||||
| A014 | Contractor’s Management Plan | Each | 1.0 | $0.00 | ||||||
| A015 | Integrated Master Schedule (IMS) | Included in FFP CLIN 0022 | ||||||||
| A016 | Bi-Weekly Schedule Report | Included in FFP CLIN 0022 | ||||||||
| A017 | Contractor’s Progress, Status & Management Report | Each | 1.0 | $0.00 | ||||||
| A018 | Meetings & Briefings | Included in FFP CLIN 0022 | ||||||||
| A019 | Systems Engineering Management Plan (SEMP) | Each | 1.0 | $0.00 | ||||||
| A020 | System Installation and Checkout Test Report | Included in FFP CLIN 0024 | ||||||||
| A021 | Test Plan | Included in FFP CLIN 0024 | ||||||||
| A022 | Test Procedures | Each | 28.0 | $0.00 | ||||||
| A023 | Test Inspection Report | Included in FFP CLIN 0024 | ||||||||
| A024 | Failure Analysis and Corrective Action Report (FACAR) | Each | 1.0 | $0.00 | ||||||
| A025 | Configuration Management Plan (CMP) | Each | 1.0 | $0.00 | ||||||
| A026 | Sustainment Transition Plan | Included in FFP CLIN 0025 | ||||||||
| A027 | Integrated Logistics Support Plan (ILSP) | Included in FFP CLIN 0025 | ||||||||
| A028 | Level of Repair Analysis (LORA) | Included in FFP CLIN 0025 | ||||||||
| A029 | Maintenance Support Plan | Included in FFP CLIN 0025 | ||||||||
| A030 | Maintenance Service Report | Each | 1.0 | $0.00 | ||||||
| A031 | Logistics Management Information Summaries | Included in FFP CLIN 0025 | ||||||||
| A032 | Logistics Management Information Data Products | Each | 1.0 | $0.00 | ||||||
| A033 | Item Unique Identification (IUID) Plan | Included in FFP CLIN 0025 | ||||||||
| A034 | Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan | Included in FFP CLIN 0025 | ||||||||
| A035 | CLS Help Desk Ticket Report | Each | 20.0 | $0.00 | ||||||
| A036 | Safety Assessment Report | Each | 1.0 | $0.00 | ||||||
| A037 | Training Program Development and Management Plan | Each | 1.0 | $0.00 | ||||||
| A038 | Training Conduct Support Document Package | Each | 1.0 | $0.00 | ||||||
| A039 | Software License Renewal | Negotiated at the Delivery Order level | ||||||||
| A040 | Return for Maintenance Authorization | Negotiated at the Delivery Order level | ||||||||
| A041 | Functional Configuration Audit (FCA) Plan | Each | 1.0 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| A042 | Functional Configuration Audit (FCA) Report | Each | 3.0 | $0.00 | ||||||
| A043 | Interface Requirements Specification | Each | 1.0 | $0.00 | ||||||
| A044 | Software Design Description | Each | 1.0 | $0.00 | ||||||
| A045 | Interface Design Description | Each | 1.0 | $0.00 | ||||||
| A046 | Database Design Description (DBDD) | Each | 1.0 | $0.00 | ||||||
| TOTAL CDRL COST | $0.00 | Sum of Extended Price for CDRLS only | Sum of Extended Price for CDRLS only | |||||||
| $6,532,500.00 | Total Extended Price for CDRLS and CLINS | Total Extended Price for CDRLS and CLINS |
Option Year 1 Option Year 1
| Only yellow highlighted boxes can be filled in | |||||||||
| CLIN | CLIN Type | CLIN Description | Quantity Type | QTY (Estimated) | Lot Price | Extended Price | Description | ||
| 2001 | FFP | Site Survey / Design - Small Site | EA | 12.0 | $0.00 | 27.0 | |||
| A008 – Site Survey Report (SSR) | NSP | ||||||||
| A009 – Installation Engineering Plan (IEP) | |||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 161 to 206 | ||||||||
| Quantity Type | |||||||||
| 2002 | FFP | Site Survey / Design - Medium Site | EA | 10.0 | $0.00 | ||||
| A008 – Site Survey Report (SSR) | NSP | ||||||||
| A009 – Installation Engineering Plan (IEP) | |||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 161 to 206 | ||||||||
