Attachment 001 - Schedule of Items.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- PSICC Certified Water Operator Federal contract opportunity
- Solicitation number
- 1282B125R0004_1141278
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Schedule of Items for a federal contract opportunity to provide professional water system operation and maintenance services for eleven water systems owned by the USDA Forest Service, Pike and San Isabel National Forests, Cimarron and Comanche National Grasslands (PSICC). The contract includes a base year from January to December 2025, with four one-year option periods through December 2029. The contractor must have a minimum level "B" water treatment license and level "1" distribution license valid for the contract duration in Colorado. The contract covers operation and maintenance of both non-community and transient non-community public and administrative water systems, which must comply with Colorado drinking water regulations. The Schedule of Items lists the various water system locations and associated monthly operational costs for both the first and second halves of each month. It also includes optional items for filters, water quality testing, water hauling, and storage tank inspections.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 001 - Schedule of Items - Version 2.xlsx | XLSX spreadsheet | |
| Attachment 002 - Statement of Work - Version 3.pdf | ||
| Amendment 0002 - SF-30 - 1282B125R0004.pdf | ||
| Amendment 0001 - SF-30 - 1282B125R0004.pdf | ||
| Attachment 002 - Statement of Work - Version 2.pdf | ||
| Attachment 008 - WD 2015-5427.pdf | ||
| Attachment 009 - WD 2015-5433.pdf | ||
| Attachment 006 - WD 2015-5417.pdf | ||
| Attachment 010 - WD 2015-5439.pdf | ||
| Solicitation 1282B125R0004 1141278.pdf | ||
| Attachment 003 - Monthly Status Report Template.xlsx | XLSX spreadsheet | |
| Attachment 004 - Monitoring Schedule Template.xlsx | XLSX spreadsheet | |
| Attachment 005 - Emergency Control Fire Plan.pdf | ||
| Attachment 007 - WD 2015-5419.pdf | ||
| Attachment 002 - Statement of Work.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base
| Item 0001 - Base Year - Mandatory Items | ||||||
| Item No. | Description | Method of Measurement | Unit | Qty | Unit Price | Total |
| 0001A | Monument Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001B | Monument Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001C | Lake George Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001D | Lake George Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001E | Eleven Mile Canyon Dwelling | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001F | Eleven Mile Canyon Dwelling | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001G | Lake Isabel Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001H | Lake Isabel Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001I | Carrizo Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001J | Carrizo Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001K | AG Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001L | AG Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001M | Crystal Lakes Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 0001N | Crystal Lakes Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001O | Brown House Cystal Lakes | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001P | Brown House Cystal Lakes | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001Q | Indian Creek Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 0001R | Indian Creek Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 7 | $0.00 | |
| 0001S | Bassam Guard Station | ONE MONTH of water system operation at the Bassam Guard Station | Each | 7 | $0.00 | |
| 0001T | Rourke Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 8 | $0.00 | |
| 0001U | Rourke Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 8 | $0.00 | |
| Base Year - Optional Items | ||||||
| Optional Items - Filters | Unit | Qty | Unit Price | Total | ||
| 0002 | Pre Filter | STC3-30NN | Each | 1 | $0.00 | |
| 0003 | Final Filter | Cartridge Filter (1.0 micron) | Each | 1 | $0.00 | |
| 0004 | KDF | Each | 1 | $0.00 | ||
| 0005 | Green Sands | Each | 1 | $0.00 | ||
| 0006 | Carbon | Each | 1 | $0.00 | ||
| 0007 | QCR | Each | 1 | $0.00 | ||
