Amendment 0001 - SF-30 - 1282B125R0004.pdf
PDF 817 KB Posted
- Attached to
- PSICC Certified Water Operator Federal contract opportunity
- Solicitation number
- 1282B125R0004_1141278
- Issued by
- Department of Agriculture Forest Service
About this file
This document is Amendment 0001 to Solicitation 1282B125R0004 for PSICC Certified Water Operator services. The purpose of this amendment is to provide answers to questions and an updated Statement of Work (SOW). The SOW details the requirement for the contractor to serve as the Operator in Responsible Charge (ORC) for eleven water systems owned by the USDA Forest Service's Pike and San Isabel National Forests, Cimarron and Comanche National Grasslands. The contractor must have a minimum of a "B" water treatment license and "1" distribution license valid in Colorado. The contract consists of a one-year base period from January-December 2025 with four one-year option periods. The amendment clarifies that Forest Service personnel do not currently analyze the chlorine residual at the water system entry points during weeks the ORC is not onsite, and that the ORC must visit each system at least every 15 calendar days, with weekly chlorine residual measurements for chlorinated systems.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 001 - Schedule of Items - Version 2.xlsx | XLSX spreadsheet | |
| Attachment 002 - Statement of Work - Version 3.pdf | ||
| Amendment 0002 - SF-30 - 1282B125R0004.pdf | ||
| Attachment 002 - Statement of Work - Version 2.pdf | ||
| Attachment 006 - WD 2015-5417.pdf | ||
| Attachment 010 - WD 2015-5439.pdf | ||
| Solicitation 1282B125R0004 1141278.pdf | ||
| Attachment 003 - Monthly Status Report Template.xlsx | XLSX spreadsheet | |
| Attachment 004 - Monitoring Schedule Template.xlsx | XLSX spreadsheet | |
| Attachment 005 - Emergency Control Fire Plan.pdf | ||
| Attachment 007 - WD 2015-5419.pdf | ||
| Attachment 001 - Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment 002 - Statement of Work.pdf | ||
| Attachment 008 - WD 2015-5427.pdf | ||
| Attachment 009 - WD 2015-5433.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1282B125R0004 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
82B1
WASHINGTON DC 20250-0001
1400 INDEPENDENCE AVE SW MS-1138
SPOC INTERMOUNTAIN
USDA FOREST SERVICE
11/20/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
10/30/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
- Provide answers to questions (see page 2).
- Provide an updated statement of work via Attachment 002 - Statement of Work - Version 2.
This version replaces the original statement of work.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JEFFREY R. BLACK
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Please provide a signed copy of this amendment at the time of proposal. Acknowledgment of this amendment is required in order for the contractor to be considered responsible.
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
SF-30 CONTINUATION PAGE
Question 1: The SOW states twice per month facility inspections unless otherwise noted. The public water systems that have a PWSID # are required, at a minimum, once per week chlorine residual analysis at the entry point. Are Forrest Service personnel currently analyzing the entry point free chlorine residual during the weeks the ORC is not onsite?
Answer 1: No, Forest Service personnel are not currently analyzing the entry point free chlorine residual during the weeks the ORC is not onsite. At a minimum the ORC should visit each system (chlorinated and unchlorinated) once every 15 calendar days. Additionally, for chlorinated systems, the chlorine residual must be measured by the ORC weekly per 5 CCR 1002-11.
| 2024-11-20T08:55:37-0600 | |
| JEFFREY BLACK |