| Quantity Type | |||||||||
| 2003 | FFP | Site Survey / Design - Large Site | EA | 5.0 | $0.00 | ||||
| A008 – Site Survey Report (SSR) | NSP | ||||||||
| A009 – Installation Engineering Plan (IEP) | |||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 161 to 206 | ||||||||
| Quantity Type | |||||||||
| 2004 | FFP | Site Survey / Design - XLarge Site | EA | Negotiated at Delivery Order Level | |||||
| A008 – Site Survey Report (SSR) | |||||||||
| A009 – Installation Engineering Plan (IEP) | |||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 161 to 206 | ||||||||
| Quantity Type | |||||||||
| 2005 | FFP | Lane Install - Tier 1 | EA | 54.0 | $0.00 | 54 | 10 lanes per site, assumes 20% Tier 1 | Current 98 sites | |
| A012 – Physical Configuration Audit Report | Priced below in CDRL section in rows 161 to 206 | Total ACPs - 359 = 3.66 ACPs per site. Note: 84 of the current 98 sites have 5 or less ACPs. | |||||||
| A013 – Site Technical Data Package | Total Lanes - 820 (POV, IB COM, IB PED) = 2.28 lanes per ACP / 8.37 lanes per site | ||||||||
| A022 – Test Procedures | POV lanes = 716 | ||||||||
| A024 – Failure Analysis and Corrective Action Report (FACAR) | |||||||||
| Quantity Type | Small Sites (64 of the 98) | ||||||||
| 2006 | FFP | Lane Install - Tier 2 | EA | 216.0 | $0.00 | 216 | 10 lanes per site, assumes 80% Tier 2 | Medium Sites (24 of the 98) | |
| A012 – Physical Configuration Audit Report | Priced below in CDRL section in rows 161 to 206 | Large Sites (5 of the 98) | |||||||
| A013 – Site Technical Data Package | Xlarge Sites (5 of the 98) | ||||||||
| A022 – Test Procedures | |||||||||
| A024 – Failure Analysis and Corrective Action Report (FACAR) | |||||||||
| Quantity Type | |||||||||
| 2007 | FFP | Handheld Scanner | EA | 540.0 | $0.00 | 540 | total year lanes x 2 per lane | ||
| Quantity Type | |||||||||
| 2008 | FFP | Access Control Point (ACP) Install - Tier 1 | EA | 27.0 | $0.00 | 27 | total year sites * 5 ACPs per site, assumes 20% Tier 1 | ||
| Quantity Type | |||||||||
| 2009 | FFP | Access Control Point (ACP) Install - Tier 2 | EA | 108.0 | $0.00 | 108 | total year sites * 5 ACPs per site, assumes 80% Tier 2 | ||
| Quantity Type | |||||||||
| 2010 | FFP | Large Server Set | EA | 3.0 | $0.00 | 1 per tier 1 site | |||
| Quantity Type | |||||||||
| 2011 | FFP | Cache Box | EA | 22.0 | $0.00 | 1 per small and medium site | |||
| Quantity Type | |||||||||
| 2012 | FFP | Cloud Service | EA | 22.0 | $0.00 | 1 per small and medium site | |||
| Quantity Type | |||||||||
| 2013 | FFP | Kiosk | EA | 13.5 | $0.00 | 14 | total year sites * 2 Kiosks per site * 25% sites | ||
| Quantity Type | |||||||||
| 2014 | FFP | Web Registration | EA | 27.0 | $0.00 | 27.0 | total year sites * 1 per site | ||
| Quantity Type | |||||||||
| 2015 | FFP | Portable Registration Station | EA | 27.0 | $0.00 | 27.0 | total year sites * 1 per site | ||
| Quantity Type | 14 sites per year, 2 per small/medium site, 4 per large | ||||||||
| 2016 | FFP | Visitor Control Center (VCC) Registration Workstation | EA | 64.0 | $0.00 | 64 | (total small/med year sites * 2 per site) + (total large sites * 4 per site) | ||
| Quantity Type | |||||||||
| 2017 | FFP | Central Monitoring Workstation (CMWS) | EA | 3.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 2018 | FFP | Cellular ACP - Fixed | EA | 3.0 | $0.00 | As needed ~10% of total ACP per year | |||
| Quantity Type | |||||||||
| 2019 | FFP | Cellular ACP - Deployable | EA | 3.0 | $0.00 | As needed ~10% of total ACP per year | |||