| Optional Items - Water Quality Testing | ||||||
| 0008 | Total Coliform | SM 9223 | Each | 1 | $0.00 | |
| 0009 | Nitrate | EPA 300.0 | Each | 1 | $0.00 | |
| 0010 | Nitrite | EPA 300.0 | Each | 1 | $0.00 | |
| 0011 | Lead and Copper | EPA 200.8 | Each | 1 | $0.00 | |
| 0012 | Langelier Index | SM 2330-B | Each | 1 | $0.00 | |
| 0013 | MPA | Microparticulate Analysis | Each | 1 | $0.00 | |
| 0014 | PFAS | PFOA, PFOS, PFHxS, PFNA, PFBS, GenX | Each | 1 | $0.00 | |
| Optional Items - Water Hauling | ||||||
| 0015 | Troubleshooting Mobilization | Miles | 1 | $0.00 | ||
| 0016 | Troubleshooting Labor | Hours | 1 | $0.00 | ||
| 0017 | Supplying Potable Water | 3000 gallons | Each | 1 | $0.00 | |
| Optional Items - Storage Tank Inspections | ||||||
| 00018 | Storage Tank Inspection | Each | 1 | $0.00 |
Total: $0.00
OY1
| Item 1000 - Option Year 1 - Mandatory Items | ||||||
| Item No. | Description | Method of Measurement | Unit | Qty | Unit Price | Total |
| 1000A | Monument Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000B | Monument Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000C | Lake George Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000D | Lake George Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000E | Eleven Mile Canyon Dwelling | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000F | Eleven Mile Canyon Dwelling | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000G | Lake Isabel Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000H | Lake Isabel Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000I | Carrizo Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000J | Carrizo Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000K | AG Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000L | AG Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000M | Crystal Lakes Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 1000N | Crystal Lakes Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000O | Brown House Cystal Lakes | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000P | Brown House Cystal Lakes | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000Q | Indian Creek Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 1000R | Indian Creek Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 7 | $0.00 | |
| 1000S | Bassam Guard Station | ONE MONTH of water system operation at the Bassam Guard Station | Each | 7 | $0.00 | |
| 1000T | Rourke Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 8 | $0.00 | |
| 1000U | Rourke Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 8 | $0.00 | |
| Option Year 1 - Optional Items | ||||||
| Optional Items - Filters | Unit | Qty | Unit Price | Total | ||
| 1001 | Pre Filter | STC3-30NN | Each | 1 | $0.00 | |
| 1002 | Final Filter | Cartridge Filter (1.0 micron) | Each | 1 | $0.00 | |
| 1003 | KDF | Each | 1 | $0.00 | ||
| 1004 | Green Sands | Each | 1 | $0.00 | ||
| 1005 | Carbon | Each | 1 | $0.00 | ||
| 1006 | QCR | Each | 1 | $0.00 | ||
| Optional Items - Water Quality Testing | ||||||
| 1007 | Total Coliform | SM 9223 | Each | 1 | $0.00 | |
| 1008 | Nitrate | EPA 300.0 | Each | 1 | $0.00 | |
| 1009 | Nitrite | EPA 300.0 | Each | 1 | $0.00 | |
| 1010 | Lead and Copper | EPA 200.8 | Each | 1 | $0.00 | |
| 1011 | Langelier Index | SM 2330-B | Each | 1 | $0.00 | |
| 1012 | MPA | Microparticulate Analysis | Each | 1 | $0.00 | |
| 1013 | PFAS | PFOA, PFOS, PFHxS, PFNA, PFBS, GenX | Each | 1 | $0.00 | |
| Optional Items - Water Hauling | ||||||
| 1014 | Troubleshooting Mobilization | Miles | 1 | $0.00 | ||
| 1015 | Troubleshooting Labor | Hours | 1 | $0.00 | ||
| 1016 | Supplying Potable Water | 3000 gallons | Each | 1 | $0.00 | |
| Optional Items - Storage Tank Inspections | ||||||
| 1017 | Storage Tank Inspection | Each | 1 | $0.00 |
Total: $0.00
OY2
| Item 2000 - Option Year 2 - Mandatory Items | ||||||
| Item No. | Description | Method of Measurement | Unit | Qty | Unit Price | Total |