| Quantity Type | |||||||||
| 2020 | FFP | Cybersecurity | LO (6 months) | 2.0 | $0.00 | ||||
| A002 – Information Systems Accreditation Documentation | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A003 – Vulnerability Scan Compliance Report | |||||||||
| A004 – Privacy Impact Assessment (PIA) | |||||||||
| Quantity Type | |||||||||
| 2021 | FFP | Site Registration System | EA | 3.0 | $0.00 | As needed | |||
| Quantity Type | |||||||||
| 2022 | FFP | Program Management | LO (year) | 1.0 | $0.00 | ||||
| A014 – Contractor’s Management Plan | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A015 – Integrated Master Schedule (IMS) | NSP | ||||||||
| A016 – Bi-Weekly Schedule Report | |||||||||
| A018 – Meetings & Briefings | |||||||||
| A036 – Safety Assessment Report | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A037 – Training Conduct Support Document Package | |||||||||
| A038 – Training Program Development and Management Plan | |||||||||
| Quantity Type | |||||||||
| 2023 | FFP | Systems Engineering | EA | 1.0 | $0.00 | ||||
| A001 – System Description and Architecture | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A005 – Failure Modes and Effects Criticality Analysis (FMECA) Report | |||||||||
| A007 – Software Quality Assurance Plan | |||||||||
| A011 – Physical Configuration Audit (PCA) Plan | |||||||||
| A019 – Systems Engineering Management Plan (SEMP) | |||||||||
| A025 – Configuration Management Plan (CMP) | |||||||||
| A041 – Functional Configuration Audit (FCA) Plan | |||||||||
| A043 – Interface Requirements Specification | |||||||||
| A044 – Software Design Description | |||||||||
| A045 – Interface Design Description | |||||||||
| A046 – Database Design Description (DBDD) | |||||||||
| Quantity Type | |||||||||
| 2024 | FFP | System Verification Documentation | EA | 32.0 | $0.00 | total year sites + 5 | |||
| A020 – System Installation and Checkout Test Report | NSP | ||||||||
| A021 – Test Plan | |||||||||
| A023 – Test Inspection Report | |||||||||
| A012 – Physical Configuration Audit (PCA) Report | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A022 – Test Procedures | |||||||||
| A024 – Failure Analysis and Corrective Action Report (FACAR) priced provided below | |||||||||
| A042 – Functional Configuration Audit (FCA) Report | |||||||||
| Quantity Type | |||||||||
| 2025 | FFP | Logistics Management | EA | 1.0 | $0.00 | ||||
| A026 – Sustainment Transition Plan | NSP | ||||||||
| A027 – Integrated Logistics Support Plan (ILSP) | |||||||||
| A028 – Level of Repair Analysis (LORA) | |||||||||
| A029 – Maintenance Support Plan | |||||||||
| A030 – Maintenance Service Report | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A031 – Logistics Management Information Summaries | NSP | ||||||||
| A032 – Logistics Management Information Data Products | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A033 – Item Unique Identification (IUID) Plan | NSP | ||||||||
| A034 – Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan | |||||||||
| Quantity Type | |||||||||
| 2026 | FFP | Migration of User Data (L) | EA | 5.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 2027 | FFP | Migration of User Data (M) | EA | 10.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 2028 | FFP | Migration of User Data (S) | EA | 12.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 2029 | FFP | Post-Government Site Acceptance User Support | EA | 27.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 2030 | FFP | Nlets Support License | EA | 17.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 2031 | FFP | Operator Training Course | EA | 17.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 2032 | FFP | Admin Training Course | EA | 17.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 2033 | FFP | Registrar Training Course | EA | 17.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 2034 | FFP | Maintainer Training Course | EA | 17.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 2035 | FFP | Depot Level Training Course | EA | 2.0 | $0.00 | *QTY of 2 per year starting in yr 2 | |||