| 2000A | Monument Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000B | Monument Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000C | Lake George Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000D | Lake George Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000E | Eleven Mile Canyon Dwelling | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000F | Eleven Mile Canyon Dwelling | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000G | Lake Isabel Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000H | Lake Isabel Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000I | Carrizo Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000J | Carrizo Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000K | AG Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000L | AG Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000M | Crystal Lakes Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 2000N | Crystal Lakes Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000O | Brown House Cystal Lakes | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000P | Brown House Cystal Lakes | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000Q | Indian Creek Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 2000R | Indian Creek Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 7 | $0.00 | |
| 2000S | Bassam Guard Station | ONE MONTH of water system operation at the Bassam Guard Station | Each | 7 | $0.00 | |
| 2000T | Rourke Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 8 | $0.00 | |
| 2000U | Rourke Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 8 | $0.00 | |
| Option Year 2 - Optional Items | ||||||
| Optional Items - Filters | Unit | Qty | Unit Price | Total | ||
| 2001 | Pre Filter | STC3-30NN | Each | 1 | $0.00 | |
| 2002 | Final Filter | Cartridge Filter (1.0 micron) | Each | 1 | $0.00 | |
| 2003 | KDF | Each | 1 | $0.00 | ||
| 2004 | Green Sands | Each | 1 | $0.00 | ||
| 2005 | Carbon | Each | 1 | $0.00 | ||
| 2006 | QCR | Each | 1 | $0.00 | ||
| Optional Items - Water Quality Testing | ||||||
| 2007 | Total Coliform | SM 9223 | Each | 1 | $0.00 | |
| 2008 | Nitrate | EPA 300.0 | Each | 1 | $0.00 | |
| 2009 | Nitrite | EPA 300.0 | Each | 1 | $0.00 | |
| 2010 | Lead and Copper | EPA 200.8 | Each | 1 | $0.00 | |
| 2011 | Langelier Index | SM 2330-B | Each | 1 | $0.00 | |
| 2012 | MPA | Microparticulate Analysis | Each | 1 | $0.00 | |
| 2013 | PFAS | PFOA, PFOS, PFHxS, PFNA, PFBS, GenX | Each | 1 | $0.00 | |
| Optional Items - Water Hauling | ||||||
| 2014 | Troubleshooting Mobilization | Miles | 1 | $0.00 | ||
| 2015 | Troubleshooting Labor | Hours | 1 | $0.00 | ||
| 2016 | Supplying Potable Water | 3000 gallons | Each | 1 | $0.00 | |
| Optional Items - Storage Tank Inspections | ||||||
| 2017 | Storage Tank Inspection | Each | 1 | $0.00 |
Total: $0.00
OY3
| Item 3000 - Option Year 3 - Mandatory Items | ||||||
| Item No. | Description | Method of Measurement | Unit | Qty | Unit Price | Total |
| 3000A | Monument Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000B | Monument Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000C | Lake George Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000D | Lake George Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000E | Eleven Mile Canyon Dwelling | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000F | Eleven Mile Canyon Dwelling | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000G | Lake Isabel Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000H | Lake Isabel Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000I | Carrizo Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000J | Carrizo Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000K | AG Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000L | AG Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000M | Crystal Lakes Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 3000N | Crystal Lakes Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000O | Brown House Cystal Lakes | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000P | Brown House Cystal Lakes | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000Q | Indian Creek Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 3000R | Indian Creek Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 7 | $0.00 | |
| 3000S | Bassam Guard Station | ONE MONTH of water system operation at the Bassam Guard Station | Each | 7 | $0.00 | |
| 3000T | Rourke Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 8 | $0.00 | |
| 3000U | Rourke Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 8 | $0.00 | |
| Option Year 3 - Optional Items | ||||||
| Optional Items - Filters | Unit | Qty | Unit Price | Total | ||