| Quantity Type | |||||||||
| 2036 | FFP | Contractor Logistics Support (CLS cost is a percentage CLINS 0005-0017 and 0021) | LO (year) | 0.0% | $0.00 | 1 per associated site | |||
| A024 – Failure Analysis and Corrective Action Report (FACAR) | Priced below in CDRL section in rows 161 to 206 | ||||||||
| A035 – CLS Help Desk Ticket Report | |||||||||
| Quantity Type | |||||||||
| 2037 | FFP | Engineering Change Proposals | EA | $4,942,000.00 | |||||
| A006 – Engineering Change Proposal | Negotiated at Delivery Order Level | ||||||||
| Quantity Type | |||||||||
| 2038 | FFP | Changes | EA | Negotiated at Delivery Order Level | |||||
| Quantity Type | |||||||||
| 2039 | CR | Travel | EA | $1,593,750.00 | |||||
| Quantity Type | |||||||||
| 2040 | FFP | Sustainment Support - Small Site | EA | 74.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 2041 | FFP | Sustainment Support - Medium Site | EA | 35.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 2042 | FFP | Sustainment Support - Large Site | EA | 10.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 2043 | FFP | Sustainment Support - Xlarge Site | EA | 5.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 2044 | FFP | Technology Research and Evaluation | EA | Negotiated at Delivery Order Level |
2045 FFP Software License Renewal EA Negotiated at Delivery Order Level
2046 FFP Return for Maintenance Authorization EA Negotiated at Delivery Order Level
2047 FFP Individually Pre-Priced CDRL(s) EA Negotiated at Delivery Order Level
| 0048 | FFP | Contractor Manpower Reporting | LO (year) | 1.0 | $0.00 | |||
| A017 – Contractor’s Progress, Status & Management Report | Priced below in CDRL section in rows 161 to 206 | |||||||
| TOTAL CLIN COST | $6,535,750.00 | Sum of Extended Prices for CLINS only | Sum of Extended Prices for CLINS only | |||||
| CDRL # | CDRL Description | Quantity Type | QTY (Estimated) | Lot Price | Extended Price | |||
| A001 | System Description and Architecture | Each | 1.0 | $0.00 | ||||
| A002 | Information Systems Accreditation Documentation | Each | 2.0 | $0.00 | ||||
| A003 | Vulnerability Scan Compliance Report | Each | 2.0 | $0.00 | ||||
| A004 | Privacy Impact Assessment (PIA) | Each | 2.0 | $0.00 | ||||
| A005 | Failure Modes and Effects Criticality Analysis (FMECA) Report | Each | 2.0 | $0.00 | ||||
| A006 | Engineering Change Proposals (ECP) | Negotiated at the Delivery Order level | ||||||
| A007 | Software Quality Assurance Plan | Each | 1.0 | $0.00 | ||||
| A008 | Site Survey Report (SSR) | Included in FFP CLINs 2001, 2002, 2003, and 2004 | ||||||
| A009 | Installation Engineering Plan (IEP) | Included in FFP CLINs 2001, 2002, 2003, and 2004 | ||||||
| A010 | Criminal Justice Information Services (CJIS) Security Plan | Each | 17.0 | $0.00 | ||||
| A011 | Physical Configuration Audit (PCA) Plan | Each | 1.0 | $0.00 | ||||
| A012 | Physical Configuration Audit (PCA) Report | Each | 27.0 | $0.00 | ||||
| A013 | Site Technical Data Package | Each | 27.0 | $0.00 | ||||
| A014 | Contractor’s Management Plan | Each | 1.0 | $0.00 | ||||
| A015 | Integrated Master Schedule (IMS) | Included in FFP CLIN 2022 | ||||||
| A016 | Bi-Weekly Schedule Report | Included in FFP CLIN 2022 | ||||||
| A017 | Contractor’s Progress, Status & Management Report | Each | 1.0 | $0.00 | ||||
| A018 | Meetings & Briefings | Included in FFP CLIN 2022 | ||||||
| A019 | Systems Engineering Management Plan (SEMP) | Each | 1.0 | $0.00 | ||||
| A020 | System Installation and Checkout Test Report | Included in FFP CLIN 2024 | ||||||
| A021 | Test Plan | Included in FFP CLIN 2024 | ||||||
| A022 | Test Procedures | Each | 27.0 | $0.00 | ||||
| A023 | Test Inspection Report | Included in FFP CLIN 2024 | ||||||
| A024 | Failure Analysis and Corrective Action Report (FACAR) | Each | 1.0 | $0.00 | ||||
| A025 | Configuration Management Plan (CMP) | Each | 1.0 | $0.00 | ||||
| A026 | Sustainment Transition Plan | Included in FFP CLIN 2025 | ||||||
| A027 | Integrated Logistics Support Plan (ILSP) | Included in FFP CLIN 2025 | ||||||
| A028 | Level of Repair Analysis (LORA) | Included in FFP CLIN 2025 | ||||||
| A029 | Maintenance Support Plan | Included in FFP CLIN 2025 | ||||||
| A030 | Maintenance Service Report | Each | 1.0 | $0.00 | ||||
| A031 | Logistics Management Information Summaries | Included in FFP CLIN 2025 | ||||||
| A032 | Logistics Management Information Data Products | Each | 1.0 | $0.00 | ||||
| A033 | Item Unique Identification (IUID) Plan | Included in FFP CLIN 2025 | ||||||
| A034 | Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan | Included in FFP CLIN 2025 | ||||||
| A035 | CLS Help Desk Ticket Report | Each | 20.0 | $0.00 | ||||
| A036 | Safety Assessment Report | Each | 1.0 | $0.00 | ||||
| A037 | Training Program Development and Management Plan | Each | 1.0 | $0.00 | ||||
| A038 | Training Conduct Support Document Package | Each | 1.0 | $0.00 | ||||
| A039 | Software License Renewal | Negotiated at the Delivery Order level | ||||||
| A040 | Return for Maintenance Authorization | Negotiated at the Delivery Order level | ||||||
| A041 | Functional Configuration Audit (FCA) Plan | Each | 1.0 | $0.00 | ||||
| A042 | Functional Configuration Audit (FCA) Report | Each | 3.0 | $0.00 | ||||
| A043 | Interface Requirements Specification | Each | 1.0 | $0.00 | ||||
| A044 | Software Design Description | Each | 1.0 | $0.00 | ||||
| A045 | Interface Design Description | Each | 1.0 | $0.00 | ||||
| A046 | Database Design Description (DBDD) | Each | 1.0 | $0.00 | ||||
| TOTAL CDRL COST | $0.00 | Sum of Extended Price for CDRLS only | Sum of Extended Price for CDRLS only | |||||
| $6,535,750.00 | Total Extended Price for CDRLS and CLINS | Total Extended Price for CDRLS and CLINS |
Option Year 2 Option Year 2
| Only yellow highlighted boxes can be filled in | |||||||||
| CLIN | CLIN Type | CLIN Description | Quantity Type | QTY (Estimated) | Lot Price | Extended Price | Description | ||
| 3001 | FFP | Site Survey / Design - Small Site | EA | 12.0 | $0.00 | 27.0 | |||
| A008 – Site Survey Report (SSR) | NSP | ||||||||
| A009 – Installation Engineering Plan (IEP) | |||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 155 to 196 | ||||||||
| Quantity Type | |||||||||
| 3002 | FFP | Site Survey / Design - Medium Site | EA | 10.0 | $0.00 | ||||
| A008 – Site Survey Report (SSR) | NSP | ||||||||
| A009 – Installation Engineering Plan (IEP) | |||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 155 to 196 | ||||||||
| Quantity Type | |||||||||
| 3003 | FFP | Site Survey / Design - Large Site | EA | 5.0 | $0.00 | ||||