| 3001 | Pre Filter | STC3-30NN | Each | 1 | $0.00 | |
| 3002 | Final Filter | Cartridge Filter (1.0 micron) | Each | 1 | $0.00 | |
| 3003 | KDF | Each | 1 | $0.00 | ||
| 3004 | Green Sands | Each | 1 | $0.00 | ||
| 3005 | Carbon | Each | 1 | $0.00 | ||
| 3006 | QCR | Each | 1 | $0.00 | ||
| Optional Items - Water Quality Testing | ||||||
| 3007 | Total Coliform | SM 9223 | Each | 1 | $0.00 | |
| 3008 | Nitrate | EPA 300.0 | Each | 1 | $0.00 | |
| 3009 | Nitrite | EPA 300.0 | Each | 1 | $0.00 | |
| 3010 | Lead and Copper | EPA 200.8 | Each | 1 | $0.00 | |
| 3011 | Langelier Index | SM 2330-B | Each | 1 | $0.00 | |
| 3012 | MPA | Microparticulate Analysis | Each | 1 | $0.00 | |
| 3013 | PFAS | PFOA, PFOS, PFHxS, PFNA, PFBS, GenX | Each | 1 | $0.00 | |
| Optional Items - Water Hauling | ||||||
| 3014 | Troubleshooting Mobilization | Miles | 1 | $0.00 | ||
| 3015 | Troubleshooting Labor | Hours | 1 | $0.00 | ||
| 3016 | Supplying Potable Water | 3000 gallons | Each | 1 | $0.00 | |
| Optional Items - Storage Tank Inspections | ||||||
| 3017 | Storage Tank Inspection | Each | 1 | $0.00 |
Total: $0.00
OY4
| Item 4000 - Option Year 4 - Mandatory Items | ||||||
| Item No. | Description | Method of Measurement | Unit | Qty | Unit Price | Total |
| 4000A | Monument Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000B | Monument Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000C | Lake George Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000D | Lake George Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000E | Eleven Mile Canyon Dwelling | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000F | Eleven Mile Canyon Dwelling | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000G | Lake Isabel Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000H | Lake Isabel Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000I | Carrizo Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000J | Carrizo Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000K | AG Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000L | AG Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000M | Crystal Lakes Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 4000N | Crystal Lakes Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000O | Brown House Cystal Lakes | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000P | Brown House Cystal Lakes | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000Q | Indian Creek Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 4000R | Indian Creek Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 7 | $0.00 | |
| 4000S | Bassam Guard Station | ONE MONTH of water system operation at the Bassam Guard Station | Each | 7 | $0.00 | |
| 4000T | Rourke Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 8 | $0.00 | |
| 4000U | Rourke Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 8 | $0.00 | |
| Optional Items | ||||||
| Optional Items - Filters | Unit | Qty | Unit Price | Total | ||
| 4001 | Pre Filter | STC3-30NN | Each | 1 | $0.00 | |
| 4002 | Final Filter | Cartridge Filter (1.0 micron) | Each | 1 | $0.00 | |
| 4003 | KDF | Each | 1 | $0.00 | ||
| 4004 | Green Sands | Each | 1 | $0.00 | ||
| 4005 | Carbon | Each | 1 | $0.00 | ||
| 4006 | QCR | Each | 1 | $0.00 | ||
| Optional Items - Water Quality Testing | ||||||
| 4007 | Total Coliform | SM 9223 | Each | 1 | $0.00 | |
| 4008 | Nitrate | EPA 300.0 | Each | 1 | $0.00 | |
| 4009 | Nitrite | EPA 300.0 | Each | 1 | $0.00 | |
| 4010 | Lead and Copper | EPA 200.8 | Each | 1 | $0.00 | |
| 4011 | Langelier Index | SM 2330-B | Each | 1 | $0.00 | |
| 4012 | MPA | Microparticulate Analysis | Each | 1 | $0.00 | |
| 4013 | PFAS | PFOA, PFOS, PFHxS, PFNA, PFBS, GenX | Each | 1 | $0.00 | |
| Optional Items - Water Hauling | ||||||
| 4014 | Troubleshooting Mobilization | Miles | 1 | $0.00 | ||
| 4015 | Troubleshooting Labor | Hours | 1 | $0.00 | ||
| 4016 | Supplying Potable Water | 3000 gallons | Each | 1 | $0.00 | |
| Optional Items - Storage Tank Inspections | ||||||
| 4017 | Storage Tank Inspection | Each | 1 | $0.00 |
Total: $0.00
Total Bid Price
| Base Price | $0.00 |
| OY1 Price | $0.00 |
| OY2 Price | $0.00 |
| OY3 Price | $0.00 |
| OY4 Price | $0.00 |
| Total Bid Price: | $0.00 |
File details come from the government source that posted it. Updated .