| A008 – Site Survey Report (SSR) | NSP | ||||||||
| A009 – Installation Engineering Plan (IEP) | |||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 155 to 196 | ||||||||
| Quantity Type | |||||||||
| 3004 | FFP | Site Survey / Design - XLarge Site | EA | Negotiated at Delivery Order Level | |||||
| A008 – Site Survey Report (SSR) | |||||||||
| A009 – Installation Engineering Plan (IEP) | |||||||||
| A010 – Criminal Justice Information Services (CJIS) Security Plan | Priced below in CDRL section in rows 155 to 196 | ||||||||
| Quantity Type | |||||||||
| 3005 | FFP | Lane Install - Tier 1 | EA | 54.0 | $0.00 | 54 | 10 lanes per site, assumes 20% Tier 1 | Current 98 sites | |
| A012 – Physical Configuration Audit Report | Priced below in CDRL section in rows 155 to 196 | Total ACPs - 359 = 3.66 ACPs per site. Note: 84 of the current 98 sites have 5 or less ACPs. | |||||||
| A013 – Site Technical Data Package | Total Lanes - 820 (POV, IB COM, IB PED) = 2.28 lanes per ACP / 8.37 lanes per site | ||||||||
| A022 – Test Procedures | POV lanes = 716 | ||||||||
| A024 – Failure Analysis and Corrective Action Report (FACAR) | |||||||||
| Quantity Type | Small Sites (64 of the 98) | ||||||||
| 3006 | FFP | Lane Install - Tier 2 | EA | 216.0 | $0.00 | 216 | 10 lanes per site, assumes 80% Tier 2 | Medium Sites (24 of the 98) | |
| A012 – Physical Configuration Audit Report | Priced below in CDRL section in rows 155 to 196 | Large Sites (5 of the 98) | |||||||
| A013 – Site Technical Data Package | Xlarge Sites (5 of the 98) | ||||||||
| A022 – Test Procedures | |||||||||
| A024 – Failure Analysis and Corrective Action Report (FACAR) | |||||||||
| Quantity Type | |||||||||
| 3007 | FFP | Handheld Scanner | EA | 540.0 | $0.00 | 540 | total year lanes x 2 per lane | ||
| Quantity Type | |||||||||
| 3008 | FFP | Access Control Point (ACP) Install - Tier 1 | EA | 27.0 | $0.00 | 27 | total year sites * 5 ACPs per site, assumes 20% Tier 1 | ||
| Quantity Type | |||||||||
| 3009 | FFP | Access Control Point (ACP) Install - Tier 2 | EA | 108.0 | $0.00 | 108 | total year sites * 5 ACPs per site, assumes 80% Tier 2 | ||
| Quantity Type | |||||||||
| 3010 | FFP | Large Server Set | EA | 3.0 | $0.00 | 1 per tier 1 site | |||
| Quantity Type | |||||||||
| 3011 | FFP | Cache Box | EA | 22.0 | $0.00 | 1 per small and medium site | |||
| Quantity Type | |||||||||
| 3012 | FFP | Cloud Service | EA | 22.0 | $0.00 | 1 per small and medium site | |||
| Quantity Type | |||||||||
| 3013 | FFP | Kiosk | EA | 13.5 | $0.00 | 14 | total year sites * 2 Kiosks per site * 25% sites | ||
| Quantity Type | |||||||||
| 3014 | FFP | Web Registration | EA | 27.0 | $0.00 | 27.0 | total year sites * 1 per site | ||
| Quantity Type | |||||||||
| 3015 | FFP | Portable Registration Station | EA | 27.0 | $0.00 | 27.0 | total year sites * 1 per site | ||
| Quantity Type | 14 sites per year, 2 per small/medium site, 4 per large | ||||||||
| 3016 | FFP | Visitor Control Center (VCC) Registration Workstation | EA | 64.0 | $0.00 | 64 | (total small/med year sites * 2 per site) + (total large sites * 4 per site) | ||
| Quantity Type | |||||||||
| 3017 | FFP | Central Monitoring Workstation (CMWS) | EA | 3.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 3018 | FFP | Cellular ACP - Fixed | EA | 3.0 | $0.00 | As needed ~10% of total ACP per year | |||
| Quantity Type | |||||||||
| 3019 | FFP | Cellular ACP - Deployable | EA | 3.0 | $0.00 | As needed ~10% of total ACP per year | |||
| Quantity Type | |||||||||
| 3020 | FFP | Cybersecurity | LO (6 months) | 2.0 | $0.00 | ||||
| A002 – Information Systems Accreditation Documentation | Priced below in CDRL section in rows 155 to 196 | ||||||||
| A003 – Vulnerability Scan Compliance Report | |||||||||
| A004 – Privacy Impact Assessment (PIA) | |||||||||
| Quantity Type | |||||||||
| 3021 | FFP | Site Registration System | EA | 3.0 | $0.00 | As needed | |||
| Quantity Type | |||||||||
| 3022 | FFP | Program Management | LO (year) | 1.0 | $0.00 | ||||
| A014 – Contractor’s Management Plan | Priced below in CDRL section in rows 155 to 196 | ||||||||
| A015 – Integrated Master Schedule (IMS) | NSP | ||||||||
| A016 – Bi-Weekly Schedule Report | |||||||||
| A018 – Meetings & Briefings | |||||||||
| A036 – Safety Assessment Report | Priced below in CDRL section in rows 155 to 196 | ||||||||
| A037 – Training Conduct Support Document Package | |||||||||
| A038 – Training Program Development and Management Plan | |||||||||
| Quantity Type | |||||||||
| 3023 | FFP | Systems Engineering | EA | 1.0 | $0.00 | ||||
| A001 – System Description and Architecture | Priced below in CDRL section in rows 155 to 196 | ||||||||
| A005 – Failure Modes and Effects Criticality Analysis (FMECA) Report | |||||||||
| A007 – Software Quality Assurance Plan | |||||||||
| A011 – Physical Configuration Audit (PCA) Plan | |||||||||
| A019 – Systems Engineering Management Plan (SEMP) | |||||||||
| A025 – Configuration Management Plan (CMP) | |||||||||
| A041 – Functional Configuration Audit (FCA) Plan | |||||||||
| A043 – Interface Requirements Specification | |||||||||
| A044 – Software Design Description | |||||||||
| A045 – Interface Design Description | |||||||||
| A046 – Database Design Description (DBDD) | |||||||||
| Quantity Type | |||||||||
| 3024 | FFP | System Verification Documentation | EA | 32.0 | $0.00 | total year sites + 5 | |||
| A020 – System Installation and Checkout Test Report | NSP | ||||||||
| A021 – Test Plan | |||||||||
| A023 – Test Inspection Report | |||||||||
| A012 – Physical Configuration Audit (PCA) Report | Priced below in CDRL section in rows 155 to 196 | ||||||||
| A022 – Test Procedures | |||||||||
| A024 – Failure Analysis and Corrective Action Report (FACAR) priced provided below | |||||||||
| A042 – Functional Configuration Audit (FCA) Report | |||||||||
| Quantity Type | |||||||||
| 3025 | FFP | Logistics Management | EA | 1.0 | $0.00 | ||||
| A026 – Sustainment Transition Plan | NSP | ||||||||
| A027 – Integrated Logistics Support Plan (ILSP) | |||||||||
| A028 – Level of Repair Analysis (LORA) | |||||||||
| A029 – Maintenance Support Plan | |||||||||
| A030 – Maintenance Service Report | Priced below in CDRL section in rows 155 to 196 | ||||||||
| A031 – Logistics Management Information Summaries | NSP | ||||||||
| A032 – Logistics Management Information Data Products | Priced below in CDRL section in rows 155 to 196 | ||||||||
| A033 – Item Unique Identification (IUID) Plan | NSP | ||||||||
| A034 – Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan | |||||||||
| Quantity Type | |||||||||
| 3026 | FFP | Migration of User Data (L) | EA | 5.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 3027 | FFP | Migration of User Data (M) | EA | 10.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 3028 | FFP | Migration of User Data (S) | EA | 12.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 3029 | FFP | Post-Government Site Acceptance User Support | EA | 27.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 3030 | FFP | Nlets Support License | EA | 17.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 3031 | FFP | Operator Training Course | EA | 17.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 3032 | FFP | Admin Training Course | EA | 17.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 3033 | FFP | Registrar Training Course | EA | 17.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 3034 | FFP | Maintainer Training Course | EA | 17.0 | $0.00 | 1 per associated site | |||
| Quantity Type | |||||||||
| 3035 | FFP | Depot Level Training Course | EA | 2.0 | $0.00 | *QTY of 2 per year starting in yr 2 | |||
| Quantity Type | |||||||||
| 3036 | FFP | Contractor Logistics Support (CLS cost is a percentage CLINS 0005-0017 and 0021) | LO (year) | 0.0% | $0.00 | 1 per associated site | |||
| A024 – Failure Analysis and Corrective Action Report (FACAR) | Priced below in CDRL section in rows 155 to 196 | ||||||||
| A035 – CLS Help Desk Ticket Report | |||||||||
| Quantity Type | |||||||||
| 3037 | FFP | Engineering Change Proposals | EA | $5,224,000.00 | |||||
| A006 – Engineering Change Proposal | Negotiated at Delivery Order Level | ||||||||
| Quantity Type | |||||||||
| 3038 | FFP | Changes | EA | Negotiated at Delivery Order Level | |||||
| Quantity Type | |||||||||
| 3039 | CR | Travel | EA | $1,593,750.00 | |||||
| Quantity Type | |||||||||
| 3040 | FFP | Sustainment Support - Small Site | EA | 81.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 3041 | FFP | Sustainment Support - Medium Site | EA | 42.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 3042 | FFP | Sustainment Support - Large Site | EA | 13.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 3043 | FFP | Sustainment Support - Xlarge Site | EA | 5.0 | $0.00 | ||||
| Quantity Type | |||||||||
| 3044 | FFP | Technology Research and Evaluation | EA | Negotiated at Delivery Order Level |
3045 FFP Software License Renewal EA Negotiated at Delivery Order Level
3046 FFP Return for Maintenance Authorization EA Negotiated at Delivery Order Level
3047 FFP Individually Pre-Priced CDRL(s) EA Negotiated at Delivery Order Level
| 0048 | FFP | Contractor Manpower Reporting | LO (year) | 1.0 | $0.00 | |||
| A017 – Contractor’s Progress, Status & Management Report | Priced below in CDRL section in rows 161 to 206 | |||||||
| TOTAL CLIN COST | $6,817,750.00 | Sum of Extended Prices for CLINS only | Sum of Extended Prices for CLINS only | |||||
| CDRL # | CDRL Description | Quantity Type | QTY (Estimated) | Lot Price | Extended Price | |||
| A001 | System Description and Architecture | Each | 1.0 | $0.00 | ||||
| A002 | Information Systems Accreditation Documentation | Each | 2.0 | $0.00 | ||||
| A003 | Vulnerability Scan Compliance Report | Each | 2.0 | $0.00 | ||||
| A004 | Privacy Impact Assessment (PIA) | Each | 2.0 | $0.00 | ||||
| A005 | Failure Modes and Effects Criticality Analysis (FMECA) Report | Each | 2.0 | $0.00 | ||||
| A006 | Engineering Change Proposals (ECP) | Negotiated at the Delivery Order level | ||||||
| A007 | Software Quality Assurance Plan | Each | 1.0 | $0.00 | ||||
| A008 | Site Survey Report (SSR) | Included in FFP CLINs 3001, 3002, 3003, and 3004 | ||||||
| A009 | Installation Engineering Plan (IEP) | Included in FFP CLINs 3001, 3002, 3003, and 3004 | ||||||
| A010 | Criminal Justice Information Services (CJIS) Security Plan | Each | 17.0 | $0.00 | ||||
| A011 | Physical Configuration Audit (PCA) Plan | Each | 1.0 | $0.00 | ||||
| A012 | Physical Configuration Audit (PCA) Report | Each | 27.0 | $0.00 | ||||
| A013 | Site Technical Data Package | Each | 27.0 | $0.00 | ||||
| A014 | Contractor’s Management Plan | Each | 1.0 | $0.00 |